CD-2 Required Documents |
|
|
|
Performance
Baseline Cost/Schedule Material |
|
|
WBS 1.1 P3 schedule |
WBS 1.1 Basis of Estimate |
|
|
WBS 1.2 XPP P3 schedule |
WBS 1.2 XPP Basis of Estimate |
|
|
WBS 1.3 CXI P3 schedule |
WBS 1.3 CXI Basis of Estimate |
|
|
WBS 1.4 XCS P3 schedule |
WBS 1.4 XCS Basis of
Estimate |
|
|
WBS 1.5 DCO P3 schedule |
WBS 1.5 DCO Basis of Estimate |
|
|
WBS 1.6 Controls P3 schedule |
WBS 1.6 Basis of Estimate |
|
|
BNL P3 schedule |
|
|
|
Milestones |
|
|
|
|
|
|
Requirements
Documents, Specification Documents, Test Plans |
|
|
|
|
|
Preliminary Design
Reviews |
|
|
WBS 1.2 XPP |
|
|
|
WBS 1.3 CXI |
|
|
|
WBS 1.4 XCS |
|
|
|
|
|
|
WBS Structure/Dictionary/RAM |
|
|
WBS Structure |
|
|
|
WBS Dictionary |
|
|
|
Responsibility Assignment Matrix (RAM) |
|
|
|
|
|
|
Project Execution Plan |
|
|
|
|
|
Revised Hazards
Analysis/QIP |
|
|
Hazards Analysis |
|
|
|
Quality
Implementation Plan |
|
|
|
|
|
|
Revised Risk
Management Plan |
|
|
|
|
|
Risk Registry |
|
|
|
|
|
PMCS/EVMS |
|
|
Earned Value Management System Description |
|
|
|
Earned Value Management System Control Account and Work Package Planning
Procedure |
|
|
|
Earned Value Management System Change Control Procedure |
|
|
|
Earned Value Management System Project Schedule Procedure |
|
|
|
Earned Value Management System Cost Estimating Procedure |
|
|
|
Earned Value Management System
Monthly Status and Reporting Procedure |
|
|
|
Earned Value Management System Subcontractor Management Procedure |
|
|
|
|
|
|
Value Management/VE
Report |
|
|
Value
Management Plan |
|
|
|
|
|
|
Back-Up Documents |
|
|
Conceptual Design Report |
|
|
|
EIR Matrix with Definitions |
|