Accelerator Operations and Engineering
Accelerator Operations
Accelerator recovery is ongoing. Linac and Booster BAS activated. Permitted access to SPEAR tunnel ends Thursday 9/18.
Beam Lines and Development
Beam Line Systems Report
SPEAR and beam line checkouts are being conducted in preparation for SPEAR startup.