The SSRL Weekly Report - October 10, 2025

Published Date
Accelerator Operations and Engineering

Accelerator Operations

Accelerator startup as scheduled. 500 mA stored beam in SPEAR has been established. On track to beamline startup next week. 

Beam Lines and Development

Beam Line Operations Report 

Beam Line Authorizations (BLAs) and helium validations in process.

Beam lines open Monday (10/13) for startup commissioning.

Duty Operator 24/7 coverage resumes Friday (10/10).

Beam Line Systems Report

The BL4-1 monochromator was reinstalled after refurbishment and is ready for beam.

The BL7-3 hutch expansion project is complete.