Accelerator Operations and Engineering
Accelerator Operations
Accelerator startup as scheduled. 500 mA stored beam in SPEAR has been established. On track to beamline startup next week.
Beam Lines and Development
Beam Line Operations Report
Beam Line Authorizations (BLAs) and helium validations in process.
Beam lines open Monday (10/13) for startup commissioning.
Duty Operator 24/7 coverage resumes Friday (10/10).
Beam Line Systems Report
The BL4-1 monochromator was reinstalled after refurbishment and is ready for beam.
The BL7-3 hutch expansion project is complete.