Published Date
Accelerator Operations and Engineering
Accelerator Operations
PAMM on Monday, followed by AP through Wednesday morning. User beam as scheduled since Wednesday. During PAMM cooling circuit for BL17 ID was reconfigured which improved cooling effectiveness and mitigated issues with elevated temperature since the beginning of this run.
Beam Lines and Development
Beam Line Systems Report
The BL8-1 removal project is done with phase 2. Phase 3, the removal of the optics girder, is being planned.
Planning and space creation is underway for the long term storage of equipment currently on the experimental floor
Calendar
SLAC Safety Fair - November 13, 2025 (Onsite)
SSRL Holiday Breakfast – December 9, 2025 (Bldg. 120 near BL 9)
SSRL SAC Meetings – March 2-3, 2026 & September 14-15, 2026