Accelerator Operations and Engineering

Accelerator Operations

PAMM on Monday, followed by AP through Wednesday morning. User beam as scheduled since Wednesday. During PAMM cooling circuit for BL17 ID was reconfigured which improved cooling effectiveness and mitigated issues with elevated temperature since the beginning of this run. 

Beam Lines and Development

Beam Line Systems Report

The BL8-1 removal project is done with phase 2.  Phase 3, the removal of the optics girder, is being planned.

Planning and space creation is underway for the long term storage of equipment currently on the experimental floor