Accelerator Operations and Engineering
User run as scheduled. PAMM on Monday (7/14), followed by AP until Wednesday morning. The corrector magnet with LCW leak was repaired during PAMM and put back to operation.
Operations Report
Last week, SPEAR was up 99.0%. The FY25 run uptime is 96.8% to date. The MTBF to date is 74.2 hours. The injector uptime to date is 99.2%.