Published Date
Accelerator Operations and Engineering
Accelerator Operations
User beam delivery as scheduled. Vibration due to LSCC construction is felt by the electron beam. Repaired LCW leak on a sextupole magnet, rain gutter inside SPEAR, and BL-17 ID bellow fan during PAMM on Monday.
Operations Report
Last week, SPEAR was up 99.7%. The FY25 run uptime is 99.2% to date. The MTBF to date is 93.6. hours. The injector uptime to date is 98.8%.
Calendar
SSRL SAC Meeting – March 2-3, 2025 & September 14-15, 2026
Previously Reported
Reminder - Goals for FY 2026