The SSRL Weekly Report - December 12, 2025

Published Date
Accelerator Operations and Engineering

Accelerator Operations

User beam delivery as scheduled.  Vibration due to LSCC construction is felt by the electron beam. Repaired LCW leak on a sextupole magnet, rain gutter inside SPEAR, and BL-17 ID bellow fan during PAMM on Monday.

Operations Report

Last week, SPEAR was up 99.7%.  The FY25 run uptime is 99.2% to date.  The MTBF to date is 93.6. hours.  The injector uptime to date is 98.8%. 

Calendar

SSRL SAC Meeting – March 2-3, 2025 & September 14-15, 2026

Previously Reported

Reminder - Goals for FY 2026

This is a reminder to everyone to enter your goals for FY26 before the winter shutdown. https://intranet.slac.stanford.edu/news/2025-11-20-goal-setting-fy26?utm_source=SLAC+Manag[…]OPY_01&utm_medium=email&utm_term=0_-af79515f29-41823265