1. Summary
The Stanford Synchrotron Radiation Lightsource (SSRL) at SLAC National Accelerator Laboratory is a U.S. Department of Energy (DOE) Office of Science national user facility that provides synchrotron radiation to researchers in many fields of science and technology, including biology, catalysis, chemistry, energy, engineering, forensics, geoscience, materials science, medicine, molecular environmental science, and physics. SSRL is primarily supported by the DOE Basic Energy Sciences (BES) Program, with additional support for the SSRL Structural Molecular Biology Program from the DOE Biological and Environmental Research (BER) Program and the National Institutes of Health (NIH).
SLAC is operated by Stanford University, a nonprofit U.S. institution of higher education that conducts fundamental research in basic and applied science and engineering, which is widely and openly published and made available to the scientific and academic community. Stanford University's Openness in Research policy defines limitations on classified work and/or research requiring national security controls.
SSRL’s User Facility Access Policy as described herein provides a concise overview of the framework for scientists from academia, industry and other types of research organizations to access SSRL to utilize existing scientific equipment or to work together with SSRL in pursuit of new scientific opportunities.
Access to SSRL is granted through proposals that are peer-reviewed and rated by the SSRL Proposal Review Panel (PRP). The scientific peer review process is intended to be efficient, fair, and transparent, and it recognizes the needs and contributions of users and staff to maintain and strengthen SSRL’s position as an internationally leading photon science user facility. Modes of accessing beam time at SSRL include General User (GU) and Partner User (PU) proposals. In addition, proposals can be submitted for non-proprietary or proprietary research.
Policies that impact the user community are developed in consultation and coordination with external advisory groups, principally the SSRL Users’ Executive Committee (UEC), and are subject to review by the SSRL Scientific Advisory Committee (SAC).
2. User Access
2.1 General User Access
General Users (GU) apply for and are awarded beam time through a centralized, online, peer-reviewed proposal submission and beam time request process that is managed by SSRL. GU mechanisms include standard proposals, rapid access proposals, and block allocation group (BAG) proposals. A small percentage of beam time is available for SSRL staff access and through the Director’s discretionary Letter of Intent (LOI) access (see below).
When submitting new proposals, which may include multiple techniques at several beam lines, prospective GUs indicate the total number of shifts desired for each beam line. For each proposal, the PRP provides a numeric rating as well as a recommended beam time allocation for the lifetime of the proposal.
Users submit separate beam time requests for each beam line, technique or time period desired. Beam time can be spread out over several scheduling periods during the lifetime of the proposals.
Successful proposals are awarded beam time on SSRL beam lines, with priority given to the proposals rated highest by the PRP and, for continuations, includes consideration of those demonstrating efficient and productive use of beam time.
2.1.1 Standard GU Proposals
Calls for standard GU proposals are distributed three times a year, with deadlines announced through the SSRL website, electronic newsletter and by email to the user community. Prospective GUs submit proposals that include an estimated total number of shifts that can be spread out over six scheduling periods, or up to two years. Successful proposals are awarded beam time on SSRL beam lines, with priority given to the proposals rated highest by the PRP.
2.1.2 Rapid Access GU Proposals
SSRL has a mechanism for quick turnaround assignment of GU beam time for urgent needs that arise between the standard proposal review cycles. A small amount of beam time may be set aside for rapid access on several beam lines (usually one or two days during the scheduling period). Rapid access proposals can only be submitted for simple, straightforward experiments (not involving complicated equipment set-up or potential hazards which would require significantly more time than the rapid access mechanism allows). Rapid access proposals are submitted through the user portal. These are considered on a continuing basis and are not subject to evaluation cycle deadlines. Rapid access proposals are peer reviewed by the PRP and concurrently by the relevant beam line scientist who evaluates the technical feasibility. If the proposal is highly rated by the PRP and determined feasible, it competes for the next available rapid access slot on the desired beam line.
2.1.3 Block Allocation Group (BAG) Proposals
Block Allocation Groups (BAGs) proposals are a mode of beam time access intended for groups of researchers that want to combine their short beam time requests into a single proposal in order to permit greater flexibility in beam time allocation and scheduling. BAG proposals may be submitted by groups working at the same university or with a shared affiliation. Combining the beam time of individual groups permits greater flexibility in the choice of projects and samples during a given allocation period and offers the individuals in the BAGs the benefit of access to more regular allocation of beam time. BAG proposals are at present open for Macromolecular Crystallography only.
2.1.4 Staff Access
SSRL scientists are encouraged to submit standard, peer-reviewed proposals to compete for GU beam time. A small percentage of beam time is available to support research programs of SSRL staff scientists and facilitate their interaction and collaboration with external users. Staff access time is limited to an annual maximum of 60 8-hour shifts per individual staff scientist and 20% of the available time on a GU beam line. In addition, instrumentation/methodology development projects can be allocated facility characterization beam time for developing or testing equipment, software, etc.
2.1.5 Director's Discretionary Access
A limited amount of beam time may be designated at the discretion of the SSRL Director, typically for short experiments deemed desirable for the development of SSRL scientific and/or industrial programs. Director’s discretionary beam time can be used to test the feasibility of an exploratory experiment, for novel ideas that have been conceived outside of the normal proposal review cycle, or for students who need a small amount of beam time to complete their thesis. Proposals are submitted through the user portal using the Letter of Intent (LOI) mechanism. LOI proposals can only be submitted for straightforward experiments (not involving potential hazards which would require significantly more time for review than the LOI mechanism allows). LOI proposals can be considered on a continuing basis and are not subject to evaluation cycle deadlines. LOI proposals are reviewed by the SSRL Director, SSRL Safety Officer, and other individuals as appropriate. If approved and determined feasible, LOI proposals compete for beam time on the desired beam line(s). Access for LOI proposals does not exceed 15% of the total available beam time.
2.1.6 Peer Review
The PRP includes peer-review groups composed of scientific peers, external to the SLAC/SSRL staff, and organized by techniques or scientific disciplines that cover a broad range of basic and applied science as well as method and instrumentation development. Peer review criteria used in evaluating and rating proposals includes:
- Scientific merit of planned experiments, including technical and/or industrial importance;
- Value of using synchrotron radiation to accomplish the proposed work;
- Appropriateness of the amount of requested beam time.
These criteria are designed to recognize the value of basic, applied and industrial research, while impartially evaluating the likely success of the experiment. Reviews must be balanced, however, so as not to discriminate against new users or user communities.
For each proposal, the PRP provides a numeric rating as well as a maximum allocation of beam time for which the proposal can be considered.
2.1.6.1 Proposal Lifetime
GU proposals can be eligible for up to six scheduling cycles (up to two years), or shorter eligibility periods as deemed appropriate by the PRP. The PRP reviews the number of shifts requested by the proposal team and recommends the number of beam time shifts to be allocated for each beam line during the lifetime of the proposal.
2.1.6.2 Proposal Extension Requests
GU proposals are eligible to request a one-time proposal extension from the PRP, who evaluates progress accomplished to date; new elements; future plans to be pursued under the existing proposal; an updated list of collaborators; a summary of how previous beam time at SSRL and other facilities was used; and a list of publications related to work conducted at SSRL on the proposal. Based on the extension material, the PRP may extend the proposal for an additional year (not to exceed a total of two additional years), change the rating, change the beam time allocation, or terminate the proposal.
2.1.7 Beam Time Allocation
Primary criteria for allocating beam time include the numeric rating and recommended number of shifts provided by the PRP. The PRP considers beam time utilization and progress in their deliberations. In addition to the material provided by the proposal team in the initial proposal, periodic progress reports may be requested to justify use of beam time, particularly on oversubscribed beam lines. The PRP may modify their initial rating and shift allocation based on subsequent reviews.
After proposals have been peer reviewed and rated, GUs submit beam time requests (BTRs) for each scheduling cycle in which beam time is desired. GUs submit separate beam time requests for each beam line, technique or time period desired. A typical run year is about nine months organized in three scheduling cycles. The BTR provides users with the ability to communicate details about the amount of beam time desired on a specific beam line, equipment and configuration, potential safety hazards, and preferred or unavailable dates. Shifts assigned to date for active proposals are tracked through the user portal.
GU proposals and beam time requests are reviewed by an SSRL Safety Officer to evaluate potential safety hazards and, where deemed needed, to coordinate mitigations required for the proposed experiment to be carried out safely and in compliance with all relevant SSRL and SLAC requirements. Beam line scientists and technical support staff also conduct feasibility reviews of proposed experiments and beam time requests, and they provide input on the appropriateness of scheduling experiments on various beam lines as well as the number of shifts needed for various techniques. PRP ratings, recommended amount of beam time, staff input and availability of resources are used to determine beam time schedules, which are centrally coordinated by User Research Administration staff.
Beam time allocations are communicated and coordinated to proposal teams through the user portal. Schedules are also posted on the SSRL website.
2.2 Partner User Access
Partner user (PU) arrangements may include Collaborative Access Proposals (CAPs) or Participating Research Teams (PRTs). PUs typically involve a greater degree of collaboration with SSRL than is expected of GUs and may drive new developments that ultimately will be managed and operated by SSRL. PU arrangements must have a positive impact on the GU program. Individual users or user groups who are interested in a PU arrangement need to contact SSRL management to initiate the process.
PU arrangements are negotiated on a case-by-case basis but generally do not exceed 50% of the available user shifts on a particular beam line. Although PUs may provide funding or support for development on SSRL beam lines, SSRL manages the operations and improvements of all beam lines in order to maintain facility-wide standards and to ensure consistency in areas such as user interfaces, instrumentation, robotics, IT systems and user support. This consistency ensures that GUs can easily make effective use of the beam lines that involve PUs without retraining. Scheduling of PU beam time, coordination of safety review, and support for beam line checkouts/changeovers that require SSRL equipment is centrally managed by SSRL staff.
PU proposal review criteria are similar to the GU criteria and include:
- Scientific or technical merit, innovation and/or industrial importance;
- Experimental plan and technical feasibility;
- Capability of the experimental group and quality of past performance based on track record (publications, patents, industry impact);
- Appropriateness of the amount of requested beam time;
- Impact on the GU program.
PU arrangements are documented in a PU Agreement that includes specific terms as well as understandings, such as those related to contributions of the parties, relationships and responsibilities in developing and/or supporting beam line operations, deliverables, milestones, review and renewal mechanisms.
2.2.1 Collaborative Access Proposals
Upon determination of mutual interest by a user/user group and SSRL to engage in a collaboration to enhance or develop a new capability or beam line, to engage in outreach activities to build up a new research area, technique or user community, or to support a science activity, users may submit an SSRL Collaborative Access Proposal (CAP). CAPs may vary in scope, with more comprehensive collaborative arrangements requiring resources to support GU users. Depending on the scope of the CAP, access to a fraction of beam time may be negotiated.
CAPs are reviewed by SSRL management. Depending on the scope of the proposal, the CAP review group evaluates the proposal and makes a recommendation for immediate approval, further review, or rejection. Additional reviews may include feasibility input from staff or peer review of proposals by external experts with appropriate scientific/technical skills and review by the SSRL SAC. The final decision is made by the SSRL Director.
The term of approved CAPs is typically for two or more years, with a formal process for renewal detailed in the PU Agreement (usually every year or two). Based on their review, the CAP review group may recommend renewal without modification, change some of the conditions, revise the beam time allocation or terminate the CAP. The final renewal decision is made by the SSRL Director.
2.2.2 Participating Research Team Access
The Participating Research Team (PRT) approach is used, under limited situations, for large-scope, long-term arrangements that meet institutional needs and that involve significant investment, such as a new beam line facility, with long-term commitment by the institutions involved to support GU operations.
PRTs are reviewed by SSRL management and the SAC. Additional reviews may include feasibility input from staff, peer review of proposals by external experts with appropriate scientific/technical skills, review of Conceptual Design Report (CDR), management and safety plan reviews by facility-appointed committees, and documentation of funding commitments. PRT arrangements must have a positive impact on the GU program, and this is considered during the evaluation and approval process. The ultimate decision of the terms and conditions for the PRT is made by the SSRL Director within the framework of, and consistent with existing policies.
PRT agreements are negotiated and executed to document understandings as well as specific terms for approved PRT arrangements, including the relationships, contributions of the parties, deliverables, milestones, review and renewal mechanisms. At regular intervals specified in the agreement (approximately every three years) each PRT is reviewed by the SSRL SAC, augmented by outside scientists drawn from the community as appropriate. Based on their review, the SAC may recommend renewal, revise the terms, or terminate the PRT. The final PRT renewal decision is made by the SSRL Director.
3. User Agreements
All GU and PU experiments must be run under the terms of a user agreement executed by an officer at the user’s institution. A single user agreement covers all experimenters from that institution. The DOE has implemented standard user agreements for Non-Proprietary Research and for Proprietary Research, and only minor modifications to the terms of the standard agreements may be made. Substantive changes require approval by the DOE which can delay user access to the user facility.
4. Non-Proprietary and Proprietary User Access
Beam time usage at SSRL can be either non-proprietary or proprietary. The majority of SSRL beam time is used for non-proprietary research.
SSRL can accommodate proprietary users who have scientific projects for which they wish to maintain confidentiality of proposal, data or results for a certain period of time (as needed for patent or other reasons). Proprietary users may submit GU proposals, or they may submit PU proposals if affiliated with a CAP or PRT.
Proprietary research proposals are subject to the same safety review and approval process as non-proprietary use proposals. Proprietary research proposals are peer reviewed in accordance with criteria described previously. Proprietary research proposals must provide sufficient information to enable peer review; however, confidential details of specific composition of a sample can, for example, be withheld if it will not compromise the ability to review the proposals. Confidence is maintained on these proposals during the review process.
Proprietary research is executed through the DOE’s Proprietary User Agreement template. Proprietary Research is subject to the DOE full-cost recovery advance payment of facility charges. The facility charges are established as a dollar rate for each shift of beam time and are updated based on the annual facility budget and available shifts. In accordance with the DOE accounting policies, proprietary research experiments performed at SSRL shall neither start nor continue without advance payment.
Consistent with Stanford University and SLAC policies (in addition to those related to classified and research requiring national security controls), other conditions related to proprietary research include:
- Stanford faculty, students, or research staff will not be directly involved in the research;
- Sufficient information on samples needs to be provided so that the SSRL Safety Officer can assure that all ES&H guidelines are met and that there is no risk to people, the facility, or the environment;
- Proprietary time is limited to no more than 15% of total available beam time; and
- Disclosure of the intellectually significant results of the experimental work will be made public within five years from the time of completion of the analysis of the data.