DOE REVIEW OF THE  LUSI Project

April 20-22, 2009

DOCUMENTS AND BACKUP INFORMATION  

 w   Review Home Page   w  Plenary Session  w Breakout Sessions

Project Management Documents
  Detailed Cost Estimate
  Hazards Analysis
  Milestone Table Dictionary
  Monthly Report - February 2009
  PEP (CD-2)  and Draft Revision of PEP
  Quality Implementation Plan (QIP)
  RAM
  Risk Management Plan
  Risk Registry
  WBS Dictionary
  WBS Structure
   
     
 
Requirements Documents, Specification Documents, Test Plans
 
Procurement Documents
  APP Status Log
   
  XPP Instrument
   CXI Instrument
  Interface Control Documents
  XCS Instrument

 

 
Instrument Team Documents
  CXI Instrument Team Leader Meeting - October 2008
  XPP Team Leaders Meeting - October 2008
  XCS Instrument Team Leader Meeting - December 2008
   
Update of CD-2 Responses
 
Design Review Reports
  WBS 1.2 XPP
  WBS 1.3 CXI
  WBS 1.4 XCS
   WBS 1.5 DCO
 
ARRA Schedule
  WBS 1.1
  WBS 1.2 XPP
  WBS 1.3 CXI
  WBS 1.4 XCS
  WBS 1.5 DCO
  WBS 1.6 Controls
  BNL Schedule
  ARRA Level 1 thru Level 3 Milestones
  ARRA Level 4 and 5 Milestones
   
Baseline Schedule
  WBS 1.1
  WBS 1.2 XPP
  WBS 1.3 CXI
  WBS 1.4 XCS
  WBS 1.5 DCO
  WBS 1.6 Controls
  BNL Schedule
  Baseline Level 1 thru Level 3 Milestones
  Baseline Level 4 and 5 Milestones