Doc Type |
Number |
Title |
|
|
|
GRD |
1.1-001 |
Global Requirements Document |
|
PRD |
1.1-002 |
LCLS Start-Up Test Plan |
|
PRD |
1.1-003 |
Conventional Alignment System Requirements |
|
ESD |
1.1-100 |
LCLS Basis of Estimate Methodology |
|
PRD |
1.1-304 |
LCLS Controls Feedback Requirements |
|
PRD |
1.1-305 |
LCLS Timing System Requirements |
|
PRD |
1.1-307 |
LCLS High Level Software Application Requirements |
|
PRD |
1.1-309 |
LCLS Electron Beam Diagnostics Requirements |
|
PRD |
1.1-310 |
LCLS Personnel Protection System Requirements |
|
PRD |
1.1-313 |
LCLS Control Room Requirements |
|
PRD |
1.1-314 |
LCLS Beam Position Measurement System Requirements |
|
ESD |
1.1-320 |
LCLS Drawing Number System Definition |
|
PRD |
1.2-001 |
General System Requirements |
|
PRD |
1.2-002 |
Cooling Water, Electrical Isolation, and Fire Extinguisher
Requirements for the Sector 20 Alcove |
|
ESD |
1.2-100 |
Design Specifications for the 120 Hz RF Gun |
|
ESD |
1.2-101 |
Design Specifications for the RF Gun Load Lock |
|
PRD |
1.3-001 |
LCLS Linac System Requirements |
|
PRD |
1.3-002 |
LCLS Linac L1 Subsystem Requirements |
|
PRD |
1.3-003 |
LCLS Linac BC1 Subsystem Requirements |
|
PRD |
1.3-004 |
LCLS Linac L2 Subsystem Requirements |
|
PRD |
1.3-005 |
LCLS Linac BC2 Subsystem Requirements |
|
PRD |
1.3-006 |
LCLS Linac L3 Subsystem Requirements |
|
PRD |
1.3-007 |
LCLS Linac LTU Subsystem Requirements |
|
PRD |
1.3-008 |
LCLS Linac E-Dump Subsystem Requirements |
|
PRD |
1.3-009 |
LCLS Linac X-Band RF Requirements |
|
PRD |
1.3-010 |
LCLS Linac S-Band RF Requirements |
|
ESD |
1.3-100 |
LCLS Linac Quad and Dipole Power Supply Specifications |
|
ESD |
1.3-101 |
LCLS Linac Bend Magnet Specifications |
|
ESD |
1.3-102 |
LCLS Linac Quad Magnet Specifications |
|
ESD |
1.3-103 |
LCLS Linac Corrector Magnet Specifications |
|
ESD |
1.3-104 |
LCLS Linac Dump Kicker Specifications |
|
ESD |
1.3-117 |
LCLS Linac Safety Dump Specification |
|
ESD |
1.3-119 |
LCLS Linac Drawing Number System Definition |
|
PRD |
1.4-001 |
General Undulator System Requirements |
|
PRD |
1.4-002 |
Magnetic Measurement Facility Requirements |
|
PRD |
1.4-003 |
Beam Based Alignment System Requirements |
|
ESD |
1.4-105 |
Hydrostatic Leveling System Specifications |
|
PRD |
1.5-001 |
XTOD Physics Requirements |
|
PRD |
1.6-001 |
General System Requirements |
|
PRD |
1.9-001 |
Physics Requirements For Conventional Facilities |
|
ESD |
1.9-100 |
Shielding Requirements for the LCLS Project (Title I) |
|
ESD |
1.9-101 |
Architectural/Engineering Design Guidelines, LCLS
Conventional Facilities Project Design Criteria |
|
|
|
|