TopBar.GIF (7574 bytes)

INDEX

Home Page
Technical Home Page
Internal Documents

WBS (pdf) / WBS (xls)
Project Documentation
FEL Physics Meetings


LCLS Project Space
    L1 Project Space
    L2 Project Space
    Drop Boxes
    Help
LCLS SCS Website
Discontinued
    LCLS Newsletters (old)
Basic LCLS Geometry
LCLS Special Reports
LCLS Site Layout
 
 

LCLS

LCLS INTERNALS

LIST OF MONTHLY DOE REPORTS

LCLS System Requirement Documents (PRD)

Internal EIR Documents

LCLS Advanced Procurement Plan Appendix A

M. Reichanadter: Presentation 4/22/04

January 2004, LCLS Prototype Undulator Report

December 12, 2003 LCLS Linac Review Report

December 2, 2003 LCLS Endstation Review Report

November 14, 2003 LCLS Undulator Review Report

LCLS CD-1 TEC (detailed)

LCLS CD-1 TEC (MS Project Version)

CD-0 Approve Mission Need

LCLS Funding  Profile

LCLS Project Deliverables / Pre-requisites for Critical Decision

Tabular Timeline for the LCLS

Internal Documents of the 2002 LCLS Lehman Review

Internal Documents of the 2003 LCLS Lehman Review

Schedule

 

 

 

 

 

 

 

INTERNAL NEWS
The next meeting of the LCLS Scientific Advisory Committee (SAC)  is scheduled  for July  8-9, 2004 at SLAC.
The LCLS External Independent Review (EIR) to set the performance project baseline for CD-2b is scheduled for June 7-11, 2004 at SLAC.


Last Updated: 18 May 2004
Content Owners: John Galayda, SLAC/SSRL
Heinz-Dieter Nuhn, SSRL
Page Editor: Heinz-Dieter Nuhn, SSRL

Disclaimer