DOE CD-3 REVIEW of the
LCLS LUSI Project
Supporting Documentation
July 15, 2009
w
Review Home Page
w
Plenary Session
w
Supporting Documentation
w
Project Management Documents
Detailed Cost Estimate
Hazards Analysis
Milestone Table Dictionary
Monthly Report:
March 2009
April 2009
May 2009
PEP (CD-2)
and
Draft Revision of PEP
Quality Implementation Plan (QIP)
RAM
Risk Management Plan
Risk Registry
Schedule
WBS Dictionary
WBS Structure
Requirements Documents, Specification Documents, Test Plans
Procurement Documents
APP Status Log
Interface Control Documents
1.1-521-r0 LUSI-XTOD Near Experimental Hall
1.1-523-r0 XES to LUSI ICD
1.1-524-r1 NEH Laser Transport Control System ICD
1.6-002-r1 Interface between the 2D-PAD and CXI Instrument
XES PCDS to LUSI CSI Instrument ICD
XES PCDS to LUSI XPP Instrument ICD
LUSI XPP Instrument to DCO ICD
XES PCDS to LUSI XCS Instrument ICD
CXI Instrument to DCO Interface Control Document
CXI Instrument to XCS Instrument Interface Control Document
CXI Instrument to MEC Instrument Interface Control Document
Instrument Team Documents
CXI Instrument Team Leader Meeting - October 2008
XPP Team Leaders Meeting - October 2008
XCS Instrument Team Leader Meeting - December 2008
Responses to the April 2009 Status Review
Design Review Reports
WBS 1.2 XPP
XPP Supports PDR - Aug 2008
XPP Laser Optical Table & Laser Enclosure Fabrication Design Review - November 2008 - REPORT
XPP Instrument Design Review - December 2007
XPP Diffractometer & Detector Mover Advanced Procurement Technical Review - November 2008
XPP Final Instrument Design Review - March 2009
WBS 1.3 CXI
1 Micron Sample Chamber PDR
Reference Laser PDR - March 2009 - REPORT
CXI Reference Laser System PDR - March 2009
CXI 1 Micron KB Mirror System Advanced Procurement Technical Review - REPORT
CXI Preliminary Instrument Design Review - Dec 2007
CXI Final Instrument Design Review Report - June 2009
Detector State and 1 micron Precision Instrument Stand Preliminary Design Review Report
WBS 1.4 XCS
XCS Preliminary Design Review
XCS Final Instrument Design Review Report - June 18, 2009
WBS 1.5 DCO
Intensity Position Monitor PDR - REPORT
LUSI DCO Attenuator/Pulse Picker PDR - December 2008
Profile Monitor & Wavefront Monitor, Optics PDR - REPORT
Harmonic Rejection Mirror Design Review Report