Doc Type |
Number |
Title |
|
GRD |
1.1-001 |
Global
Requirements Document |
PRD |
1.1-002 |
LCLS
Start-Up Test Plan |
PRD |
1.1-003 |
Conventional
Alignment System Requirements |
ESD |
1.1-100 |
LCLS
Basis of Estimate Methodology |
PRD |
1.1-304 |
LCLS
Controls Feedback Requirements |
PRD |
1.1-314 |
LCLS
Beam Position Measurement System Requirements |
PRD |
1.2-001 |
General
System Requirements |
PRD |
1.2-002 |
Cooling
Water, Electrical Isolation, and Fire Extinguisher Requirements for the
Sector 20 Alcove |
PRD |
1.3-001 |
LCLS
Linac System Requirements |
PRD |
1.3-002 |
LCLS
Linac L1 Subsystem Requirements |
PRD |
1.3-003 |
LCLS
Linac BC1 Subsystem Requirements |
PRD |
1.3-004 |
LCLS
Linac L2 Subsystem Requirements |
PRD |
1.3-005 |
LCLS
Linac BC2 Subsystem Requirements |
PRD |
1.3-006 |
LCLS
Linac L3 Subsystem Requirements |
PRD |
1.3-007 |
LCLS
Linac LTU Subsystem Requirements |
PRD |
1.3-008 |
LCLS
Linac E-Dump Subsystem Requirements |
PRD |
1.3-009 |
LCLS
Linac X-Band RF Requirements |
PRD |
1.3-010 |
LCLS
Linac S-Band RF Requirements |
ESD |
1.3-100 |
LCLS
Linac Quad and Dipole Power Supply Specifications |
ESD |
1.3-101 |
LCLS
Linac Bend Magnet Specifications |
ESD |
1.3-102 |
LCLS
Linac Quad Magnet Specifications |
ESD |
1.3-103 |
LCLS
Linac Corrector Magnet Specifications |
ESD |
1.3-104 |
LCLS
Linac Dump Kicker Specifications |
ESD |
1.3-117 |
LCLS
Linac Safety Dump Specification |
ESD |
1.3-119 |
LCLS
Linac Drawing Number System Definition |
PRD |
1.4-001 |
General
System Requirements |
PRD |
1.4-002 |
Magnetic
Measurement Facility Requirements |
PRD |
1.4-003 |
Beam
Based Alignment System Requirements |
PRD |
1.5-001 |
XTOD
Physics Requirements |
PRD |
1.6-001 |
General
System Requirements |
PRD |
1.9-001 |
Physics
Requirements For Conventional Facilities |
ESD |
1.9-100 |
Shielding
Requirements for the LCLS Project (Title I) |
ESD |
1.9-101 |
Architectural/Engineering
Design Guidelines, LCLS Conventional Facilities Project Design Criteria |