BL4-2 Biological Small Angle Scattering/Diffraction

Updates on the 4-2 Optics Upgrade (April 17, 2007)

The new station is located next to BL11-1. Hutch footprints have been laid out, and the construction of the optics hutch will follow. The plywood boards laminated with lead in the foreground will form the hutch wall.

The new station layout

The new BL4 area as viewed towards the wiggler source (4/16/07)

 

Hutch Design

The appoximate outline of the new 4-2 experimental hutch, which will be 7.5m long in the beam direction

 

 

.