SSRL Beam Port Schedule


X-ray beam lines are scheduled in three 8-hour shifts each day (11pm-7am; 7am-3pm; 3-11pm). Checkouts/changeovers are scheduled during the 7am-3pm shift. Most X-ray beam lines officially turn over to the next user much earlier than 3pm depending on the equipment requirements and staff availability. At least 1 week prior to arrival, users need to contact the designated beam line engineer/scientist (see SSRL Beam Lines by Number for contact information) to discuss beam line configuration needs and start times. Unless instructed otherwise, experiments end at 7am (6am when Maintenance (MA) or Accelerator Physics (AP) are scheduled).


Weeks of the Schedule
 Oct. 21, 2024   Oct. 28, 2024   Nov. 04, 2024   Nov. 11, 2024 
 Nov. 18, 2024   Nov. 25, 2024   Dec. 02, 2024   Dec. 09, 2024 
 Dec. 16, 2024   Dec. 23, 2024   Dec. 30, 2024   Jan. 06, 2025 
 Jan. 13, 2025   Jan. 20, 2025   Jan. 27, 2025   Feb. 03, 2025 
 Feb. 10, 2025   Feb. 17, 2025   Feb. 24, 2025   Mar. 03, 2025 
 Mar. 10, 2025   Mar. 17, 2025   Mar. 24, 2025   Mar. 31, 2025 
 Apr. 07, 2025   Apr. 14, 2025   Apr. 21, 2025   Apr. 28, 2025 

Back to Table of Contents

WEEK OF Oct. 21, 2024
                                         
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
BEAM   LINE 1-5  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 2-1  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 2-2  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
BEAM   LINE 2-3  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               STUP               8019 J.Richardson  8019 J.Richardson  8019 J.Richar/DOWN DOWN               DOWN              
STUP               CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson  DOWN               DOWN               Unscheduled       
STUP               8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  DOWN               DOWN               Unscheduled       
BEAM   LINE 4-1  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
BEAM   LINE 4-2  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui/DOWN DOWN               DOWN              
CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      DOWN               DOWN               Unscheduled       
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      DOWN               DOWN               CHANGE/8877 T.Mats
BEAM   LINE 4-3  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               Unscheduled        Unscheduled        8092 D.Sokaras     8092 D.Sokara/DOWN DOWN               DOWN              
Unscheduled        Unscheduled        CHANGE/8092 D.Soka 8092 D.Sokaras     DOWN               DOWN               Unscheduled       
Unscheduled        Unscheduled        8092 D.Sokaras     8092 D.Sokaras     DOWN               DOWN               Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 7-2  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               STUP               Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
STUP               Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
STUP               Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
BEAM   LINE 7-3  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 9-3  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
BEAM   LINE 11-2 
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
BEAM   LINE 11-3 
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               STUP               STUP               STUP               STUP/DOWN          DOWN               DOWN              
STUP               STUP               STUP               STUP               DOWN               DOWN               Unscheduled       
STUP               STUP               STUP               STUP               DOWN               DOWN               Unscheduled       
BEAM   LINE 15-2 
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokara/DOWN DOWN               DOWN              
CHANGE/8892 D.Soka 8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     DOWN               DOWN               Unscheduled       
8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     DOWN               DOWN               Unscheduled       
BEAM   LINE 17-2 
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              

Back to Table of Contents

WEEK OF Oct. 28, 2024
                                         
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
BEAM   LINE 1-5  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               FACI               FACI               FACI               6103 S.Hesse       6103 S.Hesse      
FACI               FACI               FACI               FACI               Xray CHECKOUT/6103 6103 S.Hesse       6103 S.Hesse      
FACI               FACI               FACI               FACI               6103 S.Hesse       6103 S.Hesse       6103 S.Hesse      
BEAM   LINE 2-1  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               8810 N.Strange     8810 N.Strange     8810 N.Strange     8810 N.Strange     6196 J.Baek        6196 J.Baek       
Unscheduled        8810 N.Strange     8810 N.Strange     8810 N.Strange     Xray CHECKOUT/6196 6196 J.Baek        Unscheduled       
Xray CHECKOUT/8810 8810 N.Strange     8810 N.Strange     8810 N.Strange     6196 J.Baek        6196 J.Baek        Unscheduled       
BEAM   LINE 2-2  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        Unscheduled        6657 X.Zheng       6657 X.Zheng       6657 X.Zheng       6729 R.Root        6729 R.Root       
Unscheduled        CHANGE/6657 X.Zhen 6657 X.Zheng       6657 X.Zheng       CHANGE/6729 R.Root 6729 R.Root        6729 R.Root       
Unscheduled        6657 X.Zheng       6657 X.Zheng       6657 X.Zheng       6729 R.Root        6729 R.Root        6729 R.Root       
BEAM   LINE 4-1  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        6789 S.Masina      6798 D.Pe          6798 D.Pe          6798 D.Pe          6689 R.Ross        6689 R.Ross       
Unscheduled        SMB CHECKOUT/6798  6798 D.Pe          6798 D.Pe          SMB CHECKOUT/6689  6689 R.Ross        6689 R.Ross       
SMB CHECKOUT/6789  6798 D.Pe          6798 D.Pe          6798 D.Pe          6689 R.Ross        6689 R.Ross        6689 R.Ross       
BEAM   LINE 4-2  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      5119 G.Wong        5119 G.Wong        5119 G.Wong        5119 G.Wong       
8877 T.Matsui      8877 T.Matsui      CHANGE/5119 G.Wong 5119 G.Wong        5119 G.Wong        5119 G.Wong        5119 G.Wong       
8877 T.Matsui      8877 T.Matsui      5119 G.Wong        5119 G.Wong        5119 G.Wong        5119 G.Wong        5119 G.Wong       
BEAM   LINE 4-3  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               6653 M.Preefer     6653 M.Preefer     6614 S.George      6163 G.George      6163 G.George     
FACI               SMB CHECKOUT/6653  6653 M.Preefer     SMB CHECKOUT/6614  SMB CHECKOUT/6163  6163 G.George      6163 G.George     
FACI               6653 M.Preefer     6653 M.Preefer     6614 S.George      6163 G.George      6163 G.George      6163 G.George     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        6282 T.Hersbach    8892 D.Sokaras     8892 D.Sokaras     Unscheduled        Unscheduled        Unscheduled       
Unscheduled        CHANGE/8892 D.Soka 8892 D.Sokaras     Unscheduled        Unscheduled        Unscheduled        Unscheduled       
CHANGE/6282 T.Hers 8892 D.Sokaras     8892 D.Sokaras     Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-2  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        FACI               FACI              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        FACI               FACI               FACI              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        FACI               FACI               FACI              
BEAM   LINE 7-3  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 9-3  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        6481 S.Krishna     6481 S.Krishna    
CHANGE/8099 S.Bare 8099 S.Bare        8099 S.Bare        8099 S.Bare        CHANGE/6481 S.Kris 6481 S.Krishna     6481 S.Krishna    
8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        6481 S.Krishna     6481 S.Krishna     6481 S.Krishna    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     6317 S.Kozimor     6317 S.Kozimor    
Unscheduled        5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     SMB CHECKOUT/6317  6317 S.Kozimor     6317 S.Kozimor    
SMB CHECKOUT/5555  5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     6317 S.Kozimor     6317 S.Kozimor     6317 S.Kozimor    
BEAM   LINE 11-3 
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               FACI               FACI               6103 S.Hesse       6103 S.Hesse       6103 S.Hesse      
FACI               FACI               FACI               Xray CHECKOUT/6103 6103 S.Hesse       6103 S.Hesse       6103 S.Hesse      
FACI               FACI               FACI               6103 S.Hesse       6103 S.Hesse       6103 S.Hesse       6103 S.Hesse      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        8019 J.Richardson  8019 J.Richardson  6718 E.Nuccio      6718 E.Nuccio      6801 H.Lyu         6801 H.Lyu        
CHANGE/8019 J.Rich 8019 J.Richardson  CHANGE/6718 E.Nucc 6718 E.Nuccio      CHANGE/6801 H.Lyu  6801 H.Lyu         6801 H.Lyu        
8019 J.Richardson  8019 J.Richardson  6718 E.Nuccio      6718 E.Nuccio      6801 H.Lyu         6801 H.Lyu         6801 H.Lyu        
BEAM   LINE 15-2 
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        STUP               6793 R.Colina Ruiz 6793 R.Colina Ruiz 6793 R.Colina Ruiz 6646 S.Hayes       6646 S.Hayes      
STUP               CHANGE/6793 R.Coli 6793 R.Colina Ruiz 6793 R.Colina Ruiz CHANGE/6646 S.Haye 6646 S.Hayes       6646 S.Hayes      
STUP               6793 R.Colina Ruiz 6793 R.Colina Ruiz 6793 R.Colina Ruiz 6646 S.Hayes       6646 S.Hayes       6646 S.Hayes      
BEAM   LINE 17-2 
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               8895 K.Stone       8895 K.Stone       8895 K.Stone       93K1 B.Saini       93K1 B.Saini      
FACI               Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone       Xray CHECKOUT/93K1 93K1 B.Saini       93K1 B.Saini      
FACI               8895 K.Stone       8895 K.Stone       8895 K.Stone       93K1 B.Saini       93K1 B.Saini       93K1 B.Saini      

Back to Table of Contents

WEEK OF Nov. 04, 2024
                                         
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
BEAM   LINE 1-5  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6103 S.Hesse       AP                 AP                 5529 N.Akmansen Ka 5529 N.Akmansen Ka 6006 Y.Wu          6006 Y.Wu         
AP                 AP                 Xray CHECKOUT/5529 5529 N.Akmansen Ka Xray CHECKOUT/6006 6006 Y.Wu          6006 Y.Wu         
AP                 AP                 5529 N.Akmansen Ka 5529 N.Akmansen Ka 6006 Y.Wu          6006 Y.Wu          6006 Y.Wu         
BEAM   LINE 2-1  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
Unscheduled        AP                 AP                 FACI               FACI               6810 Z.Liang       6810 Z.Liang      
AP                 AP                 FACI               FACI               Xray CHECKOUT/6810 6810 Z.Liang       Unscheduled       
AP                 AP                 FACI               FACI               6810 Z.Liang       6810 Z.Liang       Unscheduled       
BEAM   LINE 2-2  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
Unscheduled        AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6729 R.Root        AP                 AP                 6014 D.Fike        6014 D.Fike        6710 V.Noel        6710 V.Noel       
AP                 AP                 CHANGE/6014 D.Fike 6014 D.Fike        CHANGE/6710 V.Noel 6710 V.Noel        6710 V.Noel       
AP                 AP                 6014 D.Fike        6014 D.Fike        6710 V.Noel        6710 V.Noel        6710 V.Noel       
BEAM   LINE 4-1  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6689 R.Ross        AP                 AP                 6547 N.Sunariwal   6547 N.Sunariwal   8010 N.Strange     8010 N.Strange    
AP                 AP                 SMB CHECKOUT/6547  6547 N.Sunariwal   SMB CHECKOUT/8010  8010 N.Strange     8010 N.Strange    
AP                 AP                 6547 N.Sunariwal   6547 N.Sunariwal   8010 N.Strange     8010 N.Strange     8010 N.Strange    
BEAM   LINE 4-2  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
5119 G.Wong        AP                 AP                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      12D9 I.Badea      
AP                 AP                 CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      CHANGE/12D9 I.Bade 12D9 I.Badea      
AP                 AP                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      12D9 I.Badea       12D9 I.Badea      
BEAM   LINE 4-3  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6163 G.George      AP                 AP                 11L5 Y.Ha          11L5 Y.Ha          8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 SMB CHECKOUT/11L5  11L5 Y.Ha          SMB CHECKOUT/8092  8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 11L5 Y.Ha          11L5 Y.Ha          8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
Unscheduled        AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
Unscheduled        AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
FACI               AP                 AP                 FACI               FACI               Unscheduled        Unscheduled       
AP                 AP                 FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
FACI               AP                 AP                 FACI               6277 G.George      6277 G.George      6277 G.George     
AP                 AP                 FACI               CHANGE/6277 G.Geor 6277 G.George      6277 G.George      6277 G.George     
AP                 AP                 FACI               6277 G.George      6277 G.George      6277 G.George      6277 G.George     
BEAM   LINE 7-3  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
FACI               AP                 AP                 6375 P.Riggs-Gelas 6375 P.Riggs-Gelas 6616 T.Stemmler    6616 T.Stemmler   
AP                 AP                 SMB CHECKOUT/6375  6375 P.Riggs-Gelas SMB CHECKOUT/6616  6616 T.Stemmler    6616 T.Stemmler   
AP                 AP                 6375 P.Riggs-Gelas 6375 P.Riggs-Gelas 6616 T.Stemmler    6616 T.Stemmler    6616 T.Stemmler   
BEAM   LINE 9-3  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6481 S.Krishna     AP                 AP                 6331 E.Dunphy      6331 E.Dunphy      6581 A.Brenner     6581 A.Brenner    
AP                 AP                 CHANGE/6331 E.Dunp 6331 E.Dunphy      CHANGE/6581 A.Bren 6581 A.Brenner     6581 A.Brenner    
AP                 AP                 6331 E.Dunphy      6331 E.Dunphy      6581 A.Brenner     6581 A.Brenner     6581 A.Brenner    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
Unscheduled        AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6317 S.Kozimor     AP                 AP                 6491 M.Wang        6491 M.Wang        6491 M.Wang        6491 M.Wang       
AP                 AP                 SMB CHECKOUT/6491  6491 M.Wang        6491 M.Wang        6491 M.Wang        6491 M.Wang       
AP                 AP                 6491 M.Wang        6491 M.Wang        6491 M.Wang        6491 M.Wang        6491 M.Wang       
BEAM   LINE 11-3 
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6103 S.Hesse       AP                 AP                 6804 Y.Cho         6241 C.Salamat     6241 C.Salamat     6241 C.Salamat    
AP                 AP                 Xray CHECKOUT/6804 Xray CHECKOUT/6241 6241 C.Salamat     6241 C.Salamat     6241 C.Salamat    
AP                 AP                 6804 Y.Cho         6241 C.Salamat     6241 C.Salamat     6241 C.Salamat     6241 C.Salamat    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6801 H.Lyu         AP                 AP                 6524 G.Druschel    6524 G.Druschel    6014 D.Fike        6014 D.Fike       
AP                 AP                 CHANGE/6524 G.Drus 6524 G.Druschel    CHANGE/6014 D.Fike 6014 D.Fike        6014 D.Fike       
AP                 AP                 6524 G.Druschel    6524 G.Druschel    6014 D.Fike        6014 D.Fike        6014 D.Fike       
BEAM   LINE 15-2 
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6646 S.Hayes       AP                 6646 S.Hayes       6177 P.O'Day       6177 P.O'Day       6411 R.Dias        6411 R.Dias       
AP                 CHANGE/6646 S.Haye CHANGE/6177 P.O'Da 6177 P.O'Day       CHANGE/6411 R.Dias 6411 R.Dias        6411 R.Dias       
AP                 6646 S.Hayes       6177 P.O'Day       6177 P.O'Day       6411 R.Dias        6411 R.Dias        6411 R.Dias       
BEAM   LINE 17-2 
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
93K1 B.Saini       AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              

Back to Table of Contents

WEEK OF Nov. 11, 2024
                                         
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
BEAM   LINE 1-5  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6006 Y.Wu          FACI               6601 S.Verschraege 6601 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege
FACI               Xray CHECKOUT/6601 6601 S.Verschraege CHANGE/6506 S.Vers 6506 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege
FACI               6601 S.Verschraege 6601 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege
BEAM   LINE 2-1  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        8062 M.Preefer     8062 M.Preefer     8062 M.Preefer     93K7 R.Macaluso    8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/8062 8062 M.Preefer     8062 M.Preefer     Xray CHECKOUT/93K7 Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone      
8062 M.Preefer     8062 M.Preefer     8062 M.Preefer     93K7 R.Macaluso    8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 2-2  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6710 V.Noel        6287 L.Dresselhaus 6287 L.Dresselhaus 6776 T.Bosak       6776 T.Bosak       6629 D.Rodrigues   6629 D.Rodrigues  
CHANGE/6287 L.Dres 6287 L.Dresselhaus CHANGE/6776 T.Bosa 6776 T.Bosak       CHANGE/6629 D.Rodr 6629 D.Rodrigues   6629 D.Rodrigues  
6287 L.Dresselhaus 6287 L.Dresselhaus 6776 T.Bosak       6776 T.Bosak       6629 D.Rodrigues   6629 D.Rodrigues   6629 D.Rodrigues  
BEAM   LINE 4-1  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
8010 N.Strange     6047 J.Catalano    6047 J.Catalano    6262 A.Naranjo-Sol 6262 A.Naranjo-Sol 6394 B.Maki        6394 B.Maki       
SMB CHECKOUT/6047  6047 J.Catalano    SMB CHECKOUT/6262  6262 A.Naranjo-Sol SMB CHECKOUT/6394  6394 B.Maki        6394 B.Maki       
6047 J.Catalano    6047 J.Catalano    6262 A.Naranjo-Sol 6262 A.Naranjo-Sol 6394 B.Maki        6394 B.Maki        6394 B.Maki       
BEAM   LINE 4-2  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
12D9 I.Badea       RA                 12C9 J.Rueben      6743 A.Hussain     8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
RA                 CHANGE/12C9 J.Rueb CHANGE/6743 A.Huss CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
RA                 12C9 J.Rueben      6743 A.Hussain     8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
8092 D.Sokaras     6508 M.Kirk        6508 M.Kirk        6801 H.Lyu         6801 H.Lyu         6728 K.Shigenobu   6728 K.Shigenobu  
SMB CHECKOUT/6508  6508 M.Kirk        SMB CHECKOUT/6801  6801 H.Lyu         SMB CHECKOUT/6728  6728 K.Shigenobu   6728 K.Shigenobu  
6508 M.Kirk        6508 M.Kirk        6801 H.Lyu         6801 H.Lyu         6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6277 G.George      6776 T.Bosak       6776 T.Bosak       6655 C.Woltz       6655 C.Woltz       8019 J.Richardson  8019 J.Richardson 
CHANGE/6776 T.Bosa 6776 T.Bosak       CHANGE/6655 C.Wolt 6655 C.Woltz       CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson 
6776 T.Bosak       6776 T.Bosak       6655 C.Woltz       6655 C.Woltz       8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
BEAM   LINE 7-3  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6616 T.Stemmler    6616 T.Stemmler    6653 M.Preefer     6582 Y.Guo         6582 Y.Guo         6508 M.Kirk        6508 M.Kirk       
6616 T.Stemmler    SMB CHECKOUT/6653  SMB CHECKOUT/6582  6582 Y.Guo         SMB CHECKOUT/6508  6508 M.Kirk        6508 M.Kirk       
6616 T.Stemmler    6653 M.Preefer     6582 Y.Guo         6582 Y.Guo         6508 M.Kirk        6508 M.Kirk        6508 M.Kirk       
BEAM   LINE 9-3  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6581 A.Brenner     6731 L.Chen        6731 L.Chen        6731 L.Chen        6483 S.Vijayaragha 6483 S.Vijayaragha 6483 S.Vijayaragha
CHANGE/6731 L.Chen 6731 L.Chen        6731 L.Chen        CHANGE/6483 S.Vija 6483 S.Vijayaragha 6483 S.Vijayaragha 6483 S.Vijayaragha
6731 L.Chen        6731 L.Chen        6731 L.Chen        6483 S.Vijayaragha 6483 S.Vijayaragha 6483 S.Vijayaragha 6483 S.Vijayaragha
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6491 M.Wang        FACI               FACI               FACI               FACI               6137 Z.Xue         6137 Z.Xue        
FACI               FACI               FACI               FACI               SMB CHECKOUT/6137  6137 Z.Xue         6137 Z.Xue        
FACI               FACI               FACI               FACI               6137 Z.Xue         6137 Z.Xue         6137 Z.Xue        
BEAM   LINE 11-3 
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6241 C.Salamat     6305 W.Go          6305 W.Go          6305 W.Go          6305 W.Go          6788 A.Magni       6788 A.Magni      
Xray CHECKOUT/6305 6305 W.Go          6305 W.Go          6305 W.Go          Xray CHECKOUT/6788 6788 A.Magni       6788 A.Magni      
6305 W.Go          6305 W.Go          6305 W.Go          6305 W.Go          6788 A.Magni       6788 A.Magni       6788 A.Magni      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6014 D.Fike        8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  6773 A.Yang        6657 X.Zheng       6657 X.Zheng      
CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson  CHANGE/6773 A.Yang CHANGE/6657 X.Zhen 6657 X.Zheng       6657 X.Zheng      
8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  6773 A.Yang        6657 X.Zheng       6657 X.Zheng       6657 X.Zheng      
BEAM   LINE 15-2 
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6411 R.Dias        STUP               5636 L.Gee         5636 L.Gee         STUP               6649 J.Penner-Hahn 6649 J.Penner-Hahn
STUP               CHANGE/5636 L.Gee  5636 L.Gee         STUP               CHANGE/6649 J.Penn 6649 J.Penner-Hahn 6649 J.Penner-Hahn
STUP               5636 L.Gee         5636 L.Gee         STUP               6649 J.Penner-Hahn 6649 J.Penner-Hahn 6649 J.Penner-Hahn
BEAM   LINE 17-2 
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
FACI               FACI               FACI               93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim  
FACI               FACI               Xray CHECKOUT/93H6 93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim  
FACI               FACI               93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim  

Back to Table of Contents

WEEK OF Nov. 18, 2024
                                         
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
BEAM   LINE 1-5  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6506 S.Verschra/AP AP                 AP                 FACI               6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman    
AP                 AP                 FACI               Xray CHECKOUT/6713 6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman    
AP                 AP                 FACI               6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman    
BEAM   LINE 2-1  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
8095 K.Stone/AP    AP                 AP                 6679 M.Cosby       6679 M.Cosby       8895 K.Stone       8895 K.Stone      
AP                 AP                 Xray CHECKOUT/6679 6679 M.Cosby       CHANGE/8895 K.Ston 8895 K.Stone       8895 K.Stone      
AP                 AP                 6679 M.Cosby       6679 M.Cosby       8895 K.Stone       8895 K.Stone       8895 K.Stone      
BEAM   LINE 2-2  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6629 D.Rodrigue/AP AP                 AP                 FACI               6782 E.Ellison     6782 E.Ellison     6782 E.Ellison    
AP                 AP                 FACI               CHANGE/6782 E.Elli 6782 E.Ellison     6782 E.Ellison     6782 E.Ellison    
AP                 AP                 FACI               6782 E.Ellison     6782 E.Ellison     6782 E.Ellison     6782 E.Ellison    
BEAM   LINE 4-1  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6394 B.Maki/AP     AP                 AP                 5757 F.Bridges     5757 F.Bridges     6147 D.Pan         6147 D.Pan        
AP                 AP                 SMB CHECKOUT/5757  5757 F.Bridges     SMB CHECKOUT/6147  6147 D.Pan         6147 D.Pan        
AP                 AP                 5757 F.Bridges     5757 F.Bridges     6147 D.Pan         6147 D.Pan         6147 D.Pan        
BEAM   LINE 4-2  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
8877 T.Matsui/AP   AP                 AP                 RA                 RA                 8877 T.Matsui      8877 T.Matsui     
AP                 AP                 RA                 RA                 8877 T.Matsui      8877 T.Matsui      CHANGE/12D0 Z.Bu  
AP                 AP                 RA                 RA                 8877 T.Matsui      8877 T.Matsui      12D0 Z.Bu         
BEAM   LINE 4-3  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6728 K.Shigenob/AP AP                 AP                 6249 P.Zhang       6249 P.Zhang       6232 A.Garcia-Espa 6232 A.Garcia-Espa
AP                 AP                 SMB CHECKOUT/6249  6249 P.Zhang       SMB CHECKOUT/6232  6232 A.Garcia-Espa 6232 A.Garcia-Espa
AP                 AP                 6249 P.Zhang       6249 P.Zhang       6232 A.Garcia-Espa 6232 A.Garcia-Espa 6232 A.Garcia-Espa
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
AP                 AP                 AP                 6770 L.Mu          6770 L.Mu          6247 K.Thurber     6247 K.Thurber    
AP                 AP                 CHANGE/6770 L.Mu   6770 L.Mu          CHANGE/6247 K.Thur 6247 K.Thurber     6247 K.Thurber    
AP                 AP                 6770 L.Mu          6770 L.Mu          6247 K.Thurber     6247 K.Thurber     6247 K.Thurber    
BEAM   LINE 7-2  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
8019 J.Richards/AP AP                 AP                 6226 M.Crotteau    6226 M.Crotteau    8067 S.Webb        8067 S.Webb       
AP                 AP                 CHANGE/6226 M.Crot 6226 M.Crotteau    CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb       
AP                 AP                 6226 M.Crotteau    6226 M.Crotteau    8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6508 M.Kirk/AP     AP                 AP                 8098 T.Kroll       8098 T.Kroll       5842 J.Lentz       5842 J.Lentz      
AP                 AP                 SMB CHECKOUT/8098  8098 T.Kroll       SMB CHECKOUT/5842  5842 J.Lentz       5842 J.Lentz      
AP                 AP                 8098 T.Kroll       8098 T.Kroll       5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
BEAM   LINE 9-3  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6483 S.Vijayara/AP AP                 AP                 6379 M.Abernathy   6379 M.Abernathy   6109 H.Shafaat     6109 H.Shafaat    
AP                 AP                 SMB CHECKOUT/6379  6379 M.Abernathy   SMB CHECKOUT/6109  6109 H.Shafaat     6109 H.Shafaat    
AP                 AP                 6379 M.Abernathy   6379 M.Abernathy   6109 H.Shafaat     6109 H.Shafaat     6109 H.Shafaat    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6137 Z.Xue/AP      AP                 AP                 6425 R.Abergel     6086 R.Abergel     6086 R.Abergel     6086 R.Abergel    
AP                 AP                 SMB CHECKOUT/6425  SMB CHECKOUT/6086  6086 R.Abergel     6086 R.Abergel     Unscheduled       
AP                 AP                 6425 R.Abergel     6086 R.Abergel     6086 R.Abergel     6086 R.Abergel     Unscheduled       
BEAM   LINE 11-3 
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6788 A.Magni/AP    AP                 AP                 6006 Y.Wu          6006 Y.Wu          6686 J.Chen        6686 J.Chen       
AP                 AP                 CHANGE/11M7 R.Rao  6006 Y.Wu          CHANGE/6686 J.Chen 6686 J.Chen        6686 J.Chen       
AP                 AP                 CHANGE/6006 Y.Wu   6006 Y.Wu          6686 J.Chen        6686 J.Chen        6686 J.Chen       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6657 X.Zheng/AP    AP                 AP                 6338 X.Zheng       6338 X.Zheng       6226 M.Crotteau    6226 M.Crotteau   
AP                 AP                 CHANGE/6338 X.Zhen 6338 X.Zheng       CHANGE/6226 M.Crot 6226 M.Crotteau    6226 M.Crotteau   
AP                 AP                 6338 X.Zheng       6338 X.Zheng       6226 M.Crotteau    6226 M.Crotteau    6226 M.Crotteau   
BEAM   LINE 15-2 
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6649 J.Penner-H/AP AP                 AP                 6462 R.Kim         6462 R.Kim         6163 G.George      6163 G.George     
AP                 AP                 CHANGE/6462 R.Kim  6462 R.Kim         CHANGE/6163 G.Geor 6163 G.George      6163 G.George     
AP                 AP                 6462 R.Kim         6462 R.Kim         6163 G.George      6163 G.George      6163 G.George     
BEAM   LINE 17-2 
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
93H6 E.Nisenboi/AP AP                 AP                 93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   FACI              
AP                 AP                 93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   FACI               FACI              
AP                 AP                 93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   FACI               FACI              

Back to Table of Contents

WEEK OF Nov. 25, 2024
                                         
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
BEAM   LINE 1-5  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman     DOWN               DOWN               6713 A.Hoffman     6713 A.Hoffman    
6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman     DOWN               DOWN               6713 A.Hoffman     6713 A.Hoffman    
6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffma/DOWN DOWN               6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman    
BEAM   LINE 2-1  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
8895 K.Stone       FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI/DOWN          DOWN               FACI               FACI               FACI              
BEAM   LINE 2-2  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6782 E.Ellison     6478 X.Fang        6478 X.Fang        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
CHANGE/6478 X.Fang 6478 X.Fang        6478 X.Fang        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
6478 X.Fang        6478 X.Fang        6478 X.Fang/DOWN   DOWN               8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 4-1  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6147 D.Pan         6140 F.Bridges     9705 J.LiSA        DOWN               DOWN               9705 J.LiSA        9705 J.LiSA       
SMB CHECKOUT/6140  SMB CHECKOUT/9705  9705 J.LiSA        DOWN               DOWN               9705 J.LiSA        9705 J.LiSA       
6140 F.Bridges     9705 J.LiSA        9705 J.LiSA/DOWN   DOWN               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 4-2  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
12D0 Z.Bu          12D0 Z.Bu          8877 T.Matsui      DOWN               DOWN               6006 Y.Wu          6006 Y.Wu         
12D0 Z.Bu          CHANGE/8877 T.Mats 8877 T.Matsui      DOWN               DOWN               6006 Y.Wu          CHANGE/5816 A.Ayzn
12D0 Z.Bu          8877 T.Matsui      8877 T.Matsui/DOWN DOWN               6006 Y.Wu          6006 Y.Wu          5816 A.Ayzner     
BEAM   LINE 4-3  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6232 A.Garcia-Espa 6791 M.Machado Ama 6791 M.Machado Ama DOWN               DOWN               6791 M.Machado Ama 6791 M.Machado Ama
SMB CHECKOUT/6791  6791 M.Machado Ama 6791 M.Machado Ama DOWN               DOWN               6791 M.Machado Ama 6791 M.Machado Ama
6791 M.Machado Ama 6791 M.Machado Ama 6791 M.Machad/DOWN DOWN               6791 M.Machado Ama 6791 M.Machado Ama 6791 M.Machado Ama
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6247 K.Thurber     6820 E.Santos      6820 E.Santos      DOWN               DOWN               8907 M.Preefer     8907 M.Preefer    
Xray CHECKOUT/6820 6820 E.Santos      Unscheduled        DOWN               DOWN               8907 M.Preefer     8907 M.Preefer    
6820 E.Santos      6820 E.Santos      DOWN               DOWN               8907 M.Preefer     8907 M.Preefer     8907 M.Preefer    
BEAM   LINE 7-2  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
8067 S.Webb        8067 S.Webb        8067 S.Webb        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
8067 S.Webb        8067 S.Webb        8067 S.Webb        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
8067 S.Webb        8067 S.Webb        8067 S.Webb/DOWN   DOWN               8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
5842 J.Lentz       6538 A.Duncan      6538 A.Duncan      DOWN               DOWN               6163 G.George      6163 G.George     
SMB CHECKOUT/6538  6538 A.Duncan      Unscheduled        DOWN               DOWN               6163 G.George      6163 G.George     
6538 A.Duncan      6538 A.Duncan      SMB CHECKOUT//DOWN DOWN               6163 G.George      6163 G.George      6163 G.George     
BEAM   LINE 9-3  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6109 H.Shafaat     8098 T.Kroll       8098 T.Kroll       DOWN               DOWN               6781 G.George      6781 G.George     
SMB CHECKOUT/8098  8098 T.Kroll       SMB CHECKOUT/6781  DOWN               DOWN               6781 G.George      6781 G.George     
8098 T.Kroll       8098 T.Kroll       6781 G.George/DOWN DOWN               6781 G.George      6781 G.George      6781 G.George     
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
Unscheduled        6113 V.Noel        6113 V.Noel        DOWN               DOWN               Unscheduled        Unscheduled       
SMB CHECKOUT/6113  6113 V.Noel        6113 V.Noel        DOWN               DOWN               Unscheduled        Unscheduled       
6113 V.Noel        6113 V.Noel        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6686 J.Chen        6438 R.Smaha       6438 R.Smaha       DOWN               DOWN               FACI               FACI              
Xray CHECKOUT/6438 6438 R.Smaha       FACI               DOWN               DOWN               FACI               FACI              
6438 R.Smaha       6438 R.Smaha       FACI/DOWN          DOWN               FACI               FACI               FACI              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6226 M.Crotteau    Unscheduled        8067 S.Webb        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
Unscheduled        CHANGE/8067 S.Webb 8067 S.Webb        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
Unscheduled        8067 S.Webb        8067 S.Webb/DOWN   DOWN               8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 15-2 
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6163 G.George      6176 J.Finzel      6176 J.Finzel      DOWN               DOWN               6282 T.Hersbach    6282 T.Hersbach   
CHANGE/6176 J.Finz 6176 J.Finzel      Unscheduled        DOWN               DOWN               6282 T.Hersbach    6282 T.Hersbach   
6176 J.Finzel      6176 J.Finzel      DOWN               DOWN               6282 T.Hersbach    6282 T.Hersbach    6282 T.Hersbach   
BEAM   LINE 17-2 
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
FACI               FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI/DOWN          DOWN               FACI               FACI               FACI              

Back to Table of Contents

WEEK OF Dec. 02, 2024
                                         
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
BEAM   LINE 1-5  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
6713 A.Hoffman     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     6166 J.Chen        6166 J.Chen        6166 J.Chen       
Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     Xray CHECKOUT/6166 6166 J.Chen        6166 J.Chen        6166 J.Chen       
8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     6166 J.Chen        6166 J.Chen        6166 J.Chen        6166 J.Chen       
BEAM   LINE 2-1  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
FACI               6789 S.Masina      6789 S.Masina      6789 S.Masina      Unscheduled        11L9 E.Gamage      Unscheduled       
Xray CHECKOUT/6789 6789 S.Masina      6789 S.Masina      Unscheduled        Xray CHECKOUT/11L9 Unscheduled        Unscheduled       
6789 S.Masina      6789 S.Masina      6789 S.Masina      Unscheduled        11L9 E.Gamage      Unscheduled        Unscheduled       
BEAM   LINE 2-2  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
8067 S.Webb        8067 S.Webb        5611 K.Lau         5611 K.Lau         5611 K.Lau         6732 J.Anne        6732 J.Anne       
8067 S.Webb        CHANGE/5611 K.Lau  5611 K.Lau         5611 K.Lau         CHANGE/6732 J.Anne 6732 J.Anne        6732 J.Anne       
8067 S.Webb        5611 K.Lau         5611 K.Lau         5611 K.Lau         6732 J.Anne        6732 J.Anne        6732 J.Anne       
BEAM   LINE 4-1  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
9705 J.LiSA        5419 G.Giri        5419 G.Giri        6434 Z.Jiang       6434 Z.Jiang       6750 A.Asundi      6750 A.Asundi     
SMB CHECKOUT/5419  5419 G.Giri        SMB CHECKOUT/6434  6434 Z.Jiang       SMB CHECKOUT/6750  6750 A.Asundi      6750 A.Asundi     
5419 G.Giri        5419 G.Giri        6434 Z.Jiang       6434 Z.Jiang       6750 A.Asundi      6750 A.Asundi      6750 A.Asundi     
BEAM   LINE 4-2  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
5816 A.Ayzner      5816 A.Ayzner      8877 T.Matsui      8877 T.Matsui      5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
5816 A.Ayzner      CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/5504 Y.Srin 5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
5816 A.Ayzner      8877 T.Matsui      8877 T.Matsui      5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
BEAM   LINE 4-3  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
6791 M.Machado Ama 6700 B.Stewart     6700 B.Stewart     6555 K.Lancaster   6555 K.Lancaster   6770 L.Mu          6770 L.Mu         
SMB CHECKOUT/6700  6700 B.Stewart     SMB CHECKOUT/6555  6555 K.Lancaster   SMB CHECKOUT/6770  6770 L.Mu          6770 L.Mu         
6700 B.Stewart     6700 B.Stewart     6555 K.Lancaster   6555 K.Lancaster   6770 L.Mu          6770 L.Mu          6770 L.Mu         
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
8907 M.Preefer     6643 A.Lee         6643 A.Lee         FACI               Unscheduled        6063 A.White Smirn 6063 A.White Smirn
CHANGE/6643 A.Lee  6643 A.Lee         FACI               Unscheduled        CHANGE/6063 A.Whit 6063 A.White Smirn 6063 A.White Smirn
6643 A.Lee         6643 A.Lee         FACI               Unscheduled        6063 A.White Smirn 6063 A.White Smirn 6063 A.White Smirn
BEAM   LINE 7-2  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
8067 S.Webb        6531 A.Bhattacharj 6531 A.Bhattacharj 6732 J.Anne        6732 J.Anne        8092 D.Sokaras     8092 D.Sokaras    
CHANGE/6531 A.Bhat 6531 A.Bhattacharj CHANGE/6732 J.Anne 6732 J.Anne        CHANGE/8092 D.Soka 8092 D.Sokaras     8092 D.Sokaras    
6531 A.Bhattacharj 6531 A.Bhattacharj 6732 J.Anne        6732 J.Anne        8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 7-3  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
6163 G.George      6308 W.Wang        6308 W.Wang        6546 T.Jackson     6546 T.Jackson     6096 M.Abernathy   6096 M.Abernathy  
SMB CHECKOUT/6308  6308 W.Wang        SMB CHECKOUT/6546  6546 T.Jackson     SMB CHECKOUT/6096  6096 M.Abernathy   6096 M.Abernathy  
6308 W.Wang        6308 W.Wang        6546 T.Jackson     6546 T.Jackson     6096 M.Abernathy   6096 M.Abernathy   6096 M.Abernathy  
BEAM   LINE 9-3  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
6781 G.George      6781 G.George      6781 G.George      6793 R.Colina Ruiz 6793 R.Colina Ruiz 6555 K.Lancaster   6555 K.Lancaster  
6781 G.George      6781 G.George      SMB CHECKOUT/6793  6793 R.Colina Ruiz SMB CHECKOUT/6555  6555 K.Lancaster   6555 K.Lancaster  
6781 G.George      6781 G.George      6793 R.Colina Ruiz 6793 R.Colina Ruiz 6555 K.Lancaster   6555 K.Lancaster   6555 K.Lancaster  
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
Unscheduled        6480 T.Sowers      6480 T.Sowers      6480 T.Sowers      6585 G.Hettiarachc 6585 G.Hettiarachc 6585 G.Hettiarachc
SMB CHECKOUT/6480  6480 T.Sowers      6480 T.Sowers      SMB CHECKOUT/6585  6585 G.Hettiarachc 6585 G.Hettiarachc 6585 G.Hettiarachc
6480 T.Sowers      6480 T.Sowers      6480 T.Sowers      6585 G.Hettiarachc 6585 G.Hettiarachc 6585 G.Hettiarachc 6585 G.Hettiarachc
BEAM   LINE 11-3 
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
FACI               5419 G.Giri        5419 G.Giri        5419 G.Giri        8095 K.Stone       8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/5419 5419 G.Giri        5419 G.Giri        Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone       8095 K.Stone      
5419 G.Giri        5419 G.Giri        5419 G.Giri        8095 K.Stone       8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
8067 S.Webb        6732 J.Anne        6732 J.Anne        6732 J.Anne        6531 A.Bhattacharj 6531 A.Bhattacharj 6531 A.Bhattacharj
CHANGE/6732 J.Anne 6732 J.Anne        6732 J.Anne        CHANGE/6531 A.Bhat 6531 A.Bhattacharj 6531 A.Bhattacharj Unscheduled       
6732 J.Anne        6732 J.Anne        6732 J.Anne        6531 A.Bhattacharj 6531 A.Bhattacharj 6531 A.Bhattacharj Unscheduled       
BEAM   LINE 15-2 
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
6282 T.Hersbach    STUP               8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       11K1 A.Follmer     11K1 A.Follmer    
STUP               CHANGE/8098 T.Krol 8098 T.Kroll       8098 T.Kroll       CHANGE/11K1 A.Foll 11K1 A.Follmer     11K1 A.Follmer    
STUP               8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       11K1 A.Follmer     11K1 A.Follmer     11K1 A.Follmer    
BEAM   LINE 17-2 
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
FACI               FACI               FACI               FACI               6604 C.Crain       6604 C.Crain       6604 C.Crain      
FACI               FACI               FACI               Xray CHECKOUT/6604 6604 C.Crain       6604 C.Crain       6604 C.Crain      
FACI               FACI               FACI               6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain      

Back to Table of Contents

WEEK OF Dec. 09, 2024
                                         
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
BEAM   LINE 1-5  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6166 J.Chen/AP     AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain      
AP                 AP                 Xray CHECKOUT/6604 6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain      
AP                 AP                 6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain      
BEAM   LINE 2-2  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6732 J.Anne/AP     AP                 AP                 FACI               6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
AP                 AP                 FACI               CHANGE/6703 E.Fade 6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
AP                 AP                 FACI               6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
BEAM   LINE 4-1  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6750 A.Asundi/AP   AP                 AP                 6782 E.Ellison     6782 E.Ellison     6692 N.Rivera      6692 N.Rivera     
AP                 AP                 SMB CHECKOUT/6782  6782 E.Ellison     SMB CHECKOUT/6692  6692 N.Rivera      6692 N.Rivera     
AP                 AP                 6782 E.Ellison     6782 E.Ellison     6692 N.Rivera      6692 N.Rivera      6692 N.Rivera     
BEAM   LINE 4-2  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
5504 Y.Srinivas/AP AP                 AP                 8877 T.Matsui      6513 S.Dehe        6057 D.Mai         6057 D.Mai        
AP                 AP                 CHANGE/8877 T.Mats CHANGE/6513 S.Dehe CHANGE/6057 D.Mai  6057 D.Mai         6057 D.Mai        
AP                 AP                 8877 T.Matsui      6513 S.Dehe        6057 D.Mai         6057 D.Mai         6057 D.Mai        
BEAM   LINE 4-3  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6770 L.Mu/AP       AP                 AP                 6209 A.Braun       6209 A.Braun       6123 H.La Pierre   6123 H.La Pierre  
AP                 AP                 SMB CHECKOUT/6209  6209 A.Braun       SMB CHECKOUT/6123  6123 H.La Pierre   6123 H.La Pierre  
AP                 AP                 6209 A.Braun       6209 A.Braun       6123 H.La Pierre   6123 H.La Pierre   6123 H.La Pierre  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6063 A.White Sm/AP AP                 AP                 6675 C.Cao         6675 C.Cao         6762 H.Gao         6762 H.Gao        
AP                 AP                 CHANGE/6675 C.Cao  6675 C.Cao         CHANGE/6762 H.Gao  6762 H.Gao         6762 H.Gao        
AP                 AP                 6675 C.Cao         6675 C.Cao         6762 H.Gao         6762 H.Gao         6762 H.Gao        
BEAM   LINE 7-2  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
8092 D.Sokaras/AP  AP                 AP                 6772 R.Bryant      6772 R.Bryant      6700 B.Stewart     6700 B.Stewart    
AP                 AP                 CHANGE/6772 R.Brya 6772 R.Bryant      CHANGE/6700 B.Stew 6700 B.Stewart     6700 B.Stewart    
AP                 AP                 6772 R.Bryant      6772 R.Bryant      6700 B.Stewart     6700 B.Stewart     6700 B.Stewart    
BEAM   LINE 7-3  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6096 M.Abernath/AP AP                 AP                 6682 J.Lopez-Garri 6682 J.Lopez-Garri 8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 SMB CHECKOUT/6682  6682 J.Lopez-Garri SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 6682 J.Lopez-Garri 6682 J.Lopez-Garri 8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 9-3  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6555 K.Lancaste/AP AP                 AP                 8092 D.Sokaras     8092 D.Sokaras     5224 V.Yachandra   5224 V.Yachandra  
AP                 AP                 SMB CHECKOUT/8092  8092 D.Sokaras     SMB CHECKOUT/5224  5224 V.Yachandra   5224 V.Yachandra  
AP                 AP                 8092 D.Sokaras     8092 D.Sokaras     5224 V.Yachandra   5224 V.Yachandra   5224 V.Yachandra  
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6585 G.Hettiara/AP AP                 AP                 6692 N.Rivera      6692 N.Rivera      6729 R.Root        6729 R.Root       
AP                 AP                 SMB CHECKOUT/6692  6692 N.Rivera      SMB CHECKOUT/6729  6729 R.Root        6729 R.Root       
AP                 AP                 6692 N.Rivera      6692 N.Rivera      6729 R.Root        6729 R.Root        6729 R.Root       
BEAM   LINE 11-3 
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
8095 K.Stone/AP    AP                 AP                 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       FACI              
AP                 AP                 Xray CHECKOUT/8061 8061 S.Hesse       8061 S.Hesse       FACI               FACI              
AP                 AP                 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       FACI               FACI              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 6772 R.Bryant      6772 R.Bryant      6333 M.McNamara    6333 M.McNamara   
AP                 AP                 CHANGE/6772 R.Brya 6772 R.Bryant      CHANGE/6333 M.McNa 6333 M.McNamara    6333 M.McNamara   
AP                 AP                 6772 R.Bryant      6772 R.Bryant      6333 M.McNamara    6333 M.McNamara    6333 M.McNamara   
BEAM   LINE 15-2 
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
11K1 A.Follmer/AP  AP                 AP                 5972 M.Delgado Jai 5972 M.Delgado Jai 6672 M.Delgado Jai 6672 M.Delgado Jai
AP                 AP                 CHANGE/5972 M.Delg 5972 M.Delgado Jai CHANGE/6672 M.Delg 6672 M.Delgado Jai 6672 M.Delgado Jai
AP                 AP                 5972 M.Delgado Jai 5972 M.Delgado Jai 6672 M.Delgado Jai 6672 M.Delgado Jai 6672 M.Delgado Jai
BEAM   LINE 17-2 
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6604 C.Crain/AP    AP                 AP                 6258 M.Preefer     6258 M.Preefer     6258 M.Preefer     6258 M.Preefer    
AP                 AP                 Xray CHECKOUT/6258 6258 M.Preefer     6258 M.Preefer     6258 M.Preefer     6258 M.Preefer    
AP                 AP                 6258 M.Preefer     6258 M.Preefer     6258 M.Preefer     6258 M.Preefer     6258 M.Preefer    

Back to Table of Contents

WEEK OF Dec. 16, 2024
                                         
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
BEAM   LINE 1-5  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
BEAM   LINE 2-1  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6604 C.Crain       6438 R.Smaha       6438 R.Smaha       8095 K.Stone       AP                 AP                 AP                
SMB CHECKOUT/6438  6438 R.Smaha       CHANGE/8095 K.Ston 8095 K.Stone/AP    AP                 AP                 AP                
6438 R.Smaha       6438 R.Smaha       8095 K.Stone       AP                 AP                 AP                 AP                
BEAM   LINE 2-2  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
BEAM   LINE 2-3  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6703 E.Fadely      6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    AP                 AP                 AP                
CHANGE/6333 M.McNa 6333 M.McNamara    6333 M.McNamara    6333 M.McNamara/AP AP                 AP                 AP                
6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    AP                 AP                 AP                 AP                
BEAM   LINE 4-1  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6692 N.Rivera      6789 S.Masina      6789 S.Masina      6789 S.Masina      AP                 AP                 AP                
SMB CHECKOUT/6789  6789 S.Masina      6789 S.Masina      6789 S.Masina/AP   AP                 AP                 AP                
6789 S.Masina      6789 S.Masina      6789 S.Masina      AP                 AP                 AP                 AP                
BEAM   LINE 4-2  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6057 D.Mai         6057 D.Mai         RA                 8877 T.Matsui      AP                 AP                 AP                
6057 D.Mai         RA                 CHANGE/8877 T.Mats 8877 T.Matsui/AP   AP                 AP                 AP                
6057 D.Mai         RA                 8877 T.Matsui      AP                 AP                 AP                 AP                
BEAM   LINE 4-3  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6123 H.La Pierre   6353 P.Smith       6353 P.Smith       6353 P.Smith       AP                 AP                 AP                
SMB CHECKOUT/6353  6353 P.Smith       6353 P.Smith       6353 P.Smith/AP    AP                 AP                 AP                
6353 P.Smith       6353 P.Smith       6353 P.Smith       AP                 AP                 AP                 AP                
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6762 H.Gao         6345 M.Preefer     6287 L.Dresselhaus 6287 L.Dresselhaus AP                 AP                 AP                
CHANGE/6345 M.Pree CHANGE/6287 L.Dres 6287 L.Dresselhaus 6287 L.Dresselh/AP AP                 AP                 AP                
6345 M.Preefer     6287 L.Dresselhaus 6287 L.Dresselhaus AP                 AP                 AP                 AP                
BEAM   LINE 7-2  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6700 B.Stewart     6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    AP                 AP                 AP                
CHANGE/6333 M.McNa 6333 M.McNamara    6333 M.McNamara    6333 M.McNamara/AP AP                 AP                 AP                
6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    AP                 AP                 AP                 AP                
BEAM   LINE 7-3  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
8071 R.Sarangi     8071 R.Sarangi     6324 C.Van Stappen 6324 C.Van Stappen AP                 AP                 AP                
8071 R.Sarangi     SMB CHECKOUT/6324  6324 C.Van Stappen 6324 C.Van Stap/AP AP                 AP                 AP                
8071 R.Sarangi     6324 C.Van Stappen 6324 C.Van Stappen AP                 AP                 AP                 AP                
BEAM   LINE 9-3  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
5224 V.Yachandra   FACI               FACI               FACI               AP                 AP                 AP                
FACI               FACI               FACI               AP                 AP                 AP                 AP                
FACI               FACI               FACI               AP                 AP                 AP                 AP                
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
BEAM   LINE 11-2 
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6729 R.Root        6262 A.Naranjo-Sol 6262 A.Naranjo-Sol 6262 A.Naranjo-Sol AP                 AP                 AP                
SMB CHECKOUT/6262  6262 A.Naranjo-Sol 6262 A.Naranjo-Sol 6262 A.Naranjo-/AP AP                 AP                 AP                
6262 A.Naranjo-Sol 6262 A.Naranjo-Sol 6262 A.Naranjo-Sol AP                 AP                 AP                 AP                
BEAM   LINE 11-3 
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
FACI               FACI               6172 G.Qian        6172 G.Qian        AP                 AP                 AP                
FACI               Xray CHECKOUT/6172 6172 G.Qian        6172 G.Qian/AP     AP                 AP                 AP                
FACI               6172 G.Qian        6172 G.Qian        AP                 AP                 AP                 AP                
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
DOWN               DOWN               DOWN               DOWN               AP                 AP                 AP                
DOWN               DOWN               DOWN               DOWN/AP            AP                 AP                 AP                
DOWN               DOWN               DOWN               AP                 AP                 AP                 AP                
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6333 M.McNamara    6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      AP                 AP                 AP                
CHANGE/6656 N.Shar 6656 N.Sharma      6656 N.Sharma      6656 N.Sharma/AP   AP                 AP                 AP                
6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      AP                 AP                 AP                 AP                
BEAM   LINE 15-2 
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6672 M.Delgado Jai STUP               8898 T.Kroll       8898 T.Kroll       AP                 AP                 AP                
STUP               CHANGE/8898 T.Krol 8898 T.Kroll       8898 T.Kroll/AP    AP                 AP                 AP                
STUP               8898 T.Kroll       8898 T.Kroll       AP                 AP                 AP                 AP                
BEAM   LINE 17-2 
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6258 M.Preefer     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     AP                 AP                 AP                
Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone/AP  AP                 AP                 AP                
8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     AP                 AP                 AP                 AP                

Back to Table of Contents

WEEK OF Dec. 23, 2024
                                         
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
BEAM   LINE 1-5  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-1  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-2  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-3  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-1  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-2  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-3  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 7-2  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 7-3  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 9-3  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 11-2 
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 11-3 
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 15-2 
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 17-2 
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                

Back to Table of Contents

WEEK OF Dec. 30, 2024
                                         
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
BEAM   LINE 1-5  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-1  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-2  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-3  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-1  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-2  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-3  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 7-2  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 7-3  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 9-3  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 11-2 
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 11-3 
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 15-2 
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 17-2 
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                

Back to Table of Contents

WEEK OF Jan. 06, 2025
                                         
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
BEAM   LINE 1-5  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 2-1  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 2-2  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 2-3  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 4-1  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 4-2  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 4-3  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 7-2  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 7-3  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 9-3  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 11-2 
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 11-3 
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 15-2 
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 17-2 
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              

Back to Table of Contents

WEEK OF Jan. 13, 2025
                                         
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
BEAM   LINE 1-5  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      8061 S.Hesse       8061 S.Hesse      
Unscheduled        Xray CHECKOUT/6707 6707 A.Maurya      6707 A.Maurya      Xray CHECKOUT/8061 8061 S.Hesse       8061 S.Hesse      
Unscheduled        6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      8061 S.Hesse       8061 S.Hesse       8061 S.Hesse      
BEAM   LINE 2-1  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               8095 K.Stone       Unscheduled        FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
Xray CHECKOUT/8095 Unscheduled        FACI               Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
8095 K.Stone       Unscheduled        FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 2-2  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               6152 B.Gartman     6152 B.Gartman     6152 B.Gartman     6152 B.Gartman     6811 H.Emerson     6811 H.Emerson    
CHANGE/6152 B.Gart 6152 B.Gartman     6152 B.Gartman     6152 B.Gartman     CHANGE/6811 H.Emer 6811 H.Emerson     6811 H.Emerson    
6152 B.Gartman     6152 B.Gartman     6152 B.Gartman     6152 B.Gartman     6811 H.Emerson     6811 H.Emerson     6811 H.Emerson    
BEAM   LINE 4-1  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               8099 S.Bare        8099 S.Bare        8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     6713 A.Hoffman    
CHANGE/8099 S.Bare 8099 S.Bare        CHANGE/8014 A.Hoff 8014 A.Hoffman     8014 A.Hoffman     CHANGE/6713 A.Hoff 6713 A.Hoffman    
8099 S.Bare        8099 S.Bare        8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman    
BEAM   LINE 4-2  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               8877 T.Matsui      8877 T.Matsui      6108 S.Hall        6108 S.Hall        11M3 A.Ritchhart   11M3 A.Ritchhart  
CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/6108 S.Hall 6108 S.Hall        CHANGE/11M3 A.Ritc 11M3 A.Ritchhart   CHANGE/8877 T.Mats
8877 T.Matsui      8877 T.Matsui      6108 S.Hall        6108 S.Hall        11M3 A.Ritchhart   11M3 A.Ritchhart   8877 T.Matsui     
BEAM   LINE 4-3  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               8099 S.Bare        8099 S.Bare        6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail  
SMB CHECKOUT/8099  8099 S.Bare        SMB CHECKOUT/6778  6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail  
8099 S.Bare        8099 S.Bare        6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        6425 R.Abergel     6425 R.Abergel     6425 R.Abergel     Unscheduled        Unscheduled       
Unscheduled        CHANGE/6425 R.Aber 6425 R.Abergel     6425 R.Abergel     Unscheduled        Unscheduled        Unscheduled       
Unscheduled        6425 R.Abergel     6425 R.Abergel     6425 R.Abergel     Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               FACI               Unscheduled        Unscheduled        6394 B.Maki        6394 B.Maki        6394 B.Maki       
FACI               Unscheduled        Unscheduled        CHANGE/6394 B.Maki 6394 B.Maki        6394 B.Maki        6394 B.Maki       
FACI               Unscheduled        Unscheduled        6394 B.Maki        6394 B.Maki        6394 B.Maki        6394 B.Maki       
BEAM   LINE 7-3  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        6738 K.Chacon      6738 K.Chacon      6738 K.Chacon      5964 M.Green       5964 M.Green      
Unscheduled        SMB CHECKOUT/6738  6738 K.Chacon      6738 K.Chacon      SMB CHECKOUT/5964  5964 M.Green       5964 M.Green      
Unscheduled        6738 K.Chacon      6738 K.Chacon      6738 K.Chacon      5964 M.Green       5964 M.Green       5964 M.Green      
BEAM   LINE 9-3  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               FACI               Unscheduled        Unscheduled        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
FACI               Unscheduled        Unscheduled        SMB CHECKOUT/9705  9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
FACI               Unscheduled        Unscheduled        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               FACI               FACI               FACI               FACI               6120 A.van Veelen  6120 A.van Veelen 
FACI               FACI               FACI               FACI               SMB CHECKOUT/6120  6120 A.van Veelen  6120 A.van Veelen 
FACI               FACI               FACI               FACI               6120 A.van Veelen  6120 A.van Veelen  6120 A.van Veelen 
BEAM   LINE 11-3 
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     6653 M.Preefer     6653 M.Preefer     8095 K.Stone      
Xray CHECKOUT/8907 8907 M.Preefer     8907 M.Preefer     Xray CHECKOUT/6653 6653 M.Preefer     Xray CHECKOUT/8095 8095 K.Stone      
8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     6653 M.Preefer     6653 M.Preefer     8095 K.Stone       8095 K.Stone      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               FACI               6040 B.Wan         6040 B.Wan         Unscheduled        5993 K.Kovnir      5993 K.Kovnir     
FACI               SMB CHECKOUT/6040  6040 B.Wan         Unscheduled        SMB CHECKOUT/5993  5993 K.Kovnir      5993 K.Kovnir     
FACI               6040 B.Wan         6040 B.Wan         Unscheduled        5993 K.Kovnir      5993 K.Kovnir      5993 K.Kovnir     
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               COMM               COMM               COMM               COMM               6775 A.Braun       6775 A.Braun      
COMM               COMM               COMM               COMM               CHANGE/6775 A.Brau 6775 A.Braun       6775 A.Braun      
COMM               COMM               COMM               COMM               6775 A.Braun       6775 A.Braun       6775 A.Braun      
BEAM   LINE 17-2 
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               FACI               5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki   
FACI               Xray CHECKOUT/5785 5785 J.Baniecki    Xray CHECKOUT/5785 5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki   
FACI               5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki   

Back to Table of Contents

WEEK OF Jan. 20, 2025
                                         
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
BEAM   LINE 1-5  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
8061 S.Hesse       8061 S.Hesse       6642 M.Sobkowicz K 6642 M.Sobkowicz K 6642 M.Sobkowicz K 6701 A.Ayzner      6701 A.Ayzner     
8061 S.Hesse       Xray CHECKOUT/6642 6642 M.Sobkowicz K 6642 M.Sobkowicz K Xray CHECKOUT/6701 6701 A.Ayzner      6701 A.Ayzner     
8061 S.Hesse       6642 M.Sobkowicz K 6642 M.Sobkowicz K 6642 M.Sobkowicz K 6701 A.Ayzner      6701 A.Ayzner      6701 A.Ayzner     
BEAM   LINE 2-1  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
9705 J.LiSA        9705 J.LiSA        6818 S.Saeed       6818 S.Saeed       6818 S.Saeed       8095 K.Stone       8095 K.Stone      
9705 J.LiSA        Xray CHECKOUT/6818 6818 S.Saeed       6818 S.Saeed       Xray CHECKOUT/8095 8095 K.Stone       Unscheduled       
9705 J.LiSA        6818 S.Saeed       6818 S.Saeed       6818 S.Saeed       8095 K.Stone       8095 K.Stone       Unscheduled       
BEAM   LINE 2-2  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6811 H.Emerson     6811 H.Emerson     6670 C.Lopano      6670 C.Lopano      6667 M.Stuckman    6667 M.Stuckman    6667 M.Stuckman   
6811 H.Emerson     CHANGE/6670 C.Lopa 6670 C.Lopano      CHANGE/6667 M.Stuc 6667 M.Stuckman    6667 M.Stuckman    6667 M.Stuckman   
6811 H.Emerson     6670 C.Lopano      6670 C.Lopano      6667 M.Stuckman    6667 M.Stuckman    6667 M.Stuckman    6667 M.Stuckman   
BEAM   LINE 4-1  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6713 A.Hoffman     6697 M.Yousuf      6697 M.Yousuf      6697 M.Yousuf      6697 M.Yousuf      6161 J.Finzel      6161 J.Finzel     
CHANGE/6697 M.Yous 6697 M.Yousuf      6697 M.Yousuf      6697 M.Yousuf      CHANGE/6161 J.Finz 6161 J.Finzel      6161 J.Finzel     
6697 M.Yousuf      6697 M.Yousuf      6697 M.Yousuf      6697 M.Yousuf      6161 J.Finzel      6161 J.Finzel      6161 J.Finzel     
BEAM   LINE 4-2  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
8877 T.Matsui      RA                 6702 Y.Na          6702 Y.Na          12C8 M.Beck        6806 R.Dauskardt   6806 R.Dauskardt  
RA                 CHANGE/6702 Y.Na   6702 Y.Na          CHANGE/12C8 M.Beck CHANGE/6806 R.Daus 6806 R.Dauskardt   6806 R.Dauskardt  
RA                 6702 Y.Na          6702 Y.Na          12C8 M.Beck        6806 R.Dauskardt   6806 R.Dauskardt   6806 R.Dauskardt  
BEAM   LINE 4-3  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6778 U.Kurumbail   Unscheduled        6804 Y.Cho         6804 Y.Cho         6804 Y.Cho         6667 M.Stuckman    6667 M.Stuckman   
Unscheduled        SMB CHECKOUT/6804  6804 Y.Cho         6804 Y.Cho         SMB CHECKOUT/6667  6667 M.Stuckman    6667 M.Stuckman   
Unscheduled        6804 Y.Cho         6804 Y.Cho         6804 Y.Cho         6667 M.Stuckman    6667 M.Stuckman    6667 M.Stuckman   
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
Unscheduled        Unscheduled        8890 J.Nelson Weke 6675 C.Cao         6675 C.Cao         6641 R.Hannagan    6641 R.Hannagan   
Unscheduled        CHANGE/8890 J.Nels CHANGE/6675 C.Cao  6675 C.Cao         CHANGE/6641 R.Hann 6641 R.Hannagan    6641 R.Hannagan   
Unscheduled        8890 J.Nelson Weke 6675 C.Cao         6675 C.Cao         6641 R.Hannagan    6641 R.Hannagan    6641 R.Hannagan   
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6394 B.Maki        6B96 E.Snell       6B96 E.Snell       8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
CHANGE/6B96 E.Snel 6B96 E.Snell       CHANGE/8867 S.Webb 8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
6B96 E.Snell       6B96 E.Snell       8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
BEAM   LINE 7-3  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
5964 M.Green       5964 M.Green       6469 A.Braun       6554 K.Lui         6554 K.Lui         5393 C.Dewey       5393 C.Dewey      
5964 M.Green       SMB CHECKOUT/6469  SMB CHECKOUT/6554  6554 K.Lui         SMB CHECKOUT/5393  5393 C.Dewey       5393 C.Dewey      
5964 M.Green       6469 A.Braun       6554 K.Lui         6554 K.Lui         5393 C.Dewey       5393 C.Dewey       5393 C.Dewey      
BEAM   LINE 9-3  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
9705 J.LiSA        9705 J.LiSA        6677 Z.Liang       6677 Z.Liang       6677 Z.Liang       8090 J.Nelson Weke 8090 J.Nelson Weke
9705 J.LiSA        SMB CHECKOUT/6677  6677 Z.Liang       6677 Z.Liang       SMB CHECKOUT/8090  8090 J.Nelson Weke 8090 J.Nelson Weke
9705 J.LiSA        6677 Z.Liang       6677 Z.Liang       6677 Z.Liang       8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6120 A.van Veelen  6120 A.van Veelen  6120 A.van Veelen  6138 E.Balboni     6138 E.Balboni     6691 A.van Veelen  6691 A.van Veelen 
6120 A.van Veelen  6120 A.van Veelen  SMB CHECKOUT/6138  6138 E.Balboni     SMB CHECKOUT/6691  6691 A.van Veelen  6691 A.van Veelen 
6120 A.van Veelen  6120 A.van Veelen  6138 E.Balboni     6138 E.Balboni     6691 A.van Veelen  6691 A.van Veelen  6691 A.van Veelen 
BEAM   LINE 11-3 
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
8095 K.Stone       8095 K.Stone       6810 Z.Liang       6810 Z.Liang       6810 Z.Liang       6818 S.Saeed       6818 S.Saeed      
8095 K.Stone       Xray CHECKOUT/6810 6810 Z.Liang       6810 Z.Liang       Xray CHECKOUT/6818 6818 S.Saeed       6818 S.Saeed      
8095 K.Stone       6810 Z.Liang       6810 Z.Liang       6810 Z.Liang       6818 S.Saeed       6818 S.Saeed       6818 S.Saeed      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
5993 K.Kovnir      5993 K.Kovnir      DOWN               DOWN               DOWN               DOWN               DOWN              
5993 K.Kovnir      DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
5993 K.Kovnir      DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
DOWN               FACI               FACI               6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      6656 N.Sharma     
FACI               FACI               CHANGE/6656 N.Shar 6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      6656 N.Sharma     
FACI               FACI               6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      6656 N.Sharma     
BEAM   LINE 15-2 
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6775 A.Braun       6775 A.Braun       6745 D.Eum         6745 D.Eum         6745 D.Eum         COMM               COMM              
6775 A.Braun       CHANGE/6745 D.Eum  6745 D.Eum         6745 D.Eum         COMM               COMM               COMM              
6775 A.Braun       6745 D.Eum         6745 D.Eum         6745 D.Eum         COMM               COMM               COMM              
BEAM   LINE 17-2 
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
5785 J.Baniecki    5785 J.Baniecki    FACI               FACI               FACI               6367 E.Abdo        6367 E.Abdo       
5785 J.Baniecki    FACI               FACI               FACI               Xray CHECKOUT/6367 6367 E.Abdo        6367 E.Abdo       
5785 J.Baniecki    FACI               FACI               FACI               6367 E.Abdo        6367 E.Abdo        6367 E.Abdo       

Back to Table of Contents

WEEK OF Jan. 27, 2025
                                         
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
BEAM   LINE 1-5  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6701 A.Ayzner/AP   AP                 AP                 6711 N.Strange     6711 N.Strange     6711 N.Strange     6711 N.Strange    
AP                 AP                 Xray CHECKOUT/6711 6711 N.Strange     6711 N.Strange     6711 N.Strange     6711 N.Strange    
AP                 AP                 6711 N.Strange     6711 N.Strange     6711 N.Strange     6711 N.Strange     6711 N.Strange    
BEAM   LINE 2-1  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
AP                 AP                 AP                 93K1 B.Saini       93K1 B.Saini       6305 W.Go          6305 W.Go         
AP                 AP                 Xray CHECKOUT/93K1 93K1 B.Saini       Xray CHECKOUT/6305 6305 W.Go          6305 W.Go         
AP                 AP                 93K1 B.Saini       93K1 B.Saini       6305 W.Go          6305 W.Go          6305 W.Go         
BEAM   LINE 2-2  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6667 M.Stuckman/AP AP                 AP                 6825 G.Chen        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 CHANGE/6825 G.Chen CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 6825 G.Chen        8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 4-1  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6161 J.Finzel/AP   AP                 AP                 6753 G.Bejger      6753 G.Bejger      6753 G.Bejger      6753 G.Bejger     
AP                 AP                 SMB CHECKOUT/6753  6753 G.Bejger      6753 G.Bejger      6753 G.Bejger      6753 G.Bejger     
AP                 AP                 6753 G.Bejger      6753 G.Bejger      6753 G.Bejger      6753 G.Bejger      6753 G.Bejger     
BEAM   LINE 4-2  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6806 R.Dauskard/AP AP                 AP                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
AP                 AP                 CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
AP                 AP                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6667 M.Stuckman/AP AP                 AP                 6773 A.Yang        6773 A.Yang        6479 G.Chen        6479 G.Chen       
AP                 AP                 SMB CHECKOUT/6773  6773 A.Yang        SMB CHECKOUT/6479  6479 G.Chen        6479 G.Chen       
AP                 AP                 6773 A.Yang        6773 A.Yang        6479 G.Chen        6479 G.Chen        6479 G.Chen       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6641 R.Hannagan/AP AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
AP                 AP                 AP                 FACI               8090 J.Nelson Weke 6712 D.Agyeman-Bud 6712 D.Agyeman-Bud
AP                 AP                 FACI               CHANGE/8090 J.Nels CHANGE/6712 D.Agye 6712 D.Agyeman-Bud 6712 D.Agyeman-Bud
AP                 AP                 FACI               8090 J.Nelson Weke 6712 D.Agyeman-Bud 6712 D.Agyeman-Bud 6712 D.Agyeman-Bud
BEAM   LINE 7-2  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
8867 S.Webb/AP     AP                 AP                 6795 B.Lee         6795 B.Lee         6588 E.Espinosa Vi 6588 E.Espinosa Vi
AP                 AP                 CHANGE/6795 B.Lee  6795 B.Lee         CHANGE/6588 E.Espi 6588 E.Espinosa Vi 6588 E.Espinosa Vi
AP                 AP                 6795 B.Lee         6795 B.Lee         6588 E.Espinosa Vi 6588 E.Espinosa Vi 6588 E.Espinosa Vi
BEAM   LINE 7-3  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
5393 C.Dewey/AP    AP                 AP                 11M1 J.Bridwell-Ra 11M1 J.Bridwell-Ra 5910 E.Pierce      5910 E.Pierce     
AP                 AP                 SMB CHECKOUT/11M1  11M1 J.Bridwell-Ra SMB CHECKOUT/5910  5910 E.Pierce      5910 E.Pierce     
AP                 AP                 11M1 J.Bridwell-Ra 11M1 J.Bridwell-Ra 5910 E.Pierce      5910 E.Pierce      5910 E.Pierce     
BEAM   LINE 9-3  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
8090 J.Nelson W/AP AP                 AP                 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
AP                 AP                 SMB CHECKOUT/8871  8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
AP                 AP                 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6691 A.van Veel/AP AP                 AP                 6811 H.Emerson     6811 H.Emerson     6626 S.Saslow      6626 S.Saslow     
AP                 AP                 SMB CHECKOUT/6811  6811 H.Emerson     SMB CHECKOUT/6626  6626 S.Saslow      6626 S.Saslow     
AP                 AP                 6811 H.Emerson     6811 H.Emerson     6626 S.Saslow      6626 S.Saslow      6626 S.Saslow     
BEAM   LINE 11-3 
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6818 S.Saeed/AP    AP                 AP                 6657 X.Zheng       6657 X.Zheng       6429 H.Ramachandra 6429 H.Ramachandra
AP                 AP                 Xray CHECKOUT/6657 6657 X.Zheng       Xray CHECKOUT/6429 6429 H.Ramachandra 6429 H.Ramachandra
AP                 AP                 6657 X.Zheng       6657 X.Zheng       6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6656 N.Sharma/AP   AP                 AP                 6812 T.Varga       6812 T.Varga       6812 T.Varga       6812 T.Varga      
AP                 AP                 CHANGE/6812 T.Varg 6812 T.Varga       6812 T.Varga       6812 T.Varga       6812 T.Varga      
AP                 AP                 6812 T.Varga       6812 T.Varga       6812 T.Varga       6812 T.Varga       6812 T.Varga      
BEAM   LINE 15-2 
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
COMM/AP            AP                 AP                 6149 U.Bovensiepen 6149 U.Bovensiepen 6149 U.Bovensiepen 6149 U.Bovensiepen
AP                 AP                 CHANGE/6149 U.Bove 6149 U.Bovensiepen 6149 U.Bovensiepen 6149 U.Bovensiepen CHANGE/6724 A.Nara
AP                 AP                 6149 U.Bovensiepen 6149 U.Bovensiepen 6149 U.Bovensiepen 6149 U.Bovensiepen 6724 A.Narayanan N
BEAM   LINE 17-2 
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6367 E.Abdo/AP     AP                 AP                 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       8061 S.Hesse      
AP                 AP                 Xray CHECKOUT/8061 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       8061 S.Hesse      
AP                 AP                 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       8061 S.Hesse      

Back to Table of Contents

WEEK OF Feb. 03, 2025
                                         
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
BEAM   LINE 1-5  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6711 N.Strange     6623 D.Banerjee    6623 D.Banerjee    6623 D.Banerjee    6336 S.Ju          6336 S.Ju          6336 S.Ju         
Xray CHECKOUT/6623 6623 D.Banerjee    6623 D.Banerjee    Xray CHECKOUT/6336 6336 S.Ju          6336 S.Ju          6336 S.Ju         
6623 D.Banerjee    6623 D.Banerjee    6623 D.Banerjee    6336 S.Ju          6336 S.Ju          6336 S.Ju          6336 S.Ju         
BEAM   LINE 2-1  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6305 W.Go          8095 K.Stone       Unscheduled        6501 D.Billing     6501 D.Billing     6501 D.Billing     6501 D.Billing    
Xray CHECKOUT/8095 Unscheduled        Xray CHECKOUT/6501 6501 D.Billing     6501 D.Billing     6501 D.Billing     Unscheduled       
8095 K.Stone       Unscheduled        6501 D.Billing     6501 D.Billing     6501 D.Billing     6501 D.Billing     Unscheduled       
BEAM   LINE 2-2  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
8067 S.Webb        6718 E.Nuccio      6718 E.Nuccio      6795 B.Lee         6795 B.Lee         6604 C.Crain       6604 C.Crain      
CHANGE/6718 E.Nucc 6718 E.Nuccio      CHANGE/6795 B.Lee  6795 B.Lee         CHANGE/6604 C.Crai 6604 C.Crain       6604 C.Crain      
6718 E.Nuccio      6718 E.Nuccio      6795 B.Lee         6795 B.Lee         6604 C.Crain       6604 C.Crain       6604 C.Crain      
BEAM   LINE 4-1  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6753 G.Bejger      Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
8877 T.Matsui      12D3 E.Araujo      12D3 E.Araujo      12D3 E.Araujo      Unscheduled        Unscheduled        5983 S.Zhang      
CHANGE/12D3 E.Arau 12D3 E.Araujo      12D3 E.Araujo      Unscheduled        Unscheduled        CHANGE/5983 S.Zhan 5983 S.Zhang      
12D3 E.Araujo      12D3 E.Araujo      12D3 E.Araujo      Unscheduled        Unscheduled        5983 S.Zhang       5983 S.Zhang      
BEAM   LINE 4-3  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6479 G.Chen        6810 Z.Liang       6810 Z.Liang       6733 T.Xu          6733 T.Xu          6778 U.Kurumbail   6778 U.Kurumbail  
SMB CHECKOUT/6810  6810 Z.Liang       SMB CHECKOUT/6733  6733 T.Xu          Xray CHECKOUT/6778 6778 U.Kurumbail   6778 U.Kurumbail  
6810 Z.Liang       6810 Z.Liang       6733 T.Xu          6733 T.Xu          6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6712 D.Agyeman-Bud 6820 E.Santos      6820 E.Santos      6584 T.Kim         6584 T.Kim         6740 S.Singh       6740 S.Singh      
Xray CHECKOUT/6820 6820 E.Santos      CHANGE/6584 T.Kim  6584 T.Kim         CHANGE/6740 S.Sing 6740 S.Singh       6740 S.Singh      
6820 E.Santos      6820 E.Santos      6584 T.Kim         6584 T.Kim         6740 S.Singh       6740 S.Singh       6740 S.Singh      
BEAM   LINE 7-2  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6588 E.Espinosa Vi 6758 S.Tian        6758 S.Tian        6758 S.Tian        6615 L.Lu          6615 L.Lu          6615 L.Lu         
CHANGE/6758 S.Tian 6758 S.Tian        6758 S.Tian        CHANGE/6615 L.Lu   6615 L.Lu          6615 L.Lu          6615 L.Lu         
6758 S.Tian        6758 S.Tian        6758 S.Tian        6615 L.Lu          6615 L.Lu          6615 L.Lu          6615 L.Lu         
BEAM   LINE 7-3  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
5910 E.Pierce      6716 A.Johs        6716 A.Johs        6565 L.Mydy        6617 S.Dai         6376 G.Borgstahl   6376 G.Borgstahl  
SMB CHECKOUT/6716  6716 A.Johs        SMB CHECKOUT/6565  SMB CHECKOUT/6617  Xray CHECKOUT/6376 6376 G.Borgstahl   6376 G.Borgstahl  
6716 A.Johs        6716 A.Johs        6565 L.Mydy        6617 S.Dai         6376 G.Borgstahl   6376 G.Borgstahl   6376 G.Borgstahl  
BEAM   LINE 9-3  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
8871 R.Sarangi     FACI               FACI               FACI               FACI               8098 T.Kroll       8098 T.Kroll      
FACI               FACI               FACI               FACI               Xray CHECKOUT/8098 8098 T.Kroll       8098 T.Kroll      
FACI               FACI               FACI               FACI               8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6626 S.Saslow      6847 C.Zweifel     6847 C.Zweifel     6847 C.Zweifel     6700 B.Stewart     6700 B.Stewart     6700 B.Stewart    
SMB CHECKOUT/6847  6847 C.Zweifel     6847 C.Zweifel     SMB CHECKOUT/6700  6700 B.Stewart     6700 B.Stewart     6700 B.Stewart    
6847 C.Zweifel     6847 C.Zweifel     6847 C.Zweifel     6700 B.Stewart     6700 B.Stewart     6700 B.Stewart     6700 B.Stewart    
BEAM   LINE 11-3 
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6429 H.Ramachandra 5562 H.Cumberbatch 5562 H.Cumberbatch Unscheduled        6825 G.Chen        6825 G.Chen        6825 G.Chen       
Xray CHECKOUT/5562 5562 H.Cumberbatch Unscheduled        Xray CHECKOUT/6825 6825 G.Chen        6825 G.Chen        6825 G.Chen       
5562 H.Cumberbatch 5562 H.Cumberbatch Unscheduled        6825 G.Chen        6825 G.Chen        6825 G.Chen        6825 G.Chen       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6812 T.Varga       FACI               6710 V.Noel        6710 V.Noel        6710 V.Noel        6718 E.Nuccio      6718 E.Nuccio     
FACI               CHANGE/6710 V.Noel 6710 V.Noel        6710 V.Noel        CHANGE/6718 E.Nucc 6718 E.Nuccio      6718 E.Nuccio     
FACI               6710 V.Noel        6710 V.Noel        6710 V.Noel        6718 E.Nuccio      6718 E.Nuccio      6718 E.Nuccio     
BEAM   LINE 15-2 
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6724 A.Narayanan N 6724 A.Narayanan N 6724 A.Narayanan N 6641 R.Hannagan    6641 R.Hannagan    6498 G.Kamat       6498 G.Kamat      
6724 A.Narayanan N 6724 A.Narayanan N CHANGE/6641 R.Hann 6641 R.Hannagan    CHANGE/6498 G.Kama 6498 G.Kamat       6498 G.Kamat      
6724 A.Narayanan N 6724 A.Narayanan N 6641 R.Hannagan    6641 R.Hannagan    6498 G.Kamat       6498 G.Kamat       6498 G.Kamat      
BEAM   LINE 17-2 
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
8061 S.Hesse       Unscheduled        Unscheduled        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       
Unscheduled        Unscheduled        SU class exp/8224  8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       
Unscheduled        Unscheduled        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       

Back to Table of Contents

WEEK OF Feb. 10, 2025
                                         
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
BEAM   LINE 1-5  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6336 S.Ju/AP       AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        6604 C.Crain       6604 C.Crain      
AP                 AP                 Unscheduled        Unscheduled        Xray CHECKOUT/6604 6604 C.Crain       6604 C.Crain      
AP                 AP                 Unscheduled        Unscheduled        6604 C.Crain       6604 C.Crain       6604 C.Crain      
BEAM   LINE 2-2  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6604 C.Crain/AP    AP                 AP                 6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
AP                 AP                 CHANGE/6703 E.Fade 6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
AP                 AP                 6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
BEAM   LINE 4-1  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
5983 S.Zhang/AP    AP                 AP                 8877 T.Matsui      12D1 J.McFarlane   12D1 J.McFarlane   8877 T.Matsui     
AP                 AP                 CHANGE/8877 T.Mats CHANGE/12D1 J.McFa 12D1 J.McFarlane   CHANGE/8877 T.Mats 8877 T.Matsui     
AP                 AP                 8877 T.Matsui      12D1 J.McFarlane   12D1 J.McFarlane   8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6778 U.Kurumbai/AP AP                 AP                 6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
AP                 AP                 SMB CHECKOUT/6860  6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
AP                 AP                 6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6740 S.Singh/AP    AP                 AP                 6345 M.Preefer     6345 M.Preefer     6604 C.Crain       6604 C.Crain      
AP                 AP                 CHANGE/6345 M.Pree 6345 M.Preefer     CHANGE/6604 C.Crai 6604 C.Crain       6604 C.Crain      
AP                 AP                 6345 M.Preefer     6345 M.Preefer     6604 C.Crain       6604 C.Crain       6604 C.Crain      
BEAM   LINE 7-2  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6615 L.Lu/AP       AP                 AP                 6772 R.Bryant      6772 R.Bryant      6210 A.Kravchenko  6210 A.Kravchenko 
AP                 AP                 CHANGE/6772 R.Brya 6772 R.Bryant      CHANGE/6210 A.Krav 6210 A.Kravchenko  6210 A.Kravchenko 
AP                 AP                 6772 R.Bryant      6772 R.Bryant      6210 A.Kravchenko  6210 A.Kravchenko  6210 A.Kravchenko 
BEAM   LINE 7-3  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6376 G.Borgstah/AP AP                 AP                 6872 K.Zhao        6872 K.Zhao        8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 Xray CHECKOUT/6872 6872 K.Zhao        Xray CHECKOUT/8071 8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 6872 K.Zhao        6872 K.Zhao        8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 9-3  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
8098 T.Kroll/AP    AP                 AP                 6438 R.Smaha       6438 R.Smaha       8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 Xray CHECKOUT/6438 6438 R.Smaha       Xray CHECKOUT/8092 8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 6438 R.Smaha       6438 R.Smaha       8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6700 B.Stewart/AP  AP                 AP                 Unscheduled        Unscheduled        6729 R.Root        6729 R.Root       
AP                 AP                 Unscheduled        Unscheduled        SMB CHECKOUT/6729  6729 R.Root        6729 R.Root       
AP                 AP                 Unscheduled        Unscheduled        6729 R.Root        6729 R.Root        6729 R.Root       
BEAM   LINE 11-3 
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6825 G.Chen/AP     AP                 AP                 6438 R.Smaha       FACI               6367 E.Abdo        6367 E.Abdo       
AP                 AP                 Xray CHECKOUT/6438 FACI               Xray CHECKOUT/6367 6367 E.Abdo        6367 E.Abdo       
AP                 AP                 6438 R.Smaha       FACI               6367 E.Abdo        6367 E.Abdo        6367 E.Abdo       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6718 E.Nuccio/AP   AP                 AP                 6795 B.Lee         6795 B.Lee         6772 R.Bryant      6772 R.Bryant     
AP                 AP                 CHANGE/6795 B.Lee  6795 B.Lee         CHANGE/6772 R.Brya 6772 R.Bryant      6772 R.Bryant     
AP                 AP                 6795 B.Lee         6795 B.Lee         6772 R.Bryant      6772 R.Bryant      6772 R.Bryant     
BEAM   LINE 15-2 
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6498 G.Kamat/AP    AP                 AP                 6376 G.Borgstahl   6376 G.Borgstahl   6282 T.Hersbach    6282 T.Hersbach   
AP                 AP                 Xray CHECKOUT/6376 6376 G.Borgstahl   Xray CHECKOUT/6282 6282 T.Hersbach    6282 T.Hersbach   
AP                 AP                 6376 G.Borgstahl   6376 G.Borgstahl   6282 T.Hersbach    6282 T.Hersbach    6282 T.Hersbach   
BEAM   LINE 17-2 
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
8224 D.Reis/AP     AP                 AP                 FACI               6391 J.Li          6391 J.Li          6391 J.Li         
AP                 AP                 FACI               Xray CHECKOUT/8049 6391 J.Li          6391 J.Li          6391 J.Li         
AP                 AP                 FACI               Xray CHECKOUT/6391 6391 J.Li          6391 J.Li          6391 J.Li         

Back to Table of Contents

WEEK OF Feb. 17, 2025
                                         
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
BEAM   LINE 1-5  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
FACI               FACI               6343 J.Arens       FACI               6688 Y.Shi         6688 Y.Shi         6688 Y.Shi        
FACI               Xray CHECKOUT/6343 FACI               Xray CHECKOUT/6688 6688 Y.Shi         6688 Y.Shi         6688 Y.Shi        
FACI               6343 J.Arens       FACI               6688 Y.Shi         6688 Y.Shi         6688 Y.Shi         6688 Y.Shi        
BEAM   LINE 2-1  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6604 C.Crain       6604 C.Crain       Unscheduled        Unscheduled        Unscheduled        8095 K.Stone       8095 K.Stone      
6604 C.Crain       Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/8095 8095 K.Stone       Unscheduled       
6604 C.Crain       Unscheduled        Unscheduled        Unscheduled        8095 K.Stone       8095 K.Stone       Unscheduled       
BEAM   LINE 2-2  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6703 E.Fadely      6657 X.Zheng       6657 X.Zheng       6671 M.Engel       6671 M.Engel       6113 V.Noel        6113 V.Noel       
CHANGE/6657 X.Zhen 6657 X.Zheng       CHANGE/6671 M.Enge 6671 M.Engel       CHANGE/6113 V.Noel 6113 V.Noel        6113 V.Noel       
6657 X.Zheng       6657 X.Zheng       6671 M.Engel       6671 M.Engel       6113 V.Noel        6113 V.Noel        6113 V.Noel       
BEAM   LINE 4-1  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
8877 T.Matsui      8877 T.Matsui      6743 A.Hussain     8047 T.Weiss       8047 T.Weiss       5497 M.Georgiadis  5497 M.Georgiadis 
8877 T.Matsui      CHANGE/6743 A.Huss CHANGE/8047 T.Weis 8047 T.Weiss       CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
8877 T.Matsui      6743 A.Hussain     8047 T.Weiss       8047 T.Weiss       5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6860 S.Kozimor     6860 S.Kozimor     6671 M.Engel       6671 M.Engel       6209 A.Braun       6209 A.Braun       6887 M.Waters     
6860 S.Kozimor     SMB CHECKOUT/6671  6671 M.Engel       SMB CHECKOUT/6209  6209 A.Braun       SMB CHECKOUT/6887  6887 M.Waters     
6860 S.Kozimor     6671 M.Engel       6671 M.Engel       6209 A.Braun       6209 A.Braun       6887 M.Waters      6887 M.Waters     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6604 C.Crain       6604 C.Crain       6858 P.Mukherjee   6858 P.Mukherjee   6562 E.Allen       6562 E.Allen       6562 E.Allen      
6604 C.Crain       CHANGE/6858 P.Mukh 6858 P.Mukherjee   CHANGE/6562 E.Alle 6562 E.Allen       6562 E.Allen       6562 E.Allen      
6604 C.Crain       6858 P.Mukherjee   6858 P.Mukherjee   6562 E.Allen       6562 E.Allen       6562 E.Allen       6562 E.Allen      
BEAM   LINE 7-2  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6210 A.Kravchenko  6538 A.Duncan      6538 A.Duncan      6538 A.Duncan      6538 A.Duncan      6710 V.Noel        6710 V.Noel       
CHANGE/6538 A.Dunc 6538 A.Duncan      6538 A.Duncan      6538 A.Duncan      CHANGE/6710 V.Noel 6710 V.Noel        6710 V.Noel       
6538 A.Duncan      6538 A.Duncan      6538 A.Duncan      6538 A.Duncan      6710 V.Noel        6710 V.Noel        6710 V.Noel       
BEAM   LINE 7-3  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi     6874 L.Li          6874 L.Li          6738 K.Chacon      6738 K.Chacon     
8071 R.Sarangi     8071 R.Sarangi     Xray CHECKOUT/6874 6874 L.Li          Xray CHECKOUT/6738 6738 K.Chacon      6738 K.Chacon     
8071 R.Sarangi     8071 R.Sarangi     6874 L.Li          6874 L.Li          6738 K.Chacon      6738 K.Chacon      6738 K.Chacon     
BEAM   LINE 9-3  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
8092 D.Sokaras     8092 D.Sokaras     8090 J.Nelson Weke 8090 J.Nelson Weke 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
8092 D.Sokaras     Xray CHECKOUT/8090 8090 J.Nelson Weke Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
8092 D.Sokaras     8090 J.Nelson Weke 8090 J.Nelson Weke 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6729 R.Root        6729 R.Root        6626 S.Saslow      6626 S.Saslow      6811 H.Emerson     6140 F.Bridges     6140 F.Bridges    
6729 R.Root        SMB CHECKOUT/6626  6626 S.Saslow      CHANGE/6811 H.Emer Xray CHECKOUT/6140 6140 F.Bridges     6140 F.Bridges    
6729 R.Root        6626 S.Saslow      6626 S.Saslow      6811 H.Emerson     6140 F.Bridges     6140 F.Bridges     6140 F.Bridges    
BEAM   LINE 11-3 
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6367 E.Abdo        8061 S.Hesse       FACI               8061 S.Hesse       8095 K.Stone       8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/8061 FACI               8061 S.Hesse       Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone       8095 K.Stone      
8061 S.Hesse       FACI               8061 S.Hesse       8095 K.Stone       8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6772 R.Bryant      8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  6656 N.Sharma      6656 N.Sharma     
CHANGE/8019 J.Rich 8019 J.Richardson  CHANGE/8019 J.Rich 8019 J.Richardson  CHANGE/6656 N.Shar 6656 N.Sharma      6656 N.Sharma     
8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  6656 N.Sharma      6656 N.Sharma      6656 N.Sharma     
BEAM   LINE 15-2 
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6282 T.Hersbach    6282 T.Hersbach    STUP               6077 M.Baker       6077 M.Baker       6646 S.Hayes       6646 S.Hayes      
6282 T.Hersbach    STUP               Xray CHECKOUT/6077 6077 M.Baker       Xray CHECKOUT/6646 6646 S.Hayes       6646 S.Hayes      
6282 T.Hersbach    STUP               6077 M.Baker       6077 M.Baker       6646 S.Hayes       6646 S.Hayes       6646 S.Hayes      
BEAM   LINE 17-2 
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6391 J.Li          6391 J.Li          6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich   6709 J.Turner     
6391 J.Li          Xray CHECKOUT/6457 6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich   CHANGE/6709 J.Turn 6709 J.Turner     
6391 J.Li          6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich   6709 J.Turner      6709 J.Turner     

Back to Table of Contents

WEEK OF Feb. 24, 2025
                                         
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
BEAM   LINE 1-5  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6688 Y.Shi/AP      AP                 AP                 FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
AP                 AP                 FACI               Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
AP                 AP                 FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        8062 M.Preefer    
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        CHANGE/8062 M.Pree 8062 M.Preefer    
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        8062 M.Preefer     8062 M.Preefer    
BEAM   LINE 2-2  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6113 V.Noel/AP     AP                 AP                 6629 D.Rodrigues   6629 D.Rodrigues   8019 J.Richardson  8019 J.Richardson 
AP                 AP                 CHANGE/6629 D.Rodr 6629 D.Rodrigues   CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson 
AP                 AP                 6629 D.Rodrigues   6629 D.Rodrigues   8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
BEAM   LINE 4-1  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
5497 M.Georgiad/AP AP                 AP                 8077 T.Matsui      8077 T.Matsui      8077 T.Matsui      8077 T.Matsui     
AP                 AP                 CHANGE/8077 T.Mats 8077 T.Matsui      8077 T.Matsui      8077 T.Matsui      8077 T.Matsui     
AP                 AP                 8077 T.Matsui      8077 T.Matsui      8077 T.Matsui      8077 T.Matsui      8077 T.Matsui     
BEAM   LINE 4-3  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6887 M.Waters/AP   AP                 AP                 8090 J.Nelson Weke 8090 J.Nelson Weke 6825 G.Chen        6825 G.Chen       
AP                 AP                 SMB CHECKOUT/8090  8090 J.Nelson Weke Xray CHECKOUT/6825 6825 G.Chen        6825 G.Chen       
AP                 AP                 8090 J.Nelson Weke 8090 J.Nelson Weke 6825 G.Chen        6825 G.Chen        6825 G.Chen       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6562 E.Allen/AP    AP                 AP                 FACI               6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana
AP                 AP                 FACI               CHANGE/6843 A.Mani 6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana
AP                 AP                 FACI               6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana
BEAM   LINE 7-2  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6710 V.Noel/AP     AP                 AP                 6700 B.Stewart     6700 B.Stewart     8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 CHANGE/6700 B.Stew 6700 B.Stewart     CHANGE/8092 D.Soka 8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 6700 B.Stewart     6700 B.Stewart     8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 7-3  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6738 K.Chacon/AP   AP                 AP                 Unscheduled        Unscheduled        6530 L.Quintanar   6530 L.Quintanar  
AP                 AP                 Unscheduled        Unscheduled        Xray CHECKOUT/6530 6530 L.Quintanar   6530 L.Quintanar  
AP                 AP                 Unscheduled        Unscheduled        6530 L.Quintanar   6530 L.Quintanar   6530 L.Quintanar  
BEAM   LINE 9-3  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
9705 J.LiSA/AP     AP                 AP                 8099 S.Bare        6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers   
AP                 AP                 Xray CHECKOUT/8099 Xray CHECKOUT/6699 6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers   
AP                 AP                 8099 S.Bare        6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers   
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6140 F.Bridges/AP  AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-3 
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
8095 K.Stone/AP    AP                 AP                 6788 A.Magni       6788 A.Magni       6055 M.Chabinyc    6055 M.Chabinyc   
AP                 AP                 Xray CHECKOUT/6788 6788 A.Magni       Xray CHECKOUT/6055 6055 M.Chabinyc    6055 M.Chabinyc   
AP                 AP                 6788 A.Magni       6788 A.Magni       6055 M.Chabinyc    6055 M.Chabinyc    6055 M.Chabinyc   
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6656 N.Sharma/AP   AP                 AP                 6801 H.Lyu         6801 H.Lyu         6830 H.Hao         6830 H.Hao        
AP                 AP                 CHANGE/6801 H.Lyu  6801 H.Lyu         CHANGE/6830 H.Hao  6830 H.Hao         6830 H.Hao        
AP                 AP                 6801 H.Lyu         6801 H.Lyu         6830 H.Hao         6830 H.Hao         6830 H.Hao        
BEAM   LINE 15-2 
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6646 S.Hayes/AP    AP                 AP                 6684 J.Babicz      6684 J.Babicz      6872 K.Zhao        6872 K.Zhao       
AP                 AP                 Xray CHECKOUT/6684 6684 J.Babicz      Xray CHECKOUT/6872 6872 K.Zhao        6872 K.Zhao       
AP                 AP                 6684 J.Babicz      6684 J.Babicz      6872 K.Zhao        6872 K.Zhao        6872 K.Zhao       
BEAM   LINE 17-2 
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6709 J.Turner/AP   AP                 AP                 8049 V.Thampy      8049 V.Thampy      6687 N.Kundu       6687 N.Kundu      
AP                 AP                 Xray CHECKOUT/8049 8049 V.Thampy      Xray CHECKOUT/6687 6687 N.Kundu       6687 N.Kundu      
AP                 AP                 8049 V.Thampy      8049 V.Thampy      6687 N.Kundu       6687 N.Kundu       6687 N.Kundu      

Back to Table of Contents

WEEK OF Mar. 03, 2025
                                         
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
BEAM   LINE 1-5  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
8091 C.Tassone     6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      FACI               6711 N.Strange     6711 N.Strange    
Xray CHECKOUT/6707 6707 A.Maurya      6707 A.Maurya      FACI               Xray CHECKOUT/6711 6711 N.Strange     6711 N.Strange    
6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      FACI               6711 N.Strange     6711 N.Strange     6711 N.Strange    
BEAM   LINE 2-1  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
8062 M.Preefer     6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra 6679 M.Cosby       6679 M.Cosby      
Xray CHECKOUT/6429 6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra Xray CHECKOUT/6679 6679 M.Cosby       6679 M.Cosby      
6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra 6679 M.Cosby       6679 M.Cosby       6679 M.Cosby      
BEAM   LINE 2-2  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
8019 J.Richardson  6852 R.Root        6852 R.Root        6014 D.Fike        6014 D.Fike        6670 C.Lopano      6670 C.Lopano     
CHANGE/6852 R.Root 6852 R.Root        CHANGE/6014 D.Fike 6014 D.Fike        CHANGE/6670 C.Lopa 6670 C.Lopano      6670 C.Lopano     
6852 R.Root        6852 R.Root        6014 D.Fike        6014 D.Fike        6670 C.Lopano      6670 C.Lopano      6670 C.Lopano     
BEAM   LINE 4-1  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
8077 T.Matsui      Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6825 G.Chen        6677 Z.Liang       6677 Z.Liang       6516 A.Evers       6516 A.Evers       6163 G.George      6163 G.George     
SMB CHECKOUT/6677  6677 Z.Liang       SMB CHECKOUT/6516  6516 A.Evers       SMB CHECKOUT/6163  6163 G.George      6163 G.George     
6677 Z.Liang       6677 Z.Liang       6516 A.Evers       6516 A.Evers       6163 G.George      6163 G.George      6163 G.George     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6843 A.Maniyangana 6791 M.Machado Ama 6791 M.Machado Ama 6791 M.Machado Ama 6809 E.Espinosa Vi 6809 E.Espinosa Vi 6809 E.Espinosa Vi
CHANGE/6791 M.Mach 6791 M.Machado Ama 6791 M.Machado Ama CHANGE/6809 E.Espi 6809 E.Espinosa Vi 6809 E.Espinosa Vi 6809 E.Espinosa Vi
6791 M.Machado Ama 6791 M.Machado Ama 6791 M.Machado Ama 6809 E.Espinosa Vi 6809 E.Espinosa Vi 6809 E.Espinosa Vi 6809 E.Espinosa Vi
BEAM   LINE 7-2  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
8092 D.Sokaras     6394 B.Maki        6394 B.Maki        6394 B.Maki        6394 B.Maki        6277 G.George      6277 G.George     
CHANGE/6394 B.Maki 6394 B.Maki        6394 B.Maki        6394 B.Maki        CHANGE/6277 G.Geor 6277 G.George      6277 G.George     
6394 B.Maki        6394 B.Maki        6394 B.Maki        6394 B.Maki        6277 G.George      6277 G.George      6277 G.George     
BEAM   LINE 7-3  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6530 L.Quintanar   6827 G.George      6827 G.George      6827 G.George      6827 G.George      6670 C.Lopano      6670 C.Lopano     
Xray CHECKOUT/6827 6827 G.George      6827 G.George      6827 G.George      Xray CHECKOUT/6670 6670 C.Lopano      6670 C.Lopano     
6827 G.George      6827 G.George      6827 G.George      6827 G.George      6670 C.Lopano      6670 C.Lopano      6670 C.Lopano     
BEAM   LINE 9-3  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6699 J.Chalmers    5582 S.Khatib      5582 S.Khatib      6823 C.Sievers     6823 C.Sievers     6503 T.Siboonruang 6503 T.Siboonruang
Xray CHECKOUT/5582 5582 S.Khatib      Xray CHECKOUT/6823 6823 C.Sievers     Xray CHECKOUT/6503 6503 T.Siboonruang 6503 T.Siboonruang
5582 S.Khatib      5582 S.Khatib      6823 C.Sievers     6823 C.Sievers     6503 T.Siboonruang 6503 T.Siboonruang 6503 T.Siboonruang
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
FACI               6516 A.Evers       6516 A.Evers       6786 A.Naranjo-Sol 6786 A.Naranjo-Sol 5993 K.Kovnir      5993 K.Kovnir     
SMB CHECKOUT/6516  6516 A.Evers       SMB CHECKOUT/6786  6786 A.Naranjo-Sol SMB CHECKOUT/5993  5993 K.Kovnir      5993 K.Kovnir     
6516 A.Evers       6516 A.Evers       6786 A.Naranjo-Sol 6786 A.Naranjo-Sol 5993 K.Kovnir      5993 K.Kovnir      5993 K.Kovnir     
BEAM   LINE 11-3 
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6055 M.Chabinyc    93K9 D.Dede        93K9 D.Dede        Unscheduled        FACI               6345 M.Preefer     6345 M.Preefer    
Xray CHECKOUT/93K9 93K9 D.Dede        Unscheduled        FACI               Xray CHECKOUT/6345 6345 M.Preefer     6345 M.Preefer    
93K9 D.Dede        93K9 D.Dede        Unscheduled        FACI               6345 M.Preefer     6345 M.Preefer     6345 M.Preefer    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6830 H.Hao         6729 R.Root        6729 R.Root        6852 R.Root        6852 R.Root        6014 D.Fike        6014 D.Fike       
CHANGE/6729 R.Root 6729 R.Root        CHANGE/6852 R.Root 6852 R.Root        CHANGE/6014 D.Fike 6014 D.Fike        6014 D.Fike       
6729 R.Root        6729 R.Root        6852 R.Root        6852 R.Root        6014 D.Fike        6014 D.Fike        6014 D.Fike       
BEAM   LINE 15-2 
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6872 K.Zhao        6530 L.Quintanar   6530 L.Quintanar   6530 L.Quintanar   STUP               6212 U.Bergmann    6212 U.Bergmann   
Xray CHECKOUT/6530 6530 L.Quintanar   6530 L.Quintanar   STUP               Xray CHECKOUT/6212 6212 U.Bergmann    6212 U.Bergmann   
6530 L.Quintanar   6530 L.Quintanar   6530 L.Quintanar   STUP               6212 U.Bergmann    6212 U.Bergmann    6212 U.Bergmann   
BEAM   LINE 17-2 
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6687 N.Kundu       FACI               8062 M.Preefer     8062 M.Preefer     FACI               9705 J.LiSA        9705 J.LiSA       
FACI               Xray CHECKOUT/8062 8062 M.Preefer     FACI               Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA       
FACI               8062 M.Preefer     8062 M.Preefer     FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       

Back to Table of Contents

WEEK OF Mar. 10, 2025
                                         
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
BEAM   LINE 1-5  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6711 N.Strang/FACI FACI               6085 N.Idris       6085 N.Idris/FACI  FACI               9705 J.LiSA        9705 J.LiSA       
FACI               Xray CHECKOUT/6085 6085 N.Idris       FACI               Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA       
FACI               6085 N.Idris       6085 N.Idris       FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 2-1  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6679 M.Cosby       6814 J.Cooley      6814 J.Cooley      6814 J.Cooley      6814 J.Cooley      8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/6814 6814 J.Cooley      6814 J.Cooley      6814 J.Cooley      Xray CHECKOUT/8095 8095 K.Stone       Unscheduled       
6814 J.Cooley      6814 J.Cooley      6814 J.Cooley      6814 J.Cooley      8095 K.Stone       8095 K.Stone       Unscheduled       
BEAM   LINE 2-2  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6670 C.Lopano      6080 E.Bailey      6080 E.Bailey      6721 C.Kim         6721 C.Kim         6071 M.Pushie      6071 M.Pushie     
CHANGE/6080 E.Bail 6080 E.Bailey      CHANGE/6721 C.Kim  6721 C.Kim         CHANGE/6071 M.Push 6071 M.Pushie      6071 M.Pushie     
6080 E.Bailey      6080 E.Bailey      6721 C.Kim         6721 C.Kim         6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
BEAM   LINE 4-1  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6163 G.George      6878 T.Li          6878 T.Li          6444 N.Patra       6444 N.Patra       6089 J.Chorover    6089 J.Chorover   
SMB CHECKOUT/6878  6878 T.Li          SMB CHECKOUT/6444  6444 N.Patra       SMB CHECKOUT/6089  6089 J.Chorover    6089 J.Chorover   
6878 T.Li          6878 T.Li          6444 N.Patra       6444 N.Patra       6089 J.Chorover    6089 J.Chorover    6089 J.Chorover   
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6809 E.Espinosa Vi 8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     6344 D.Lee         6344 D.Lee        
CHANGE/8907 M.Pree 8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     CHANGE/6344 D.Lee  6344 D.Lee         6344 D.Lee        
8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     6344 D.Lee         6344 D.Lee         6344 D.Lee        
BEAM   LINE 7-2  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6277 G.George      6496 M.Pushie      6496 M.Pushie      6496 M.Pushie      6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
CHANGE/6496 M.Push 6496 M.Pushie      6496 M.Pushie      CHANGE/6071 M.Push 6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
6496 M.Pushie      6496 M.Pushie      6496 M.Pushie      6071 M.Pushie      6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
BEAM   LINE 7-3  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6670 C.Lopano      6029 A.Asundi      6029 A.Asundi      6617 S.Dai         6617 S.Dai         6096 M.Abernathy   6096 M.Abernathy  
Xray CHECKOUT/6029 6029 A.Asundi      Xray CHECKOUT/6617 6617 S.Dai         Xray CHECKOUT/6096 6096 M.Abernathy   6096 M.Abernathy  
6029 A.Asundi      6029 A.Asundi      6617 S.Dai         6617 S.Dai         6096 M.Abernathy   6096 M.Abernathy   6096 M.Abernathy  
BEAM   LINE 9-3  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6503 T.Siboonruang 6571 R.JANA        6571 R.JANA        6777 M.Matalkeh    6777 M.Matalkeh    6573 E.Volk        6573 E.Volk       
Xray CHECKOUT/6571 6571 R.JANA        Xray CHECKOUT/6777 6777 M.Matalkeh    Xray CHECKOUT/6573 6573 E.Volk        6573 E.Volk       
6571 R.JANA        6571 R.JANA        6777 M.Matalkeh    6777 M.Matalkeh    6573 E.Volk        6573 E.Volk        6573 E.Volk       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
5993 K.Kovnir      6086 R.Abergel     6086 R.Abergel     6425 R.Abergel     6425 R.Abergel     6611 Y.Tang        6611 Y.Tang       
SMB CHECKOUT/6086  6086 R.Abergel     SMB CHECKOUT/6425  6425 R.Abergel     SMB CHECKOUT/6611  6611 Y.Tang        6611 Y.Tang       
6086 R.Abergel     6086 R.Abergel     6425 R.Abergel     6425 R.Abergel     6611 Y.Tang        6611 Y.Tang        6611 Y.Tang       
BEAM   LINE 11-3 
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6345 M.Preefer     FACI               6729 R.Root        6729 R.Root        6729 R.Root        6882 D.Pe          6882 D.Pe         
FACI               Xray CHECKOUT/6729 6729 R.Root        6729 R.Root        Xray CHECKOUT/6882 6882 D.Pe          6882 D.Pe         
FACI               6729 R.Root        6729 R.Root        6729 R.Root        6882 D.Pe          6882 D.Pe          6882 D.Pe         
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6014 D.Fike        6226 M.Crotteau    6226 M.Crotteau    6226 M.Crotteau    6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
CHANGE/6226 M.Crot 6226 M.Crotteau    6226 M.Crotteau    CHANGE/6071 M.Push 6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
6226 M.Crotteau    6226 M.Crotteau    6226 M.Crotteau    6071 M.Pushie      6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
BEAM   LINE 15-2 
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6212 U.Bergmann    Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        6514 O.Paredes Mel
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/6514 6514 O.Paredes Mel
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        6514 O.Paredes Mel 6514 O.Paredes Mel
BEAM   LINE 17-2 
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
9705 J.LiSA        FACI               5615 J.Ravichandra 5615 J.Ravichandra 6866 S.Wu          6866 S.Wu          6866 S.Wu         
FACI               Xray CHECKOUT/5615 5615 J.Ravichandra Xray CHECKOUT/6866 6866 S.Wu          6866 S.Wu          6866 S.Wu         
FACI               5615 J.Ravichandra 5615 J.Ravichandra 6866 S.Wu          6866 S.Wu          6866 S.Wu          6866 S.Wu         

Back to Table of Contents

WEEK OF Mar. 17, 2025
                                         
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
BEAM   LINE 1-5  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
9705 J.LiSA/AP     AP                 AP                 FACI               8061 S.Hesse       8061 S.Hesse       8061 S.Hesse      
AP                 AP                 FACI               Xray CHECKOUT/8061 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse      
AP                 AP                 FACI               8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       8061 S.Hesse      
BEAM   LINE 2-1  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 6512 K.Tamakuwala  6512 K.Tamakuwala  Unscheduled        6713 A.Hoffman    
AP                 AP                 Xray CHECKOUT/6512 6512 K.Tamakuwala  Unscheduled        CHANGE/6713 A.Hoff 6713 A.Hoffman    
AP                 AP                 6512 K.Tamakuwala  6512 K.Tamakuwala  Unscheduled        6713 A.Hoffman     6713 A.Hoffman    
BEAM   LINE 2-2  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6071 M.Pushie/AP   AP                 AP                 6755 N.Sharma      6755 N.Sharma      6237 S.Shulda      6237 S.Shulda     
AP                 AP                 CHANGE/6755 N.Shar 6755 N.Sharma      CHANGE/6237 S.Shul 6237 S.Shulda      6237 S.Shulda     
AP                 AP                 6755 N.Sharma      6755 N.Sharma      6237 S.Shulda      6237 S.Shulda      6237 S.Shulda     
BEAM   LINE 4-1  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6089 J.Chorover/AP AP                 AP                 6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu  
AP                 AP                 SMB CHECKOUT/6728  6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu  
AP                 AP                 6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6344 D.Lee/AP      AP                 AP                 8090 J.Nelson Weke CHANGE/6338 X.Zhen 6338 X.Zheng       6338 X.Zheng      
AP                 AP                 CHANGE/8090 J.Nels 8090 J.Nelson Weke 6338 X.Zheng       6338 X.Zheng       6338 X.Zheng      
AP                 AP                 8090 J.Nelson Weke 8090 J.Nelson Weke 6338 X.Zheng       6338 X.Zheng       6338 X.Zheng      
BEAM   LINE 7-2  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6071 M.Pushie/AP   AP                 AP                 6716 A.Johs        6716 A.Johs        8019 J.Richardson  8019 J.Richardson 
AP                 AP                 CHANGE/6716 A.Johs 6716 A.Johs        CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson 
AP                 AP                 6716 A.Johs        6716 A.Johs        8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
BEAM   LINE 7-3  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6096 M.Abernath/AP AP                 AP                 Unscheduled        Unscheduled        5964 M.Green       5964 M.Green      
AP                 AP                 Unscheduled        Unscheduled        Xray CHECKOUT/5964 5964 M.Green       5964 M.Green      
AP                 AP                 Unscheduled        Unscheduled        5964 M.Green       5964 M.Green       5964 M.Green      
BEAM   LINE 9-3  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6573 E.Volk/AP     AP                 AP                 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
AP                 AP                 CHANGE/8871 R.Sara 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
AP                 AP                 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6611 Y.Tang/AP     AP                 AP                 11J8 J.Zhang       11J8 J.Zhang       Unscheduled        Unscheduled       
AP                 AP                 SMB CHECKOUT/11J8  11J8 J.Zhang       Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 11J8 J.Zhang       11J8 J.Zhang       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6882 D.Pe/AP       AP                 AP                 6305 W.Go          6305 W.Go          8049 V.Thampy      8049 V.Thampy     
AP                 AP                 Xray CHECKOUT/6305 6305 W.Go          Xray CHECKOUT/8049 8049 V.Thampy      8049 V.Thampy     
AP                 AP                 6305 W.Go          6305 W.Go          8049 V.Thampy      8049 V.Thampy      8049 V.Thampy     
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6071 M.Pushie/AP   AP                 AP                 6680 G.Drakakaki   6680 G.Drakakaki   6531 A.Bhattacharj 6531 A.Bhattacharj
AP                 AP                 CHANGE/6680 G.Drak 6680 G.Drakakaki   CHANGE/6531 A.Bhat 6531 A.Bhattacharj 6531 A.Bhattacharj
AP                 AP                 6680 G.Drakakaki   6680 G.Drakakaki   6531 A.Bhattacharj 6531 A.Bhattacharj 6531 A.Bhattacharj
BEAM   LINE 15-2 
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6514 O.Paredes /AP AP                 AP                 COMM               COMM               8806 M.Reinhard    8806 M.Reinhard   
AP                 AP                 COMM               COMM               Xray CHECKOUT/8806 8806 M.Reinhard    8806 M.Reinhard   
AP                 AP                 COMM               COMM               8806 M.Reinhard    8806 M.Reinhard    8806 M.Reinhard   
BEAM   LINE 17-2 
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6866 S.Wu/AP       AP                 AP                 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
AP                 AP                 Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
AP                 AP                 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      

Back to Table of Contents

WEEK OF Mar. 24, 2025
                                         
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
BEAM   LINE 1-5  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8061 S.Hesse       FACI               6006 Y.Wu          5529 N.Akmansen Ka 5529 N.Akmansen Ka 6103 S.Hesse       6103 S.Hesse      
FACI               Xray CHECKOUT/6006 Xray CHECKOUT/5529 5529 N.Akmansen Ka Xray CHECKOUT/6103 6103 S.Hesse       6103 S.Hesse      
FACI               6006 Y.Wu          5529 N.Akmansen Ka 5529 N.Akmansen Ka 6103 S.Hesse       6103 S.Hesse       6103 S.Hesse      
BEAM   LINE 2-1  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
6713 A.Hoffman     6155 Y.WU          6155 Y.WU          6155 Y.WU          FACI               8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/6155 6155 Y.WU          6155 Y.WU          FACI               Xray CHECKOUT/8095 8095 K.Stone       Unscheduled       
6155 Y.WU          6155 Y.WU          6155 Y.WU          FACI               8095 K.Stone       8095 K.Stone       Unscheduled       
BEAM   LINE 2-2  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
6237 S.Shulda      6333 M.McNamara    6333 M.McNamara    6843 A.Maniyangana 6843 A.Maniyangana Unscheduled        Unscheduled       
CHANGE/6333 M.McNa 6333 M.McNamara    CHANGE/6843 A.Mani 6843 A.Maniyangana Unscheduled        Unscheduled        Unscheduled       
6333 M.McNamara    6333 M.McNamara    6843 A.Maniyangana 6843 A.Maniyangana Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-1  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
6728 K.Shigenobu   Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
6338 X.Zheng       6830 H.Hao         6830 H.Hao         6345 M.Preefer     6345 M.Preefer     6804 Y.Cho         6804 Y.Cho        
CHANGE/6830 H.Hao  6830 H.Hao         CHANGE/6345 M.Pree 6345 M.Preefer     CHANGE/6804 Y.Cho  6804 Y.Cho         6804 Y.Cho        
6830 H.Hao         6830 H.Hao         6345 M.Preefer     6345 M.Preefer     6804 Y.Cho         6804 Y.Cho         6804 Y.Cho        
BEAM   LINE 7-2  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8019 J.Richardson  5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      6333 M.McNamara    6333 M.McNamara    6333 M.McNamara   
CHANGE/5771 C.Hans 5771 C.Hansel      5771 C.Hansel      CHANGE/6333 M.McNa 6333 M.McNamara    6333 M.McNamara    6333 M.McNamara   
5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    6333 M.McNamara   
BEAM   LINE 7-3  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
5964 M.Green       6469 A.Braun       6469 A.Braun       6682 J.Lopez-Garri 6682 J.Lopez-Garri 6178 A.Cordones-Ha 6178 A.Cordones-Ha
Xray CHECKOUT/6469 6469 A.Braun       Xray CHECKOUT/6682 6682 J.Lopez-Garri Xray CHECKOUT/6178 6178 A.Cordones-Ha 6178 A.Cordones-Ha
6469 A.Braun       6469 A.Braun       6682 J.Lopez-Garri 6682 J.Lopez-Garri 6178 A.Cordones-Ha 6178 A.Cordones-Ha 6178 A.Cordones-Ha
BEAM   LINE 9-3  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8871 R.Sarangi     6536 J.Schneider   6536 J.Schneider   6831 M.Abernathy   6831 M.Abernathy   6793 R.Colina Ruiz 6793 R.Colina Ruiz
Xray CHECKOUT/6536 6536 J.Schneider   Xray CHECKOUT/6831 6831 M.Abernathy   Xray CHECKOUT/6793 6793 R.Colina Ruiz 6793 R.Colina Ruiz
6536 J.Schneider   6536 J.Schneider   6831 M.Abernathy   6831 M.Abernathy   6793 R.Colina Ruiz 6793 R.Colina Ruiz 6793 R.Colina Ruiz
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
Unscheduled        Unscheduled        Unscheduled        6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
Unscheduled        Unscheduled        SMB CHECKOUT/6860  6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
Unscheduled        Unscheduled        6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
BEAM   LINE 11-3 
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8049 V.Thampy      5419 G.Giri        5419 G.Giri        6686 J.Chen        6686 J.Chen        6241 C.Salamat     6241 C.Salamat    
Xray CHECKOUT/5419 5419 G.Giri        Xray CHECKOUT/6686 6686 J.Chen        Xray CHECKOUT/6241 6241 C.Salamat     6241 C.Salamat    
5419 G.Giri        5419 G.Giri        6686 J.Chen        6686 J.Chen        6241 C.Salamat     6241 C.Salamat     6241 C.Salamat    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
6531 A.Bhattacharj 6277 G.George      6277 G.George      6277 G.George      8067 S.Webb        8067 S.Webb        Unscheduled       
CHANGE/6277 G.Geor 6277 G.George      6277 G.George      CHANGE/8067 S.Webb 8067 S.Webb        Unscheduled        Unscheduled       
6277 G.George      6277 G.George      6277 G.George      8067 S.Webb        8067 S.Webb        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8806 M.Reinhard    6724 A.Narayanan N 6724 A.Narayanan N 6724 A.Narayanan N STUP               Unscheduled        Unscheduled       
Xray CHECKOUT/6724 6724 A.Narayanan N 6724 A.Narayanan N STUP               Unscheduled        Unscheduled        Unscheduled       
6724 A.Narayanan N 6724 A.Narayanan N 6724 A.Narayanan N STUP               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8895 K.Stone       FACI               6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon     
FACI               Xray CHECKOUT/6463 6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon     
FACI               6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon     

Back to Table of Contents

WEEK OF Mar. 31, 2025
                                         
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
BEAM   LINE 1-5  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6103 S.Hesse/AP    AP                 AP                 FACI               FACI               Unscheduled        Unscheduled       
AP                 AP                 FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
AP                 AP                 Xray CHECKOUT/8010 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
AP                 AP                 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
BEAM   LINE 2-2  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 6626 S.Saslow      6626 S.Saslow      6811 H.Emerson     6811 H.Emerson    
AP                 AP                 CHANGE/6626 S.Sasl 6626 S.Saslow      CHANGE/6811 H.Emer 6811 H.Emerson     6811 H.Emerson    
AP                 AP                 6626 S.Saslow      6626 S.Saslow      6811 H.Emerson     6811 H.Emerson     6811 H.Emerson    
BEAM   LINE 4-1  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 8099 S.Bare        8099 S.Bare        6883 C.Kronawitter 6883 C.Kronawitter
AP                 AP                 SMB CHECKOUT/8099  8099 S.Bare        CHANGE/6883 C.Kron 6883 C.Kronawitter 6883 C.Kronawitter
AP                 AP                 8099 S.Bare        8099 S.Bare        6883 C.Kronawitter 6883 C.Kronawitter 6883 C.Kronawitter
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6804 Y.Cho/AP      AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6333 M.McNamara/AP AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6178 A.Cordones/AP AP                 AP                 Unscheduled        Unscheduled        6628 N.Blackburn   6628 N.Blackburn  
AP                 AP                 Unscheduled        Unscheduled        Xray CHECKOUT/6628 6628 N.Blackburn   6628 N.Blackburn  
AP                 AP                 Unscheduled        Unscheduled        6628 N.Blackburn   6628 N.Blackburn   6628 N.Blackburn  
BEAM   LINE 9-3  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6793 R.Colina R/AP AP                 AP                 6768 G.Sethi       6768 G.Sethi       5798 I.Bogacz      5798 I.Bogacz     
AP                 AP                 Xray CHECKOUT/6768 6768 G.Sethi       Xray CHECKOUT/5798 5798 I.Bogacz      5798 I.Bogacz     
AP                 AP                 6768 G.Sethi       6768 G.Sethi       5798 I.Bogacz      5798 I.Bogacz      5798 I.Bogacz     
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6860 S.Kozimor/AP  AP                 AP                 93J6 P.Heimann     6491 M.Wang        6491 M.Wang        6491 M.Wang       
AP                 AP                 SMB CHECKOUT/93J6  SMB CHECKOUT/6491  6491 M.Wang        6491 M.Wang        6491 M.Wang       
AP                 AP                 93J6 P.Heimann     6491 M.Wang        6491 M.Wang        6491 M.Wang        6491 M.Wang       
BEAM   LINE 11-3 
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6241 C.Salamat/AP  AP                 AP                 6764 K.Das         FACI               6345 M.Preefer     6345 M.Preefer    
AP                 AP                 Xray CHECKOUT/6764 FACI               Xray CHECKOUT/6345 6345 M.Preefer     6345 M.Preefer    
AP                 AP                 6764 K.Das         FACI               6345 M.Preefer     6345 M.Preefer     6345 M.Preefer    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
DOWN/AP            AP                 AP                 6438 R.Smaha       6438 R.Smaha       6426 R.Huang       6426 R.Huang      
AP                 AP                 SMB CHECKOUT/6438  6438 R.Smaha       SMB CHECKOUT/6426  6426 R.Huang       6426 R.Huang      
AP                 AP                 6438 R.Smaha       6438 R.Smaha       6426 R.Huang       6426 R.Huang       6426 R.Huang      
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 6793 R.Colina Ruiz 6793 R.Colina Ruiz 6363 K.Sengupta    6363 K.Sengupta   
AP                 AP                 Xray CHECKOUT/6793 6793 R.Colina Ruiz Xray CHECKOUT/6363 6363 K.Sengupta    6363 K.Sengupta   
AP                 AP                 6793 R.Colina Ruiz 6793 R.Colina Ruiz 6363 K.Sengupta    6363 K.Sengupta    6363 K.Sengupta   
BEAM   LINE 17-2 
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6463 K.Harmon/AP   AP                 AP                 FACI               FACI               6072 M.Dean        6072 M.Dean       
AP                 AP                 FACI               FACI               Xray CHECKOUT/6072 6072 M.Dean        6072 M.Dean       
AP                 AP                 FACI               FACI               6072 M.Dean        6072 M.Dean        6072 M.Dean       

Back to Table of Contents

WEEK OF Apr. 07, 2025
                                         
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
BEAM   LINE 1-5  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
8010 N.Strange     6841 C.Zwanziger   6841 C.Zwanziger   6841 C.Zwanziger   6841 C.Zwanziger   8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/6841 6841 C.Zwanziger   6841 C.Zwanziger   6841 C.Zwanziger   Xray CHECKOUT/8095 8095 K.Stone       Unscheduled       
6841 C.Zwanziger   6841 C.Zwanziger   6841 C.Zwanziger   6841 C.Zwanziger   8095 K.Stone       8095 K.Stone       Unscheduled       
BEAM   LINE 2-2  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6811 H.Emerson     6152 B.Gartman     6152 B.Gartman     6075 F.Feyrer      6075 F.Feyrer      6450 K.Mateos      6450 K.Mateos     
CHANGE/6152 B.Gart 6152 B.Gartman     CHANGE/6075 F.Feyr 6075 F.Feyrer      CHANGE/6450 K.Mate 6450 K.Mateos      6450 K.Mateos     
6152 B.Gartman     6152 B.Gartman     6075 F.Feyrer      6075 F.Feyrer      6450 K.Mateos      6450 K.Mateos      6450 K.Mateos     
BEAM   LINE 4-1  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6883 C.Kronawitter 6151 D.Miller      6151 D.Miller      6650 S.Daly        6650 S.Daly        6801 H.Lyu         6801 H.Lyu        
CHANGE/6151 D.Mill 6151 D.Miller      SMB CHECKOUT/6650  6650 S.Daly        SMB CHECKOUT/6801  6801 H.Lyu         6801 H.Lyu        
6151 D.Miller      6151 D.Miller      6650 S.Daly        6650 S.Daly        6801 H.Lyu         6801 H.Lyu         6801 H.Lyu        
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
FACI               6075 F.Feyrer      6075 F.Feyrer      6075 F.Feyrer      8067 S.Webb        8067 S.Webb        8067 S.Webb       
CHANGE/6075 F.Feyr 6075 F.Feyrer      6075 F.Feyrer      CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb       
6075 F.Feyrer      6075 F.Feyrer      6075 F.Feyrer      8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6628 N.Blackburn   6628 N.Blackburn   6628 N.Blackburn   6616 T.Stemmler    6616 T.Stemmler    6616 T.Stemmler    6616 T.Stemmler   
6628 N.Blackburn   6628 N.Blackburn   Xray CHECKOUT/6616 6616 T.Stemmler    6616 T.Stemmler    6616 T.Stemmler    6616 T.Stemmler   
6628 N.Blackburn   6628 N.Blackburn   6616 T.Stemmler    6616 T.Stemmler    6616 T.Stemmler    6616 T.Stemmler    6616 T.Stemmler   
BEAM   LINE 9-3  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
5798 I.Bogacz      5799 M.Doyle       5799 M.Doyle       5799 M.Doyle       5799 M.Doyle       Unscheduled        Unscheduled       
Xray CHECKOUT/5799 5799 M.Doyle       5799 M.Doyle       5799 M.Doyle       Unscheduled        Unscheduled        Unscheduled       
5799 M.Doyle       5799 M.Doyle       5799 M.Doyle       5799 M.Doyle       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6491 M.Wang        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6345 M.Preefer     6876 J.Bocarsly    6876 J.Bocarsly    6876 J.Bocarsly    6876 J.Bocarsly    6250 E.Mu          6250 E.Mu         
Xray CHECKOUT/6876 6876 J.Bocarsly    6876 J.Bocarsly    6876 J.Bocarsly    Xray CHECKOUT/6250 6250 E.Mu          6250 E.Mu         
6876 J.Bocarsly    6876 J.Bocarsly    6876 J.Bocarsly    6876 J.Bocarsly    6250 E.Mu          6250 E.Mu          6250 E.Mu         
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6426 R.Huang       6426 R.Huang       6804 Y.Cho         6804 Y.Cho         6650 S.Daly        6650 S.Daly        6650 S.Daly       
6426 R.Huang       SMB CHECKOUT/6804  6804 Y.Cho         SMB CHECKOUT/6650  6650 S.Daly        6650 S.Daly        6650 S.Daly       
6426 R.Huang       6804 Y.Cho         6804 Y.Cho         6650 S.Daly        6650 S.Daly        6650 S.Daly        6650 S.Daly       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
BEAM   LINE 15-2 
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6363 K.Sengupta    STUP               6864 J.Gable       6864 J.Gable       6864 J.Gable       Unscheduled        Unscheduled       
STUP               Xray CHECKOUT/6864 6864 J.Gable       6864 J.Gable       Unscheduled        Unscheduled        Unscheduled       
STUP               6864 J.Gable       6864 J.Gable       6864 J.Gable       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6072 M.Dean        6072 M.Dean        6072 M.Dean        FACI               FACI               Unscheduled        Unscheduled       
6072 M.Dean        6072 M.Dean        FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
6072 M.Dean        6072 M.Dean        FACI               FACI               Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Apr. 14, 2025
                                         
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
BEAM   LINE 1-5  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
6450 K.Mateos/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
6801 H.Lyu/DOWN    DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
8067 S.Webb/DOWN   DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
6616 T.Stemml/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
6250 E.Mu/DOWN     DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
6650 S.Daly/DOWN   DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 21, 2025
                                         
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
BEAM   LINE 1-5  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 28, 2025
                                         
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
BEAM   LINE 1-5  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-2  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-1  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-3  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled