SLAC National Accelerator Laboratory
Beam Current: 0.00 mA Beam Status: Down Loss Rate: 0.00 mA/min
SPEAR Plot

SPEAR Operator Messages

26-NOV-2014 08:36 AP 4pm until 10pm tonight. No beam Thursday. User beam delivery expected by noon Friday.

SSRL BEAMLINES For Updates From the BL Duty Operator, Call 926-BEAM (2326)
Beamline Steering Period Gap/mm Field/T K Pwr/W Yield/Ah
1 Closed Fault - 48.0 0.001 - 0 158.56
2 Closed Fault - 48.0 0.001 - 0 66.22
4 Closed 10 18.0 1.894 40.70 0 156.79
5 Closed 14 40.0 0.384 5.02 0 93.79
6 Closed Fault 27 16.0 0.849 5.55 0 160.86
7 Closed Fault 10 17.5 1.925 41.36 0 160.88
8 Closed Fault - 48.0 0.001 - 0 147.64
9 Closed 8 24.6 1.928 49.61 0 0.00
10 Closed 15 23.8 1.272 16.28 0 156.53
11 Closed 13 16.0 1.996 32.63 0 158.46
12-2 Closed 67 22.0 0.142 0.29 0 150.64
13 Closed EPU 25.7 0.328 2.43 0 142.20
14 Closed Fault - 48.0 0.001 - 0 153.33
Top-off mode: Disabled Total run electron beam current integral: 200.896 Ah

Detailed Accelerator and Beam Line Information