SLAC National Accelerator Laboratory
Beam Current: 0.00 mA Beam Status: Down Loss Rate: 0.00 mA/min
SPEAR Plot

SPEAR Operator Messages

16-DEC-2014 10:22 SPEAR user beam to restart January 6th at 6am.
16-DEC-2014 10:19 SPEAR user beam wiil be delivered until Dec 19th 6am.

SSRL BEAMLINES For Updates From the BL Duty Operator, Call 926-BEAM (2326)
Beamline Steering Period Gap/mm Field/T K Pwr/W Yield/Ah
1 Closed Fault - 48.0 0.000 - 0 382.59
2 Closed Fault - 48.0 0.000 - 0 287.40
4 Closed 10 18.0 1.892 40.64 0 379.47
5 Closed 14 40.0 0.384 5.02 0 290.33
6 Closed Fault 27 16.0 0.850 5.56 0 384.90
7 Closed Fault 10 17.4 1.932 41.51 0 384.92
8 Closed Fault - 48.0 0.000 - 0 371.63
9 Closed 8 24.6 1.929 49.62 0 0.00
10 Closed Fault 15 23.9 1.272 16.28 0 380.48
11 Closed 13 16.0 1.996 32.62 0 382.50
12-2 Closed 67 22.0 0.142 0.30 0 374.69
13 Closed EPU 42.0 0.114 0.85 0 366.25
14 Closed Fault - 48.0 0.000 - 0 376.87
Top-off mode: Disabled Total run electron beam current integral: 429.623 Ah

Detailed Accelerator and Beam Line Information