SLAC National Accelerator Laboratory
Beam Current: 0.00 mA Beam Status: Down Loss Rate: 0.00 mA/min
SPEAR Plot

SPEAR Operator Messages

6-AUG-2014 15:09 SPEAR3 is shut down for annual downtime work until November 17, 2014.

SSRL BEAMLINES For Updates From the BL Duty Operator, Call 926-BEAM (2326)
Beamline Steering Period Gap/mm Field/T K Pwr/W Yield/Ah
1 Closed Fault - 48.0 0.000 - 0 0.00
2 Closed Fault - 48.0 0.000 - 0 0.00
4 Closed 10 150.0 0.156 3.33 0 0.00
5 Closed 14 12.6 0.780 10.20 0 0.00
6 Closed Fault 27 16.0 0.850 5.55 0 0.00
7 Closed Fault 10 20.0 1.770 38.01 0 0.00
8 Closed Fault - 48.0 0.000 - 0 0.00
9 Closed 8 24.6 1.929 49.61 0 0.00
10 Closed Fault 15 23.9 1.271 16.27 0 0.00
11 Closed 13 149.9 0.090 1.47 0 0.00
12-2 Closed 67 6.0 1.020 2.10 0 0.00
13 Closed EPU 50.0 0.072 0.54 0 0.00
14 Closed Fault - 48.0 0.000 - 0 0.00
Top-off mode: Disabled Total run electron beam current integral: 0.042 Ah

Detailed Accelerator and Beam Line Information