| Energy: 3.000 GeV | Beam Status: Beams | Beam Current: 350.03 mA |
| Vacuum Quality*: -0.41 Ah | Loss Rate: -3.03 mA/min | Lifetime: -1.93 h |
| 3-JAN-2012 09:00 | SPEAR3 is scheduled to deliver beam to SSRL users in automatic mode with frequent fills every 5 min to 350mA . The SSRL program is defined in the 2011-2012 User Run Schedule. Maintenance and Accelerator Physics activities are scheduled every two weeks, Monday 6am through Wednesday 6am. |
| SSRL BEAMLINES | For Updates From the BL Duty Operator, Call 926-BEAM (2326) |
| Beamline | Steering | Period | Gap/mm | Field/T | K | Pwr/W | Yield/Ah | ||
|---|---|---|---|---|---|---|---|---|---|
| 1 | Open | OK | - | 48.0 | 1.249 | - | 50 | 521.72 | |
| 2 | Open | OK | - | 48.0 | 1.249 | - | 50 | 521.59 | |
| 4 | Open | – | 10 | 18.0 | 1.892 | 40.64 | 16427 | 519.58 | |
| 5 | Closed | – | 10 | 30.4 | 0.512 | 8.75 | 957 | 427.55 | |
| 6 | Open | OK | 27 | 17.3 | 0.783 | 5.12 | 2314 | 507.15 | |
| 7 | Open | – | 10 | 17.4 | 1.932 | 41.51 | 17131 | 521.39 | |
| 8 | Open | OK | - | 48.0 | 1.249 | - | 50 | 519.49 | |
| 9 | Closed | – | 8 | 24.6 | 1.929 | 49.63 | 17257 | 467.54 | |
| 10 | Open | OK | 15 | 23.8 | 1.275 | 16.32 | 6664 | 505.80 | |
| 11 | Open | – | 13 | 16.0 | 1.996 | 32.63 | 18087 | 508.23 | |
| 12-2 | Open | – | 67 | 6.8 | 0.871 | 1.79 | 2232 | 508.72 | |
| 13 | Open | – | EPU | 26.5 | 0.310 | 2.31 | 353 | 508.45 | |
| 14 | Closed | OK | - | 48.0 | 1.249 | - | 50 | 483.81 | |
| Top-off mode: Enabled | Total run electron beam current integral: 588.601 Ah |
| Accelerator Information | |
| Vacuum Information (internal use only): SPEAR, Beamlines | |
| SPEAR Home Page | SPEAR Dedication video, Picture 1, Picture 2 |
| * Vacuum Quality = 0.4 * ( Lifetime / 1 h ) * ( Beam Current / 1000 mA )0.6 |