| Energy: 3.000 GeV | Beam Status: Beams | Beam Current: 495.12 mA |
| Vacuum Quality*: 2.05 Ah | Loss Rate: 1.06 mA/min | Lifetime: 7.82 h |
| 3-NOV-2012 09:00 | The SSRL program is defined in the 2012-2013 User Run Schedule. Maintenance and Accelerator Physics activities are scheduled every two weeks, Monday 6am through Wednesday 6am. |
| SSRL BEAMLINES | For Updates From the BL Duty Operator, Call 926-BEAM (2326) |
| Beamline | Steering | Period | Gap/mm | Field/T | K | Pwr/W | Yield/Ah | ||
|---|---|---|---|---|---|---|---|---|---|
| 1 | Open | OK | - | 48.0 | 1.249 | - | 71 | 1300.92 | |
| 2 | Open | OK | - | 48.0 | 1.249 | - | 71 | 1297.20 | |
| 4 | Open | – | 10 | 18.0 | 1.892 | 40.64 | 23236 | 1292.37 | |
| 5 | Open | – | 10 | 30.0 | 0.518 | 8.86 | 1388 | 1255.34 | |
| 6 | Open | OK | 27 | 16.0 | 0.850 | 5.56 | 3855 | 1297.08 | |
| 7 | Open | OK | 10 | 17.4 | 1.932 | 41.51 | 24232 | 1298.92 | |
| 8 | Open | OK | - | 48.0 | 1.249 | - | 71 | 1299.29 | |
| 9 | Open | – | 8 | 24.6 | 1.929 | 49.61 | 24397 | 422.72 | |
| 10 | Open | OK | 15 | 23.9 | 1.271 | 16.28 | 9381 | 1296.76 | |
| 11 | Open | – | 13 | 16.0 | 1.996 | 32.63 | 25584 | 1291.23 | |
| 12-2 | Open | – | 67 | 22.0 | 0.142 | 0.29 | 84 | 1288.17 | |
| 13 | Open | – | EPU | 40.0 | 0.128 | 0.95 | 85 | 1289.03 | |
| 14 | Open | OK | - | 48.0 | 1.249 | - | 71 | 1151.45 | |
| Top-off mode: Enabled | Total run electron beam current integral: 1351.130 Ah |
| Accelerator Information | |
| Vacuum Information (internal use only): SPEAR, Beamlines | |
| SPEAR Home Page | SPEAR Dedication video, Picture 1, Picture 2 |
| * Vacuum Quality = 0.4 * ( Lifetime / 1 h ) * ( Beam Current / 1000 mA )0.6 |