| Energy: 3.000 GeV | Beam Status: Beams (MCC) | Beam Current: 497.85 mA |
| Vacuum Quality*: 1.75 Ah | Loss Rate: 1.25 mA/min | Lifetime: 6.64 h |
| 3-NOV-2012 09:00 | The SSRL program is defined in the 2012-2013 User Run Schedule. Maintenance and Accelerator Physics activities are scheduled every two weeks, Monday 6am through Wednesday 6am. |
| SSRL BEAMLINES | For Updates From the BL Duty Operator, Call 926-BEAM (2326) |
| Beamline | Steering | Period | Gap/mm | Field/T | K | Pwr/W | Yield/Ah | ||
|---|---|---|---|---|---|---|---|---|---|
| 1 | Open | OK | - | 48.0 | 1.249 | - | 71 | 1583.76 | |
| 2 | Open | OK | - | 48.0 | 1.249 | - | 71 | 1581.95 | |
| 4 | Open | – | 10 | 18.0 | 1.892 | 40.65 | 23371 | 1576.65 | |
| 5 | Open | – | 10 | 51.2 | 0.282 | 4.82 | 414 | 1539.71 | |
| 6 | Open | OK | 27 | 16.0 | 0.850 | 5.56 | 3876 | 1580.32 | |
| 7 | Open | OK | 10 | 17.4 | 1.932 | 41.51 | 24366 | 1578.86 | |
| 8 | Open | OK | - | 48.0 | 1.249 | - | 71 | 1582.42 | |
| 9 | Open | – | 8 | 24.6 | 1.929 | 49.63 | 24545 | 700.03 | |
| 10 | Open | OK | 15 | 23.8 | 1.272 | 16.29 | 9444 | 1581.31 | |
| 11 | Open | – | 13 | 16.0 | 1.996 | 32.62 | 25718 | 1574.46 | |
| 12-2 | Open | – | 67 | 6.7 | 0.885 | 1.82 | 3275 | 1571.41 | |
| 13 | Open | – | EPU | 40.1 | 0.128 | 0.96 | 85 | 1573.55 | |
| 14 | Open | OK | - | 48.0 | 1.249 | - | 71 | 1434.69 | |
| Top-off mode: Enabled | Total run electron beam current integral: 1646.417 Ah |
| Accelerator Information | |
| Vacuum Information (internal use only): SPEAR, Beamlines | |
| SPEAR Home Page | SPEAR Dedication video, Picture 1, Picture 2 |
| * Vacuum Quality = 0.4 * ( Lifetime / 1 h ) * ( Beam Current / 1000 mA )0.6 |