| Energy: 3.000 GeV | Beam Status: Beams | Beam Current: 91.01 mA |
| Vacuum Quality*: 5.92 Ah | Loss Rate: 0.02 mA/min | Lifetime: 62.37 h |
| 8-MAY-2008 19:42 | The scheduled program is to deliver beam to Users. |
| SSRL BEAMLINES | For Updates From the BL Duty Operator, Call 926-BEAM (2326) |
| Beamline | Steering | Period | Gap/mm | Field/T | K | Pwr/W | Yield/Ah | |
|---|---|---|---|---|---|---|---|---|
| 1 | Open | OK | - | 48.0 | 1.249 | - | 13 | 328.65 |
| 2 | Open | OK | - | 48.0 | 1.249 | - | 13 | 328.16 |
| 4 | Closed | – | 10 | 18.0 | 1.892 | 40.65 | 4272 | 0.00 |
| 5 | Open | – | 10 | 40.3 | 0.381 | 6.51 | 138 | 328.33 |
| 6 | Open | OK | 27 | 16.0 | 0.850 | 5.56 | 709 | 321.63 |
| 7 | Open | OK | 10 | 17.4 | 1.933 | 41.52 | 4457 | 329.13 |
| 8 | Open | OK | - | 48.0 | 1.249 | - | 13 | 328.41 |
| 9 | Open | OK | 8 | 24.6 | 1.929 | 49.63 | 4487 | 328.57 |
| 10 | Open | OK | 15 | 23.9 | 1.271 | 16.28 | 1724 | 328.73 |
| 11 | Open | OK | 13 | 16.0 | 1.996 | 32.63 | 4703 | 328.75 |
| 12-2 | Open | – | 67 | 7.3 | 0.798 | 1.64 | 487 | 321.51 |
| 13 | Open | – | EPU | 40.5 | 0.125 | 0.93 | 15 | 168.81 |
| Total Run Electron Beam Intensity Integral: 371.307 Ah |
|---|
| Vacuum Information
(Internal Use Only)
Dedication video Inside tunnel pictures 1 , 2 SPEAR3 Installation History SPEAR Home Page |