LUSI MIE
Supporting Documentation
June 3, 2009
Procurement Docs | ||
Bid Evaluation Guide for the Procurement of the CXI 1 micron KB System | Sebastien Boutet | |
CXI 1 micron K-B Mirror System Proposal Evaluation Procedure | Paul Montanez |
Radiation Physics | ||
Comparison of FLUKA and STAC8 for shielding calculations of the hard X-ray line of the LCLS | J. Vollaire,A. Prinz | |
Shielding Requirements for the LCLS hard X-ray beam pipe | J. Vollaire,J. Liu,Alyssa Prinz | |
Shielding Recommendations for the walls of the FEH Hutches | J. Vollaire,Alyssa Prinz |
Statement of Work | ||
SOW for the CXI 1 micron KB system, Mirror Coating | Sebastien Boutet | |
SOW for the CXI 1 micron KB System, Mirror Substrates | Sebastien Boutet | |
SOW for the CXI 1 micron KB System, Mechanical System | Sebastien Boutet | |
SOW for the CXI 1 micron KB System, Mirror Metrology | Sebastien Boutet | |
SOW for the CXI 0.1 micron KB System, Mirror Coating | Sebastien Boutet | |
SOW for the CXI 0.1 micron KB System, Mirror Substrates | Sebastien Boutet | |
SOW for the CXI 0.1 micron KB System, Mechanical System | Sebastien Boutet | |
SOW for the CXI 0.1 micron KB System, Mirror Metrology | Sebastien Boutet | |
SOW for the Design of the CXI Detector Stage | Sebastien Boutet |
Startup Plan | ||
CXI Instrument Start-up Plan | Sebastien Boutet |