Tuesday, October 9th
(Location: Redwood Rooms A/B, Building 48)
 
Start	Topic						Presenter
  8:00	Welcome
  8:15	Project Overview & Site Office				H. Lee
  8:45	Project Assessment & Revised Baseline Overview		J. Galayda
  9:15	ETC & BCR					M. Reichanadter
  9:45	Break
10:00	E-Beam Systems					D. Schultz
10:20	Photon Beam Systems 				J. Arthur
10:40	Conventional Facilities				D. Saenz
11:00	Rebaseline Process					T. Mast
11:30	Lunch	
12:30	SITE Tour (meet at Building 280A)
 

Tuesday, October 9th - Afternoon Schedule
  Redwood A/B (ROB, Bldg 48) Pac Crest (Bldg 280A, Room 180) Palisades (Bldg 280B, Room 162) Red Slate (Bldg 280C, Room 112) Castle Crags (Bldg 280B, Room 241)
12:30 SITE Tour (meet at Building 280A, Schultz, Saenz)        
1:00        
1:30 Key Project Cost and Schedule Assumptions (Mast/Reichanadter)        
2:00        
2:30   Photon Controls Systems - WBS 1.06.02.10 (Haller,Arthur) Critical Path (Mast,Jeff Chan, Richard M.)   Linac Power Conversion  WBS 1.03.02.04 (Shoaee, Bellomo)
3:00    
3:30   L2/BC2/L3 Commissioning - WBS 2.03.07.10 (Schultz) System Functions & Requirements (Marsh / Reichanadter)   Linac System Installation  WBS 1.03.07 (JQ Chan, Jeff Chan)
4:00    
4:30   Executive Session      
5:00        
           
  Redwood A/B (ROB, Bldg 48) Pac Crest (Bldg 280A, Room 180) Palisades (Bldg 280B, Room 162 Red Slate (Bldg 280C, Room 112) Castle Crags (Bldg 280B, Room 241)
Wednesday, October 10th        
8:00   Executive Session      
8:30     Undulator Magnetic Measurement Facility (SLAC) - WBS 1.04.03.06 (Pope, Schultz, JQ Chan) Near Experiment Hall - WBS 1.09.03.11 (Saenz, Malahowski, Albino)  
9:00    
9:30     Production Undulator - WBS 2.04.03.04 (Pile/Schultz/White) Far Experiment Hall - WBS 1.09.03.14  (Saenz, Malahowski, Albino)  
10:00      
10:30       Central Utility Plant - WBS 1.09.03.18  (Saenz, Malahowski, Albino)  
11:00        
11:30          
Noon   Lunch Lunch Lunch  
12:30    
1:00          
1:30     Start Up Plan (Schultz/Arthur/Saenz) 2-D X-Ray Detector - WBS 2.06.05.02 (Moeller)  
2:00      
2:30       Project Execution Plan (Lee/Joma) & Integrated Project Team (Lee / Joma/Brown/Galayda or Reichanadter)  
3:00        
3:30          
4:00   Executive Session      
4:30        
5:00        
           
  Redwood A/B (ROB, Bldg 48) Pac Crest (Bldg 280A, Room 180) Palisades (Bldg 280B, Room 162 Red Slate (Bldg 280C, Room 112) Castle Crags (Bldg 280B, Room 241)
 Thursday, October 12th        
8:00   Executive Session   Funding Profile (Lee/ Joma/Reichanadter)  
8:30      
9:00       Risk Management (ALL)  
9:30        
10:00        
10:30          
11:00          
11:30          
Noon   Lunch Lunch Lunch  
12:30    
1:00    Executive Session      
1:30        
2:00        
2:30        
3:00        
3:30        
4:00 Closeout - KAVLI Auditorium        