DOE Status Meeting of the

Linac Coherent Light Source Project

Breakout Sessions 


May 13-15, 2008

 Printable Agenda

 

  w   Review Home Page    Plenary Agenda

Wednesday, May 14th

SC1/SC2 – Physics Commissioning (Accelerator & FEL)  
LOCATION: Redwood C, Bldg 48

8:00am	Drive Laser Status and Hand-Off to Operations		W. White
8:30	Experience with the RF Gun(s)				D.Dowell
9:00	High Level Application				H. Loos
9:30	Diagnostics, RF, & Feedback - Results and Limitations	J. Frisch 
10:00	LTU & Undulator Commissioning Plans			H.-D. Nuhn 
10:30	Break
	
F SC1/SC2 group to join SC8 (Redwood AB)
	

	
SC3/4/5 – Electron-Beam, Undulator, Photon Beam Installation Status 
LOCATION: Red Slate Conference Room (Bldg 280C, Room 112)

 8:00	Photon Beam System Overview & Status			J. Arthur
 8:30	FEE Status					D. McMahon
 9:00	NEH Status 					S. Moeller
 9:30 	Photon Beam Controls				G. Haller
10:00	Break
10:30	E-Beam System Overview & Status			D. Schultz
11:00	Linac Status and Schedule 				J. Chan 
11:30	Undulator Status and Schedule				G. Pile
12:00	Lunch
  1:00	E-Beam Controls					H. Shoaee
  1:30	Undulator System Component Status			D. Walters
  2:00 	Girder Assembly					E. Lundahl
	Undulator Magnet Tuning				Z. Wolf
  2:30	Break
 


SC6/9 – Conventional Facilities / ES&H 
LOCATION: Redwood D, Bldg 48

8:00am	Conventional Facilities Overview & Status		J. Albino
9:00	Far Experimental Hall – Hutches			D. Saenz
9:30	Space Conversion to Offices			D. Saenz
10:00	Break
10:20	Construction Safety				M. Scharfenstein
11:00	Plan for Commissioning			J. Sevilla
11:45	Discussion	
12:00	Lunch
1:00pm	Turner Contract Close-out			J. Dee / C. Silva
1:30	Discussion
2:30	Break


SC7 – Cost and Schedule  
LOCATION: Redwood C, Bldg 48

11:00 am	EVMS Status and Overview			T. Mast



SC8 – Early Science / Transition to Operations
LOCATION: Redwood A/B, Bldg 48

8:00am	Transition to Operations			J. Galayda
8:30	Installation Status & Operational Readiness Process	R. M. Boyce
9:00	LCLS Operations in 2009			R. Erickson
9:30	Discussion	
10:30	Break
	
F Group to be joined by SC1/SC2
	
11:00	FEE/FEL Overview Commissioning Plans		H. Tompkins
11:30	FEE Diagnostics and Commissioning		R. Bionta 
12:00	Lunch
  1:30	LCLS User Access Policy			J. R. Schneider
  2:00	LCLS User Interface and User Operations in 2009	J. Arthur
  2:30        AMO Early Science Capability			J. Bozek
  3:00	LUSI Status & Early Science Capability		J. Hastings
 