DOE Status Meeting of the
Linac Coherent Light Source Project
Breakout Sessions
May 13-15,
2008
Printable Agenda |
|
Wednesday, May 14th
SC1/SC2 – Physics Commissioning (Accelerator & FEL)
LOCATION: Redwood C, Bldg 48
8:00am Drive Laser Status and Hand-Off to Operations W. White
8:30 Experience with the RF Gun(s) D.Dowell
9:00 High Level Application H. Loos
9:30 Diagnostics, RF, & Feedback - Results and Limitations J. Frisch
10:00 LTU & Undulator Commissioning Plans H.-D. Nuhn
10:30 Break
F SC1/SC2 group to join SC8 (Redwood AB)
SC3/4/5 – Electron-Beam, Undulator, Photon Beam Installation Status
LOCATION: Red Slate Conference Room (Bldg 280C, Room 112)
8:00 Photon Beam System Overview & Status J. Arthur
8:30 FEE Status D. McMahon
9:00 NEH Status S. Moeller
9:30 Photon Beam Controls G. Haller
10:00 Break
10:30 E-Beam System Overview & Status D. Schultz
11:00 Linac Status and Schedule J. Chan
11:30 Undulator Status and Schedule G. Pile
12:00 Lunch
1:00 E-Beam Controls H. Shoaee
1:30 Undulator System Component Status D. Walters
2:00 Girder Assembly E. Lundahl
Undulator Magnet Tuning Z. Wolf
2:30 Break
SC6/9 – Conventional Facilities / ES&H
LOCATION: Redwood D, Bldg 48
8:00am Conventional Facilities Overview & Status J. Albino
9:00 Far Experimental Hall – Hutches D. Saenz
9:30 Space Conversion to Offices D. Saenz
10:00 Break
10:20 Construction Safety M. Scharfenstein
11:00 Plan for Commissioning J. Sevilla
11:45 Discussion
12:00 Lunch
1:00pm Turner Contract Close-out J. Dee / C. Silva
1:30 Discussion
2:30 Break
SC7 – Cost and Schedule
LOCATION: Redwood C, Bldg 48
11:00 am EVMS Status and Overview T. Mast
SC8 – Early Science / Transition to Operations
LOCATION: Redwood A/B, Bldg 48
8:00am Transition to Operations J. Galayda
8:30 Installation Status & Operational Readiness Process R. M. Boyce
9:00 LCLS Operations in 2009 R. Erickson
9:30 Discussion
10:30 Break
F Group to be joined by SC1/SC2
11:00 FEE/FEL Overview Commissioning Plans H. Tompkins
11:30 FEE Diagnostics and Commissioning R. Bionta
12:00 Lunch
1:30 LCLS User Access Policy J. R. Schneider
2:00 LCLS User Interface and User Operations in 2009 J. Arthur
2:30 AMO Early Science Capability J. Bozek
3:00 LUSI Status & Early Science Capability J. Hastings