Independent Project Review of the

SLAC Research Support Building &

Infrastructure Rehabilitation (RSB) Project

 

Supporting Documentation

May 18-19, 2009

Location: Kavli 3rd Floor Conference Room

 Agenda (printable)   w   Presentations    w Charge

Committee Contact Information w SLAC Contact Information w Directions to SLAC and Meeting Room Locations


  Acquisition Strategy
  Advance Procurement Plan
  Charter Integrated Project Team
  Life Cycle Cost Analysis
  Preliminary Hazard Analysis Report - Draft
  Preliminary Project Execution Plan - Draft
  Quality Implementation Procedure (QIP) - Draft
  Risk Risk Registry
  Risk Management Plan - Draft
  Security Vulnerability Assessment Report (Preliminary) - Draft
  Statement of Mission Need
  WBS Dictionary - Draft
   
  OMB 300: Non-Information Technology Capital Assessment Plan and Business Case Summary - Part 1
  10-SC-70, RSB for PED/Construction
  Schedule by Building
  Davis Langdon 60% Conceptual Design Cost Report
  Building 003 Remodel - 60% Conceptual Design Report Cost Estimate - Reconciled
  Building 024 Remodel - 60% Conceptual Design Report Cost Estimate - Reconciled
  Building 041 Remodel - 60% Conceptual Report Cost Estimate - Reconciled
  Research Support Building - 60% Conceptual Design Report Cost Estimate -Reconciled
  90% Conceptual Design Report
  Compliance with the National Environmental Policy Act