Schedule for Accelerator Physics Experiments at SSRL March 23 - March 25, 1998 Revision 2.0 March 20, 1998 +--------------------------------+--------------------------------+ | Monday March 23, 1998 | Tuesday March 24, 1998 | | Tuesday March 24, 1998 | Wednesday March 25, 1998 | 06:00 +--------------------------------+--------------------------------+ 06:00 |Accelerator Modeling. |... cont Lifetime Studies. | |[LeBlanc] +--------------------------------+ 07:00 |8 hours; 3.00 GeV; up to 100 mA |SPEAR Cable Plant Inventory. | | |[Martin] | | |3 hours including 2 hours of | | | S P E A R A C C E S S | | | | | +--------------------------------+ 10:00 | |Impedance Characterization. | | |[Sebek] | | |12 hours; 2.3-3 GeV; 0 - 100 mA | | | | | | | | | | | | | 14:00 +--------------------------------+ | |BL7-2 Mirror Feedback: BPM | | |Electrical Center Drift with | | |SPEAR Current. ** | | |[Rabedeau], Bocek | | |6 hours; 3.0 GeV; 10 - 100 mA | | | A N D | | |Pinpost Thermal Studies: 9-3 | | |with Mo Power Filtering. ** | | |[Rabedeau] | | |6 hours; 3.0 GeV; 10 - 100 mA | | | | | 20:00 +--------------------------------+ | |Lifetime Studies. | | |{[Limborg]}, SPEAR Operator | | |11 hours; 2.3-3 GeV; 0 - 100 mA | | | +--------------------------------+ 22:00 | |Lifetime Studies. | | |[Limborg] | | |4 hours; 2.3-3 GeV; 0 - 100 mA | | | | | | | | | | | | | | +--------------------------------+ 02:00 | |Prepare for User Run at 06:00 | | |[SPEAR Operator] | | |4 hours | | | | | | | | | | | cont ... | | 06:00 +--------------------------------+--------------------------------+ 06:00 Do not exceed 100 mA in SPEAR except where noted. Explanation: [] = Spokesperson(s); {} = Not present during experiment; **,* = Beam most or part of the time parasitically available for users, resp. Program manager: Heinz-Dieter Nuhn, X2275, Pager 9-849-9492, Hm (650) 691-9453
Heinz-Dieter Nuhn, SSRL 20 March 1998