06:00 +--------------------------------+--------------------------------+ 06:00
|SPEAR Maintenance. |Measure Orbit Response Matrices.|
|[Scott], et al. |[{Safranek}], SPEAR Operator |
| |3 hours; 3 GeV; up to 100 mA |
| | |
| | |
| +--------------------------------+ 09:00
| |Measure Bump Response Matrix |
| |and Test New Matrices in Silver |
| |and Feedback. |
| |[Corbett, Safranek] |
| |3 hours; 3 GeV; up to 100 mA |
| +--------------------------------+ 12:00
| |BTS Injection Studies. |
| |[Safranek] |
| |8 hours; 2.26 GeV; up to 100 mA |
14:00 +--------------------------------+ |
|Recovery from Maintenance. | |
|[SPEAR Operator] | |
| with | |
| Boooster Ejection | |
| Kicker Studies. | |
| [Ortiz], et al. | |
| 2 hours | |
18:00 +--------------------------------+ |
|MATLAB/Channel Access Orbit | |
|Control. | |
|[Corbett], Terebilo | |
|12 hours; 3 GeV; up to 100 mA +--------------------------------+ 20:00
| |Tune vs. Lifetime Mapping. |
| |{[Guerra]}, SPEAR Operator |
| |6 hours; 3 GeV; up to 100 mA |
| | |
| | |
| | |
| | |
00:00 + + + 00:00
| | |
| | |
| | |
| +--------------------------------+ 02:00
| |Prepare for User Run at 06:00 |
| |[SPEAR Operator] |
| | |
| | |
| | |
| | |
| | |
06:00 +--------------------------------+--------------------------------+ 06:00
Do not exceed 100 mA in SPEAR except where noted.
Explanation: [] = Spokesperson(s); {} = Not present during experiment;
**,* = Beam most or part of the time parasitically available for users, resp.
Program manager: Heinz-Dieter Nuhn, X2275, Pager 9-849-9492, Hm (650) 691-9453