EXPERIMENTAL STATION 5-1

 

RESPONSIBLE STAFF: Dan Brehmer
Hirohito Ogasawara
EXPERIMENTS:Photoemission; NEXAFS (see also: Spectroscopic Techniques)
% TIME GENERAL USE:~25%
SCHEDULING: Proposal Submittal and Scheduling Procedures
Current SPEAR and Beam Line Schedules
SOURCE: Elliptically polarized undulator
OPTICS: M0 vertical deflecting spherical, water-cooled
M2 horizontal deflecting spherical
M3 vertical deflecting elliptical
MONOCHROMATOR: Spherical Grating Monochromator (SGM)
SLITS : 0-1000 µm. Entrance slit cooled and movable
± 200 mm along optical axis
GRATINGS : 3 water-cooled interchangeable
HORIZONTAL ANGULAR ACCEPTANCE : 0.25 mrad
ENERGY RANGE : 300 l/mm: 150 - 400 E/DE 10000
600 l/mm: 250 - 700 E/DE 10000
1100 l/mm: 500 - 1200 E/DE 10000
SPOT SIZE : 0.01 x 0.075 mm2
INSTRUMENTATION: Computer:
Digital AlphaStation 500/266 w/21" monitor PC and CD burner
CAMAC Crate:
hex scaler, real time clock, D/A converter
NIM Electronics:
voltage to frequency converter

SSRL | Beamlines | User Admin | Safety

Last Updated: 27 SEP 2006
Content Owner: Hirohito Ogasawara
Page Editor: Lisa Dunn