Schedule for Accelerator Physics Experiments at SSRL
April 20 - April 22, 1998 Revision 0.0
April 15, 1998
+--------------------------------+--------------------------------+
| Monday April 20, 1998 | Tuesday April 21, 1998 |
| Tuesday April 21, 1998 | Wednesday April 22, 1998 |
06:00 +--------------------------------+--------------------------------+ 06:00
|Accelerator Modeling. |Lifetime Studies, RF Cavity |
|[LeBlanc] |Thermal Feedback. |
|8 hours; 3.00 GeV; up to 100 mA |[Limborg, Sebek] |
| |18 hours; 2.3-3 GeV; 2 - 100 mA;|
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
14:00 +--------------------------------+ |
|Bunch Loss Correction. | |
|[Guerra] | |
|3 hours; 2.3 GeV; up to 100 mA | |
| | |
| | |
17:00 +--------------------------------+ |
|Nonlinear Dynamics Study. | |
|[Terebilo], Cornacchia, Wille | |
|10 hours; 3.0 GeV; 5 - 10 mA | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| +--------------------------------+ 00:00
| |Measurement or Bend Magnet |
| |Contribution to the BL5 Steering|
| |Signal.[Troxel],3 GeV; 60-100 mA|
| +--------------------------------+ 02:00
| |Prepare for User Run at 06:00 |
03:00 +--------------------------------+[SPEAR Operator] |
|Test of the 10S11 RF Station at |4 hours |
|the Original Park Position. | |
|{[Guerra]}, SPEAR Operator | |
|3 hours; 3.0 GeV; up to 100 mA | |
| | |
06:00 +--------------------------------+--------------------------------+ 06:00
Do not exceed 100 mA in SPEAR except where noted.
Explanation: [] = Spokesperson(s); {} = Not present during experiment;
**,* = Beam most or part of the time parasitically available for users, resp.
Program manager: Heinz-Dieter Nuhn, X2275, Pager 9-849-9492, Hm (650) 691-9453
Heinz-Dieter Nuhn, SSRL 15 April 1998