Schedule for Accelerator Physics Experiments at SSRL
March 23 - March 25, 1998 Revision 2.0
March 20, 1998
+--------------------------------+--------------------------------+
| Monday March 23, 1998 | Tuesday March 24, 1998 |
| Tuesday March 24, 1998 | Wednesday March 25, 1998 |
06:00 +--------------------------------+--------------------------------+ 06:00
|Accelerator Modeling. |... cont Lifetime Studies. |
|[LeBlanc] +--------------------------------+ 07:00
|8 hours; 3.00 GeV; up to 100 mA |SPEAR Cable Plant Inventory. |
| |[Martin] |
| |3 hours including 2 hours of |
| | S P E A R A C C E S S |
| | |
| +--------------------------------+ 10:00
| |Impedance Characterization. |
| |[Sebek] |
| |12 hours; 2.3-3 GeV; 0 - 100 mA |
| | |
| | |
| | |
| | |
14:00 +--------------------------------+ |
|BL7-2 Mirror Feedback: BPM | |
|Electrical Center Drift with | |
|SPEAR Current. ** | |
|[Rabedeau], Bocek | |
|6 hours; 3.0 GeV; 10 - 100 mA | |
| A N D | |
|Pinpost Thermal Studies: 9-3 | |
|with Mo Power Filtering. ** | |
|[Rabedeau] | |
|6 hours; 3.0 GeV; 10 - 100 mA | |
| | |
20:00 +--------------------------------+ |
|Lifetime Studies. | |
|{[Limborg]}, SPEAR Operator | |
|11 hours; 2.3-3 GeV; 0 - 100 mA | |
| +--------------------------------+ 22:00
| |Lifetime Studies. |
| |[Limborg] |
| |4 hours; 2.3-3 GeV; 0 - 100 mA |
| | |
| | |
| | |
| | |
| +--------------------------------+ 02:00
| |Prepare for User Run at 06:00 |
| |[SPEAR Operator] |
| |4 hours |
| | |
| | |
| | |
| cont ... | |
06:00 +--------------------------------+--------------------------------+ 06:00
Do not exceed 100 mA in SPEAR except where noted.
Explanation: [] = Spokesperson(s); {} = Not present during experiment;
**,* = Beam most or part of the time parasitically available for users, resp.
Program manager: Heinz-Dieter Nuhn, X2275, Pager 9-849-9492, Hm (650) 691-9453
Heinz-Dieter Nuhn, SSRL 20 March 1998