SSRL Beam Port Schedule


X-ray beam lines are scheduled in three 8-hour shifts each day (11pm-7am; 7am-3pm; 3-11pm). Checkouts/changeovers are scheduled during the 7am-3pm shift. Most X-ray beam lines officially turn over to the next user much earlier than 3pm depending on the equipment requirements and staff availability. At least 1 week prior to arrival, users need to contact the designated beam line engineer/scientist (see SSRL Beam Lines by Number for contact information) to discuss beam line configuration needs and start times. Unless instructed otherwise, experiments end at 7am (6am when Maintenance (MA) or Accelerator Physics (AP) are scheduled).


Weeks of the Schedule
 Oct. 21, 2024   Oct. 28, 2024   Nov. 04, 2024   Nov. 11, 2024 
 Nov. 18, 2024   Nov. 25, 2024   Dec. 02, 2024   Dec. 09, 2024 
 Dec. 16, 2024   Dec. 23, 2024   Dec. 30, 2024   Jan. 06, 2025 
 Jan. 13, 2025   Jan. 20, 2025   Jan. 27, 2025   Feb. 03, 2025 
 Feb. 10, 2025   Feb. 17, 2025   Feb. 24, 2025   Mar. 03, 2025 
 Mar. 10, 2025   Mar. 17, 2025   Mar. 24, 2025   Mar. 31, 2025 
 Apr. 07, 2025   Apr. 14, 2025   Apr. 21, 2025   Apr. 28, 2025 
 May 05, 2025   May 12, 2025   May 19, 2025   May 26, 2025 
 Jun. 02, 2025   Jun. 09, 2025   Jun. 16, 2025   Jun. 23, 2025 
 Jun. 30, 2025   Jul. 07, 2025   Jul. 14, 2025   Jul. 21, 2025 
 Jul. 28, 2025 

Back to Table of Contents

WEEK OF Oct. 21, 2024
                                         
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
BEAM   LINE 1-5  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 2-1  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 2-2  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
BEAM   LINE 2-3  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               STUP               8019 J.Richardson  8019 J.Richardson  8019 J.Richar/DOWN DOWN               DOWN              
STUP               CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson  DOWN               DOWN               Unscheduled       
STUP               8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  DOWN               DOWN               Unscheduled       
BEAM   LINE 4-1  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
BEAM   LINE 4-2  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui/DOWN DOWN               DOWN              
CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      DOWN               DOWN               Unscheduled       
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      DOWN               DOWN               CHANGE/8877 T.Mats
BEAM   LINE 4-3  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               Unscheduled        Unscheduled        8092 D.Sokaras     8092 D.Sokara/DOWN DOWN               DOWN              
Unscheduled        Unscheduled        CHANGE/8092 D.Soka 8092 D.Sokaras     DOWN               DOWN               Unscheduled       
Unscheduled        Unscheduled        8092 D.Sokaras     8092 D.Sokaras     DOWN               DOWN               Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 7-2  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               STUP               Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
STUP               Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
STUP               Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
BEAM   LINE 7-3  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 9-3  
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled       
BEAM   LINE 11-2 
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
FACI               FACI               FACI               FACI               DOWN               DOWN               Unscheduled       
BEAM   LINE 11-3 
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               STUP               STUP               STUP               STUP/DOWN          DOWN               DOWN              
STUP               STUP               STUP               STUP               DOWN               DOWN               Unscheduled       
STUP               STUP               STUP               STUP               DOWN               DOWN               Unscheduled       
BEAM   LINE 15-2 
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokara/DOWN DOWN               DOWN              
CHANGE/8892 D.Soka 8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     DOWN               DOWN               Unscheduled       
8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     DOWN               DOWN               Unscheduled       
BEAM   LINE 17-2 
Oct. 21, 2024      Oct. 22, 2024      Oct. 23, 2024      Oct. 24, 2024      Oct. 25, 2024      Oct. 26, 2024      Oct. 27, 2024     
STUP               FACI               FACI               FACI               FACI/DOWN          DOWN               DOWN              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              
FACI               FACI               FACI               FACI               DOWN               DOWN               FACI              

Back to Table of Contents

WEEK OF Oct. 28, 2024
                                         
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
BEAM   LINE 1-5  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               FACI               FACI               FACI               6103 S.Hesse       6103 S.Hesse      
FACI               FACI               FACI               FACI               Xray CHECKOUT/6103 6103 S.Hesse       6103 S.Hesse      
FACI               FACI               FACI               FACI               6103 S.Hesse       6103 S.Hesse       6103 S.Hesse      
BEAM   LINE 2-1  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               8810 N.Strange     8810 N.Strange     8810 N.Strange     8810 N.Strange     6196 J.Baek        6196 J.Baek       
Unscheduled        8810 N.Strange     8810 N.Strange     8810 N.Strange     Xray CHECKOUT/6196 6196 J.Baek        Unscheduled       
Xray CHECKOUT/8810 8810 N.Strange     8810 N.Strange     8810 N.Strange     6196 J.Baek        6196 J.Baek        Unscheduled       
BEAM   LINE 2-2  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        Unscheduled        6657 X.Zheng       6657 X.Zheng       6657 X.Zheng       6729 R.Root        6729 R.Root       
Unscheduled        CHANGE/6657 X.Zhen 6657 X.Zheng       6657 X.Zheng       CHANGE/6729 R.Root 6729 R.Root        6729 R.Root       
Unscheduled        6657 X.Zheng       6657 X.Zheng       6657 X.Zheng       6729 R.Root        6729 R.Root        6729 R.Root       
BEAM   LINE 4-1  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        6789 S.Masina      6798 D.Pe          6798 D.Pe          6798 D.Pe          6689 R.Ross        6689 R.Ross       
Unscheduled        SMB CHECKOUT/6798  6798 D.Pe          6798 D.Pe          SMB CHECKOUT/6689  6689 R.Ross        6689 R.Ross       
SMB CHECKOUT/6789  6798 D.Pe          6798 D.Pe          6798 D.Pe          6689 R.Ross        6689 R.Ross        6689 R.Ross       
BEAM   LINE 4-2  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      5119 G.Wong        5119 G.Wong        5119 G.Wong        5119 G.Wong       
8877 T.Matsui      8877 T.Matsui      CHANGE/5119 G.Wong 5119 G.Wong        5119 G.Wong        5119 G.Wong        5119 G.Wong       
8877 T.Matsui      8877 T.Matsui      5119 G.Wong        5119 G.Wong        5119 G.Wong        5119 G.Wong        5119 G.Wong       
BEAM   LINE 4-3  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               6653 M.Preefer     6653 M.Preefer     6614 S.George      6163 G.George      6163 G.George     
FACI               SMB CHECKOUT/6653  6653 M.Preefer     SMB CHECKOUT/6614  SMB CHECKOUT/6163  6163 G.George      6163 G.George     
FACI               6653 M.Preefer     6653 M.Preefer     6614 S.George      6163 G.George      6163 G.George      6163 G.George     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        6282 T.Hersbach    8892 D.Sokaras     8892 D.Sokaras     Unscheduled        Unscheduled        Unscheduled       
Unscheduled        CHANGE/8892 D.Soka 8892 D.Sokaras     Unscheduled        Unscheduled        Unscheduled        Unscheduled       
CHANGE/6282 T.Hers 8892 D.Sokaras     8892 D.Sokaras     Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-2  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        FACI               FACI              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        FACI               FACI               FACI              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        FACI               FACI               FACI              
BEAM   LINE 7-3  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 9-3  
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        6481 S.Krishna     6481 S.Krishna    
CHANGE/8099 S.Bare 8099 S.Bare        8099 S.Bare        8099 S.Bare        CHANGE/6481 S.Kris 6481 S.Krishna     6481 S.Krishna    
8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        6481 S.Krishna     6481 S.Krishna     6481 S.Krishna    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     6317 S.Kozimor     6317 S.Kozimor    
Unscheduled        5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     SMB CHECKOUT/6317  6317 S.Kozimor     6317 S.Kozimor    
SMB CHECKOUT/5555  5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     6317 S.Kozimor     6317 S.Kozimor     6317 S.Kozimor    
BEAM   LINE 11-3 
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               FACI               FACI               6103 S.Hesse       6103 S.Hesse       6103 S.Hesse      
FACI               FACI               FACI               Xray CHECKOUT/6103 6103 S.Hesse       6103 S.Hesse       6103 S.Hesse      
FACI               FACI               FACI               6103 S.Hesse       6103 S.Hesse       6103 S.Hesse       6103 S.Hesse      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        8019 J.Richardson  8019 J.Richardson  6718 E.Nuccio      6718 E.Nuccio      6801 H.Lyu         6801 H.Lyu        
CHANGE/8019 J.Rich 8019 J.Richardson  CHANGE/6718 E.Nucc 6718 E.Nuccio      CHANGE/6801 H.Lyu  6801 H.Lyu         6801 H.Lyu        
8019 J.Richardson  8019 J.Richardson  6718 E.Nuccio      6718 E.Nuccio      6801 H.Lyu         6801 H.Lyu         6801 H.Lyu        
BEAM   LINE 15-2 
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
Unscheduled        STUP               6793 R.Colina Ruiz 6793 R.Colina Ruiz 6793 R.Colina Ruiz 6646 S.Hayes       6646 S.Hayes      
STUP               CHANGE/6793 R.Coli 6793 R.Colina Ruiz 6793 R.Colina Ruiz CHANGE/6646 S.Haye 6646 S.Hayes       6646 S.Hayes      
STUP               6793 R.Colina Ruiz 6793 R.Colina Ruiz 6793 R.Colina Ruiz 6646 S.Hayes       6646 S.Hayes       6646 S.Hayes      
BEAM   LINE 17-2 
Oct. 28, 2024      Oct. 29, 2024      Oct. 30, 2024      Oct. 31, 2024      Nov. 01, 2024      Nov. 02, 2024      Nov. 03, 2024     
FACI               FACI               8895 K.Stone       8895 K.Stone       8895 K.Stone       93K1 B.Saini       93K1 B.Saini      
FACI               Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone       Xray CHECKOUT/93K1 93K1 B.Saini       93K1 B.Saini      
FACI               8895 K.Stone       8895 K.Stone       8895 K.Stone       93K1 B.Saini       93K1 B.Saini       93K1 B.Saini      

Back to Table of Contents

WEEK OF Nov. 04, 2024
                                         
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
BEAM   LINE 1-5  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6103 S.Hesse       AP                 AP                 5529 N.Akmansen Ka 5529 N.Akmansen Ka 6006 Y.Wu          6006 Y.Wu         
AP                 AP                 Xray CHECKOUT/5529 5529 N.Akmansen Ka Xray CHECKOUT/6006 6006 Y.Wu          6006 Y.Wu         
AP                 AP                 5529 N.Akmansen Ka 5529 N.Akmansen Ka 6006 Y.Wu          6006 Y.Wu          6006 Y.Wu         
BEAM   LINE 2-1  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
Unscheduled        AP                 AP                 FACI               FACI               6810 Z.Liang       6810 Z.Liang      
AP                 AP                 FACI               FACI               Xray CHECKOUT/6810 6810 Z.Liang       Unscheduled       
AP                 AP                 FACI               FACI               6810 Z.Liang       6810 Z.Liang       Unscheduled       
BEAM   LINE 2-2  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
Unscheduled        AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6729 R.Root        AP                 AP                 6014 D.Fike        6014 D.Fike        6710 V.Noel        6710 V.Noel       
AP                 AP                 CHANGE/6014 D.Fike 6014 D.Fike        CHANGE/6710 V.Noel 6710 V.Noel        6710 V.Noel       
AP                 AP                 6014 D.Fike        6014 D.Fike        6710 V.Noel        6710 V.Noel        6710 V.Noel       
BEAM   LINE 4-1  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6689 R.Ross        AP                 AP                 6547 N.Sunariwal   6547 N.Sunariwal   8010 N.Strange     8010 N.Strange    
AP                 AP                 SMB CHECKOUT/6547  6547 N.Sunariwal   SMB CHECKOUT/8010  8010 N.Strange     8010 N.Strange    
AP                 AP                 6547 N.Sunariwal   6547 N.Sunariwal   8010 N.Strange     8010 N.Strange     8010 N.Strange    
BEAM   LINE 4-2  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
5119 G.Wong        AP                 AP                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      12D9 I.Badea      
AP                 AP                 CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      CHANGE/12D9 I.Bade 12D9 I.Badea      
AP                 AP                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      12D9 I.Badea       12D9 I.Badea      
BEAM   LINE 4-3  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6163 G.George      AP                 AP                 11L5 Y.Ha          11L5 Y.Ha          8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 SMB CHECKOUT/11L5  11L5 Y.Ha          SMB CHECKOUT/8092  8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 11L5 Y.Ha          11L5 Y.Ha          8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
Unscheduled        AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
Unscheduled        AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
FACI               AP                 AP                 FACI               FACI               Unscheduled        Unscheduled       
AP                 AP                 FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
FACI               AP                 AP                 FACI               6277 G.George      6277 G.George      6277 G.George     
AP                 AP                 FACI               CHANGE/6277 G.Geor 6277 G.George      6277 G.George      6277 G.George     
AP                 AP                 FACI               6277 G.George      6277 G.George      6277 G.George      6277 G.George     
BEAM   LINE 7-3  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
FACI               AP                 AP                 6375 P.Riggs-Gelas 6375 P.Riggs-Gelas 6616 T.Stemmler    6616 T.Stemmler   
AP                 AP                 SMB CHECKOUT/6375  6375 P.Riggs-Gelas SMB CHECKOUT/6616  6616 T.Stemmler    6616 T.Stemmler   
AP                 AP                 6375 P.Riggs-Gelas 6375 P.Riggs-Gelas 6616 T.Stemmler    6616 T.Stemmler    6616 T.Stemmler   
BEAM   LINE 9-3  
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6481 S.Krishna     AP                 AP                 6331 E.Dunphy      6331 E.Dunphy      6581 A.Brenner     6581 A.Brenner    
AP                 AP                 CHANGE/6331 E.Dunp 6331 E.Dunphy      CHANGE/6581 A.Bren 6581 A.Brenner     6581 A.Brenner    
AP                 AP                 6331 E.Dunphy      6331 E.Dunphy      6581 A.Brenner     6581 A.Brenner     6581 A.Brenner    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
Unscheduled        AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6317 S.Kozimor     AP                 AP                 6491 M.Wang        6491 M.Wang        6491 M.Wang        6491 M.Wang       
AP                 AP                 SMB CHECKOUT/6491  6491 M.Wang        6491 M.Wang        6491 M.Wang        6491 M.Wang       
AP                 AP                 6491 M.Wang        6491 M.Wang        6491 M.Wang        6491 M.Wang        6491 M.Wang       
BEAM   LINE 11-3 
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6103 S.Hesse       AP                 AP                 6804 Y.Cho         6241 C.Salamat     6241 C.Salamat     6241 C.Salamat    
AP                 AP                 Xray CHECKOUT/6804 Xray CHECKOUT/6241 6241 C.Salamat     6241 C.Salamat     6241 C.Salamat    
AP                 AP                 6804 Y.Cho         6241 C.Salamat     6241 C.Salamat     6241 C.Salamat     6241 C.Salamat    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6801 H.Lyu         AP                 AP                 6524 G.Druschel    6524 G.Druschel    6014 D.Fike        6014 D.Fike       
AP                 AP                 CHANGE/6524 G.Drus 6524 G.Druschel    CHANGE/6014 D.Fike 6014 D.Fike        6014 D.Fike       
AP                 AP                 6524 G.Druschel    6524 G.Druschel    6014 D.Fike        6014 D.Fike        6014 D.Fike       
BEAM   LINE 15-2 
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
6646 S.Hayes       AP                 6646 S.Hayes       6177 P.O'Day       6177 P.O'Day       6411 R.Dias        6411 R.Dias       
AP                 CHANGE/6646 S.Haye CHANGE/6177 P.O'Da 6177 P.O'Day       CHANGE/6411 R.Dias 6411 R.Dias        6411 R.Dias       
AP                 6646 S.Hayes       6177 P.O'Day       6177 P.O'Day       6411 R.Dias        6411 R.Dias        6411 R.Dias       
BEAM   LINE 17-2 
Nov. 04, 2024      Nov. 05, 2024      Nov. 06, 2024      Nov. 07, 2024      Nov. 08, 2024      Nov. 09, 2024      Nov. 10, 2024     
93K1 B.Saini       AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              

Back to Table of Contents

WEEK OF Nov. 11, 2024
                                         
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
BEAM   LINE 1-5  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6006 Y.Wu          FACI               6601 S.Verschraege 6601 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege
FACI               Xray CHECKOUT/6601 6601 S.Verschraege CHANGE/6506 S.Vers 6506 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege
FACI               6601 S.Verschraege 6601 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege 6506 S.Verschraege
BEAM   LINE 2-1  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        8062 M.Preefer     8062 M.Preefer     8062 M.Preefer     93K7 R.Macaluso    8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/8062 8062 M.Preefer     8062 M.Preefer     Xray CHECKOUT/93K7 Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone      
8062 M.Preefer     8062 M.Preefer     8062 M.Preefer     93K7 R.Macaluso    8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 2-2  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6710 V.Noel        6287 L.Dresselhaus 6287 L.Dresselhaus 6776 T.Bosak       6776 T.Bosak       6629 D.Rodrigues   6629 D.Rodrigues  
CHANGE/6287 L.Dres 6287 L.Dresselhaus CHANGE/6776 T.Bosa 6776 T.Bosak       CHANGE/6629 D.Rodr 6629 D.Rodrigues   6629 D.Rodrigues  
6287 L.Dresselhaus 6287 L.Dresselhaus 6776 T.Bosak       6776 T.Bosak       6629 D.Rodrigues   6629 D.Rodrigues   6629 D.Rodrigues  
BEAM   LINE 4-1  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
8010 N.Strange     6047 J.Catalano    6047 J.Catalano    6262 A.Naranjo-Sol 6262 A.Naranjo-Sol 6394 B.Maki        6394 B.Maki       
SMB CHECKOUT/6047  6047 J.Catalano    SMB CHECKOUT/6262  6262 A.Naranjo-Sol SMB CHECKOUT/6394  6394 B.Maki        6394 B.Maki       
6047 J.Catalano    6047 J.Catalano    6262 A.Naranjo-Sol 6262 A.Naranjo-Sol 6394 B.Maki        6394 B.Maki        6394 B.Maki       
BEAM   LINE 4-2  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
12D9 I.Badea       RA                 12C9 J.Rueben      6743 A.Hussain     8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
RA                 CHANGE/12C9 J.Rueb CHANGE/6743 A.Huss CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
RA                 12C9 J.Rueben      6743 A.Hussain     8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
8092 D.Sokaras     6508 M.Kirk        6508 M.Kirk        6801 H.Lyu         6801 H.Lyu         6728 K.Shigenobu   6728 K.Shigenobu  
SMB CHECKOUT/6508  6508 M.Kirk        SMB CHECKOUT/6801  6801 H.Lyu         SMB CHECKOUT/6728  6728 K.Shigenobu   6728 K.Shigenobu  
6508 M.Kirk        6508 M.Kirk        6801 H.Lyu         6801 H.Lyu         6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6277 G.George      6776 T.Bosak       6776 T.Bosak       6655 C.Woltz       6655 C.Woltz       8019 J.Richardson  8019 J.Richardson 
CHANGE/6776 T.Bosa 6776 T.Bosak       CHANGE/6655 C.Wolt 6655 C.Woltz       CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson 
6776 T.Bosak       6776 T.Bosak       6655 C.Woltz       6655 C.Woltz       8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
BEAM   LINE 7-3  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6616 T.Stemmler    6616 T.Stemmler    6653 M.Preefer     6582 Y.Guo         6582 Y.Guo         6508 M.Kirk        6508 M.Kirk       
6616 T.Stemmler    SMB CHECKOUT/6653  SMB CHECKOUT/6582  6582 Y.Guo         SMB CHECKOUT/6508  6508 M.Kirk        6508 M.Kirk       
6616 T.Stemmler    6653 M.Preefer     6582 Y.Guo         6582 Y.Guo         6508 M.Kirk        6508 M.Kirk        6508 M.Kirk       
BEAM   LINE 9-3  
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6581 A.Brenner     6731 L.Chen        6731 L.Chen        6731 L.Chen        6483 S.Vijayaragha 6483 S.Vijayaragha 6483 S.Vijayaragha
CHANGE/6731 L.Chen 6731 L.Chen        6731 L.Chen        CHANGE/6483 S.Vija 6483 S.Vijayaragha 6483 S.Vijayaragha 6483 S.Vijayaragha
6731 L.Chen        6731 L.Chen        6731 L.Chen        6483 S.Vijayaragha 6483 S.Vijayaragha 6483 S.Vijayaragha 6483 S.Vijayaragha
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6491 M.Wang        FACI               FACI               FACI               FACI               6137 Z.Xue         6137 Z.Xue        
FACI               FACI               FACI               FACI               SMB CHECKOUT/6137  6137 Z.Xue         6137 Z.Xue        
FACI               FACI               FACI               FACI               6137 Z.Xue         6137 Z.Xue         6137 Z.Xue        
BEAM   LINE 11-3 
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6241 C.Salamat     6305 W.Go          6305 W.Go          6305 W.Go          6305 W.Go          6788 A.Magni       6788 A.Magni      
Xray CHECKOUT/6305 6305 W.Go          6305 W.Go          6305 W.Go          Xray CHECKOUT/6788 6788 A.Magni       6788 A.Magni      
6305 W.Go          6305 W.Go          6305 W.Go          6305 W.Go          6788 A.Magni       6788 A.Magni       6788 A.Magni      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6014 D.Fike        8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  6773 A.Yang        6657 X.Zheng       6657 X.Zheng      
CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson  CHANGE/6773 A.Yang CHANGE/6657 X.Zhen 6657 X.Zheng       6657 X.Zheng      
8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  6773 A.Yang        6657 X.Zheng       6657 X.Zheng       6657 X.Zheng      
BEAM   LINE 15-2 
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
6411 R.Dias        STUP               5636 L.Gee         5636 L.Gee         STUP               6649 J.Penner-Hahn 6649 J.Penner-Hahn
STUP               CHANGE/5636 L.Gee  5636 L.Gee         STUP               CHANGE/6649 J.Penn 6649 J.Penner-Hahn 6649 J.Penner-Hahn
STUP               5636 L.Gee         5636 L.Gee         STUP               6649 J.Penner-Hahn 6649 J.Penner-Hahn 6649 J.Penner-Hahn
BEAM   LINE 17-2 
Nov. 11, 2024      Nov. 12, 2024      Nov. 13, 2024      Nov. 14, 2024      Nov. 15, 2024      Nov. 16, 2024      Nov. 17, 2024     
FACI               FACI               FACI               93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim  
FACI               FACI               Xray CHECKOUT/93H6 93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim  
FACI               FACI               93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim  

Back to Table of Contents

WEEK OF Nov. 18, 2024
                                         
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
BEAM   LINE 1-5  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6506 S.Verschra/AP AP                 AP                 FACI               6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman    
AP                 AP                 FACI               Xray CHECKOUT/6713 6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman    
AP                 AP                 FACI               6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman    
BEAM   LINE 2-1  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
8095 K.Stone/AP    AP                 AP                 6679 M.Cosby       6679 M.Cosby       8895 K.Stone       8895 K.Stone      
AP                 AP                 Xray CHECKOUT/6679 6679 M.Cosby       CHANGE/8895 K.Ston 8895 K.Stone       8895 K.Stone      
AP                 AP                 6679 M.Cosby       6679 M.Cosby       8895 K.Stone       8895 K.Stone       8895 K.Stone      
BEAM   LINE 2-2  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6629 D.Rodrigue/AP AP                 AP                 FACI               6782 E.Ellison     6782 E.Ellison     6782 E.Ellison    
AP                 AP                 FACI               CHANGE/6782 E.Elli 6782 E.Ellison     6782 E.Ellison     6782 E.Ellison    
AP                 AP                 FACI               6782 E.Ellison     6782 E.Ellison     6782 E.Ellison     6782 E.Ellison    
BEAM   LINE 4-1  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6394 B.Maki/AP     AP                 AP                 5757 F.Bridges     5757 F.Bridges     6147 D.Pan         6147 D.Pan        
AP                 AP                 SMB CHECKOUT/5757  5757 F.Bridges     SMB CHECKOUT/6147  6147 D.Pan         6147 D.Pan        
AP                 AP                 5757 F.Bridges     5757 F.Bridges     6147 D.Pan         6147 D.Pan         6147 D.Pan        
BEAM   LINE 4-2  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
8877 T.Matsui/AP   AP                 AP                 RA                 RA                 8877 T.Matsui      8877 T.Matsui     
AP                 AP                 RA                 RA                 8877 T.Matsui      8877 T.Matsui      CHANGE/12D0 Z.Bu  
AP                 AP                 RA                 RA                 8877 T.Matsui      8877 T.Matsui      12D0 Z.Bu         
BEAM   LINE 4-3  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6728 K.Shigenob/AP AP                 AP                 6249 P.Zhang       6249 P.Zhang       6232 A.Garcia-Espa 6232 A.Garcia-Espa
AP                 AP                 SMB CHECKOUT/6249  6249 P.Zhang       SMB CHECKOUT/6232  6232 A.Garcia-Espa 6232 A.Garcia-Espa
AP                 AP                 6249 P.Zhang       6249 P.Zhang       6232 A.Garcia-Espa 6232 A.Garcia-Espa 6232 A.Garcia-Espa
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
AP                 AP                 AP                 6770 L.Mu          6770 L.Mu          6247 K.Thurber     6247 K.Thurber    
AP                 AP                 CHANGE/6770 L.Mu   6770 L.Mu          CHANGE/6247 K.Thur 6247 K.Thurber     6247 K.Thurber    
AP                 AP                 6770 L.Mu          6770 L.Mu          6247 K.Thurber     6247 K.Thurber     6247 K.Thurber    
BEAM   LINE 7-2  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
8019 J.Richards/AP AP                 AP                 6226 M.Crotteau    6226 M.Crotteau    8067 S.Webb        8067 S.Webb       
AP                 AP                 CHANGE/6226 M.Crot 6226 M.Crotteau    CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb       
AP                 AP                 6226 M.Crotteau    6226 M.Crotteau    8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6508 M.Kirk/AP     AP                 AP                 8098 T.Kroll       8098 T.Kroll       5842 J.Lentz       5842 J.Lentz      
AP                 AP                 SMB CHECKOUT/8098  8098 T.Kroll       SMB CHECKOUT/5842  5842 J.Lentz       5842 J.Lentz      
AP                 AP                 8098 T.Kroll       8098 T.Kroll       5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
BEAM   LINE 9-3  
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6483 S.Vijayara/AP AP                 AP                 6379 M.Abernathy   6379 M.Abernathy   6109 H.Shafaat     6109 H.Shafaat    
AP                 AP                 SMB CHECKOUT/6379  6379 M.Abernathy   SMB CHECKOUT/6109  6109 H.Shafaat     6109 H.Shafaat    
AP                 AP                 6379 M.Abernathy   6379 M.Abernathy   6109 H.Shafaat     6109 H.Shafaat     6109 H.Shafaat    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6137 Z.Xue/AP      AP                 AP                 6425 R.Abergel     6086 R.Abergel     6086 R.Abergel     6086 R.Abergel    
AP                 AP                 SMB CHECKOUT/6425  SMB CHECKOUT/6086  6086 R.Abergel     6086 R.Abergel     Unscheduled       
AP                 AP                 6425 R.Abergel     6086 R.Abergel     6086 R.Abergel     6086 R.Abergel     Unscheduled       
BEAM   LINE 11-3 
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6788 A.Magni/AP    AP                 AP                 6006 Y.Wu          6006 Y.Wu          6686 J.Chen        6686 J.Chen       
AP                 AP                 CHANGE/11M7 R.Rao  6006 Y.Wu          CHANGE/6686 J.Chen 6686 J.Chen        6686 J.Chen       
AP                 AP                 CHANGE/6006 Y.Wu   6006 Y.Wu          6686 J.Chen        6686 J.Chen        6686 J.Chen       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6657 X.Zheng/AP    AP                 AP                 6338 X.Zheng       6338 X.Zheng       6226 M.Crotteau    6226 M.Crotteau   
AP                 AP                 CHANGE/6338 X.Zhen 6338 X.Zheng       CHANGE/6226 M.Crot 6226 M.Crotteau    6226 M.Crotteau   
AP                 AP                 6338 X.Zheng       6338 X.Zheng       6226 M.Crotteau    6226 M.Crotteau    6226 M.Crotteau   
BEAM   LINE 15-2 
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
6649 J.Penner-H/AP AP                 AP                 6462 R.Kim         6462 R.Kim         6163 G.George      6163 G.George     
AP                 AP                 CHANGE/6462 R.Kim  6462 R.Kim         CHANGE/6163 G.Geor 6163 G.George      6163 G.George     
AP                 AP                 6462 R.Kim         6462 R.Kim         6163 G.George      6163 G.George      6163 G.George     
BEAM   LINE 17-2 
Nov. 18, 2024      Nov. 19, 2024      Nov. 20, 2024      Nov. 21, 2024      Nov. 22, 2024      Nov. 23, 2024      Nov. 24, 2024     
93H6 E.Nisenboi/AP AP                 AP                 93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   FACI              
AP                 AP                 93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   FACI               FACI              
AP                 AP                 93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   FACI               FACI              

Back to Table of Contents

WEEK OF Nov. 25, 2024
                                         
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
BEAM   LINE 1-5  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman     DOWN               DOWN               6713 A.Hoffman     6713 A.Hoffman    
6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman     DOWN               DOWN               6713 A.Hoffman     6713 A.Hoffman    
6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffma/DOWN DOWN               6713 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman    
BEAM   LINE 2-1  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
8895 K.Stone       FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI/DOWN          DOWN               FACI               FACI               FACI              
BEAM   LINE 2-2  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6782 E.Ellison     6478 X.Fang        6478 X.Fang        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
CHANGE/6478 X.Fang 6478 X.Fang        6478 X.Fang        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
6478 X.Fang        6478 X.Fang        6478 X.Fang/DOWN   DOWN               8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 4-1  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6147 D.Pan         6140 F.Bridges     9705 J.LiSA        DOWN               DOWN               9705 J.LiSA        9705 J.LiSA       
SMB CHECKOUT/6140  SMB CHECKOUT/9705  9705 J.LiSA        DOWN               DOWN               9705 J.LiSA        9705 J.LiSA       
6140 F.Bridges     9705 J.LiSA        9705 J.LiSA/DOWN   DOWN               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 4-2  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
12D0 Z.Bu          12D0 Z.Bu          8877 T.Matsui      DOWN               DOWN               6006 Y.Wu          6006 Y.Wu         
12D0 Z.Bu          CHANGE/8877 T.Mats 8877 T.Matsui      DOWN               DOWN               6006 Y.Wu          CHANGE/5816 A.Ayzn
12D0 Z.Bu          8877 T.Matsui      8877 T.Matsui/DOWN DOWN               6006 Y.Wu          6006 Y.Wu          5816 A.Ayzner     
BEAM   LINE 4-3  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6232 A.Garcia-Espa 6791 M.Machado Ama 6791 M.Machado Ama DOWN               DOWN               6791 M.Machado Ama 6791 M.Machado Ama
SMB CHECKOUT/6791  6791 M.Machado Ama 6791 M.Machado Ama DOWN               DOWN               6791 M.Machado Ama 6791 M.Machado Ama
6791 M.Machado Ama 6791 M.Machado Ama 6791 M.Machad/DOWN DOWN               6791 M.Machado Ama 6791 M.Machado Ama 6791 M.Machado Ama
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6247 K.Thurber     6820 E.Santos      6820 E.Santos      DOWN               DOWN               8907 M.Preefer     8907 M.Preefer    
Xray CHECKOUT/6820 6820 E.Santos      Unscheduled        DOWN               DOWN               8907 M.Preefer     8907 M.Preefer    
6820 E.Santos      6820 E.Santos      DOWN               DOWN               8907 M.Preefer     8907 M.Preefer     8907 M.Preefer    
BEAM   LINE 7-2  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
8067 S.Webb        8067 S.Webb        8067 S.Webb        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
8067 S.Webb        8067 S.Webb        8067 S.Webb        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
8067 S.Webb        8067 S.Webb        8067 S.Webb/DOWN   DOWN               8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
5842 J.Lentz       6538 A.Duncan      6538 A.Duncan      DOWN               DOWN               6163 G.George      6163 G.George     
SMB CHECKOUT/6538  6538 A.Duncan      Unscheduled        DOWN               DOWN               6163 G.George      6163 G.George     
6538 A.Duncan      6538 A.Duncan      SMB CHECKOUT//DOWN DOWN               6163 G.George      6163 G.George      6163 G.George     
BEAM   LINE 9-3  
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6109 H.Shafaat     8098 T.Kroll       8098 T.Kroll       DOWN               DOWN               6781 G.George      6781 G.George     
SMB CHECKOUT/8098  8098 T.Kroll       SMB CHECKOUT/6781  DOWN               DOWN               6781 G.George      6781 G.George     
8098 T.Kroll       8098 T.Kroll       6781 G.George/DOWN DOWN               6781 G.George      6781 G.George      6781 G.George     
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
Unscheduled        6113 V.Noel        6113 V.Noel        DOWN               DOWN               Unscheduled        Unscheduled       
SMB CHECKOUT/6113  6113 V.Noel        6113 V.Noel        DOWN               DOWN               Unscheduled        Unscheduled       
6113 V.Noel        6113 V.Noel        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6686 J.Chen        6438 R.Smaha       6438 R.Smaha       DOWN               DOWN               FACI               FACI              
Xray CHECKOUT/6438 6438 R.Smaha       FACI               DOWN               DOWN               FACI               FACI              
6438 R.Smaha       6438 R.Smaha       FACI/DOWN          DOWN               FACI               FACI               FACI              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6226 M.Crotteau    Unscheduled        8067 S.Webb        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
Unscheduled        CHANGE/8067 S.Webb 8067 S.Webb        DOWN               DOWN               8067 S.Webb        8067 S.Webb       
Unscheduled        8067 S.Webb        8067 S.Webb/DOWN   DOWN               8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 15-2 
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
6163 G.George      6176 J.Finzel      6176 J.Finzel      DOWN               DOWN               6282 T.Hersbach    6282 T.Hersbach   
CHANGE/6176 J.Finz 6176 J.Finzel      Unscheduled        DOWN               DOWN               6282 T.Hersbach    6282 T.Hersbach   
6176 J.Finzel      6176 J.Finzel      DOWN               DOWN               6282 T.Hersbach    6282 T.Hersbach    6282 T.Hersbach   
BEAM   LINE 17-2 
Nov. 25, 2024      Nov. 26, 2024      Nov. 27, 2024      Nov. 28, 2024      Nov. 29, 2024      Nov. 30, 2024      Dec. 01, 2024     
FACI               FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI/DOWN          DOWN               FACI               FACI               FACI              

Back to Table of Contents

WEEK OF Dec. 02, 2024
                                         
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
BEAM   LINE 1-5  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
6713 A.Hoffman     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     6166 J.Chen        6166 J.Chen        6166 J.Chen       
Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     Xray CHECKOUT/6166 6166 J.Chen        6166 J.Chen        6166 J.Chen       
8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     6166 J.Chen        6166 J.Chen        6166 J.Chen        6166 J.Chen       
BEAM   LINE 2-1  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
FACI               6789 S.Masina      6789 S.Masina      6789 S.Masina      Unscheduled        11L9 E.Gamage      Unscheduled       
Xray CHECKOUT/6789 6789 S.Masina      6789 S.Masina      Unscheduled        Xray CHECKOUT/11L9 Unscheduled        Unscheduled       
6789 S.Masina      6789 S.Masina      6789 S.Masina      Unscheduled        11L9 E.Gamage      Unscheduled        Unscheduled       
BEAM   LINE 2-2  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
8067 S.Webb        8067 S.Webb        5611 K.Lau         5611 K.Lau         5611 K.Lau         6732 J.Anne        6732 J.Anne       
8067 S.Webb        CHANGE/5611 K.Lau  5611 K.Lau         5611 K.Lau         CHANGE/6732 J.Anne 6732 J.Anne        6732 J.Anne       
8067 S.Webb        5611 K.Lau         5611 K.Lau         5611 K.Lau         6732 J.Anne        6732 J.Anne        6732 J.Anne       
BEAM   LINE 4-1  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
9705 J.LiSA        5419 G.Giri        5419 G.Giri        6434 Z.Jiang       6434 Z.Jiang       6750 A.Asundi      6750 A.Asundi     
SMB CHECKOUT/5419  5419 G.Giri        SMB CHECKOUT/6434  6434 Z.Jiang       SMB CHECKOUT/6750  6750 A.Asundi      6750 A.Asundi     
5419 G.Giri        5419 G.Giri        6434 Z.Jiang       6434 Z.Jiang       6750 A.Asundi      6750 A.Asundi      6750 A.Asundi     
BEAM   LINE 4-2  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
5816 A.Ayzner      5816 A.Ayzner      8877 T.Matsui      8877 T.Matsui      5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
5816 A.Ayzner      CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/5504 Y.Srin 5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
5816 A.Ayzner      8877 T.Matsui      8877 T.Matsui      5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
BEAM   LINE 4-3  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
6791 M.Machado Ama 6700 B.Stewart     6700 B.Stewart     6555 K.Lancaster   6555 K.Lancaster   6770 L.Mu          6770 L.Mu         
SMB CHECKOUT/6700  6700 B.Stewart     SMB CHECKOUT/6555  6555 K.Lancaster   SMB CHECKOUT/6770  6770 L.Mu          6770 L.Mu         
6700 B.Stewart     6700 B.Stewart     6555 K.Lancaster   6555 K.Lancaster   6770 L.Mu          6770 L.Mu          6770 L.Mu         
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
8907 M.Preefer     6643 A.Lee         6643 A.Lee         FACI               Unscheduled        6063 A.White Smirn 6063 A.White Smirn
CHANGE/6643 A.Lee  6643 A.Lee         FACI               Unscheduled        CHANGE/6063 A.Whit 6063 A.White Smirn 6063 A.White Smirn
6643 A.Lee         6643 A.Lee         FACI               Unscheduled        6063 A.White Smirn 6063 A.White Smirn 6063 A.White Smirn
BEAM   LINE 7-2  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
8067 S.Webb        6531 A.Bhattacharj 6531 A.Bhattacharj 6732 J.Anne        6732 J.Anne        8092 D.Sokaras     8092 D.Sokaras    
CHANGE/6531 A.Bhat 6531 A.Bhattacharj CHANGE/6732 J.Anne 6732 J.Anne        CHANGE/8092 D.Soka 8092 D.Sokaras     8092 D.Sokaras    
6531 A.Bhattacharj 6531 A.Bhattacharj 6732 J.Anne        6732 J.Anne        8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 7-3  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
6163 G.George      6308 W.Wang        6308 W.Wang        6546 T.Jackson     6546 T.Jackson     6096 M.Abernathy   6096 M.Abernathy  
SMB CHECKOUT/6308  6308 W.Wang        SMB CHECKOUT/6546  6546 T.Jackson     SMB CHECKOUT/6096  6096 M.Abernathy   6096 M.Abernathy  
6308 W.Wang        6308 W.Wang        6546 T.Jackson     6546 T.Jackson     6096 M.Abernathy   6096 M.Abernathy   6096 M.Abernathy  
BEAM   LINE 9-3  
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
6781 G.George      6781 G.George      6781 G.George      6793 R.Colina Ruiz 6793 R.Colina Ruiz 6555 K.Lancaster   6555 K.Lancaster  
6781 G.George      6781 G.George      SMB CHECKOUT/6793  6793 R.Colina Ruiz SMB CHECKOUT/6555  6555 K.Lancaster   6555 K.Lancaster  
6781 G.George      6781 G.George      6793 R.Colina Ruiz 6793 R.Colina Ruiz 6555 K.Lancaster   6555 K.Lancaster   6555 K.Lancaster  
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
Unscheduled        6480 T.Sowers      6480 T.Sowers      6480 T.Sowers      6585 G.Hettiarachc 6585 G.Hettiarachc 6585 G.Hettiarachc
SMB CHECKOUT/6480  6480 T.Sowers      6480 T.Sowers      SMB CHECKOUT/6585  6585 G.Hettiarachc 6585 G.Hettiarachc 6585 G.Hettiarachc
6480 T.Sowers      6480 T.Sowers      6480 T.Sowers      6585 G.Hettiarachc 6585 G.Hettiarachc 6585 G.Hettiarachc 6585 G.Hettiarachc
BEAM   LINE 11-3 
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
FACI               5419 G.Giri        5419 G.Giri        5419 G.Giri        8095 K.Stone       8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/5419 5419 G.Giri        5419 G.Giri        Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone       8095 K.Stone      
5419 G.Giri        5419 G.Giri        5419 G.Giri        8095 K.Stone       8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
8067 S.Webb        6732 J.Anne        6732 J.Anne        6732 J.Anne        6531 A.Bhattacharj 6531 A.Bhattacharj 6531 A.Bhattacharj
CHANGE/6732 J.Anne 6732 J.Anne        6732 J.Anne        CHANGE/6531 A.Bhat 6531 A.Bhattacharj 6531 A.Bhattacharj Unscheduled       
6732 J.Anne        6732 J.Anne        6732 J.Anne        6531 A.Bhattacharj 6531 A.Bhattacharj 6531 A.Bhattacharj Unscheduled       
BEAM   LINE 15-2 
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
6282 T.Hersbach    STUP               8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       11K1 A.Follmer     11K1 A.Follmer    
STUP               CHANGE/8098 T.Krol 8098 T.Kroll       8098 T.Kroll       CHANGE/11K1 A.Foll 11K1 A.Follmer     11K1 A.Follmer    
STUP               8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       11K1 A.Follmer     11K1 A.Follmer     11K1 A.Follmer    
BEAM   LINE 17-2 
Dec. 02, 2024      Dec. 03, 2024      Dec. 04, 2024      Dec. 05, 2024      Dec. 06, 2024      Dec. 07, 2024      Dec. 08, 2024     
FACI               FACI               FACI               FACI               6604 C.Crain       6604 C.Crain       6604 C.Crain      
FACI               FACI               FACI               Xray CHECKOUT/6604 6604 C.Crain       6604 C.Crain       6604 C.Crain      
FACI               FACI               FACI               6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain      

Back to Table of Contents

WEEK OF Dec. 09, 2024
                                         
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
BEAM   LINE 1-5  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6166 J.Chen/AP     AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain      
AP                 AP                 Xray CHECKOUT/6604 6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain      
AP                 AP                 6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain      
BEAM   LINE 2-2  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6732 J.Anne/AP     AP                 AP                 FACI               6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
AP                 AP                 FACI               CHANGE/6703 E.Fade 6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
AP                 AP                 FACI               6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
BEAM   LINE 4-1  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6750 A.Asundi/AP   AP                 AP                 6782 E.Ellison     6782 E.Ellison     6692 N.Rivera      6692 N.Rivera     
AP                 AP                 SMB CHECKOUT/6782  6782 E.Ellison     SMB CHECKOUT/6692  6692 N.Rivera      6692 N.Rivera     
AP                 AP                 6782 E.Ellison     6782 E.Ellison     6692 N.Rivera      6692 N.Rivera      6692 N.Rivera     
BEAM   LINE 4-2  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
5504 Y.Srinivas/AP AP                 AP                 8877 T.Matsui      6513 S.Dehe        6057 D.Mai         6057 D.Mai        
AP                 AP                 CHANGE/8877 T.Mats CHANGE/6513 S.Dehe CHANGE/6057 D.Mai  6057 D.Mai         6057 D.Mai        
AP                 AP                 8877 T.Matsui      6513 S.Dehe        6057 D.Mai         6057 D.Mai         6057 D.Mai        
BEAM   LINE 4-3  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6770 L.Mu/AP       AP                 AP                 6209 A.Braun       6209 A.Braun       6123 H.La Pierre   6123 H.La Pierre  
AP                 AP                 SMB CHECKOUT/6209  6209 A.Braun       SMB CHECKOUT/6123  6123 H.La Pierre   6123 H.La Pierre  
AP                 AP                 6209 A.Braun       6209 A.Braun       6123 H.La Pierre   6123 H.La Pierre   6123 H.La Pierre  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6063 A.White Sm/AP AP                 AP                 6675 C.Cao         6675 C.Cao         6762 H.Gao         6762 H.Gao        
AP                 AP                 CHANGE/6675 C.Cao  6675 C.Cao         CHANGE/6762 H.Gao  6762 H.Gao         6762 H.Gao        
AP                 AP                 6675 C.Cao         6675 C.Cao         6762 H.Gao         6762 H.Gao         6762 H.Gao        
BEAM   LINE 7-2  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
8092 D.Sokaras/AP  AP                 AP                 6772 R.Bryant      6772 R.Bryant      6700 B.Stewart     6700 B.Stewart    
AP                 AP                 CHANGE/6772 R.Brya 6772 R.Bryant      CHANGE/6700 B.Stew 6700 B.Stewart     6700 B.Stewart    
AP                 AP                 6772 R.Bryant      6772 R.Bryant      6700 B.Stewart     6700 B.Stewart     6700 B.Stewart    
BEAM   LINE 7-3  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6096 M.Abernath/AP AP                 AP                 6682 J.Lopez-Garri 6682 J.Lopez-Garri 8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 SMB CHECKOUT/6682  6682 J.Lopez-Garri SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 6682 J.Lopez-Garri 6682 J.Lopez-Garri 8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 9-3  
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6555 K.Lancaste/AP AP                 AP                 8092 D.Sokaras     8092 D.Sokaras     5224 V.Yachandra   5224 V.Yachandra  
AP                 AP                 SMB CHECKOUT/8092  8092 D.Sokaras     SMB CHECKOUT/5224  5224 V.Yachandra   5224 V.Yachandra  
AP                 AP                 8092 D.Sokaras     8092 D.Sokaras     5224 V.Yachandra   5224 V.Yachandra   5224 V.Yachandra  
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6585 G.Hettiara/AP AP                 AP                 6692 N.Rivera      6692 N.Rivera      6729 R.Root        6729 R.Root       
AP                 AP                 SMB CHECKOUT/6692  6692 N.Rivera      SMB CHECKOUT/6729  6729 R.Root        6729 R.Root       
AP                 AP                 6692 N.Rivera      6692 N.Rivera      6729 R.Root        6729 R.Root        6729 R.Root       
BEAM   LINE 11-3 
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
8095 K.Stone/AP    AP                 AP                 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       FACI              
AP                 AP                 Xray CHECKOUT/8061 8061 S.Hesse       8061 S.Hesse       FACI               FACI              
AP                 AP                 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       FACI               FACI              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
AP                 AP                 AP                 6772 R.Bryant      6772 R.Bryant      6333 M.McNamara    6333 M.McNamara   
AP                 AP                 CHANGE/6772 R.Brya 6772 R.Bryant      CHANGE/6333 M.McNa 6333 M.McNamara    6333 M.McNamara   
AP                 AP                 6772 R.Bryant      6772 R.Bryant      6333 M.McNamara    6333 M.McNamara    6333 M.McNamara   
BEAM   LINE 15-2 
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
11K1 A.Follmer/AP  AP                 AP                 5972 M.Delgado Jai 5972 M.Delgado Jai 6672 M.Delgado Jai 6672 M.Delgado Jai
AP                 AP                 CHANGE/5972 M.Delg 5972 M.Delgado Jai CHANGE/6672 M.Delg 6672 M.Delgado Jai 6672 M.Delgado Jai
AP                 AP                 5972 M.Delgado Jai 5972 M.Delgado Jai 6672 M.Delgado Jai 6672 M.Delgado Jai 6672 M.Delgado Jai
BEAM   LINE 17-2 
Dec. 09, 2024      Dec. 10, 2024      Dec. 11, 2024      Dec. 12, 2024      Dec. 13, 2024      Dec. 14, 2024      Dec. 15, 2024     
6604 C.Crain/AP    AP                 AP                 6258 M.Preefer     6258 M.Preefer     6258 M.Preefer     6258 M.Preefer    
AP                 AP                 Xray CHECKOUT/6258 6258 M.Preefer     6258 M.Preefer     6258 M.Preefer     6258 M.Preefer    
AP                 AP                 6258 M.Preefer     6258 M.Preefer     6258 M.Preefer     6258 M.Preefer     6258 M.Preefer    

Back to Table of Contents

WEEK OF Dec. 16, 2024
                                         
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
BEAM   LINE 1-5  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
BEAM   LINE 2-1  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6604 C.Crain       6438 R.Smaha       6438 R.Smaha       8095 K.Stone       AP                 AP                 AP                
SMB CHECKOUT/6438  6438 R.Smaha       CHANGE/8095 K.Ston 8095 K.Stone/AP    AP                 AP                 AP                
6438 R.Smaha       6438 R.Smaha       8095 K.Stone       AP                 AP                 AP                 AP                
BEAM   LINE 2-2  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
BEAM   LINE 2-3  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6703 E.Fadely      6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    AP                 AP                 AP                
CHANGE/6333 M.McNa 6333 M.McNamara    6333 M.McNamara    6333 M.McNamara/AP AP                 AP                 AP                
6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    AP                 AP                 AP                 AP                
BEAM   LINE 4-1  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6692 N.Rivera      6789 S.Masina      6789 S.Masina      6789 S.Masina      AP                 AP                 AP                
SMB CHECKOUT/6789  6789 S.Masina      6789 S.Masina      6789 S.Masina/AP   AP                 AP                 AP                
6789 S.Masina      6789 S.Masina      6789 S.Masina      AP                 AP                 AP                 AP                
BEAM   LINE 4-2  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6057 D.Mai         6057 D.Mai         RA                 8877 T.Matsui      AP                 AP                 AP                
6057 D.Mai         RA                 CHANGE/8877 T.Mats 8877 T.Matsui/AP   AP                 AP                 AP                
6057 D.Mai         RA                 8877 T.Matsui      AP                 AP                 AP                 AP                
BEAM   LINE 4-3  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6123 H.La Pierre   6353 S.Minasian    6353 S.Minasian    6353 S.Minasian    AP                 AP                 AP                
SMB CHECKOUT/6353  6353 S.Minasian    6353 S.Minasian    6353 S.Minasian/AP AP                 AP                 AP                
6353 S.Minasian    6353 S.Minasian    6353 S.Minasian    AP                 AP                 AP                 AP                
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6762 H.Gao         6345 M.Preefer     6287 L.Dresselhaus 6287 L.Dresselhaus AP                 AP                 AP                
CHANGE/6345 M.Pree CHANGE/6287 L.Dres 6287 L.Dresselhaus 6287 L.Dresselh/AP AP                 AP                 AP                
6345 M.Preefer     6287 L.Dresselhaus 6287 L.Dresselhaus AP                 AP                 AP                 AP                
BEAM   LINE 7-2  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6700 B.Stewart     6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    AP                 AP                 AP                
CHANGE/6333 M.McNa 6333 M.McNamara    6333 M.McNamara    6333 M.McNamara/AP AP                 AP                 AP                
6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    AP                 AP                 AP                 AP                
BEAM   LINE 7-3  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
8071 R.Sarangi     8071 R.Sarangi     6324 C.Van Stappen 6324 C.Van Stappen AP                 AP                 AP                
8071 R.Sarangi     SMB CHECKOUT/6324  6324 C.Van Stappen 6324 C.Van Stap/AP AP                 AP                 AP                
8071 R.Sarangi     6324 C.Van Stappen 6324 C.Van Stappen AP                 AP                 AP                 AP                
BEAM   LINE 9-3  
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
5224 V.Yachandra   FACI               FACI               FACI               AP                 AP                 AP                
FACI               FACI               FACI               AP                 AP                 AP                 AP                
FACI               FACI               FACI               AP                 AP                 AP                 AP                
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP                 AP                
BEAM   LINE 11-2 
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6729 R.Root        6262 A.Naranjo-Sol 6262 A.Naranjo-Sol 6262 A.Naranjo-Sol AP                 AP                 AP                
SMB CHECKOUT/6262  6262 A.Naranjo-Sol 6262 A.Naranjo-Sol 6262 A.Naranjo-/AP AP                 AP                 AP                
6262 A.Naranjo-Sol 6262 A.Naranjo-Sol 6262 A.Naranjo-Sol AP                 AP                 AP                 AP                
BEAM   LINE 11-3 
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
FACI               FACI               6172 G.Qian        6172 G.Qian        AP                 AP                 AP                
FACI               Xray CHECKOUT/6172 6172 G.Qian        6172 G.Qian/AP     AP                 AP                 AP                
FACI               6172 G.Qian        6172 G.Qian        AP                 AP                 AP                 AP                
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
DOWN               DOWN               DOWN               DOWN               AP                 AP                 AP                
DOWN               DOWN               DOWN               DOWN/AP            AP                 AP                 AP                
DOWN               DOWN               DOWN               AP                 AP                 AP                 AP                
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6333 M.McNamara    6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      AP                 AP                 AP                
CHANGE/6656 N.Shar 6656 N.Sharma      6656 N.Sharma      6656 N.Sharma/AP   AP                 AP                 AP                
6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      AP                 AP                 AP                 AP                
BEAM   LINE 15-2 
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6672 M.Delgado Jai STUP               8898 T.Kroll       8898 T.Kroll       AP                 AP                 AP                
STUP               CHANGE/8898 T.Krol 8898 T.Kroll       8898 T.Kroll/AP    AP                 AP                 AP                
STUP               8898 T.Kroll       8898 T.Kroll       AP                 AP                 AP                 AP                
BEAM   LINE 17-2 
Dec. 16, 2024      Dec. 17, 2024      Dec. 18, 2024      Dec. 19, 2024      Dec. 20, 2024      Dec. 21, 2024      Dec. 22, 2024     
6258 M.Preefer     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     AP                 AP                 AP                
Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone/AP  AP                 AP                 AP                
8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     AP                 AP                 AP                 AP                

Back to Table of Contents

WEEK OF Dec. 23, 2024
                                         
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
BEAM   LINE 1-5  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-1  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-2  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-3  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-1  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-2  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-3  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 7-2  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 7-3  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 9-3  
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 11-2 
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 11-3 
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 15-2 
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 17-2 
Dec. 23, 2024      Dec. 24, 2024      Dec. 25, 2024      Dec. 26, 2024      Dec. 27, 2024      Dec. 28, 2024      Dec. 29, 2024     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                

Back to Table of Contents

WEEK OF Dec. 30, 2024
                                         
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
BEAM   LINE 1-5  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-1  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-2  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 2-3  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-1  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-2  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 4-3  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 7-2  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 7-3  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 9-3  
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 11-2 
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 11-3 
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 15-2 
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
BEAM   LINE 17-2 
Dec. 30, 2024      Dec. 31, 2024      Jan. 01, 2025      Jan. 02, 2025      Jan. 03, 2025      Jan. 04, 2025      Jan. 05, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                
AP                 AP                 AP                 AP                 AP                 AP                 AP                

Back to Table of Contents

WEEK OF Jan. 06, 2025
                                         
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
BEAM   LINE 1-5  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 2-1  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 2-2  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 2-3  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 4-1  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 4-2  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 4-3  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 7-2  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 7-3  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 9-3  
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 11-2 
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 11-3 
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 15-2 
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
BEAM   LINE 17-2 
Jan. 06, 2025      Jan. 07, 2025      Jan. 08, 2025      Jan. 09, 2025      Jan. 10, 2025      Jan. 11, 2025      Jan. 12, 2025     
AP                 AP                 AP                 AP                 AP                 AP                 AP/STUP           
AP                 AP                 AP                 AP                 AP                 AP                 STUP              
AP                 AP                 AP                 AP                 AP                 AP                 STUP              

Back to Table of Contents

WEEK OF Jan. 13, 2025
                                         
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
BEAM   LINE 1-5  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      8061 S.Hesse       8061 S.Hesse      
Unscheduled        Xray CHECKOUT/6707 6707 A.Maurya      6707 A.Maurya      Xray CHECKOUT/8061 8061 S.Hesse       8061 S.Hesse      
Unscheduled        6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      8061 S.Hesse       8061 S.Hesse       8061 S.Hesse      
BEAM   LINE 2-1  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               8095 K.Stone       Unscheduled        FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
Xray CHECKOUT/8095 Unscheduled        FACI               Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
8095 K.Stone       Unscheduled        FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 2-2  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               6152 B.Gartman     6152 B.Gartman     6152 B.Gartman     6152 B.Gartman     6811 H.Emerson     6811 H.Emerson    
CHANGE/6152 B.Gart 6152 B.Gartman     6152 B.Gartman     6152 B.Gartman     CHANGE/6811 H.Emer 6811 H.Emerson     6811 H.Emerson    
6152 B.Gartman     6152 B.Gartman     6152 B.Gartman     6152 B.Gartman     6811 H.Emerson     6811 H.Emerson     6811 H.Emerson    
BEAM   LINE 4-1  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               8099 S.Bare        8099 S.Bare        8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     6713 A.Hoffman    
CHANGE/8099 S.Bare 8099 S.Bare        CHANGE/8014 A.Hoff 8014 A.Hoffman     8014 A.Hoffman     CHANGE/6713 A.Hoff 6713 A.Hoffman    
8099 S.Bare        8099 S.Bare        8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     6713 A.Hoffman     6713 A.Hoffman    
BEAM   LINE 4-2  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               8877 T.Matsui      8877 T.Matsui      6108 S.Hall        6108 S.Hall        11M3 A.Ritchhart   11M3 A.Ritchhart  
CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/6108 S.Hall 6108 S.Hall        CHANGE/11M3 A.Ritc 11M3 A.Ritchhart   CHANGE/8877 T.Mats
8877 T.Matsui      8877 T.Matsui      6108 S.Hall        6108 S.Hall        11M3 A.Ritchhart   11M3 A.Ritchhart   8877 T.Matsui     
BEAM   LINE 4-3  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               8099 S.Bare        8099 S.Bare        6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail  
SMB CHECKOUT/8099  8099 S.Bare        SMB CHECKOUT/6778  6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail  
8099 S.Bare        8099 S.Bare        6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        6425 R.Abergel     6425 R.Abergel     6425 R.Abergel     Unscheduled        Unscheduled       
Unscheduled        CHANGE/6425 R.Aber 6425 R.Abergel     6425 R.Abergel     Unscheduled        Unscheduled        Unscheduled       
Unscheduled        6425 R.Abergel     6425 R.Abergel     6425 R.Abergel     Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               FACI               Unscheduled        Unscheduled        6394 B.Maki        6394 B.Maki        6394 B.Maki       
FACI               Unscheduled        Unscheduled        CHANGE/6394 B.Maki 6394 B.Maki        6394 B.Maki        6394 B.Maki       
FACI               Unscheduled        Unscheduled        6394 B.Maki        6394 B.Maki        6394 B.Maki        6394 B.Maki       
BEAM   LINE 7-3  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        6738 K.Chacon      6738 K.Chacon      6738 K.Chacon      5964 M.Green       5964 M.Green      
Unscheduled        SMB CHECKOUT/6738  6738 K.Chacon      6738 K.Chacon      SMB CHECKOUT/5964  5964 M.Green       5964 M.Green      
Unscheduled        6738 K.Chacon      6738 K.Chacon      6738 K.Chacon      5964 M.Green       5964 M.Green       5964 M.Green      
BEAM   LINE 9-3  
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               FACI               Unscheduled        Unscheduled        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
FACI               Unscheduled        Unscheduled        SMB CHECKOUT/9705  9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
FACI               Unscheduled        Unscheduled        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               FACI               FACI               FACI               FACI               6120 A.van Veelen  6120 A.van Veelen 
FACI               FACI               FACI               FACI               SMB CHECKOUT/6120  6120 A.van Veelen  6120 A.van Veelen 
FACI               FACI               FACI               FACI               6120 A.van Veelen  6120 A.van Veelen  6120 A.van Veelen 
BEAM   LINE 11-3 
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     6653 M.Preefer     6653 M.Preefer     8095 K.Stone      
Xray CHECKOUT/8907 8907 M.Preefer     8907 M.Preefer     Xray CHECKOUT/6653 6653 M.Preefer     Xray CHECKOUT/8095 8095 K.Stone      
8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     6653 M.Preefer     6653 M.Preefer     8095 K.Stone       8095 K.Stone      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               FACI               6040 B.Wan         6040 B.Wan         Unscheduled        5993 K.Kovnir      5993 K.Kovnir     
FACI               SMB CHECKOUT/6040  6040 B.Wan         Unscheduled        SMB CHECKOUT/5993  5993 K.Kovnir      5993 K.Kovnir     
FACI               6040 B.Wan         6040 B.Wan         Unscheduled        5993 K.Kovnir      5993 K.Kovnir      5993 K.Kovnir     
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               COMM               COMM               COMM               COMM               6775 A.Braun       6775 A.Braun      
COMM               COMM               COMM               COMM               CHANGE/6775 A.Brau 6775 A.Braun       6775 A.Braun      
COMM               COMM               COMM               COMM               6775 A.Braun       6775 A.Braun       6775 A.Braun      
BEAM   LINE 17-2 
Jan. 13, 2025      Jan. 14, 2025      Jan. 15, 2025      Jan. 16, 2025      Jan. 17, 2025      Jan. 18, 2025      Jan. 19, 2025     
STUP               FACI               5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki   
FACI               Xray CHECKOUT/5785 5785 J.Baniecki    Xray CHECKOUT/5785 5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki   
FACI               5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki   

Back to Table of Contents

WEEK OF Jan. 20, 2025
                                         
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
BEAM   LINE 1-5  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
8061 S.Hesse       8061 S.Hesse       6642 M.Sobkowicz K 6642 M.Sobkowicz K 6642 M.Sobkowicz K 6701 A.Ayzner      6701 A.Ayzner     
8061 S.Hesse       Xray CHECKOUT/6642 6642 M.Sobkowicz K 6642 M.Sobkowicz K Xray CHECKOUT/6701 6701 A.Ayzner      6701 A.Ayzner     
8061 S.Hesse       6642 M.Sobkowicz K 6642 M.Sobkowicz K 6642 M.Sobkowicz K 6701 A.Ayzner      6701 A.Ayzner      6701 A.Ayzner     
BEAM   LINE 2-1  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
9705 J.LiSA        9705 J.LiSA        6818 S.Saeed       6818 S.Saeed       6818 S.Saeed       8095 K.Stone       8095 K.Stone      
9705 J.LiSA        Xray CHECKOUT/6818 6818 S.Saeed       6818 S.Saeed       Xray CHECKOUT/8095 8095 K.Stone       Unscheduled       
9705 J.LiSA        6818 S.Saeed       6818 S.Saeed       6818 S.Saeed       8095 K.Stone       8095 K.Stone       Unscheduled       
BEAM   LINE 2-2  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6811 H.Emerson     6811 H.Emerson     6670 C.Lopano      6670 C.Lopano      6667 M.Stuckman    6667 M.Stuckman    6667 M.Stuckman   
6811 H.Emerson     CHANGE/6670 C.Lopa 6670 C.Lopano      CHANGE/6667 M.Stuc 6667 M.Stuckman    6667 M.Stuckman    6667 M.Stuckman   
6811 H.Emerson     6670 C.Lopano      6670 C.Lopano      6667 M.Stuckman    6667 M.Stuckman    6667 M.Stuckman    6667 M.Stuckman   
BEAM   LINE 4-1  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6713 A.Hoffman     6697 M.Yousuf      6697 M.Yousuf      6697 M.Yousuf      6697 M.Yousuf      6161 J.Finzel      6161 J.Finzel     
CHANGE/6697 M.Yous 6697 M.Yousuf      6697 M.Yousuf      6697 M.Yousuf      CHANGE/6161 J.Finz 6161 J.Finzel      6161 J.Finzel     
6697 M.Yousuf      6697 M.Yousuf      6697 M.Yousuf      6697 M.Yousuf      6161 J.Finzel      6161 J.Finzel      6161 J.Finzel     
BEAM   LINE 4-2  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
8877 T.Matsui      RA                 6702 Y.Na          6702 Y.Na          12C8 M.Beck        6806 R.Dauskardt   6806 R.Dauskardt  
RA                 CHANGE/6702 Y.Na   6702 Y.Na          CHANGE/12C8 M.Beck CHANGE/6806 R.Daus 6806 R.Dauskardt   6806 R.Dauskardt  
RA                 6702 Y.Na          6702 Y.Na          12C8 M.Beck        6806 R.Dauskardt   6806 R.Dauskardt   6806 R.Dauskardt  
BEAM   LINE 4-3  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6778 U.Kurumbail   Unscheduled        6804 Y.Cho         6804 Y.Cho         6804 Y.Cho         6667 M.Stuckman    6667 M.Stuckman   
Unscheduled        SMB CHECKOUT/6804  6804 Y.Cho         6804 Y.Cho         SMB CHECKOUT/6667  6667 M.Stuckman    6667 M.Stuckman   
Unscheduled        6804 Y.Cho         6804 Y.Cho         6804 Y.Cho         6667 M.Stuckman    6667 M.Stuckman    6667 M.Stuckman   
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
Unscheduled        Unscheduled        8890 J.Nelson Weke 6675 C.Cao         6675 C.Cao         6641 R.Hannagan    6641 R.Hannagan   
Unscheduled        CHANGE/8890 J.Nels CHANGE/6675 C.Cao  6675 C.Cao         CHANGE/6641 R.Hann 6641 R.Hannagan    6641 R.Hannagan   
Unscheduled        8890 J.Nelson Weke 6675 C.Cao         6675 C.Cao         6641 R.Hannagan    6641 R.Hannagan    6641 R.Hannagan   
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6394 B.Maki        6B96 E.Snell       6B96 E.Snell       8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
CHANGE/6B96 E.Snel 6B96 E.Snell       CHANGE/8867 S.Webb 8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
6B96 E.Snell       6B96 E.Snell       8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
BEAM   LINE 7-3  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
5964 M.Green       5964 M.Green       6469 A.Braun       6554 K.Lui         6554 K.Lui         5393 C.Dewey       5393 C.Dewey      
5964 M.Green       SMB CHECKOUT/6469  SMB CHECKOUT/6554  6554 K.Lui         SMB CHECKOUT/5393  5393 C.Dewey       5393 C.Dewey      
5964 M.Green       6469 A.Braun       6554 K.Lui         6554 K.Lui         5393 C.Dewey       5393 C.Dewey       5393 C.Dewey      
BEAM   LINE 9-3  
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
9705 J.LiSA        9705 J.LiSA        6677 Z.Liang       6677 Z.Liang       6677 Z.Liang       8090 J.Nelson Weke 8090 J.Nelson Weke
9705 J.LiSA        SMB CHECKOUT/6677  6677 Z.Liang       6677 Z.Liang       SMB CHECKOUT/8090  8090 J.Nelson Weke 8090 J.Nelson Weke
9705 J.LiSA        6677 Z.Liang       6677 Z.Liang       6677 Z.Liang       8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6120 A.van Veelen  6120 A.van Veelen  6120 A.van Veelen  6138 E.Balboni     6138 E.Balboni     6691 A.van Veelen  6691 A.van Veelen 
6120 A.van Veelen  6120 A.van Veelen  SMB CHECKOUT/6138  6138 E.Balboni     SMB CHECKOUT/6691  6691 A.van Veelen  6691 A.van Veelen 
6120 A.van Veelen  6120 A.van Veelen  6138 E.Balboni     6138 E.Balboni     6691 A.van Veelen  6691 A.van Veelen  6691 A.van Veelen 
BEAM   LINE 11-3 
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
8095 K.Stone       8095 K.Stone       6810 Z.Liang       6810 Z.Liang       6810 Z.Liang       6818 S.Saeed       6818 S.Saeed      
8095 K.Stone       Xray CHECKOUT/6810 6810 Z.Liang       6810 Z.Liang       Xray CHECKOUT/6818 6818 S.Saeed       6818 S.Saeed      
8095 K.Stone       6810 Z.Liang       6810 Z.Liang       6810 Z.Liang       6818 S.Saeed       6818 S.Saeed       6818 S.Saeed      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
5993 K.Kovnir      5993 K.Kovnir      DOWN               DOWN               DOWN               DOWN               DOWN              
5993 K.Kovnir      DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
5993 K.Kovnir      DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
DOWN               FACI               FACI               6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      6656 N.Sharma     
FACI               FACI               CHANGE/6656 N.Shar 6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      6656 N.Sharma     
FACI               FACI               6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      6656 N.Sharma      6656 N.Sharma     
BEAM   LINE 15-2 
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
6775 A.Braun       6775 A.Braun       6745 D.Eum         6745 D.Eum         6745 D.Eum         COMM               COMM              
6775 A.Braun       CHANGE/6745 D.Eum  6745 D.Eum         6745 D.Eum         COMM               COMM               COMM              
6775 A.Braun       6745 D.Eum         6745 D.Eum         6745 D.Eum         COMM               COMM               COMM              
BEAM   LINE 17-2 
Jan. 20, 2025      Jan. 21, 2025      Jan. 22, 2025      Jan. 23, 2025      Jan. 24, 2025      Jan. 25, 2025      Jan. 26, 2025     
5785 J.Baniecki    5785 J.Baniecki    FACI               FACI               FACI               6367 E.Abdo        6367 E.Abdo       
5785 J.Baniecki    FACI               FACI               FACI               Xray CHECKOUT/6367 6367 E.Abdo        6367 E.Abdo       
5785 J.Baniecki    FACI               FACI               FACI               6367 E.Abdo        6367 E.Abdo        6367 E.Abdo       

Back to Table of Contents

WEEK OF Jan. 27, 2025
                                         
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
BEAM   LINE 1-5  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6701 A.Ayzner/AP   AP                 AP                 6711 N.Strange     6711 N.Strange     6711 N.Strange     6711 N.Strange    
AP                 AP                 Xray CHECKOUT/6711 6711 N.Strange     6711 N.Strange     6711 N.Strange     6711 N.Strange    
AP                 AP                 6711 N.Strange     6711 N.Strange     6711 N.Strange     6711 N.Strange     6711 N.Strange    
BEAM   LINE 2-1  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
AP                 AP                 AP                 93K1 B.Saini       93K1 B.Saini       6305 W.Go          6305 W.Go         
AP                 AP                 Xray CHECKOUT/93K1 93K1 B.Saini       Xray CHECKOUT/6305 6305 W.Go          6305 W.Go         
AP                 AP                 93K1 B.Saini       93K1 B.Saini       6305 W.Go          6305 W.Go          6305 W.Go         
BEAM   LINE 2-2  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6667 M.Stuckman/AP AP                 AP                 6825 G.Chen        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 CHANGE/6825 G.Chen CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 6825 G.Chen        8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 4-1  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6161 J.Finzel/AP   AP                 AP                 6753 G.Bejger      6753 G.Bejger      6753 G.Bejger      6753 G.Bejger     
AP                 AP                 SMB CHECKOUT/6753  6753 G.Bejger      6753 G.Bejger      6753 G.Bejger      6753 G.Bejger     
AP                 AP                 6753 G.Bejger      6753 G.Bejger      6753 G.Bejger      6753 G.Bejger      6753 G.Bejger     
BEAM   LINE 4-2  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6806 R.Dauskard/AP AP                 AP                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
AP                 AP                 CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
AP                 AP                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6667 M.Stuckman/AP AP                 AP                 6773 A.Yang        6773 A.Yang        6479 G.Chen        6479 G.Chen       
AP                 AP                 SMB CHECKOUT/6773  6773 A.Yang        SMB CHECKOUT/6479  6479 G.Chen        6479 G.Chen       
AP                 AP                 6773 A.Yang        6773 A.Yang        6479 G.Chen        6479 G.Chen        6479 G.Chen       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6641 R.Hannagan/AP AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
AP                 AP                 AP                 FACI               8090 J.Nelson Weke 6712 D.Agyeman-Bud 6712 D.Agyeman-Bud
AP                 AP                 FACI               CHANGE/8090 J.Nels CHANGE/6712 D.Agye 6712 D.Agyeman-Bud 6712 D.Agyeman-Bud
AP                 AP                 FACI               8090 J.Nelson Weke 6712 D.Agyeman-Bud 6712 D.Agyeman-Bud 6712 D.Agyeman-Bud
BEAM   LINE 7-2  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
8867 S.Webb/AP     AP                 AP                 6795 B.Lee         6795 B.Lee         6588 E.Espinosa Vi 6588 E.Espinosa Vi
AP                 AP                 CHANGE/6795 B.Lee  6795 B.Lee         CHANGE/6588 E.Espi 6588 E.Espinosa Vi 6588 E.Espinosa Vi
AP                 AP                 6795 B.Lee         6795 B.Lee         6588 E.Espinosa Vi 6588 E.Espinosa Vi 6588 E.Espinosa Vi
BEAM   LINE 7-3  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
5393 C.Dewey/AP    AP                 AP                 11M1 J.Bridwell-Ra 11M1 J.Bridwell-Ra 5910 E.Pierce      5910 E.Pierce     
AP                 AP                 SMB CHECKOUT/11M1  11M1 J.Bridwell-Ra SMB CHECKOUT/5910  5910 E.Pierce      5910 E.Pierce     
AP                 AP                 11M1 J.Bridwell-Ra 11M1 J.Bridwell-Ra 5910 E.Pierce      5910 E.Pierce      5910 E.Pierce     
BEAM   LINE 9-3  
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
8090 J.Nelson W/AP AP                 AP                 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
AP                 AP                 SMB CHECKOUT/8871  8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
AP                 AP                 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6691 A.van Veel/AP AP                 AP                 6811 H.Emerson     6811 H.Emerson     6626 S.Saslow      6626 S.Saslow     
AP                 AP                 SMB CHECKOUT/6811  6811 H.Emerson     SMB CHECKOUT/6626  6626 S.Saslow      6626 S.Saslow     
AP                 AP                 6811 H.Emerson     6811 H.Emerson     6626 S.Saslow      6626 S.Saslow      6626 S.Saslow     
BEAM   LINE 11-3 
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6818 S.Saeed/AP    AP                 AP                 6657 X.Zheng       6657 X.Zheng       6429 H.Ramachandra 6429 H.Ramachandra
AP                 AP                 Xray CHECKOUT/6657 6657 X.Zheng       Xray CHECKOUT/6429 6429 H.Ramachandra 6429 H.Ramachandra
AP                 AP                 6657 X.Zheng       6657 X.Zheng       6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6656 N.Sharma/AP   AP                 AP                 6812 T.Varga       6812 T.Varga       6812 T.Varga       6812 T.Varga      
AP                 AP                 CHANGE/6812 T.Varg 6812 T.Varga       6812 T.Varga       6812 T.Varga       6812 T.Varga      
AP                 AP                 6812 T.Varga       6812 T.Varga       6812 T.Varga       6812 T.Varga       6812 T.Varga      
BEAM   LINE 15-2 
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
COMM/AP            AP                 AP                 6149 U.Bovensiepen 6149 U.Bovensiepen 6149 U.Bovensiepen 6149 U.Bovensiepen
AP                 AP                 CHANGE/6149 U.Bove 6149 U.Bovensiepen 6149 U.Bovensiepen 6149 U.Bovensiepen CHANGE/6724 A.Nara
AP                 AP                 6149 U.Bovensiepen 6149 U.Bovensiepen 6149 U.Bovensiepen 6149 U.Bovensiepen 6724 A.Narayanan N
BEAM   LINE 17-2 
Jan. 27, 2025      Jan. 28, 2025      Jan. 29, 2025      Jan. 30, 2025      Jan. 31, 2025      Feb. 01, 2025      Feb. 02, 2025     
6367 E.Abdo/AP     AP                 AP                 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       8061 S.Hesse      
AP                 AP                 Xray CHECKOUT/8061 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       8061 S.Hesse      
AP                 AP                 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       8061 S.Hesse      

Back to Table of Contents

WEEK OF Feb. 03, 2025
                                         
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
BEAM   LINE 1-5  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6711 N.Strange     6623 D.Banerjee    6623 D.Banerjee    6623 D.Banerjee    6336 S.Ju          6336 S.Ju          6336 S.Ju         
Xray CHECKOUT/6623 6623 D.Banerjee    6623 D.Banerjee    Xray CHECKOUT/6336 6336 S.Ju          6336 S.Ju          6336 S.Ju         
6623 D.Banerjee    6623 D.Banerjee    6623 D.Banerjee    6336 S.Ju          6336 S.Ju          6336 S.Ju          6336 S.Ju         
BEAM   LINE 2-1  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6305 W.Go          8095 K.Stone       Unscheduled        6501 D.Billing     6501 D.Billing     6501 D.Billing     6501 D.Billing    
Xray CHECKOUT/8095 Unscheduled        Xray CHECKOUT/6501 6501 D.Billing     6501 D.Billing     6501 D.Billing     Unscheduled       
8095 K.Stone       Unscheduled        6501 D.Billing     6501 D.Billing     6501 D.Billing     6501 D.Billing     Unscheduled       
BEAM   LINE 2-2  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
8067 S.Webb        6718 E.Nuccio      6718 E.Nuccio      6795 B.Lee         6795 B.Lee         6604 C.Crain       6604 C.Crain      
CHANGE/6718 E.Nucc 6718 E.Nuccio      CHANGE/6795 B.Lee  6795 B.Lee         CHANGE/6604 C.Crai 6604 C.Crain       6604 C.Crain      
6718 E.Nuccio      6718 E.Nuccio      6795 B.Lee         6795 B.Lee         6604 C.Crain       6604 C.Crain       6604 C.Crain      
BEAM   LINE 4-1  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6753 G.Bejger      5982 L.Dresselhaus 5982 L.Dresselhaus Unscheduled        Unscheduled        DOWN               DOWN              
SMB CHECKOUT/5982  5982 L.Dresselhaus Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
5982 L.Dresselhaus 5982 L.Dresselhaus Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
8877 T.Matsui      12D3 E.Araujo      12D3 E.Araujo      12D3 E.Araujo      Unscheduled        Unscheduled        5983 S.Zhang      
CHANGE/12D3 E.Arau 12D3 E.Araujo      12D3 E.Araujo      Unscheduled        Unscheduled        CHANGE/5983 S.Zhan 5983 S.Zhang      
12D3 E.Araujo      12D3 E.Araujo      12D3 E.Araujo      Unscheduled        Unscheduled        5983 S.Zhang       5983 S.Zhang      
BEAM   LINE 4-3  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6479 G.Chen        6810 Z.Liang       6810 Z.Liang       6733 T.Xu          6733 T.Xu          6778 U.Kurumbail   6778 U.Kurumbail  
SMB CHECKOUT/6810  6810 Z.Liang       SMB CHECKOUT/6733  6733 T.Xu          Xray CHECKOUT/6778 6778 U.Kurumbail   6778 U.Kurumbail  
6810 Z.Liang       6810 Z.Liang       6733 T.Xu          6733 T.Xu          6778 U.Kurumbail   6778 U.Kurumbail   6778 U.Kurumbail  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6712 D.Agyeman-Bud 6820 E.Santos      6820 E.Santos      6584 T.Kim         6584 T.Kim         6740 S.Singh       6740 S.Singh      
Xray CHECKOUT/6820 6820 E.Santos      CHANGE/6584 T.Kim  6584 T.Kim         CHANGE/6740 S.Sing 6740 S.Singh       6740 S.Singh      
6820 E.Santos      6820 E.Santos      6584 T.Kim         6584 T.Kim         6740 S.Singh       6740 S.Singh       6740 S.Singh      
BEAM   LINE 7-2  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6588 E.Espinosa Vi 6758 S.Tian        6758 S.Tian        6758 S.Tian        6615 L.Lu          6615 L.Lu          6615 L.Lu         
CHANGE/6758 S.Tian 6758 S.Tian        6758 S.Tian        CHANGE/6615 L.Lu   6615 L.Lu          6615 L.Lu          6615 L.Lu         
6758 S.Tian        6758 S.Tian        6758 S.Tian        6615 L.Lu          6615 L.Lu          6615 L.Lu          6615 L.Lu         
BEAM   LINE 7-3  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
5910 E.Pierce      6716 A.Johs        6716 A.Johs        6565 L.Mydy        6617 S.Dai         6376 G.Borgstahl   6376 G.Borgstahl  
SMB CHECKOUT/6716  6716 A.Johs        SMB CHECKOUT/6565  SMB CHECKOUT/6617  Xray CHECKOUT/6376 6376 G.Borgstahl   6376 G.Borgstahl  
6716 A.Johs        6716 A.Johs        6565 L.Mydy        6617 S.Dai         6376 G.Borgstahl   6376 G.Borgstahl   6376 G.Borgstahl  
BEAM   LINE 9-3  
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
8871 R.Sarangi     FACI               FACI               FACI               FACI               8098 T.Kroll       8098 T.Kroll      
FACI               FACI               FACI               FACI               Xray CHECKOUT/8098 8098 T.Kroll       8098 T.Kroll      
FACI               FACI               FACI               FACI               8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6626 S.Saslow      6847 C.Zweifel     6847 C.Zweifel     6847 C.Zweifel     6700 B.Stewart     6700 B.Stewart     6700 B.Stewart    
SMB CHECKOUT/6847  6847 C.Zweifel     6847 C.Zweifel     SMB CHECKOUT/6700  6700 B.Stewart     6700 B.Stewart     6700 B.Stewart    
6847 C.Zweifel     6847 C.Zweifel     6847 C.Zweifel     6700 B.Stewart     6700 B.Stewart     6700 B.Stewart     6700 B.Stewart    
BEAM   LINE 11-3 
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6429 H.Ramachandra 5562 H.Cumberbatch 5562 H.Cumberbatch Unscheduled        6825 G.Chen        6825 G.Chen        6825 G.Chen       
Xray CHECKOUT/5562 5562 H.Cumberbatch Unscheduled        Xray CHECKOUT/6825 6825 G.Chen        6825 G.Chen        6825 G.Chen       
5562 H.Cumberbatch 5562 H.Cumberbatch Unscheduled        6825 G.Chen        6825 G.Chen        6825 G.Chen        6825 G.Chen       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6812 T.Varga       FACI               6710 V.Noel        6710 V.Noel        6710 V.Noel        6718 E.Nuccio      6718 E.Nuccio     
FACI               CHANGE/6710 V.Noel 6710 V.Noel        6710 V.Noel        CHANGE/6718 E.Nucc 6718 E.Nuccio      6718 E.Nuccio     
FACI               6710 V.Noel        6710 V.Noel        6710 V.Noel        6718 E.Nuccio      6718 E.Nuccio      6718 E.Nuccio     
BEAM   LINE 15-2 
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
6724 A.Narayanan N 6724 A.Narayanan N 6724 A.Narayanan N 6641 R.Hannagan    6641 R.Hannagan    6498 G.Kamat       6498 G.Kamat      
6724 A.Narayanan N 6724 A.Narayanan N CHANGE/6641 R.Hann 6641 R.Hannagan    CHANGE/6498 G.Kama 6498 G.Kamat       6498 G.Kamat      
6724 A.Narayanan N 6724 A.Narayanan N 6641 R.Hannagan    6641 R.Hannagan    6498 G.Kamat       6498 G.Kamat       6498 G.Kamat      
BEAM   LINE 17-2 
Feb. 03, 2025      Feb. 04, 2025      Feb. 05, 2025      Feb. 06, 2025      Feb. 07, 2025      Feb. 08, 2025      Feb. 09, 2025     
8061 S.Hesse       Unscheduled        Unscheduled        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       
Unscheduled        Unscheduled        SU class exp/8224  8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       
Unscheduled        Unscheduled        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       

Back to Table of Contents

WEEK OF Feb. 10, 2025
                                         
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
BEAM   LINE 1-5  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6336 S.Ju/AP       AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        6604 C.Crain       6604 C.Crain      
AP                 AP                 Unscheduled        Unscheduled        Xray CHECKOUT/6604 6604 C.Crain       6604 C.Crain      
AP                 AP                 Unscheduled        Unscheduled        6604 C.Crain       6604 C.Crain       6604 C.Crain      
BEAM   LINE 2-2  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6604 C.Crain/AP    AP                 AP                 6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
AP                 AP                 CHANGE/6703 E.Fade 6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
AP                 AP                 6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
BEAM   LINE 4-1  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
5983 S.Zhang/AP    AP                 AP                 8877 T.Matsui      12D1 J.McFarlane   12D1 J.McFarlane   8877 T.Matsui     
AP                 AP                 CHANGE/8877 T.Mats CHANGE/12D1 J.McFa 12D1 J.McFarlane   CHANGE/8877 T.Mats 8877 T.Matsui     
AP                 AP                 8877 T.Matsui      12D1 J.McFarlane   12D1 J.McFarlane   8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6778 U.Kurumbai/AP AP                 AP                 6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
AP                 AP                 SMB CHECKOUT/6860  6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
AP                 AP                 6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6740 S.Singh/AP    AP                 AP                 6345 M.Preefer     6345 M.Preefer     6604 C.Crain       6604 C.Crain      
AP                 AP                 CHANGE/6345 M.Pree 6345 M.Preefer     CHANGE/6604 C.Crai 6604 C.Crain       6604 C.Crain      
AP                 AP                 6345 M.Preefer     6345 M.Preefer     6604 C.Crain       6604 C.Crain       6604 C.Crain      
BEAM   LINE 7-2  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6615 L.Lu/AP       AP                 AP                 6772 R.Bryant      6772 R.Bryant      6210 A.Kravchenko  6210 A.Kravchenko 
AP                 AP                 CHANGE/6772 R.Brya 6772 R.Bryant      CHANGE/6210 A.Krav 6210 A.Kravchenko  6210 A.Kravchenko 
AP                 AP                 6772 R.Bryant      6772 R.Bryant      6210 A.Kravchenko  6210 A.Kravchenko  6210 A.Kravchenko 
BEAM   LINE 7-3  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6376 G.Borgstah/AP AP                 AP                 6872 K.Zhao        6872 K.Zhao        8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 Xray CHECKOUT/6872 6872 K.Zhao        Xray CHECKOUT/8071 8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 6872 K.Zhao        6872 K.Zhao        8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 9-3  
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
8098 T.Kroll/AP    AP                 AP                 6438 R.Smaha       6438 R.Smaha       8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 Xray CHECKOUT/6438 6438 R.Smaha       Xray CHECKOUT/8092 8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 6438 R.Smaha       6438 R.Smaha       8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6700 B.Stewart/AP  AP                 AP                 Unscheduled        Unscheduled        6729 R.Root        6729 R.Root       
AP                 AP                 Unscheduled        Unscheduled        SMB CHECKOUT/6729  6729 R.Root        6729 R.Root       
AP                 AP                 Unscheduled        Unscheduled        6729 R.Root        6729 R.Root        6729 R.Root       
BEAM   LINE 11-3 
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6825 G.Chen/AP     AP                 AP                 6438 R.Smaha       FACI               6367 E.Abdo        6367 E.Abdo       
AP                 AP                 Xray CHECKOUT/6438 FACI               Xray CHECKOUT/6367 6367 E.Abdo        6367 E.Abdo       
AP                 AP                 6438 R.Smaha       FACI               6367 E.Abdo        6367 E.Abdo        6367 E.Abdo       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6718 E.Nuccio/AP   AP                 AP                 6795 B.Lee         6795 B.Lee         6772 R.Bryant      6772 R.Bryant     
AP                 AP                 CHANGE/6795 B.Lee  6795 B.Lee         CHANGE/6772 R.Brya 6772 R.Bryant      6772 R.Bryant     
AP                 AP                 6795 B.Lee         6795 B.Lee         6772 R.Bryant      6772 R.Bryant      6772 R.Bryant     
BEAM   LINE 15-2 
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
6498 G.Kamat/AP    AP                 AP                 6376 G.Borgstahl   6376 G.Borgstahl   6282 T.Hersbach    6282 T.Hersbach   
AP                 AP                 Xray CHECKOUT/6376 6376 G.Borgstahl   Xray CHECKOUT/6282 6282 T.Hersbach    6282 T.Hersbach   
AP                 AP                 6376 G.Borgstahl   6376 G.Borgstahl   6282 T.Hersbach    6282 T.Hersbach    6282 T.Hersbach   
BEAM   LINE 17-2 
Feb. 10, 2025      Feb. 11, 2025      Feb. 12, 2025      Feb. 13, 2025      Feb. 14, 2025      Feb. 15, 2025      Feb. 16, 2025     
8224 D.Reis/AP     AP                 AP                 FACI               6391 J.Li          6391 J.Li          6391 J.Li         
AP                 AP                 FACI               Xray CHECKOUT/8049 6391 J.Li          6391 J.Li          6391 J.Li         
AP                 AP                 FACI               Xray CHECKOUT/6391 6391 J.Li          6391 J.Li          6391 J.Li         

Back to Table of Contents

WEEK OF Feb. 17, 2025
                                         
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
BEAM   LINE 1-5  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
FACI               FACI               6343 J.Arens       FACI               6688 Y.Shi         6688 Y.Shi         6688 Y.Shi        
FACI               Xray CHECKOUT/6343 FACI               Xray CHECKOUT/6688 6688 Y.Shi         6688 Y.Shi         6688 Y.Shi        
FACI               6343 J.Arens       FACI               6688 Y.Shi         6688 Y.Shi         6688 Y.Shi         6688 Y.Shi        
BEAM   LINE 2-1  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6604 C.Crain       6604 C.Crain       Unscheduled        Unscheduled        Unscheduled        8095 K.Stone       8095 K.Stone      
6604 C.Crain       Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/8095 8095 K.Stone       Unscheduled       
6604 C.Crain       Unscheduled        Unscheduled        Unscheduled        8095 K.Stone       8095 K.Stone       Unscheduled       
BEAM   LINE 2-2  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6703 E.Fadely      6657 X.Zheng       6657 X.Zheng       6671 M.Engel       6671 M.Engel       6113 V.Noel        6113 V.Noel       
CHANGE/6657 X.Zhen 6657 X.Zheng       CHANGE/6671 M.Enge 6671 M.Engel       CHANGE/6113 V.Noel 6113 V.Noel        6113 V.Noel       
6657 X.Zheng       6657 X.Zheng       6671 M.Engel       6671 M.Engel       6113 V.Noel        6113 V.Noel        6113 V.Noel       
BEAM   LINE 4-1  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
8877 T.Matsui      8877 T.Matsui      6743 A.Hussain     8047 T.Weiss       8047 T.Weiss       5497 M.Georgiadis  5497 M.Georgiadis 
8877 T.Matsui      CHANGE/6743 A.Huss CHANGE/8047 T.Weis 8047 T.Weiss       CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
8877 T.Matsui      6743 A.Hussain     8047 T.Weiss       8047 T.Weiss       5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6860 S.Kozimor     6860 S.Kozimor     6671 M.Engel       6671 M.Engel       6209 A.Braun       6209 A.Braun       6887 M.Waters     
6860 S.Kozimor     SMB CHECKOUT/6671  6671 M.Engel       SMB CHECKOUT/6209  6209 A.Braun       SMB CHECKOUT/6887  6887 M.Waters     
6860 S.Kozimor     6671 M.Engel       6671 M.Engel       6209 A.Braun       6209 A.Braun       6887 M.Waters      6887 M.Waters     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6604 C.Crain       6604 C.Crain       6858 P.Mukherjee   6858 P.Mukherjee   6562 E.Allen       6562 E.Allen       6562 E.Allen      
6604 C.Crain       CHANGE/6858 P.Mukh 6858 P.Mukherjee   CHANGE/6562 E.Alle 6562 E.Allen       6562 E.Allen       6562 E.Allen      
6604 C.Crain       6858 P.Mukherjee   6858 P.Mukherjee   6562 E.Allen       6562 E.Allen       6562 E.Allen       6562 E.Allen      
BEAM   LINE 7-2  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6210 A.Kravchenko  6538 A.Duncan      6538 A.Duncan      6538 A.Duncan      6538 A.Duncan      6710 V.Noel        6710 V.Noel       
CHANGE/6538 A.Dunc 6538 A.Duncan      6538 A.Duncan      6538 A.Duncan      CHANGE/6710 V.Noel 6710 V.Noel        6710 V.Noel       
6538 A.Duncan      6538 A.Duncan      6538 A.Duncan      6538 A.Duncan      6710 V.Noel        6710 V.Noel        6710 V.Noel       
BEAM   LINE 7-3  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi     6874 L.Li          6874 L.Li          6738 K.Chacon      6738 K.Chacon     
8071 R.Sarangi     8071 R.Sarangi     Xray CHECKOUT/6874 6874 L.Li          Xray CHECKOUT/6738 6738 K.Chacon      6738 K.Chacon     
8071 R.Sarangi     8071 R.Sarangi     6874 L.Li          6874 L.Li          6738 K.Chacon      6738 K.Chacon      6738 K.Chacon     
BEAM   LINE 9-3  
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
8092 D.Sokaras     8092 D.Sokaras     8090 J.Nelson Weke 8090 J.Nelson Weke 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
8092 D.Sokaras     Xray CHECKOUT/8090 8090 J.Nelson Weke Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
8092 D.Sokaras     8090 J.Nelson Weke 8090 J.Nelson Weke 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6729 R.Root        6729 R.Root        6626 S.Saslow      6626 S.Saslow      6811 H.Emerson     6140 F.Bridges     6140 F.Bridges    
6729 R.Root        SMB CHECKOUT/6626  6626 S.Saslow      CHANGE/6811 H.Emer Xray CHECKOUT/6140 6140 F.Bridges     6140 F.Bridges    
6729 R.Root        6626 S.Saslow      6626 S.Saslow      6811 H.Emerson     6140 F.Bridges     6140 F.Bridges     6140 F.Bridges    
BEAM   LINE 11-3 
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6367 E.Abdo        8061 S.Hesse       FACI               8061 S.Hesse       8095 K.Stone       8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/8061 FACI               8061 S.Hesse       Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone       8095 K.Stone      
8061 S.Hesse       FACI               8061 S.Hesse       8095 K.Stone       8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6772 R.Bryant      8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  6656 N.Sharma      6656 N.Sharma     
CHANGE/8019 J.Rich 8019 J.Richardson  CHANGE/8019 J.Rich 8019 J.Richardson  CHANGE/6656 N.Shar 6656 N.Sharma      6656 N.Sharma     
8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  6656 N.Sharma      6656 N.Sharma      6656 N.Sharma     
BEAM   LINE 15-2 
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6282 T.Hersbach    6282 T.Hersbach    STUP               6077 M.Baker       6077 M.Baker       6646 S.Hayes       6646 S.Hayes      
6282 T.Hersbach    STUP               Xray CHECKOUT/6077 6077 M.Baker       Xray CHECKOUT/6646 6646 S.Hayes       6646 S.Hayes      
6282 T.Hersbach    STUP               6077 M.Baker       6077 M.Baker       6646 S.Hayes       6646 S.Hayes       6646 S.Hayes      
BEAM   LINE 17-2 
Feb. 17, 2025      Feb. 18, 2025      Feb. 19, 2025      Feb. 20, 2025      Feb. 21, 2025      Feb. 22, 2025      Feb. 23, 2025     
6391 J.Li          6391 J.Li          6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich   6709 J.Turner     
6391 J.Li          Xray CHECKOUT/6457 6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich   CHANGE/6709 J.Turn 6709 J.Turner     
6391 J.Li          6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich   6709 J.Turner      6709 J.Turner     

Back to Table of Contents

WEEK OF Feb. 24, 2025
                                         
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
BEAM   LINE 1-5  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6688 Y.Shi/AP      AP                 AP                 FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
AP                 AP                 FACI               Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
AP                 AP                 FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
AP                 AP                 AP                 FACI               8062 M.Preefer     8062 M.Preefer     8062 M.Preefer    
AP                 AP                 FACI               CHANGE/8062 M.Pree 8062 M.Preefer     8062 M.Preefer     8062 M.Preefer    
AP                 AP                 FACI               8062 M.Preefer     8062 M.Preefer     8062 M.Preefer     8062 M.Preefer    
BEAM   LINE 2-2  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6113 V.Noel/AP     AP                 AP                 6629 D.Rodrigues   6629 D.Rodrigues   8019 J.Richardson  8019 J.Richardson 
AP                 AP                 CHANGE/6629 D.Rodr 6629 D.Rodrigues   CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson 
AP                 AP                 6629 D.Rodrigues   6629 D.Rodrigues   8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
BEAM   LINE 4-1  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
5497 M.Georgiad/AP AP                 AP                 8877 T.Matsui      12D7 P.Cavanagh    12D7 P.Cavanagh    12D7 P.Cavanagh   
AP                 AP                 CHANGE/8877 T.Mats CHANGE/12D7 P.Cava 12D7 P.Cavanagh    12D7 P.Cavanagh    12D7 P.Cavanagh   
AP                 AP                 8877 T.Matsui      12D7 P.Cavanagh    12D7 P.Cavanagh    12D7 P.Cavanagh    12D7 P.Cavanagh   
BEAM   LINE 4-3  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6887 M.Waters/AP   AP                 AP                 8090 J.Nelson Weke 8090 J.Nelson Weke 6715 O.Marques     6715 O.Marques    
AP                 AP                 SMB CHECKOUT/8090  8090 J.Nelson Weke Xray CHECKOUT/6715 6715 O.Marques     6715 O.Marques    
AP                 AP                 8090 J.Nelson Weke 8090 J.Nelson Weke 6715 O.Marques     6715 O.Marques     6715 O.Marques    
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6562 E.Allen/AP    AP                 AP                 FACI               6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana
AP                 AP                 FACI               CHANGE/6843 A.Mani 6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana
AP                 AP                 FACI               6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana
BEAM   LINE 7-2  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6710 V.Noel/AP     AP                 AP                 6700 B.Stewart     6700 B.Stewart     8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 CHANGE/6700 B.Stew 6700 B.Stewart     CHANGE/8092 D.Soka 8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 6700 B.Stewart     6700 B.Stewart     8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 7-3  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6738 K.Chacon/AP   AP                 AP                 Unscheduled        Unscheduled        6530 L.Quintanar   6530 L.Quintanar  
AP                 AP                 Unscheduled        Unscheduled        Xray CHECKOUT/6530 6530 L.Quintanar   6530 L.Quintanar  
AP                 AP                 Unscheduled        Unscheduled        6530 L.Quintanar   6530 L.Quintanar   6530 L.Quintanar  
BEAM   LINE 9-3  
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
9705 J.LiSA/AP     AP                 AP                 8099 S.Bare        6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers   
AP                 AP                 Xray CHECKOUT/8099 Xray CHECKOUT/6699 6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers   
AP                 AP                 8099 S.Bare        6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers   
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6140 F.Bridges/AP  AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-3 
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
8095 K.Stone/AP    AP                 AP                 Unscheduled        Unscheduled        6055 M.Chabinyc    6055 M.Chabinyc   
AP                 AP                 Unscheduled        Unscheduled        Xray CHECKOUT/6055 6055 M.Chabinyc    6055 M.Chabinyc   
AP                 AP                 Unscheduled        Unscheduled        6055 M.Chabinyc    6055 M.Chabinyc    6055 M.Chabinyc   
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6656 N.Sharma/AP   AP                 AP                 6801 H.Lyu         6801 H.Lyu         6830 H.Hao         6830 H.Hao        
AP                 AP                 CHANGE/6801 H.Lyu  6801 H.Lyu         CHANGE/6830 H.Hao  6830 H.Hao         6830 H.Hao        
AP                 AP                 6801 H.Lyu         6801 H.Lyu         6830 H.Hao         6830 H.Hao         6830 H.Hao        
BEAM   LINE 15-2 
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6646 S.Hayes/AP    AP                 AP                 6684 J.Babicz      6684 J.Babicz      6872 K.Zhao        6872 K.Zhao       
AP                 AP                 Xray CHECKOUT/6684 6684 J.Babicz      Xray CHECKOUT/6872 6872 K.Zhao        6872 K.Zhao       
AP                 AP                 6684 J.Babicz      6684 J.Babicz      6872 K.Zhao        6872 K.Zhao        6872 K.Zhao       
BEAM   LINE 17-2 
Feb. 24, 2025      Feb. 25, 2025      Feb. 26, 2025      Feb. 27, 2025      Feb. 28, 2025      Mar. 01, 2025      Mar. 02, 2025     
6709 J.Turner/AP   AP                 AP                 8049 V.Thampy      8049 V.Thampy      6687 N.Kundu       6687 N.Kundu      
AP                 AP                 Xray CHECKOUT/8049 8049 V.Thampy      Xray CHECKOUT/6687 6687 N.Kundu       6687 N.Kundu      
AP                 AP                 8049 V.Thampy      8049 V.Thampy      6687 N.Kundu       6687 N.Kundu       6687 N.Kundu      

Back to Table of Contents

WEEK OF Mar. 03, 2025
                                         
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
BEAM   LINE 1-5  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
8091 C.Tassone     FACI               6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      6707 A.Maurya     
FACI               Xray CHECKOUT/6707 6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      6707 A.Maurya     
FACI               6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      6707 A.Maurya     
BEAM   LINE 2-1  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
8062 M.Preefer     6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra 6679 M.Cosby       6679 M.Cosby      
Xray CHECKOUT/6429 6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra Xray CHECKOUT/6679 6679 M.Cosby       6679 M.Cosby      
6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra 6679 M.Cosby       6679 M.Cosby       6679 M.Cosby      
BEAM   LINE 2-2  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
8019 J.Richardson  6852 R.Root        6852 R.Root        6014 D.Fike        6014 D.Fike        6670 C.Lopano      6670 C.Lopano     
CHANGE/6852 R.Root 6852 R.Root        CHANGE/6014 D.Fike 6014 D.Fike        CHANGE/6670 C.Lopa 6670 C.Lopano      6670 C.Lopano     
6852 R.Root        6852 R.Root        6014 D.Fike        6014 D.Fike        6670 C.Lopano      6670 C.Lopano      6670 C.Lopano     
BEAM   LINE 4-1  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
12D7 P.Cavanagh    8877 T.Matsui      8877 T.Matsui      RA                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
CHANGE/8877 T.Mats 8877 T.Matsui      RA                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
8877 T.Matsui      8877 T.Matsui      RA                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6715 O.Marques     6677 Z.Liang       6677 Z.Liang       6516 A.Evers       6516 A.Evers       6163 G.George      6163 G.George     
SMB CHECKOUT/6677  6677 Z.Liang       SMB CHECKOUT/6516  6516 A.Evers       SMB CHECKOUT/6163  6163 G.George      6163 G.George     
6677 Z.Liang       6677 Z.Liang       6516 A.Evers       6516 A.Evers       6163 G.George      6163 G.George      6163 G.George     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6843 A.Maniyangana 6791 M.Machado Ama 6791 M.Machado Ama 6791 M.Machado Ama 6809 E.Espinosa Vi 6809 E.Espinosa Vi 6809 E.Espinosa Vi
CHANGE/6791 M.Mach 6791 M.Machado Ama 6791 M.Machado Ama CHANGE/6809 E.Espi 6809 E.Espinosa Vi 6809 E.Espinosa Vi 6809 E.Espinosa Vi
6791 M.Machado Ama 6791 M.Machado Ama 6791 M.Machado Ama 6809 E.Espinosa Vi 6809 E.Espinosa Vi 6809 E.Espinosa Vi 6809 E.Espinosa Vi
BEAM   LINE 7-2  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
8092 D.Sokaras     6394 B.Maki        6394 B.Maki        6394 B.Maki        6394 B.Maki        6277 G.George      6277 G.George     
CHANGE/6394 B.Maki 6394 B.Maki        6394 B.Maki        6394 B.Maki        CHANGE/6277 G.Geor 6277 G.George      6277 G.George     
6394 B.Maki        6394 B.Maki        6394 B.Maki        6394 B.Maki        6277 G.George      6277 G.George      6277 G.George     
BEAM   LINE 7-3  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6530 L.Quintanar   6827 G.George      6827 G.George      6827 G.George      6827 G.George      6670 C.Lopano      6670 C.Lopano     
Xray CHECKOUT/6827 6827 G.George      6827 G.George      6827 G.George      Xray CHECKOUT/6670 6670 C.Lopano      6670 C.Lopano     
6827 G.George      6827 G.George      6827 G.George      6827 G.George      6670 C.Lopano      6670 C.Lopano      6670 C.Lopano     
BEAM   LINE 9-3  
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6699 J.Chalmers    5582 S.Khatib      5582 S.Khatib      6823 C.Sievers     6823 C.Sievers     6503 T.Siboonruang 6503 T.Siboonruang
Xray CHECKOUT/5582 5582 S.Khatib      Xray CHECKOUT/6823 6823 C.Sievers     Xray CHECKOUT/6503 6503 T.Siboonruang 6503 T.Siboonruang
5582 S.Khatib      5582 S.Khatib      6823 C.Sievers     6823 C.Sievers     6503 T.Siboonruang 6503 T.Siboonruang 6503 T.Siboonruang
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
FACI               6516 A.Evers       6516 A.Evers       6786 A.Naranjo-Sol 6786 A.Naranjo-Sol 5993 K.Kovnir      5993 K.Kovnir     
SMB CHECKOUT/6516  6516 A.Evers       SMB CHECKOUT/6786  6786 A.Naranjo-Sol SMB CHECKOUT/5993  5993 K.Kovnir      5993 K.Kovnir     
6516 A.Evers       6516 A.Evers       6786 A.Naranjo-Sol 6786 A.Naranjo-Sol 5993 K.Kovnir      5993 K.Kovnir      5993 K.Kovnir     
BEAM   LINE 11-3 
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6055 M.Chabinyc    93K9 D.Dede        93K9 D.Dede        Unscheduled        FACI               6345 M.Preefer     6345 M.Preefer    
Xray CHECKOUT/93K9 93K9 D.Dede        93K9 D.Dede        FACI               Xray CHECKOUT/6345 6345 M.Preefer     6345 M.Preefer    
93K9 D.Dede        93K9 D.Dede        Unscheduled        FACI               6345 M.Preefer     6345 M.Preefer     6345 M.Preefer    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6830 H.Hao         6729 R.Root        6729 R.Root        6852 R.Root        6852 R.Root        6014 D.Fike        6014 D.Fike       
CHANGE/6729 R.Root 6729 R.Root        CHANGE/6852 R.Root 6852 R.Root        CHANGE/6014 D.Fike 6014 D.Fike        6014 D.Fike       
6729 R.Root        6729 R.Root        6852 R.Root        6852 R.Root        6014 D.Fike        6014 D.Fike        6014 D.Fike       
BEAM   LINE 15-2 
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6872 K.Zhao        6530 L.Quintanar   6530 L.Quintanar   6530 L.Quintanar   STUP               6212 U.Bergmann    6212 U.Bergmann   
Xray CHECKOUT/6530 6530 L.Quintanar   6530 L.Quintanar   STUP               Xray CHECKOUT/6212 6212 U.Bergmann    6212 U.Bergmann   
6530 L.Quintanar   6530 L.Quintanar   6530 L.Quintanar   STUP               6212 U.Bergmann    6212 U.Bergmann    6212 U.Bergmann   
BEAM   LINE 17-2 
Mar. 03, 2025      Mar. 04, 2025      Mar. 05, 2025      Mar. 06, 2025      Mar. 07, 2025      Mar. 08, 2025      Mar. 09, 2025     
6687 N.Kundu       FACI               Unscheduled        Unscheduled        FACI               9705 J.LiSA        9705 J.LiSA       
FACI               Unscheduled        Unscheduled        FACI               Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA       
FACI               Unscheduled        Unscheduled        FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       

Back to Table of Contents

WEEK OF Mar. 10, 2025
                                         
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
BEAM   LINE 1-5  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6707 A.Maurya/FACI FACI               6085 N.Idris       6085 N.Idris/FACI  FACI               9705 J.LiSA        9705 J.LiSA       
FACI               Xray CHECKOUT/6085 6085 N.Idris       FACI               Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA       
FACI               6085 N.Idris       6085 N.Idris       FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 2-1  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6679 M.Cosby       6814 J.Cooley      6814 J.Cooley      6814 J.Cooley      6814 J.Cooley      8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/6814 6814 J.Cooley      6814 J.Cooley      6814 J.Cooley      Xray CHECKOUT/8095 8095 K.Stone       Unscheduled       
6814 J.Cooley      6814 J.Cooley      6814 J.Cooley      6814 J.Cooley      8095 K.Stone       8095 K.Stone       Unscheduled       
BEAM   LINE 2-2  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6670 C.Lopano      6080 E.Bailey      6080 E.Bailey      6721 C.Kim         6721 C.Kim         6071 M.Pushie      6071 M.Pushie     
CHANGE/6080 E.Bail 6080 E.Bailey      CHANGE/6721 C.Kim  6721 C.Kim         CHANGE/6071 M.Push 6071 M.Pushie      6071 M.Pushie     
6080 E.Bailey      6080 E.Bailey      6721 C.Kim         6721 C.Kim         6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
BEAM   LINE 4-1  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
8877 T.Matsui      12D2 S.Al Kharusi  12D2 S.Al Kharusi  8877 T.Matsui      8246 D.Marchany-Ri 8246 D.Marchany-Ri 8877 T.Matsui     
CHANGE/12D2 S.Al K 12D2 S.Al Kharusi  CHANGE/8877 T.Mats CHANGE/8246 D.Marc 8246 D.Marchany-Ri CHANGE/8877 T.Mats 8877 T.Matsui     
12D2 S.Al Kharusi  12D2 S.Al Kharusi  8877 T.Matsui      8246 D.Marchany-Ri 8246 D.Marchany-Ri 8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6163 G.George      6878 T.Li          6878 T.Li          6444 N.Patra       6444 N.Patra       8092 D.Sokaras     8092 D.Sokaras    
SMB CHECKOUT/6878  6878 T.Li          SMB CHECKOUT/6444  6444 N.Patra       Xray CHECKOUT/8092 8092 D.Sokaras     8092 D.Sokaras    
6878 T.Li          6878 T.Li          6444 N.Patra       6444 N.Patra       8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6809 E.Espinosa Vi 8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     6344 D.Lee         6344 D.Lee        
CHANGE/8907 M.Pree 8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     CHANGE/6344 D.Lee  6344 D.Lee         6344 D.Lee        
8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     6344 D.Lee         6344 D.Lee         6344 D.Lee        
BEAM   LINE 7-2  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6277 G.George      6496 M.Pushie      6496 M.Pushie      6496 M.Pushie      6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
CHANGE/6496 M.Push 6496 M.Pushie      6496 M.Pushie      CHANGE/6071 M.Push 6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
6496 M.Pushie      6496 M.Pushie      6496 M.Pushie      6071 M.Pushie      6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
BEAM   LINE 7-3  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6670 C.Lopano      6029 A.Asundi      6029 A.Asundi      6617 S.Dai         6617 S.Dai         6096 M.Abernathy   6096 M.Abernathy  
Xray CHECKOUT/6029 6029 A.Asundi      Xray CHECKOUT/6617 6617 S.Dai         Xray CHECKOUT/6096 6096 M.Abernathy   6096 M.Abernathy  
6029 A.Asundi      6029 A.Asundi      6617 S.Dai         6617 S.Dai         6096 M.Abernathy   6096 M.Abernathy   6096 M.Abernathy  
BEAM   LINE 9-3  
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6503 T.Siboonruang 6571 R.JANA        6571 R.JANA        6777 M.Matalkeh    6777 M.Matalkeh    6573 E.Volk        6573 E.Volk       
Xray CHECKOUT/6571 6571 R.JANA        Xray CHECKOUT/6777 6777 M.Matalkeh    Xray CHECKOUT/6573 6573 E.Volk        6573 E.Volk       
6571 R.JANA        6571 R.JANA        6777 M.Matalkeh    6777 M.Matalkeh    6573 E.Volk        6573 E.Volk        6573 E.Volk       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
5993 K.Kovnir      6086 R.Abergel     6086 R.Abergel     6425 R.Abergel     6425 R.Abergel     6611 Y.Tang        6611 Y.Tang       
SMB CHECKOUT/6086  6086 R.Abergel     SMB CHECKOUT/6425  6425 R.Abergel     SMB CHECKOUT/6611  6611 Y.Tang        6611 Y.Tang       
6086 R.Abergel     6086 R.Abergel     6425 R.Abergel     6425 R.Abergel     6611 Y.Tang        6611 Y.Tang        6611 Y.Tang       
BEAM   LINE 11-3 
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6345 M.Preefer     FACI               6729 R.Root        6729 R.Root        6729 R.Root        6882 D.Pe          6882 D.Pe         
FACI               Xray CHECKOUT/6729 6729 R.Root        6729 R.Root        Xray CHECKOUT/6882 6882 D.Pe          6882 D.Pe         
FACI               6729 R.Root        6729 R.Root        6729 R.Root        6882 D.Pe          6882 D.Pe          6882 D.Pe         
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6014 D.Fike        6226 M.Crotteau    6226 M.Crotteau    6226 M.Crotteau    Unscheduled        Unscheduled        Unscheduled       
CHANGE/6226 M.Crot 6226 M.Crotteau    6226 M.Crotteau    Unscheduled        Unscheduled        Unscheduled        Unscheduled       
6226 M.Crotteau    6226 M.Crotteau    6226 M.Crotteau    Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
6212 U.Bergmann    Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        6514 O.Paredes Mel
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/6514 6514 O.Paredes Mel
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        6514 O.Paredes Mel 6514 O.Paredes Mel
BEAM   LINE 17-2 
Mar. 10, 2025      Mar. 11, 2025      Mar. 12, 2025      Mar. 13, 2025      Mar. 14, 2025      Mar. 15, 2025      Mar. 16, 2025     
9705 J.LiSA        FACI               5615 J.Ravichandra 5615 J.Ravichandra 6866 S.Wu          6866 S.Wu          6866 S.Wu         
FACI               Xray CHECKOUT/5615 5615 J.Ravichandra Xray CHECKOUT/6866 6866 S.Wu          6866 S.Wu          6866 S.Wu         
FACI               5615 J.Ravichandra 5615 J.Ravichandra 6866 S.Wu          6866 S.Wu          6866 S.Wu          6866 S.Wu         

Back to Table of Contents

WEEK OF Mar. 17, 2025
                                         
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
BEAM   LINE 1-5  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
9705 J.LiSA/AP     AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 6512 K.Tamakuwala  6512 K.Tamakuwala  Unscheduled        6713 A.Hoffman    
AP                 AP                 Xray CHECKOUT/6512 6512 K.Tamakuwala  Unscheduled        CHANGE/6713 A.Hoff 6713 A.Hoffman    
AP                 AP                 6512 K.Tamakuwala  6512 K.Tamakuwala  Unscheduled        6713 A.Hoffman     6713 A.Hoffman    
BEAM   LINE 2-2  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6071 M.Pushie/AP   AP                 AP                 6755 N.Sharma      6755 N.Sharma      6237 S.Shulda      6237 S.Shulda     
AP                 AP                 CHANGE/6755 N.Shar 6755 N.Sharma      CHANGE/6237 S.Shul 6237 S.Shulda      6237 S.Shulda     
AP                 AP                 6755 N.Sharma      6755 N.Sharma      6237 S.Shulda      6237 S.Shulda      6237 S.Shulda     
BEAM   LINE 4-1  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
8877 T.Matsui/AP   AP                 AP                 8877 T.Matsui      12D5 A.Koglin      12D5 A.Koglin      8047 T.Weiss      
AP                 AP                 CHANGE/8877 T.Mats CHANGE/12D5 A.Kogl 12D5 A.Koglin      CHANGE/8047 T.Weis 8047 T.Weiss      
AP                 AP                 8877 T.Matsui      12D5 A.Koglin      12D5 A.Koglin      8047 T.Weiss       8047 T.Weiss      
BEAM   LINE 4-3  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
8092 D.Sokaras/AP  AP                 AP                 6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu  
AP                 AP                 SMB CHECKOUT/6728  6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu  
AP                 AP                 6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu   6728 K.Shigenobu  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6344 D.Lee/AP      AP                 AP                 8090 J.Nelson Weke CHANGE/6338 X.Zhen 6338 X.Zheng       6338 X.Zheng      
AP                 AP                 CHANGE/8090 J.Nels 8090 J.Nelson Weke 6338 X.Zheng       6338 X.Zheng       6338 X.Zheng      
AP                 AP                 8090 J.Nelson Weke 8090 J.Nelson Weke 6338 X.Zheng       6338 X.Zheng       6338 X.Zheng      
BEAM   LINE 7-2  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6071 M.Pushie/AP   AP                 AP                 6716 A.Johs        6716 A.Johs        8019 J.Richardson  8019 J.Richardson 
AP                 AP                 CHANGE/6716 A.Johs 6716 A.Johs        CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson 
AP                 AP                 6716 A.Johs        6716 A.Johs        8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
BEAM   LINE 7-3  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6096 M.Abernath/AP AP                 AP                 6614 S.George      6614 S.George      5964 M.Green       5964 M.Green      
AP                 AP                 Xray CHECKOUT/6614 6614 S.George      Xray CHECKOUT/5964 5964 M.Green       5964 M.Green      
AP                 AP                 6614 S.George      6614 S.George      5964 M.Green       5964 M.Green       5964 M.Green      
BEAM   LINE 9-3  
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6573 E.Volk/AP     AP                 AP                 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
AP                 AP                 CHANGE/8871 R.Sara 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
AP                 AP                 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6611 Y.Tang/AP     AP                 AP                 11J8 J.Zhang       11J8 J.Zhang       11J8 J.Zhang       11J8 J.Zhang      
AP                 AP                 SMB CHECKOUT/11J8  11J8 J.Zhang       11J8 J.Zhang       11J8 J.Zhang       11J8 J.Zhang      
AP                 AP                 11J8 J.Zhang       11J8 J.Zhang       11J8 J.Zhang       11J8 J.Zhang       11J8 J.Zhang      
BEAM   LINE 11-3 
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6882 D.Pe/AP       AP                 AP                 6305 W.Go          6305 W.Go          8049 V.Thampy      8049 V.Thampy     
AP                 AP                 Xray CHECKOUT/6305 6305 W.Go          Xray CHECKOUT/8049 8049 V.Thampy      8049 V.Thampy     
AP                 AP                 6305 W.Go          6305 W.Go          8049 V.Thampy      8049 V.Thampy      8049 V.Thampy     
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
AP                 AP                 AP                 6680 G.Drakakaki   6680 G.Drakakaki   6531 A.Bhattacharj 6531 A.Bhattacharj
AP                 AP                 CHANGE/6680 G.Drak 6680 G.Drakakaki   CHANGE/6531 A.Bhat 6531 A.Bhattacharj 6531 A.Bhattacharj
AP                 AP                 6680 G.Drakakaki   6680 G.Drakakaki   6531 A.Bhattacharj 6531 A.Bhattacharj 6531 A.Bhattacharj
BEAM   LINE 15-2 
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6514 O.Paredes /AP AP                 AP                 COMM               COMM               8806 M.Reinhard    8806 M.Reinhard   
AP                 AP                 COMM               COMM               Xray CHECKOUT/8806 8806 M.Reinhard    8806 M.Reinhard   
AP                 AP                 COMM               COMM               8806 M.Reinhard    8806 M.Reinhard    8806 M.Reinhard   
BEAM   LINE 17-2 
Mar. 17, 2025      Mar. 18, 2025      Mar. 19, 2025      Mar. 20, 2025      Mar. 21, 2025      Mar. 22, 2025      Mar. 23, 2025     
6866 S.Wu/AP       AP                 AP                 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
AP                 AP                 Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
AP                 AP                 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      

Back to Table of Contents

WEEK OF Mar. 24, 2025
                                         
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
BEAM   LINE 1-5  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
FACI               FACI               6006 Y.Wu          5529 N.Akmansen Ka 5529 N.Akmansen Ka 6103 S.Hesse       6103 S.Hesse      
FACI               Xray CHECKOUT/6006 Xray CHECKOUT/5529 5529 N.Akmansen Ka Xray CHECKOUT/6103 6103 S.Hesse       6103 S.Hesse      
FACI               6006 Y.Wu          5529 N.Akmansen Ka 5529 N.Akmansen Ka 6103 S.Hesse       6103 S.Hesse       6103 S.Hesse      
BEAM   LINE 2-1  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
6713 A.Hoffman     6155 Y.WU          6155 Y.WU          6155 Y.WU          FACI               8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/6155 6155 Y.WU          6155 Y.WU          FACI               Xray CHECKOUT/8095 8095 K.Stone       Unscheduled       
6155 Y.WU          6155 Y.WU          6155 Y.WU          FACI               8095 K.Stone       8095 K.Stone       Unscheduled       
BEAM   LINE 2-2  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
6237 S.Shulda      6333 M.McNamara    6333 M.McNamara    6843 A.Maniyangana 6843 A.Maniyangana Unscheduled        Unscheduled       
CHANGE/6333 M.McNa 6333 M.McNamara    CHANGE/6843 A.Mani 6843 A.Maniyangana Unscheduled        Unscheduled        Unscheduled       
6333 M.McNamara    6333 M.McNamara    6843 A.Maniyangana 6843 A.Maniyangana Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-1  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8047 T.Weiss       8877 T.Matsui      8877 T.Matsui      6743 A.Hussain     6244 A.Simafranca  5497 M.Georgiadis  5497 M.Georgiadis 
CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/6743 A.Huss CHANGE/6244 A.Sima CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
8877 T.Matsui      8877 T.Matsui      6743 A.Hussain     6244 A.Simafranca  5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
6728 K.Shigenobu   6614 S.George      6614 S.George      6801 H.Lyu         6801 H.Lyu         6801 H.Lyu         6801 H.Lyu        
Xray CHECKOUT/6614 6614 S.George      Xray CHECKOUT/6801 6801 H.Lyu         6801 H.Lyu         6801 H.Lyu         6801 H.Lyu        
6614 S.George      6614 S.George      6801 H.Lyu         6801 H.Lyu         6801 H.Lyu         6801 H.Lyu         6801 H.Lyu        
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
6338 X.Zheng       6830 H.Hao         6830 H.Hao         6345 M.Preefer     6345 M.Preefer     6804 Y.Cho         6804 Y.Cho        
CHANGE/6830 H.Hao  6830 H.Hao         CHANGE/6345 M.Pree 6345 M.Preefer     CHANGE/6804 Y.Cho  6804 Y.Cho         6804 Y.Cho        
6830 H.Hao         6830 H.Hao         6345 M.Preefer     6345 M.Preefer     6804 Y.Cho         6804 Y.Cho         6804 Y.Cho        
BEAM   LINE 7-2  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8019 J.Richardson  5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      6333 M.McNamara    6333 M.McNamara    6333 M.McNamara   
CHANGE/5771 C.Hans 5771 C.Hansel      5771 C.Hansel      CHANGE/6333 M.McNa 6333 M.McNamara    6333 M.McNamara    6333 M.McNamara   
5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    6333 M.McNamara   
BEAM   LINE 7-3  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
5964 M.Green       6469 A.Braun       6469 A.Braun       6682 J.Lopez-Garri 6682 J.Lopez-Garri 6178 A.Cordones-Ha 6178 A.Cordones-Ha
Xray CHECKOUT/6469 6469 A.Braun       Xray CHECKOUT/6682 6682 J.Lopez-Garri Xray CHECKOUT/6178 6178 A.Cordones-Ha 6178 A.Cordones-Ha
6469 A.Braun       6469 A.Braun       6682 J.Lopez-Garri 6682 J.Lopez-Garri 6178 A.Cordones-Ha 6178 A.Cordones-Ha 6178 A.Cordones-Ha
BEAM   LINE 9-3  
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8871 R.Sarangi     6536 J.Schneider   6536 J.Schneider   6831 M.Abernathy   6831 M.Abernathy   6793 R.Colina Ruiz 6793 R.Colina Ruiz
Xray CHECKOUT/6536 6536 J.Schneider   Xray CHECKOUT/6831 6831 M.Abernathy   Xray CHECKOUT/6793 6793 R.Colina Ruiz 6793 R.Colina Ruiz
6536 J.Schneider   6536 J.Schneider   6831 M.Abernathy   6831 M.Abernathy   6793 R.Colina Ruiz 6793 R.Colina Ruiz 6793 R.Colina Ruiz
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
11J8 J.Zhang       Unscheduled        Unscheduled        6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
Unscheduled        Unscheduled        SMB CHECKOUT/6860  6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
Unscheduled        Unscheduled        6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor     6860 S.Kozimor    
BEAM   LINE 11-3 
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8049 V.Thampy      5419 G.Giri        5419 G.Giri        6788 A.Magni       Unscheduled        6241 C.Salamat     6241 C.Salamat    
Xray CHECKOUT/5419 5419 G.Giri        Xray CHECKOUT/6788 Unscheduled        Xray CHECKOUT/6241 6241 C.Salamat     6241 C.Salamat    
5419 G.Giri        5419 G.Giri        6788 A.Magni       Unscheduled        6241 C.Salamat     6241 C.Salamat     6241 C.Salamat    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
6531 A.Bhattacharj 6277 G.George      6277 G.George      6277 G.George      8067 S.Webb        8067 S.Webb        Unscheduled       
CHANGE/6277 G.Geor 6277 G.George      6277 G.George      CHANGE/8067 S.Webb 8067 S.Webb        Unscheduled        Unscheduled       
6277 G.George      6277 G.George      6277 G.George      8067 S.Webb        8067 S.Webb        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8806 M.Reinhard    6724 A.Narayanan N 6724 A.Narayanan N 6724 A.Narayanan N STUP               9705 J.LiSA        9705 J.LiSA       
Xray CHECKOUT/6724 6724 A.Narayanan N 6724 A.Narayanan N STUP               Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA       
6724 A.Narayanan N 6724 A.Narayanan N 6724 A.Narayanan N STUP               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 17-2 
Mar. 24, 2025      Mar. 25, 2025      Mar. 26, 2025      Mar. 27, 2025      Mar. 28, 2025      Mar. 29, 2025      Mar. 30, 2025     
8895 K.Stone       FACI               6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon     
FACI               Xray CHECKOUT/6463 6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon     
FACI               6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon     

Back to Table of Contents

WEEK OF Mar. 31, 2025
                                         
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
BEAM   LINE 1-5  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6103 S.Hesse/AP    AP                 AP                 FACI               FACI               6006 Y.Wu          Unscheduled       
AP                 AP                 FACI               FACI               Xray CHECKOUT/6006 6006 Y.Wu          Unscheduled       
AP                 AP                 FACI               FACI               6006 Y.Wu          Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
AP                 AP                 Xray CHECKOUT/8010 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
AP                 AP                 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
BEAM   LINE 2-2  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 6626 S.Saslow      6626 S.Saslow      FACI               FACI              
AP                 AP                 CHANGE/6626 S.Sasl 6626 S.Saslow      6626 S.Saslow      FACI               FACI              
AP                 AP                 6626 S.Saslow      6626 S.Saslow      FACI               FACI               FACI              
BEAM   LINE 4-1  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               8014 A.Hoffman     8014 A.Hoffman    
AP                 AP                 DOWN               DOWN               CHANGE/8014 A.Hoff 8014 A.Hoffman     8014 A.Hoffman    
AP                 AP                 DOWN               DOWN               8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman    
BEAM   LINE 4-2  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
5497 M.Georgiad/AP AP                 AP                 8877 T.Matsui      6881 W.Luo         6881 W.Luo         6881 W.Luo        
AP                 AP                 CHANGE/8877 T.Mats CHANGE/6881 W.Luo  6881 W.Luo         6881 W.Luo         RA                
AP                 AP                 8877 T.Matsui      6881 W.Luo         6881 W.Luo         6881 W.Luo         RA                
BEAM   LINE 4-3  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6801 H.Lyu/AP      AP                 AP                 8099 S.Bare        8099 S.Bare        6883 C.Kronawitter 6883 C.Kronawitter
AP                 AP                 SMB CHECKOUT/8099  8099 S.Bare        CHANGE/6883 C.Kron 6883 C.Kronawitter 6883 C.Kronawitter
AP                 AP                 8099 S.Bare        8099 S.Bare        6883 C.Kronawitter 6883 C.Kronawitter 6883 C.Kronawitter
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6804 Y.Cho/AP      AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6333 M.McNamara/AP AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6178 A.Cordones/AP AP                 AP                 FACI               FACI               6628 N.Blackburn   6628 N.Blackburn  
AP                 AP                 FACI               FACI               Xray CHECKOUT/6628 6628 N.Blackburn   6628 N.Blackburn  
AP                 AP                 FACI               FACI               6628 N.Blackburn   6628 N.Blackburn   6628 N.Blackburn  
BEAM   LINE 9-3  
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6793 R.Colina R/AP AP                 AP                 6768 G.Sethi       6768 G.Sethi       5798 I.Bogacz      5798 I.Bogacz     
AP                 AP                 Xray CHECKOUT/6768 6768 G.Sethi       Xray CHECKOUT/5798 5798 I.Bogacz      5798 I.Bogacz     
AP                 AP                 6768 G.Sethi       6768 G.Sethi       5798 I.Bogacz      5798 I.Bogacz      5798 I.Bogacz     
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6860 S.Kozimor/AP  AP                 AP                 93J6 P.Heimann     6491 M.Wang        6491 M.Wang        6491 M.Wang       
AP                 AP                 SMB CHECKOUT/93J6  SMB CHECKOUT/6491  6491 M.Wang        6491 M.Wang        6491 M.Wang       
AP                 AP                 93J6 P.Heimann     6491 M.Wang        6491 M.Wang        6491 M.Wang        6491 M.Wang       
BEAM   LINE 11-3 
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6241 C.Salamat/AP  AP                 AP                 6764 K.Das         FACI               6345 M.Preefer     6345 M.Preefer    
AP                 AP                 Xray CHECKOUT/6764 FACI               Xray CHECKOUT/6345 6345 M.Preefer     6345 M.Preefer    
AP                 AP                 6764 K.Das         FACI               6345 M.Preefer     6345 M.Preefer     6345 M.Preefer    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
DOWN/AP            AP                 AP                 6438 R.Smaha       6438 R.Smaha       6426 R.Huang       6426 R.Huang      
AP                 AP                 SMB CHECKOUT/6438  6438 R.Smaha       SMB CHECKOUT/6426  6426 R.Huang       6426 R.Huang      
AP                 AP                 6438 R.Smaha       6438 R.Smaha       6426 R.Huang       6426 R.Huang       6426 R.Huang      
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
AP                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
9705 J.LiSA/AP     AP                 AP                 6793 R.Colina Ruiz 6793 R.Colina Ruiz 6363 K.Sengupta    6363 K.Sengupta   
AP                 AP                 Xray CHECKOUT/6793 6793 R.Colina Ruiz Xray CHECKOUT/6363 6363 K.Sengupta    6363 K.Sengupta   
AP                 AP                 6793 R.Colina Ruiz 6793 R.Colina Ruiz 6363 K.Sengupta    6363 K.Sengupta    6363 K.Sengupta   
BEAM   LINE 17-2 
Mar. 31, 2025      Apr. 01, 2025      Apr. 02, 2025      Apr. 03, 2025      Apr. 04, 2025      Apr. 05, 2025      Apr. 06, 2025     
6463 K.Harmon/AP   AP                 AP                 FACI               FACI               6072 M.Dean        6072 M.Dean       
AP                 AP                 FACI               FACI               Xray CHECKOUT/6072 6072 M.Dean        6072 M.Dean       
AP                 AP                 FACI               FACI               6072 M.Dean        6072 M.Dean        6072 M.Dean       

Back to Table of Contents

WEEK OF Apr. 07, 2025
                                         
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
BEAM   LINE 1-5  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        6711 N.Strange     6711 N.Strange     6711 N.Strange     Unscheduled        Unscheduled       
Unscheduled        Unscheduled        6711 N.Strange     6711 N.Strange     Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Xray CHECKOUT/6711 6711 N.Strange     6711 N.Strange     Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
8010 N.Strange     6841 C.Zwanziger   6841 C.Zwanziger   6841 C.Zwanziger   6841 C.Zwanziger   8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/6841 6841 C.Zwanziger   6841 C.Zwanziger   6841 C.Zwanziger   Xray CHECKOUT/8095 8095 K.Stone       Unscheduled       
6841 C.Zwanziger   6841 C.Zwanziger   6841 C.Zwanziger   6841 C.Zwanziger   8095 K.Stone       8095 K.Stone       Unscheduled       
BEAM   LINE 2-2  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
FACI               6075 F.Feyrer      6075 F.Feyrer      6075 F.Feyrer      6450 K.Mateos      6450 K.Mateos      6450 K.Mateos     
CHANGE/6075 F.Feyr 6075 F.Feyrer      6075 F.Feyrer      CHANGE/6450 K.Mate 6450 K.Mateos      6450 K.Mateos      6450 K.Mateos     
6075 F.Feyrer      6075 F.Feyrer      6075 F.Feyrer      6450 K.Mateos      6450 K.Mateos      6450 K.Mateos      6450 K.Mateos     
BEAM   LINE 4-1  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman    
8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman    
8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman    
BEAM   LINE 4-2  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
RA                 6249 P.Zhang       12D6 W.Thomas      12D6 W.Thomas      12D0 Z.Bu          12D0 Z.Bu          12D0 Z.Bu         
CHANGE/6249 P.Zhan CHANGE/12D6 W.Thom 12D6 W.Thomas      CHANGE/12D0 Z.Bu   12D0 Z.Bu          12D0 Z.Bu          CHANGE/8877 T.Mats
6249 P.Zhang       12D6 W.Thomas      12D6 W.Thomas      12D0 Z.Bu          12D0 Z.Bu          12D0 Z.Bu          8877 T.Matsui     
BEAM   LINE 4-3  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6883 C.Kronawitter 6151 D.Miller      6151 D.Miller      6650 S.Daly        6650 S.Daly        6801 H.Lyu         6801 H.Lyu        
CHANGE/6151 D.Mill 6151 D.Miller      SMB CHECKOUT/6650  6650 S.Daly        SMB CHECKOUT/6801  6801 H.Lyu         6801 H.Lyu        
6151 D.Miller      6151 D.Miller      6650 S.Daly        6650 S.Daly        6801 H.Lyu         6801 H.Lyu         6801 H.Lyu        
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        FACI               6578 W.Chiu        6578 W.Chiu        FACI              
Unscheduled        Unscheduled        FACI               CHANGE/6578 W.Chiu 6578 W.Chiu        FACI               FACI              
Unscheduled        Unscheduled        FACI               6578 W.Chiu        6578 W.Chiu        FACI               FACI              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
FACI               6075 F.Feyrer      6075 F.Feyrer      6075 F.Feyrer      8067 S.Webb        8067 S.Webb        8067 S.Webb       
CHANGE/6075 F.Feyr 6075 F.Feyrer      6075 F.Feyrer      CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb       
6075 F.Feyrer      6075 F.Feyrer      6075 F.Feyrer      8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6628 N.Blackburn   6628 N.Blackburn   6628 N.Blackburn   11N1 L.Zhang       11N1 L.Zhang       6616 T.Stemmler    6616 T.Stemmler   
6628 N.Blackburn   6628 N.Blackburn   Xray CHECKOUT/11N1 11N1 L.Zhang       Xray CHECKOUT/6616 6616 T.Stemmler    6616 T.Stemmler   
6628 N.Blackburn   6628 N.Blackburn   11N1 L.Zhang       11N1 L.Zhang       6616 T.Stemmler    6616 T.Stemmler    6616 T.Stemmler   
BEAM   LINE 9-3  
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
5798 I.Bogacz      5799 M.Doyle       5799 M.Doyle       5799 M.Doyle       5799 M.Doyle       6163 G.George      6163 G.George     
Xray CHECKOUT/5799 5799 M.Doyle       5799 M.Doyle       5799 M.Doyle       Xray CHECKOUT/6163 6163 G.George      6163 G.George     
5799 M.Doyle       5799 M.Doyle       5799 M.Doyle       5799 M.Doyle       6163 G.George      6163 G.George      6163 G.George     
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6491 M.Wang/FACI   FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-3 
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6345 M.Preefer     6876 J.Bocarsly    6876 J.Bocarsly    6876 J.Bocarsly    6876 J.Bocarsly    6250 E.Mu          6250 E.Mu         
Xray CHECKOUT/6876 6876 J.Bocarsly    6876 J.Bocarsly    6876 J.Bocarsly    Xray CHECKOUT/6250 6250 E.Mu          6250 E.Mu         
6876 J.Bocarsly    6876 J.Bocarsly    6876 J.Bocarsly    6876 J.Bocarsly    6250 E.Mu          6250 E.Mu          6250 E.Mu         
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6426 R.Huang       6426 R.Huang       6804 Y.Cho         6804 Y.Cho         6650 S.Daly        6650 S.Daly        6650 S.Daly       
6426 R.Huang       SMB CHECKOUT/6804  6804 Y.Cho         SMB CHECKOUT/6650  6650 S.Daly        6650 S.Daly        6650 S.Daly       
6426 R.Huang       6804 Y.Cho         6804 Y.Cho         6650 S.Daly        6650 S.Daly        6650 S.Daly        6650 S.Daly       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
BEAM   LINE 15-2 
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6363 K.Sengupta    STUP               6864 J.Gable       6864 J.Gable       6864 J.Gable       8892 D.Sokaras     8892 D.Sokaras    
STUP               Xray CHECKOUT/6864 6864 J.Gable       6864 J.Gable       CHANGE/8892 D.Soka 8892 D.Sokaras     8892 D.Sokaras    
STUP               6864 J.Gable       6864 J.Gable       6864 J.Gable       8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras    
BEAM   LINE 17-2 
Apr. 07, 2025      Apr. 08, 2025      Apr. 09, 2025      Apr. 10, 2025      Apr. 11, 2025      Apr. 12, 2025      Apr. 13, 2025     
6072 M.Dean        6072 M.Dean        6072 M.Dean        FACI               FACI               Unscheduled        Unscheduled       
6072 M.Dean        6072 M.Dean        FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
6072 M.Dean        6072 M.Dean        FACI               FACI               Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Apr. 14, 2025
                                         
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
BEAM   LINE 1-5  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
6450 K.Mateos/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
8014 A.Hoffma/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
8877 T.Matsui/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
6801 H.Lyu/DOWN    DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
FACI/DOWN          DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
8067 S.Webb/DOWN   DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
6616 T.Stemml/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
6163 G.George/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
FACI/DOWN          DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
6250 E.Mu/DOWN     DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
6650 S.Daly/DOWN   DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
8892 D.Sokara/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 14, 2025      Apr. 15, 2025      Apr. 16, 2025      Apr. 17, 2025      Apr. 18, 2025      Apr. 19, 2025      Apr. 20, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 21, 2025
                                         
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
BEAM   LINE 1-5  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 21, 2025      Apr. 22, 2025      Apr. 23, 2025      Apr. 24, 2025      Apr. 25, 2025      Apr. 26, 2025      Apr. 27, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 28, 2025
                                         
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
BEAM   LINE 1-5  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
AP                 AP                 FACI               Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
AP                 AP                 FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 FACI               Unscheduled        6604 C.Crain       6604 C.Crain      
AP                 AP                 FACI               Unscheduled        Xray CHECKOUT/6604 6604 C.Crain       6604 C.Crain      
AP                 AP                 FACI               Unscheduled        6604 C.Crain       6604 C.Crain       6604 C.Crain      
BEAM   LINE 2-2  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 6984 J.Ahn         6984 J.Ahn         6710 V.Noel        6710 V.Noel       
AP                 AP                 CHANGE/6984 J.Ahn  6984 J.Ahn         CHANGE/6710 V.Noel 6710 V.Noel        6710 V.Noel       
AP                 AP                 6984 J.Ahn         6984 J.Ahn         6710 V.Noel        6710 V.Noel        6710 V.Noel       
BEAM   LINE 4-1  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 8877 T.Matsui      6743 A.Hussain     5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 CHANGE/8877 T.Mats CHANGE/6743 A.Huss CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 8877 T.Matsui      6743 A.Hussain     5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 FACI               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 FACI               FACI               6247 K.Thurber     6247 K.Thurber    
AP                 AP                 FACI               FACI               Xray CHECKOUT/6247 6247 K.Thurber     6247 K.Thurber    
AP                 AP                 FACI               FACI               6247 K.Thurber     6247 K.Thurber     6247 K.Thurber    
BEAM   LINE 7-2  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 6394 B.Maki        6394 B.Maki        6755 N.Sharma      6755 N.Sharma     
AP                 AP                 CHANGE/6394 B.Maki 6394 B.Maki        CHANGE/6755 N.Shar 6755 N.Sharma      6755 N.Sharma     
AP                 AP                 6394 B.Maki        6394 B.Maki        6755 N.Sharma      6755 N.Sharma      6755 N.Sharma     
BEAM   LINE 7-3  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 FACI               6831 M.Abernathy   6831 M.Abernathy   6831 M.Abernathy  
AP                 AP                 FACI               Xray CHECKOUT/6831 6831 M.Abernathy   6831 M.Abernathy   6831 M.Abernathy  
AP                 AP                 FACI               6831 M.Abernathy   6831 M.Abernathy   6831 M.Abernathy   6831 M.Abernathy  
BEAM   LINE 9-3  
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 8099 S.Bare        8099 S.Bare        6696 M.Yousuf      6696 M.Yousuf     
AP                 AP                 Xray CHECKOUT/8099 8099 S.Bare        Xray CHECKOUT/6696 6696 M.Yousuf      6696 M.Yousuf     
AP                 AP                 8099 S.Bare        8099 S.Bare        6696 M.Yousuf      6696 M.Yousuf      6696 M.Yousuf     
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-3 
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 FACI               11M5 K.Das         11M5 K.Das         11M5 K.Das        
AP                 AP                 FACI               Xray CHECKOUT/11M5 11M5 K.Das         11M5 K.Das         11M5 K.Das        
AP                 AP                 FACI               11M5 K.Das         11M5 K.Das         11M5 K.Das         11M5 K.Das        
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 FACI               8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
AP                 AP                 FACI               CHANGE/8090 J.Nels 8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
AP                 AP                 FACI               8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 15-2 
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        COMM               COMM              
AP                 AP                 Unscheduled        Unscheduled        COMM               COMM               COMM              
AP                 AP                 Unscheduled        Unscheduled        COMM               COMM               COMM              
BEAM   LINE 17-2 
Apr. 28, 2025      Apr. 29, 2025      Apr. 30, 2025      May 01, 2025       May 02, 2025       May 03, 2025       May 04, 2025      
DOWN/AP            AP                 AP                 FACI               FACI               6222 S.Hesse       6222 S.Hesse      
AP                 AP                 FACI               FACI               Xray CHECKOUT/6222 6222 S.Hesse       6222 S.Hesse      
AP                 AP                 FACI               FACI               6222 S.Hesse       6222 S.Hesse       6222 S.Hesse      

Back to Table of Contents

WEEK OF May 05, 2025 
                                         
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
BEAM   LINE 1-5  
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
8091 C.Tassone     Unscheduled        Unscheduled        Unscheduled        8091 C.Tassone     Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/8091 8091 C.Tassone     Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        8091 C.Tassone     Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain       FACI               8895 K.Stone       8895 K.Stone      
6604 C.Crain       6604 C.Crain       6604 C.Crain       FACI               Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone      
6604 C.Crain       6604 C.Crain       6604 C.Crain       FACI               8895 K.Stone       8895 K.Stone       8895 K.Stone      
BEAM   LINE 2-2  
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
6710 V.Noel        6755 N.Sharma      6755 N.Sharma      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
CHANGE/6755 N.Shar 6755 N.Sharma      CHANGE/6703 E.Fade 6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
6755 N.Sharma      6755 N.Sharma      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely     
BEAM   LINE 4-1  
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis  8877 T.Matsui      8247 S.Russi       8247 S.Russi       8877 T.Matsui     
5497 M.Georgiadis  5497 M.Georgiadis  CHANGE/8877 T.Mats CHANGE/8247 S.Russ 8247 S.Russi       CHANGE/8877 T.Mats 8877 T.Matsui     
5497 M.Georgiadis  5497 M.Georgiadis  8877 T.Matsui      8247 S.Russi       8247 S.Russi       8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
Unscheduled        6840 X.Zheng       6840 X.Zheng       6671 M.Engel       6671 M.Engel       8090 J.Nelson Weke 8090 J.Nelson Weke
SMB CHECKOUT/6840  6840 X.Zheng       SMB CHECKOUT/6671  6671 M.Engel       SMB CHECKOUT/8090  8090 J.Nelson Weke 8090 J.Nelson Weke
6840 X.Zheng       6840 X.Zheng       6671 M.Engel       6671 M.Engel       8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
6247 K.Thurber     6465 N.Majoras     6465 N.Majoras     6465 N.Majoras     6465 N.Majoras     6237 S.Shulda      6237 S.Shulda     
Xray CHECKOUT/6465 6465 N.Majoras     6465 N.Majoras     6465 N.Majoras     Xray CHECKOUT/6237 6237 S.Shulda      6237 S.Shulda     
6465 N.Majoras     6465 N.Majoras     6465 N.Majoras     6465 N.Majoras     6237 S.Shulda      6237 S.Shulda      6237 S.Shulda     
BEAM   LINE 7-2  
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
6755 N.Sharma      6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      8067 S.Webb        8067 S.Webb        8067 S.Webb       
CHANGE/6703 E.Fade 6703 E.Fadely      6703 E.Fadely      CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb       
6703 E.Fadely      6703 E.Fadely      6703 E.Fadely      8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
6831 M.Abernathy   6682 J.Lopez-Garri 6682 J.Lopez-Garri 6029 A.Asundi      6029 A.Asundi      6710 V.Noel        6710 V.Noel       
Xray CHECKOUT/6682 6682 J.Lopez-Garri Xray CHECKOUT/6029 6029 A.Asundi      Xray CHECKOUT/6710 6710 V.Noel        6710 V.Noel       
6682 J.Lopez-Garri 6682 J.Lopez-Garri 6029 A.Asundi      6029 A.Asundi      6710 V.Noel        6710 V.Noel        6710 V.Noel       
BEAM   LINE 9-3  
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
6696 M.Yousuf      6437 S.Kristy      6437 S.Kristy      6437 S.Kristy      6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers   
Xray CHECKOUT/6437 6437 S.Kristy      6437 S.Kristy      Xray CHECKOUT/6699 6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers   
6437 S.Kristy      6437 S.Kristy      6437 S.Kristy      6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers    6699 J.Chalmers   
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
FACI               FACI               93K9 D.Dede        93K9 D.Dede        93K9 D.Dede        6759 S.Singh       6759 S.Singh      
FACI               Xray CHECKOUT/93K9 93K9 D.Dede        93K9 D.Dede        Xray CHECKOUT/6759 6759 S.Singh       6759 S.Singh      
FACI               93K9 D.Dede        93K9 D.Dede        93K9 D.Dede        6759 S.Singh       6759 S.Singh       6759 S.Singh      
BEAM   LINE 11-3 
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
11M5 K.Das         6895 R.Wu          6895 R.Wu          6895 R.Wu          6438 R.Smaha       7002 J.Baniecki    7002 J.Baniecki   
Xray CHECKOUT/6895 6895 R.Wu          6895 R.Wu          Xray CHECKOUT/6438 6438 R.Smaha       7002 J.Baniecki    7002 J.Baniecki   
6895 R.Wu          6895 R.Wu          6895 R.Wu          6438 R.Smaha       Xray CHECKOUT/7002 7002 J.Baniecki    7002 J.Baniecki   
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
8090 J.Nelson Weke 6804 Y.Cho         6804 Y.Cho         6801 H.Lyu         6801 H.Lyu         6277 G.George      6277 G.George     
CHANGE/6804 Y.Cho  6804 Y.Cho         CHANGE/6801 H.Lyu  6801 H.Lyu         CHANGE/6277 G.Geor 6277 G.George      6277 G.George     
6804 Y.Cho         6804 Y.Cho         6801 H.Lyu         6801 H.Lyu         6277 G.George      6277 G.George      6277 G.George     
BEAM   LINE 15-2 
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
COMM               Unscheduled        6857 E.Erdem       6857 E.Erdem       6857 E.Erdem       6282 T.Hersbach    6282 T.Hersbach   
Unscheduled        Xray CHECKOUT/6857 6857 E.Erdem       6857 E.Erdem       Xray CHECKOUT/6282 6282 T.Hersbach    6282 T.Hersbach   
Unscheduled        6857 E.Erdem       6857 E.Erdem       6857 E.Erdem       6282 T.Hersbach    6282 T.Hersbach    6282 T.Hersbach   
BEAM   LINE 17-2 
May 05, 2025       May 06, 2025       May 07, 2025       May 08, 2025       May 09, 2025       May 10, 2025       May 11, 2025      
6222 S.Hesse       6367 E.Abdo        6367 E.Abdo        6367 E.Abdo        FACI               6934 G.Giri        6934 G.Giri       
Xray CHECKOUT/6367 6367 E.Abdo        6367 E.Abdo        FACI               Xray CHECKOUT/6934 6934 G.Giri        6934 G.Giri       
6367 E.Abdo        6367 E.Abdo        6367 E.Abdo        FACI               6934 G.Giri        6934 G.Giri        6934 G.Giri       

Back to Table of Contents

WEEK OF May 12, 2025 
                                         
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
BEAM   LINE 1-5  
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
AP                 AP                 AP                 FACI               FACI               6570 D.Rivera      6570 D.Rivera     
AP                 AP                 FACI               FACI               Xray CHECKOUT/6570 6570 D.Rivera      6570 D.Rivera     
AP                 AP                 FACI               FACI               6570 D.Rivera      6570 D.Rivera      6570 D.Rivera     
BEAM   LINE 2-1  
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
8895 K.Stone/AP    AP                 AP                 6995 K.Harmon      6995 K.Harmon      6995 K.Harmon      6995 K.Harmon     
AP                 AP                 Xray CHECKOUT/6995 6995 K.Harmon      6995 K.Harmon      6995 K.Harmon      6995 K.Harmon     
AP                 AP                 6995 K.Harmon      6995 K.Harmon      6995 K.Harmon      6995 K.Harmon      6995 K.Harmon     
BEAM   LINE 2-2  
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
6703 E.Fadely/AP   AP                 AP                 Unscheduled        Unscheduled        6260 Y.Tang        6260 Y.Tang       
AP                 AP                 Unscheduled        Unscheduled        CHANGE/6260 Y.Tang 6260 Y.Tang        6260 Y.Tang       
AP                 AP                 Unscheduled        Unscheduled        6260 Y.Tang        6260 Y.Tang        6260 Y.Tang       
BEAM   LINE 4-1  
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
8877 T.Matsui/AP   AP                 AP                 6057 D.Mai         6057 D.Mai         6057 D.Mai         6057 D.Mai        
AP                 AP                 CHANGE/6057 D.Mai  6057 D.Mai         6057 D.Mai         6057 D.Mai         CHANGE/8877 T.Mats
AP                 AP                 6057 D.Mai         6057 D.Mai         6057 D.Mai         6057 D.Mai         8877 T.Matsui     
BEAM   LINE 4-3  
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
8090 J.Nelson W/AP AP                 AP                 6662 U.Bergmann    6662 U.Bergmann    6662 U.Bergmann    6662 U.Bergmann   
AP                 AP                 6662 U.Bergmann    6662 U.Bergmann    6662 U.Bergmann    6662 U.Bergmann    6662 U.Bergmann   
AP                 AP                 6662 U.Bergmann    6662 U.Bergmann    6662 U.Bergmann    6662 U.Bergmann    6662 U.Bergmann   
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
6237 S.Shulda/AP   AP                 AP                 FACI               6840 X.Zheng       6840 X.Zheng       6840 X.Zheng      
AP                 AP                 FACI               Xray CHECKOUT/6840 6840 X.Zheng       6840 X.Zheng       6840 X.Zheng      
AP                 AP                 FACI               6840 X.Zheng       6840 X.Zheng       6840 X.Zheng       6840 X.Zheng      
BEAM   LINE 7-2  
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
8067 S.Webb/AP     AP                 AP                 6394 B.Maki        6394 B.Maki        6277 G.George      6277 G.George     
AP                 AP                 CHANGE/6394 B.Maki 6394 B.Maki        CHANGE/6277 G.Geor 6277 G.George      6277 G.George     
AP                 AP                 6394 B.Maki        6394 B.Maki        6277 G.George      6277 G.George      6277 G.George     
BEAM   LINE 7-3  
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
6710 V.Noel/AP     AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
6699 J.Chalmers/AP AP                 AP                 Unscheduled        Unscheduled        6750 A.Asundi      6750 A.Asundi     
AP                 AP                 Unscheduled        Unscheduled        Xray CHECKOUT/6750 6750 A.Asundi      6750 A.Asundi     
AP                 AP                 Unscheduled        Unscheduled        6750 A.Asundi      6750 A.Asundi      6750 A.Asundi     
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
6759 S.Singh/AP    AP                 AP                 FACI               8099 S.Bare        8099 S.Bare        Unscheduled       
AP                 AP                 FACI               Xray CHECKOUT/8099 8099 S.Bare        Unscheduled        Unscheduled       
AP                 AP                 FACI               8099 S.Bare        8099 S.Bare        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
7002 J.Baniecki/AP AP                 AP                 FACI               6688 Y.Shi         6438 R.Smaha       6222 S.Hesse      
AP                 AP                 FACI               Xray CHECKOUT/6688 Xray CHECKOUT/6438 Xray CHECKOUT/6222 Xray CHECKOUT/6895
AP                 AP                 FACI               6688 Y.Shi         6438 R.Smaha       6222 S.Hesse       6895 R.Wu         
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
6277 G.George/AP   AP                 AP                 6680 G.Drakakaki   6680 G.Drakakaki   6932 J.Uhler       6932 J.Uhler      
AP                 AP                 CHANGE/6680 G.Drak 6680 G.Drakakaki   CHANGE/6932 J.Uhle 6932 J.Uhler       6932 J.Uhler      
AP                 AP                 6680 G.Drakakaki   6680 G.Drakakaki   6932 J.Uhler       6932 J.Uhler       6932 J.Uhler      
BEAM   LINE 15-2 
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
6282 T.Hersbach/AP AP                 AP                 Unscheduled        Unscheduled        Unscheduled        8892 D.Sokaras    
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/8892 8892 D.Sokaras    
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        8892 D.Sokaras     8892 D.Sokaras    
BEAM   LINE 17-2 
May 12, 2025       May 13, 2025       May 14, 2025       May 15, 2025       May 16, 2025       May 17, 2025       May 18, 2025      
6934 G.Giri/AP     AP                 AP                 FACI               FACI               6203 A.Halavanau   6203 A.Halavanau  
AP                 AP                 FACI               FACI               Xray CHECKOUT/6203 6203 A.Halavanau   6203 A.Halavanau  
AP                 AP                 FACI               FACI               6203 A.Halavanau   6203 A.Halavanau   6203 A.Halavanau  

Back to Table of Contents

WEEK OF May 19, 2025 
                                         
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
BEAM   LINE 1-5  
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
6570 D.Rivera      FACI               6941 N.Malmstadt   6941 N.Malmstadt   6941 N.Malmstadt   6941 N.Malmstadt   Unscheduled       
FACI               Xray CHECKOUT/6941 6941 N.Malmstadt   6941 N.Malmstadt   6941 N.Malmstadt   6941 N.Malmstadt   Unscheduled       
FACI               6941 N.Malmstadt   6941 N.Malmstadt   6941 N.Malmstadt   6941 N.Malmstadt   Unscheduled        Unscheduled       
BEAM   LINE 2-1  
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
6995 K.Harmon      6172 G.Qian        6172 G.Qian        6172 G.Qian        6172 G.Qian        6677 Z.Liang       6677 Z.Liang      
Xray CHECKOUT/6172 6172 G.Qian        6172 G.Qian        6172 G.Qian        Xray CHECKOUT/6677 6677 Z.Liang       6677 Z.Liang      
6172 G.Qian        6172 G.Qian        6172 G.Qian        6172 G.Qian        6677 Z.Liang       6677 Z.Liang       6677 Z.Liang      
BEAM   LINE 2-2  
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
6260 Y.Tang        6691 A.van Veelen  6691 A.van Veelen  6691 A.van Veelen  6957 F.Meyer       6957 F.Meyer       6957 F.Meyer      
CHANGE/6691 A.van  6691 A.van Veelen  6691 A.van Veelen  CHANGE/6957 F.Meye 6957 F.Meyer       6957 F.Meyer       6957 F.Meyer      
6691 A.van Veelen  6691 A.van Veelen  6691 A.van Veelen  6957 F.Meyer       6957 F.Meyer       6957 F.Meyer       6957 F.Meyer      
BEAM   LINE 4-1  
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      6467 A.Sewa        6467 A.Sewa        6467 A.Sewa       
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      CHANGE/6467 A.Sewa 6467 A.Sewa        6467 A.Sewa        6467 A.Sewa       
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      6467 A.Sewa        6467 A.Sewa        6467 A.Sewa        6467 A.Sewa       
BEAM   LINE 4-3  
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
6662 U.Bergmann    6804 Y.Cho         6804 Y.Cho         6830 H.Hao         6830 H.Hao         6801 H.Lyu         6801 H.Lyu        
SMB CHECKOUT/6804  6804 Y.Cho         SMB CHECKOUT/6830  6830 H.Hao         SMB CHECKOUT/6801  6801 H.Lyu         6801 H.Lyu        
6804 Y.Cho         6804 Y.Cho         6830 H.Hao         6830 H.Hao         6801 H.Lyu         6801 H.Lyu         6801 H.Lyu        
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
6840 X.Zheng       6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana 8090 J.Nelson Weke 6404 D.Hamilton    6404 D.Hamilton   
Xray CHECKOUT/6843 6843 A.Maniyangana 6843 A.Maniyangana Xray CHECKOUT/8090 Xray CHECKOUT/6404 6404 D.Hamilton    6404 D.Hamilton   
6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana 8090 J.Nelson Weke 6404 D.Hamilton    6404 D.Hamilton    6404 D.Hamilton   
BEAM   LINE 7-2  
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
6277 G.George      6277 G.George      6277 G.George      6940 V.Natu        6940 V.Natu        6710 V.Noel        6710 V.Noel       
6277 G.George      6277 G.George      CHANGE/6940 V.Natu 6940 V.Natu        CHANGE/6710 V.Noel 6710 V.Noel        6710 V.Noel       
6277 G.George      6277 G.George      6940 V.Natu        6940 V.Natu        6710 V.Noel        6710 V.Noel        6710 V.Noel       
BEAM   LINE 7-3  
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
6750 A.Asundi      6798 D.Pe          6798 D.Pe          6677 Z.Liang       6677 Z.Liang       6789 S.Masina      6789 S.Masina     
Xray CHECKOUT/6798 6798 D.Pe          Xray CHECKOUT/6677 6677 Z.Liang       Xray CHECKOUT/6789 6789 S.Masina      6789 S.Masina     
6798 D.Pe          6798 D.Pe          6677 Z.Liang       6677 Z.Liang       6789 S.Masina      6789 S.Masina      6789 S.Masina     
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
Unscheduled        6571 R.JANA        FACI               6571 R.JANA        6571 R.JANA        6571 R.JANA        6571 R.JANA       
SMB CHECKOUT/6571  FACI               6571 R.JANA        6571 R.JANA        6571 R.JANA        6571 R.JANA        6571 R.JANA       
6571 R.JANA        FACI               6571 R.JANA        6571 R.JANA        6571 R.JANA        6571 R.JANA        6571 R.JANA       
BEAM   LINE 11-3 
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
6895 R.Wu          FACI               6938 J.Chen        6938 J.Chen        6938 J.Chen        FACI               Unscheduled       
FACI               Xray CHECKOUT/6938 6938 J.Chen        6938 J.Chen        FACI               Unscheduled        Unscheduled       
FACI               6938 J.Chen        6938 J.Chen        6938 J.Chen        FACI               Unscheduled        Unscheduled       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
6932 J.Uhler       6957 F.Meyer       6957 F.Meyer       6894 J.Ruytinx     6894 J.Ruytinx     6531 A.Bhattacharj 6531 A.Bhattacharj
CHANGE/6957 F.Meye 6957 F.Meyer       CHANGE/6894 J.Ruyt 6894 J.Ruytinx     CHANGE/6531 A.Bhat 6531 A.Bhattacharj 6531 A.Bhattacharj
6957 F.Meyer       6957 F.Meyer       6894 J.Ruytinx     6894 J.Ruytinx     6531 A.Bhattacharj 6531 A.Bhattacharj 6531 A.Bhattacharj
BEAM   LINE 15-2 
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
8892 D.Sokaras     8892 D.Sokaras     8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       6827 G.George      6827 G.George     
8892 D.Sokaras     Xray CHECKOUT/8098 8098 T.Kroll       8098 T.Kroll       Xray CHECKOUT/6827 6827 G.George      6827 G.George     
8892 D.Sokaras     8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       6827 G.George      6827 G.George      6827 G.George     
BEAM   LINE 17-2 
May 19, 2025       May 20, 2025       May 21, 2025       May 22, 2025       May 23, 2025       May 24, 2025       May 25, 2025      
6203 A.Halavanau   FACI               Unscheduled        6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      8091 C.Tassone    
FACI               Unscheduled        Xray CHECKOUT/6707 6707 A.Maurya      6707 A.Maurya      Xray CHECKOUT/8091 8091 C.Tassone    
FACI               Unscheduled        6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      8091 C.Tassone     8091 C.Tassone    

Back to Table of Contents

WEEK OF May 26, 2025 
                                         
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
BEAM   LINE 1-5  
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
Unscheduled        Unscheduled        FACI               6999 A.Hoffman     6999 A.Hoffman     6999 A.Hoffman     6999 A.Hoffman    
Unscheduled        FACI               Xray CHECKOUT/6999 6999 A.Hoffman     6999 A.Hoffman     6999 A.Hoffman     6999 A.Hoffman    
Unscheduled        FACI               6999 A.Hoffman     6999 A.Hoffman     6999 A.Hoffman     6999 A.Hoffman     6999 A.Hoffman    
BEAM   LINE 2-1  
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
6677 Z.Liang       6677 Z.Liang       6789 S.Masina      6789 S.Masina      6789 S.Masina      8095 K.Stone       8095 K.Stone      
6677 Z.Liang       Xray CHECKOUT/6789 6789 S.Masina      6789 S.Masina      Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone      
6677 Z.Liang       6789 S.Masina      6789 S.Masina      6789 S.Masina      8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 2-2  
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
6957 F.Meyer       6758 S.Tian        6758 S.Tian        6615 L.Lu          6615 L.Lu          6776 T.Bosak       6776 T.Bosak      
CHANGE/6758 S.Tian 6758 S.Tian        Xray CHECKOUT/6615 6615 L.Lu          CHANGE/6776 T.Bosa 6776 T.Bosak       6776 T.Bosak      
6758 S.Tian        6758 S.Tian        6615 L.Lu          6615 L.Lu          6776 T.Bosak       6776 T.Bosak       6776 T.Bosak      
BEAM   LINE 4-1  
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
6467 A.Sewa        6467 A.Sewa        8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      6388 W.Luo         6388 W.Luo        
6467 A.Sewa        CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      CHANGE/6388 W.Luo  6388 W.Luo         6388 W.Luo        
6467 A.Sewa        8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      6388 W.Luo         6388 W.Luo         6388 W.Luo        
BEAM   LINE 4-3  
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
6801 H.Lyu         6801 H.Lyu         6801 H.Lyu         Unscheduled        6887 M.Waters      6830 H.Hao         6830 H.Hao        
6801 H.Lyu         6801 H.Lyu         6801 H.Lyu         Xray CHECKOUT/6887 Xray CHECKOUT/6830 6830 H.Hao         6830 H.Hao        
6801 H.Lyu         6801 H.Lyu         Unscheduled        6887 M.Waters      6830 H.Hao         6830 H.Hao         6830 H.Hao        
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
6404 D.Hamilton    6404 D.Hamilton    8062 M.Preefer     8062 M.Preefer     6063 A.White Smirn 6063 A.White Smirn 6063 A.White Smirn
6404 D.Hamilton    Xray CHECKOUT/8062 8062 M.Preefer     Xray CHECKOUT/6063 6063 A.White Smirn 6063 A.White Smirn 6063 A.White Smirn
6404 D.Hamilton    8062 M.Preefer     8062 M.Preefer     6063 A.White Smirn 6063 A.White Smirn 6063 A.White Smirn 6063 A.White Smirn
BEAM   LINE 7-2  
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
6710 V.Noel        6710 V.Noel        6776 T.Bosak       6776 T.Bosak       6776 T.Bosak       6480 T.Sowers      6480 T.Sowers     
6710 V.Noel        CHANGE/6776 T.Bosa 6776 T.Bosak       6776 T.Bosak       CHANGE/6480 T.Sowe 6480 T.Sowers      6480 T.Sowers     
6710 V.Noel        6776 T.Bosak       6776 T.Bosak       6776 T.Bosak       6480 T.Sowers      6480 T.Sowers      6480 T.Sowers     
BEAM   LINE 7-3  
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
6789 S.Masina      6789 S.Masina      Unscheduled        Unscheduled        Unscheduled        8092 D.Sokaras     8092 D.Sokaras    
6789 S.Masina      Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/8092 8092 D.Sokaras     8092 D.Sokaras    
6789 S.Masina      Unscheduled        Unscheduled        Unscheduled        8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
6571 R.JANA        Unscheduled        FACI               11L3 G.Bejger      11L3 G.Bejger      11L3 G.Bejger      11L3 G.Bejger     
Unscheduled        FACI               Xray CHECKOUT/11L3 11L3 G.Bejger      11L3 G.Bejger      11L3 G.Bejger      11L3 G.Bejger     
Unscheduled        FACI               11L3 G.Bejger      11L3 G.Bejger      11L3 G.Bejger      11L3 G.Bejger      11L3 G.Bejger     
BEAM   LINE 11-3 
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
Unscheduled        Unscheduled        6952 G.Nkala       6952 G.Nkala       6765 Z.Xue         6765 Z.Xue         6765 Z.Xue        
Unscheduled        Xray CHECKOUT/6952 6952 G.Nkala       Xray CHECKOUT/6765 6765 Z.Xue         6765 Z.Xue         6765 Z.Xue        
Unscheduled        6952 G.Nkala       6952 G.Nkala       6765 Z.Xue         6765 Z.Xue         6765 Z.Xue         6765 Z.Xue        
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
6531 A.Bhattacharj 6897 I.Rein        6897 I.Rein        6830 H.Hao         6830 H.Hao         6657 X.Zheng       6657 X.Zheng      
CHANGE/6897 I.Rein 6897 I.Rein        CHANGE/6830 H.Hao  6830 H.Hao         CHANGE/6657 X.Zhen 6657 X.Zheng       6657 X.Zheng      
6897 I.Rein        6897 I.Rein        6830 H.Hao         6830 H.Hao         6657 X.Zheng       6657 X.Zheng       6657 X.Zheng      
BEAM   LINE 15-2 
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
6827 G.George      6827 G.George      6962 A.Crawford    6962 A.Crawford    9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
6827 G.George      Xray CHECKOUT/6962 6962 A.Crawford    Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
6827 G.George      6962 A.Crawford    6962 A.Crawford    9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 17-2 
May 26, 2025       May 27, 2025       May 28, 2025       May 29, 2025       May 30, 2025       May 31, 2025       Jun. 01, 2025     
8091 C.Tassone     8091 C.Tassone     FACI               11M5 K.Das         11M5 K.Das         8224 D.Reis        8224 D.Reis       
8091 C.Tassone     FACI               Xray CHECKOUT/11M5 11M5 K.Das         Xray CHECKOUT/8224 8224 D.Reis        8224 D.Reis       
8091 C.Tassone     FACI               11M5 K.Das         11M5 K.Das         8224 D.Reis        8224 D.Reis        8224 D.Reis       

Back to Table of Contents

WEEK OF Jun. 02, 2025
                                         
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
BEAM   LINE 1-5  
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
6999 A.Hoffman/AP  AP                 AP                 FACI               FACI               6867 D.Banerjee    6867 D.Banerjee   
AP                 AP                 FACI               FACI               Xray CHECKOUT/6867 6867 D.Banerjee    6867 D.Banerjee   
AP                 AP                 FACI               FACI               6867 D.Banerjee    6867 D.Banerjee    6867 D.Banerjee   
BEAM   LINE 2-1  
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
8095 K.Stone/AP    AP                 AP                 6789 S.Masina      6789 S.Masina      5984 E.Corson      5984 E.Corson     
AP                 AP                 Xray CHECKOUT/6789 6789 S.Masina      Xray CHECKOUT/5984 5984 E.Corson      5984 E.Corson     
AP                 AP                 6789 S.Masina      6789 S.Masina      5984 E.Corson      5984 E.Corson      5984 E.Corson     
BEAM   LINE 2-2  
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
6776 T.Bosak/AP    AP                 AP                 6237 S.Shulda      6237 S.Shulda      6604 C.Crain       6604 C.Crain      
AP                 AP                 CHANGE/6237 S.Shul 6237 S.Shulda      CHANGE/6604 C.Crai 6604 C.Crain       6604 C.Crain      
AP                 AP                 6237 S.Shulda      6237 S.Shulda      6604 C.Crain       6604 C.Crain       6604 C.Crain      
BEAM   LINE 4-1  
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
6388 W.Luo/AP      AP                 AP                 8877 T.Matsui      8877 T.Matsui      5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 8877 T.Matsui      8877 T.Matsui      5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
6830 H.Hao/AP      AP                 AP                 6468 J.Rigby       6468 J.Rigby       6194 M.Liu         6194 M.Liu        
AP                 AP                 SMB CHECKOUT/6468  6468 J.Rigby       SMB CHECKOUT/6194  6194 M.Liu         6194 M.Liu        
AP                 AP                 6468 J.Rigby       6468 J.Rigby       6194 M.Liu         6194 M.Liu         6194 M.Liu        
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
6063 A.White Sm/AP AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
6480 T.Sowers/AP   AP                 AP                 6394 B.Maki        6394 B.Maki        6903 M.Vejar       6903 M.Vejar      
AP                 AP                 CHANGE/6394 B.Maki 6394 B.Maki        CHANGE/6903 M.Veja 6903 M.Vejar       6903 M.Vejar      
AP                 AP                 6394 B.Maki        6394 B.Maki        6903 M.Vejar       6903 M.Vejar       6903 M.Vejar      
BEAM   LINE 7-3  
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
AP                 AP                 AP                 6123 H.La Pierre   6123 H.La Pierre   6827 G.George      6827 G.George     
AP                 AP                 Xray CHECKOUT/6123 6123 H.La Pierre   Xray CHECKOUT/6827 6827 G.George      6827 G.George     
AP                 AP                 6123 H.La Pierre   6123 H.La Pierre   6827 G.George      6827 G.George      6827 G.George     
BEAM   LINE 9-3  
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
8092 D.Sokaras/AP  AP                 AP                 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
AP                 AP                 Xray CHECKOUT/8871 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
AP                 AP                 8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi     8871 R.Sarangi    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
11L3 G.Bejger/AP   AP                 AP                 FACI               6779 R.Rathnayake  6779 R.Rathnayake  6779 R.Rathnayake 
AP                 AP                 FACI               Xray CHECKOUT/6779 6779 R.Rathnayake  6779 R.Rathnayake  6779 R.Rathnayake 
AP                 AP                 FACI               6779 R.Rathnayake  6779 R.Rathnayake  6779 R.Rathnayake  6779 R.Rathnayake 
BEAM   LINE 11-3 
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
6765 Z.Xue/AP      AP                 AP                 6952 G.Nkala       FACI               5833 E.Abdo        Unscheduled       
AP                 AP                 Xray CHECKOUT/6952 6952 G.Nkala       Xray CHECKOUT/5833 Unscheduled        Unscheduled       
AP                 AP                 6952 G.Nkala       FACI               5833 E.Abdo        Unscheduled        Unscheduled       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
6657 X.Zheng/AP    AP                 AP                 6718 E.Nuccio      6718 E.Nuccio      6792 R.Bryant      6792 R.Bryant     
AP                 AP                 CHANGE/6718 E.Nucc 6718 E.Nuccio      CHANGE/6792 R.Brya 6792 R.Bryant      6792 R.Bryant     
AP                 AP                 6718 E.Nuccio      6718 E.Nuccio      6792 R.Bryant      6792 R.Bryant      6792 R.Bryant     
BEAM   LINE 15-2 
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
9705 J.LiSA/AP     AP                 AP                 Unscheduled        6849 J.Penner-Hahn 6849 J.Penner-Hahn 6849 J.Penner-Hahn
AP                 AP                 Unscheduled        Xray CHECKOUT/6849 6849 J.Penner-Hahn 6849 J.Penner-Hahn Xray CHECKOUT/8806
AP                 AP                 Unscheduled        6849 J.Penner-Hahn 6849 J.Penner-Hahn 6849 J.Penner-Hahn 8806 M.Reinhard   
BEAM   LINE 17-2 
Jun. 02, 2025      Jun. 03, 2025      Jun. 04, 2025      Jun. 05, 2025      Jun. 06, 2025      Jun. 07, 2025      Jun. 08, 2025     
8224 D.Reis/AP     AP                 AP                 8049 V.Thampy      8049 V.Thampy      93K8 P.Welander    93K8 P.Welander   
AP                 AP                 Xray CHECKOUT/8049 8049 V.Thampy      Xray CHECKOUT/93K8 93K8 P.Welander    93K8 P.Welander   
AP                 AP                 8049 V.Thampy      8049 V.Thampy      93K8 P.Welander    93K8 P.Welander    93K8 P.Welander   

Back to Table of Contents

WEEK OF Jun. 09, 2025
                                         
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
BEAM   LINE 1-5  
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
6867 D.Banerjee    FACI               FACI               Unscheduled        6707 A.Maurya      6707 A.Maurya      6707 A.Maurya     
FACI               FACI               Unscheduled        Xray CHECKOUT/6707 6707 A.Maurya      6707 A.Maurya      Unscheduled       
FACI               FACI               Unscheduled        6707 A.Maurya      6707 A.Maurya      6707 A.Maurya      Unscheduled       
BEAM   LINE 2-1  
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
5984 E.Corson      6953 N.Nguyen      6953 N.Nguyen      6953 N.Nguyen      FACI               8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/6953 6953 N.Nguyen      6953 N.Nguyen      FACI               Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone      
6953 N.Nguyen      6953 N.Nguyen      6953 N.Nguyen      FACI               8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 2-2  
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
6604 C.Crain       6721 C.Kim         6721 C.Kim         6721 C.Kim         8067 S.Webb        8067 S.Webb        8067 S.Webb       
CHANGE/6721 C.Kim  6721 C.Kim         6721 C.Kim         CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb       
6721 C.Kim         6721 C.Kim         6721 C.Kim         8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 4-1  
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
5497 M.Georgiadis  5497 M.Georgiadis  12D7 P.Cavanagh    12D7 P.Cavanagh    12D7 P.Cavanagh    12D7 P.Cavanagh    6895 R.Wu         
5497 M.Georgiadis  CHANGE/12D7 P.Cava 12D7 P.Cavanagh    12D7 P.Cavanagh    12D7 P.Cavanagh    CHANGE/6895 R.Wu   6895 R.Wu         
5497 M.Georgiadis  12D7 P.Cavanagh    12D7 P.Cavanagh    12D7 P.Cavanagh    12D7 P.Cavanagh    6895 R.Wu          6895 R.Wu         
BEAM   LINE 4-3  
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
6194 M.Liu         6715 O.Marques     6715 O.Marques     6952 G.Nkala       6952 G.Nkala       5910 E.Pierce      5910 E.Pierce     
SMB CHECKOUT/6715  6715 O.Marques     SMB CHECKOUT/6952  6952 G.Nkala       SMB CHECKOUT/5910  5910 E.Pierce      5910 E.Pierce     
6715 O.Marques     6715 O.Marques     6952 G.Nkala       6952 G.Nkala       5910 E.Pierce      5910 E.Pierce      5910 E.Pierce     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
6903 M.Vejar       Unscheduled        Unscheduled        8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
Unscheduled        Unscheduled        CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
Unscheduled        Unscheduled        8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
6827 G.George      6827 G.George      6614 S.George      6614 S.George      6614 S.George      6538 A.Duncan      6538 A.Duncan     
6827 G.George      Xray CHECKOUT/6614 6614 S.George      6614 S.George      Xray CHECKOUT/6538 6538 A.Duncan      6538 A.Duncan     
6827 G.George      6614 S.George      6614 S.George      6614 S.George      6538 A.Duncan      6538 A.Duncan      6538 A.Duncan     
BEAM   LINE 9-3  
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
8871 R.Sarangi     6872 K.Zhao        6872 K.Zhao        Unscheduled        6793 R.Colina Ruiz 6793 R.Colina Ruiz 6793 R.Colina Ruiz
Xray CHECKOUT/6872 6872 K.Zhao        Unscheduled        Xray CHECKOUT/6793 6793 R.Colina Ruiz 6793 R.Colina Ruiz 6793 R.Colina Ruiz
6872 K.Zhao        6872 K.Zhao        Unscheduled        6793 R.Colina Ruiz 6793 R.Colina Ruiz 6793 R.Colina Ruiz 6793 R.Colina Ruiz
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
6779 R.Rathnayake  FACI               DOWN               DOWN               DOWN               DOWN               DOWN              
FACI               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
FACI               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
Unscheduled        5833 E.Abdo        5833 E.Abdo        5833 E.Abdo        8091 C.Tassone     6686 J.Chen        6686 J.Chen       
Xray CHECKOUT/5833 5833 E.Abdo        5833 E.Abdo        FACI               Xray CHECKOUT/6686 6686 J.Chen        6686 J.Chen       
5833 E.Abdo        5833 E.Abdo        5833 E.Abdo        Xray CHECKOUT/8091 6686 J.Chen        6686 J.Chen        6686 J.Chen       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
6792 R.Bryant      8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  6524 G.Druschel    6524 G.Druschel    6524 G.Druschel   
CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson  CHANGE/6524 G.Drus 6524 G.Druschel    6524 G.Druschel    6524 G.Druschel   
8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  6524 G.Druschel    6524 G.Druschel    6524 G.Druschel    6524 G.Druschel   
BEAM   LINE 15-2 
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
8806 M.Reinhard    8806 M.Reinhard    6724 A.Narayanan N 6724 A.Narayanan N 6724 A.Narayanan N 6998 A.Garcia-Espa 6998 A.Garcia-Espa
8806 M.Reinhard    Xray CHECKOUT/6724 6724 A.Narayanan N 6724 A.Narayanan N Xray CHECKOUT/6998 6998 A.Garcia-Espa 6998 A.Garcia-Espa
8806 M.Reinhard    6724 A.Narayanan N 6724 A.Narayanan N 6724 A.Narayanan N 6998 A.Garcia-Espa 6998 A.Garcia-Espa 6998 A.Garcia-Espa
BEAM   LINE 17-2 
Jun. 09, 2025      Jun. 10, 2025      Jun. 11, 2025      Jun. 12, 2025      Jun. 13, 2025      Jun. 14, 2025      Jun. 15, 2025     
93K8 P.Welander    97L4 Z.Chen        97L4 Z.Chen        Unscheduled        6760 G.Harlow      6760 G.Harlow      6760 G.Harlow     
Xray CHECKOUT/97L4 97L4 Z.Chen        Unscheduled        Xray CHECKOUT/6760 6760 G.Harlow      6760 G.Harlow      6760 G.Harlow     
97L4 Z.Chen        97L4 Z.Chen        Unscheduled        6760 G.Harlow      6760 G.Harlow      6760 G.Harlow      6760 G.Harlow     

Back to Table of Contents

WEEK OF Jun. 16, 2025
                                         
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
BEAM   LINE 1-5  
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
AP                 AP                 AP                 6979 J.Werner      6979 J.Werner      9705 J.LiSA        9705 J.LiSA       
AP                 AP                 Xray CHECKOUT/6979 6979 J.Werner      Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA       
AP                 AP                 6979 J.Werner      6979 J.Werner      9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 2-1  
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
8095 K.Stone/AP    AP                 AP                 6538 A.Duncan      6538 A.Duncan      6429 H.Ramachandra 6429 H.Ramachandra
AP                 AP                 Xray CHECKOUT/6538 6538 A.Duncan      Xray CHECKOUT/6429 6429 H.Ramachandra 6429 H.Ramachandra
AP                 AP                 6538 A.Duncan      6538 A.Duncan      6429 H.Ramachandra 6429 H.Ramachandra 6429 H.Ramachandra
BEAM   LINE 2-2  
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
8067 S.Webb/AP     AP                 AP                 6940 V.Natu        6940 V.Natu        6277 G.George      6277 G.George     
AP                 AP                 CHANGE/6940 V.Natu 6940 V.Natu        CHANGE/6277 G.Geor 6277 G.George      6277 G.George     
AP                 AP                 6940 V.Natu        6940 V.Natu        6277 G.George      6277 G.George      6277 G.George     
BEAM   LINE 4-1  
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
6895 R.Wu/AP       AP                 AP                 6765 Z.Xue         8877 T.Matsui      6743 A.Hussain     8877 T.Matsui     
AP                 AP                 CHANGE/6765 Z.Xue  CHANGE/8877 T.Mats CHANGE/6743 A.Huss CHANGE/8877 T.Mats 8877 T.Matsui     
AP                 AP                 6765 Z.Xue         8877 T.Matsui      6743 A.Hussain     8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
5910 E.Pierce/AP   AP                 AP                 6627 J.Kirtley     6627 J.Kirtley     6232 A.Garcia-Espa 6232 A.Garcia-Espa
AP                 AP                 SMB CHECKOUT/6627  6627 J.Kirtley     SMB CHECKOUT/6232  6232 A.Garcia-Espa 6232 A.Garcia-Espa
AP                 AP                 6627 J.Kirtley     6627 J.Kirtley     6232 A.Garcia-Espa 6232 A.Garcia-Espa 6232 A.Garcia-Espa
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
AP                 AP                 AP                 FACI               FACI               6921 C.Cao         6921 C.Cao        
AP                 AP                 FACI               FACI               Xray CHECKOUT/6921 6921 C.Cao         6921 C.Cao        
AP                 AP                 FACI               FACI               6921 C.Cao         6921 C.Cao         6921 C.Cao        
BEAM   LINE 7-2  
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
8067 S.Webb/AP     AP                 AP                 8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 CHANGE/8092 D.Soka 8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 7-3  
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
6538 A.Duncan/AP   AP                 AP                 6824 B.Yu          6824 B.Yu          6147 D.Pan         6147 D.Pan        
AP                 AP                 Xray CHECKOUT/6824 6824 B.Yu          Xray CHECKOUT/6147 6147 D.Pan         Xray CHECKOUT/6618
AP                 AP                 6824 B.Yu          6824 B.Yu          6147 D.Pan         6147 D.Pan         6618 F.Bridges    
BEAM   LINE 9-3  
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
6793 R.Colina R/AP AP                 AP                 Unscheduled        Unscheduled        6470 A.Heyer       6470 A.Heyer      
AP                 AP                 Unscheduled        Unscheduled        Xray CHECKOUT/6470 6470 A.Heyer       6470 A.Heyer      
AP                 AP                 Unscheduled        Unscheduled        6470 A.Heyer       6470 A.Heyer       6470 A.Heyer      
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
6686 J.Chen/AP     AP                 AP                 6882 D.Pe          6882 D.Pe          6882 D.Pe          6882 D.Pe         
AP                 AP                 Xray CHECKOUT/6882 6882 D.Pe          6882 D.Pe          6882 D.Pe          6882 D.Pe         
AP                 AP                 6882 D.Pe          6882 D.Pe          6882 D.Pe          6882 D.Pe          6882 D.Pe         
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
6524 G.Druschel/AP AP                 AP                 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 15-2 
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
6998 A.Garcia-E/AP AP                 AP                 Unscheduled        6851 B.Charette    6851 B.Charette    6851 B.Charette   
AP                 AP                 Unscheduled        Xray CHECKOUT/6851 6851 B.Charette    6851 B.Charette    Xray CHECKOUT/6056
AP                 AP                 Unscheduled        6851 B.Charette    6851 B.Charette    6851 B.Charette    6056 V.Sharma     
BEAM   LINE 17-2 
Jun. 16, 2025      Jun. 17, 2025      Jun. 18, 2025      Jun. 19, 2025      Jun. 20, 2025      Jun. 21, 2025      Jun. 22, 2025     
6760 G.Harlow/AP   AP                 AP                 FACI               FACI               93M3 P.McIntyre    93M3 P.McIntyre   
AP                 AP                 FACI               FACI               Xray CHECKOUT/93M3 93M3 P.McIntyre    93M3 P.McIntyre   
AP                 AP                 FACI               FACI               93M3 P.McIntyre    93M3 P.McIntyre    93M3 P.McIntyre   

Back to Table of Contents

WEEK OF Jun. 23, 2025
                                         
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
BEAM   LINE 1-5  
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
9705 J.LiSA        FACI               FACI               FACI               FACI               8091 C.Tassone     8091 C.Tassone    
FACI               FACI               FACI               FACI               Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone    
FACI               FACI               FACI               FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
6429 H.Ramachandra 6429 H.Ramachandra 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
6429 H.Ramachandra Xray CHECKOUT/8010 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
6429 H.Ramachandra 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
BEAM   LINE 2-2  
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
6277 G.George      6655 C.Woltz       6655 C.Woltz       6655 C.Woltz       6626 S.Saslow      6626 S.Saslow      6626 S.Saslow     
CHANGE/6655 C.Wolt 6655 C.Woltz       6655 C.Woltz       CHANGE/6626 S.Sasl 6626 S.Saslow      6626 S.Saslow      6626 S.Saslow     
6655 C.Woltz       6655 C.Woltz       6655 C.Woltz       6626 S.Saslow      6626 S.Saslow      6626 S.Saslow      6626 S.Saslow     
BEAM   LINE 4-1  
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
8877 T.Matsui      12E0 R.Zarcone     Unscheduled        6702 Y.Na          6702 Y.Na          8877 T.Matsui      8877 T.Matsui     
CHANGE/12E0 R.Zarc Unscheduled        CHANGE/6702 Y.Na   6702 Y.Na          CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui     
12E0 R.Zarcone     Unscheduled        6702 Y.Na          6702 Y.Na          8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
6232 A.Garcia-Espa 6163 G.George      6163 G.George      6614 S.George      6614 S.George      6975 K.Lancaster   6975 K.Lancaster  
SMB CHECKOUT/6163  6163 G.George      SMB CHECKOUT/6614  6614 S.George      SMB CHECKOUT/6975  6975 K.Lancaster   6975 K.Lancaster  
6163 G.George      6163 G.George      6614 S.George      6614 S.George      6975 K.Lancaster   6975 K.Lancaster   6975 K.Lancaster  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
6921 C.Cao         6345 M.Preefer     6345 M.Preefer     6345 M.Preefer     6986 E.Savage      6986 E.Savage      6986 E.Savage     
Xray CHECKOUT/6345 6345 M.Preefer     6345 M.Preefer     CHANGE/6986 E.Sava 6986 E.Savage      6986 E.Savage      6986 E.Savage     
6345 M.Preefer     6345 M.Preefer     6345 M.Preefer     6986 E.Savage      6986 E.Savage      6986 E.Savage      6986 E.Savage     
BEAM   LINE 7-2  
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
8092 D.Sokaras     6394 B.Maki        6394 B.Maki        6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    6333 M.McNamara   
CHANGE/6394 B.Maki 6394 B.Maki        CHANGE/6333 M.McNa 6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    6333 M.McNamara   
6394 B.Maki        6394 B.Maki        6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    6333 M.McNamara   
BEAM   LINE 7-3  
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
6618 F.Bridges     6618 F.Bridges     6140 F.Bridges     6140 F.Bridges     6738 K.Chacon      6738 K.Chacon      6738 K.Chacon     
6618 F.Bridges     Xray CHECKOUT/6140 6140 F.Bridges     Xray CHECKOUT/6738 6738 K.Chacon      6738 K.Chacon      6738 K.Chacon     
6618 F.Bridges     6140 F.Bridges     6140 F.Bridges     6738 K.Chacon      6738 K.Chacon      6738 K.Chacon      6738 K.Chacon     
BEAM   LINE 9-3  
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
6470 A.Heyer       Unscheduled        6927 Y.Yang        6927 Y.Yang        6927 Y.Yang        6379 M.Abernathy   6379 M.Abernathy  
Unscheduled        Xray CHECKOUT/6927 6927 Y.Yang        6927 Y.Yang        Xray CHECKOUT/6379 6379 M.Abernathy   6379 M.Abernathy  
Unscheduled        6927 Y.Yang        6927 Y.Yang        6927 Y.Yang        6379 M.Abernathy   6379 M.Abernathy   6379 M.Abernathy  
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
6882 D.Pe          8095 K.Stone       8095 K.Stone       8095 K.Stone       6984 J.Ahn         6984 J.Ahn         6984 J.Ahn        
Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone       Xray CHECKOUT/6984 6984 J.Ahn         6984 J.Ahn         6984 J.Ahn        
8095 K.Stone       8095 K.Stone       8095 K.Stone       6984 J.Ahn         6984 J.Ahn         6984 J.Ahn         6984 J.Ahn        
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
8067 S.Webb        6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    6655 C.Woltz       6655 C.Woltz       6655 C.Woltz      
CHANGE/6333 M.McNa 6333 M.McNamara    6333 M.McNamara    CHANGE/6655 C.Wolt 6655 C.Woltz       6655 C.Woltz       6655 C.Woltz      
6333 M.McNamara    6333 M.McNamara    6333 M.McNamara    6655 C.Woltz       6655 C.Woltz       6655 C.Woltz       6655 C.Woltz      
BEAM   LINE 15-2 
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
6056 V.Sharma      6056 V.Sharma      6056 V.Sharma      6177 P.O'Day       6177 P.O'Day       6925 M.Graham      6925 M.Graham     
6056 V.Sharma      6056 V.Sharma      Xray CHECKOUT/6177 6177 P.O'Day       Xray CHECKOUT/6925 6925 M.Graham      6925 M.Graham     
6056 V.Sharma      6056 V.Sharma      6177 P.O'Day       6177 P.O'Day       6925 M.Graham      6925 M.Graham      6925 M.Graham     
BEAM   LINE 17-2 
Jun. 23, 2025      Jun. 24, 2025      Jun. 25, 2025      Jun. 26, 2025      Jun. 27, 2025      Jun. 28, 2025      Jun. 29, 2025     
93M3 P.McIntyre    FACI               FACI               6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon     
FACI               FACI               Xray CHECKOUT/6463 6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon     
FACI               FACI               6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon      6463 K.Harmon     

Back to Table of Contents

WEEK OF Jun. 30, 2025
                                         
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
BEAM   LINE 1-5  
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
8091 C.Tassone     6688 Y.Shi         6688 Y.Shi         6688 Y.Shi         Unscheduled        Unscheduled        Unscheduled       
Xray CHECKOUT/6688 6688 Y.Shi         6688 Y.Shi         6688 Y.Shi         Unscheduled        Unscheduled        Unscheduled       
6688 Y.Shi         6688 Y.Shi         6688 Y.Shi         Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
8010 N.Strange     6679 M.Cosby       6679 M.Cosby       6679 M.Cosby       6250 E.Mu          6250 E.Mu          6250 E.Mu         
Xray CHECKOUT/6679 6679 M.Cosby       6679 M.Cosby       Xray CHECKOUT/6250 6250 E.Mu          6250 E.Mu          6250 E.Mu         
6679 M.Cosby       6679 M.Cosby       6679 M.Cosby       6250 E.Mu          6250 E.Mu          6250 E.Mu          6250 E.Mu         
BEAM   LINE 2-2  
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
6626 S.Saslow      6629 D.Rodrigues   6629 D.Rodrigues   6629 D.Rodrigues   8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
CHANGE/6629 D.Rodr 6629 D.Rodrigues   6629 D.Rodrigues   CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
6629 D.Rodrigues   6629 D.Rodrigues   6629 D.Rodrigues   8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
BEAM   LINE 4-1  
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
8877 T.Matsui      12D3 E.Araujo      12D3 E.Araujo      12D3 E.Araujo      12D0 Z.Bu          12D0 Z.Bu          12D0 Z.Bu         
CHANGE/12D3 E.Arau 12D3 E.Araujo      12D3 E.Araujo      CHANGE/12D0 Z.Bu   12D0 Z.Bu          12D0 Z.Bu          12D0 Z.Bu         
12D3 E.Araujo      12D3 E.Araujo      12D3 E.Araujo      12D0 Z.Bu          12D0 Z.Bu          12D0 Z.Bu          12D0 Z.Bu         
BEAM   LINE 4-3  
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
6975 K.Lancaster   6975 K.Lancaster   6975 K.Lancaster   6870 R.Szilagyi    6870 R.Szilagyi    6870 R.Szilagyi    6870 R.Szilagyi   
6975 K.Lancaster   6975 K.Lancaster   SMB CHECKOUT/6870  6870 R.Szilagyi    6870 R.Szilagyi    6870 R.Szilagyi    6870 R.Szilagyi   
6975 K.Lancaster   6975 K.Lancaster   6870 R.Szilagyi    6870 R.Szilagyi    6870 R.Szilagyi    6870 R.Szilagyi    6870 R.Szilagyi   
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
6986 E.Savage      6723 H.Smith       6723 H.Smith       6723 H.Smith       6604 C.Crain       6604 C.Crain       6604 C.Crain      
Xray CHECKOUT/6723 6723 H.Smith       6723 H.Smith       Xray CHECKOUT/6604 6604 C.Crain       6604 C.Crain       6604 C.Crain      
6723 H.Smith       6723 H.Smith       6723 H.Smith       6604 C.Crain       6604 C.Crain       6604 C.Crain       6604 C.Crain      
BEAM   LINE 7-2  
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
6333 M.McNamara    6758 S.Tian        6758 S.Tian        6758 S.Tian        6615 L.Lu          6615 L.Lu          6615 L.Lu         
CHANGE/6758 S.Tian 6758 S.Tian        6758 S.Tian        CHANGE/6615 L.Lu   6615 L.Lu          6615 L.Lu          6615 L.Lu         
6758 S.Tian        6758 S.Tian        6758 S.Tian        6615 L.Lu          6615 L.Lu          6615 L.Lu          6615 L.Lu         
BEAM   LINE 7-3  
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
6738 K.Chacon      6738 K.Chacon      Unscheduled        Unscheduled        6758 S.Tian        6758 S.Tian        6758 S.Tian       
6738 K.Chacon      Unscheduled        Unscheduled        Xray CHECKOUT/6758 6758 S.Tian        6758 S.Tian        6758 S.Tian       
6738 K.Chacon      Unscheduled        Unscheduled        6758 S.Tian        6758 S.Tian        6758 S.Tian        6758 S.Tian       
BEAM   LINE 9-3  
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
6379 M.Abernathy   6379 M.Abernathy   6379 M.Abernathy   6975 K.Lancaster   6975 K.Lancaster   6975 K.Lancaster   6975 K.Lancaster  
6379 M.Abernathy   6379 M.Abernathy   Xray CHECKOUT/6975 6975 K.Lancaster   6975 K.Lancaster   6975 K.Lancaster   6975 K.Lancaster  
6379 M.Abernathy   6379 M.Abernathy   6975 K.Lancaster   6975 K.Lancaster   6975 K.Lancaster   6975 K.Lancaster   6975 K.Lancaster  
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
6984 J.Ahn         6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana 6765 Z.Xue         6765 Z.Xue        
Xray CHECKOUT/6843 6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana Xray CHECKOUT/6765 6765 Z.Xue         FACI              
6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana 6843 A.Maniyangana 6765 Z.Xue         6765 Z.Xue         FACI              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
6655 C.Woltz       93K3 S.Webb        93K3 S.Webb        93K3 S.Webb        8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
CHANGE/93K3 S.Webb 93K3 S.Webb        93K3 S.Webb        CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
93K3 S.Webb        93K3 S.Webb        93K3 S.Webb        8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
BEAM   LINE 15-2 
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
6925 M.Graham      6864 J.Gable       6864 J.Gable       6864 J.Gable       8898 T.Kroll       8898 T.Kroll       8898 T.Kroll      
Xray CHECKOUT/6864 6864 J.Gable       6864 J.Gable       Xray CHECKOUT/8898 8898 T.Kroll       8898 T.Kroll       8898 T.Kroll      
6864 J.Gable       6864 J.Gable       6864 J.Gable       8898 T.Kroll       8898 T.Kroll       8898 T.Kroll       8898 T.Kroll      
BEAM   LINE 17-2 
Jun. 30, 2025      Jul. 01, 2025      Jul. 02, 2025      Jul. 03, 2025      Jul. 04, 2025      Jul. 05, 2025      Jul. 06, 2025     
6463 K.Harmon      FACI               6391 J.Li          6391 J.Li          6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich  
FACI               Xray CHECKOUT/6391 6391 J.Li          Xray CHECKOUT/6457 6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich  
FACI               6391 J.Li          6391 J.Li          6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich   6457 G.Coslovich  

Back to Table of Contents

WEEK OF Jul. 07, 2025
                                         
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
BEAM   LINE 1-5  
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        6241 C.Salamat     6241 C.Salamat    
FACI               Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/6241 6241 C.Salamat     6241 C.Salamat    
FACI               Unscheduled        Unscheduled        Unscheduled        6241 C.Salamat     6241 C.Salamat     6241 C.Salamat    
BEAM   LINE 2-1  
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
6250 E.Mu          FACI               6604 C.Crain       6604 C.Crain       6604 C.Crain       8095 K.Stone       8095 K.Stone      
FACI               Xray CHECKOUT/6604 6604 C.Crain       6604 C.Crain       Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone      
FACI               6604 C.Crain       6604 C.Crain       6604 C.Crain       8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 2-2  
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
8019 J.Richardson  6903 M.Vejar       6903 M.Vejar       6718 E.Nuccio      6718 E.Nuccio      6812 T.Varga       6812 T.Varga      
CHANGE/6903 M.Veja 6903 M.Vejar       CHANGE/6718 E.Nucc 6718 E.Nuccio      CHANGE/6812 T.Varg 6812 T.Varga       6812 T.Varga      
6903 M.Vejar       6903 M.Vejar       6718 E.Nuccio      6718 E.Nuccio      6812 T.Varga       6812 T.Varga       6812 T.Varga      
BEAM   LINE 4-1  
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
12D0 Z.Bu          6765 Z.Xue         8047 T.Weiss       12E0 R.Zarcone     12C9 J.Rueben      12E2 P.Cavanagh    12E2 P.Cavanagh   
CHANGE/6765 Z.Xue  CHANGE/8047 T.Weis CHANGE/12E0 R.Zarc CHANGE/12C9 J.Rueb CHANGE/12E2 P.Cava 12E2 P.Cavanagh    12E2 P.Cavanagh   
6765 Z.Xue         8047 T.Weiss       12E0 R.Zarcone     12C9 J.Rueben      12E2 P.Cavanagh    12E2 P.Cavanagh    12E2 P.Cavanagh   
BEAM   LINE 4-3  
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
6870 R.Szilagyi    Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
6604 C.Crain       6707 A.Maurya      Unscheduled        8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
Xray CHECKOUT/6707 Unscheduled        Xray CHECKOUT/8090 8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
6707 A.Maurya      Unscheduled        8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 7-2  
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
6615 L.Lu          6531 A.Bhattacharj 6531 A.Bhattacharj 6531 A.Bhattacharj 8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
CHANGE/6531 A.Bhat 6531 A.Bhattacharj 6531 A.Bhattacharj CHANGE/8019 J.Rich 8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
6531 A.Bhattacharj 6531 A.Bhattacharj 6531 A.Bhattacharj 8019 J.Richardson  8019 J.Richardson  8019 J.Richardson  8019 J.Richardson 
BEAM   LINE 7-3  
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
6758 S.Tian        6615 L.Lu          6615 L.Lu          6615 L.Lu          6615 L.Lu          6744 D.Strawn      6744 D.Strawn     
Xray CHECKOUT/6615 6615 L.Lu          6615 L.Lu          6615 L.Lu          Xray CHECKOUT/6744 6744 D.Strawn      6744 D.Strawn     
6615 L.Lu          6615 L.Lu          6615 L.Lu          6615 L.Lu          6744 D.Strawn      6744 D.Strawn      6744 D.Strawn     
BEAM   LINE 9-3  
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
6975 K.Lancaster   FACI               6581 A.Brenner     6581 A.Brenner     6581 A.Brenner     6994 J.Chen        6994 J.Chen       
FACI               Xray CHECKOUT/6581 6581 A.Brenner     6581 A.Brenner     Xray CHECKOUT/6994 6994 J.Chen        6994 J.Chen       
FACI               6581 A.Brenner     6581 A.Brenner     6581 A.Brenner     6994 J.Chen        6994 J.Chen        6994 J.Chen       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
FACI               6222 S.Hesse       93K9 D.Dede        93K9 D.Dede        6788 A.Magni       6241 C.Salamat     6241 C.Salamat    
FACI               6222 S.Hesse       93K9 D.Dede        Xray CHECKOUT/6788 Xray CHECKOUT/6241 6241 C.Salamat     6241 C.Salamat    
CHANGE/6222 S.Hess CHANGE/93K9 D.Dede 93K9 D.Dede        6788 A.Magni       6241 C.Salamat     6241 C.Salamat     6241 C.Salamat    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
Unscheduled        6978 G.Nkala       6978 G.Nkala       6842 B.Poulter     6842 B.Poulter     6040 B.Wan         6040 B.Wan        
SMB CHECKOUT/6978  6978 G.Nkala       SMB CHECKOUT/6842  6842 B.Poulter     SMB CHECKOUT/6040  6040 B.Wan         6040 B.Wan        
6978 G.Nkala       6978 G.Nkala       6842 B.Poulter     6842 B.Poulter     6040 B.Wan         6040 B.Wan         6040 B.Wan        
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
8019 J.Richardson  Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
8898 T.Kroll       Unscheduled        8092 D.Sokaras     8092 D.Sokaras     Unscheduled        6212 U.Bergmann    6212 U.Bergmann   
Unscheduled        Xray CHECKOUT/8092 8092 D.Sokaras     Unscheduled        Xray CHECKOUT/6212 6212 U.Bergmann    6212 U.Bergmann   
Unscheduled        8092 D.Sokaras     8092 D.Sokaras     Unscheduled        6212 U.Bergmann    6212 U.Bergmann    6212 U.Bergmann   
BEAM   LINE 17-2 
Jul. 07, 2025      Jul. 08, 2025      Jul. 09, 2025      Jul. 10, 2025      Jul. 11, 2025      Jul. 12, 2025      Jul. 13, 2025     
6457 G.Coslovich   Unscheduled        Unscheduled        8062 M.Preefer     8062 M.Preefer     8062 M.Preefer     8062 M.Preefer    
Unscheduled        Unscheduled        Xray CHECKOUT/8062 8062 M.Preefer     8062 M.Preefer     8062 M.Preefer     8062 M.Preefer    
Unscheduled        Unscheduled        8062 M.Preefer     8062 M.Preefer     8062 M.Preefer     8062 M.Preefer     8062 M.Preefer    

Back to Table of Contents

WEEK OF Jul. 14, 2025
                                         
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
BEAM   LINE 1-5  
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
6241 C.Salamat/AP  AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
8095 K.Stone/AP    AP                 AP                 6605 P.Welander    6605 P.Welander    6605 P.Welander    6605 P.Welander   
AP                 AP                 6605 P.Welander    6605 P.Welander    6605 P.Welander    6605 P.Welander    6605 P.Welander   
AP                 AP                 6605 P.Welander    6605 P.Welander    6605 P.Welander    6605 P.Welander    6605 P.Welander   
BEAM   LINE 2-2  
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
6812 T.Varga/AP    AP                 AP                 93K3 S.Webb        93K3 S.Webb        6538 A.Duncan      6538 A.Duncan     
AP                 AP                 CHANGE/93K3 S.Webb 93K3 S.Webb        CHANGE/6538 A.Dunc 6538 A.Duncan      6538 A.Duncan     
AP                 AP                 93K3 S.Webb        93K3 S.Webb        6538 A.Duncan      6538 A.Duncan      6538 A.Duncan     
BEAM   LINE 4-1  
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
12E2 P.Cavanagh/AP AP                 AP                 12E2 P.Cavanagh    12E2 P.Cavanagh    6388 W.Luo         6388 W.Luo        
AP                 AP                 12E2 P.Cavanagh    12E2 P.Cavanagh    CHANGE/6388 W.Luo  6388 W.Luo         6388 W.Luo        
AP                 AP                 12E2 P.Cavanagh    12E2 P.Cavanagh    6388 W.Luo         6388 W.Luo         6388 W.Luo        
BEAM   LINE 4-3  
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
AP                 AP                 AP                 6194 M.Liu         6194 M.Liu         6770 L.Mu          6770 L.Mu         
AP                 AP                 6194 M.Liu         6194 M.Liu         SMB CHECKOUT/6770  6770 L.Mu          6770 L.Mu         
AP                 AP                 6194 M.Liu         6194 M.Liu         6770 L.Mu          6770 L.Mu          6770 L.Mu         
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
AP                 AP                 AP                 6675 C.Cao         6675 C.Cao         8090 J.Nelson Weke 8090 J.Nelson Weke
AP                 AP                 Xray CHECKOUT/6675 6675 C.Cao         Xray CHECKOUT/8090 8090 J.Nelson Weke 8090 J.Nelson Weke
AP                 AP                 6675 C.Cao         6675 C.Cao         8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
8090 J.Nelson W/AP AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
8019 J.Richards/AP AP                 AP                 93K3 S.Webb        93K3 S.Webb        6071 M.Pushie      6071 M.Pushie     
AP                 AP                 CHANGE/93K3 S.Webb 93K3 S.Webb        CHANGE/6071 M.Push 6071 M.Pushie      6071 M.Pushie     
AP                 AP                 93K3 S.Webb        93K3 S.Webb        6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
BEAM   LINE 7-3  
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
6744 D.Strawn/AP   AP                 AP                 6399 K.Haas        6399 K.Haas        6399 K.Haas        6399 K.Haas       
AP                 AP                 Xray CHECKOUT/6399 6399 K.Haas        6399 K.Haas        6399 K.Haas        6399 K.Haas       
AP                 AP                 6399 K.Haas        6399 K.Haas        6399 K.Haas        6399 K.Haas        6399 K.Haas       
BEAM   LINE 9-3  
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
6994 J.Chen/AP     AP                 AP                 6147 D.Pan         6147 D.Pan         6619 R.Baumbach    6619 R.Baumbach   
AP                 AP                 Xray CHECKOUT/6147 6147 D.Pan         Xray CHECKOUT/6619 6619 R.Baumbach    6619 R.Baumbach   
AP                 AP                 6147 D.Pan         6147 D.Pan         6619 R.Baumbach    6619 R.Baumbach    6619 R.Baumbach   
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
6241 C.Salamat/AP  AP                 AP                 8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     8907 M.Preefer    
AP                 AP                 8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     8907 M.Preefer    
AP                 AP                 8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     8907 M.Preefer     8907 M.Preefer    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
6040 B.Wan/AP      AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
AP                 AP                 AP                 FACI               6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
AP                 AP                 FACI               CHANGE/6071 M.Push 6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
AP                 AP                 FACI               6071 M.Pushie      6071 M.Pushie      6071 M.Pushie      6071 M.Pushie     
BEAM   LINE 15-2 
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
6212 U.Bergmann/AP AP                 AP                 8053 D.Nordlund    8053 D.Nordlund    8053 D.Nordlund    6943 D.Eum        
AP                 AP                 8053 D.Nordlund    8053 D.Nordlund    8053 D.Nordlund    Xray CHECKOUT/6943 6943 D.Eum        
AP                 AP                 8053 D.Nordlund    8053 D.Nordlund    8053 D.Nordlund    6943 D.Eum         6943 D.Eum        
BEAM   LINE 17-2 
Jul. 14, 2025      Jul. 15, 2025      Jul. 16, 2025      Jul. 17, 2025      Jul. 18, 2025      Jul. 19, 2025      Jul. 20, 2025     
8062 M.Preefer/AP  AP                 AP                 FACI               7002 J.Baniecki    7002 J.Baniecki    7002 J.Baniecki   
AP                 AP                 FACI               Xray CHECKOUT/7002 7002 J.Baniecki    7002 J.Baniecki    7002 J.Baniecki   
AP                 AP                 FACI               7002 J.Baniecki    7002 J.Baniecki    7002 J.Baniecki    7002 J.Baniecki   

Back to Table of Contents

WEEK OF Jul. 21, 2025
                                         
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
BEAM   LINE 1-5  
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
Unscheduled        8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       Unscheduled        Unscheduled       
Xray CHECKOUT/8061 8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       Unscheduled        Unscheduled        Unscheduled       
8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       8061 S.Hesse       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
6605 P.Welander    FACI               6161 J.Finzel      6161 J.Finzel      FACI               8095 K.Stone       8095 K.Stone      
FACI               Xray CHECKOUT/6161 6161 J.Finzel      FACI               Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone      
FACI               6161 J.Finzel      6161 J.Finzel      FACI               8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 2-2  
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
6538 A.Duncan      6915 T.Tkesheliadz 6915 T.Tkesheliadz 6915 T.Tkesheliadz 8062 M.Preefer     8062 M.Preefer     8062 M.Preefer    
CHANGE/6915 T.Tkes 6915 T.Tkesheliadz 6915 T.Tkesheliadz CHANGE/8062 M.Pree 8062 M.Preefer     8062 M.Preefer     8062 M.Preefer    
6915 T.Tkesheliadz 6915 T.Tkesheliadz 6915 T.Tkesheliadz 8062 M.Preefer     8062 M.Preefer     8062 M.Preefer     8062 M.Preefer    
BEAM   LINE 4-1  
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
6388 W.Luo         6057 D.Mai         6057 D.Mai         RA                 12E4 A.Chretien    12E4 A.Chretien    8877 T.Matsui     
CHANGE/6057 D.Mai  6057 D.Mai         RA                 CHANGE/12E4 A.Chre 12E4 A.Chretien    CHANGE/8877 T.Mats 8877 T.Matsui     
6057 D.Mai         6057 D.Mai         RA                 12E4 A.Chretien    12E4 A.Chretien    8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
6770 L.Mu          6838 S.Singh       6838 S.Singh       6838 S.Singh       6838 S.Singh       8092 D.Sokaras     8092 D.Sokaras    
SMB CHECKOUT/6838  6838 S.Singh       6838 S.Singh       6838 S.Singh       SMB CHECKOUT/8092  8092 D.Sokaras     8092 D.Sokaras    
6838 S.Singh       6838 S.Singh       6838 S.Singh       6838 S.Singh       8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
8090 J.Nelson Weke Unscheduled        FACI               FACI               6964 J.Wacker      6964 J.Wacker      6964 J.Wacker     
8090 J.Nelson Weke FACI               FACI               Xray CHECKOUT/6964 6964 J.Wacker      6964 J.Wacker      6964 J.Wacker     
Unscheduled        FACI               FACI               6964 J.Wacker      6964 J.Wacker      6964 J.Wacker      6964 J.Wacker     
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
6071 M.Pushie      6071 M.Pushie      6974 A.Grigg       6974 A.Grigg       6974 A.Grigg       6394 B.Maki        6394 B.Maki       
6071 M.Pushie      CHANGE/6974 A.Grig 6974 A.Grigg       6974 A.Grigg       CHANGE/6394 B.Maki 6394 B.Maki        6394 B.Maki       
6071 M.Pushie      6974 A.Grigg       6974 A.Grigg       6974 A.Grigg       6394 B.Maki        6394 B.Maki        6394 B.Maki       
BEAM   LINE 7-3  
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
6399 K.Haas        Unscheduled        Unscheduled        Unscheduled        6919 K.Rush        6919 K.Rush        6919 K.Rush       
Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/6919 6919 K.Rush        6919 K.Rush        6919 K.Rush       
Unscheduled        Unscheduled        Unscheduled        6919 K.Rush        6919 K.Rush        6919 K.Rush        6919 K.Rush       
BEAM   LINE 9-3  
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
6619 R.Baumbach    6619 R.Baumbach    6976 A.Peccia      6976 A.Peccia      6976 A.Peccia      Unscheduled        Unscheduled       
6619 R.Baumbach    Xray CHECKOUT/6976 6976 A.Peccia      6976 A.Peccia      Unscheduled        Unscheduled        Unscheduled       
6619 R.Baumbach    6976 A.Peccia      6976 A.Peccia      6976 A.Peccia      Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
8907 M.Preefer     6911 M.Dixit       6911 M.Dixit       6911 M.Dixit       6911 M.Dixit       6993 A.Geslin      6993 A.Geslin     
Xray CHECKOUT/6911 6911 M.Dixit       6911 M.Dixit       6911 M.Dixit       Xray CHECKOUT/6993 6993 A.Geslin      6993 A.Geslin     
6911 M.Dixit       6911 M.Dixit       6911 M.Dixit       6911 M.Dixit       6993 A.Geslin      6993 A.Geslin      6993 A.Geslin     
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
6071 M.Pushie      6812 T.Varga       6812 T.Varga       6812 T.Varga       6915 T.Tkesheliadz 6915 T.Tkesheliadz 6915 T.Tkesheliadz
CHANGE/6812 T.Varg 6812 T.Varga       6812 T.Varga       Xray CHECKOUT/6915 6915 T.Tkesheliadz 6915 T.Tkesheliadz 6915 T.Tkesheliadz
6812 T.Varga       6812 T.Varga       6812 T.Varga       6915 T.Tkesheliadz 6915 T.Tkesheliadz 6915 T.Tkesheliadz 6915 T.Tkesheliadz
BEAM   LINE 15-2 
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
6943 D.Eum         6943 D.Eum         6514 O.Paredes Mel 6514 O.Paredes Mel 6514 O.Paredes Mel 6838 S.Singh       6838 S.Singh      
6943 D.Eum         Xray CHECKOUT/6514 6514 O.Paredes Mel 6514 O.Paredes Mel Xray CHECKOUT/6838 6838 S.Singh       6838 S.Singh      
6943 D.Eum         6514 O.Paredes Mel 6514 O.Paredes Mel 6514 O.Paredes Mel 6838 S.Singh       6838 S.Singh       6838 S.Singh      
BEAM   LINE 17-2 
Jul. 21, 2025      Jul. 22, 2025      Jul. 23, 2025      Jul. 24, 2025      Jul. 25, 2025      Jul. 26, 2025      Jul. 27, 2025     
7002 J.Baniecki    7002 J.Baniecki    FACI               FACI               FACI               6711 N.Strange     6711 N.Strange    
7002 J.Baniecki    FACI               FACI               FACI               Xray CHECKOUT/6711 6711 N.Strange     6711 N.Strange    
7002 J.Baniecki    FACI               FACI               FACI               6711 N.Strange     6711 N.Strange     6711 N.Strange    

Back to Table of Contents

WEEK OF Jul. 28, 2025
                                         
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
BEAM   LINE 1-5  
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
8095 K.Stone/AP    AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
8062 M.Preefer/AP  AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
8877 T.Matsui/AP   AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
8092 D.Sokaras/AP  AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
6964 J.Wacker/AP   AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
6394 B.Maki/AP     AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
6919 K.Rush/AP     AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
6993 A.Geslin/AP   AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
6915 T.Tkesheli/AP AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
6838 S.Singh/AP    AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Jul. 28, 2025      Jul. 29, 2025      Jul. 30, 2025      Jul. 31, 2025      Aug. 01, 2025      Aug. 02, 2025      Aug. 03, 2025     
6711 N.Strange/AP  AP/DOWN            DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN