X-ray beam lines are scheduled in three 8-hour shifts each day (11pm-7am; 7am-3pm; 3-11pm). Checkouts/changeovers are scheduled during the 7am-3pm shift. Most X-ray beam lines officially turn over to the next user much earlier than 3pm depending on the equipment requirements and staff availability. At least 1 week prior to arrival, users need to contact the designated beam line engineer/scientist (see SSRL Beam Lines by Number for contact information) to discuss beam line configuration needs and start times. Unless instructed otherwise, experiments end at 7am (6am when Maintenance (MA) or Accelerator Physics (AP) are scheduled). |
WEEK OF Oct. 17, 2022 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
BEAM LINE 1-5 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Oct. 17, 2022 | Oct. 18, 2022 | Oct. 19, 2022 | Oct. 20, 2022 | Oct. 21, 2022 | Oct. 22, 2022 | Oct. 23, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Oct. 24, 2022 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
BEAM LINE 1-5 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 2-1 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 2-2 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | FACI | FACI | 8226 R.Sarangi | 6160 M.Polizzotto | 6160 M.Polizzotto | 6160 M.Polizzotto |
FACI | FACI | CHANGE/8226 R.Sara | CHANGE/6160 M.Poli | 6160 M.Polizzotto | 6160 M.Polizzotto | 6160 M.Polizzotto |
FACI | FACI | 8226 R.Sarangi | 6160 M.Polizzotto | 6160 M.Polizzotto | 6160 M.Polizzotto | 6160 M.Polizzotto |
BEAM LINE 4-1 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | FACI | FACI | 8099 S.Bare | 8099 S.Bare | 5543 B.Gates | 5543 B.Gates |
FACI | FACI | CHANGE/8099 S.Bare | 8099 S.Bare | CHANGE/5543 B.Gate | 5543 B.Gates | 5543 B.Gates |
FACI | FACI | 8099 S.Bare | 8099 S.Bare | 5543 B.Gates | 5543 B.Gates | 5543 B.Gates |
BEAM LINE 4-2 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui |
CHANGE/8877 T.Mats | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui |
8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | FACI | FACI | 6160 M.Polizzotto | 6160 M.Polizzotto | 5903 W.Tong | 5903 W.Tong |
FACI | FACI | SMB CHECKOUT/6160 | 6160 M.Polizzotto | SMB CHECKOUT/5903 | 5903 W.Tong | 5903 W.Tong |
FACI | FACI | 6160 M.Polizzotto | 6160 M.Polizzotto | 5903 W.Tong | 5903 W.Tong | 5903 W.Tong |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | 8881 Y.Liu | 8881 Y.Liu |
DOWN | DOWN | DOWN | DOWN | DOWN | 8881 Y.Liu | 8881 Y.Liu |
DOWN | DOWN | DOWN | DOWN | CHANGE/8881 Y.Liu | 8881 Y.Liu | 8881 Y.Liu |
BEAM LINE 7-2 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | DOWN | DOWN | Unscheduled | 6091 M.Zeineh | 6091 M.Zeineh | 6091 M.Zeineh |
DOWN | DOWN | Unscheduled | CHANGE/6091 M.Zein | 6091 M.Zeineh | 6091 M.Zeineh | 6091 M.Zeineh |
DOWN | DOWN | Unscheduled | 6091 M.Zeineh | 6091 M.Zeineh | 6091 M.Zeineh | 6091 M.Zeineh |
BEAM LINE 7-3 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | FACI | FACI | 8226 R.Sarangi | 8226 R.Sarangi | 5764 C.Lee | 5764 C.Lee |
FACI | FACI | SMB CHECKOUT/8226 | 8226 R.Sarangi | CHECKOUT/5764 | 5764 C.Lee | 5764 C.Lee |
FACI | FACI | 8226 R.Sarangi | 8226 R.Sarangi | 5764 C.Lee | 5764 C.Lee | 5764 C.Lee |
BEAM LINE 9-3 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | Unscheduled | Unscheduled | 6061 M.Muehe | 6061 M.Muehe | 6178 A.Cordones-Ha | 6178 A.Cordones-Ha |
Unscheduled | Unscheduled | SMB CHECKOUT/6061 | 6061 M.Muehe | SMB CHECKOUT/6178 | 6178 A.Cordones-Ha | 6178 A.Cordones-Ha |
Unscheduled | Unscheduled | 6061 M.Muehe | 6061 M.Muehe | 6178 A.Cordones-Ha | 6178 A.Cordones-Ha | 6178 A.Cordones-Ha |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | FACI | FACI | FACI | FACI | 8814 A.Hoffman | 8814 A.Hoffman |
FACI | FACI | FACI | FACI | CHANGE/8814 A.Hoff | 8814 A.Hoffman | 8814 A.Hoffman |
FACI | FACI | FACI | FACI | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman |
BEAM LINE 11-2 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | FACI | FACI | 5894 M.Raven | 5894 M.Raven | 5894 M.Raven | 6226 M.Crotteau |
FACI | FACI | CHANGE/5894 M.Rave | 5894 M.Raven | 5894 M.Raven | CHANGE/6226 M.Crot | 6226 M.Crotteau |
FACI | FACI | 5894 M.Raven | 5894 M.Raven | 5894 M.Raven | 6226 M.Crotteau | 6226 M.Crotteau |
BEAM LINE 15-2 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | COMM | COMM | COMM | COMM | 8898 T.Kroll | 8898 T.Kroll |
COMM | COMM | COMM | COMM | CHANGE/8898 T.Krol | 8898 T.Kroll | 8898 T.Kroll |
COMM | COMM | COMM | COMM | 8898 T.Kroll | 8898 T.Kroll | 8898 T.Kroll |
BEAM LINE 17-2 | ||||||
Oct. 24, 2022 | Oct. 25, 2022 | Oct. 26, 2022 | Oct. 27, 2022 | Oct. 28, 2022 | Oct. 29, 2022 | Oct. 30, 2022 |
DOWN | DOWN | DOWN | DOWN | COMM | COMM | COMM |
DOWN | DOWN | DOWN | COMM | COMM | COMM | COMM |
DOWN | DOWN | DOWN | COMM | COMM | COMM | COMM |
WEEK OF Oct. 31, 2022 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
BEAM LINE 1-5 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 2-1 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
FACI | 5778 E.Mu | 5778 E.Mu | FACI | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
Xray CHECKOUT/5778 | 5778 E.Mu | FACI | Xray CHECKOUT/9705 | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
5778 E.Mu | 5778 E.Mu | FACI | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
BEAM LINE 2-2 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
6160 M.Polizzotto | 6237 S.Shulda | 6237 S.Shulda | 6237 S.Shulda | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
CHANGE/6237 S.Shul | 6237 S.Shulda | 6237 S.Shulda | CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
6237 S.Shulda | 6237 S.Shulda | 6237 S.Shulda | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 4-1 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
5543 B.Gates | 5666 L.Chen | 5666 L.Chen | 5666 L.Chen | Unscheduled | 5743 M.Zhu | 5743 M.Zhu |
Unscheduled | 5666 L.Chen | 5666 L.Chen | Unscheduled | SMB CHECKOUT/5743 | 5743 M.Zhu | 5743 M.Zhu |
CHANGE/5666 L.Chen | 5666 L.Chen | 5666 L.Chen | Unscheduled | 5743 M.Zhu | 5743 M.Zhu | 5743 M.Zhu |
BEAM LINE 4-2 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
8877 T.Matsui | 8877 T.Matsui | 5928 T.Szyperski | 5928 T.Szyperski | 5928 T.Szyperski | 8047 T.Weiss | 8877 T.Matsui |
8877 T.Matsui | CHANGE/5928 T.Szyp | 5928 T.Szyperski | 5928 T.Szyperski | CHANGE/8047 T.Weis | CHANGE/8877 T.Mats | 8877 T.Matsui |
8877 T.Matsui | 5928 T.Szyperski | 5928 T.Szyperski | 5928 T.Szyperski | 8047 T.Weiss | 8877 T.Matsui | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
5903 W.Tong | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor |
SMB CHECKOUT/5555 | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor |
5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | CHANGE/5555 S.Kozi | 5555 S.Kozimor | 5555 S.Kozimor |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
8881 Y.Liu | 6119 F.Yang | 6119 F.Yang | 6119 F.Yang | 8890 J.Nelson Weke | 5844 X.Zheng | 5844 X.Zheng |
CHANGE/6119 F.Yang | 6119 F.Yang | 6119 F.Yang | CHANGE/8890 J.Nels | CHANGE/5844 X.Zhen | 5844 X.Zheng | 5844 X.Zheng |
6119 F.Yang | 6119 F.Yang | 6119 F.Yang | 8890 J.Nelson Weke | 5844 X.Zheng | 5844 X.Zheng | 5844 X.Zheng |
BEAM LINE 7-2 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
6091 M.Zeineh | 6095 L.Paulus | 6095 L.Paulus | 6095 L.Paulus | 6095 L.Paulus | 6089 J.Chorover | 6089 J.Chorover |
CHANGE/6095 L.Paul | 6095 L.Paulus | 6095 L.Paulus | 6095 L.Paulus | CHANGE/6089 J.Chor | 6089 J.Chorover | 6089 J.Chorover |
6095 L.Paulus | 6095 L.Paulus | 6095 L.Paulus | 6095 L.Paulus | 6089 J.Chorover | 6089 J.Chorover | 6089 J.Chorover |
BEAM LINE 7-3 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
5764 C.Lee | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 9-3 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
6178 A.Cordones-Ha | 6109 H.Shafaat | 6109 H.Shafaat | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn |
SMB CHECKOUT/6109 | 6109 H.Shafaat | SMB CHECKOUT/5901 | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn |
6109 H.Shafaat | 6109 H.Shafaat | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman |
8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman |
8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman |
BEAM LINE 11-2 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
DOWN | 6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | 5586 D.Olive | 5639 J.Catalano | 5639 J.Catalano |
SMB CHECKOUT/6121 | 6121 S.Hickam | 6121 S.Hickam | SMB CHECKOUT/5586 | SMB CHECKOUT/5639 | 5639 J.Catalano | 5639 J.Catalano |
6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | 5586 D.Olive | 5639 J.Catalano | 5639 J.Catalano | 5639 J.Catalano |
BEAM LINE 11-3 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
6226 M.Crotteau | 6226 M.Crotteau | 6089 J.Chorover | 6089 J.Chorover | 6089 J.Chorover | 5320 H.Steinrueck | 5320 H.Steinrueck |
6226 M.Crotteau | CHANGE/6089 J.Chor | 6089 J.Chorover | 6089 J.Chorover | CHANGE/5320 H.Stei | 5320 H.Steinrueck | 5320 H.Steinrueck |
6226 M.Crotteau | 6089 J.Chorover | 6089 J.Chorover | 6089 J.Chorover | 5320 H.Steinrueck | 5320 H.Steinrueck | 5320 H.Steinrueck |
BEAM LINE 15-2 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
8898 T.Kroll | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras | STUP | COMM | COMM |
CHANGE/8092 D.Soka | 8092 D.Sokaras | 8092 D.Sokaras | STUP | COMM | COMM | COMM |
8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras | STUP | COMM | COMM | COMM |
BEAM LINE 17-2 | ||||||
Oct. 31, 2022 | Nov. 01, 2022 | Nov. 02, 2022 | Nov. 03, 2022 | Nov. 04, 2022 | Nov. 05, 2022 | Nov. 06, 2022 |
COMM | COMM | COMM | COMM | COMM | COMM | COMM |
COMM | COMM | COMM | COMM | COMM | COMM | COMM |
COMM | COMM | COMM | COMM | COMM | COMM | COMM |
WEEK OF Nov. 07, 2022 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
BEAM LINE 1-5 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
FACI | FACI | FACI | FACI | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
FACI | FACI | FACI | Xray CHECKOUT/9705 | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
FACI | FACI | FACI | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
BEAM LINE 2-1 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
9705 J.LiSA | 5997 C.Hahn | 5997 C.Hahn | FACI | FACI | FACI | FACI |
Xray CHECKOUT/5997 | 5997 C.Hahn | 5997 C.Hahn | FACI | FACI | FACI | FACI |
5997 C.Hahn | 5997 C.Hahn | 5997 C.Hahn | FACI | FACI | FACI | FACI |
BEAM LINE 2-2 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
8067 S.Webb | 6089 J.Chorover | 6089 J.Chorover | 6089 J.Chorover | 6089 J.Chorover | 5735 A.Bhattacharj | 5735 A.Bhattacharj |
CHANGE/6089 J.Chor | 6089 J.Chorover | 6089 J.Chorover | 6089 J.Chorover | CHANGE/5735 A.Bhat | 5735 A.Bhattacharj | 5735 A.Bhattacharj |
6089 J.Chorover | 6089 J.Chorover | 6089 J.Chorover | 6089 J.Chorover | 5735 A.Bhattacharj | 5735 A.Bhattacharj | 5735 A.Bhattacharj |
BEAM LINE 4-1 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
5743 M.Zhu | 5472 P.O'Day | 5472 P.O'Day | 6047 J.Catalano | 6047 J.Catalano | 6140 F.Bridges | 6140 F.Bridges |
SMB CHECKOUT/5472 | 5472 P.O'Day | SMB CHECKOUT/6047 | 6047 J.Catalano | SMB CHECKOUT/6140 | 6140 F.Bridges | 6140 F.Bridges |
5472 P.O'Day | 5472 P.O'Day | 6047 J.Catalano | 6047 J.Catalano | 6140 F.Bridges | 6140 F.Bridges | 6140 F.Bridges |
BEAM LINE 4-2 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
8877 T.Matsui | 8877 T.Matsui | RA | 5119 G.Wong | 5119 G.Wong | 5119 G.Wong | 5504 Y.Srinivasan |
8877 T.Matsui | RA | CHANGE/5119 G.Wong | 5119 G.Wong | 5119 G.Wong | CHANGE/5504 Y.Srin | 5504 Y.Srinivasan |
8877 T.Matsui | RA | 5119 G.Wong | 5119 G.Wong | 5119 G.Wong | 5504 Y.Srinivasan | 5504 Y.Srinivasan |
BEAM LINE 4-3 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
5555 S.Kozimor | 6069 C.Van Stappen | 6069 C.Van Stappen | 6069 C.Van Stappen | 90H3 V.Noel | 90H3 V.Noel | 90H3 V.Noel |
SMB CHECKOUT/6069 | 6069 C.Van Stappen | 6069 C.Van Stappen | SMB CHECKOUT/90H3 | 90H3 V.Noel | 90H3 V.Noel | 90H3 V.Noel |
6069 C.Van Stappen | 6069 C.Van Stappen | 6069 C.Van Stappen | 90H3 V.Noel | 90H3 V.Noel | 90H3 V.Noel | 90H3 V.Noel |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
5844 X.Zheng | 6237 S.Shulda | 6237 S.Shulda | 5749 L.Carnevale | 5749 L.Carnevale | 5749 L.Carnevale | 5749 L.Carnevale |
CHANGE/6237 S.Shul | 6237 S.Shulda | CHANGE/5749 L.Carn | 5749 L.Carnevale | 5749 L.Carnevale | 5749 L.Carnevale | 5749 L.Carnevale |
6237 S.Shulda | 6237 S.Shulda | 5749 L.Carnevale | 5749 L.Carnevale | 5749 L.Carnevale | 5749 L.Carnevale | 5749 L.Carnevale |
BEAM LINE 7-2 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
6089 J.Chorover | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson | 6210 A.Kravchenko | 6210 A.Kravchenko | 6210 A.Kravchenko |
CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson | CHANGE/6210 A.Krav | 6210 A.Kravchenko | 6210 A.Kravchenko | 6210 A.Kravchenko |
8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson | 6210 A.Kravchenko | 6210 A.Kravchenko | 6210 A.Kravchenko | 6210 A.Kravchenko |
BEAM LINE 7-3 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 9-3 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
5901 J.Penner-Hahn | 5636 L.Gee | 5636 L.Gee | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn |
SMB CHECKOUT/5636 | 5636 L.Gee | SMB CHECKOUT/5480 | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn |
5636 L.Gee | 5636 L.Gee | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman |
8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman |
8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman | 8814 A.Hoffman |
BEAM LINE 11-2 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
5639 J.Catalano | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor |
SMB CHECKOUT/5555 | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor |
5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | CHANGE/5555 S.Kozi | 5555 S.Kozimor | 5555 S.Kozimor |
BEAM LINE 11-3 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
5320 H.Steinrueck | 5735 A.Bhattacharj | 5735 A.Bhattacharj | 5735 A.Bhattacharj | 5735 A.Bhattacharj | 8019 J.Richardson | 8019 J.Richardson |
CHANGE/5735 A.Bhat | 5735 A.Bhattacharj | 5735 A.Bhattacharj | 5735 A.Bhattacharj | CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson |
5735 A.Bhattacharj | 5735 A.Bhattacharj | 5735 A.Bhattacharj | 5735 A.Bhattacharj | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
BEAM LINE 15-2 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
COMM | STUP | STUP | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
STUP | STUP | CHANGE/9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
STUP | STUP | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
BEAM LINE 17-2 | ||||||
Nov. 07, 2022 | Nov. 08, 2022 | Nov. 09, 2022 | Nov. 10, 2022 | Nov. 11, 2022 | Nov. 12, 2022 | Nov. 13, 2022 |
COMM | COMM | COMM | COMM | COMM | COMM | COMM |
COMM | COMM | COMM | COMM | COMM | COMM | COMM |
COMM | COMM | COMM | COMM | COMM | COMM | COMM |
WEEK OF Nov. 14, 2022 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
BEAM LINE 1-5 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
9705 J.LiSA/AP | AP | AP | FACI | FACI | Unscheduled | Unscheduled |
AP | AP | FACI | FACI | Unscheduled | Unscheduled | Unscheduled |
AP | AP | FACI | FACI | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 2-1 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
FACI/AP | AP | AP | 5683 Z.Jiang | 5683 Z.Jiang | 5998 V.Augustyn | 5998 V.Augustyn |
AP | AP | Xray CHECKOUT/5683 | 5683 Z.Jiang | Xray CHECKOUT/5998 | 5998 V.Augustyn | 5998 V.Augustyn |
AP | AP | 5683 Z.Jiang | 5683 Z.Jiang | 5998 V.Augustyn | 5998 V.Augustyn | 5998 V.Augustyn |
BEAM LINE 2-2 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
5735 A.Bhattach/AP | AP | AP | 5898 Q.Zhao | 5898 Q.Zhao | 6066 A.Foster | 6066 A.Foster |
AP | AP | CHANGE/5898 Q.Zhao | 5898 Q.Zhao | CHANGE/6066 A.Fost | 6066 A.Foster | 6066 A.Foster |
AP | AP | 5898 Q.Zhao | 5898 Q.Zhao | 6066 A.Foster | 6066 A.Foster | 6066 A.Foster |
BEAM LINE 4-1 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
6140 F.Bridges/AP | AP | AP | 6147 F.Bridges | 6147 F.Bridges | 5945 E.Mu | 5945 E.Mu |
AP | AP | SMB CHECKOUT/6147 | 6147 F.Bridges | SMB CHECKOUT/5945 | 5945 E.Mu | 5945 E.Mu |
AP | AP | 6147 F.Bridges | 6147 F.Bridges | 5945 E.Mu | 5945 E.Mu | 5945 E.Mu |
BEAM LINE 4-2 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
5504 Y.Srinivas/AP | AP | AP | 8877 T.Matsui | 6193 J.Nielsen | 8092 D.Sokaras | 8092 D.Sokaras |
AP | AP | CHANGE/8877 T.Mats | CHANGE/6193 J.Niel | CHANGE/8092 D.Soka | 8092 D.Sokaras | 8092 D.Sokaras |
AP | AP | 8877 T.Matsui | 6193 J.Nielsen | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras |
BEAM LINE 4-3 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
90H3 V.Noel/AP | AP | AP | Unscheduled | Unscheduled | 5889 M.Kirk | 5889 M.Kirk |
AP | AP | Unscheduled | Unscheduled | SMB CHECKOUT/5889 | 5889 M.Kirk | 5889 M.Kirk |
AP | AP | Unscheduled | Unscheduled | 5889 M.Kirk | 5889 M.Kirk | 5889 M.Kirk |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
5749 L.Carneval/AP | AP | AP | 6221 P.Zhang | 6221 P.Zhang | 6221 P.Zhang | 5738 D.Agyeman-Bud |
AP | AP | CHANGE/6221 P.Zhan | 6221 P.Zhang | 6221 P.Zhang | CHANGE/5738 D.Agye | 5738 D.Agyeman-Bud |
AP | AP | 6221 P.Zhang | 6221 P.Zhang | 6221 P.Zhang | 5738 D.Agyeman-Bud | 5738 D.Agyeman-Bud |
BEAM LINE 7-2 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
6210 A.Kravchen/AP | AP | AP | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb |
AP | AP | CHANGE/8867 S.Webb | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb |
AP | AP | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb |
BEAM LINE 7-3 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 9-3 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
5480 N.Blackbur/AP | AP | AP | 5545 C.Roberts | 5545 C.Roberts | 5499 A.Holewinski | 5499 A.Holewinski |
AP | AP | CHANGE/5545 C.Robe | 5545 C.Roberts | CHANGE/5499 A.Hole | 5499 A.Holewinski | 5499 A.Holewinski |
AP | AP | 5545 C.Roberts | 5545 C.Roberts | 5499 A.Holewinski | 5499 A.Holewinski | 5499 A.Holewinski |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
8814 A.Hoffman/AP | AP | AP | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 11-2 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
5555 S.Kozimor/AP | AP | AP | 5858 O.Duckworth | 5858 O.Duckworth | 6160 M.Polizzotto | 6160 M.Polizzotto |
AP | AP | SMB CHECKOUT/5858 | 5858 O.Duckworth | SMB CHECKOUT/6160 | 6160 M.Polizzotto | 6160 M.Polizzotto |
AP | AP | 5858 O.Duckworth | 5858 O.Duckworth | 6160 M.Polizzotto | 6160 M.Polizzotto | 6160 M.Polizzotto |
BEAM LINE 11-3 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
FACI/AP | AP | AP | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
8019 J.Richards/AP | AP | AP | 5844 X.Zheng | 5844 X.Zheng | 8090 J.Nelson Weke | 8090 J.Nelson Weke |
AP | AP | CHANGE/5844 X.Zhen | 5844 X.Zheng | CHANGE/8090 J.Nels | 8090 J.Nelson Weke | 8090 J.Nelson Weke |
AP | AP | 5844 X.Zheng | 5844 X.Zheng | 8090 J.Nelson Weke | 8090 J.Nelson Weke | 8090 J.Nelson Weke |
BEAM LINE 15-2 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
9705 J.LiSA/AP | AP | AP | STUP | 4756 K.Haas | 4756 K.Haas | 4756 K.Haas |
AP | AP | STUP | CHANGE/4756 K.Haas | 4756 K.Haas | 4756 K.Haas | 4756 K.Haas |
AP | AP | STUP | 4756 K.Haas | 4756 K.Haas | 4756 K.Haas | 4756 K.Haas |
BEAM LINE 17-2 | ||||||
Nov. 14, 2022 | Nov. 15, 2022 | Nov. 16, 2022 | Nov. 17, 2022 | Nov. 18, 2022 | Nov. 19, 2022 | Nov. 20, 2022 |
COMM/AP | AP | AP | COMM | COMM | COMM | COMM |
AP | AP | COMM | COMM | COMM | COMM | COMM |
AP | AP | COMM | COMM | COMM | COMM | COMM |
WEEK OF Nov. 21, 2022 | ||||||
DOWN 4PM | HOLIDAY | Restart ~noon | ||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
BEAM LINE 1-5 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
Unscheduled | Unscheduled | FACI | DOWN | DOWN | FACI | FACI |
Unscheduled | FACI | FACI | DOWN | DOWN | FACI | FACI |
Unscheduled | FACI | FACI/DOWN | DOWN | FACI | FACI | FACI |
BEAM LINE 2-1 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
5998 V.Augustyn | 5967 Z.Cai | 5967 Z.Cai | DOWN | DOWN | FACI | FACI |
Xray CHECKOUT/5967 | 5967 Z.Cai | FACI | DOWN | DOWN | FACI | FACI |
5967 Z.Cai | 5967 Z.Cai | FACI/DOWN | DOWN | FACI | FACI | FACI |
BEAM LINE 2-2 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
6066 A.Foster | 6066 A.Foster | 6095 L.Paulus | DOWN | DOWN | 6095 L.Paulus | 6095 L.Paulus |
6066 A.Foster | CHANGE/6095 L.Paul | 6095 L.Paulus | DOWN | DOWN | 6095 L.Paulus | 6095 L.Paulus |
6066 A.Foster | 6095 L.Paulus | 6095 L.Paulus/DOWN | DOWN | 6095 L.Paulus | 6095 L.Paulus | 6095 L.Paulus |
BEAM LINE 4-1 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
5945 E.Mu | 90H4 Y.Yue | 6196 J.Baek | DOWN | DOWN | 6196 J.Baek | 6196 J.Baek |
SMB CHECKOUT/90H4 | Unscheduled | 6196 J.Baek | DOWN | DOWN | 6196 J.Baek | 6196 J.Baek |
90H4 Y.Yue | SMB CHECKOUT/6196 | 6196 J.Baek/DOWN | DOWN | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek |
BEAM LINE 4-2 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
8092 D.Sokaras | 8092 D.Sokaras | 8897 I.Rajkovic | DOWN | DOWN | 6136 A.Bhattachary | 6136 A.Bhattachary |
8092 D.Sokaras | CHANGE/8897 I.Rajk | 8897 I.Rajkovic | DOWN | DOWN | 6136 A.Bhattachary | CHANGE/8897 I.Rajk |
8092 D.Sokaras | 8897 I.Rajkovic | 8897 I.Rajkov/DOWN | DOWN | CHANGE/6136 A.Bhat | 6136 A.Bhattachary | 8897 I.Rajkovic |
BEAM LINE 4-3 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
5889 M.Kirk/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
5738 D.Agyeman-Bud | 5738 D.Agyeman-Bud | 5738 D.Agyeman-Bud | DOWN | DOWN | 5965 J.Li | 5965 J.Li |
5738 D.Agyeman-Bud | 5738 D.Agyeman-Bud | 5738 D.Agyeman-Bud | DOWN | DOWN | 5965 J.Li | 5965 J.Li |
5738 D.Agyeman-Bud | 5738 D.Agyeman-Bud | 5738 D.Agyema/DOWN | DOWN | 5965 J.Li | 5965 J.Li | 5965 J.Li |
BEAM LINE 7-2 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
8867 S.Webb | 8067 S.Webb | 8067 S.Webb | DOWN | DOWN | 8067 S.Webb | 8067 S.Webb |
CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb | DOWN | DOWN | 8067 S.Webb | 8067 S.Webb |
8067 S.Webb | 8067 S.Webb | 8067 S.Webb/DOWN | DOWN | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 7-3 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
Unscheduled | 5889 M.Kirk | 5889 M.Kirk | DOWN | DOWN | 5224 V.Yachandra | 5224 V.Yachandra |
SMB CHECKOUT/5889 | 5889 M.Kirk | SMB CHECKOUT/5224 | DOWN | DOWN | 5224 V.Yachandra | 5224 V.Yachandra |
5889 M.Kirk | 5889 M.Kirk | 5224 V.Yachan/DOWN | DOWN | 5224 V.Yachandra | 5224 V.Yachandra | 5224 V.Yachandra |
BEAM LINE 9-3 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
5499 A.Holewinski | 6191 S.Louisia | 6191 S.Louisia | DOWN | DOWN | 5088 L.Greenlee | 5088 L.Greenlee |
CHANGE/6191 S.Loui | 6191 S.Louisia | CHANGE/5088 L.Gree | DOWN | DOWN | 5088 L.Greenlee | 5088 L.Greenlee |
6191 S.Louisia | 6191 S.Louisia | 5088 L.Greenl/DOWN | DOWN | 5088 L.Greenlee | 5088 L.Greenlee | 5088 L.Greenlee |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
FACI | FACI | FACI | DOWN | DOWN | FACI | FACI |
FACI | FACI | FACI | DOWN | DOWN | FACI | FACI |
FACI | FACI | FACI/DOWN | DOWN | FACI | FACI | FACI |
BEAM LINE 11-2 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
6160 M.Polizzotto | Unscheduled | 6041 B.Schumm | DOWN | DOWN | 6041 B.Schumm | 6041 B.Schumm |
Unscheduled | SMB CHECKOUT/6041 | 6041 B.Schumm | DOWN | DOWN | 6041 B.Schumm | 6041 B.Schumm |
Unscheduled | 6041 B.Schumm | 6041 B.Schumm/DOWN | DOWN | 6041 B.Schumm | 6041 B.Schumm | 6041 B.Schumm |
BEAM LINE 11-3 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
FACI | FACI | FACI | DOWN | DOWN | FACI | FACI |
FACI | FACI | FACI | DOWN | DOWN | FACI | FACI |
FACI | FACI | FACI/DOWN | DOWN | FACI | FACI | FACI |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
8090 J.Nelson Weke | 6249 P.Zhang | 6249 P.Zhang | DOWN | DOWN | 8067 S.Webb | 8067 S.Webb |
CHANGE/6249 P.Zhan | 6249 P.Zhang | 6249 P.Zhang | DOWN | DOWN | 8067 S.Webb | 8067 S.Webb |
6249 P.Zhang | 6249 P.Zhang | 6249 P.Zhang/DOWN | DOWN | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 15-2 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
4756 K.Haas | 5801 R.Hadt | 5801 R.Hadt | DOWN | DOWN | 5777 T.Large | 5777 T.Large |
CHANGE/5801 R.Hadt | 5801 R.Hadt | 5801 R.Hadt | DOWN | DOWN | 5777 T.Large | 5777 T.Large |
5801 R.Hadt | 5801 R.Hadt | 5801 R.Hadt/DOWN | DOWN | 5777 T.Large | 5777 T.Large | 5777 T.Large |
BEAM LINE 17-2 | ||||||
Nov. 21, 2022 | Nov. 22, 2022 | Nov. 23, 2022 | Nov. 24, 2022 | Nov. 25, 2022 | Nov. 26, 2022 | Nov. 27, 2022 |
COMM | COMM | COMM | DOWN | DOWN | COMM | COMM |
COMM | COMM | COMM | DOWN | DOWN | COMM | COMM |
COMM | COMM | COMM/DOWN | DOWN | COMM | COMM | COMM |
WEEK OF Nov. 28, 2022 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
BEAM LINE 1-5 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
FACI | FACI | Unscheduled | Unscheduled | FACI | 6024 A.Maurya | 6024 A.Maurya |
FACI | Unscheduled | Unscheduled | FACI | Xray CHECKOUT/6024 | 6024 A.Maurya | 6024 A.Maurya |
FACI | Unscheduled | Unscheduled | FACI | 6024 A.Maurya | 6024 A.Maurya | 6024 A.Maurya |
BEAM LINE 2-1 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
FACI | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | FACI | FACI |
Xray CHECKOUT/8010 | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | FACI | FACI | FACI |
8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | FACI | FACI | FACI |
BEAM LINE 2-2 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
6095 L.Paulus | 6091 M.Zeineh | 6091 M.Zeineh | 6091 M.Zeineh | 6091 M.Zeineh | 6039 S.Ho | 6039 S.Ho |
CHANGE/6091 M.Zein | 6091 M.Zeineh | 6091 M.Zeineh | 6091 M.Zeineh | CHANGE/6039 S.Ho | 6039 S.Ho | 6039 S.Ho |
6091 M.Zeineh | 6091 M.Zeineh | 6091 M.Zeineh | 6091 M.Zeineh | 6039 S.Ho | 6039 S.Ho | 6039 S.Ho |
BEAM LINE 4-1 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
6196 J.Baek | 5396 J.Nelson Weke | 5396 J.Nelson Weke | 6010 G.Seidler | 6010 G.Seidler | 8081 Y.Liu | 8081 Y.Liu |
SMB CHECKOUT/5396 | 5396 J.Nelson Weke | SMB CHECKOUT/6010 | 6010 G.Seidler | SMB CHECKOUT/8081 | 8081 Y.Liu | 8081 Y.Liu |
5396 J.Nelson Weke | 5396 J.Nelson Weke | 6010 G.Seidler | 6010 G.Seidler | 8081 Y.Liu | 8081 Y.Liu | 8081 Y.Liu |
BEAM LINE 4-2 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
8897 I.Rajkovic | 5968 A.Pena-Alcant | 12B3 S.Pokhrel | 12B3 S.Pokhrel | 12B3 S.Pokhrel | 5474 S.Bone | 5474 S.Bone |
CHANGE/5968 A.Pena | CHANGE/12B3 S.Pokh | 12B3 S.Pokhrel | 12B3 S.Pokhrel | CHANGE/5474 S.Bone | 5474 S.Bone | RA |
5968 A.Pena-Alcant | 12B3 S.Pokhrel | 12B3 S.Pokhrel | 12B3 S.Pokhrel | 5474 S.Bone | 5474 S.Bone | RA |
BEAM LINE 4-3 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
5965 J.Li | 8090 J.Nelson Weke | 5957 P.Mukherjee | 5957 P.Mukherjee | 5957 P.Mukherjee | 6247 K.Thurber | 6247 K.Thurber |
CHANGE/8090 J.Nels | CHANGE/5957 P.Mukh | 5957 P.Mukherjee | 5957 P.Mukherjee | CHANGE/6247 K.Thur | 6247 K.Thurber | 6247 K.Thurber |
8090 J.Nelson Weke | 5957 P.Mukherjee | 5957 P.Mukherjee | 5957 P.Mukherjee | 6247 K.Thurber | 6247 K.Thurber | 6247 K.Thurber |
BEAM LINE 7-2 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
8067 S.Webb | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann |
CHANGE/5847 U.Berg | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann |
5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann | 5847 U.Bergmann |
BEAM LINE 7-3 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
5224 V.Yachandra | 5224 V.Yachandra | 5224 V.Yachandra | 5224 V.Yachandra | 5617 K.Rush | 5617 K.Rush | 5617 K.Rush |
5224 V.Yachandra | 5224 V.Yachandra | 5224 V.Yachandra | SMB CHECKOUT/5617 | 5617 K.Rush | 5617 K.Rush | 5617 K.Rush |
5224 V.Yachandra | 5224 V.Yachandra | 5224 V.Yachandra | 5617 K.Rush | 5617 K.Rush | 5617 K.Rush | 5617 K.Rush |
BEAM LINE 9-3 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
5088 L.Greenlee | 8099 S.Bare | 8099 S.Bare | 6215 N.Lefton | 6215 N.Lefton | 5302 L.Li | 5302 L.Li |
CHANGE/8099 S.Bare | 8099 S.Bare | CHANGE/6215 N.Left | 6215 N.Lefton | CHANGE/5302 L.Li | 5302 L.Li | 5302 L.Li |
8099 S.Bare | 8099 S.Bare | 6215 N.Lefton | 6215 N.Lefton | 5302 L.Li | 5302 L.Li | 5302 L.Li |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
FACI | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone |
Xray CHECKOUT/8891 | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone |
8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone | 8891 C.Tassone |
BEAM LINE 11-2 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
6041 B.Schumm | 5328 R.Abergel | 5328 R.Abergel | 5806 L.Moreau | 5806 L.Moreau | 5926 L.Moreau | 5926 L.Moreau |
SMB CHECKOUT/5328 | 5328 R.Abergel | SMB CHECKOUT/5806 | 5806 L.Moreau | 5806 L.Moreau | 5926 L.Moreau | 5926 L.Moreau |
5328 R.Abergel | 5328 R.Abergel | 5806 L.Moreau | 5806 L.Moreau | CHANGE/5926 L.More | 5926 L.Moreau | 5926 L.Moreau |
BEAM LINE 11-3 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
FACI | FACI | FACI | 6252 C.Cheng | Unscheduled | 5968 A.Pena-Alcant | 5968 A.Pena-Alcant |
FACI | FACI | Xray CHECKOUT/6252 | CHANGE/8209 A.Lind | Xray CHECKOUT/5968 | 5968 A.Pena-Alcant | 5968 A.Pena-Alcant |
FACI | FACI | 6252 C.Cheng | 8209 A.Lindenberg | 5968 A.Pena-Alcant | 5968 A.Pena-Alcant | 5968 A.Pena-Alcant |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
8067 S.Webb | 8067 S.Webb | 6039 S.Ho | 6039 S.Ho | 6039 S.Ho | 6180 A.Templeton | 6180 A.Templeton |
8067 S.Webb | CHANGE/6039 S.Ho | 6039 S.Ho | 6039 S.Ho | CHANGE/6180 A.Temp | 6180 A.Templeton | 6180 A.Templeton |
8067 S.Webb | 6039 S.Ho | 6039 S.Ho | 6039 S.Ho | 6180 A.Templeton | 6180 A.Templeton | 6180 A.Templeton |
BEAM LINE 15-2 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
5777 T.Large | 5814 H.Yan | 5814 H.Yan | 5814 H.Yan | STUP | 6033 A.Crawford | 6033 A.Crawford |
CHANGE/5814 H.Yan | 5814 H.Yan | 5814 H.Yan | STUP | CHANGE/6033 A.Craw | 6033 A.Crawford | 6033 A.Crawford |
5814 H.Yan | 5814 H.Yan | 5814 H.Yan | STUP | 6033 A.Crawford | 6033 A.Crawford | 6033 A.Crawford |
BEAM LINE 17-2 | ||||||
Nov. 28, 2022 | Nov. 29, 2022 | Nov. 30, 2022 | Dec. 01, 2022 | Dec. 02, 2022 | Dec. 03, 2022 | Dec. 04, 2022 |
COMM | COMM | COMM | COMM | COMM | COMM | COMM |
COMM | COMM | COMM | COMM | COMM | COMM | COMM |
COMM | COMM | COMM | COMM | COMM | COMM | COMM |
WEEK OF Dec. 05, 2022 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
BEAM LINE 1-5 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
6024 A.Maurya/AP | AP | AP | FACI | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
AP | AP | FACI | Xray CHECKOUT/8091 | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
AP | AP | FACI | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
BEAM LINE 2-1 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
FACI/AP | AP | AP | 5945 E.Mu | 5945 E.Mu | 5903 W.Tong | 5903 W.Tong |
AP | AP | Xray CHECKOUT/5945 | 5945 E.Mu | Xray CHECKOUT/5903 | 5903 W.Tong | 5903 W.Tong |
AP | AP | 5945 E.Mu | 5945 E.Mu | 5903 W.Tong | 5903 W.Tong | 5903 W.Tong |
BEAM LINE 2-2 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
6039 S.Ho/AP | AP | AP | 5794 T.Varga | 5794 T.Varga | 6113 V.Noel | 6113 V.Noel |
AP | AP | CHANGE/5794 T.Varg | 5794 T.Varga | CHANGE/6113 V.Noel | 6113 V.Noel | 6113 V.Noel |
AP | AP | 5794 T.Varga | 5794 T.Varga | 6113 V.Noel | 6113 V.Noel | 6113 V.Noel |
BEAM LINE 4-1 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
8081 Y.Liu/AP | AP | AP | 6114 R.Ngunjiri | 6114 R.Ngunjiri | 5156 L.Li | 5156 L.Li |
AP | AP | SMB CHECKOUT/6114 | 6114 R.Ngunjiri | SMB CHECKOUT/5156 | 5156 L.Li | 5156 L.Li |
AP | AP | 6114 R.Ngunjiri | 6114 R.Ngunjiri | 5156 L.Li | 5156 L.Li | 5156 L.Li |
BEAM LINE 4-2 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
RA/AP | AP | AP | 8877 T.Matsui | 8877 T.Matsui | 5996 J.DuBois | 5996 J.DuBois |
AP | AP | CHANGE/8877 T.Mats | 8877 T.Matsui | CHANGE/5996 J.DuBo | 5996 J.DuBois | CHANGE/8877 T.Mats |
AP | AP | 8877 T.Matsui | 8877 T.Matsui | 5996 J.DuBois | 5996 J.DuBois | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
DOWN/AP | AP | AP | Unscheduled | 8092 D.Sokaras | 5664 R.Walroth | 5664 R.Walroth |
AP | AP | Unscheduled | CHANGE/8092 D.Soka | CHANGE/5664 R.Walr | 5664 R.Walroth | 5664 R.Walroth |
AP | AP | Unscheduled | 8092 D.Sokaras | 5664 R.Walroth | 5664 R.Walroth | 5664 R.Walroth |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
DOWN/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
6247 K.Thurber/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
5847 U.Bergmann/AP | AP | AP | 8090 J.Nelson Weke | 8090 J.Nelson Weke | 5756 A.Seyfferth | 5756 A.Seyfferth |
AP | AP | CHANGE/8090 J.Nels | 8090 J.Nelson Weke | CHANGE/5756 A.Seyf | 5756 A.Seyfferth | 5756 A.Seyfferth |
AP | AP | 8090 J.Nelson Weke | 8090 J.Nelson Weke | 5756 A.Seyfferth | 5756 A.Seyfferth | 5756 A.Seyfferth |
BEAM LINE 7-3 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
5617 K.Rush/AP | AP | AP | 5910 E.Pierce | 5910 E.Pierce | 5963 J.Shearer | 5963 J.Shearer |
AP | AP | SMB CHECKOUT/5910 | 5910 E.Pierce | SMB CHECKOUT/5963 | 5963 J.Shearer | 5963 J.Shearer |
AP | AP | 5910 E.Pierce | 5910 E.Pierce | 5963 J.Shearer | 5963 J.Shearer | 5963 J.Shearer |
BEAM LINE 9-3 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
5302 L.Li/AP | AP | AP | 6155 Y.WU | 6155 Y.WU | 6001 C.Zhou | 6001 C.Zhou |
AP | AP | CHANGE/6155 Y.WU | 6155 Y.WU | CHANGE/6001 C.Zhou | 6001 C.Zhou | 6001 C.Zhou |
AP | AP | 6155 Y.WU | 6155 Y.WU | 6001 C.Zhou | 6001 C.Zhou | 6001 C.Zhou |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
8891 C.Tassone/AP | AP | AP | FACI | Unscheduled | Unscheduled | Unscheduled |
AP | AP | FACI | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | FACI | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
5926 L.Moreau/AP | AP | AP | 6260 Y.Tang | 6260 Y.Tang | 6117 P.Smith | 6117 P.Smith |
AP | AP | SMB CHECKOUT/6260 | 6260 Y.Tang | SMB CHECKOUT/6117 | 6117 P.Smith | 6117 P.Smith |
AP | AP | 6260 Y.Tang | 6260 Y.Tang | 6117 P.Smith | 6117 P.Smith | 6117 P.Smith |
BEAM LINE 11-3 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
5968 A.Pena-Alc/AP | AP | AP | 6150 G.Kamat | 6150 G.Kamat | 5419 G.Giri | 5419 G.Giri |
AP | AP | Xray CHECKOUT/6150 | 6150 G.Kamat | Xray CHECKOUT/5419 | 5419 G.Giri | 5419 G.Giri |
AP | AP | 6150 G.Kamat | 6150 G.Kamat | 5419 G.Giri | 5419 G.Giri | 5419 G.Giri |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
6180 A.Templeto/AP | AP | AP | 6179 S.Kuppan | 6179 S.Kuppan | 6014 D.Fike | 6014 D.Fike |
AP | AP | CHANGE/6179 S.Kupp | 6179 S.Kuppan | CHANGE/6014 D.Fike | 6014 D.Fike | 6014 D.Fike |
AP | AP | 6179 S.Kuppan | 6179 S.Kuppan | 6014 D.Fike | 6014 D.Fike | 6014 D.Fike |
BEAM LINE 15-2 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
6033 A.Crawford/AP | AP | AP | STUP | 6056 V.Sharma | 6056 V.Sharma | 6056 V.Sharma |
AP | AP | STUP | CHANGE/6056 V.Shar | 6056 V.Sharma | 6056 V.Sharma | 6056 V.Sharma |
AP | AP | STUP | 6056 V.Sharma | 6056 V.Sharma | 6056 V.Sharma | 6056 V.Sharma |
BEAM LINE 17-2 | ||||||
Dec. 05, 2022 | Dec. 06, 2022 | Dec. 07, 2022 | Dec. 08, 2022 | Dec. 09, 2022 | Dec. 10, 2022 | Dec. 11, 2022 |
COMM/AP | AP | AP | COMM | COMM | 5873 C.Takacs | 5873 C.Takacs |
AP | AP | COMM | COMM | Xray CHECKOUT/5873 | 5873 C.Takacs | 5873 C.Takacs |
AP | AP | COMM | COMM | 5873 C.Takacs | 5873 C.Takacs | 5873 C.Takacs |
WEEK OF Dec. 12, 2022 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
BEAM LINE 1-5 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
8091 C.Tassone | 8091 C.Tassone | FACI | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick |
8091 C.Tassone | FACI | Xray CHECKOUT/6110 | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick |
8091 C.Tassone | FACI | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick |
BEAM LINE 2-1 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
5903 W.Tong | 5903 W.Tong | Unscheduled | Unscheduled | Unscheduled | 6250 S.Narasimhan | 6250 S.Narasimhan |
5903 W.Tong | Unscheduled | Unscheduled | Unscheduled | Xray CHECKOUT/6250 | 6250 S.Narasimhan | 6250 S.Narasimhan |
5903 W.Tong | Unscheduled | Unscheduled | Unscheduled | 6250 S.Narasimhan | 6250 S.Narasimhan | 6250 S.Narasimhan |
BEAM LINE 2-2 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 2-3 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
6113 V.Noel | 6260 Y.Tang | 6260 Y.Tang | 5919 A.Picard | 5919 A.Picard | 11H9 D.Viana | 11H9 D.Viana |
CHANGE/6260 Y.Tang | 6260 Y.Tang | CHANGE/5919 A.Pica | 5919 A.Picard | CHANGE/11H9 D.Vian | 11H9 D.Viana | 11H9 D.Viana |
6260 Y.Tang | 6260 Y.Tang | 5919 A.Picard | 5919 A.Picard | 11H9 D.Viana | 11H9 D.Viana | 11H9 D.Viana |
BEAM LINE 4-1 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
5156 L.Li | 8067 S.Webb | 8067 S.Webb | 5906 H.Wang | 5906 H.Wang | 9705 J.LiSA | 9705 J.LiSA |
SMB CHECKOUT/8067 | 8067 S.Webb | SMB CHECKOUT/5906 | 5906 H.Wang | SMB CHECKOUT/9705 | 9705 J.LiSA | 9705 J.LiSA |
8067 S.Webb | 8067 S.Webb | 5906 H.Wang | 5906 H.Wang | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
BEAM LINE 4-2 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
8877 T.Matsui | 8877 T.Matsui | 5996 J.DuBois | 8877 T.Matsui | 12B4 Z.Bu | 12B4 Z.Bu | 8877 T.Matsui |
8877 T.Matsui | CHANGE/5996 J.DuBo | CHANGE/8877 T.Mats | CHANGE/12B4 Z.Bu | 12B4 Z.Bu | CHANGE/8877 T.Mats | 8877 T.Matsui |
8877 T.Matsui | 5996 J.DuBois | 8877 T.Matsui | 12B4 Z.Bu | 12B4 Z.Bu | 8877 T.Matsui | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
DOWN | 5963 J.Shearer | 5963 J.Shearer | 5963 J.Shearer | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster |
SMB CHECKOUT/5963 | 5963 J.Shearer | 5963 J.Shearer | SMB CHECKOUT/6158 | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster |
5963 J.Shearer | 5963 J.Shearer | 5963 J.Shearer | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
5664 R.Walroth | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 5786 T.Hersbach |
CHANGE/8892 D.Soka | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | CHANGE/5786 T.Hers | 5786 T.Hersbach |
8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 5786 T.Hersbach | 5786 T.Hersbach |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
5756 A.Seyfferth | 5756 A.Seyfferth | Unscheduled | Unscheduled | Unscheduled | 5914 C.Petersen | 5914 C.Petersen |
5756 A.Seyfferth | Unscheduled | Unscheduled | Unscheduled | CHANGE/5914 C.Pete | 5914 C.Petersen | 5914 C.Petersen |
5756 A.Seyfferth | Unscheduled | Unscheduled | Unscheduled | 5914 C.Petersen | 5914 C.Petersen | 5914 C.Petersen |
BEAM LINE 7-3 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
5963 J.Shearer | DOWN | DOWN | DOWN | 6096 M.Abernathy | 6096 M.Abernathy | 6096 M.Abernathy |
DOWN | DOWN | DOWN | SMB CHECKOUT/6096 | 6096 M.Abernathy | 6096 M.Abernathy | 6096 M.Abernathy |
DOWN | DOWN | DOWN | 6096 M.Abernathy | 6096 M.Abernathy | 6096 M.Abernathy | 6096 M.Abernathy |
BEAM LINE 9-3 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
6001 C.Zhou | 5075 A.Braun | 5075 A.Braun | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster |
SMB CHECKOUT/5075 | 5075 A.Braun | SMB CHECKOUT/6158 | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster |
5075 A.Braun | 5075 A.Braun | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
6117 P.Smith/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
5419 G.Giri | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 90H4 Y.Yue | 5837 K.Lim | 5837 K.Lim |
Xray CHECKOUT/8095 | 8095 K.Stone | 8095 K.Stone | Xray CHECKOUT/90H4 | Xray CHECKOUT/5837 | 5837 K.Lim | 5837 K.Lim |
8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 90H4 Y.Yue | 5837 K.Lim | 5837 K.Lim | 5837 K.Lim |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
6014 D.Fike | 11H5 G.Druschel | 11H5 G.Druschel | FACI | 6156 G.Druschel | 6156 G.Druschel | 6156 G.Druschel |
CHANGE/11H5 G.Drus | 11H5 G.Druschel | FACI | CHANGE/6156 G.Drus | 6156 G.Druschel | CHANGE/6156 G.Drus | 6156 G.Druschel |
11H5 G.Druschel | 11H5 G.Druschel | FACI | 6156 G.Druschel | 6156 G.Druschel | 6156 G.Druschel | 6156 G.Druschel |
BEAM LINE 15-2 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
6056 V.Sharma | STUP | 5673 S.Jannuzzi | 5673 S.Jannuzzi | 5673 S.Jannuzzi | STUP | 6074 J.Azadmanesh |
STUP | CHANGE/5673 S.Jann | 5673 S.Jannuzzi | 5673 S.Jannuzzi | STUP | CHANGE/6074 J.Azad | 6074 J.Azadmanesh |
STUP | 5673 S.Jannuzzi | 5673 S.Jannuzzi | 5673 S.Jannuzzi | STUP | 6074 J.Azadmanesh | 6074 J.Azadmanesh |
BEAM LINE 17-2 | ||||||
Dec. 12, 2022 | Dec. 13, 2022 | Dec. 14, 2022 | Dec. 15, 2022 | Dec. 16, 2022 | Dec. 17, 2022 | Dec. 18, 2022 |
5873 C.Takacs | Unscheduled | 6258 M.Preefer | 6258 M.Preefer | 6258 M.Preefer | 6181 P.Mukherjee | 6181 P.Mukherjee |
Unscheduled | Xray CHECKOUT/6258 | 6258 M.Preefer | 6258 M.Preefer | Xray CHECKOUT/6181 | 6181 P.Mukherjee | 6181 P.Mukherjee |
Unscheduled | 6258 M.Preefer | 6258 M.Preefer | 6258 M.Preefer | 6181 P.Mukherjee | 6181 P.Mukherjee | 6181 P.Mukherjee |
WEEK OF Dec. 19, 2022 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
BEAM LINE 1-5 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
6110 N.Leick/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
6250 S.Narasimh/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
11H9 D.Viana/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
9705 J.LiSA/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
8877 T.Matsui/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
6158 K.Lancaste/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
5786 T.Hersbach/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
DOWN/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
5914 C.Petersen/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
6096 M.Abernath/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
6158 K.Lancaste/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
DOWN/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
5837 K.Lim/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
DOWN/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
6156 G.Druschel/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
6074 J.Azadmane/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Dec. 19, 2022 | Dec. 20, 2022 | Dec. 21, 2022 | Dec. 22, 2022 | Dec. 23, 2022 | Dec. 24, 2022 | Dec. 25, 2022 |
6181 P.Mukherje/AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Dec. 26, 2022 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
BEAM LINE 1-5 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Dec. 26, 2022 | Dec. 27, 2022 | Dec. 28, 2022 | Dec. 29, 2022 | Dec. 30, 2022 | Dec. 31, 2022 | Jan. 01, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jan. 02, 2023 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
BEAM LINE 1-5 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jan. 02, 2023 | Jan. 03, 2023 | Jan. 04, 2023 | Jan. 05, 2023 | Jan. 06, 2023 | Jan. 07, 2023 | Jan. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jan. 09, 2023 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
BEAM LINE 1-5 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jan. 09, 2023 | Jan. 10, 2023 | Jan. 11, 2023 | Jan. 12, 2023 | Jan. 13, 2023 | Jan. 14, 2023 | Jan. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jan. 16, 2023 | ||||||
HOLIDAY | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
BEAM LINE 1-5 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jan. 16, 2023 | Jan. 17, 2023 | Jan. 18, 2023 | Jan. 19, 2023 | Jan. 20, 2023 | Jan. 21, 2023 | Jan. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jan. 23, 2023 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
BEAM LINE 1-5 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jan. 23, 2023 | Jan. 24, 2023 | Jan. 25, 2023 | Jan. 26, 2023 | Jan. 27, 2023 | Jan. 28, 2023 | Jan. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jan. 30, 2023 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
BEAM LINE 1-5 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jan. 30, 2023 | Jan. 31, 2023 | Feb. 01, 2023 | Feb. 02, 2023 | Feb. 03, 2023 | Feb. 04, 2023 | Feb. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Feb. 06, 2023 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
BEAM LINE 1-5 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Feb. 06, 2023 | Feb. 07, 2023 | Feb. 08, 2023 | Feb. 09, 2023 | Feb. 10, 2023 | Feb. 11, 2023 | Feb. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Feb. 13, 2023 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
BEAM LINE 1-5 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Feb. 13, 2023 | Feb. 14, 2023 | Feb. 15, 2023 | Feb. 16, 2023 | Feb. 17, 2023 | Feb. 18, 2023 | Feb. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Feb. 20, 2023 | ||||||
HOLIDAY | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
BEAM LINE 1-5 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Feb. 20, 2023 | Feb. 21, 2023 | Feb. 22, 2023 | Feb. 23, 2023 | Feb. 24, 2023 | Feb. 25, 2023 | Feb. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Feb. 27, 2023 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
BEAM LINE 1-5 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Feb. 27, 2023 | Feb. 28, 2023 | Mar. 01, 2023 | Mar. 02, 2023 | Mar. 03, 2023 | Mar. 04, 2023 | Mar. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Mar. 06, 2023 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
BEAM LINE 1-5 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Mar. 06, 2023 | Mar. 07, 2023 | Mar. 08, 2023 | Mar. 09, 2023 | Mar. 10, 2023 | Mar. 11, 2023 | Mar. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Mar. 13, 2023 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
BEAM LINE 1-5 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Mar. 13, 2023 | Mar. 14, 2023 | Mar. 15, 2023 | Mar. 16, 2023 | Mar. 17, 2023 | Mar. 18, 2023 | Mar. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Mar. 20, 2023 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
BEAM LINE 1-5 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Mar. 20, 2023 | Mar. 21, 2023 | Mar. 22, 2023 | Mar. 23, 2023 | Mar. 24, 2023 | Mar. 25, 2023 | Mar. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Mar. 27, 2023 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
BEAM LINE 1-5 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Mar. 27, 2023 | Mar. 28, 2023 | Mar. 29, 2023 | Mar. 30, 2023 | Mar. 31, 2023 | Apr. 01, 2023 | Apr. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Apr. 03, 2023 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
BEAM LINE 1-5 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Apr. 03, 2023 | Apr. 04, 2023 | Apr. 05, 2023 | Apr. 06, 2023 | Apr. 07, 2023 | Apr. 08, 2023 | Apr. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Apr. 10, 2023 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
BEAM LINE 1-5 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Apr. 10, 2023 | Apr. 11, 2023 | Apr. 12, 2023 | Apr. 13, 2023 | Apr. 14, 2023 | Apr. 15, 2023 | Apr. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Apr. 17, 2023 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
BEAM LINE 1-5 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Apr. 17, 2023 | Apr. 18, 2023 | Apr. 19, 2023 | Apr. 20, 2023 | Apr. 21, 2023 | Apr. 22, 2023 | Apr. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Apr. 24, 2023 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
BEAM LINE 1-5 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Apr. 24, 2023 | Apr. 25, 2023 | Apr. 26, 2023 | Apr. 27, 2023 | Apr. 28, 2023 | Apr. 29, 2023 | Apr. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF May 01, 2023 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
BEAM LINE 1-5 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
May 01, 2023 | May 02, 2023 | May 03, 2023 | May 04, 2023 | May 05, 2023 | May 06, 2023 | May 07, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF May 08, 2023 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
BEAM LINE 1-5 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
May 08, 2023 | May 09, 2023 | May 10, 2023 | May 11, 2023 | May 12, 2023 | May 13, 2023 | May 14, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF May 15, 2023 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
BEAM LINE 1-5 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
May 15, 2023 | May 16, 2023 | May 17, 2023 | May 18, 2023 | May 19, 2023 | May 20, 2023 | May 21, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF May 22, 2023 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
BEAM LINE 1-5 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
May 22, 2023 | May 23, 2023 | May 24, 2023 | May 25, 2023 | May 26, 2023 | May 27, 2023 | May 28, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF May 29, 2023 | ||||||
HOLIDAY | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
BEAM LINE 1-5 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
May 29, 2023 | May 30, 2023 | May 31, 2023 | Jun. 01, 2023 | Jun. 02, 2023 | Jun. 03, 2023 | Jun. 04, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jun. 05, 2023 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
BEAM LINE 1-5 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jun. 05, 2023 | Jun. 06, 2023 | Jun. 07, 2023 | Jun. 08, 2023 | Jun. 09, 2023 | Jun. 10, 2023 | Jun. 11, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jun. 12, 2023 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
BEAM LINE 1-5 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jun. 12, 2023 | Jun. 13, 2023 | Jun. 14, 2023 | Jun. 15, 2023 | Jun. 16, 2023 | Jun. 17, 2023 | Jun. 18, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jun. 19, 2023 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
BEAM LINE 1-5 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jun. 19, 2023 | Jun. 20, 2023 | Jun. 21, 2023 | Jun. 22, 2023 | Jun. 23, 2023 | Jun. 24, 2023 | Jun. 25, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jun. 26, 2023 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
BEAM LINE 1-5 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jun. 26, 2023 | Jun. 27, 2023 | Jun. 28, 2023 | Jun. 29, 2023 | Jun. 30, 2023 | Jul. 01, 2023 | Jul. 02, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jul. 03, 2023 | ||||||
HOLIDAY | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
BEAM LINE 1-5 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jul. 03, 2023 | Jul. 04, 2023 | Jul. 05, 2023 | Jul. 06, 2023 | Jul. 07, 2023 | Jul. 08, 2023 | Jul. 09, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jul. 10, 2023 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
BEAM LINE 1-5 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jul. 10, 2023 | Jul. 11, 2023 | Jul. 12, 2023 | Jul. 13, 2023 | Jul. 14, 2023 | Jul. 15, 2023 | Jul. 16, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jul. 17, 2023 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
BEAM LINE 1-5 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jul. 17, 2023 | Jul. 18, 2023 | Jul. 19, 2023 | Jul. 20, 2023 | Jul. 21, 2023 | Jul. 22, 2023 | Jul. 23, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jul. 24, 2023 | ||||||
Run Ends 6AM | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
BEAM LINE 1-5 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jul. 24, 2023 | Jul. 25, 2023 | Jul. 26, 2023 | Jul. 27, 2023 | Jul. 28, 2023 | Jul. 29, 2023 | Jul. 30, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jul. 31, 2023 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
BEAM LINE 1-5 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jul. 31, 2023 | Aug. 01, 2023 | Aug. 02, 2023 | Aug. 03, 2023 | Aug. 04, 2023 | Aug. 05, 2023 | Aug. 06, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Aug. 07, 2023 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
BEAM LINE 1-5 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 2-1 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 2-2 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | 8019 J.Richardson | 8019 J.Richardson | 6450 P.Lam | 6450 P.Lam |
DOWN | DOWN | CHANGE/8019 J.Rich | 8019 J.Richardson | CHANGE/6450 P.Lam | 6450 P.Lam | 6450 P.Lam |
DOWN | DOWN | 8019 J.Richardson | 8019 J.Richardson | 6450 P.Lam | 6450 P.Lam | 6450 P.Lam |
BEAM LINE 4-1 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 4-2 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | Unscheduled | 6136 A.Bhattachary | 6006 Y.Wu | 8877 T.Matsui |
DOWN | DOWN | Unscheduled | CHANGE/6136 A.Bhat | CHANGE/6006 Y.Wu | CHANGE/8877 T.Mats | 8877 T.Matsui |
DOWN | DOWN | Unscheduled | 6136 A.Bhattachary | 6006 Y.Wu | 8877 T.Matsui | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 7-2 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | 6450 P.Lam | 6450 P.Lam | 11J6 T.Varner | 11J6 T.Varner |
DOWN | DOWN | CHANGE/6450 P.Lam | 6450 P.Lam | CHANGE/11J6 T.Varn | 11J6 T.Varner | 11J6 T.Varner |
DOWN | DOWN | 6450 P.Lam | 6450 P.Lam | 11J6 T.Varner | 11J6 T.Varner | 11J6 T.Varner |
BEAM LINE 7-3 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled | SMB CHECKOUT/93H9 |
DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled | 93H9 T.Large |
BEAM LINE 9-3 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | 8099 S.Bare | 8099 S.Bare | 8099 S.Bare | 5302 L.Li |
DOWN | DOWN | CHANGE/8099 S.Bare | 8099 S.Bare | 8099 S.Bare | CHANGE/5302 L.Li | 5302 L.Li |
DOWN | DOWN | 8099 S.Bare | 8099 S.Bare | 8099 S.Bare | 5302 L.Li | 5302 L.Li |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 11-3 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | Unscheduled | Unscheduled | 5474 S.Bone | 5474 S.Bone |
DOWN | DOWN | Unscheduled | Unscheduled | SMB CHECKOUT/5474 | 5474 S.Bone | 5474 S.Bone |
DOWN | DOWN | Unscheduled | Unscheduled | 5474 S.Bone | 5474 S.Bone | 5474 S.Bone |
BEAM LINE 15-2 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | COMM | COMM | 8092 D.Sokaras | 8092 D.Sokaras |
DOWN | DOWN | COMM | COMM | Unscheduled | 8092 D.Sokaras | 8092 D.Sokaras |
DOWN | DOWN | COMM | COMM | CHANGE/8092 D.Soka | 8092 D.Sokaras | 8092 D.Sokaras |
BEAM LINE 17-2 | ||||||
Aug. 07, 2023 | Aug. 08, 2023 | Aug. 09, 2023 | Aug. 10, 2023 | Aug. 11, 2023 | Aug. 12, 2023 | Aug. 13, 2023 |
DOWN | DOWN | DOWN | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
DOWN | DOWN | FACI | FACI | FACI | FACI | FACI |
WEEK OF Aug. 14, 2023 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
BEAM LINE 1-5 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
FACI | FACI | FACI | 6110 N.Leick | 6110 N.Leick | 6343 J.Arens | 6085 N.Idris |
FACI | FACI | Xray CHECKOUT/6110 | 6110 N.Leick | Xray CHECKOUT/6343 | Xray CHECKOUT/6085 | Xray CHECKOUT/5918 |
FACI | FACI | 6110 N.Leick | 6110 N.Leick | 6343 J.Arens | 6085 N.Idris | 5918 B.Paulsen |
BEAM LINE 2-1 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
FACI | FACI | FACI | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
FACI | FACI | Xray CHECKOUT/8095 | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
FACI | FACI | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
BEAM LINE 2-2 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
6450 P.Lam | 5756 A.Seyfferth | 5756 A.Seyfferth | 5756 A.Seyfferth | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
CHANGE/5756 A.Seyf | 5756 A.Seyfferth | 5756 A.Seyfferth | CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
5756 A.Seyfferth | 5756 A.Seyfferth | 5756 A.Seyfferth | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 4-1 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
FACI | FACI | FACI | FACI | FACI | Unscheduled | Unscheduled |
FACI | FACI | FACI | FACI | Unscheduled | Unscheduled | Unscheduled |
FACI | FACI | FACI | FACI | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 4-2 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
8877 T.Matsui | 5816 A.Ayzner | 5816 A.Ayzner | 6337 K.Younes | 6337 K.Younes | 6193 J.Nielsen | 8877 T.Matsui |
CHANGE/5816 A.Ayzn | 5816 A.Ayzner | CHANGE/6337 K.Youn | 6337 K.Younes | CHANGE/6193 J.Niel | CHANGE/8877 T.Mats | 8877 T.Matsui |
5816 A.Ayzner | 5816 A.Ayzner | 6337 K.Younes | 6337 K.Younes | 6193 J.Nielsen | 8877 T.Matsui | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
FACI | 5844 X.Zheng | 5844 X.Zheng | 5844 X.Zheng | 8090 J.Nelson Weke | 5635 A.Cordones-Ha | 5635 A.Cordones-Ha |
SMB CHECKOUT/5844 | 5844 X.Zheng | 5844 X.Zheng | SMB CHECKOUT/8090 | SMB CHECKOUT/5635 | 5635 A.Cordones-Ha | 5635 A.Cordones-Ha |
5844 X.Zheng | 5844 X.Zheng | 5844 X.Zheng | 8090 J.Nelson Weke | 5635 A.Cordones-Ha | 5635 A.Cordones-Ha | 5635 A.Cordones-Ha |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
FACI | 6345 M.Preefer | 6345 M.Preefer | 6344 D.Lee | 6344 D.Lee | 5632 M.Doeff | 8881 Y.Liu |
CHANGE/6345 M.Pree | 6345 M.Preefer | CHANGE/6344 D.Lee | 6344 D.Lee | CHANGE/5632 M.Doef | 5632 M.Doeff | 8881 Y.Liu |
6345 M.Preefer | 6345 M.Preefer | 6344 D.Lee | 6344 D.Lee | 5632 M.Doeff | CHANGE/8881 Y.Liu | 8881 Y.Liu |
BEAM LINE 7-2 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
11J6 T.Varner | 8019 J.Richardson | 8019 J.Richardson | DOWN | DOWN | DOWN | DOWN |
CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richar/DOWN | DOWN | DOWN | DOWN | DOWN |
8019 J.Richardson | 8019 J.Richardson | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
93H9 T.Large | 5842 J.Lentz | 5842 J.Lentz | DOWN | DOWN | DOWN | DOWN |
SMB CHECKOUT/5842 | 5842 J.Lentz | 5842 J.Lentz/DOWN | DOWN | DOWN | DOWN | DOWN |
5842 J.Lentz | 5842 J.Lentz | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
5302 L.Li | 5302 L.Li | 5545 C.Roberts | 5545 C.Roberts | 5545 C.Roberts | 6094 M.Stone | 6094 M.Stone |
5302 L.Li | CHANGE/5545 C.Robe | 5545 C.Roberts | 5545 C.Roberts | CHANGE/6094 M.Ston | 6094 M.Stone | 6094 M.Stone |
5302 L.Li | 5545 C.Roberts | 5545 C.Roberts | 5545 C.Roberts | 6094 M.Stone | 6094 M.Stone | 6094 M.Stone |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
FACI | FACI | FACI | 6160 M.Polizzotto | 6160 M.Polizzotto | 5513 C.Kim | 5513 C.Kim |
FACI | FACI | SMB CHECKOUT/6160 | 6160 M.Polizzotto | SMB CHECKOUT/5513 | 5513 C.Kim | 5513 C.Kim |
FACI | FACI | 6160 M.Polizzotto | 6160 M.Polizzotto | 5513 C.Kim | 5513 C.Kim | 5513 C.Kim |
BEAM LINE 11-3 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
FACI | FACI | FACI | FACI | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
FACI | FACI | FACI | Xray CHECKOUT/8095 | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
FACI | FACI | FACI | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
5474 S.Bone | 5894 M.Raven | 5894 M.Raven | 5894 M.Raven | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
CHANGE/5894 M.Rave | 5894 M.Raven | 5894 M.Raven | CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
5894 M.Raven | 5894 M.Raven | 5894 M.Raven | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 15-2 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
8092 D.Sokaras | 8092 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | STUP | 6233 A.Garcia-Espa | 6233 A.Garcia-Espa |
8092 D.Sokaras | CHANGE/8892 D.Soka | 8892 D.Sokaras | STUP | CHANGE/6233 A.Garc | 6233 A.Garcia-Espa | 6233 A.Garcia-Espa |
8092 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | STUP | 6233 A.Garcia-Espa | 6233 A.Garcia-Espa | 6233 A.Garcia-Espa |
BEAM LINE 17-2 | ||||||
Aug. 14, 2023 | Aug. 15, 2023 | Aug. 16, 2023 | Aug. 17, 2023 | Aug. 18, 2023 | Aug. 19, 2023 | Aug. 20, 2023 |
FACI | FACI | FACI | FACI | 6391 J.Li | 6391 J.Li | 6391 J.Li |
FACI | FACI | FACI | Xray CHECKOUT/6391 | 6391 J.Li | 6391 J.Li | 6391 J.Li |
FACI | FACI | FACI | 6391 J.Li | 6391 J.Li | 6391 J.Li | 6391 J.Li |
WEEK OF Aug. 21, 2023 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
BEAM LINE 1-5 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
5918 B.Paulsen/AP | AP | AP | 6024 A.Maurya | 6024 A.Maurya | FACI | FACI |
AP | AP | Xray CHECKOUT/6024 | 6024 A.Maurya | 6024 A.Maurya/FACI | FACI | FACI |
AP | AP | 6024 A.Maurya | 6024 A.Maurya | FACI | FACI | FACI |
BEAM LINE 2-1 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
8095 K.Stone/AP | AP | AP | 6237 S.Shulda | 6237 S.Shulda | 8010 N.Strange | 8010 N.Strange |
AP | AP | Xray CHECKOUT/6237 | 6237 S.Shulda | Xray CHECKOUT/8010 | 8010 N.Strange | 8010 N.Strange |
AP | AP | 6237 S.Shulda | 6237 S.Shulda | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange |
BEAM LINE 2-2 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
8067 S.Webb/AP | AP | AP | 5474 S.Bone | 5474 S.Bone | 6071 M.Pushie | 6071 M.Pushie |
AP | AP | CHANGE/5474 S.Bone | 5474 S.Bone | CHANGE/6071 M.Push | 6071 M.Pushie | 6071 M.Pushie |
AP | AP | 5474 S.Bone | 5474 S.Bone | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie |
BEAM LINE 4-1 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
AP | AP | AP | 6155 Y.WU | 6155 Y.WU | 8014 A.Hoffman | 8014 A.Hoffman |
AP | AP | CHANGE/6155 Y.WU | 6155 Y.WU | CHANGE/8014 A.Hoff | 8014 A.Hoffman | 8014 A.Hoffman |
AP | AP | 6155 Y.WU | 6155 Y.WU | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman |
BEAM LINE 4-2 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
8877 T.Matsui/AP | AP | AP | 12B6 A.Sewa | 12B6 A.Sewa | 12B4 Z.Bu | 6433 S.Bone |
AP | AP | CHANGE/12B6 A.Sewa | 12B6 A.Sewa | CHANGE/12B4 Z.Bu | CHANGE/6433 S.Bone | 6433 S.Bone |
AP | AP | 12B6 A.Sewa | 12B6 A.Sewa | 12B4 Z.Bu | 6433 S.Bone | 6433 S.Bone |
BEAM LINE 4-3 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
5635 A.Cordones/AP | AP | AP | 5531 R.Runnebaum | 5531 R.Runnebaum | 8014 A.Hoffman | 8014 A.Hoffman |
AP | AP | CHANGE/5531 R.Runn | 5531 R.Runnebaum | CHANGE/8014 A.Hoff | 8014 A.Hoffman | 8014 A.Hoffman |
AP | AP | 5531 R.Runnebaum | 5531 R.Runnebaum | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
8881 Y.Liu/AP | AP | AP | 5844 X.Zheng | 5844 X.Zheng | 6247 K.Thurber | 6247 K.Thurber |
AP | AP | CHANGE/5844 X.Zhen | 5844 X.Zheng | CHANGE/6247 K.Thur | 6247 K.Thurber | 6247 K.Thurber |
AP | AP | 5844 X.Zheng | 5844 X.Zheng | 6247 K.Thurber | 6247 K.Thurber | 6247 K.Thurber |
BEAM LINE 7-2 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
6094 M.Stone/AP | AP | AP | FACI | FACI | 5126 J.Yano | 5126 J.Yano |
AP | AP | FACI | FACI | SMB CHECKOUT/5126 | 5126 J.Yano | 5126 J.Yano |
AP | AP | FACI | FACI | 5126 J.Yano | 5126 J.Yano | 5126 J.Yano |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
5513 C.Kim/AP | AP | AP | 6270 S.Saslow | 6270 S.Saslow | 6113 V.Noel | 6113 V.Noel |
AP | AP | SMB CHECKOUT/6270 | 6270 S.Saslow | SMB CHECKOUT/6113 | 6113 V.Noel | 6113 V.Noel |
AP | AP | 6270 S.Saslow | 6270 S.Saslow | 6113 V.Noel | 6113 V.Noel | 6113 V.Noel |
BEAM LINE 11-3 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
8095 K.Stone/AP | AP | AP | 6252 C.Cheng | 6252 C.Cheng | 6103 S.Hesse | 8091 C.Tassone |
AP | AP | CHANGE/5968 A.Pena | CHANGE/6082 P.Nguy | CHANGE/6103 S.Hess | CHANGE/8091 C.Tass | 8091 C.Tassone |
AP | AP | CHANGE/6252 C.Chen | Xray CHECKOUT/6252 | 6103 S.Hesse | 8091 C.Tassone | 8091 C.Tassone |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
FACI/AP | AP | AP | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
8067 S.Webb/AP | AP | AP | 5735 A.Bhattacharj | 5735 A.Bhattacharj | 8019 J.Richardson | 8019 J.Richardson |
AP | AP | CHANGE/5735 A.Bhat | 5735 A.Bhattacharj | CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson |
AP | AP | 5735 A.Bhattacharj | 5735 A.Bhattacharj | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
BEAM LINE 15-2 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
6233 A.Garcia-E/AP | AP | AP | STUP | STUP | 8006 M.Reinhard | 8006 M.Reinhard |
AP | AP | STUP | STUP | CHANGE/8006 M.Rein | 8006 M.Reinhard | 8006 M.Reinhard |
AP | AP | STUP | STUP | 8006 M.Reinhard | 8006 M.Reinhard | 8006 M.Reinhard |
BEAM LINE 17-2 | ||||||
Aug. 21, 2023 | Aug. 22, 2023 | Aug. 23, 2023 | Aug. 24, 2023 | Aug. 25, 2023 | Aug. 26, 2023 | Aug. 27, 2023 |
6391 J.Li/AP | AP | AP | 6219 Y.Takamura | 6219 Y.Takamura | 6219 Y.Takamura | 6219 Y.Takamura |
AP | AP | Xray CHECKOUT/6219 | 6219 Y.Takamura | 6219 Y.Takamura | 6219 Y.Takamura | 6219 Y.Takamura |
AP | AP | 6219 Y.Takamura | 6219 Y.Takamura | 6219 Y.Takamura | 6219 Y.Takamura | 6219 Y.Takamura |
WEEK OF Aug. 28, 2023 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
BEAM LINE 1-5 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
FACI | FACI | 8091 C.Tassone | 8091 C.Tassone | 5529 N.Akmansen Ka | 6273 S.Bent | 8091 C.Tassone |
FACI | Xray CHECKOUT/8091 | Xray CHECKOUT/8091 | Xray CHECKOUT/5529 | Xray CHECKOUT/6273 | Xray CHECKOUT/8091 | 8091 C.Tassone |
FACI | 8091 C.Tassone | 8091 C.Tassone | 5529 N.Akmansen Ka | 6273 S.Bent | 8091 C.Tassone | 8091 C.Tassone |
BEAM LINE 2-1 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
8010 N.Strange | 8010 N.Strange | 5839 B.Saini | 5839 B.Saini | 5839 B.Saini | 93H0 K.Stone | 93H0 K.Stone |
8010 N.Strange | Xray CHECKOUT/5839 | 5839 B.Saini | 5839 B.Saini | Xray CHECKOUT/93H0 | Xray CHECKOUT/93H0 | 93H0 K.Stone |
8010 N.Strange | 5839 B.Saini | 5839 B.Saini | 5839 B.Saini | 93H0 K.Stone | 93H0 K.Stone | 93H0 K.Stone |
BEAM LINE 2-2 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
6071 M.Pushie | 6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | 6113 V.Noel | 6113 V.Noel |
CHANGE/6121 S.Hick | 6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | CHANGE/6113 V.Noel | 6113 V.Noel | 6113 V.Noel |
6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | 6113 V.Noel | 6113 V.Noel | 6113 V.Noel |
BEAM LINE 4-1 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
8014 A.Hoffman | 6147 F.Bridges | 6147 F.Bridges | 6357 A.van Veelen | 6357 A.van Veelen | 6029 A.Asundi | 6029 A.Asundi |
SMB CHECKOUT/6147 | 6147 F.Bridges | SMB CHECKOUT/6357 | 6357 A.van Veelen | SMB CHECKOUT/6029 | 6029 A.Asundi | 6029 A.Asundi |
6147 F.Bridges | 6147 F.Bridges | 6357 A.van Veelen | 6357 A.van Veelen | 6029 A.Asundi | 6029 A.Asundi | 6029 A.Asundi |
BEAM LINE 4-2 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
6433 S.Bone | 5558 A.Marras | 12C0 S.Owoso | 12B5 S.Dehe | 5822 Y.Na | 5119 G.Wong | 6134 K.Meador |
CHANGE/5558 A.Marr | CHANGE/12B7 M.Beck | CHANGE/12B5 S.Dehe | CHANGE/5822 Y.Na | CHANGE/5119 G.Wong | CHANGE/6134 K.Mead | 6134 K.Meador |
5558 A.Marras | CHANGE/12C0 S.Owos | 12B5 S.Dehe | 5822 Y.Na | 5119 G.Wong | 6134 K.Meador | 6134 K.Meador |
BEAM LINE 4-3 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
8014 A.Hoffman | 6209 A.Braun | 6209 A.Braun | 93I7 B.Chaudhuri | 93I7 B.Chaudhuri | 6139 C.Morrell | 6139 C.Morrell |
SMB CHECKOUT/6209 | 6209 A.Braun | SMB CHECKOUT/93I7 | 93I7 B.Chaudhuri | SMB CHECKOUT/6139 | 6139 C.Morrell | 6139 C.Morrell |
6209 A.Braun | 6209 A.Braun | 93I7 B.Chaudhuri | 93I7 B.Chaudhuri | 6139 C.Morrell | 6139 C.Morrell | 6139 C.Morrell |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
DOWN | Unscheduled | 8090 J.Nelson Weke | 6428 N.Sharma | 6307 E.Espinosa Vi | 5508 A.van Veelen | 5508 A.van Veelen |
Unscheduled | CHANGE/8090 J.Nels | CHANGE/6428 N.Shar | CHANGE/6307 E.Espi | CHANGE/5508 A.van | 5508 A.van Veelen | 5508 A.van Veelen |
Unscheduled | 8090 J.Nelson Weke | 6428 N.Sharma | 6307 E.Espinosa Vi | 5508 A.van Veelen | 5508 A.van Veelen | 5508 A.van Veelen |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
6247 K.Thurber | STUP | Unscheduled | Unscheduled | Unscheduled | FACI | FACI |
STUP | Unscheduled | Unscheduled | Unscheduled | FACI | FACI | FACI |
STUP | Unscheduled | Unscheduled | Unscheduled | FACI | FACI | FACI |
BEAM LINE 7-2 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
5126 J.Yano | 5126 J.Yano | 6375 P.Riggs-Gelas | 6375 P.Riggs-Gelas | 6375 P.Riggs-Gelas | 8871 R.Sarangi | 8871 R.Sarangi |
5126 J.Yano | SMB CHECKOUT/6375 | 6375 P.Riggs-Gelas | 6375 P.Riggs-Gelas | SMB CHECKOUT/8871 | 8871 R.Sarangi | 8871 R.Sarangi |
5126 J.Yano | 6375 P.Riggs-Gelas | 6375 P.Riggs-Gelas | 6375 P.Riggs-Gelas | 8871 R.Sarangi | 8871 R.Sarangi | 8871 R.Sarangi |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
6113 V.Noel | 6425 R.Abergel | 6425 R.Abergel | 5535 S.Ying | 5535 S.Ying | 6089 J.Chorover | 6089 J.Chorover |
SMB CHECKOUT/6425 | 6425 R.Abergel | SMB CHECKOUT/5535 | 5535 S.Ying | SMB CHECKOUT/6089 | 6089 J.Chorover | 6089 J.Chorover |
6425 R.Abergel | 6425 R.Abergel | 5535 S.Ying | 5535 S.Ying | 6089 J.Chorover | 6089 J.Chorover | 6089 J.Chorover |
BEAM LINE 11-3 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
8091 C.Tassone | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick | 6241 C.Salamat | 6241 C.Salamat | 6204 M.Cosby |
Xray CHECKOUT/6110 | 6110 N.Leick | 6110 N.Leick | Xray CHECKOUT/6241 | 6241 C.Salamat | Xray CHECKOUT/6204 | 6204 M.Cosby |
6110 N.Leick | 6110 N.Leick | 6110 N.Leick | 6241 C.Salamat | 6241 C.Salamat | 6204 M.Cosby | 6204 M.Cosby |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
8019 J.Richardson | 6428 N.Sharma | 6428 N.Sharma | 6428 N.Sharma | 11J9 Z.Hao | 5844 X.Zheng | 5844 X.Zheng |
CHANGE/6428 N.Shar | 6428 N.Sharma | 6428 N.Sharma | CHANGE/11J9 Z.Hao | CHANGE/5844 X.Zhen | 5844 X.Zheng | 5844 X.Zheng |
6428 N.Sharma | 6428 N.Sharma | 6428 N.Sharma | 11J9 Z.Hao | 5844 X.Zheng | 5844 X.Zheng | 5844 X.Zheng |
BEAM LINE 15-2 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
8006 M.Reinhard | STUP | 6376 J.Azadmanesh | 6376 J.Azadmanesh | 6376 J.Azadmanesh | 5866 M.Nielsen | 5866 M.Nielsen |
STUP | CHANGE/6376 J.Azad | 6376 J.Azadmanesh | 6376 J.Azadmanesh | CHANGE/5866 M.Niel | 5866 M.Nielsen | 5866 M.Nielsen |
STUP | 6376 J.Azadmanesh | 6376 J.Azadmanesh | 6376 J.Azadmanesh | 5866 M.Nielsen | 5866 M.Nielsen | 5866 M.Nielsen |
BEAM LINE 17-2 | ||||||
Aug. 28, 2023 | Aug. 29, 2023 | Aug. 30, 2023 | Aug. 31, 2023 | Sep. 01, 2023 | Sep. 02, 2023 | Sep. 03, 2023 |
6219 Y.Takamura | 6024 A.Maurya | 6024 A.Maurya | 6024 A.Maurya | FACI | 8010 N.Strange | 8010 N.Strange |
Xray CHECKOUT/6024 | 6024 A.Maurya | 6024 A.Maurya | FACI | Xray CHECKOUT/8010 | 8010 N.Strange | 8010 N.Strange |
6024 A.Maurya | 6024 A.Maurya | 6024 A.Maurya | FACI | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange |
WEEK OF Sep. 04, 2023 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
BEAM LINE 1-5 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
8091 C.Tassone | 8091 C.Tassone | COMM | COMM | COMM | COMM | COMM |
8091 C.Tassone | Unscheduled | COMM | COMM | COMM | COMM | COMM |
8091 C.Tassone | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 2-1 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
93H0 K.Stone | 93H0 K.Stone | COMM | COMM | COMM | COMM | COMM |
93H0 K.Stone | Unscheduled | COMM | COMM | COMM | COMM | COMM |
93H0 K.Stone | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 2-2 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
DOWN | DOWN | DOWN/COMM | COMM | COMM | COMM | COMM |
DOWN | DOWN | COMM | COMM | COMM | COMM | COMM |
DOWN | DOWN | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 2-3 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
6113 V.Noel | 6113 V.Noel | COMM | COMM | COMM | COMM | COMM |
6113 V.Noel | Unscheduled | COMM | COMM | COMM | COMM | COMM |
6113 V.Noel | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 4-1 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
6029 A.Asundi | 6029 A.Asundi | COMM | COMM | COMM | COMM | COMM |
6029 A.Asundi | Unscheduled | COMM | COMM | COMM | COMM | COMM |
6029 A.Asundi | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 4-2 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
6134 K.Meador | Unscheduled | COMM | COMM | COMM | COMM | COMM |
Unscheduled | Unscheduled | COMM | COMM | COMM | COMM | COMM |
Unscheduled | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 4-3 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
6139 C.Morrell | 6139 C.Morrell | COMM | COMM | COMM | COMM | COMM |
6139 C.Morrell | Unscheduled | COMM | COMM | COMM | COMM | COMM |
6139 C.Morrell | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
DOWN | DOWN | DOWN/COMM | COMM | COMM | COMM | COMM |
DOWN | DOWN | COMM | COMM | COMM | COMM | COMM |
DOWN | DOWN | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
5508 A.van Veelen | 5508 A.van Veelen | COMM | COMM | COMM | COMM | COMM |
5508 A.van Veelen | Unscheduled | COMM | COMM | COMM | COMM | COMM |
5508 A.van Veelen | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
FACI | FACI | COMM | COMM | COMM | COMM | COMM |
FACI | Unscheduled | COMM | COMM | COMM | COMM | COMM |
FACI | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 7-2 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
DOWN | DOWN | COMM | COMM | COMM | COMM | COMM |
DOWN | Unscheduled | COMM | COMM | COMM | COMM | COMM |
DOWN | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 7-3 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
DOWN | DOWN | COMM | COMM | COMM | COMM | COMM |
DOWN | Unscheduled | COMM | COMM | COMM | COMM | COMM |
DOWN | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 9-3 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
8871 R.Sarangi | 8871 R.Sarangi | COMM | COMM | COMM | COMM | COMM |
8871 R.Sarangi | Unscheduled | COMM | COMM | COMM | COMM | COMM |
8871 R.Sarangi | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
DOWN | DOWN | DOWN/COMM | COMM | COMM | COMM | COMM |
DOWN | DOWN | COMM | COMM | COMM | COMM | COMM |
DOWN | DOWN | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 11-2 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
6089 J.Chorover | 6089 J.Chorover | COMM | COMM | COMM | COMM | COMM |
6089 J.Chorover | Unscheduled | COMM | COMM | COMM | COMM | COMM |
6089 J.Chorover | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 11-3 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
6204 M.Cosby | 6204 M.Cosby | COMM | COMM | COMM | COMM | COMM |
6204 M.Cosby | Unscheduled | COMM | COMM | COMM | COMM | COMM |
6204 M.Cosby | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
FACI | FACI | COMM | COMM | COMM | COMM | COMM |
FACI | Unscheduled | COMM | COMM | COMM | COMM | COMM |
FACI | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
5844 X.Zheng | 5844 X.Zheng | COMM | COMM | COMM | COMM | COMM |
5844 X.Zheng | Unscheduled | COMM | COMM | COMM | COMM | COMM |
5844 X.Zheng | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 15-2 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
5866 M.Nielsen | 5866 M.Nielsen | COMM | COMM | COMM | COMM | COMM |
5866 M.Nielsen | Unscheduled | COMM | COMM | COMM | COMM | COMM |
5866 M.Nielsen | Unscheduled | COMM | COMM | COMM | COMM | COMM |
BEAM LINE 17-2 | ||||||
Sep. 04, 2023 | Sep. 05, 2023 | Sep. 06, 2023 | Sep. 07, 2023 | Sep. 08, 2023 | Sep. 09, 2023 | Sep. 10, 2023 |
8010 N.Strange | 8010 N.Strange | COMM | COMM | COMM | COMM | COMM |
8010 N.Strange | Unscheduled | COMM | COMM | COMM | COMM | COMM |
8010 N.Strange | Unscheduled | COMM | COMM | COMM | COMM | COMM |