X-ray beam lines are scheduled in three 8-hour shifts each day (11pm-7am; 7am-3pm; 3-11pm). Checkouts/changeovers are scheduled during the 7am-3pm shift. Most X-ray beam lines officially turn over to the next user much earlier than 3pm depending on the equipment requirements and staff availability. At least 1 week prior to arrival, users need to contact the designated beam line engineer/scientist (see SSRL Beam Lines by Number for contact information) to discuss beam line configuration needs and start times. Unless instructed otherwise, experiments end at 7am (6am when Maintenance (MA) or Accelerator Physics (AP) are scheduled). |
WEEK OF Sep. 25, 2023 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
BEAM LINE 1-5 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
CHANGE/6294 M.Delg | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Sep. 25, 2023 | Sep. 26, 2023 | Sep. 27, 2023 | Sep. 28, 2023 | Sep. 29, 2023 | Sep. 30, 2023 | Oct. 01, 2023 |
COMM | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Oct. 02, 2023 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
BEAM LINE 1-5 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Oct. 02, 2023 | Oct. 03, 2023 | Oct. 04, 2023 | Oct. 05, 2023 | Oct. 06, 2023 | Oct. 07, 2023 | Oct. 08, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Oct. 09, 2023 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
BEAM LINE 1-5 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Oct. 09, 2023 | Oct. 10, 2023 | Oct. 11, 2023 | Oct. 12, 2023 | Oct. 13, 2023 | Oct. 14, 2023 | Oct. 15, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Oct. 16, 2023 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
BEAM LINE 1-5 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Oct. 16, 2023 | Oct. 17, 2023 | Oct. 18, 2023 | Oct. 19, 2023 | Oct. 20, 2023 | Oct. 21, 2023 | Oct. 22, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Oct. 23, 2023 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
BEAM LINE 1-5 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Oct. 23, 2023 | Oct. 24, 2023 | Oct. 25, 2023 | Oct. 26, 2023 | Oct. 27, 2023 | Oct. 28, 2023 | Oct. 29, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Oct. 30, 2023 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
BEAM LINE 1-5 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Oct. 30, 2023 | Oct. 31, 2023 | Nov. 01, 2023 | Nov. 02, 2023 | Nov. 03, 2023 | Nov. 04, 2023 | Nov. 05, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Nov. 06, 2023 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
BEAM LINE 1-5 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Nov. 06, 2023 | Nov. 07, 2023 | Nov. 08, 2023 | Nov. 09, 2023 | Nov. 10, 2023 | Nov. 11, 2023 | Nov. 12, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Nov. 13, 2023 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
BEAM LINE 1-5 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 2-1 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | FACI | 93H0 K.Stone | 93H0 K.Stone | 93H0 K.Stone | 8810 N.Strange | 8810 N.Strange |
FACI | Xray CHECKOUT/93H0 | 93H0 K.Stone | 93H0 K.Stone | VUV CHECKOUT | 8810 N.Strange | 8810 N.Strange |
FACI | 93H0 K.Stone | 93H0 K.Stone | 93H0 K.Stone | 8810 N.Strange | 8810 N.Strange | 8810 N.Strange |
BEAM LINE 2-2 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | Unscheduled | 5794 T.Varga | 5794 T.Varga | 5794 T.Varga | 8019 J.Richardson | 8019 J.Richardson |
Unscheduled | CHANGE/5794 T.Varg | 5794 T.Varga | 5794 T.Varga | CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson |
Unscheduled | 5794 T.Varga | 5794 T.Varga | 5794 T.Varga | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
BEAM LINE 4-1 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | STUP | STUP | STUP | STUP | STUP | STUP |
STUP | STUP | STUP | STUP | STUP | STUP | STUP |
STUP | STUP | STUP | STUP | STUP | STUP | STUP |
BEAM LINE 4-2 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui |
CHANGE/8877 T.Mats | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui |
8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | STUP | STUP | STUP | STUP | 6160 M.Polizzotto | 6160 M.Polizzotto |
STUP | STUP | STUP | STUP | SMB CHECKOUT/6160 | 6160 M.Polizzotto | 6160 M.Polizzotto |
STUP | STUP | STUP | STUP | 6160 M.Polizzotto | 6160 M.Polizzotto | 6160 M.Polizzotto |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 7-2 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | FACI | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson | 6240 V.Noel | 6240 V.Noel |
FACI | CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson | CHANGE/6240 V.Noel | 6240 V.Noel | 6240 V.Noel |
FACI | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson | 6240 V.Noel | 6240 V.Noel | 6240 V.Noel |
BEAM LINE 7-3 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | Unscheduled | Unscheduled | Unscheduled | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn |
Unscheduled | Unscheduled | Unscheduled | SMB CHECKOUT/5480 | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn |
Unscheduled | Unscheduled | Unscheduled | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | STUP | STUP | STUP | STUP | 8019 J.Richardson | 8019 J.Richardson |
STUP | STUP | STUP | STUP | SMB CHECKOUT/8019 | 8019 J.Richardson | 8019 J.Richardson |
STUP | STUP | STUP | STUP | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
BEAM LINE 11-3 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled | 8019 J.Richardson | 8019 J.Richardson |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
BEAM LINE 15-2 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | STUP | STUP | STUP | STUP | 6406 E.Biasin | 6406 E.Biasin |
STUP | STUP | STUP | STUP | CHANGE/6406 E.Bias | 6406 E.Biasin | 6406 E.Biasin |
STUP | STUP | STUP | STUP | 6406 E.Biasin | 6406 E.Biasin | 6406 E.Biasin |
BEAM LINE 17-2 | ||||||
Nov. 13, 2023 | Nov. 14, 2023 | Nov. 15, 2023 | Nov. 16, 2023 | Nov. 17, 2023 | Nov. 18, 2023 | Nov. 19, 2023 |
DOWN | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
WEEK OF Nov. 20, 2023 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
BEAM LINE 1-5 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
FACI | 6506 S.Verschraege | Unscheduled | DOWN | DOWN | Unscheduled | Unscheduled |
Xray CHECKOUT/6506 | Unscheduled | Unscheduled | DOWN | DOWN | Unscheduled | Xray CHECKOUT/8091 |
6506 S.Verschraege | Unscheduled | DOWN | DOWN | Unscheduled | Unscheduled | 8091 C.Tassone |
BEAM LINE 2-1 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
8810 N.Strange | FACI | 6429 H.Ramachandra | DOWN | DOWN | 6429 H.Ramachandra | 6429 H.Ramachandra |
FACI | Xray CHECKOUT/6429 | 6429 H.Ramachandra | DOWN | DOWN | 6429 H.Ramachandra | 6429 H.Ramachandra |
FACI | 6429 H.Ramachandra | 6429 H.Ramach/DOWN | DOWN | 6429 H.Ramachandra | 6429 H.Ramachandra | 6429 H.Ramachandra |
BEAM LINE 2-2 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
8019 J.Richardson | 8019 J.Richardson | 6113 V.Noel | DOWN | DOWN | 6113 V.Noel | 6113 V.Noel |
8019 J.Richardson | CHANGE/6113 V.Noel | 6113 V.Noel | DOWN | DOWN | 6113 V.Noel | 6113 V.Noel |
8019 J.Richardson | 6113 V.Noel | 6113 V.Noel/DOWN | DOWN | 6113 V.Noel | 6113 V.Noel | 6113 V.Noel |
BEAM LINE 4-1 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
STUP | 8099 S.Bare | 8099 S.Bare | DOWN | DOWN | 8099 S.Bare | 5827 C.Kronawitter |
CHANGE/8099 S.Bare | 8099 S.Bare | 8099 S.Bare | DOWN | DOWN | CHANGE/5827 C.Kron | 5827 C.Kronawitter |
8099 S.Bare | 8099 S.Bare | 8099 S.Bare/DOWN | DOWN | 8099 S.Bare | 5827 C.Kronawitter | 5827 C.Kronawitter |
BEAM LINE 4-2 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
8877 T.Matsui | 6193 J.Nielsen | 8877 T.Matsui | DOWN | DOWN | 6433 S.Bone | 6433 S.Bone |
CHANGE/6193 J.Niel | CHANGE/8877 T.Mats | 8877 T.Matsui | DOWN | DOWN | 6433 S.Bone | 6433 S.Bone |
6193 J.Nielsen | 8877 T.Matsui | DOWN | DOWN | 6433 S.Bone | 6433 S.Bone | 6433 S.Bone |
BEAM LINE 4-3 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
6160 M.Polizzotto | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
FACI | 8890 J.Nelson Weke | 8890 J.Nelson Weke | DOWN | DOWN | DOWN | DOWN |
Xray CHECKOUT/8890 | 8890 J.Nelson Weke | Xray CHECKOUT/6221 | DOWN | DOWN | DOWN | DOWN |
8890 J.Nelson Weke | 8890 J.Nelson Weke | 6221 P.Zhang/DOWN | DOWN | 6221 P.Zhang/DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
6240 V.Noel | 5982 L.Dresselhaus | 5982 L.Dresselhaus | DOWN | DOWN | 6403 T.Sowers | 6403 T.Sowers |
CHANGE/5982 L.Dres | 5982 L.Dresselhaus | CHANGE/6403 T.Sowe | DOWN | DOWN | 6403 T.Sowers | 6403 T.Sowers |
5982 L.Dresselhaus | 5982 L.Dresselhaus | 6403 T.Sowers/DOWN | DOWN | 6403 T.Sowers | 6403 T.Sowers | 6403 T.Sowers |
BEAM LINE 7-3 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
DOWN | 5636 L.Gee | 5636 L.Gee | DOWN | DOWN | 6163 G.George | 6163 G.George |
SMB CHECKOUT/5636 | 5636 L.Gee | SMB CHECKOUT/6163 | DOWN | DOWN | 6163 G.George | 6163 G.George |
5636 L.Gee | 5636 L.Gee | 6163 G.George/DOWN | DOWN | 6163 G.George | 6163 G.George | 6163 G.George |
BEAM LINE 9-3 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
5480 N.Blackburn | 6035 I.Bogacz | 6035 I.Bogacz | DOWN | DOWN | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn |
SMB CHECKOUT/6035 | 6035 I.Bogacz | SMB CHECKOUT/5901 | DOWN | DOWN | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn |
6035 I.Bogacz | 6035 I.Bogacz | 5901 J.Penner/DOWN | DOWN | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
8019 J.Richardson | Unscheduled | Unscheduled | DOWN | DOWN | 6491 M.Wang | 6491 M.Wang |
Unscheduled | Unscheduled | SMB CHECKOUT/6491 | DOWN | DOWN | 6491 M.Wang | 6491 M.Wang |
Unscheduled | Unscheduled | 6491 M.Wang/DOWN | DOWN | 6491 M.Wang | 6491 M.Wang | 6491 M.Wang |
BEAM LINE 11-3 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
FACI | 6252 C.Cheng | 6506 S.Verschraege | DOWN | DOWN | 6137 Z.Xue | 6137 Z.Xue |
Xray CHECKOUT/6252 | Xray CHECKOUT/6506 | Xray CHECKOUT/6137 | DOWN | DOWN | 6137 Z.Xue | 6137 Z.Xue |
6252 C.Cheng | 6506 S.Verschraege | 6137 Z.Xue/DOWN | DOWN | 6137 Z.Xue | 6137 Z.Xue | 6137 Z.Xue |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
8019 J.Richardson | 5735 A.Bhattacharj | 5735 A.Bhattacharj | DOWN | DOWN | 6428 N.Sharma | 6428 N.Sharma |
CHANGE/5735 A.Bhat | 5735 A.Bhattacharj | 5735 A.Bhattacharj | DOWN | DOWN | 6428 N.Sharma | 6428 N.Sharma |
5735 A.Bhattacharj | 5735 A.Bhattacharj | 5735 A.Bhatta/DOWN | DOWN | 6428 N.Sharma | 6428 N.Sharma | 6428 N.Sharma |
BEAM LINE 15-2 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
6406 E.Biasin | 5777 T.Large | 5777 T.Large | DOWN | DOWN | Unscheduled | Unscheduled |
CHANGE/5777 T.Larg | 5777 T.Large | 5777 T.Large | DOWN | DOWN | Unscheduled | Unscheduled |
5777 T.Large | 5777 T.Large | 5777 T.Large/DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 17-2 | ||||||
Nov. 20, 2023 | Nov. 21, 2023 | Nov. 22, 2023 | Nov. 23, 2023 | Nov. 24, 2023 | Nov. 25, 2023 | Nov. 26, 2023 |
FACI | FACI | FACI | DOWN | DOWN | FACI | FACI |
FACI | FACI | FACI | DOWN | DOWN | FACI | FACI |
FACI | FACI | FACI/DOWN | DOWN | FACI | FACI | FACI |
WEEK OF Nov. 27, 2023 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
BEAM LINE 1-5 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 93I8 J.Nelson | 93I8 J.Nelson | 93I8 J.Nelson |
8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | Xray CHECKOUT/93I8 | 93I8 J.Nelson | 93I8 J.Nelson | 93I8 J.Nelson |
8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 93I8 J.Nelson | 93I8 J.Nelson | 93I8 J.Nelson | 93I8 J.Nelson |
BEAM LINE 2-1 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
6429 H.Ramachandra | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone |
Xray CHECKOUT/8895 | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone |
8895 K.Stone | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone | 8895 K.Stone |
BEAM LINE 2-2 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
6113 V.Noel | 6287 L.Dresselhaus | 6287 L.Dresselhaus | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew |
CHANGE/6287 L.Dres | 6287 L.Dresselhaus | CHANGE/6477 A.Jew | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew |
6287 L.Dresselhaus | 6287 L.Dresselhaus | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew |
BEAM LINE 4-1 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
5827 C.Kronawitter | 5827 C.Kronawitter | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun |
5827 C.Kronawitter | CHANGE/5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun |
5827 C.Kronawitter | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun |
BEAM LINE 4-2 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
6433 S.Bone | 6539 E.Biasin | 12A6 K.Lee | 12A6 K.Lee | 5558 A.Marras | 8877 T.Matsui | 8877 T.Matsui |
CHANGE/6539 E.Bias | CHANGE/12A6 K.Lee | 12A6 K.Lee | CHANGE/5558 A.Marr | 5558 A.Marras | 8877 T.Matsui | 8877 T.Matsui |
6539 E.Biasin | 12A6 K.Lee | 12A6 K.Lee | 5558 A.Marras | CHANGE/8877 T.Mats | 8877 T.Matsui | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
DOWN | 6345 M.Preefer | 6345 M.Preefer | 6475 K.Nam | 6479 G.Chen | 5910 E.Pierce | 5910 E.Pierce |
SMB CHECKOUT/6345 | 6345 M.Preefer | SMB CHECKOUT/6475 | SMB CHECKOUT/6479 | 6479 G.Chen | 5910 E.Pierce | 5910 E.Pierce |
6345 M.Preefer | 6345 M.Preefer | 6475 K.Nam | 6479 G.Chen | CHANGE/5910 E.Pier | 5910 E.Pierce | 5910 E.Pierce |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | 8890 J.Nelson Weke | 8890 J.Nelson Weke |
DOWN | DOWN | DOWN | DOWN | Unscheduled | 8890 J.Nelson Weke | 8890 J.Nelson Weke |
DOWN | DOWN | DOWN | DOWN | CHANGE/8890 J.Nels | 8890 J.Nelson Weke | 8890 J.Nelson Weke |
BEAM LINE 7-2 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
6403 T.Sowers | 11J4 L.LEFTICARIU | 11J4 L.LEFTICARIU | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
CHANGE/11J4 L.LEFT | 11J4 L.LEFTICARIU | CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
11J4 L.LEFTICARIU | 11J4 L.LEFTICARIU | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 7-3 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
6163 G.George | 93H9 T.Large | 93H9 T.Large | 93H9 T.Large | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
SMB CHECKOUT/93H9 | 93H9 T.Large | 93H9 T.Large | SMB CHECKOUT/8019 | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
93H9 T.Large | 93H9 T.Large | 93H9 T.Large | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
BEAM LINE 9-3 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
5901 J.Penner-Hahn | 6509 V.Sosa Alfaro | 6509 V.Sosa Alfaro | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster |
SMB CHECKOUT/6509 | 6509 V.Sosa Alfaro | SMB CHECKOUT/6158 | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster |
6509 V.Sosa Alfaro | 6509 V.Sosa Alfaro | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster | 6158 K.Lancaster |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
6491 M.Wang | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
6137 Z.Xue | 6055 M.Chabinyc | 6055 M.Chabinyc | 6012 Q.Liu | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse |
Xray CHECKOUT/6055 | 6055 M.Chabinyc | Xray CHECKOUT/6012 | Xray CHECKOUT/6103 | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse |
6055 M.Chabinyc | 6055 M.Chabinyc | 6012 Q.Liu | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
6428 N.Sharma | 6428 N.Sharma | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone |
6428 N.Sharma | CHANGE/8064 S.Bone | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone |
6428 N.Sharma | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone |
BEAM LINE 15-2 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
Unscheduled | STUP | STUP | 6032 M.Guo | 6032 M.Guo | 6032 M.Guo | 6032 M.Guo |
STUP | STUP | CHANGE/6032 M.Guo | 6032 M.Guo | 6032 M.Guo | 6032 M.Guo | 6032 M.Guo |
STUP | STUP | 6032 M.Guo | 6032 M.Guo | 6032 M.Guo | 6032 M.Guo | 6032 M.Guo |
BEAM LINE 17-2 | ||||||
Nov. 27, 2023 | Nov. 28, 2023 | Nov. 29, 2023 | Nov. 30, 2023 | Dec. 01, 2023 | Dec. 02, 2023 | Dec. 03, 2023 |
FACI | FACI | FACI | 6391 J.Li | 6391 J.Li | 6391 J.Li | 6391 J.Li |
FACI | FACI | Xray CHECKOUT/6391 | 6391 J.Li | 6391 J.Li | 6391 J.Li | 6391 J.Li |
FACI | FACI | 6391 J.Li | 6391 J.Li | 6391 J.Li | 6391 J.Li | 6391 J.Li |
WEEK OF Dec. 04, 2023 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
BEAM LINE 1-5 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
93I8 J.Nelson/AP | AP | AP | 6024 A.Maurya | 6024 A.Maurya | 6024 A.Maurya | FACI |
AP | AP | Xray CHECKOUT/6024 | 6024 A.Maurya | 6024 A.Maurya | FACI | Xray CHECKOUT/93J2 |
AP | AP | 6024 A.Maurya | 6024 A.Maurya | 6024 A.Maurya | FACI | 93J2 I.Jayapurna |
BEAM LINE 2-1 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
8895 K.Stone/AP | AP | AP | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange |
AP | AP | Xray CHECKOUT/8010 | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange |
AP | AP | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange |
BEAM LINE 2-2 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
6477 A.Jew/AP | AP | AP | 5888 N.Tosca | 5888 N.Tosca | 5756 A.Seyfferth | 5756 A.Seyfferth |
AP | AP | CHANGE/5888 N.Tosc | 5888 N.Tosca | CHANGE/5756 A.Seyf | 5756 A.Seyfferth | 5756 A.Seyfferth |
AP | AP | 5888 N.Tosca | 5888 N.Tosca | 5756 A.Seyfferth | 5756 A.Seyfferth | 5756 A.Seyfferth |
BEAM LINE 4-1 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
5266 A.Uzun/AP | AP | AP | 8095 K.Stone | 8095 K.Stone | 6484 S.Koh | 6484 S.Koh |
AP | AP | SMB CHECKOUT/8095 | 8095 K.Stone | SMB CHECKOUT/6484 | 6484 S.Koh | 6484 S.Koh |
AP | AP | 8095 K.Stone | 8095 K.Stone | 6484 S.Koh | 6484 S.Koh | 6484 S.Koh |
BEAM LINE 4-2 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
8877 T.Matsui/AP | AP | AP | 6136 A.Bhattachary | 8877 T.Matsui | Unscheduled | Unscheduled |
AP | AP | CHANGE/6136 A.Bhat | CHANGE/8877 T.Mats | Unscheduled | Unscheduled | Unscheduled |
AP | AP | 6136 A.Bhattachary | 8877 T.Matsui | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 4-3 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
5910 E.Pierce/AP | AP | AP | 6158 K.Lancaster | 6158 K.Lancaster | 6013 M.Zoric | 6013 M.Zoric |
AP | AP | SMB CHECKOUT/6158 | 6158 K.Lancaster | SMB CHECKOUT/6013 | 6013 M.Zoric | 6013 M.Zoric |
AP | AP | 6158 K.Lancaster | 6158 K.Lancaster | 6013 M.Zoric | 6013 M.Zoric | 6013 M.Zoric |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
DOWN/AP | AP | AP | CHAR | 6406 E.Biasin | 6406 E.Biasin | 8892 D.Sokaras |
AP | AP | CHAR | CHANGE/6406 E.Bias | 6406 E.Biasin | CHANGE/8892 D.Soka | 8892 D.Sokaras |
AP | AP | CHAR | 6406 E.Biasin | 6406 E.Biasin | 8892 D.Sokaras | 8892 D.Sokaras |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
8890 J.Nelson W/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 7-2 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
8067 S.Webb/AP | AP | AP | 5756 A.Seyfferth | 5756 A.Seyfferth | 5756 A.Seyfferth | 5756 A.Seyfferth |
AP | AP | CHANGE/5756 A.Seyf | 5756 A.Seyfferth | 5756 A.Seyfferth | 5756 A.Seyfferth | 5756 A.Seyfferth |
AP | AP | 5756 A.Seyfferth | 5756 A.Seyfferth | 5756 A.Seyfferth | 5756 A.Seyfferth | 5756 A.Seyfferth |
BEAM LINE 7-3 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
8019 J.Richards/AP | AP | AP | 11K3 K.Chacon | 11K3 K.Chacon | 6123 H.La Pierre | 6123 H.La Pierre |
AP | AP | SMB CHECKOUT/11K3 | 11K3 K.Chacon | SMB CHECKOUT/6123 | 6123 H.La Pierre | 6123 H.La Pierre |
AP | AP | 11K3 K.Chacon | 11K3 K.Chacon | 6123 H.La Pierre | 6123 H.La Pierre | 6123 H.La Pierre |
BEAM LINE 9-3 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
6158 K.Lancaste/AP | AP | AP | 8099 S.Bare | 8099 S.Bare | 6498 G.Kamat | 6498 G.Kamat |
AP | AP | CHANGE/8099 S.Bare | 8099 S.Bare | CHANGE/6498 G.Kama | 6498 G.Kamat | 6498 G.Kamat |
AP | AP | 8099 S.Bare | 8099 S.Bare | 6498 G.Kamat | 6498 G.Kamat | 6498 G.Kamat |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
DOWN/AP | AP | AP | 5009 S.Kozimor | 5009 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor |
AP | AP | SMB CHECKOUT/5009 | 5009 S.Kozimor | CHANGE/6317 S.Kozi | 6317 S.Kozimor | 6317 S.Kozimor |
AP | AP | 5009 S.Kozimor | 5009 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor |
BEAM LINE 11-3 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
6103 S.Hesse/AP | AP | AP | 5419 G.Giri | 5419 G.Giri | 6088 K.White | 6088 K.White |
AP | AP | Xray CHECKOUT/5419 | 5419 G.Giri | Xray CHECKOUT/6088 | 6088 K.White | 6088 K.White |
AP | AP | 5419 G.Giri | 5419 G.Giri | 6088 K.White | 6088 K.White | 6088 K.White |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
8064 S.Bone/AP | AP | AP | 5892 R.Bryant | 5892 R.Bryant | 6014 D.Fike | 6014 D.Fike |
AP | AP | CHANGE/5892 R.Brya | 5892 R.Bryant | CHANGE/6014 D.Fike | 6014 D.Fike | 6014 D.Fike |
AP | AP | 5892 R.Bryant | 5892 R.Bryant | 6014 D.Fike | 6014 D.Fike | 6014 D.Fike |
BEAM LINE 15-2 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
6032 M.Guo/AP | AP | AP | 8898 T.Kroll | 8898 T.Kroll | STUP | 6376 J.Azadmanesh |
AP | AP | CHANGE/8898 T.Krol | 8898 T.Kroll | STUP | CHANGE/6376 J.Azad | 6376 J.Azadmanesh |
AP | AP | 8898 T.Kroll | 8898 T.Kroll | STUP | 6376 J.Azadmanesh | 6376 J.Azadmanesh |
BEAM LINE 17-2 | ||||||
Dec. 04, 2023 | Dec. 05, 2023 | Dec. 06, 2023 | Dec. 07, 2023 | Dec. 08, 2023 | Dec. 09, 2023 | Dec. 10, 2023 |
6391 J.Li/AP | AP | AP | 6219 Y.Takamura | 6219 Y.Takamura | 6219 Y.Takamura | FACI |
AP | AP | Xray CHECKOUT/6219 | 6219 Y.Takamura | 6219 Y.Takamura | FACI | FACI |
AP | AP | 6219 Y.Takamura | 6219 Y.Takamura | 6219 Y.Takamura | FACI | FACI |
WEEK OF Dec. 11, 2023 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
BEAM LINE 1-5 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
93J2 I.Jayapurna | 5968 A.Pena-Alcant | 5968 A.Pena-Alcant | 5816 A.Ayzner | 6343 J.Arens | 8010 N.Strange | 8010 N.Strange |
Xray CHECKOUT/5968 | 5968 A.Pena-Alcant | Xray CHECKOUT/5816 | Xray CHECKOUT/6343 | Xray CHECKOUT/8010 | 8010 N.Strange | Xray CHECKOUT/6110 |
5968 A.Pena-Alcant | 5968 A.Pena-Alcant | 5816 A.Ayzner | 6343 J.Arens | 8010 N.Strange | 8010 N.Strange | 6110 N.Leick |
BEAM LINE 2-1 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
8010 N.Strange | FACI | 93I3 D.Yancey | 5998 V.Augustyn | 5998 V.Augustyn | FACI | 93H0 K.Stone |
FACI | Xray CHECKOUT/93I3 | Xray CHECKOUT/5998 | 5998 V.Augustyn | FACI | Xray CHECKOUT/93H0 | 93H0 K.Stone |
FACI | 93I3 D.Yancey | 5998 V.Augustyn | 5998 V.Augustyn | FACI | 93H0 K.Stone | 93H0 K.Stone |
BEAM LINE 2-2 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
5756 A.Seyfferth | 6089 J.Chorover | 6089 J.Chorover | 6228 M.McNamara | 6228 M.McNamara | 6229 C.Mays | 6229 C.Mays |
CHANGE/6089 J.Chor | 6089 J.Chorover | CHANGE/6228 M.McNa | 6228 M.McNamara | CHANGE/6229 C.Mays | 6229 C.Mays | 6229 C.Mays |
6089 J.Chorover | 6089 J.Chorover | 6228 M.McNamara | 6228 M.McNamara | 6229 C.Mays | 6229 C.Mays | 6229 C.Mays |
BEAM LINE 4-1 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
6484 S.Koh | FACI | 5813 M.Vejar | 5813 M.Vejar | 6453 K.Kang | DOWN | DOWN |
FACI | SMB CHECKOUT/5813 | 5813 M.Vejar | SMB CHECKOUT/6453 | DOWN | DOWN | DOWN |
FACI | 5813 M.Vejar | 5813 M.Vejar | 6453 K.Kang | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
Unscheduled | RA | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai | Unscheduled |
RA | CHANGE/6057 D.Mai | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai | Unscheduled | Unscheduled |
RA | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai | Unscheduled | Unscheduled |
BEAM LINE 4-3 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
6013 M.Zoric | 6327 C.Geci | 6327 C.Geci | 6327 C.Geci | 6327 C.Geci | 6232 A.Garcia-Espa | 6232 A.Garcia-Espa |
SMB CHECKOUT/6327 | 6327 C.Geci | 6327 C.Geci | 6327 C.Geci | SMB CHECKOUT/6232 | 6232 A.Garcia-Espa | 6232 A.Garcia-Espa |
6327 C.Geci | 6327 C.Geci | 6327 C.Geci | 6327 C.Geci | 6232 A.Garcia-Espa | 6232 A.Garcia-Espa | 6232 A.Garcia-Espa |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
8892 D.Sokaras | 5786 T.Hersbach | 5786 T.Hersbach | 5786 T.Hersbach | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras |
CHANGE/5786 T.Hers | 5786 T.Hersbach | 5786 T.Hersbach | CHANGE/8092 D.Soka | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras |
5786 T.Hersbach | 5786 T.Hersbach | 5786 T.Hersbach | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 7-2 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
5756 A.Seyfferth | 6089 J.Chorover | 6089 J.Chorover | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara | 6229 C.Mays |
CHANGE/6089 J.Chor | 6089 J.Chorover | CHANGE/6228 M.McNa | 6228 M.McNamara | 6228 M.McNamara | CHANGE/6229 C.Mays | 6229 C.Mays |
6089 J.Chorover | 6089 J.Chorover | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara | 6229 C.Mays | 6229 C.Mays |
BEAM LINE 7-3 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
6123 H.La Pierre | 6376 J.Azadmanesh | 6376 J.Azadmanesh | 6536 J.Schneider | 6536 J.Schneider | 6375 P.Riggs-Gelas | 6375 P.Riggs-Gelas |
SMB CHECKOUT/6376 | 6376 J.Azadmanesh | SMB CHECKOUT/6536 | 6536 J.Schneider | SMB CHECKOUT/6375 | 6375 P.Riggs-Gelas | 6375 P.Riggs-Gelas |
6376 J.Azadmanesh | 6376 J.Azadmanesh | 6536 J.Schneider | 6536 J.Schneider | 6375 P.Riggs-Gelas | 6375 P.Riggs-Gelas | 6375 P.Riggs-Gelas |
BEAM LINE 9-3 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
6498 G.Kamat | 6166 J.Chen | 6166 J.Chen | 6053 A.Bhan | 6053 A.Bhan | 6053 A.Bhan | 8099 S.Bare |
CHANGE/6166 J.Chen | 6166 J.Chen | CHANGE/6053 A.Bhan | 6053 A.Bhan | 6053 A.Bhan | CHANGE/8099 S.Bare | 8099 S.Bare |
6166 J.Chen | 6166 J.Chen | 6053 A.Bhan | 6053 A.Bhan | 6053 A.Bhan | 8099 S.Bare | 8099 S.Bare |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
6317 S.Kozimor | 6352 P.Smith | 6352 P.Smith | 6352 P.Smith | 6353 P.Smith | 6516 A.Evers | 6516 A.Evers |
SMB CHECKOUT/6352 | 6352 P.Smith | 6352 P.Smith | Xray CHECKOUT/6353 | SMB CHECKOUT/6516 | 6516 A.Evers | 6516 A.Evers |
6352 P.Smith | 6352 P.Smith | 6352 P.Smith | 6353 P.Smith | 6516 A.Evers | 6516 A.Evers | 6516 A.Evers |
BEAM LINE 11-3 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
6088 K.White | 6438 R.Smaha | 6438 R.Smaha | 5968 A.Pena-Alcant | 6006 Y.Wu | 6515 M.Cosby | 6515 M.Cosby |
Xray CHECKOUT/6438 | 6438 R.Smaha | Xray CHECKOUT/5968 | Xray CHECKOUT/6006 | Xray CHECKOUT/6515 | 6515 M.Cosby | 6515 M.Cosby |
6438 R.Smaha | 6438 R.Smaha | 5968 A.Pena-Alcant | 6006 Y.Wu | 6515 M.Cosby | 6515 M.Cosby | 6515 M.Cosby |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
6014 D.Fike | 6333 M.McNamara | 6333 M.McNamara | 6333 M.McNamara | 6333 M.McNamara | 6180 A.Templeton | 6180 A.Templeton |
CHANGE/6333 M.McNa | 6333 M.McNamara | 6333 M.McNamara | 6333 M.McNamara | CHANGE/6180 A.Temp | 6180 A.Templeton | 6180 A.Templeton |
6333 M.McNamara | 6333 M.McNamara | 6333 M.McNamara | 6333 M.McNamara | 6180 A.Templeton | 6180 A.Templeton | 6180 A.Templeton |
BEAM LINE 15-2 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
6376 J.Azadmanesh | 6376 J.Azadmanesh | STUP | 6177 P.O'Day | 6177 P.O'Day | 6177 P.O'Day | 6000 G.George |
6376 J.Azadmanesh | STUP | CHANGE/6177 P.O'Da | 6177 P.O'Day | 6177 P.O'Day | CHANGE/6000 G.Geor | 6000 G.George |
6376 J.Azadmanesh | STUP | 6177 P.O'Day | 6177 P.O'Day | 6177 P.O'Day | 6000 G.George | 6000 G.George |
BEAM LINE 17-2 | ||||||
Dec. 11, 2023 | Dec. 12, 2023 | Dec. 13, 2023 | Dec. 14, 2023 | Dec. 15, 2023 | Dec. 16, 2023 | Dec. 17, 2023 |
FACI | FACI | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 8890 J.Nelson Weke |
FACI | Xray CHECKOUT/8890 | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 8890 J.Nelson Weke |
FACI | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 8890 J.Nelson Weke |
WEEK OF Dec. 18, 2023 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
BEAM LINE 1-5 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
6110 N.Leick | 6110 N.Leick/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6110 N.Leick | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6110 N.Leick | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
93H0 K.Stone | 93H0 K.Stone/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
93H0 K.Stone | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
93H0 K.Stone | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
6229 C.Mays | 6479 G.Chen/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
CHANGE/6479 G.Chen | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6479 G.Chen | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
Unscheduled | 8877 T.Matsui/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
CHANGE/8877 T.Mats | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
8877 T.Matsui | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
6232 A.Garcia-Espa | 6232 A.Garcia/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6232 A.Garcia-Espa | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6232 A.Garcia-Espa | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
8092 D.Sokaras | 8092 D.Sokara/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
8092 D.Sokaras | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
8092 D.Sokaras | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
6229 C.Mays | 6229 C.Mays/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6229 C.Mays | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6229 C.Mays | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
6375 P.Riggs-Gelas | 6375 P.Riggs-/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6375 P.Riggs-Gelas | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6375 P.Riggs-Gelas | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
8099 S.Bare | 8099 S.Bare/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
8099 S.Bare | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
8099 S.Bare | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
6516 A.Evers | 6516 A.Evers/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6516 A.Evers | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6516 A.Evers | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
6515 M.Cosby | 6515 M.Cosby/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6515 M.Cosby | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6515 M.Cosby | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
6180 A.Templeton | 6180 A.Temple/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6180 A.Templeton | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
6180 A.Templeton | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
6000 G.George | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Dec. 18, 2023 | Dec. 19, 2023 | Dec. 20, 2023 | Dec. 21, 2023 | Dec. 22, 2023 | Dec. 23, 2023 | Dec. 24, 2023 |
8890 J.Nelson Weke | 8890 J.Nelson/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
8890 J.Nelson Weke | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
8890 J.Nelson Weke | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Dec. 25, 2023 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
BEAM LINE 1-5 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Dec. 25, 2023 | Dec. 26, 2023 | Dec. 27, 2023 | Dec. 28, 2023 | Dec. 29, 2023 | Dec. 30, 2023 | Dec. 31, 2023 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jan. 01, 2024 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
BEAM LINE 1-5 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jan. 01, 2024 | Jan. 02, 2024 | Jan. 03, 2024 | Jan. 04, 2024 | Jan. 05, 2024 | Jan. 06, 2024 | Jan. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jan. 08, 2024 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
BEAM LINE 1-5 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jan. 08, 2024 | Jan. 09, 2024 | Jan. 10, 2024 | Jan. 11, 2024 | Jan. 12, 2024 | Jan. 13, 2024 | Jan. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jan. 15, 2024 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
BEAM LINE 1-5 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | FACI | Unscheduled | Unscheduled |
DOWN | DOWN | AP | FACI | Unscheduled | Unscheduled | Unscheduled |
DOWN | DOWN/AP | AP | FACI | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 2-1 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | FACI | 93H0 K.Stone | 93H0 K.Stone |
DOWN | DOWN | AP | FACI | Xray CHECKOUT/93H0 | 93H0 K.Stone | 93H0 K.Stone |
DOWN | DOWN/AP | AP | FACI | 93H0 K.Stone | 93H0 K.Stone | 93H0 K.Stone |
BEAM LINE 2-2 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | 8224 D.Reis | 8224 D.Reis | 8224 D.Reis |
DOWN | DOWN | AP | Xray CHECKOUT/8224 | 8224 D.Reis | 8224 D.Reis | 8224 D.Reis |
DOWN | DOWN/AP | AP | 8224 D.Reis | 8224 D.Reis | 8224 D.Reis | 8224 D.Reis |
BEAM LINE 2-3 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | 6480 T.Sowers | 6480 T.Sowers | 6480 T.Sowers |
DOWN | DOWN | AP | CHANGE/6480 T.Sowe | 6480 T.Sowers | 6480 T.Sowers | 6480 T.Sowers |
DOWN | DOWN/AP | AP | 6480 T.Sowers | 6480 T.Sowers | 6480 T.Sowers | 6480 T.Sowers |
BEAM LINE 4-1 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | 8090 J.Nelson Weke | 8090 J.Nelson Weke | 8090 J.Nelson Weke |
DOWN | DOWN | AP | SMB CHECKOUT/8090 | 8090 J.Nelson Weke | 8090 J.Nelson Weke | 8090 J.Nelson Weke |
DOWN | DOWN/AP | AP | 8090 J.Nelson Weke | 8090 J.Nelson Weke | 8090 J.Nelson Weke | 8090 J.Nelson Weke |
BEAM LINE 4-2 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | RA | Unscheduled | Unscheduled |
DOWN | DOWN | AP | RA | Unscheduled | Unscheduled | Unscheduled |
DOWN | DOWN/AP | AP | RA | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 4-3 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | 6444 N.Patra | 6444 N.Patra | 6444 N.Patra |
DOWN | DOWN | AP | SMB CHECKOUT/6444 | 6444 N.Patra | 6444 N.Patra | 6444 N.Patra |
DOWN | DOWN/AP | AP | 6444 N.Patra | 6444 N.Patra | 6444 N.Patra | 6444 N.Patra |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | DOWN | DOWN | DOWN |
DOWN | DOWN | AP | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN/AP | AP | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | DOWN | DOWN | DOWN |
DOWN | DOWN | AP | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN/AP | AP | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | FACI | 5505 A.Lee | 5505 A.Lee |
DOWN | DOWN | AP | FACI | Xray CHECKOUT/5505 | 5505 A.Lee | 5505 A.Lee |
DOWN | DOWN/AP | AP | FACI | 5505 A.Lee | 5505 A.Lee | 5505 A.Lee |
BEAM LINE 7-2 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | Unscheduled | Unscheduled | 6075 F.Feyrer |
DOWN | DOWN | AP | Unscheduled | Unscheduled | CHANGE/6075 F.Feyr | 6075 F.Feyrer |
DOWN | DOWN/AP | AP | Unscheduled | Unscheduled | 6075 F.Feyrer | 6075 F.Feyrer |
BEAM LINE 7-3 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | 8071 R.Sarangi | 8071 R.Sarangi | 8071 R.Sarangi |
DOWN | DOWN | AP | SMB CHECKOUT/8071 | 8071 R.Sarangi | 8071 R.Sarangi | 8071 R.Sarangi |
DOWN | DOWN/AP | AP | 8071 R.Sarangi | 8071 R.Sarangi | 8071 R.Sarangi | 8071 R.Sarangi |
BEAM LINE 9-3 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | 8014 A.Hoffman | 6483 S.Vijayaragha | 6483 S.Vijayaragha |
DOWN | DOWN | AP | SMB CHECKOUT/8014 | CHANGE/6483 S.Vija | 6483 S.Vijayaragha | 6483 S.Vijayaragha |
DOWN | DOWN/AP | AP | 8014 A.Hoffman | 6483 S.Vijayaragha | 6483 S.Vijayaragha | 6483 S.Vijayaragha |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | DOWN | DOWN | DOWN |
DOWN | DOWN | AP | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN/AP | AP | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | DOWN | DOWN | DOWN |
DOWN | DOWN | AP | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN/AP | AP | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | FACI | 6103 S.Hesse | 6103 S.Hesse |
DOWN | DOWN | AP | FACI | Xray CHECKOUT/6103 | 6103 S.Hesse | 6103 S.Hesse |
DOWN | DOWN/AP | AP | FACI | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | DOWN | DOWN | DOWN |
DOWN | DOWN | AP | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN/AP | AP | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | 6226 M.Crotteau | 6226 M.Crotteau | 6226 M.Crotteau |
DOWN | DOWN | AP | CHANGE/6226 M.Crot | 6226 M.Crotteau | 6226 M.Crotteau | 6226 M.Crotteau |
DOWN | DOWN/AP | AP | 6226 M.Crotteau | 6226 M.Crotteau | 6226 M.Crotteau | 6226 M.Crotteau |
BEAM LINE 15-2 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | STUP | 8098 T.Kroll | 8098 T.Kroll |
DOWN | DOWN | AP | STUP | CHANGE/8098 T.Krol | 8098 T.Kroll | CHANGE/6100 M.Rein |
DOWN | DOWN/AP | AP | STUP | 8098 T.Kroll | 8098 T.Kroll | 6100 M.Reinhard |
BEAM LINE 17-2 | ||||||
Jan. 15, 2024 | Jan. 16, 2024 | Jan. 17, 2024 | Jan. 18, 2024 | Jan. 19, 2024 | Jan. 20, 2024 | Jan. 21, 2024 |
DOWN | DOWN | AP | AP | FACI | FACI | FACI |
DOWN | DOWN | AP | FACI | FACI | FACI | FACI |
DOWN | DOWN/AP | AP | FACI | FACI | FACI | FACI |
WEEK OF Jan. 22, 2024 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
BEAM LINE 1-5 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
93H0 K.Stone/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
8224 D.Reis/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
6480 T.Sowers/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
8090 J.Nelson/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
6444 N.Patra/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
5505 A.Lee/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
6075 F.Feyrer/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
8071 R.Sarang/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
6483 S.Vijaya/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
6103 S.Hesse/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
6226 M.Crotte/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
6100 M.Reinha/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Jan. 22, 2024 | Jan. 23, 2024 | Jan. 24, 2024 | Jan. 25, 2024 | Jan. 26, 2024 | Jan. 27, 2024 | Jan. 28, 2024 |
FACI/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jan. 29, 2024 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
BEAM LINE 1-5 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | Unscheduled | FACI | 5918 B.Paulsen | 5918 B.Paulsen |
DOWN | DOWN | DOWN | FACI | Xray CHECKOUT/5918 | 5918 B.Paulsen | 5918 B.Paulsen |
DOWN | DOWN | Unscheduled | FACI | 5918 B.Paulsen | 5918 B.Paulsen | DOWN |
BEAM LINE 2-1 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | 6501 D.Billing | 6501 D.Billing | 6501 D.Billing | 6501 D.Billing |
DOWN | DOWN | DOWN | 6501 D.Billing | 6501 D.Billing | 6501 D.Billing | 6501 D.Billing |
DOWN | DOWN | 6501 D.Billing | 6501 D.Billing | 6501 D.Billing | 6501 D.Billing | DOWN |
BEAM LINE 2-2 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | Unscheduled | Unscheduled | 6439 C.Lopano | 6439 C.Lopano |
DOWN | DOWN | DOWN | Unscheduled | CHANGE/6439 C.Lopa | 6439 C.Lopano | 6439 C.Lopano |
DOWN | DOWN | Unscheduled | Unscheduled | 6439 C.Lopano | 6439 C.Lopano | DOWN |
BEAM LINE 4-1 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | Unscheduled | Unscheduled | 6047 J.Catalano | 6047 J.Catalano |
DOWN | DOWN | DOWN | Unscheduled | SMB CHECKOUT/6047 | 6047 J.Catalano | 6047 J.Catalano |
DOWN | DOWN | Unscheduled | Unscheduled | 6047 J.Catalano | 6047 J.Catalano | DOWN |
BEAM LINE 4-2 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | Unscheduled | 5119 G.Wong | 5119 G.Wong | 5119 G.Wong |
DOWN | DOWN | DOWN | CHANGE/5119 G.Wong | 5119 G.Wong | 5119 G.Wong | 5119 G.Wong |
DOWN | DOWN | Unscheduled | 5119 G.Wong | 5119 G.Wong | 5119 G.Wong | DOWN |
BEAM LINE 4-3 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | FACI | FACI | Unscheduled | Unscheduled |
DOWN | DOWN | DOWN | FACI | Unscheduled | Unscheduled | Unscheduled |
DOWN | DOWN | FACI | FACI | Unscheduled | Unscheduled | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | Unscheduled | Unscheduled | 5919 A.Picard | 5919 A.Picard |
DOWN | DOWN | DOWN | Unscheduled | CHANGE/5919 A.Pica | 5919 A.Picard | 5919 A.Picard |
DOWN | DOWN | Unscheduled | Unscheduled | 5919 A.Picard | 5919 A.Picard | DOWN |
BEAM LINE 7-3 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | Unscheduled | Unscheduled | 5889 M.Kirk | 5889 M.Kirk |
DOWN | DOWN | DOWN | Unscheduled | SMB CHECKOUT/5889 | 5889 M.Kirk | 5889 M.Kirk |
DOWN | DOWN | Unscheduled | Unscheduled | 5889 M.Kirk | 5889 M.Kirk | DOWN |
BEAM LINE 9-3 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | Unscheduled | Unscheduled | 6379 M.Abernathy | 6379 M.Abernathy |
DOWN | DOWN | DOWN | Unscheduled | SMB CHECKOUT/6379 | 6379 M.Abernathy | 6379 M.Abernathy |
DOWN | DOWN | Unscheduled | Unscheduled | 6379 M.Abernathy | 6379 M.Abernathy | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | FACI | Unscheduled | 6528 J.Chalmers | 6528 J.Chalmers |
DOWN | DOWN | DOWN | Unscheduled | SMB CHECKOUT/6528 | 6528 J.Chalmers | 6528 J.Chalmers |
DOWN | DOWN | FACI | Unscheduled | 6528 J.Chalmers | 6528 J.Chalmers | DOWN |
BEAM LINE 11-3 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | Unscheduled | Unscheduled | 6249 P.Zhang | 6249 P.Zhang |
DOWN | DOWN | DOWN | Unscheduled | Xray CHECKOUT/6249 | 6249 P.Zhang | 6249 P.Zhang |
DOWN | DOWN | Unscheduled | Unscheduled | 6249 P.Zhang | 6249 P.Zhang | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | Unscheduled | Unscheduled | 6440 M.Rowley | 6440 M.Rowley |
DOWN | DOWN | DOWN | Unscheduled | CHANGE/6440 M.Rowl | 6440 M.Rowley | 6440 M.Rowley |
DOWN | DOWN | Unscheduled | Unscheduled | 6440 M.Rowley | 6440 M.Rowley | DOWN |
BEAM LINE 15-2 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | Unscheduled | STUP | 6176 J.Finzel | 6176 J.Finzel |
DOWN | DOWN | DOWN | STUP | CHANGE/6176 J.Finz | 6176 J.Finzel | 6176 J.Finzel |
DOWN | DOWN | Unscheduled | STUP | 6176 J.Finzel | 6176 J.Finzel | DOWN |
BEAM LINE 17-2 | ||||||
Jan. 29, 2024 | Jan. 30, 2024 | Jan. 31, 2024 | Feb. 01, 2024 | Feb. 02, 2024 | Feb. 03, 2024 | Feb. 04, 2024 |
DOWN | DOWN | DOWN | FACI | FACI | Xray CHECKOUT/93H6 | 93H6 E.Nisenboim |
DOWN | DOWN | DOWN | FACI | Unscheduled | 93H6 E.Nisenboim | 93H6 E.Nisenboim |
DOWN | DOWN | FACI | FACI | Unscheduled | 93H6 E.Nisenboim | DOWN |
WEEK OF Feb. 05, 2024 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
BEAM LINE 1-5 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Feb. 05, 2024 | Feb. 06, 2024 | Feb. 07, 2024 | Feb. 08, 2024 | Feb. 09, 2024 | Feb. 10, 2024 | Feb. 11, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Feb. 12, 2024 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
BEAM LINE 1-5 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | 6520 D.Sconyers | 6520 D.Sconyers | FACI | 6103 S.Hesse |
AP | Unscheduled | Xray CHECKOUT/6520 | 6520 D.Sconyers | 6520 D.Sconyers | Xray CHECKOUT/6103 | 6103 S.Hesse |
AP | Unscheduled | 6520 D.Sconyers | 6520 D.Sconyers | FACI | 6103 S.Hesse | 6103 S.Hesse |
BEAM LINE 2-1 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | 6479 G.Chen | 6479 G.Chen | 9705 J.LiSA | 9705 J.LiSA |
AP | Unscheduled | Xray CHECKOUT/6479 | 6479 G.Chen | Xray CHECKOUT/9705 | 9705 J.LiSA | 9705 J.LiSA |
AP | Unscheduled | 6479 G.Chen | 6479 G.Chen | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
BEAM LINE 2-2 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | 6516 A.Evers | 6516 A.Evers | 6160 M.Polizzotto | 6160 M.Polizzotto |
AP | Unscheduled | CHANGE/6516 A.Ever | 6516 A.Evers | CHANGE/6160 M.Poli | 6160 M.Polizzotto | 6160 M.Polizzotto |
AP | Unscheduled | 6516 A.Evers | 6516 A.Evers | 6160 M.Polizzotto | 6160 M.Polizzotto | 6160 M.Polizzotto |
BEAM LINE 4-1 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | FACI | FACI | 6029 A.Asundi | 6029 A.Asundi |
AP | Unscheduled | FACI | FACI | SMB CHECKOUT/6029 | 6029 A.Asundi | 6029 A.Asundi |
AP | Unscheduled | FACI | FACI | 6029 A.Asundi | 6029 A.Asundi | 6029 A.Asundi |
BEAM LINE 4-2 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | 5822 Y.Na | 5822 Y.Na | 6108 S.Hall | 6108 S.Hall |
AP | Unscheduled | CHANGE/5822 Y.Na | 5822 Y.Na | CHANGE/6108 S.Hall | 6108 S.Hall | CHANGE/5504 Y.Srin |
AP | Unscheduled | 5822 Y.Na | 5822 Y.Na | 6108 S.Hall | 6108 S.Hall | 5504 Y.Srinivasan |
BEAM LINE 4-3 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | 8099 S.Bare | 8099 S.Bare | 5531 R.Runnebaum | 5531 R.Runnebaum |
AP | Unscheduled | CHANGE/8099 S.Bare | 8099 S.Bare | CHANGE/5531 R.Runn | 5531 R.Runnebaum | 5531 R.Runnebaum |
AP | Unscheduled | 8099 S.Bare | 8099 S.Bare | 5531 R.Runnebaum | 5531 R.Runnebaum | 5531 R.Runnebaum |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | DOWN | DOWN | DOWN | DOWN |
AP | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 5369 C.Tan | 5369 C.Tan |
AP | Unscheduled | Xray CHECKOUT/8890 | 8890 J.Nelson Weke | Xray CHECKOUT/5369 | 5369 C.Tan | 5369 C.Tan |
AP | Unscheduled | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 5369 C.Tan | 5369 C.Tan | 5369 C.Tan |
BEAM LINE 7-2 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | 6071 M.Pushie | 6071 M.Pushie | 6496 M.Pushie | 6496 M.Pushie |
AP | Unscheduled | CHANGE/6071 M.Push | 6071 M.Pushie | CHANGE/6496 M.Push | 6496 M.Pushie | 6496 M.Pushie |
AP | Unscheduled | 6071 M.Pushie | 6071 M.Pushie | 6496 M.Pushie | 6496 M.Pushie | 6496 M.Pushie |
BEAM LINE 7-3 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | DOWN | DOWN | DOWN | DOWN |
AP | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | 8871 R.Sarangi | 8871 R.Sarangi | 8871 R.Sarangi | 8871 R.Sarangi |
AP | Unscheduled | SMB CHECKOUT/8871 | 8871 R.Sarangi | 8871 R.Sarangi | 8871 R.Sarangi | 8871 R.Sarangi |
AP | Unscheduled | 8871 R.Sarangi | 8871 R.Sarangi | 8871 R.Sarangi | 8871 R.Sarangi | 8871 R.Sarangi |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | 6425 R.Abergel | 6425 R.Abergel | Unscheduled | 6086 R.Abergel |
AP | Unscheduled | SMB CHECKOUT/6425 | 6425 R.Abergel | 6425 R.Abergel | Unscheduled | 6086 R.Abergel |
AP | Unscheduled | 6425 R.Abergel | 6425 R.Abergel | Unscheduled | CHANGE/6086 R.Aber | 6086 R.Abergel |
BEAM LINE 11-3 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | 5677 Y.Lee | 5677 Y.Lee | 5931 B.Paulsen | 5931 B.Paulsen |
AP | Unscheduled | Xray CHECKOUT/5677 | 5677 Y.Lee | Xray CHECKOUT/5931 | 5931 B.Paulsen | 5931 B.Paulsen |
AP | Unscheduled | 5677 Y.Lee | 5677 Y.Lee | 5931 B.Paulsen | 5931 B.Paulsen | 5931 B.Paulsen |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | DOWN | Unscheduled | 6156 G.Druschel | 6156 G.Druschel | 6101 M.Barnes | 6101 M.Barnes |
AP | Unscheduled | SMB CHECKOUT/6156 | 6156 G.Druschel | SMB CHECKOUT/6101 | 6101 M.Barnes | 6101 M.Barnes |
AP | Unscheduled | 6156 G.Druschel | 6156 G.Druschel | 6101 M.Barnes | 6101 M.Barnes | 6101 M.Barnes |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | FACI | FACI | FACI | FACI | FACI |
AP | FACI | FACI | FACI | FACI | FACI | FACI |
AP | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 15-2 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | STUP | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
AP | Unscheduled | STUP | CHANGE/9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
AP | Unscheduled | STUP | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
BEAM LINE 17-2 | ||||||
Feb. 12, 2024 | Feb. 13, 2024 | Feb. 14, 2024 | Feb. 15, 2024 | Feb. 16, 2024 | Feb. 17, 2024 | Feb. 18, 2024 |
DOWN/AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | 5436 J.Turner | 5436 J.Turner |
AP | Unscheduled | Unscheduled | Unscheduled | Xray CHECKOUT/5436 | 5436 J.Turner | Xray CHECKOUT/93J8 |
AP | Unscheduled | Unscheduled | Unscheduled | 5436 J.Turner | 5436 J.Turner | 93J8 V.Stoica |
WEEK OF Feb. 19, 2024 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
BEAM LINE 1-5 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
6103 S.Hesse | 6103 S.Hesse | Unscheduled | Unscheduled | Unscheduled | 6278 N.Malmstadt | 6278 N.Malmstadt |
6103 S.Hesse | Unscheduled | Unscheduled | Unscheduled | Xray CHECKOUT/6278 | 6278 N.Malmstadt | 6278 N.Malmstadt |
6103 S.Hesse | Unscheduled | Unscheduled | Unscheduled | 6278 N.Malmstadt | 6278 N.Malmstadt | 6278 N.Malmstadt |
BEAM LINE 2-1 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
9705 J.LiSA | 9705 J.LiSA | 6219 Y.Takamura | 6219 Y.Takamura | 6219 Y.Takamura | 93H0 K.Stone | 93H0 K.Stone |
9705 J.LiSA | Xray CHECKOUT/6219 | 6219 Y.Takamura | 6219 Y.Takamura | Xray CHECKOUT/93H0 | 93H0 K.Stone | 93H0 K.Stone |
9705 J.LiSA | 6219 Y.Takamura | 6219 Y.Takamura | 6219 Y.Takamura | 93H0 K.Stone | 93H0 K.Stone | 93H0 K.Stone |
BEAM LINE 2-2 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
6160 M.Polizzotto | 6260 Y.Tang | 6260 Y.Tang | 5611 K.Lau | 5611 K.Lau | 8067 S.Webb | 8067 S.Webb |
CHANGE/6260 Y.Tang | 6260 Y.Tang | CHANGE/5611 K.Lau | 5611 K.Lau | CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
6260 Y.Tang | 6260 Y.Tang | 5611 K.Lau | 5611 K.Lau | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 4-1 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
6029 A.Asundi | 6029 A.Asundi | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek | Unscheduled | Unscheduled |
6029 A.Asundi | SMB CHECKOUT/6196 | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek | Unscheduled | Unscheduled |
6029 A.Asundi | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek | Unscheduled | Unscheduled |
BEAM LINE 4-2 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
5504 Y.Srinivasan | 5504 Y.Srinivasan | 8877 T.Matsui | 5968 A.Pena-Alcant | 6513 S.Dehe | 6539 E.Biasin | 6539 E.Biasin |
5504 Y.Srinivasan | CHANGE/8877 T.Mats | CHANGE/5968 A.Pena | CHANGE/6513 S.Dehe | CHANGE/6539 E.Bias | 6539 E.Biasin | Unscheduled |
5504 Y.Srinivasan | 8877 T.Matsui | 5968 A.Pena-Alcant | 6513 S.Dehe | 6539 E.Biasin | 6539 E.Biasin | Unscheduled |
BEAM LINE 4-3 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
5531 R.Runnebaum | 5524 C.Kronawitter | 5524 C.Kronawitter | 5999 J.Guo | 5999 J.Guo | 6194 M.Liu | 6194 M.Liu |
Unscheduled | 5524 C.Kronawitter | CHANGE/5999 J.Guo | 5999 J.Guo | CHANGE/6194 M.Liu | 6194 M.Liu | 6194 M.Liu |
CHANGE/5524 C.Kron | 5524 C.Kronawitter | 5999 J.Guo | 5999 J.Guo | 6194 M.Liu | 6194 M.Liu | 6194 M.Liu |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
5369 C.Tan | 5369 C.Tan | 8064 S.Bone | 5485 X.Milhet | 5485 X.Milhet | 6063 A.White Smirn | 6063 A.White Smirn |
5369 C.Tan | Xray CHECKOUT/8064 | Xray CHECKOUT/5485 | 5485 X.Milhet | Xray CHECKOUT/6063 | 6063 A.White Smirn | Unscheduled |
5369 C.Tan | 8064 S.Bone | 5485 X.Milhet | 5485 X.Milhet | 6063 A.White Smirn | 6063 A.White Smirn | Unscheduled |
BEAM LINE 7-2 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
6496 M.Pushie | 6496 M.Pushie | FACI | FACI | FACI | FACI | 5882 S.Tian |
6496 M.Pushie | FACI | FACI | FACI | FACI | CHANGE/5882 S.Tian | 5882 S.Tian |
6496 M.Pushie | FACI | FACI | FACI | FACI | 5882 S.Tian | 5882 S.Tian |
BEAM LINE 7-3 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
8871 R.Sarangi | 8871 R.Sarangi | 8871 R.Sarangi | 6503 T.Siboonruang | 6503 T.Siboonruang | 9705 J.LiSA | 9705 J.LiSA |
8871 R.Sarangi | 8871 R.Sarangi | SMB CHECKOUT/6503 | 6503 T.Siboonruang | SMB CHECKOUT/9705 | 9705 J.LiSA | 9705 J.LiSA |
8871 R.Sarangi | 8871 R.Sarangi | 6503 T.Siboonruang | 6503 T.Siboonruang | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
6086 R.Abergel | Unscheduled | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-3 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
5931 B.Paulsen | 5931 B.Paulsen | 6305 W.Go | 6143 K.Bagchi | 6143 K.Bagchi | 5925 R.Belisle | 5925 R.Belisle |
5931 B.Paulsen | Xray CHECKOUT/6305 | Xray CHECKOUT/6143 | 6143 K.Bagchi | Xray CHECKOUT/5925 | 5925 R.Belisle | 5925 R.Belisle |
5931 B.Paulsen | 6305 W.Go | 6143 K.Bagchi | 6143 K.Bagchi | 5925 R.Belisle | 5925 R.Belisle | 5925 R.Belisle |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
6101 M.Barnes | 6101 M.Barnes | 5755 J.Judy | 5755 J.Judy | 5755 J.Judy | 6275 O.Duckworth | 6275 O.Duckworth |
6101 M.Barnes | SMB CHECKOUT/5755 | 5755 J.Judy | 5755 J.Judy | SMB CHECKOUT/6275 | 6275 O.Duckworth | 6275 O.Duckworth |
6101 M.Barnes | 5755 J.Judy | 5755 J.Judy | 5755 J.Judy | 6275 O.Duckworth | 6275 O.Duckworth | 6275 O.Duckworth |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 15-2 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
9705 J.LiSA | 6514 O.Paredes Mel | 6514 O.Paredes Mel | 6514 O.Paredes Mel | 6514 O.Paredes Mel | 6282 T.Hersbach | 6282 T.Hersbach |
CHANGE/6514 O.Pare | 6514 O.Paredes Mel | 6514 O.Paredes Mel | 6514 O.Paredes Mel | CHANGE/6282 T.Hers | 6282 T.Hersbach | 6282 T.Hersbach |
6514 O.Paredes Mel | 6514 O.Paredes Mel | 6514 O.Paredes Mel | 6514 O.Paredes Mel | 6282 T.Hersbach | 6282 T.Hersbach | 6282 T.Hersbach |
BEAM LINE 17-2 | ||||||
Feb. 19, 2024 | Feb. 20, 2024 | Feb. 21, 2024 | Feb. 22, 2024 | Feb. 23, 2024 | Feb. 24, 2024 | Feb. 25, 2024 |
93J8 V.Stoica | 93J8 V.Stoica | 93J8 V.Stoica | 93J8 V.Stoica | Unscheduled | Unscheduled | Unscheduled |
93J8 V.Stoica | 93J8 V.Stoica | 93J8 V.Stoica | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
93J8 V.Stoica | 93J8 V.Stoica | 93J8 V.Stoica | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
WEEK OF Feb. 26, 2024 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
BEAM LINE 1-5 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
6278 N.Malmstad/AP | AP | AP | 5544 J.Utterback | 5544 J.Utterback | 5544 J.Utterb/DOWN | DOWN |
AP | AP | Xray CHECKOUT/5544 | 5544 J.Utterback | 5544 J.Utterback | DOWN | DOWN |
AP | AP | 5544 J.Utterback | 5544 J.Utterback | 5544 J.Utterback | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
93H0 K.Stone/AP | AP | AP | 6237 S.Shulda | 6237 S.Shulda | 6438 R.Smaha/DOWN | DOWN |
AP | AP | Xray CHECKOUT/6237 | 6237 S.Shulda | Xray CHECKOUT/6438 | DOWN | DOWN |
AP | AP | 6237 S.Shulda | 6237 S.Shulda | 6438 R.Smaha | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
8067 S.Webb/AP | AP | AP | 6291 T.Paunesku | 6291 T.Paunesku | 6533 A.Bhatta/DOWN | DOWN |
AP | AP | CHANGE/6291 T.Paun | 6291 T.Paunesku | CHANGE/6533 A.Bhat | DOWN | DOWN |
AP | AP | 6291 T.Paunesku | 6291 T.Paunesku | 6533 A.Bhattachary | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
AP | AP | AP | 6088 K.White | 6088 K.White | 5757 F.Bridge/DOWN | DOWN |
AP | AP | SMB CHECKOUT/6088 | 6088 K.White | Xray CHECKOUT/5757 | DOWN | DOWN |
AP | AP | 6088 K.White | 6088 K.White | 5757 F.Bridges | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
AP | AP | AP | 8877 T.Matsui | 5928 T.Szyperski | 5928 T.Szyper/DOWN | DOWN |
AP | AP | CHANGE/8877 T.Mats | CHANGE/5928 T.Szyp | 5928 T.Szyperski | DOWN | DOWN |
AP | AP | 8877 T.Matsui | 5928 T.Szyperski | 5928 T.Szyperski | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
6194 M.Liu/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
AP | AP | AP | 93I8 J.Nelson | 93I8 J.Nelson | 6205 M.Dixit/DOWN | DOWN |
AP | AP | Xray CHECKOUT/93I8 | 93I8 J.Nelson | Xray CHECKOUT/6205 | DOWN | DOWN |
AP | AP | 93I8 J.Nelson | 93I8 J.Nelson | 6205 M.Dixit | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
5882 S.Tian/AP | AP | AP | FACI | 6041 B.Schumm | 6041 B.Schumm/DOWN | DOWN |
AP | AP | FACI | CHANGE/6041 B.Schu | 6041 B.Schumm | DOWN | DOWN |
AP | AP | FACI | 6041 B.Schumm | 6041 B.Schumm | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
DOWN/AP | AP | AP | 6470 A.Heyer | 6470 A.Heyer | 6324 C.Van St/DOWN | DOWN |
AP | AP | SMB CHECKOUT/6470 | 6470 A.Heyer | SMB CHECKOUT/6324 | DOWN | DOWN |
AP | AP | 6470 A.Heyer | 6470 A.Heyer | 6324 C.Van Stappen | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
9705 J.LiSA/AP | AP | AP | 5685 Z.Mathe | 5685 Z.Mathe | 6354 W.Drisde/DOWN | DOWN |
AP | AP | SMB CHECKOUT/5685 | 5685 Z.Mathe | SMB CHECKOUT/6354 | DOWN | DOWN |
AP | AP | 5685 Z.Mathe | 5685 Z.Mathe | 6354 W.Drisdell | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
AP | AP | AP | 6270 S.Saslow | 6270 S.Saslow | 5843 S.Fakhre/DOWN | DOWN |
AP | AP | SMB CHECKOUT/6270 | 6270 S.Saslow | SMB CHECKOUT/5843 | DOWN | DOWN |
AP | AP | 6270 S.Saslow | 6270 S.Saslow | 5843 S.Fakhreddine | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
5925 R.Belisle/AP | AP | AP | 6475 K.Nam | 6475 K.Nam | 8091 C.Tasson/DOWN | DOWN |
AP | AP | Xray CHECKOUT/6475 | 6475 K.Nam | Xray CHECKOUT/8091 | DOWN | DOWN |
AP | AP | 6475 K.Nam | 6475 K.Nam | 8091 C.Tassone | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
6275 O.Duckwo/D/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
FACI/AP | AP | AP | FACI | FACI | 6504 E.Herndo/DOWN | DOWN |
AP | AP | FACI | FACI | CHANGE/6504 E.Hern | DOWN | DOWN |
AP | AP | FACI | FACI | 6504 E.Herndon | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
6282 T.Hersbach/AP | AP | AP | STUP | 8092 D.Sokaras | 8092 D.Sokara/DOWN | DOWN |
AP | AP | STUP | CHANGE/8092 D.Soka | 8092 D.Sokaras | DOWN | DOWN |
AP | AP | STUP | 8092 D.Sokaras | 8092 D.Sokaras | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Feb. 26, 2024 | Feb. 27, 2024 | Feb. 28, 2024 | Feb. 29, 2024 | Mar. 01, 2024 | Mar. 02, 2024 | Mar. 03, 2024 |
AP | AP | AP | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone/DOWN | DOWN |
AP | AP | Bladecoating/8095 | 8095 K.Stone | 8095 K.Stone | DOWN | DOWN |
AP | AP | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | DOWN | DOWN |
WEEK OF Mar. 04, 2024 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
BEAM LINE 1-5 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | Unscheduled | 6484 S.Koh | 6484 S.Koh | 9705 J.LiSA | FACI |
DOWN | Unscheduled | Xray CHECKOUT/6484 | 6484 S.Koh | Xray CHECKOUT/9705 | FACI | FACI |
DOWN | Unscheduled | 6484 S.Koh | 6484 S.Koh | 9705 J.LiSA | FACI | FACI |
BEAM LINE 2-1 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | 6150 G.Kamat | 6150 G.Kamat | 6150 G.Kamat | 93H0 K.Stone | 93H0 K.Stone |
DOWN | Xray CHECKOUT/6150 | 6150 G.Kamat | 6150 G.Kamat | Xray CHECKOUT/93H0 | 93H0 K.Stone | 93H0 K.Stone |
DOWN | 6150 G.Kamat | 6150 G.Kamat | 6150 G.Kamat | 93H0 K.Stone | 93H0 K.Stone | 93H0 K.Stone |
BEAM LINE 2-2 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | 6504 E.Herndon | 6504 E.Herndon | 6504 E.Herndon | 6518 K.Bidas | 6518 K.Bidas |
DOWN | CHANGE/6504 E.Hern | 6504 E.Herndon | 6504 E.Herndon | CHANGE/6518 K.Bida | 6518 K.Bidas | 6518 K.Bidas |
DOWN | 6504 E.Herndon | 6504 E.Herndon | 6504 E.Herndon | 6518 K.Bidas | 6518 K.Bidas | 6518 K.Bidas |
BEAM LINE 4-1 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 4-2 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | 8877 T.Matsui | FACI | FACI | 6269 Y.Han | 6269 Y.Han |
DOWN | CHANGE/8877 T.Mats | FACI | FACI | CHANGE/6269 Y.Han | 6269 Y.Han | CHANGE/8877 T.Mats |
DOWN | 8877 T.Matsui | FACI | FACI | 6269 Y.Han | 6269 Y.Han | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | Unscheduled | 6411 R.Dias | 6411 R.Dias | 5733 C.Van Stappen | 5733 C.Van Stappen |
DOWN | Unscheduled | SMB CHECKOUT/6411 | 6411 R.Dias | SMB CHECKOUT/5733 | 5733 C.Van Stappen | 5733 C.Van Stappen |
DOWN | Unscheduled | 6411 R.Dias | 6411 R.Dias | 5733 C.Van Stappen | 5733 C.Van Stappen | 5733 C.Van Stappen |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | 6510 M.Porwal | 6344 D.Lee | 6344 D.Lee | 5844 X.Zheng | 5844 X.Zheng |
DOWN | Xray CHECKOUT/6510 | Xray CHECKOUT/6344 | 6344 D.Lee | Xray CHECKOUT/5844 | 5844 X.Zheng | 5844 X.Zheng |
DOWN | 6510 M.Porwal | 6344 D.Lee | 6344 D.Lee | 5844 X.Zheng | 5844 X.Zheng | 5844 X.Zheng |
BEAM LINE 7-2 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | FACI | 6359 A.Dickinson | 6359 A.Dickinson | 6124 C.Van Genucht | 6124 C.Van Genucht |
DOWN | FACI | CHANGE/6359 A.Dick | 6359 A.Dickinson | CHANGE/6124 C.Van | 6124 C.Van Genucht | 6124 C.Van Genucht |
DOWN | FACI | 6359 A.Dickinson | 6359 A.Dickinson | 6124 C.Van Genucht | 6124 C.Van Genucht | 6124 C.Van Genucht |
BEAM LINE 7-3 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | Unscheduled | Unscheduled | 8071 R.Sarangi | 8071 R.Sarangi | 8071 R.Sarangi |
DOWN | Unscheduled | Unscheduled | SMB CHECKOUT/8071 | 8071 R.Sarangi | 8071 R.Sarangi | 8071 R.Sarangi |
DOWN | Unscheduled | Unscheduled | 8071 R.Sarangi | 8071 R.Sarangi | 8071 R.Sarangi | 8071 R.Sarangi |
BEAM LINE 9-3 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | 6155 Y.WU | 6155 Y.WU | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
DOWN | SMB CHECKOUT/6155 | 6155 Y.WU | SMB CHECKOUT/9705 | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
DOWN | 6155 Y.WU | 6155 Y.WU | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | 6538 A.Duncan | 6113 V.Noel | 6113 V.Noel | 93J0 T.Colburn | 93J0 T.Colburn |
DOWN | SMB CHECKOUT/6538 | SMB CHECKOUT/6113 | 6113 V.Noel | SMB CHECKOUT/93J0 | 93J0 T.Colburn | 93J0 T.Colburn |
DOWN | 6538 A.Duncan | 6113 V.Noel | 6113 V.Noel | 93J0 T.Colburn | 93J0 T.Colburn | 93J0 T.Colburn |
BEAM LINE 11-3 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | 6520 D.Sconyers | 6241 C.Salamat | 6241 C.Salamat | 6103 S.Hesse | 6103 S.Hesse |
DOWN | Xray CHECKOUT/6520 | Xray CHECKOUT/6241 | 6241 C.Salamat | Xray CHECKOUT/6103 | 6103 S.Hesse | FACI |
DOWN | 6520 D.Sconyers | 6241 C.Salamat | 6241 C.Salamat | 6103 S.Hesse | 6103 S.Hesse | FACI |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | 6518 K.Bidas | 6518 K.Bidas | 6309 A.Templeton | 6309 A.Templeton | 6309 A.Templeton |
DOWN | CHANGE/6518 K.Bida | 6518 K.Bidas | CHANGE/6309 A.Temp | 6309 A.Templeton | 6309 A.Templeton | 6309 A.Templeton |
DOWN | 6518 K.Bidas | 6518 K.Bidas | 6309 A.Templeton | 6309 A.Templeton | 6309 A.Templeton | 6309 A.Templeton |
BEAM LINE 15-2 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | COMM | 6177 P.O'Day | 6177 P.O'Day | 6096 M.Abernathy | 6096 M.Abernathy |
DOWN | COMM | CHANGE/6177 P.O'Da | 6177 P.O'Day | CHANGE/6096 M.Aber | 6096 M.Abernathy | 6096 M.Abernathy |
DOWN | COMM | 6177 P.O'Day | 6177 P.O'Day | 6096 M.Abernathy | 6096 M.Abernathy | 6096 M.Abernathy |
BEAM LINE 17-2 | ||||||
Mar. 04, 2024 | Mar. 05, 2024 | Mar. 06, 2024 | Mar. 07, 2024 | Mar. 08, 2024 | Mar. 09, 2024 | Mar. 10, 2024 |
DOWN | DOWN | Unscheduled | Xray CHECKOUT/6208 | 6208 R.Bramante | 6208 R.Bramante | 6208 R.Bramante |
DOWN | Unscheduled | Unscheduled | 6208 R.Bramante | 6208 R.Bramante | 6208 R.Bramante | 6208 R.Bramante |
DOWN | Unscheduled | Unscheduled | 6208 R.Bramante | 6208 R.Bramante | 6208 R.Bramante | 6208 R.Bramante |
WEEK OF Mar. 11, 2024 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
BEAM LINE 1-5 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
FACI/AP | AP | AP | FACI | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse |
AP | AP | FACI | CHANGE/6704 I.Jaya | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse |
AP | AP | FACI | Xray CHECKOUT/6103 | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse |
BEAM LINE 2-1 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
93H0 K.Stone/AP | AP | AP | 5945 E.Mu | 5945 E.Mu | 5984 E.Corson | 5984 E.Corson |
AP | AP | Xray CHECKOUT/5945 | 5945 E.Mu | Xray CHECKOUT/5984 | 5984 E.Corson | 5984 E.Corson |
AP | AP | 5945 E.Mu | 5945 E.Mu | 5984 E.Corson | 5984 E.Corson | 5984 E.Corson |
BEAM LINE 2-2 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
6518 K.Bidas/AP | AP | AP | 5608 J.Johnson | 5608 J.Johnson | 5888 N.Tosca | 5888 N.Tosca |
AP | AP | CHANGE/5608 J.John | 5608 J.Johnson | CHANGE/5888 N.Tosc | 5888 N.Tosca | 5888 N.Tosca |
AP | AP | 5608 J.Johnson | 5608 J.Johnson | 5888 N.Tosca | 5888 N.Tosca | 5888 N.Tosca |
BEAM LINE 4-1 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
AP | AP | AP | 6029 A.Asundi | 6029 A.Asundi | 9705 J.LiSA | 9705 J.LiSA |
AP | AP | SMB CHECKOUT/6029 | 6029 A.Asundi | SMB CHECKOUT/9705 | 9705 J.LiSA | 9705 J.LiSA |
AP | AP | 6029 A.Asundi | 6029 A.Asundi | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
BEAM LINE 4-2 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
8877 T.Matsui/AP | AP | AP | 8877 T.Matsui | 6467 A.Sewa | 6467 A.Sewa | 6467 A.Sewa |
AP | AP | CHANGE/8877 T.Mats | Unscheduled | 6467 A.Sewa | 6467 A.Sewa | RA |
AP | AP | 8877 T.Matsui | CHANGE/6467 A.Sewa | 6467 A.Sewa | 6467 A.Sewa | RA |
BEAM LINE 4-3 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
5733 C.Van Stap/AP | AP | AP | FACI | FACI | 6555 K.Lancaster | 6555 K.Lancaster |
AP | AP | FACI | FACI | SMB CHECKOUT/6555 | 6555 K.Lancaster | 6555 K.Lancaster |
AP | AP | FACI | FACI | 6555 K.Lancaster | 6555 K.Lancaster | 6555 K.Lancaster |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
5844 X.Zheng/AP | AP | AP | 6603 D.Agyeman-Bud | 6603 D.Agyeman-Bud | 6237 S.Shulda | 6237 S.Shulda |
AP | AP | Xray CHECKOUT/6603 | 6603 D.Agyeman-Bud | Xray CHECKOUT/6237 | 6237 S.Shulda | 6237 S.Shulda |
AP | AP | 6603 D.Agyeman-Bud | 6603 D.Agyeman-Bud | 6237 S.Shulda | 6237 S.Shulda | 6237 S.Shulda |
BEAM LINE 7-2 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
6124 C.Van Genu/AP | AP | AP | 6538 A.Duncan | 6538 A.Duncan | 6538 A.Duncan | Unscheduled |
AP | AP | CHANGE/6538 A.Dunc | 6538 A.Duncan | 6538 A.Duncan | Unscheduled | Unscheduled |
AP | AP | 6538 A.Duncan | 6538 A.Duncan | 6538 A.Duncan | Unscheduled | Unscheduled |
BEAM LINE 7-3 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
8071 R.Sarangi/AP | AP | AP | Unscheduled | Unscheduled | 6508 M.Kirk | 6508 M.Kirk |
AP | AP | Unscheduled | Unscheduled | SMB CHECKOUT/6508 | 6508 M.Kirk | 6508 M.Kirk |
AP | AP | Unscheduled | Unscheduled | 6508 M.Kirk | 6508 M.Kirk | 6508 M.Kirk |
BEAM LINE 9-3 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
9705 J.LiSA/AP | AP | AP | 8099 S.Bare | 8099 S.Bare | 6581 A.Brenner | 6581 A.Brenner |
AP | AP | SMB CHECKOUT/8099 | 8099 S.Bare | SMB CHECKOUT/6581 | 6581 A.Brenner | 6581 A.Brenner |
AP | AP | 8099 S.Bare | 8099 S.Bare | 6581 A.Brenner | 6581 A.Brenner | 6581 A.Brenner |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
93J0 T.Colburn/AP | AP | AP | 6415 N.Patra | 6415 N.Patra | 6505 C.Zweifel | 6505 C.Zweifel |
AP | AP | SMB CHECKOUT/6415 | 6415 N.Patra | SMB CHECKOUT/6505 | 6505 C.Zweifel | 6505 C.Zweifel |
AP | AP | 6415 N.Patra | 6415 N.Patra | 6505 C.Zweifel | 6505 C.Zweifel | 6505 C.Zweifel |
BEAM LINE 11-3 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
FACI/AP | AP | AP | 6103 S.Hesse | 6252 C.Cheng | 5968 A.Pena-Alcant | 6012 Q.Liu |
AP | AP | Xray CHECKOUT/6103 | Xray CHECKOUT/6252 | Xray CHECKOUT/5968 | Xray CHECKOUT/6012 | Xray CHECKOUT/6006 |
AP | AP | 6103 S.Hesse | 6252 C.Cheng | 5968 A.Pena-Alcant | 6012 Q.Liu | 6006 Y.Wu |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
6309 A.Templeto/AP | AP | AP | 5888 N.Tosca | 5888 N.Tosca | 8019 J.Richardson | 8019 J.Richardson |
AP | AP | CHANGE/5888 N.Tosc | 5888 N.Tosca | CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson |
AP | AP | 5888 N.Tosca | 5888 N.Tosca | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
BEAM LINE 15-2 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
6096 M.Abernath/AP | AP | AP | STUP | STUP | 6056 V.Sharma | 6056 V.Sharma |
AP | AP | STUP | STUP | CHANGE/6056 V.Shar | 6056 V.Sharma | 6056 V.Sharma |
AP | AP | STUP | STUP | 6056 V.Sharma | 6056 V.Sharma | 6056 V.Sharma |
BEAM LINE 17-2 | ||||||
Mar. 11, 2024 | Mar. 12, 2024 | Mar. 13, 2024 | Mar. 14, 2024 | Mar. 15, 2024 | Mar. 16, 2024 | Mar. 17, 2024 |
6208 R.Bramante/AP | AP | AP | FACI | FACI | 5615 J.Ravichandra | 5615 J.Ravichandra |
AP | AP | FACI | FACI | Xray CHECKOUT/5615 | 5615 J.Ravichandra | 5615 J.Ravichandra |
AP | AP | FACI | FACI | 5615 J.Ravichandra | 5615 J.Ravichandra | 5615 J.Ravichandra |
WEEK OF Mar. 18, 2024 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
BEAM LINE 1-5 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
6103 S.Hesse | FACI | DOWN | Unscheduled | 6006 Y.Wu | 6006 Y.Wu | 6006 Y.Wu |
FACI | Xray CHECKOUT/DOWN | DOWN | Xray CHECKOUT/6006 | 6006 Y.Wu | 6006 Y.Wu | 6006 Y.Wu |
FACI | DOWN | DOWN | 6006 Y.Wu | 6006 Y.Wu | 6006 Y.Wu | 6006 Y.Wu |
BEAM LINE 2-1 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
5984 E.Corson | 6250 E.Mu | DOWN | 6250 E.Mu | 6250 E.Mu | 93H0 K.Stone | 93H0 K.Stone |
Xray CHECKOUT/6250 | 6250 E.Mu/DOWN | DOWN | 6250 E.Mu | Xray CHECKOUT/93H0 | 93H0 K.Stone | 93H0 K.Stone |
6250 E.Mu | DOWN | DOWN | 6250 E.Mu | 93H0 K.Stone | 93H0 K.Stone | 93H0 K.Stone |
BEAM LINE 2-2 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
5888 N.Tosca | 6596 D.Ohnemus | DOWN | 6596 D.Ohnemus | 6538 A.Duncan | 6538 A.Duncan | 6538 A.Duncan |
CHANGE/6596 D.Ohne | 6596 D.Ohnemu/DOWN | DOWN | CHANGE/6538 A.Dunc | 6538 A.Duncan | 6538 A.Duncan | 6538 A.Duncan |
6596 D.Ohnemus | DOWN | DOWN | 6538 A.Duncan | 6538 A.Duncan | 6538 A.Duncan | 6538 A.Duncan |
BEAM LINE 4-1 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
9705 J.LiSA | 9705 J.LiSA | DOWN | 6593 P.Jensen | 6593 P.Jensen | 6357 A.van Veelen | 6357 A.van Veelen |
9705 J.LiSA | DOWN | DOWN | 6593 P.Jensen | SMB CHECKOUT/6357 | 6357 A.van Veelen | 6357 A.van Veelen |
9705 J.LiSA | DOWN | DOWN | 6593 P.Jensen | 6357 A.van Veelen | 6357 A.van Veelen | 6357 A.van Veelen |
BEAM LINE 4-2 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
RA | 6006 Y.Wu | DOWN | 8877 T.Matsui | Unscheduled | 6539 E.Biasin | RA |
CHANGE/6006 Y.Wu | DOWN | DOWN | CHANGE/6B99 S.Cram | CHANGE/6539 E.Bias | RA | RA |
6006 Y.Wu | DOWN | DOWN | Unscheduled | 6539 E.Biasin | RA | RA |
BEAM LINE 4-3 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
6555 K.Lancaster | 8090 J.Nelson Weke | DOWN | 11J7 C.Werth | 11J7 C.Werth | 6479 G.Chen | 6479 G.Chen |
SMB CHECKOUT/8090 | 8090 J.Nelson/DOWN | DOWN | 11J7 C.Werth | SMB CHECKOUT/6479 | 6479 G.Chen | 6479 G.Chen |
8090 J.Nelson Weke | DOWN | DOWN | 11J7 C.Werth | 6479 G.Chen | 6479 G.Chen | 6479 G.Chen |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
6237 S.Shulda | 6144 L.Mu | DOWN | Unscheduled | 6479 G.Chen | 6221 P.Zhang | 6221 P.Zhang |
Xray CHECKOUT/6144 | 6144 L.Mu/DOWN | DOWN | Xray CHECKOUT/6479 | Xray CHECKOUT/6221 | 6221 P.Zhang | 6221 P.Zhang |
6144 L.Mu | DOWN | DOWN | 6479 G.Chen | 6221 P.Zhang | 6221 P.Zhang | 6221 P.Zhang |
BEAM LINE 7-2 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
Unscheduled | 8867 S.Webb | DOWN | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb |
CHANGE/8867 S.Webb | 8867 S.Webb/DOWN | DOWN | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb |
8867 S.Webb | DOWN | DOWN | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb | 8867 S.Webb |
BEAM LINE 7-3 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
6508 M.Kirk | 6508 M.Kirk | DOWN | 6560 A.Smerigan | 6582 Y.Guo | 6582 Y.Guo | 6582 Y.Guo |
6508 M.Kirk | DOWN | DOWN | SMB CHECKOUT/6582 | 6582 Y.Guo | 6582 Y.Guo | 6582 Y.Guo |
6508 M.Kirk | DOWN | DOWN | 6582 Y.Guo | 6582 Y.Guo | 6582 Y.Guo | 6582 Y.Guo |
BEAM LINE 9-3 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
6581 A.Brenner | 6161 J.Finzel | DOWN | 6161 J.Finzel | 6481 S.Krishna | 6481 S.Krishna | 6481 S.Krishna |
SMB CHECKOUT/6161 | 6161 J.Finzel/DOWN | DOWN | SMB CHECKOUT/6481 | 6481 S.Krishna | 6481 S.Krishna | 6481 S.Krishna |
6161 J.Finzel | DOWN | DOWN | 6481 S.Krishna | 6481 S.Krishna | 6481 S.Krishna | 6481 S.Krishna |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
Unscheduled | Unscheduled | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
6505 C.Zweifel | 6561 H.Li | DOWN | Unscheduled | Unscheduled | 6040 B.Wan | 6040 B.Wan |
SMB CHECKOUT/6561 | 6561 H.Li/DOWN | DOWN | Unscheduled | SMB CHECKOUT/6040 | 6040 B.Wan | 6040 B.Wan |
6561 H.Li | DOWN | DOWN | Unscheduled | 6040 B.Wan | 6040 B.Wan | 6040 B.Wan |
BEAM LINE 11-3 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
6006 Y.Wu | 6055 M.Chabinyc | DOWN | Unscheduled | 6162 L.Crowe | 6103 S.Hesse | 6103 S.Hesse |
Xray CHECKOUT/6055 | 6055 M.Chabin/DOWN | DOWN | Xray CHECKOUT/6162 | Xray CHECKOUT/6103 | 6103 S.Hesse | 6103 S.Hesse |
6055 M.Chabinyc | DOWN | DOWN | 6162 L.Crowe | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
8019 J.Richardson | 8019 J.Richardson | DOWN | 5794 T.Varga | 5794 T.Varga | 6359 A.Dickinson | 6359 A.Dickinson |
8019 J.Richardson | DOWN | DOWN | 5794 T.Varga | CHANGE/6359 A.Dick | 6359 A.Dickinson | 6359 A.Dickinson |
8019 J.Richardson | DOWN | DOWN | 5794 T.Varga | 6359 A.Dickinson | 6359 A.Dickinson | 6359 A.Dickinson |
BEAM LINE 15-2 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
6056 V.Sharma | STUP | DOWN | 6314 Z.Mathe | 6314 Z.Mathe | 6409 D.Rice | 6409 D.Rice |
STUP | DOWN | DOWN | 6314 Z.Mathe | CHANGE/6409 D.Rice | 6409 D.Rice | 6409 D.Rice |
STUP | DOWN | DOWN | 6314 Z.Mathe | 6409 D.Rice | 6409 D.Rice | 6409 D.Rice |
BEAM LINE 17-2 | ||||||
Mar. 18, 2024 | Mar. 19, 2024 | Mar. 20, 2024 | Mar. 21, 2024 | Mar. 22, 2024 | Mar. 23, 2024 | Mar. 24, 2024 |
5615 J.Ravichandra | 6519 Z.Porter | DOWN | Unscheduled | 6457 G.Coslovich | 6457 G.Coslovich | 6457 G.Coslovich |
Xray CHECKOUT/6519 | 6519 Z.Porter/DOWN | DOWN | Xray CHECKOUT/6457 | 6457 G.Coslovich | 6457 G.Coslovich | 6457 G.Coslovich |
6519 Z.Porter | DOWN | DOWN | 6457 G.Coslovich | 6457 G.Coslovich | 6457 G.Coslovich | 6457 G.Coslovich |
WEEK OF Mar. 25, 2024 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
BEAM LINE 1-5 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6006 Y.Wu/AP | AP | AP | Unscheduled | Unscheduled | 6433 S.Bone | 6433 S.Bone |
AP | AP | Unscheduled | CHANGE/5833 E.Abdo | Xray CHECKOUT/6433 | 6433 S.Bone | 6433 S.Bone |
AP | AP | Unscheduled | 5833 E.Abdo | 6433 S.Bone | 6433 S.Bone | 6433 S.Bone |
BEAM LINE 2-1 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
93H0 K.Stone/AP | AP | AP | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
AP | AP | Xray CHECKOUT/8095 | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
AP | AP | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
BEAM LINE 2-2 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6538 A.Duncan/AP | AP | AP | 6039 S.Ho | 6039 S.Ho | 6338 X.Zheng | 6338 X.Zheng |
AP | AP | CHANGE/6039 S.Ho | 6039 S.Ho | CHANGE/6338 X.Zhen | 6338 X.Zheng | 6338 X.Zheng |
AP | AP | 6039 S.Ho | 6039 S.Ho | 6338 X.Zheng | 6338 X.Zheng | 6338 X.Zheng |
BEAM LINE 4-1 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6357 A.van Veel/AP | AP | AP | 6434 Z.Jiang | 6434 Z.Jiang | 6115 J.Feaster | 6115 J.Feaster |
AP | AP | SMB CHECKOUT/6434 | 6434 Z.Jiang | SMB CHECKOUT/6115 | 6115 J.Feaster | 6115 J.Feaster |
AP | AP | 6434 Z.Jiang | 6434 Z.Jiang | 6115 J.Feaster | 6115 J.Feaster | 6115 J.Feaster |
BEAM LINE 4-2 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
RA/AP | AP | AP | 5928 T.Szyperski | 5928 T.Szyperski | 8877 T.Matsui | 8877 T.Matsui |
AP | AP | CHANGE/5928 T.Szyp | 5928 T.Szyperski | CHANGE/8877 T.Mats | 8877 T.Matsui | 8877 T.Matsui |
AP | AP | 5928 T.Szyperski | 5928 T.Szyperski | 8877 T.Matsui | 8877 T.Matsui | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6479 G.Chen/AP | AP | AP | 6163 G.George | 6163 G.George | 6163 G.George | 6614 S.George |
AP | AP | SMB CHECKOUT/6163 | 6163 G.George | 6163 G.George | SMB CHECKOUT/6614 | 6614 S.George |
AP | AP | 6163 G.George | 6163 G.George | 6163 G.George | 6614 S.George | 6614 S.George |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
DOWN/AP | AP | AP | 6137 Z.Xue | 6137 Z.Xue | 8890 J.Nelson Weke | 8890 J.Nelson Weke |
AP | AP | Xray CHECKOUT/6137 | 6137 Z.Xue | Xray CHECKOUT/8890 | 8890 J.Nelson Weke | 8890 J.Nelson Weke |
AP | AP | 6137 Z.Xue | 6137 Z.Xue | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 8890 J.Nelson Weke |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6221 P.Zhang/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 7-2 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
8867 S.Webb/AP | AP | AP | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie |
AP | AP | CHANGE/6071 M.Push | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie |
AP | AP | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie |
BEAM LINE 7-3 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6582 Y.Guo/AP | AP | AP | 6068 A.Ghosh | 6068 A.Ghosh | 6068 A.Ghosh | 6068 A.Ghosh |
AP | AP | SMB CHECKOUT/6068 | 6068 A.Ghosh | 6068 A.Ghosh | 6068 A.Ghosh | 6068 A.Ghosh |
AP | AP | 6068 A.Ghosh | 6068 A.Ghosh | 6068 A.Ghosh | 6068 A.Ghosh | 6068 A.Ghosh |
BEAM LINE 9-3 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6481 S.Krishna/AP | AP | AP | 6295 J.Harris | 6295 J.Harris | 6346 M.Cendejas | 6346 M.Cendejas |
AP | AP | CHANGE/6295 J.Harr | 6295 J.Harris | SMB CHECKOUT/6346 | 6346 M.Cendejas | 6346 M.Cendejas |
AP | AP | 6295 J.Harris | 6295 J.Harris | 6346 M.Cendejas | 6346 M.Cendejas | 6346 M.Cendejas |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6040 B.Wan/AP | AP | AP | 6270 S.Saslow | 6270 S.Saslow | 6585 G.Hettiarachc | 6585 G.Hettiarachc |
AP | AP | SMB CHECKOUT/6270 | 6270 S.Saslow | SMB CHECKOUT/6585 | 6585 G.Hettiarachc | 6585 G.Hettiarachc |
AP | AP | 6270 S.Saslow | 6270 S.Saslow | 6585 G.Hettiarachc | 6585 G.Hettiarachc | 6585 G.Hettiarachc |
BEAM LINE 11-3 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6103 S.Hesse/AP | AP | AP | 8090 J.Nelson Weke | 8090 J.Nelson Weke | 6438 R.Smaha | 6438 R.Smaha |
AP | AP | Xray CHECKOUT/8090 | 8090 J.Nelson Weke | Xray CHECKOUT/6438 | 6438 R.Smaha | 6438 R.Smaha |
AP | AP | 8090 J.Nelson Weke | 8090 J.Nelson Weke | 6438 R.Smaha | 6438 R.Smaha | 6438 R.Smaha |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6359 A.Dickinso/AP | AP | AP | 6511 G.Flynn | 6511 G.Flynn | 6511 G.Flynn | 8064 S.Bone |
AP | AP | CHANGE/6511 G.Flyn | 6511 G.Flynn | 6511 G.Flynn | CHANGE/8064 S.Bone | 8064 S.Bone |
AP | AP | 6511 G.Flynn | 6511 G.Flynn | 6511 G.Flynn | 8064 S.Bone | 8064 S.Bone |
BEAM LINE 15-2 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6409 D.Rice/AP | AP | AP | 6557 C.Joseph | 6557 C.Joseph | 6557 C.Joseph | 6557 C.Joseph |
AP | AP | CHANGE/6557 C.Jose | 6557 C.Joseph | 6557 C.Joseph | 6557 C.Joseph | 6557 C.Joseph |
AP | AP | 6557 C.Joseph | 6557 C.Joseph | 6557 C.Joseph | 6557 C.Joseph | 6557 C.Joseph |
BEAM LINE 17-2 | ||||||
Mar. 25, 2024 | Mar. 26, 2024 | Mar. 27, 2024 | Mar. 28, 2024 | Mar. 29, 2024 | Mar. 30, 2024 | Mar. 31, 2024 |
6457 G.Coslovic/AP | AP | AP | 6519 Z.Porter | 6519 Z.Porter | 6519 Z.Porter | 6519 Z.Porter |
AP | AP | FACI | 6519 Z.Porter | 6519 Z.Porter | 6519 Z.Porter | 6519 Z.Porter |
AP | AP | CHANGE/6519 Z.Port | 6519 Z.Porter | 6519 Z.Porter | 6519 Z.Porter | 6519 Z.Porter |
WEEK OF Apr. 01, 2024 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
BEAM LINE 1-5 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
6433 S.Bone | FACI | 5529 N.Akmansen Ka | 5529 N.Akmansen Ka | Unscheduled | 8064 S.Bone | 8064 S.Bone |
FACI | Xray CHECKOUT/5529 | 5529 N.Akmansen Ka | Unscheduled | Xray CHECKOUT/8064 | 8064 S.Bone | 8064 S.Bone |
FACI | 5529 N.Akmansen Ka | 5529 N.Akmansen Ka | Unscheduled | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone |
BEAM LINE 2-1 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
8095 K.Stone | FACI | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange |
FACI | Xray CHECKOUT/8010 | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange |
FACI | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange |
BEAM LINE 2-2 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
6338 X.Zheng | 6359 A.Dickinson | 6359 A.Dickinson | 6226 M.Crotteau | 6226 M.Crotteau | 8064 S.Bone | 8064 S.Bone |
CHANGE/6359 A.Dick | 6359 A.Dickinson | CHANGE/6226 M.Crot | 6226 M.Crotteau | CHANGE/8064 S.Bone | 8064 S.Bone | 8064 S.Bone |
6359 A.Dickinson | 6359 A.Dickinson | 6226 M.Crotteau | 6226 M.Crotteau | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone |
BEAM LINE 4-1 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
6115 J.Feaster | 6428 N.Sharma | 6428 N.Sharma | 6515 M.Cosby | 6515 M.Cosby | 8010 N.Strange | 8010 N.Strange |
SMB CHECKOUT/6428 | 6428 N.Sharma | SMB CHECKOUT/6515 | 6515 M.Cosby | SMB CHECKOUT/8010 | 8010 N.Strange | 8010 N.Strange |
6428 N.Sharma | 6428 N.Sharma | 6515 M.Cosby | 6515 M.Cosby | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange |
BEAM LINE 4-2 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
8877 T.Matsui | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai | 6244 A.Simafranca | 5816 A.Ayzner |
CHANGE/6057 D.Mai | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai | CHANGE/6244 A.Sima | CHANGE/5816 A.Ayzn | 5816 A.Ayzner |
6057 D.Mai | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai | 6244 A.Simafranca | 5816 A.Ayzner | 5816 A.Ayzner |
BEAM LINE 4-3 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
6614 S.George | 6468 J.Rigby | 6468 J.Rigby | 6089 J.Chorover | 6089 J.Chorover | 6667 M.Stuckman | 6667 M.Stuckman |
SMB CHECKOUT/6468 | 6468 J.Rigby | SMB CHECKOUT/6089 | 6089 J.Chorover | SMB CHECKOUT/6667 | 6667 M.Stuckman | 6667 M.Stuckman |
6468 J.Rigby | 6468 J.Rigby | 6089 J.Chorover | 6089 J.Chorover | 6667 M.Stuckman | 6667 M.Stuckman | 6667 M.Stuckman |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
8890 J.Nelson Weke | 8095 K.Stone | FACI | 5586 D.Olive | 5586 D.Olive | 6277 G.George | 6277 G.George |
Xray CHECKOUT/8095 | FACI | Xray CHECKOUT/5586 | 5586 D.Olive | Xray CHECKOUT/6277 | 6277 G.George | 6277 G.George |
8095 K.Stone | FACI | 5586 D.Olive | 5586 D.Olive | 6277 G.George | 6277 G.George | 6277 G.George |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 7-2 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
6071 M.Pushie | 6277 G.George | 6277 G.George | 6277 G.George | 6277 G.George | 6240 V.Noel | 6240 V.Noel |
CHANGE/6277 G.Geor | 6277 G.George | 6277 G.George | 6277 G.George | CHANGE/6240 V.Noel | 6240 V.Noel | 6240 V.Noel |
6277 G.George | 6277 G.George | 6277 G.George | 6277 G.George | 6240 V.Noel | 6240 V.Noel | 6240 V.Noel |
BEAM LINE 7-3 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
6068 A.Ghosh | 6163 G.George | 6163 G.George | 6163 G.George | 6163 G.George | 5617 K.Rush | 5617 K.Rush |
SMB CHECKOUT/6163 | 6163 G.George | 6163 G.George | 6163 G.George | SMB CHECKOUT/5617 | 5617 K.Rush | 5617 K.Rush |
6163 G.George | 6163 G.George | 6163 G.George | 6163 G.George | 5617 K.Rush | 5617 K.Rush | 5617 K.Rush |
BEAM LINE 9-3 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
6346 M.Cendejas | 6346 M.Cendejas | 8014 A.Hoffman | 6560 A.Smerigan | 6560 A.Smerigan | 6312 W.Yang | 6312 W.Yang |
6346 M.Cendejas | CHANGE/8014 A.Hoff | CHANGE/6560 A.Smer | 6560 A.Smerigan | SMB CHECKOUT/6312 | 6312 W.Yang | 6312 W.Yang |
6346 M.Cendejas | 8014 A.Hoffman | 6560 A.Smerigan | 6560 A.Smerigan | 6312 W.Yang | 6312 W.Yang | 6312 W.Yang |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
6585 G.Hettiarachc | 6120 A.van Veelen | 6120 A.van Veelen | 6120 A.van Veelen | 6120 A.van Veelen | 6394 B.Maki | 6394 B.Maki |
SMB CHECKOUT/6120 | 6120 A.van Veelen | 6120 A.van Veelen | 6120 A.van Veelen | SMB CHECKOUT/6394 | 6394 B.Maki | 6394 B.Maki |
6120 A.van Veelen | 6120 A.van Veelen | 6120 A.van Veelen | 6120 A.van Veelen | 6394 B.Maki | 6394 B.Maki | 6394 B.Maki |
BEAM LINE 11-3 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
6438 R.Smaha | FACI | FACI | 6249 P.Zhang | 6249 P.Zhang | 6451 D.Pe | 5562 H.Cumberbatch |
FACI | FACI | Xray CHECKOUT/6249 | 6249 P.Zhang | Xray CHECKOUT/6451 | Xray CHECKOUT/5562 | 5562 H.Cumberbatch |
FACI | FACI | 6249 P.Zhang | 6249 P.Zhang | 6451 D.Pe | 5562 H.Cumberbatch | 5562 H.Cumberbatch |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
8064 S.Bone | FACI | FACI | FACI | FACI | 6226 M.Crotteau | 6226 M.Crotteau |
FACI | FACI | FACI | FACI | CHANGE/6226 M.Crot | 6226 M.Crotteau | 6226 M.Crotteau |
FACI | FACI | FACI | FACI | 6226 M.Crotteau | 6226 M.Crotteau | 6226 M.Crotteau |
BEAM LINE 15-2 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
6557 C.Joseph | STUP | 6582 Y.Guo | 6582 Y.Guo | 6582 Y.Guo | 6212 U.Bergmann | 6212 U.Bergmann |
STUP | CHANGE/6582 Y.Guo | 6582 Y.Guo | 6582 Y.Guo | CHANGE/6212 U.Berg | 6212 U.Bergmann | 6212 U.Bergmann |
STUP | 6582 Y.Guo | 6582 Y.Guo | 6582 Y.Guo | 6212 U.Bergmann | 6212 U.Bergmann | 6212 U.Bergmann |
BEAM LINE 17-2 | ||||||
Apr. 01, 2024 | Apr. 02, 2024 | Apr. 03, 2024 | Apr. 04, 2024 | Apr. 05, 2024 | Apr. 06, 2024 | Apr. 07, 2024 |
6519 Z.Porter | 93K1 B.Saini | 93K1 B.Saini | 8049 V.Thampy | 8049 V.Thampy | Unscheduled | Unscheduled |
Xray CHECKOUT/93K1 | 93K1 B.Saini | Xray CHECKOUT/8049 | 8049 V.Thampy | Unscheduled | Unscheduled | Unscheduled |
93K1 B.Saini | 93K1 B.Saini | 8049 V.Thampy | 8049 V.Thampy | Unscheduled | Unscheduled | Unscheduled |
WEEK OF Apr. 08, 2024 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
BEAM LINE 1-5 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
8064 S.Bone | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman |
Xray CHECKOUT/6713 | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman |
6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman |
BEAM LINE 2-1 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
8010 N.Strange | 6438 R.Smaha | 6438 R.Smaha | 6438 R.Smaha | 6438 R.Smaha | 5785 J.Baniecki | 5785 J.Baniecki |
Xray CHECKOUT/6438 | 6438 R.Smaha | 6438 R.Smaha | 6438 R.Smaha | Xray CHECKOUT/5785 | 5785 J.Baniecki | 5785 J.Baniecki |
6438 R.Smaha | 6438 R.Smaha | 6438 R.Smaha | 6438 R.Smaha | 5785 J.Baniecki | 5785 J.Baniecki | 5785 J.Baniecki |
BEAM LINE 2-2 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
8064 S.Bone | 5586 D.Olive | 5586 D.Olive | 5603 S.Hickam | 5603 S.Hickam | 8019 J.Richardson | 8019 J.Richardson |
CHANGE/5586 D.Oliv | 5586 D.Olive | CHANGE/5603 S.Hick | 5603 S.Hickam | CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson |
5586 D.Olive | 5586 D.Olive | 5603 S.Hickam | 5603 S.Hickam | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
BEAM LINE 4-1 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
8010 N.Strange | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 4-2 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
5816 A.Ayzner | 8877 T.Matsui | 5119 G.Wong | 5119 G.Wong | 5119 G.Wong | 5504 Y.Srinivasan | 5504 Y.Srinivasan |
CHANGE/8877 T.Mats | CHANGE/5119 G.Wong | 5119 G.Wong | 5119 G.Wong | CHANGE/5504 Y.Srin | 5504 Y.Srinivasan | 5504 Y.Srinivasan |
8877 T.Matsui | 5119 G.Wong | 5119 G.Wong | 5119 G.Wong | 5504 Y.Srinivasan | 5504 Y.Srinivasan | 5504 Y.Srinivasan |
BEAM LINE 4-3 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
6667 M.Stuckman | 6209 A.Braun | 6209 A.Braun | 6590 J.O'Hara | 6590 J.O'Hara | 5935 R.Szilagyi | 5935 R.Szilagyi |
SMB CHECKOUT/6209 | 6209 A.Braun | SMB CHECKOUT/6590 | 6590 J.O'Hara | SMB CHECKOUT/5935 | 5935 R.Szilagyi | 5935 R.Szilagyi |
6209 A.Braun | 6209 A.Braun | 6590 J.O'Hara | 6590 J.O'Hara | 5935 R.Szilagyi | 5935 R.Szilagyi | 5935 R.Szilagyi |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
DOWN | Unscheduled | Unscheduled | 8092 D.Sokaras | 8092 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras |
Unscheduled | Unscheduled | CHANGE/8092 D.Soka | 8092 D.Sokaras | CHANGE/8892 D.Soka | 8892 D.Sokaras | 8892 D.Sokaras |
Unscheduled | Unscheduled | 8092 D.Sokaras | 8092 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
6277 G.George | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 7-2 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
6240 V.Noel | 6240 V.Noel | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi | 5882 S.Tian | 5882 S.Tian |
6240 V.Noel | CHANGE/6307 E.Espi | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi | CHANGE/5882 S.Tian | 5882 S.Tian | 5882 S.Tian |
6240 V.Noel | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi | 5882 S.Tian | 5882 S.Tian | 5882 S.Tian |
BEAM LINE 7-3 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
5617 K.Rush | 5842 J.Lentz | 5842 J.Lentz | 5842 J.Lentz | 6411 R.Dias | 6411 R.Dias | 6411 R.Dias |
SMB CHECKOUT/5842 | 5842 J.Lentz | 5842 J.Lentz | SMB CHECKOUT/6411 | 6411 R.Dias | 6411 R.Dias | 6411 R.Dias |
5842 J.Lentz | 5842 J.Lentz | 5842 J.Lentz | 6411 R.Dias | 6411 R.Dias | 6411 R.Dias | 6411 R.Dias |
BEAM LINE 9-3 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
6312 W.Yang | FACI | 5935 R.Szilagyi | 5935 R.Szilagyi | 5935 R.Szilagyi | 6558 N.Patra | 6558 N.Patra |
FACI | SMB CHECKOUT/5935 | 5935 R.Szilagyi | 5935 R.Szilagyi | SMB CHECKOUT/6558 | 6558 N.Patra | 6558 N.Patra |
FACI | 5935 R.Szilagyi | 5935 R.Szilagyi | 5935 R.Szilagyi | 6558 N.Patra | 6558 N.Patra | 6558 N.Patra |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
6394 B.Maki | 6138 E.Balboni | 6138 E.Balboni | 6425 R.Abergel | 6425 R.Abergel | 6086 R.Abergel | 6086 R.Abergel |
SMB CHECKOUT/6138 | 6138 E.Balboni | SMB CHECKOUT/6425 | 6425 R.Abergel | 6425 R.Abergel | 6086 R.Abergel | Unscheduled |
6138 E.Balboni | 6138 E.Balboni | 6425 R.Abergel | 6425 R.Abergel | CHANGE/6086 R.Aber | 6086 R.Abergel | Unscheduled |
BEAM LINE 11-3 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
5562 H.Cumberbatch | 6479 G.Chen | 6479 G.Chen | 6137 Z.Xue | 6137 Z.Xue | 6429 H.Ramachandra | 6429 H.Ramachandra |
Xray CHECKOUT/6479 | 6479 G.Chen | Xray CHECKOUT/6137 | 6137 Z.Xue | Xray CHECKOUT/6429 | 6429 H.Ramachandra | 6429 H.Ramachandra |
6479 G.Chen | 6479 G.Chen | 6137 Z.Xue | 6137 Z.Xue | 6429 H.Ramachandra | 6429 H.Ramachandra | 6429 H.Ramachandra |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
6226 M.Crotteau | 6479 G.Chen | 6479 G.Chen | 6249 P.Zhang | 6249 P.Zhang | 6338 X.Zheng | 6338 X.Zheng |
CHANGE/6479 G.Chen | 6479 G.Chen | CHANGE/6249 P.Zhan | 6249 P.Zhang | CHANGE/6338 X.Zhen | 6338 X.Zheng | 6338 X.Zheng |
6479 G.Chen | 6479 G.Chen | 6249 P.Zhang | 6249 P.Zhang | 6338 X.Zheng | 6338 X.Zheng | 6338 X.Zheng |
BEAM LINE 15-2 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
6212 U.Bergmann | 6212 U.Bergmann | 6482 R.Popelka-Fil | 6482 R.Popelka-Fil | 6482 R.Popelka-Fil | 6514 O.Paredes Mel | 6514 O.Paredes Mel |
6212 U.Bergmann | CHANGE/6482 R.Pope | 6482 R.Popelka-Fil | 6482 R.Popelka-Fil | CHANGE/6514 O.Pare | 6514 O.Paredes Mel | 6514 O.Paredes Mel |
6212 U.Bergmann | 6482 R.Popelka-Fil | 6482 R.Popelka-Fil | 6482 R.Popelka-Fil | 6514 O.Paredes Mel | 6514 O.Paredes Mel | 6514 O.Paredes Mel |
BEAM LINE 17-2 | ||||||
Apr. 08, 2024 | Apr. 09, 2024 | Apr. 10, 2024 | Apr. 11, 2024 | Apr. 12, 2024 | Apr. 13, 2024 | Apr. 14, 2024 |
Unscheduled | Unscheduled | Unscheduled | 5780 A.Dudchenko | 5780 A.Dudchenko | 5780 A.Dudchenko | 6367 E.Abdo |
Unscheduled | Unscheduled | Xray CHECKOUT/5780 | 5780 A.Dudchenko | 5780 A.Dudchenko | Xray CHECKOUT/6367 | 6367 E.Abdo |
Unscheduled | Unscheduled | 5780 A.Dudchenko | 5780 A.Dudchenko | 5780 A.Dudchenko | 6367 E.Abdo | 6367 E.Abdo |
WEEK OF Apr. 15, 2024 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
BEAM LINE 1-5 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
6713 A.Hoffman/AP | AP | AP | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 2-1 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
5785 J.Baniecki/AP | AP | AP | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
AP | AP | Xray CHECKOUT/8095 | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
AP | AP | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
BEAM LINE 2-2 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
8019 J.Richards/AP | AP | AP | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara |
AP | AP | CHANGE/6228 M.McNa | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara |
AP | AP | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara |
BEAM LINE 4-1 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
AP | AP | AP | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman |
AP | AP | CHANGE/8014 A.Hoff | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman |
AP | AP | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman |
BEAM LINE 4-2 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
5504 Y.Srinivas/AP | AP | AP | 8877 T.Matsui | 6193 J.Nielsen | 5983 S.Zhang | 5983 S.Zhang |
AP | AP | CHANGE/8877 T.Mats | CHANGE/6193 J.Niel | CHANGE/5983 S.Zhan | 5983 S.Zhang | CHANGE/8877 T.Mats |
AP | AP | 8877 T.Matsui | 6193 J.Nielsen | 5983 S.Zhang | 5983 S.Zhang | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
5935 R.Szilagyi/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
8892 D.Sokaras/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
AP | AP | AP | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 6588 E.Espinosa Vi | 6588 E.Espinosa Vi |
AP | AP | Xray CHECKOUT/8890 | 8890 J.Nelson Weke | Xray CHECKOUT/6588 | 6588 E.Espinosa Vi | 6588 E.Espinosa Vi |
AP | AP | 8890 J.Nelson Weke | 8890 J.Nelson Weke | 6588 E.Espinosa Vi | 6588 E.Espinosa Vi | 6588 E.Espinosa Vi |
BEAM LINE 7-2 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
5882 S.Tian/AP | AP | AP | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara |
AP | AP | CHANGE/6228 M.McNa | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara |
AP | AP | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara |
BEAM LINE 7-3 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
6411 R.Dias/AP | AP | AP | 6304 T.Makris | 6304 T.Makris | 6399 K.Haas | 6399 K.Haas |
AP | AP | SMB CHECKOUT/6304 | 6304 T.Makris | SMB CHECKOUT/6399 | 6399 K.Haas | 6399 K.Haas |
AP | AP | 6304 T.Makris | 6304 T.Makris | 6399 K.Haas | 6399 K.Haas | 6399 K.Haas |
BEAM LINE 9-3 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
6558 N.Patra/AP | AP | AP | 6576 S.Gill | 6576 S.Gill | 6503 T.Siboonruang | 6503 T.Siboonruang |
AP | AP | SMB CHECKOUT/6576 | 6576 S.Gill | SMB CHECKOUT/6503 | 6503 T.Siboonruang | 6503 T.Siboonruang |
AP | AP | 6576 S.Gill | 6576 S.Gill | 6503 T.Siboonruang | 6503 T.Siboonruang | 6503 T.Siboonruang |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
AP | AP | AP | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor |
AP | AP | SMB CHECKOUT/5555 | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor |
AP | AP | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor | 5555 S.Kozimor |
BEAM LINE 11-3 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
6429 H.Ramachan/AP | AP | AP | FACI | 6515 M.Cosby | 6515 M.Cosby | 6515 M.Cosby |
AP | AP | FACI | Xray CHECKOUT/6515 | 6515 M.Cosby | 6515 M.Cosby | 6515 M.Cosby |
AP | AP | FACI | 6515 M.Cosby | 6515 M.Cosby | 6515 M.Cosby | 6515 M.Cosby |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
DOWN/AP | AP | AP | 11K0 L.Li | 11K0 L.Li | 11K0 L.Li | 11K0 L.Li |
AP | AP | SMB CHECKOUT/11K0 | 11K0 L.Li | 11K0 L.Li | 11K0 L.Li | 11K0 L.Li |
AP | AP | 11K0 L.Li | 11K0 L.Li | 11K0 L.Li | 11K0 L.Li | 11K0 L.Li |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
6338 X.Zheng/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 15-2 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
6514 O.Paredes /AP | AP | AP | STUP | STUP | 6568 H.Harris | 6568 H.Harris |
AP | AP | STUP | STUP | CHANGE/6568 H.Harr | 6568 H.Harris | 6568 H.Harris |
AP | AP | STUP | STUP | 6568 H.Harris | 6568 H.Harris | 6568 H.Harris |
BEAM LINE 17-2 | ||||||
Apr. 15, 2024 | Apr. 16, 2024 | Apr. 17, 2024 | Apr. 18, 2024 | Apr. 19, 2024 | Apr. 20, 2024 | Apr. 21, 2024 |
6367 E.Abdo/AP | AP | AP | FACI | 5931 B.Paulsen | 5931 B.Paulsen | 5931 B.Paulsen |
AP | AP | FACI | Xray CHECKOUT/5931 | 5931 B.Paulsen | 5931 B.Paulsen | 5931 B.Paulsen |
AP | AP | FACI | 5931 B.Paulsen | 5931 B.Paulsen | 5931 B.Paulsen | 5931 B.Paulsen |
WEEK OF Apr. 22, 2024 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
BEAM LINE 1-5 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
FACI | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 6110 N.Leick | 6110 N.Leick |
Xray CHECKOUT/8010 | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | Xray CHECKOUT/6110 | 6110 N.Leick | 6110 N.Leick |
8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 8010 N.Strange | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick |
BEAM LINE 2-1 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
8095 K.Stone | FACI | 5982 L.Dresselhaus | 5982 L.Dresselhaus | 5982 L.Dresselhaus | 93H0 K.Stone | 93H0 K.Stone |
FACI | Xray CHECKOUT/5982 | 5982 L.Dresselhaus | 5982 L.Dresselhaus | Xray CHECKOUT/93H0 | 93H0 K.Stone | 93H0 K.Stone |
FACI | 5982 L.Dresselhaus | 5982 L.Dresselhaus | 5982 L.Dresselhaus | 93H0 K.Stone | 93H0 K.Stone | 93H0 K.Stone |
BEAM LINE 2-2 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
6228 M.McNamara | 93J9 O.Duckworth | 93J9 O.Duckworth | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
CHANGE/93J9 O.Duck | 93J9 O.Duckworth | CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
93J9 O.Duckworth | 93J9 O.Duckworth | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 4-1 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
8014 A.Hoffman | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5827 C.Kronawitter | 5827 C.Kronawitter |
SMB CHECKOUT/5266 | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | SMB CHECKOUT/5827 | 5827 C.Kronawitter | 5827 C.Kronawitter |
5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5266 A.Uzun | 5827 C.Kronawitter | 5827 C.Kronawitter | 5827 C.Kronawitter |
BEAM LINE 4-2 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
8877 T.Matsui | 12C4 M.Watkins | 12C4 M.Watkins | 12C4 M.Watkins | 8877 T.Matsui | 6433 S.Bone | 6433 S.Bone |
CHANGE/12C4 M.Watk | 12C4 M.Watkins | 12C4 M.Watkins | CHANGE/8877 T.Mats | CHANGE/6433 S.Bone | 6433 S.Bone | 6433 S.Bone |
12C4 M.Watkins | 12C4 M.Watkins | 12C4 M.Watkins | 8877 T.Matsui | 6433 S.Bone | 6433 S.Bone | 6433 S.Bone |
BEAM LINE 4-3 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
Unscheduled | 6600 W.Yu | 6600 W.Yu | 6232 A.Garcia-Espa | 6232 A.Garcia-Espa | 5885 U.Bergmann | 5885 U.Bergmann |
SMB CHECKOUT/6600 | 6600 W.Yu | SMB CHECKOUT/6232 | 6232 A.Garcia-Espa | SMB CHECKOUT/5885 | 5885 U.Bergmann | 5885 U.Bergmann |
6600 W.Yu | 6600 W.Yu | 6232 A.Garcia-Espa | 6232 A.Garcia-Espa | 5885 U.Bergmann | 5885 U.Bergmann | 5885 U.Bergmann |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
6588 E.Espinosa Vi | 6604 C.Crain | 6604 C.Crain | 8095 K.Stone | 8095 K.Stone | 6247 K.Thurber | 6247 K.Thurber |
Xray CHECKOUT/6604 | 6604 C.Crain | Xray CHECKOUT/8095 | 8095 K.Stone | Xray CHECKOUT/6247 | 6247 K.Thurber | 6247 K.Thurber |
6604 C.Crain | 6604 C.Crain | 8095 K.Stone | 8095 K.Stone | 6247 K.Thurber | 6247 K.Thurber | 6247 K.Thurber |
BEAM LINE 7-2 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
6228 M.McNamara | 93J9 O.Duckworth | 93J9 O.Duckworth | 6416 A.Seyfferth | 6416 A.Seyfferth | 6416 A.Seyfferth | 6416 A.Seyfferth |
CHANGE/93J9 O.Duck | 93J9 O.Duckworth | CHANGE/6416 A.Seyf | 6416 A.Seyfferth | 6416 A.Seyfferth | 6416 A.Seyfferth | 6416 A.Seyfferth |
93J9 O.Duckworth | 93J9 O.Duckworth | 6416 A.Seyfferth | 6416 A.Seyfferth | 6416 A.Seyfferth | 6416 A.Seyfferth | 6416 A.Seyfferth |
BEAM LINE 7-3 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
6399 K.Haas | 6399 K.Haas | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
6399 K.Haas | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
6399 K.Haas | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 9-3 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
6503 T.Siboonruang | 6151 D.Miller | 6151 D.Miller | 6597 X.Feng | 6597 X.Feng | 6354 W.Drisdell | 6354 W.Drisdell |
SMB CHECKOUT/6151 | 6151 D.Miller | SMB CHECKOUT/6597 | 6597 X.Feng | SMB CHECKOUT/6354 | 6354 W.Drisdell | 6354 W.Drisdell |
6151 D.Miller | 6151 D.Miller | 6597 X.Feng | 6597 X.Feng | 6354 W.Drisdell | 6354 W.Drisdell | 6354 W.Drisdell |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
5555 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor |
SMB CHECKOUT/6317 | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor |
6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor | 6317 S.Kozimor |
BEAM LINE 11-3 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
6515 M.Cosby | 6515 M.Cosby | FACI | 8061 S.Hesse | 8061 S.Hesse | 8061 S.Hesse | 8061 S.Hesse |
6515 M.Cosby | FACI | Xray CHECKOUT/8061 | 8061 S.Hesse | 8061 S.Hesse | 8061 S.Hesse | 8061 S.Hesse |
6515 M.Cosby | FACI | 8061 S.Hesse | 8061 S.Hesse | 8061 S.Hesse | 8061 S.Hesse | 8061 S.Hesse |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
11K0 L.Li | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 5993 K.Kovnir | 5993 K.Kovnir |
SMB CHECKOUT/6071 | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | SMB CHECKOUT/5993 | 5993 K.Kovnir | 5993 K.Kovnir |
6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 5993 K.Kovnir | 5993 K.Kovnir | 5993 K.Kovnir |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 15-2 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
6568 H.Harris | 6568 H.Harris | STUP | 6000 G.George | 6000 G.George | 6462 R.Kim | 6462 R.Kim |
6568 H.Harris | STUP | CHANGE/6000 G.Geor | 6000 G.George | CHANGE/6462 R.Kim | 6462 R.Kim | 6462 R.Kim |
6568 H.Harris | STUP | 6000 G.George | 6000 G.George | 6462 R.Kim | 6462 R.Kim | 6462 R.Kim |
BEAM LINE 17-2 | ||||||
Apr. 22, 2024 | Apr. 23, 2024 | Apr. 24, 2024 | Apr. 25, 2024 | Apr. 26, 2024 | Apr. 27, 2024 | Apr. 28, 2024 |
5931 B.Paulsen | 5734 Z.Sun | 5734 Z.Sun | 5734 Z.Sun | 5734 Z.Sun | Unscheduled | FACI |
CHANGE/5734 Z.Sun | 5734 Z.Sun | 5734 Z.Sun | 5734 Z.Sun | Unscheduled | FACI | FACI |
5734 Z.Sun | 5734 Z.Sun | 5734 Z.Sun | 5734 Z.Sun | Unscheduled | FACI | FACI |
WEEK OF Apr. 29, 2024 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
BEAM LINE 1-5 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
6110 N.Leick/AP | AP | AP | 6707 A.Maurya | 6707 A.Maurya | 6707 A.Maurya | 6707 A.Maurya |
AP | AP | Xray CHECKOUT/6707 | 6707 A.Maurya | 6707 A.Maurya | 6707 A.Maurya | 6707 A.Maurya |
AP | AP | 6707 A.Maurya | 6707 A.Maurya | 6707 A.Maurya | 6707 A.Maurya | 6707 A.Maurya |
BEAM LINE 2-1 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
93H0 K.Stone/AP | AP | AP | FACI | FACI | 6161 J.Finzel | 6161 J.Finzel |
AP | AP | FACI | FACI | Xray CHECKOUT/6161 | 6161 J.Finzel | 6161 J.Finzel |
AP | AP | FACI | FACI | 6161 J.Finzel | 6161 J.Finzel | 6161 J.Finzel |
BEAM LINE 2-2 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
8067 S.Webb/AP | AP | AP | 6137 Z.Xue | 6137 Z.Xue | 6237 S.Shulda | 6237 S.Shulda |
AP | AP | CHANGE/6137 Z.Xue | 6137 Z.Xue | CHANGE/6237 S.Shul | 6237 S.Shulda | 6237 S.Shulda |
AP | AP | 6137 Z.Xue | 6137 Z.Xue | 6237 S.Shulda | 6237 S.Shulda | 6237 S.Shulda |
BEAM LINE 4-1 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
5827 C.Kronawit/AP | AP | AP | 8095 K.Stone | 8095 K.Stone | 6338 X.Zheng | 6338 X.Zheng |
AP | AP | SMB CHECKOUT/8095 | 8095 K.Stone | SMB CHECKOUT/6338 | 6338 X.Zheng | 6338 X.Zheng |
AP | AP | 8095 K.Stone | 8095 K.Stone | 6338 X.Zheng | 6338 X.Zheng | 6338 X.Zheng |
BEAM LINE 4-2 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
6433 S.Bone/AP | AP | AP | 8877 T.Matsui | 8242 S.Russi | 8242 S.Russi | 8877 T.Matsui |
AP | AP | CHANGE/8877 T.Mats | CHANGE/8242 S.Russ | 8242 S.Russi | CHANGE/8877 T.Mats | 8877 T.Matsui |
AP | AP | 8877 T.Matsui | 8242 S.Russi | 8242 S.Russi | 8877 T.Matsui | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
5885 U.Bergmann/AP | AP | AP | 6139 C.Morrell | 6139 C.Morrell | 8062 M.Preefer | 8062 M.Preefer |
AP | AP | SMB CHECKOUT/6139 | 6139 C.Morrell | SMB CHECKOUT/8062 | 8062 M.Preefer | 8062 M.Preefer |
AP | AP | 6139 C.Morrell | 6139 C.Morrell | 8062 M.Preefer | 8062 M.Preefer | 8062 M.Preefer |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
6247 K.Thurber/AP | AP | AP | 8907 M.Preefer | 6227 D.Xia | 6227 D.Xia | 6227 D.Xia |
AP | AP | Xray CHECKOUT/8907 | Xray CHECKOUT/6227 | 6227 D.Xia | 6227 D.Xia | 6227 D.Xia |
AP | AP | 8907 M.Preefer | 6227 D.Xia | 6227 D.Xia | 6227 D.Xia | 6227 D.Xia |
BEAM LINE 7-2 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
6416 A.Seyffert/AP | AP | AP | 6394 B.Maki | 6394 B.Maki | 6394 B.Maki | 6394 B.Maki |
AP | AP | CHANGE/6394 B.Maki | 6394 B.Maki | 6394 B.Maki | 6394 B.Maki | 6394 B.Maki |
AP | AP | 6394 B.Maki | 6394 B.Maki | 6394 B.Maki | 6394 B.Maki | 6394 B.Maki |
BEAM LINE 7-3 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 9-3 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
6354 W.Drisdell/AP | AP | AP | 6096 M.Abernathy | 6096 M.Abernathy | 8092 D.Sokaras | 8092 D.Sokaras |
AP | AP | SMB CHECKOUT/6096 | 6096 M.Abernathy | SMB CHECKOUT/8092 | 8092 D.Sokaras | 8092 D.Sokaras |
AP | AP | 6096 M.Abernathy | 6096 M.Abernathy | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
6317 S.Kozimor/AP | AP | AP | 93J5 H.Gao | 93J5 H.Gao | 5852 R.Daehn | 5852 R.Daehn |
AP | AP | SMB CHECKOUT/93J5 | 93J5 H.Gao | SMB CHECKOUT/5852 | 5852 R.Daehn | 5852 R.Daehn |
AP | AP | 93J5 H.Gao | 93J5 H.Gao | 5852 R.Daehn | 5852 R.Daehn | 5852 R.Daehn |
BEAM LINE 11-3 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
8061 S.Hesse/AP | AP | AP | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick |
AP | AP | Xray CHECKOUT/6110 | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick | Unscheduled |
AP | AP | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick | 6110 N.Leick | Unscheduled |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
5993 K.Kovnir/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
AP | AP | AP | 6538 A.Duncan | 6538 A.Duncan | 6014 D.Fike | 6014 D.Fike |
AP | AP | CHANGE/6538 A.Dunc | 6538 A.Duncan | CHANGE/6014 D.Fike | 6014 D.Fike | 6014 D.Fike |
AP | AP | 6538 A.Duncan | 6538 A.Duncan | 6014 D.Fike | 6014 D.Fike | 6014 D.Fike |
BEAM LINE 15-2 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
6462 R.Kim/AP | AP | AP | STUP | 6312 W.Yang | 6312 W.Yang | 6312 W.Yang |
AP | AP | STUP | CHANGE/6312 W.Yang | 6312 W.Yang | 6312 W.Yang | 6312 W.Yang |
AP | AP | STUP | 6312 W.Yang | 6312 W.Yang | 6312 W.Yang | 6312 W.Yang |
BEAM LINE 17-2 | ||||||
Apr. 29, 2024 | Apr. 30, 2024 | May 01, 2024 | May 02, 2024 | May 03, 2024 | May 04, 2024 | May 05, 2024 |
FACI/AP | AP | AP | FACI | FACI | 6367 E.Abdo | 6367 E.Abdo |
AP | AP | FACI | FACI | Xray CHECKOUT/6367 | 6367 E.Abdo | Xray CHECKOUT/8063 |
AP | AP | FACI | FACI | 6367 E.Abdo | 6367 E.Abdo | 8063 C.Takacs |
WEEK OF May 06, 2024 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
BEAM LINE 1-5 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
6707 A.Maurya | 6707 A.Maurya | FACI | 6704 I.Jayapurna | 6704 I.Jayapurna | 6688 Y.Shi | 6688 Y.Shi |
6707 A.Maurya | FACI | Xray CHECKOUT/6704 | 6704 I.Jayapurna | Xray CHECKOUT/6688 | 6688 Y.Shi | 6688 Y.Shi |
6707 A.Maurya | FACI | 6704 I.Jayapurna | 6704 I.Jayapurna | 6688 Y.Shi | 6688 Y.Shi | 6688 Y.Shi |
BEAM LINE 2-1 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
6161 J.Finzel | 6604 C.Crain | 6604 C.Crain | 6604 C.Crain | Unscheduled | 93H0 K.Stone | 93H0 K.Stone |
Xray CHECKOUT/6604 | 6604 C.Crain | 6604 C.Crain | Unscheduled | Xray CHECKOUT/93H0 | 93H0 K.Stone | 93H0 K.Stone |
6604 C.Crain | 6604 C.Crain | 6604 C.Crain | Unscheduled | 93H0 K.Stone | 93H0 K.Stone | 93H0 K.Stone |
BEAM LINE 2-2 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
6237 S.Shulda | 6505 C.Zweifel | 6505 C.Zweifel | 6505 C.Zweifel | 6260 Y.Tang | 6260 Y.Tang | 6260 Y.Tang |
CHANGE/6505 C.Zwei | 6505 C.Zweifel | 6505 C.Zweifel | CHANGE/6260 Y.Tang | 6260 Y.Tang | 6260 Y.Tang | 6260 Y.Tang |
6505 C.Zweifel | 6505 C.Zweifel | 6505 C.Zweifel | 6260 Y.Tang | 6260 Y.Tang | 6260 Y.Tang | 6260 Y.Tang |
BEAM LINE 4-1 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
6338 X.Zheng | 6137 Z.Xue | 6137 Z.Xue | 6554 K.Lui | 6554 K.Lui | 6260 Y.Tang | Unscheduled |
SMB CHECKOUT/6137 | 6137 Z.Xue | SMB CHECKOUT/6554 | 6554 K.Lui | SMB CHECKOUT/6260 | Unscheduled | Unscheduled |
6137 Z.Xue | 6137 Z.Xue | 6554 K.Lui | 6554 K.Lui | 6260 Y.Tang | Unscheduled | Unscheduled |
BEAM LINE 4-2 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
8877 T.Matsui | 8877 T.Matsui | 12C2 T.Irving | 12C2 T.Irving | 12C2 T.Irving | 12C2 T.Irving | 12C2 T.Irving |
CHANGE/8877 T.Mats | CHANGE/12C2 T.Irvi | 12C2 T.Irving | 12C2 T.Irving | 12C2 T.Irving | 12C2 T.Irving | 12C2 T.Irving |
8877 T.Matsui | 12C2 T.Irving | 12C2 T.Irving | 12C2 T.Irving | 12C2 T.Irving | 12C2 T.Irving | 12C2 T.Irving |
BEAM LINE 4-3 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
8062 M.Preefer | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
6227 D.Xia | 5902 G.Chen | 5902 G.Chen | 8062 M.Preefer | 6338 X.Zheng | 6338 X.Zheng | 6338 X.Zheng |
Xray CHECKOUT/5902 | 5902 G.Chen | Xray CHECKOUT/8062 | Xray CHECKOUT/6338 | 6338 X.Zheng | 6338 X.Zheng | 6338 X.Zheng |
5902 G.Chen | 5902 G.Chen | 8062 M.Preefer | 6338 X.Zheng | 6338 X.Zheng | 6338 X.Zheng | 6338 X.Zheng |
BEAM LINE 7-2 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
6394 B.Maki | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 6210 A.Kravchenko | 6210 A.Kravchenko |
CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | CHANGE/6210 A.Krav | 6210 A.Kravchenko | 6210 A.Kravchenko |
8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 6210 A.Kravchenko | 6210 A.Kravchenko | 6210 A.Kravchenko |
BEAM LINE 7-3 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
Unscheduled | 6546 T.Jackson | 6546 T.Jackson | 6379 M.Abernathy | 6379 M.Abernathy | 6178 A.Cordones-Ha | 6178 A.Cordones-Ha |
SMB CHECKOUT/6546 | 6546 T.Jackson | SMB CHECKOUT/6379 | 6379 M.Abernathy | SMB CHECKOUT/6178 | 6178 A.Cordones-Ha | 6178 A.Cordones-Ha |
6546 T.Jackson | 6546 T.Jackson | 6379 M.Abernathy | 6379 M.Abernathy | 6178 A.Cordones-Ha | 6178 A.Cordones-Ha | 6178 A.Cordones-Ha |
BEAM LINE 9-3 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
8092 D.Sokaras | 6536 J.Schneider | 6536 J.Schneider | 8098 T.Kroll | 8098 T.Kroll | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn |
SMB CHECKOUT/6536 | 6536 J.Schneider | SMB CHECKOUT/8098 | 8098 T.Kroll | SMB CHECKOUT/5901 | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn |
6536 J.Schneider | 6536 J.Schneider | 8098 T.Kroll | 8098 T.Kroll | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn | 5901 J.Penner-Hahn |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
5852 R.Daehn | 6305 W.Go | 6305 W.Go | 6160 M.Polizzotto | 6160 M.Polizzotto | 6260 Y.Tang | 6260 Y.Tang |
SMB CHECKOUT/6305 | 6305 W.Go | SMB CHECKOUT/6160 | 6160 M.Polizzotto | SMB CHECKOUT/6260 | 6260 Y.Tang | 6260 Y.Tang |
6305 W.Go | 6305 W.Go | 6160 M.Polizzotto | 6160 M.Polizzotto | 6260 Y.Tang | 6260 Y.Tang | 6260 Y.Tang |
BEAM LINE 11-3 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
Unscheduled | 6103 S.Hesse | 6103 S.Hesse | FACI | 6679 M.Cosby | 6679 M.Cosby | 6679 M.Cosby |
FACI | FACI | 6103 S.Hesse | Xray CHECKOUT/6679 | 6679 M.Cosby | 6679 M.Cosby | 6679 M.Cosby |
CHANGE/6103 S.Hess | CHANGE/6103 S.Hess | FACI | 6679 M.Cosby | 6679 M.Cosby | 6679 M.Cosby | 6679 M.Cosby |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
6014 D.Fike | 6039 S.Ho | 6039 S.Ho | 6039 S.Ho | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
CHANGE/6039 S.Ho | 6039 S.Ho | 6039 S.Ho | CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
6039 S.Ho | 6039 S.Ho | 6039 S.Ho | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 15-2 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
6312 W.Yang | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | STUP | 6032 M.Guo | 6032 M.Guo |
CHANGE/8892 D.Soka | 8892 D.Sokaras | 8892 D.Sokaras | STUP | CHANGE/6032 M.Guo | 6032 M.Guo | 6032 M.Guo |
8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | STUP | 6032 M.Guo | 6032 M.Guo | 6032 M.Guo |
BEAM LINE 17-2 | ||||||
May 06, 2024 | May 07, 2024 | May 08, 2024 | May 09, 2024 | May 10, 2024 | May 11, 2024 | May 12, 2024 |
8063 C.Takacs | Unscheduled | Unscheduled | 5785 J.Baniecki | 5785 J.Baniecki | 5785 J.Baniecki | 5785 J.Baniecki |
Unscheduled | Unscheduled | Xray CHECKOUT/5785 | 5785 J.Baniecki | 5785 J.Baniecki | 5785 J.Baniecki | 5785 J.Baniecki |
Unscheduled | Unscheduled | 5785 J.Baniecki | 5785 J.Baniecki | 5785 J.Baniecki | 5785 J.Baniecki | 5785 J.Baniecki |
WEEK OF May 13, 2024 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
BEAM LINE 1-5 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
6688 Y.Shi/AP | AP | AP | FACI | 8061 S.Hesse | 8061 S.Hesse | 8061 S.Hesse |
AP | AP | FACI | Xray CHECKOUT/8061 | 8061 S.Hesse | 8061 S.Hesse | 8061 S.Hesse |
AP | AP | FACI | 8061 S.Hesse | 8061 S.Hesse | 8061 S.Hesse | 8061 S.Hesse |
BEAM LINE 2-1 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
93H0 K.Stone/AP | AP | AP | Unscheduled | Unscheduled | 6150 G.Kamat | 6150 G.Kamat |
AP | AP | Unscheduled | Unscheduled | Xray CHECKOUT/6150 | 6150 G.Kamat | 6150 G.Kamat |
AP | AP | Unscheduled | Unscheduled | 6150 G.Kamat | 6150 G.Kamat | 6150 G.Kamat |
BEAM LINE 2-2 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
6260 Y.Tang/AP | AP | AP | 5898 Q.Zhao | 5898 Q.Zhao | 6477 A.Jew | 6477 A.Jew |
AP | AP | CHANGE/5898 Q.Zhao | 5898 Q.Zhao | CHANGE/6477 A.Jew | 6477 A.Jew | 6477 A.Jew |
AP | AP | 5898 Q.Zhao | 5898 Q.Zhao | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew |
BEAM LINE 4-1 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
AP | AP | AP | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek |
AP | AP | SMB CHECKOUT/6196 | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek |
AP | AP | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek | 6196 J.Baek |
BEAM LINE 4-2 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
12C2 T.Irving/AP | AP | AP | 8877 T.Matsui | 6136 A.Bhattachary | 6337 K.Younes | 6337 K.Younes |
AP | AP | CHANGE/8877 T.Mats | CHANGE/6136 A.Bhat | CHANGE/6337 K.Youn | 6337 K.Younes | CHANGE/8877 T.Mats |
AP | AP | 8877 T.Matsui | 6136 A.Bhattachary | 6337 K.Younes | 6337 K.Younes | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
AP | AP | AP | 6043 T.Xu | 6043 T.Xu | 6249 P.Zhang | 6249 P.Zhang |
AP | AP | SMB CHECKOUT/6043 | 6043 T.Xu | SMB CHECKOUT/6249 | 6249 P.Zhang | 6249 P.Zhang |
AP | AP | 6043 T.Xu | 6043 T.Xu | 6249 P.Zhang | 6249 P.Zhang | 6249 P.Zhang |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
AP | AP | AP | 6425 R.Abergel | 6425 R.Abergel | FACI | FACI |
AP | AP | CHANGE/6425 R.Aber | 6425 R.Abergel | FACI | FACI | FACI |
AP | AP | 6425 R.Abergel | 6425 R.Abergel | FACI | FACI | FACI |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
6338 X.Zheng/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
6210 A.Kravchen/AP | AP | AP | 6B96 E.Snell | Unscheduled | Unscheduled | Unscheduled |
AP | AP | CHANGE/6B96 E.Snel | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | 6B96 E.Snell | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 7-3 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
6178 A.Cordones/AP | AP | AP | 6565 L.Mydy | 6565 L.Mydy | 5665 T.Stemmler | 5665 T.Stemmler |
AP | AP | SMB CHECKOUT/6565 | 6565 L.Mydy | SMB CHECKOUT/5665 | 5665 T.Stemmler | 5665 T.Stemmler |
AP | AP | 6565 L.Mydy | 6565 L.Mydy | 5665 T.Stemmler | 5665 T.Stemmler | 5665 T.Stemmler |
BEAM LINE 9-3 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
5901 J.Penner-H/AP | AP | AP | 6375 P.Riggs-Gelas | 6375 P.Riggs-Gelas | 6458 D.Yang | 6458 D.Yang |
AP | AP | SMB CHECKOUT/6375 | 6375 P.Riggs-Gelas | SMB CHECKOUT/6458 | 6458 D.Yang | 6458 D.Yang |
AP | AP | 6375 P.Riggs-Gelas | 6375 P.Riggs-Gelas | 6458 D.Yang | 6458 D.Yang | 6458 D.Yang |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
6260 Y.Tang/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-3 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
6679 M.Cosby/AP | AP | AP | FACI | 6492 G.Yan | 6492 G.Yan | 6492 G.Yan |
AP | AP | FACI | Xray CHECKOUT/6492 | 6492 G.Yan | 6492 G.Yan | 6492 G.Yan |
AP | AP | FACI | 6492 G.Yan | 6492 G.Yan | 6492 G.Yan | 6492 G.Yan |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
8067 S.Webb/AP | AP | AP | 8019 J.Richardson | 8019 J.Richardson | 6440 M.Rowley | 6440 M.Rowley |
AP | AP | CHANGE/8019 J.Rich | 8019 J.Richardson | CHANGE/6440 M.Rowl | 6440 M.Rowley | 6440 M.Rowley |
AP | AP | 8019 J.Richardson | 8019 J.Richardson | 6440 M.Rowley | 6440 M.Rowley | 6440 M.Rowley |
BEAM LINE 15-2 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
6032 M.Guo/AP | AP | AP | STUP | 8098 T.Kroll | 8098 T.Kroll | 8806 M.Reinhard |
AP | AP | STUP | CHANGE/8098 T.Krol | 8098 T.Kroll | CHANGE/8806 M.Rein | 8806 M.Reinhard |
AP | AP | STUP | 8098 T.Kroll | 8098 T.Kroll | 8806 M.Reinhard | 8806 M.Reinhard |
BEAM LINE 17-2 | ||||||
May 13, 2024 | May 14, 2024 | May 15, 2024 | May 16, 2024 | May 17, 2024 | May 18, 2024 | May 19, 2024 |
5785 J.Baniecki/AP | AP | AP | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
WEEK OF May 20, 2024 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
BEAM LINE 1-5 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
8061 S.Hesse | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | FACI | 6273 S.Bent | Unscheduled |
Xray CHECKOUT/8091 | 8091 C.Tassone | 8091 C.Tassone | FACI | Xray CHECKOUT/6273 | Unscheduled | Unscheduled |
8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | FACI | 6273 S.Bent | Unscheduled | Unscheduled |
BEAM LINE 2-1 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
6150 G.Kamat | FACI | Unscheduled | Unscheduled | Unscheduled | 8095 K.Stone | 8095 K.Stone |
FACI | Unscheduled | Unscheduled | Unscheduled | Xray CHECKOUT/8095 | 8095 K.Stone | 8095 K.Stone |
FACI | Unscheduled | Unscheduled | Unscheduled | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
BEAM LINE 2-2 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
6477 A.Jew | 5639 J.Catalano | 5639 J.Catalano | 6533 A.Bhattachary | 6533 A.Bhattachary | 6533 A.Bhattachary | 6533 A.Bhattachary |
CHANGE/5639 J.Cata | 5639 J.Catalano | CHANGE/6533 A.Bhat | 6533 A.Bhattachary | 6533 A.Bhattachary | 6533 A.Bhattachary | 6533 A.Bhattachary |
5639 J.Catalano | 5639 J.Catalano | 6533 A.Bhattachary | 6533 A.Bhattachary | 6533 A.Bhattachary | 6533 A.Bhattachary | 6533 A.Bhattachary |
BEAM LINE 4-1 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
6196 J.Baek | 5813 M.Vejar | 5813 M.Vejar | 5419 G.Giri | 5419 G.Giri | 9705 J.LiSA | 9705 J.LiSA |
SMB CHECKOUT/5813 | 5813 M.Vejar | SMB CHECKOUT/5419 | 5419 G.Giri | SMB CHECKOUT/9705 | 9705 J.LiSA | 9705 J.LiSA |
5813 M.Vejar | 5813 M.Vejar | 5419 G.Giri | 5419 G.Giri | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
BEAM LINE 4-2 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
8877 T.Matsui | 12C1 H.Song | 12C3 I.Badea | 12C3 I.Badea | 12C3 I.Badea | 5968 A.Pena-Alcant | 5968 A.Pena-Alcant |
CHANGE/12C1 H.Song | CHANGE/12C3 I.Bade | 12C3 I.Badea | 12C3 I.Badea | CHANGE/5968 A.Pena | 5968 A.Pena-Alcant | CHANGE/8847 T.Weis |
12C1 H.Song | 12C3 I.Badea | 12C3 I.Badea | 12C3 I.Badea | 5968 A.Pena-Alcant | 5968 A.Pena-Alcant | 8847 T.Weiss |
BEAM LINE 4-3 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
6249 P.Zhang | FACI | 5531 R.Runnebaum | 5531 R.Runnebaum | 5531 R.Runnebaum | 5999 J.Guo | 5999 J.Guo |
FACI | CHANGE/5531 R.Runn | 5531 R.Runnebaum | 5531 R.Runnebaum | SMB CHECKOUT/5999 | 5999 J.Guo | 5999 J.Guo |
FACI | 5531 R.Runnebaum | 5531 R.Runnebaum | 5531 R.Runnebaum | 5999 J.Guo | 5999 J.Guo | 5999 J.Guo |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
FACI | 6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | FACI | 8090 J.Nelson Weke |
CHANGE/6121 S.Hick | 6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | FACI | CHANGE/8090 J.Nels | 8090 J.Nelson Weke |
6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | 6121 S.Hickam | FACI | 8090 J.Nelson Weke | 8090 J.Nelson Weke |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
Unscheduled | 8062 M.Preefer | 8062 M.Preefer | 6531 A.Bhattacharj | 6531 A.Bhattacharj | 6538 A.Duncan | 6538 A.Duncan |
CHANGE/8062 M.Pree | 8062 M.Preefer | CHANGE/6531 A.Bhat | 6531 A.Bhattacharj | CHANGE/6538 A.Dunc | 6538 A.Duncan | 6538 A.Duncan |
8062 M.Preefer | 8062 M.Preefer | 6531 A.Bhattacharj | 6531 A.Bhattacharj | 6538 A.Duncan | 6538 A.Duncan | 6538 A.Duncan |
BEAM LINE 7-3 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
5665 T.Stemmler | Unscheduled | 11K3 K.Chacon | 11K3 K.Chacon | 11K3 K.Chacon | 6530 L.Quintanar | 6530 L.Quintanar |
Unscheduled | SMB CHECKOUT/11K3 | 11K3 K.Chacon | 11K3 K.Chacon | SMB CHECKOUT/6530 | 6530 L.Quintanar | 6530 L.Quintanar |
Unscheduled | 11K3 K.Chacon | 11K3 K.Chacon | 11K3 K.Chacon | 6530 L.Quintanar | 6530 L.Quintanar | 6530 L.Quintanar |
BEAM LINE 9-3 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
6458 D.Yang | FACI | FACI | FACI | FACI | 6555 K.Lancaster | 6555 K.Lancaster |
FACI | FACI | FACI | FACI | SMB CHECKOUT/6555 | 6555 K.Lancaster | 6555 K.Lancaster |
FACI | FACI | FACI | FACI | 6555 K.Lancaster | 6555 K.Lancaster | 6555 K.Lancaster |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
Unscheduled | 6086 R.Abergel | 6086 R.Abergel | Unscheduled | Unscheduled | 6352 P.Smith | 6352 P.Smith |
SMB CHECKOUT/6086 | 6086 R.Abergel | Unscheduled | Unscheduled | SMB CHECKOUT/6352 | 6352 P.Smith | 6352 P.Smith |
6086 R.Abergel | 6086 R.Abergel | Unscheduled | Unscheduled | 6352 P.Smith | 6352 P.Smith | 6352 P.Smith |
BEAM LINE 11-3 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
6492 G.Yan | FACI | 6058 P.Zhang | 6058 P.Zhang | 6058 P.Zhang | 6715 O.Marques | 6715 O.Marques |
FACI | Xray CHECKOUT/6058 | 6058 P.Zhang | 6058 P.Zhang | Xray CHECKOUT/6715 | 6715 O.Marques | 6715 O.Marques |
FACI | 6058 P.Zhang | 6058 P.Zhang | 6058 P.Zhang | 6715 O.Marques | 6715 O.Marques | 6715 O.Marques |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
6440 M.Rowley | 6531 A.Bhattacharj | 6531 A.Bhattacharj | 5639 J.Catalano | 5639 J.Catalano | 8064 S.Bone | 8064 S.Bone |
CHANGE/6531 A.Bhat | 6531 A.Bhattacharj | CHANGE/5639 J.Cata | 5639 J.Catalano | CHANGE/8064 S.Bone | 8064 S.Bone | 8064 S.Bone |
6531 A.Bhattacharj | 6531 A.Bhattacharj | 5639 J.Catalano | 5639 J.Catalano | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone |
BEAM LINE 15-2 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
8806 M.Reinhard | 8806 M.Reinhard | COMM | COMM | 6527 J.da Silva Pa | 6527 J.da Silva Pa | 6527 J.da Silva Pa |
8806 M.Reinhard | COMM | COMM | CHANGE/6527 J.da S | 6527 J.da Silva Pa | 6527 J.da Silva Pa | 6527 J.da Silva Pa |
8806 M.Reinhard | COMM | COMM | 6527 J.da Silva Pa | 6527 J.da Silva Pa | 6527 J.da Silva Pa | 6527 J.da Silva Pa |
BEAM LINE 17-2 | ||||||
May 20, 2024 | May 21, 2024 | May 22, 2024 | May 23, 2024 | May 24, 2024 | May 25, 2024 | May 26, 2024 |
FACI | 6709 J.Turner | 6709 J.Turner | 6709 J.Turner | 6391 J.Li | 6391 J.Li | 6391 J.Li |
Xray CHECKOUT/6709 | 6709 J.Turner | 6709 J.Turner | Xray CHECKOUT/6391 | 6391 J.Li | 6391 J.Li | 6391 J.Li |
6709 J.Turner | 6709 J.Turner | 6709 J.Turner | 6391 J.Li | 6391 J.Li | 6391 J.Li | 6391 J.Li |
WEEK OF May 27, 2024 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
BEAM LINE 1-5 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
Unscheduled | FACI | Unscheduled | 6601 S.Verschraege | FACI | 6601 S.Verschraege | 6601 S.Verschraege |
FACI | Unscheduled | Xray CHECKOUT/6601 | FACI | 6601 S.Verschraege | 6601 S.Verschraege | 6601 S.Verschraege |
FACI | Unscheduled | 6601 S.Verschraege | FACI | 6601 S.Verschraege | 6601 S.Verschraege | 6601 S.Verschraege |
BEAM LINE 2-1 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
8095 K.Stone | 8095 K.Stone | FACI | 11L0 A.Ansbro | 11L0 A.Ansbro | 8095 K.Stone | 8095 K.Stone |
8095 K.Stone | FACI | Xray CHECKOUT/11L0 | 11L0 A.Ansbro | Xray CHECKOUT/8095 | 8095 K.Stone | 8095 K.Stone |
8095 K.Stone | FACI | 11L0 A.Ansbro | 11L0 A.Ansbro | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
BEAM LINE 2-2 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
6533 A.Bhattachary | 6478 X.Fang | 6478 X.Fang | 6478 X.Fang | 6478 X.Fang | 6596 D.Ohnemus | 6596 D.Ohnemus |
CHANGE/6478 X.Fang | 6478 X.Fang | 6478 X.Fang | 6478 X.Fang | CHANGE/6596 D.Ohne | 6596 D.Ohnemus | 6596 D.Ohnemus |
6478 X.Fang | 6478 X.Fang | 6478 X.Fang | 6478 X.Fang | 6596 D.Ohnemus | 6596 D.Ohnemus | 6596 D.Ohnemus |
BEAM LINE 4-1 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
9705 J.LiSA | 9705 J.LiSA | 6723 H.Smith | 6147 F.Bridges | 6147 F.Bridges | 6227 D.Xia | 6227 D.Xia |
9705 J.LiSA | SMB CHECKOUT/6723 | SMB CHECKOUT/6147 | 6147 F.Bridges | SMB CHECKOUT/6227 | 6227 D.Xia | Unscheduled |
9705 J.LiSA | 6723 H.Smith | 6147 F.Bridges | 6147 F.Bridges | 6227 D.Xia | 6227 D.Xia | Unscheduled |
BEAM LINE 4-2 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
8847 T.Weiss | 8847 T.Weiss | 12C6 P.Cavanagh | 12C6 P.Cavanagh | 5558 A.Marras | 5497 M.Georgiadis | 5497 M.Georgiadis |
8847 T.Weiss | CHANGE/12C6 P.Cava | 12C6 P.Cavanagh | CHANGE/5558 A.Marr | CHANGE/5497 M.Geor | 5497 M.Georgiadis | 5497 M.Georgiadis |
8847 T.Weiss | 12C6 P.Cavanagh | 12C6 P.Cavanagh | 5558 A.Marras | 5497 M.Georgiadis | 5497 M.Georgiadis | 5497 M.Georgiadis |
BEAM LINE 4-3 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
5999 J.Guo | 5999 J.Guo | 11K4 M.Barreto | 11K4 M.Barreto | Unscheduled | Unscheduled | Unscheduled |
5999 J.Guo | SMB CHECKOUT/11K4 | 11K4 M.Barreto | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
5999 J.Guo | 11K4 M.Barreto | 11K4 M.Barreto | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
8090 J.Nelson Weke | 8090 J.Nelson Weke | 6345 M.Preefer | 6656 N.Sharma | 6656 N.Sharma | 6712 D.Agyeman-Bud | 6712 D.Agyeman-Bud |
8090 J.Nelson Weke | CHANGE/6345 M.Pree | CHANGE/6656 N.Shar | 6656 N.Sharma | CHANGE/6712 D.Agye | 6712 D.Agyeman-Bud | 6712 D.Agyeman-Bud |
8090 J.Nelson Weke | 6345 M.Preefer | 6656 N.Sharma | 6656 N.Sharma | 6712 D.Agyeman-Bud | 6712 D.Agyeman-Bud | 6712 D.Agyeman-Bud |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
6538 A.Duncan | 6538 A.Duncan | 6538 A.Duncan | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe |
6538 A.Duncan | 6538 A.Duncan | CHANGE/6502 M.Mueh | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe |
6538 A.Duncan | 6538 A.Duncan | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe |
BEAM LINE 7-3 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
6530 L.Quintanar | 6530 L.Quintanar | 6546 T.Jackson | 6546 T.Jackson | 5224 V.Yachandra | 5224 V.Yachandra | 5224 V.Yachandra |
6530 L.Quintanar | SMB CHECKOUT/6546 | 6546 T.Jackson | SMB CHECKOUT/5224 | 5224 V.Yachandra | 5224 V.Yachandra | 5224 V.Yachandra |
6530 L.Quintanar | 6546 T.Jackson | 6546 T.Jackson | 5224 V.Yachandra | 5224 V.Yachandra | 5224 V.Yachandra | 5224 V.Yachandra |
BEAM LINE 9-3 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
6555 K.Lancaster | 6555 K.Lancaster | FACI | FACI | FACI | 6096 M.Abernathy | 6096 M.Abernathy |
6555 K.Lancaster | FACI | FACI | FACI | SMB CHECKOUT/6096 | 6096 M.Abernathy | 6096 M.Abernathy |
6555 K.Lancaster | FACI | FACI | FACI | 6096 M.Abernathy | 6096 M.Abernathy | 6096 M.Abernathy |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
6352 P.Smith | 6352 P.Smith | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
6352 P.Smith | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
6352 P.Smith | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-3 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
6715 O.Marques | 6715 O.Marques | 6588 E.Espinosa Vi | 6588 E.Espinosa Vi | 6588 E.Espinosa Vi | 6451 D.Pe | 6451 D.Pe |
6715 O.Marques | Xray CHECKOUT/6588 | 6588 E.Espinosa Vi | 6588 E.Espinosa Vi | Xray CHECKOUT/6451 | 6451 D.Pe | 6451 D.Pe |
6715 O.Marques | 6588 E.Espinosa Vi | 6588 E.Espinosa Vi | 6588 E.Espinosa Vi | 6451 D.Pe | 6451 D.Pe | 6451 D.Pe |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
8064 S.Bone | 11K9 T.Bosak | 11K9 T.Bosak | 11K9 T.Bosak | 6655 C.Woltz | 6655 C.Woltz | 6655 C.Woltz |
CHANGE/11K9 T.Bosa | 11K9 T.Bosak | 11K9 T.Bosak | CHANGE/6655 C.Wolt | 6655 C.Woltz | 6655 C.Woltz | 6655 C.Woltz |
11K9 T.Bosak | 11K9 T.Bosak | 11K9 T.Bosak | 6655 C.Woltz | 6655 C.Woltz | 6655 C.Woltz | 6655 C.Woltz |
BEAM LINE 15-2 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
6527 J.da Silva Pa | 6149 U.Bovensiepen | 6149 U.Bovensiepen | 6149 U.Bovensiepen | 6149 U.Bovensiepen | 6282 T.Hersbach | 6282 T.Hersbach |
CHANGE/6149 U.Bove | 6149 U.Bovensiepen | 6149 U.Bovensiepen | 6149 U.Bovensiepen | CHANGE/6282 T.Hers | 6282 T.Hersbach | 6282 T.Hersbach |
6149 U.Bovensiepen | 6149 U.Bovensiepen | 6149 U.Bovensiepen | 6149 U.Bovensiepen | 6282 T.Hersbach | 6282 T.Hersbach | 6282 T.Hersbach |
BEAM LINE 17-2 | ||||||
May 27, 2024 | May 28, 2024 | May 29, 2024 | May 30, 2024 | May 31, 2024 | Jun. 01, 2024 | Jun. 02, 2024 |
6391 J.Li | 6391 J.Li | FACI | 6521 B.Gunn | 6521 B.Gunn | 6521 B.Gunn | 6521 B.Gunn |
6391 J.Li | FACI | Xray CHECKOUT/6521 | 6521 B.Gunn | 6521 B.Gunn | 6521 B.Gunn | 6521 B.Gunn |
6391 J.Li | FACI | 6521 B.Gunn | 6521 B.Gunn | 6521 B.Gunn | 6521 B.Gunn | 6521 B.Gunn |
WEEK OF Jun. 03, 2024 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
BEAM LINE 1-5 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
6601 S.Verschraege | AP | AP | FACI | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse |
AP | AP | FACI | Xray CHECKOUT/6103 | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse |
AP | AP | FACI | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse | 6103 S.Hesse |
BEAM LINE 2-1 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
8095 K.Stone | AP | AP | 6689 R.Ross | 6689 R.Ross | 5944 Z.Jiang | 5944 Z.Jiang |
AP | AP | Xray CHECKOUT/6689 | 6689 R.Ross | Xray CHECKOUT/5944 | 5944 Z.Jiang | 5944 Z.Jiang |
AP | AP | 6689 R.Ross | 6689 R.Ross | 5944 Z.Jiang | 5944 Z.Jiang | 5944 Z.Jiang |
BEAM LINE 2-2 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
DOWN | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
6596 D.Ohnemus | AP | AP | 6479 G.Chen | 6479 G.Chen | 8064 S.Bone | 8064 S.Bone |
AP | AP | CHANGE/6479 G.Chen | 6479 G.Chen | CHANGE/8064 S.Bone | 8064 S.Bone | 8064 S.Bone |
AP | AP | 6479 G.Chen | 6479 G.Chen | 8064 S.Bone | 8064 S.Bone | 8064 S.Bone |
BEAM LINE 4-1 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
Unscheduled | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 4-2 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
5497 M.Georgiadis | AP | AP | 8877 T.Matsui | 12C5 R.Moskovitz | 6660 T.Ferron | 6660 T.Ferron |
AP | AP | CHANGE/8877 T.Mats | CHANGE/12C5 R.Mosk | CHANGE/6660 T.Ferr | 6660 T.Ferron | 6660 T.Ferron |
AP | AP | 8877 T.Matsui | 12C5 R.Moskovitz | 6660 T.Ferron | 6660 T.Ferron | 6660 T.Ferron |
BEAM LINE 4-3 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
Unscheduled | AP | AP | 6249 P.Zhang | 6249 P.Zhang | 8092 D.Sokaras | 8092 D.Sokaras |
AP | AP | SMB CHECKOUT/6249 | 6249 P.Zhang | SMB CHECKOUT/8092 | 8092 D.Sokaras | 8092 D.Sokaras |
AP | AP | 6249 P.Zhang | 6249 P.Zhang | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
Unscheduled | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
6712 D.Agyeman-Bud | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
DOWN | AP | AP | 6712 D.Agyeman-Bud | 6712 D.Agyeman-Bud | 6247 K.Thurber | 6247 K.Thurber |
AP | AP | CHANGE/6712 D.Agye | 6712 D.Agyeman-Bud | CHANGE/6247 K.Thur | 6247 K.Thurber | 6247 K.Thurber |
AP | AP | 6712 D.Agyeman-Bud | 6712 D.Agyeman-Bud | 6247 K.Thurber | 6247 K.Thurber | 6247 K.Thurber |
BEAM LINE 7-2 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
6502 M.Muehe | AP | AP | 6041 B.Schumm | 6041 B.Schumm | 8019 J.Richardson | 8019 J.Richardson |
AP | AP | CHANGE/6041 B.Schu | 6041 B.Schumm | CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson |
AP | AP | 6041 B.Schumm | 6041 B.Schumm | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
BEAM LINE 7-3 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
5224 V.Yachandra | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 9-3 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
6096 M.Abernathy | AP | AP | 93J0 T.Colburn | 93J0 T.Colburn | 6258 M.Preefer | 6258 M.Preefer |
AP | AP | SMB CHECKOUT/93J0 | 93J0 T.Colburn | SMB CHECKOUT/6258 | 6258 M.Preefer | 6258 M.Preefer |
AP | AP | 93J0 T.Colburn | 93J0 T.Colburn | 6258 M.Preefer | 6258 M.Preefer | 6258 M.Preefer |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
Unscheduled | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
Unscheduled | AP | AP | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 11-3 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
6451 D.Pe | AP | AP | 6103 S.Hesse | 6055 M.Chabinyc | 6548 Z.Sun | 6548 Z.Sun |
AP | AP | Xray CHECKOUT/6103 | Xray CHECKOUT/6055 | Xray CHECKOUT/6548 | 6548 Z.Sun | 6548 Z.Sun |
AP | AP | 6103 S.Hesse | 6055 M.Chabinyc | 6548 Z.Sun | 6548 Z.Sun | 6548 Z.Sun |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
DOWN | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
6655 C.Woltz | AP | AP | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe |
AP | AP | CHANGE/6502 M.Mueh | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe |
AP | AP | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe | 6502 M.Muehe |
BEAM LINE 15-2 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
6282 T.Hersbach | AP | AP | 6177 P.O'Day | 6177 P.O'Day | 5636 L.Gee | 5636 L.Gee |
AP | AP | CHANGE/6177 P.O'Da | 6177 P.O'Day | CHANGE/5636 L.Gee | 5636 L.Gee | 5636 L.Gee |
AP | AP | 6177 P.O'Day | 6177 P.O'Day | 5636 L.Gee | 5636 L.Gee | 5636 L.Gee |
BEAM LINE 17-2 | ||||||
Jun. 03, 2024 | Jun. 04, 2024 | Jun. 05, 2024 | Jun. 06, 2024 | Jun. 07, 2024 | Jun. 08, 2024 | Jun. 09, 2024 |
6521 B.Gunn | AP | AP | 6457 G.Coslovich | 6457 G.Coslovich | 6457 G.Coslovich | 6457 G.Coslovich |
AP | AP | Xray CHECKOUT/6457 | 6457 G.Coslovich | 6457 G.Coslovich | 6457 G.Coslovich | 6457 G.Coslovich |
AP | AP | 6457 G.Coslovich | 6457 G.Coslovich | 6457 G.Coslovich | 6457 G.Coslovich | 6457 G.Coslovich |
WEEK OF Jun. 10, 2024 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
BEAM LINE 1-5 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
6103 S.Hesse | 6336 S.Ju | 5529 N.Akmansen Ka | FACI | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
CHANGE/6336 S.Ju | CHANGE/5529 N.Akma | FACI | Xray CHECKOUT/8091 | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
6336 S.Ju | 5529 N.Akmansen Ka | FACI | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
BEAM LINE 2-1 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
5944 Z.Jiang | 93K0 J.Li | 93K0 J.Li | 6675 C.Cao | 6675 C.Cao | 6605 P.Welander | 6605 P.Welander |
Xray CHECKOUT/93K0 | 93K0 J.Li | Xray CHECKOUT/6675 | 6675 C.Cao | Xray CHECKOUT/6605 | 6605 P.Welander | 6605 P.Welander |
93K0 J.Li | 93K0 J.Li | 6675 C.Cao | 6675 C.Cao | 6605 P.Welander | 6605 P.Welander | 6605 P.Welander |
BEAM LINE 2-2 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
8064 S.Bone | 8064 S.Bone | 6152 B.Gartman | 6152 B.Gartman | 6152 B.Gartman | 6237 S.Shulda | 6237 S.Shulda |
8064 S.Bone | CHANGE/6152 B.Gart | 6152 B.Gartman | 6152 B.Gartman | CHANGE/6237 S.Shul | 6237 S.Shulda | 6237 S.Shulda |
8064 S.Bone | 6152 B.Gartman | 6152 B.Gartman | 6152 B.Gartman | 6237 S.Shulda | 6237 S.Shulda | 6237 S.Shulda |
BEAM LINE 4-1 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 4-2 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
6660 T.Ferron | 8877 T.Matsui | 6193 J.Nielsen | 8877 T.Matsui | 8847 T.Weiss | 5497 M.Georgiadis | RA |
CHANGE/8877 T.Mats | CHANGE/6193 J.Niel | CHANGE/8877 T.Mats | CHANGE/8847 T.Weis | CHANGE/5497 M.Geor | RA | RA |
8877 T.Matsui | 6193 J.Nielsen | 8877 T.Matsui | 8847 T.Weiss | 5497 M.Georgiadis | RA | RA |
BEAM LINE 4-3 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
8092 D.Sokaras | 6715 O.Marques | 6715 O.Marques | 6479 G.Chen | 6479 G.Chen | 5830 J.Velazquez | 5830 J.Velazquez |
SMB CHECKOUT/6715 | 6715 O.Marques | SMB CHECKOUT/6479 | 6479 G.Chen | SMB CHECKOUT/5830 | 5830 J.Velazquez | 5830 J.Velazquez |
6715 O.Marques | 6715 O.Marques | 6479 G.Chen | 6479 G.Chen | 5830 J.Velazquez | 5830 J.Velazquez | 5830 J.Velazquez |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
6247 K.Thurber | 6510 M.Porwal | 6510 M.Porwal | 6510 M.Porwal | 6205 M.Dixit | 6205 M.Dixit | 6205 M.Dixit |
CHANGE/6510 M.Porw | 6510 M.Porwal | 6510 M.Porwal | CHANGE/6205 M.Dixi | 6205 M.Dixit | 6205 M.Dixit | 6205 M.Dixit |
6510 M.Porwal | 6510 M.Porwal | 6510 M.Porwal | 6205 M.Dixit | 6205 M.Dixit | 6205 M.Dixit | 6205 M.Dixit |
BEAM LINE 7-2 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
8019 J.Richardson | 6673 U.Bergmann | 6673 U.Bergmann | 6673 U.Bergmann | 6673 U.Bergmann | 6700 B.Stewart | 6700 B.Stewart |
CHANGE/6673 U.Berg | 6673 U.Bergmann | 6673 U.Bergmann | 6673 U.Bergmann | CHANGE/6700 B.Stew | 6700 B.Stewart | 6700 B.Stewart |
6673 U.Bergmann | 6673 U.Bergmann | 6673 U.Bergmann | 6673 U.Bergmann | 6700 B.Stewart | 6700 B.Stewart | 6700 B.Stewart |
BEAM LINE 7-3 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
Unscheduled | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn |
SMB CHECKOUT/6682 | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri | SMB CHECKOUT/5480 | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn |
6682 J.Lopez-Garri | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn | 5480 N.Blackburn |
BEAM LINE 9-3 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
6258 M.Preefer | 5224 V.Yachandra | 5224 V.Yachandra | 5224 V.Yachandra | Unscheduled | 6677 Z.Liang | 6677 Z.Liang |
SMB CHECKOUT/5224 | 5224 V.Yachandra | 5224 V.Yachandra | Unscheduled | SMB CHECKOUT/6677 | 6677 Z.Liang | Unscheduled |
5224 V.Yachandra | 5224 V.Yachandra | 5224 V.Yachandra | Unscheduled | 6677 Z.Liang | 6677 Z.Liang | Unscheduled |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
FACI | 6528 J.Chalmers | 6528 J.Chalmers | 6528 J.Chalmers | 6528 J.Chalmers | 6528 J.Chalmers | Unscheduled |
SMB CHECKOUT/6528 | 6528 J.Chalmers | 6528 J.Chalmers | 6528 J.Chalmers | 6528 J.Chalmers | 6528 J.Chalmers | Unscheduled |
6528 J.Chalmers | 6528 J.Chalmers | 6528 J.Chalmers | 6528 J.Chalmers | 6528 J.Chalmers | Unscheduled | Unscheduled |
BEAM LINE 11-3 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
6548 Z.Sun | 6241 C.Salamat | 6241 C.Salamat | 6532 P.Hung | 6532 P.Hung | 6520 D.Sconyers | 6520 D.Sconyers |
Xray CHECKOUT/6241 | 6241 C.Salamat | Xray CHECKOUT/6532 | 6532 P.Hung | Xray CHECKOUT/6520 | 6520 D.Sconyers | 6520 D.Sconyers |
6241 C.Salamat | 6241 C.Salamat | 6532 P.Hung | 6532 P.Hung | 6520 D.Sconyers | 6520 D.Sconyers | 6520 D.Sconyers |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
6502 M.Muehe | 6656 N.Sharma | 6656 N.Sharma | 6656 N.Sharma | 6180 A.Templeton | 6180 A.Templeton | 6180 A.Templeton |
CHANGE/6656 N.Shar | 6656 N.Sharma | 6656 N.Sharma | CHANGE/6180 A.Temp | 6180 A.Templeton | 6180 A.Templeton | 6180 A.Templeton |
6656 N.Sharma | 6656 N.Sharma | 6656 N.Sharma | 6180 A.Templeton | 6180 A.Templeton | 6180 A.Templeton | 6180 A.Templeton |
BEAM LINE 15-2 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
5636 L.Gee | STUP | 6077 M.Baker | 6077 M.Baker | 6077 M.Baker | 6646 S.Hayes | 6646 S.Hayes |
STUP | CHANGE/6077 M.Bake | 6077 M.Baker | 6077 M.Baker | CHANGE/6646 S.Haye | 6646 S.Hayes | 6646 S.Hayes |
STUP | 6077 M.Baker | 6077 M.Baker | 6077 M.Baker | 6646 S.Hayes | 6646 S.Hayes | 6646 S.Hayes |
BEAM LINE 17-2 | ||||||
Jun. 10, 2024 | Jun. 11, 2024 | Jun. 12, 2024 | Jun. 13, 2024 | Jun. 14, 2024 | Jun. 15, 2024 | Jun. 16, 2024 |
6457 G.Coslovich | FACI | FACI | FACI | 8061 S.Hesse | 6367 E.Abdo | 6367 E.Abdo |
FACI | FACI | FACI | CHANGE/8061 S.Hess | Xray CHECKOUT/6367 | 6367 E.Abdo | 6367 E.Abdo |
FACI | FACI | FACI | 8061 S.Hesse | 6367 E.Abdo | 6367 E.Abdo | 6367 E.Abdo |
WEEK OF Jun. 17, 2024 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
BEAM LINE 1-5 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
8091 C.Tasson/PAAM | PAAM | PAAM | DOWN | 6085 N.Idris | 6711 N.Strange | 6711 N.Strange |
PAAM | PAAM | DOWN | DOWN | Xray CHECKOUT/6711 | 6711 N.Strange | 6711 N.Strange |
PAAM | PAAM | DOWN | Xray CHECKOUT/6085 | 6711 N.Strange | 6711 N.Strange | 6711 N.Strange |
BEAM LINE 2-1 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
6605 P.Weland/PAAM | PAAM | PAAM | DOWN | 6677 Z.Liang | 6677 Z.Liang | 6677 Z.Liang |
PAAM | PAAM | DOWN | DOWN | 6677 Z.Liang | 6677 Z.Liang | 6677 Z.Liang |
PAAM | PAAM | DOWN | Xray CHECKOUT/6677 | 6677 Z.Liang | 6677 Z.Liang | 6677 Z.Liang |
BEAM LINE 2-2 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
DOWN/PAAM | PAAM | PAAM | DOWN | DOWN | DOWN | DOWN |
PAAM | PAAM | DOWN | DOWN | DOWN | DOWN | DOWN |
PAAM | PAAM | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
6237 S.Shulda/PAAM | PAAM | PAAM | DOWN | 5508 A.van Veelen | 6667 M.Stuckman | 6667 M.Stuckman |
PAAM | PAAM | DOWN | DOWN | CHANGE/6667 M.Stuc | 6667 M.Stuckman | 6667 M.Stuckman |
PAAM | PAAM | DOWN | CHANGE/5508 A.van | 6667 M.Stuckman | 6667 M.Stuckman | 6667 M.Stuckman |
BEAM LINE 4-1 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
PAAM | PAAM | PAAM | DOWN | 6518 K.Bidas | 5949 Z.Jiang | 5949 Z.Jiang |
PAAM | PAAM | DOWN | DOWN | SMB CHECKOUT/5949 | 5949 Z.Jiang | 5949 Z.Jiang |
PAAM | PAAM | DOWN | SMB CHECKOUT/6518 | 5949 Z.Jiang | 5949 Z.Jiang | 5949 Z.Jiang |
BEAM LINE 4-2 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
RA/PAAM | PAAM | PAAM | DOWN | Unscheduled | 6B99 S.Cramer | 6B99 S.Cramer |
PAAM | PAAM | DOWN | DOWN | CHANGE/6B99 S.Cram | 6B99 S.Cramer | Unscheduled |
PAAM | PAAM | DOWN | Unscheduled | 6B99 S.Cramer | 6B99 S.Cramer | Unscheduled |
BEAM LINE 4-3 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
5830 J.Velazq/PAAM | PAAM | PAAM | DOWN | 6600 W.Yu | 5830 J.Velazquez | 5830 J.Velazquez |
PAAM | PAAM | DOWN | DOWN | SMB CHECKOUT/5830 | 5830 J.Velazquez | 5830 J.Velazquez |
PAAM | PAAM | DOWN | SMB CHECKOUT/6600 | 5830 J.Velazquez | 5830 J.Velazquez | 5830 J.Velazquez |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
PAAM | PAAM | PAAM | DOWN | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
PAAM | PAAM | PAAM | DOWN | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
6205 M.Dixit/PAAM | PAAM | PAAM | DOWN | 93J3 J.Seto | Unscheduled | Unscheduled |
PAAM | PAAM | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | DOWN | CHANGE/93J3 J.Seto | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 7-2 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
6700 B.Stewar/PAAM | PAAM | PAAM | DOWN | 11K7 S.George | 8067 S.Webb | 8067 S.Webb |
PAAM | PAAM | DOWN | DOWN | CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
PAAM | PAAM | DOWN | CHANGE/11K7 S.Geor | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 7-3 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
5480 N.Blackb/PAAM | PAAM | PAAM | DOWN | 6554 K.Lui | 8071 R.Sarangi | 8071 R.Sarangi |
PAAM | PAAM | DOWN | DOWN | SMB CHECKOUT/8071 | 8071 R.Sarangi | 8071 R.Sarangi |
PAAM | PAAM | DOWN | SMB CHECKOUT/6554 | 8071 R.Sarangi | 8071 R.Sarangi | 8071 R.Sarangi |
BEAM LINE 9-3 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
PAAM | PAAM | PAAM | DOWN | 8099 S.Bare | 6498 G.Kamat | 6498 G.Kamat |
PAAM | PAAM | DOWN | DOWN | SMB CHECKOUT/6498 | 6498 G.Kamat | 6498 G.Kamat |
PAAM | PAAM | DOWN | SMB CHECKOUT/8099 | 6498 G.Kamat | 6498 G.Kamat | 6498 G.Kamat |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
PAAM | PAAM | PAAM | DOWN | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
PAAM | PAAM | PAAM | DOWN | 5993 K.Kovnir | 5993 K.Kovnir | 5993 K.Kovnir |
PAAM | PAAM | DOWN | DOWN | 5993 K.Kovnir | 5993 K.Kovnir | 5993 K.Kovnir |
PAAM | PAAM | DOWN | SMB CHECKOUT/5993 | 5993 K.Kovnir | 5993 K.Kovnir | 5993 K.Kovnir |
BEAM LINE 11-3 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
6520 D.Sconye/PAAM | PAAM | PAAM | DOWN | 6103 S.Hesse | 6686 J.Chen | 6686 J.Chen |
PAAM | PAAM | DOWN | DOWN | Xray CHECKOUT/6686 | 6686 J.Chen | Unscheduled |
PAAM | PAAM | DOWN | Xray CHECKOUT/6103 | 6686 J.Chen | 6686 J.Chen | Unscheduled |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
DOWN/PAAM | PAAM | PAAM | DOWN | DOWN | DOWN | DOWN |
PAAM | PAAM | DOWN | DOWN | DOWN | DOWN | DOWN |
PAAM | PAAM | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
6180 A.Temple/PAAM | PAAM | PAAM | DOWN | 6524 G.Druschel | 8067 S.Webb | 8067 S.Webb |
PAAM | PAAM | DOWN | DOWN | CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
PAAM | PAAM | DOWN | CHANGE/6524 G.Drus | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 15-2 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
6646 S.Hayes/PAAM | PAAM | PAAM | DOWN | 11K1 A.Follmer | 6060 A.Ghosh | 6060 A.Ghosh |
PAAM | PAAM | DOWN | DOWN | CHANGE/6060 A.Ghos | 6060 A.Ghosh | 6060 A.Ghosh |
PAAM | PAAM | DOWN | CHANGE/11K1 A.Foll | 6060 A.Ghosh | 6060 A.Ghosh | 6060 A.Ghosh |
BEAM LINE 17-2 | ||||||
Jun. 17, 2024 | Jun. 18, 2024 | Jun. 19, 2024 | Jun. 20, 2024 | Jun. 21, 2024 | Jun. 22, 2024 | Jun. 23, 2024 |
6367 E.Abdo/PAAM | PAAM | PAAM | DOWN | FACI | 8061 S.Hesse | 5931 B.Paulsen |
PAAM | PAAM | DOWN | DOWN | CHANGE/8061 S.Hess | Xray CHECKOUT/5931 | 5931 B.Paulsen |
PAAM | PAAM | DOWN | FACI | 8061 S.Hesse | 5931 B.Paulsen | 5931 B.Paulsen |
WEEK OF Jun. 24, 2024 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
BEAM LINE 1-5 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
6711 N.Strange | Unscheduled | Unscheduled | 6623 D.Banerjee | 6623 D.Banerjee | 6623 D.Banerjee | Unscheduled |
Unscheduled | Unscheduled | Xray CHECKOUT/6623 | 6623 D.Banerjee | 6623 D.Banerjee | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | 6623 D.Banerjee | 6623 D.Banerjee | 6623 D.Banerjee | Unscheduled | Unscheduled |
BEAM LINE 2-1 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
6677 Z.Liang | FACI | FACI | FACI | 6176 J.Finzel | 6176 J.Finzel | 6176 J.Finzel |
FACI | FACI | FACI | Xray CHECKOUT/6176 | 6176 J.Finzel | 6176 J.Finzel | 6176 J.Finzel |
FACI | FACI | FACI | 6176 J.Finzel | 6176 J.Finzel | 6176 J.Finzel | 6176 J.Finzel |
BEAM LINE 2-2 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
6667 M.Stuckman | 6121 S.Hickam | 6121 S.Hickam | 6691 S.Hickam | 6691 S.Hickam | 6080 E.Bailey | 6080 E.Bailey |
CHANGE/6121 S.Hick | 6121 S.Hickam | CHANGE/6691 S.Hick | 6691 S.Hickam | CHANGE/6080 E.Bail | 6080 E.Bailey | 6080 E.Bailey |
6121 S.Hickam | 6121 S.Hickam | 6691 S.Hickam | 6691 S.Hickam | 6080 E.Bailey | 6080 E.Bailey | 6080 E.Bailey |
BEAM LINE 4-1 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
5949 Z.Jiang | 6653 P.Hyde | 6653 P.Hyde | 11J8 J.Zhang | 6140 F.Bridges | 6552 F.Bridges | 6552 F.Bridges |
SMB CHECKOUT/6653 | 6653 P.Hyde | SMB CHECKOUT/11J8 | SMB CHECKOUT/6140 | SMB CHECKOUT/6552 | 6552 F.Bridges | 6552 F.Bridges |
6653 P.Hyde | 6653 P.Hyde | 11J8 J.Zhang | 6140 F.Bridges | 6552 F.Bridges | 6552 F.Bridges | 6552 F.Bridges |
BEAM LINE 4-2 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
Unscheduled | 6702 Y.Na | 6702 Y.Na | 12C7 H.Ravi Shanka | 12C7 H.Ravi Shanka | 6057 D.Mai | 6057 D.Mai |
CHANGE/6702 Y.Na | 6702 Y.Na | CHANGE/12C7 H.Ravi | 12C7 H.Ravi Shanka | CHANGE/6057 D.Mai | 6057 D.Mai | 6057 D.Mai |
6702 Y.Na | 6702 Y.Na | 12C7 H.Ravi Shanka | 12C7 H.Ravi Shanka | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai |
BEAM LINE 4-3 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
5830 J.Velazquez | 6444 N.Patra | 6444 N.Patra | 5945 E.Mu | 5945 E.Mu | 6653 P.Hyde | 6653 P.Hyde |
SMB CHECKOUT/6444 | 6444 N.Patra | SMB CHECKOUT/5945 | 5945 E.Mu | SMB CHECKOUT/6653 | 6653 P.Hyde | 6653 P.Hyde |
6444 N.Patra | 6444 N.Patra | 5945 E.Mu | 5945 E.Mu | 6653 P.Hyde | 6653 P.Hyde | 6653 P.Hyde |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
Unscheduled | 8907 M.Preefer | 8907 M.Preefer | 6433 S.Bone | 6433 S.Bone | 6237 S.Shulda | 6237 S.Shulda |
CHANGE/8907 M.Pree | 8907 M.Preefer | CHANGE/6433 S.Bone | 6433 S.Bone | CHANGE/6237 S.Shul | 6237 S.Shulda | 6237 S.Shulda |
8907 M.Preefer | 8907 M.Preefer | 6433 S.Bone | 6433 S.Bone | 6237 S.Shulda | 6237 S.Shulda | 6237 S.Shulda |
BEAM LINE 7-2 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
8067 S.Webb | FACI | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 6496 M.Pushie |
FACI | CHANGE/6071 M.Push | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | CHANGE/6496 M.Push | 6496 M.Pushie |
FACI | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 6071 M.Pushie | 6496 M.Pushie | 6496 M.Pushie |
BEAM LINE 7-3 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
8071 R.Sarangi | 6448 D.Ladd | 6448 D.Ladd | Unscheduled | Unscheduled | 6710 V.Noel | 6710 V.Noel |
SMB CHECKOUT/6448 | 6448 D.Ladd | Unscheduled | Unscheduled | SMB CHECKOUT/6710 | 6710 V.Noel | 6710 V.Noel |
6448 D.Ladd | 6448 D.Ladd | Unscheduled | Unscheduled | 6710 V.Noel | 6710 V.Noel | 6710 V.Noel |
BEAM LINE 9-3 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
6498 G.Kamat | 6191 S.Louisia | 6191 S.Louisia | 6573 E.Volk | 6573 E.Volk | 6362 J.Zhu | 6362 J.Zhu |
SMB CHECKOUT/6191 | 6191 S.Louisia | SMB CHECKOUT/6573 | 6573 E.Volk | SMB CHECKOUT/6362 | 6362 J.Zhu | 6362 J.Zhu |
6191 S.Louisia | 6191 S.Louisia | 6573 E.Volk | 6573 E.Volk | 6362 J.Zhu | 6362 J.Zhu | 6362 J.Zhu |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
5993 K.Kovnir | 5993 K.Kovnir | 5993 K.Kovnir | FACI | FACI | 6605 P.Welander | 6605 P.Welander |
5993 K.Kovnir | 5993 K.Kovnir | FACI | FACI | SMB CHECKOUT/6605 | 6605 P.Welander | 6605 P.Welander |
5993 K.Kovnir | 5993 K.Kovnir | FACI | FACI | 6605 P.Welander | 6605 P.Welander | 6605 P.Welander |
BEAM LINE 11-3 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
Unscheduled | 6663 N.Noel | 6663 N.Noel | FACI | 6273 S.Bent | 6601 S.Verschraege | 6601 S.Verschraege |
Xray CHECKOUT/6663 | 6663 N.Noel | FACI | Xray CHECKOUT/6273 | Xray CHECKOUT/6601 | 6601 S.Verschraege | 6601 S.Verschraege |
6663 N.Noel | 6663 N.Noel | FACI | 6273 S.Bent | 6601 S.Verschraege | 6601 S.Verschraege | 6601 S.Verschraege |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
8067 S.Webb | 8067 S.Webb | 6440 M.Rowley | 6440 M.Rowley | 6440 M.Rowley | 6478 X.Fang | 6478 X.Fang |
8067 S.Webb | CHANGE/6440 M.Rowl | 6440 M.Rowley | 6440 M.Rowley | CHANGE/6478 X.Fang | 6478 X.Fang | 6478 X.Fang |
8067 S.Webb | 6440 M.Rowley | 6440 M.Rowley | 6440 M.Rowley | 6478 X.Fang | 6478 X.Fang | 6478 X.Fang |
BEAM LINE 15-2 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
6060 A.Ghosh | 6649 J.Penner-Hahn | 6649 J.Penner-Hahn | 6649 J.Penner-Hahn | STUP | 6560 A.Smerigan | 6560 A.Smerigan |
CHANGE/6649 J.Penn | 6649 J.Penner-Hahn | 6649 J.Penner-Hahn | STUP | CHANGE/6560 A.Smer | 6560 A.Smerigan | 6560 A.Smerigan |
6649 J.Penner-Hahn | 6649 J.Penner-Hahn | 6649 J.Penner-Hahn | STUP | 6560 A.Smerigan | 6560 A.Smerigan | 6560 A.Smerigan |
BEAM LINE 17-2 | ||||||
Jun. 24, 2024 | Jun. 25, 2024 | Jun. 26, 2024 | Jun. 27, 2024 | Jun. 28, 2024 | Jun. 29, 2024 | Jun. 30, 2024 |
5931 B.Paulsen | 6548 Z.Sun | 6548 Z.Sun | FACI | FACI | 8091 C.Tassone | 8091 C.Tassone |
Xray CHECKOUT/6548 | 6548 Z.Sun | FACI | FACI | Xray CHECKOUT/8091 | 8091 C.Tassone | 8091 C.Tassone |
6548 Z.Sun | 6548 Z.Sun | FACI | FACI | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
WEEK OF Jul. 01, 2024 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
BEAM LINE 1-5 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
Unscheduled | FACI | FACI | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
FACI | FACI | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
FACI | FACI | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 2-1 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6176 J.Finzel | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 8095 K.Stone | 8095 K.Stone |
Xray CHECKOUT/6713 | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | Xray CHECKOUT/8095 | 8095 K.Stone | 8095 K.Stone |
6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
BEAM LINE 2-2 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6080 E.Bailey | 6080 E.Bailey | 6721 C.Kim | 6721 C.Kim | 6721 C.Kim | 93K3 S.Webb | 93K3 S.Webb |
6080 E.Bailey | CHANGE/6721 C.Kim | 6721 C.Kim | 6721 C.Kim | CHANGE/93K3 S.Webb | 93K3 S.Webb | 93K3 S.Webb |
6080 E.Bailey | 6721 C.Kim | 6721 C.Kim | 6721 C.Kim | 93K3 S.Webb | 93K3 S.Webb | 93K3 S.Webb |
BEAM LINE 4-1 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6552 F.Bridges | 6619 F.Bridges | 6619 F.Bridges | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew |
SMB CHECKOUT/6619 | 6619 F.Bridges | SMB CHECKOUT/6477 | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew |
6619 F.Bridges | 6619 F.Bridges | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew | 6477 A.Jew |
BEAM LINE 4-2 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6057 D.Mai | 6513 S.Dehe | RA | 6006 Y.Wu | 6006 Y.Wu | 6433 S.Bone | 6433 S.Bone |
CHANGE/6513 S.Dehe | RA | CHANGE/6006 Y.Wu | 6006 Y.Wu | CHANGE/6433 S.Bone | 6433 S.Bone | 6433 S.Bone |
6513 S.Dehe | RA | 6006 Y.Wu | 6006 Y.Wu | 6433 S.Bone | 6433 S.Bone | 6433 S.Bone |
BEAM LINE 4-3 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6653 P.Hyde | 6627 J.Kirtley | 6627 J.Kirtley | 5919 A.Picard | 5919 A.Picard | 6113 V.Noel | 6113 V.Noel |
SMB CHECKOUT/6627 | 6627 J.Kirtley | SMB CHECKOUT/5919 | 5919 A.Picard | SMB CHECKOUT/6113 | 6113 V.Noel | 6113 V.Noel |
6627 J.Kirtley | 6627 J.Kirtley | 5919 A.Picard | 5919 A.Picard | 6113 V.Noel | 6113 V.Noel | 6113 V.Noel |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
Unscheduled | Unscheduled | Unscheduled | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras |
Unscheduled | Unscheduled | CHANGE/8892 D.Soka | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras |
Unscheduled | Unscheduled | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6237 S.Shulda | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6496 M.Pushie | 6496 M.Pushie | 6496 M.Pushie | 93K3 S.Webb | 93K3 S.Webb | 6210 A.Kravchenko | 6210 A.Kravchenko |
6496 M.Pushie | 6496 M.Pushie | CHANGE/93K3 S.Webb | 93K3 S.Webb | CHANGE/6210 A.Krav | 6210 A.Kravchenko | 6210 A.Kravchenko |
6496 M.Pushie | 6496 M.Pushie | 93K3 S.Webb | 93K3 S.Webb | 6210 A.Kravchenko | 6210 A.Kravchenko | 6210 A.Kravchenko |
BEAM LINE 7-3 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6710 V.Noel | 5842 J.Lentz | 5842 J.Lentz | 5842 J.Lentz | 5842 J.Lentz | 6096 M.Abernathy | 6096 M.Abernathy |
SMB CHECKOUT/5842 | 5842 J.Lentz | 5842 J.Lentz | 5842 J.Lentz | SMB CHECKOUT/6096 | 6096 M.Abernathy | 6096 M.Abernathy |
5842 J.Lentz | 5842 J.Lentz | 5842 J.Lentz | 5842 J.Lentz | 6096 M.Abernathy | 6096 M.Abernathy | 6096 M.Abernathy |
BEAM LINE 9-3 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6362 J.Zhu | 6215 N.Lefton | 5302 L.Li | 5302 L.Li | 5302 L.Li | 6535 A.Datye | 6535 A.Datye |
SMB CHECKOUT/6215 | SMB CHECKOUT/5302 | 5302 L.Li | 5302 L.Li | SMB CHECKOUT/6535 | 6535 A.Datye | 6535 A.Datye |
6215 N.Lefton | 5302 L.Li | 5302 L.Li | 5302 L.Li | 6535 A.Datye | 6535 A.Datye | 6535 A.Datye |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6605 P.Welander | 6490 M.Wang | 6490 M.Wang | 6490 M.Wang | 6490 M.Wang | Unscheduled | Unscheduled |
SMB CHECKOUT/6490 | 6490 M.Wang | 6490 M.Wang | 6490 M.Wang | Unscheduled | Unscheduled | Unscheduled |
6490 M.Wang | 6490 M.Wang | 6490 M.Wang | 6490 M.Wang | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-3 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6601 S.Verschraege | FACI | 6664 S.Masina | 6664 S.Masina | 6664 S.Masina | 6664 S.Masina | 6664 S.Masina |
FACI | Xray CHECKOUT/6664 | 6664 S.Masina | 6664 S.Masina | 6664 S.Masina | 6664 S.Masina | 6664 S.Masina |
FACI | 6664 S.Masina | 6664 S.Masina | 6664 S.Masina | 6664 S.Masina | 6664 S.Masina | 6664 S.Masina |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6478 X.Fang | 6478 X.Fang | 6700 B.Stewart | 6700 B.Stewart | Unscheduled | 93K3 S.Webb | 93K3 S.Webb |
6478 X.Fang | CHANGE/6700 B.Stew | 6700 B.Stewart | Unscheduled | CHANGE/93K3 S.Webb | 93K3 S.Webb | 93K3 S.Webb |
6478 X.Fang | 6700 B.Stewart | 6700 B.Stewart | Unscheduled | 93K3 S.Webb | 93K3 S.Webb | 93K3 S.Webb |
BEAM LINE 15-2 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
6560 A.Smerigan | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras | 6568 H.Harris | 6568 H.Harris |
CHANGE/8092 D.Soka | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras | CHANGE/6568 H.Harr | 6568 H.Harris | 6568 H.Harris |
8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras | 8092 D.Sokaras | 6568 H.Harris | 6568 H.Harris | 6568 H.Harris |
BEAM LINE 17-2 | ||||||
Jul. 01, 2024 | Jul. 02, 2024 | Jul. 03, 2024 | Jul. 04, 2024 | Jul. 05, 2024 | Jul. 06, 2024 | Jul. 07, 2024 |
8091 C.Tassone | 8091 C.Tassone | FACI | 6203 A.Halavanau | 6203 A.Halavanau | 6203 A.Halavanau | 6203 A.Halavanau |
8091 C.Tassone | FACI | Xray CHECKOUT/6203 | 6203 A.Halavanau | 6203 A.Halavanau | 6203 A.Halavanau | 6203 A.Halavanau |
8091 C.Tassone | FACI | 6203 A.Halavanau | 6203 A.Halavanau | 6203 A.Halavanau | 6203 A.Halavanau | 6203 A.Halavanau |
WEEK OF Jul. 08, 2024 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
BEAM LINE 1-5 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
AP | AP | AP | 6706 V.Wall | 6706 V.Wall | 6706 V.Wall | 6706 V.Wall |
AP | AP | Xray CHECKOUT/6706 | 6706 V.Wall | 6706 V.Wall | 6706 V.Wall | 6706 V.Wall |
AP | AP | 6706 V.Wall | 6706 V.Wall | 6706 V.Wall | 6706 V.Wall | 6706 V.Wall |
BEAM LINE 2-1 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
8095 K.Stone/AP | AP | AP | 6438 R.Smaha | 6438 R.Smaha | 6604 C.Crain | 6604 C.Crain |
AP | AP | Xray CHECKOUT/6438 | 6438 R.Smaha | Xray CHECKOUT/6604 | 6604 C.Crain | 6604 C.Crain |
AP | AP | 6438 R.Smaha | 6438 R.Smaha | 6604 C.Crain | 6604 C.Crain | 6604 C.Crain |
BEAM LINE 2-2 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
93K3 S.Webb/AP | AP | AP | Unscheduled | Unscheduled | 6718 E.Nuccio | 6718 E.Nuccio |
AP | AP | Unscheduled | Unscheduled | CHANGE/6718 E.Nucc | 6718 E.Nuccio | 6718 E.Nuccio |
AP | AP | Unscheduled | Unscheduled | 6718 E.Nuccio | 6718 E.Nuccio | 6718 E.Nuccio |
BEAM LINE 4-1 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
6477 A.Jew/AP | AP | AP | Unscheduled | Unscheduled | 6505 C.Zweifel | 6505 C.Zweifel |
AP | AP | Unscheduled | Unscheduled | SMB CHECKOUT/6505 | 6505 C.Zweifel | 6505 C.Zweifel |
AP | AP | Unscheduled | Unscheduled | 6505 C.Zweifel | 6505 C.Zweifel | 6505 C.Zweifel |
BEAM LINE 4-2 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
6433 S.Bone/AP | AP | AP | 6467 A.Sewa | 6467 A.Sewa | 12C6 P.Cavanagh | 12C6 P.Cavanagh |
AP | AP | CHANGE/6467 A.Sewa | 6467 A.Sewa | CHANGE/12C6 P.Cava | 12C6 P.Cavanagh | Unscheduled |
AP | AP | 6467 A.Sewa | 6467 A.Sewa | 12C6 P.Cavanagh | 12C6 P.Cavanagh | Unscheduled |
BEAM LINE 4-3 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
6113 V.Noel/AP | AP | AP | 8099 S.Bare | 8099 S.Bare | 8014 A.Hoffman | 8014 A.Hoffman |
AP | AP | SMB CHECKOUT/8099 | 8099 S.Bare | SMB CHECKOUT/8014 | 8014 A.Hoffman | 8014 A.Hoffman |
AP | AP | 8099 S.Bare | 8099 S.Bare | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
8892 D.Sokaras/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
DOWN/AP | AP | AP | 8907 M.Preefer | 6465 N.Majoras | 6227 D.Xia | 6227 D.Xia |
AP | AP | CHANGE/8907 M.Pree | CHANGE/6465 N.Majo | CHANGE/6227 D.Xia | 6227 D.Xia | 6227 D.Xia |
AP | AP | 8907 M.Preefer | 6465 N.Majoras | 6227 D.Xia | 6227 D.Xia | 6227 D.Xia |
BEAM LINE 7-2 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
6210 A.Kravchen/AP | AP | AP | 6718 E.Nuccio | 6718 E.Nuccio | 6277 G.George | 6277 G.George |
AP | AP | CHANGE/6718 E.Nucc | 6718 E.Nuccio | CHANGE/6277 G.Geor | 6277 G.George | 6277 G.George |
AP | AP | 6718 E.Nuccio | 6718 E.Nuccio | 6277 G.George | 6277 G.George | 6277 G.George |
BEAM LINE 7-3 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
6096 M.Abernath/AP | AP | AP | 6096 M.Abernathy | 6636 A.Ugale | 6636 A.Ugale | 6636 A.Ugale |
AP | AP | 6096 M.Abernathy | SMB CHECKOUT/6636 | 6636 A.Ugale | 6636 A.Ugale | 6636 A.Ugale |
AP | AP | 6096 M.Abernathy | 6636 A.Ugale | 6636 A.Ugale | 6636 A.Ugale | 6636 A.Ugale |
BEAM LINE 9-3 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
6535 A.Datye/AP | AP | AP | Unscheduled | Unscheduled | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri |
AP | AP | Unscheduled | Unscheduled | SMB CHECKOUT/6682 | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri |
AP | AP | Unscheduled | Unscheduled | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
AP | AP | AP | FACI | 6608 P.Donahue | 6608 P.Donahue | 6608 P.Donahue |
AP | AP | FACI | SMB CHECKOUT/6608 | 6608 P.Donahue | 6608 P.Donahue | 6608 P.Donahue |
AP | AP | FACI | 6608 P.Donahue | 6608 P.Donahue | 6608 P.Donahue | 6608 P.Donahue |
BEAM LINE 11-3 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
6664 S.Masina/AP | AP | AP | FACI | FACI | 6438 R.Smaha | 6438 R.Smaha |
AP | AP | FACI | FACI | Xray CHECKOUT/6438 | 6438 R.Smaha | 6438 R.Smaha |
AP | AP | FACI | FACI | 6438 R.Smaha | 6438 R.Smaha | 6438 R.Smaha |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
93K3 S.Webb/AP | AP | AP | 5615 J.Ravichandra | 5615 J.Ravichandra | 8019 J.Richardson | 8019 J.Richardson |
AP | AP | CHANGE/5615 J.Ravi | 5615 J.Ravichandra | CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson |
AP | AP | 5615 J.Ravichandra | 5615 J.Ravichandra | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson |
BEAM LINE 15-2 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
6568 H.Harris/AP | AP | AP | 6338 X.Zheng | 6338 X.Zheng | 9705 J.LiSA | 9705 J.LiSA |
AP | AP | CHANGE/6338 X.Zhen | 6338 X.Zheng | CHANGE/9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
AP | AP | 6338 X.Zheng | 6338 X.Zheng | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
BEAM LINE 17-2 | ||||||
Jul. 08, 2024 | Jul. 09, 2024 | Jul. 10, 2024 | Jul. 11, 2024 | Jul. 12, 2024 | Jul. 13, 2024 | Jul. 14, 2024 |
6203 A.Halavana/AP | AP | AP | FACI | 6258 M.Preefer | 6258 M.Preefer | 6258 M.Preefer |
AP | AP | FACI | Xray CHECKOUT/6258 | 6258 M.Preefer | 6258 M.Preefer | 6258 M.Preefer |
AP | AP | FACI | 6258 M.Preefer | 6258 M.Preefer | 6258 M.Preefer | 6258 M.Preefer |
WEEK OF Jul. 15, 2024 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
BEAM LINE 1-5 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
6706 V.Wall | FACI | FACI | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman |
FACI | FACI | Xray CHECKOUT/6713 | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman |
FACI | FACI | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman | 6713 A.Hoffman |
BEAM LINE 2-1 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
6604 C.Crain | Unscheduled | Unscheduled | Unscheduled | Unscheduled | 8095 K.Stone | 8095 K.Stone |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Xray CHECKOUT/8095 | 8095 K.Stone | 8095 K.Stone |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | 8095 K.Stone | 8095 K.Stone | 8095 K.Stone |
BEAM LINE 2-2 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
6718 E.Nuccio | Unscheduled | Unscheduled | 6291 T.Paunesku | 6291 T.Paunesku | 6655 C.Woltz | 6655 C.Woltz |
Unscheduled | Unscheduled | CHANGE/6291 T.Paun | 6291 T.Paunesku | CHANGE/6655 C.Wolt | 6655 C.Woltz | 6655 C.Woltz |
Unscheduled | Unscheduled | 6291 T.Paunesku | 6291 T.Paunesku | 6655 C.Woltz | 6655 C.Woltz | 6655 C.Woltz |
BEAM LINE 4-1 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
6505 C.Zweifel | 5639 J.Catalano | 5639 J.Catalano | 5771 C.Hansel | 5771 C.Hansel | 6115 J.Feaster | 6115 J.Feaster |
SMB CHECKOUT/5639 | 5639 J.Catalano | SMB CHECKOUT/5771 | 5771 C.Hansel | SMB CHECKOUT/6115 | 6115 J.Feaster | Unscheduled |
5639 J.Catalano | 5639 J.Catalano | 5771 C.Hansel | 5771 C.Hansel | 6115 J.Feaster | 6115 J.Feaster | Unscheduled |
BEAM LINE 4-2 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
Unscheduled | 6630 I.Ramirez Mar | 6630 I.Ramirez Mar | 6630 I.Ramirez Mar | 5558 A.Marras | 6539 E.Biasin | 6539 E.Biasin |
CHANGE/6630 I.Rami | 6630 I.Ramirez Mar | 6630 I.Ramirez Mar | CHANGE/5558 A.Marr | CHANGE/6539 E.Bias | 6539 E.Biasin | 6539 E.Biasin |
6630 I.Ramirez Mar | 6630 I.Ramirez Mar | 6630 I.Ramirez Mar | 5558 A.Marras | 6539 E.Biasin | 6539 E.Biasin | 6539 E.Biasin |
BEAM LINE 4-3 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | 6194 M.Liu | 6194 M.Liu | 6194 M.Liu |
8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | SMB CHECKOUT/6194 | 6194 M.Liu | 6194 M.Liu | 6194 M.Liu |
8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | 6194 M.Liu | 6194 M.Liu | 6194 M.Liu | 6194 M.Liu |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
6227 D.Xia | 5485 X.Milhet | 5485 X.Milhet | 5485 X.Milhet | 8890 J.Nelson Weke | 6643 A.Lee | 6643 A.Lee |
CHANGE/5485 X.Milh | 5485 X.Milhet | 5485 X.Milhet | CHANGE/8890 J.Nels | CHANGE/6643 A.Lee | 6643 A.Lee | 6643 A.Lee |
5485 X.Milhet | 5485 X.Milhet | 5485 X.Milhet | 8890 J.Nelson Weke | 6643 A.Lee | 6643 A.Lee | 6643 A.Lee |
BEAM LINE 7-2 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
6277 G.George | 6277 G.George | 5771 C.Hansel | 5771 C.Hansel | 5771 C.Hansel | 6710 V.Noel | 6710 V.Noel |
6277 G.George | CHANGE/5771 C.Hans | 5771 C.Hansel | 5771 C.Hansel | CHANGE/6710 V.Noel | 6710 V.Noel | 6710 V.Noel |
6277 G.George | 5771 C.Hansel | 5771 C.Hansel | 5771 C.Hansel | 6710 V.Noel | 6710 V.Noel | 6710 V.Noel |
BEAM LINE 7-3 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
6636 A.Ugale | 6379 M.Abernathy | 6670 C.Lopano | 6670 C.Lopano | 6670 C.Lopano | 6441 C.Pollock | 6441 C.Pollock |
SMB CHECKOUT/6379 | SMB CHECKOUT/6670 | 6670 C.Lopano | 6670 C.Lopano | SMB CHECKOUT/6441 | 6441 C.Pollock | 6441 C.Pollock |
6379 M.Abernathy | 6670 C.Lopano | 6670 C.Lopano | 6670 C.Lopano | 6441 C.Pollock | 6441 C.Pollock | 6441 C.Pollock |
BEAM LINE 9-3 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
6682 J.Lopez-Garri | 6635 D.Moonshiram | 6635 D.Moonshiram | 6635 D.Moonshiram | 6635 D.Moonshiram | 8071 R.Sarangi | 8071 R.Sarangi |
SMB CHECKOUT/6635 | 6635 D.Moonshiram | 6635 D.Moonshiram | 6635 D.Moonshiram | SMB CHECKOUT/8071 | 8071 R.Sarangi | 8071 R.Sarangi |
6635 D.Moonshiram | 6635 D.Moonshiram | 6635 D.Moonshiram | 6635 D.Moonshiram | 8071 R.Sarangi | 8071 R.Sarangi | 8071 R.Sarangi |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
Unscheduled | FACI | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
FACI | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
FACI | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
6608 P.Donahue | FACI | FACI | 6047 J.Catalano | 6047 J.Catalano | 5771 C.Hansel | 5771 C.Hansel |
FACI | FACI | SMB CHECKOUT/6047 | 6047 J.Catalano | SMB CHECKOUT/5771 | 5771 C.Hansel | 5771 C.Hansel |
FACI | FACI | 6047 J.Catalano | 6047 J.Catalano | 5771 C.Hansel | 5771 C.Hansel | 5771 C.Hansel |
BEAM LINE 11-3 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
6438 R.Smaha | Unscheduled | Unscheduled | Unscheduled | Unscheduled | 6711 N.Strange | 6711 N.Strange |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Xray CHECKOUT/6711 | 6711 N.Strange | 6711 N.Strange |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | 6711 N.Strange | 6711 N.Strange | 6711 N.Strange |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson | 6226 M.Crotteau | 6226 M.Crotteau | 6226 M.Crotteau |
CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson | CHANGE/6226 M.Crot | 6226 M.Crotteau | 6226 M.Crotteau | 6226 M.Crotteau |
8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson | 6226 M.Crotteau | 6226 M.Crotteau | 6226 M.Crotteau | 6226 M.Crotteau |
BEAM LINE 15-2 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
9705 J.LiSA | 9705 J.LiSA | 6482 R.Popelka-Fil | 6482 R.Popelka-Fil | 6482 R.Popelka-Fil | 6674 D.Eum | 6674 D.Eum |
9705 J.LiSA | CHANGE/6482 R.Pope | 6482 R.Popelka-Fil | 6482 R.Popelka-Fil | CHANGE/6674 D.Eum | 6674 D.Eum | 6674 D.Eum |
9705 J.LiSA | 6482 R.Popelka-Fil | 6482 R.Popelka-Fil | 6482 R.Popelka-Fil | 6674 D.Eum | 6674 D.Eum | 6674 D.Eum |
BEAM LINE 17-2 | ||||||
Jul. 15, 2024 | Jul. 16, 2024 | Jul. 17, 2024 | Jul. 18, 2024 | Jul. 19, 2024 | Jul. 20, 2024 | Jul. 21, 2024 |
6258 M.Preefer | 6258 M.Preefer | FACI | FACI | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi |
6258 M.Preefer | FACI | FACI | Xray CHECKOUT/6307 | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi |
6258 M.Preefer | FACI | FACI | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi |
WEEK OF Jul. 22, 2024 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
BEAM LINE 1-5 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
6713 A.Hoffman | PAAM | PAAM | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
PAAM | PAAM | Xray CHECKOUT/8091 | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
PAAM | PAAM | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
BEAM LINE 2-1 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
8095 K.Stone | PAAM | PAAM | 5771 C.Hansel | 5771 C.Hansel | 6664 S.Masina | 6664 S.Masina |
PAAM | PAAM | Xray CHECKOUT/5771 | 5771 C.Hansel | Xray CHECKOUT/6664 | 6664 S.Masina | 6664 S.Masina |
PAAM | PAAM | 5771 C.Hansel | 5771 C.Hansel | 6664 S.Masina | 6664 S.Masina | 6664 S.Masina |
BEAM LINE 2-2 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
DOWN | PAAM | PAAM | DOWN | 6668 S.Conradson | 6668 S.Conradson | 6668 S.Conradson |
PAAM | PAAM | DOWN | CHANGE/6668 S.Conr | 6668 S.Conradson | 6668 S.Conradson | 6668 S.Conradson |
PAAM | PAAM | DOWN | 6668 S.Conradson | 6668 S.Conradson | 6668 S.Conradson | 6668 S.Conradson |
BEAM LINE 2-3 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
6655 C.Woltz | PAAM | PAAM | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
PAAM | PAAM | CHANGE/8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
PAAM | PAAM | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb | 8067 S.Webb |
BEAM LINE 4-1 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
Unscheduled | PAAM | PAAM | 8099 S.Bare | 8099 S.Bare | 8014 A.Hoffman | 8014 A.Hoffman |
PAAM | PAAM | 8099 S.Bare | 8099 S.Bare | SMB CHECKOUT/8014 | 8014 A.Hoffman | 8014 A.Hoffman |
PAAM | PAAM | 8099 S.Bare | 8099 S.Bare | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman |
BEAM LINE 4-2 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
6539 E.Biasin | PAAM | PAAM | 5119 G.Wong | 5119 G.Wong | 5119 G.Wong | 5504 Y.Srinivasan |
PAAM | PAAM | CHANGE/5119 G.Wong | 5119 G.Wong | 5119 G.Wong | CHANGE/5504 Y.Srin | 5504 Y.Srinivasan |
PAAM | PAAM | 5119 G.Wong | 5119 G.Wong | 5119 G.Wong | 5504 Y.Srinivasan | 5504 Y.Srinivasan |
BEAM LINE 4-3 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
6194 M.Liu | PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
Unscheduled | PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
Unscheduled | PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
6643 A.Lee | PAAM | PAAM | 6603 D.Agyeman-Bud | 6603 D.Agyeman-Bud | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi |
PAAM | PAAM | CHANGE/6603 D.Agye | 6603 D.Agyeman-Bud | CHANGE/6307 E.Espi | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi |
PAAM | PAAM | 6603 D.Agyeman-Bud | 6603 D.Agyeman-Bud | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi | 6307 E.Espinosa Vi |
BEAM LINE 7-2 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
6710 V.Noel | PAAM | PAAM | 5892 R.Bryant | 5892 R.Bryant | 6228 M.McNamara | 6228 M.McNamara |
PAAM | PAAM | CHANGE/5892 R.Brya | 5892 R.Bryant | CHANGE/6228 M.McNa | 6228 M.McNamara | 6228 M.McNamara |
PAAM | PAAM | 5892 R.Bryant | 5892 R.Bryant | 6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara |
BEAM LINE 7-3 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
6441 C.Pollock | PAAM | PAAM | 6000 G.George | 6000 G.George | 6000 G.George | 6000 G.George |
PAAM | PAAM | SMB CHECKOUT/6000 | 6000 G.George | 6000 G.George | 6000 G.George | 6000 G.George |
PAAM | PAAM | 6000 G.George | 6000 G.George | 6000 G.George | 6000 G.George | 6000 G.George |
BEAM LINE 9-3 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
8071 R.Sarangi | PAAM | PAAM | 5075 A.Braun | 5075 A.Braun | Unscheduled | Unscheduled |
PAAM | PAAM | SMB CHECKOUT/5075 | 5075 A.Braun | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | 5075 A.Braun | 5075 A.Braun | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
Unscheduled | PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
5771 C.Hansel | PAAM | PAAM | 6634 U.Kaplan | 6634 U.Kaplan | 6516 A.Evers | 6516 A.Evers |
PAAM | PAAM | SMB CHECKOUT/6634 | 6634 U.Kaplan | SMB CHECKOUT/6516 | 6516 A.Evers | 6516 A.Evers |
PAAM | PAAM | 6634 U.Kaplan | 6634 U.Kaplan | 6516 A.Evers | 6516 A.Evers | 6516 A.Evers |
BEAM LINE 11-3 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
6711 N.Strange | PAAM | PAAM | FACI | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
PAAM | PAAM | FACI | Xray CHECKOUT/8091 | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
PAAM | PAAM | FACI | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
Unscheduled | PAAM | PAAM | 5755 J.Judy | 5755 J.Judy | 6574 G.Hettiarachc | 6574 G.Hettiarachc |
PAAM | PAAM | SMB CHECKOUT/5755 | 5755 J.Judy | SMB CHECKOUT/6574 | 6574 G.Hettiarachc | 6574 G.Hettiarachc |
PAAM | PAAM | 5755 J.Judy | 5755 J.Judy | 6574 G.Hettiarachc | 6574 G.Hettiarachc | 6574 G.Hettiarachc |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
6226 M.Crotteau | PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
PAAM | PAAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 15-2 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
6674 D.Eum | PAAM | PAAM | STUP | STUP | 6100 M.Reinhard | 6100 M.Reinhard |
PAAM | PAAM | STUP | STUP | CHANGE/6100 M.Rein | 6100 M.Reinhard | 6100 M.Reinhard |
PAAM | PAAM | STUP | STUP | 6100 M.Reinhard | 6100 M.Reinhard | 6100 M.Reinhard |
BEAM LINE 17-2 | ||||||
Jul. 22, 2024 | Jul. 23, 2024 | Jul. 24, 2024 | Jul. 25, 2024 | Jul. 26, 2024 | Jul. 27, 2024 | Jul. 28, 2024 |
6307 E.Espinosa Vi | PAAM | PAAM | FACI | FACI | FACI | FACI |
PAAM | PAAM | FACI | FACI | FACI | FACI | FACI |
PAAM | PAAM | FACI | FACI | FACI | FACI | FACI |
WEEK OF Jul. 29, 2024 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
BEAM LINE 1-5 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
8091 C.Tassone | 6433 S.Bone | 6433 S.Bone | 6433 S.Bone | 6433 S.Bone | 8091 C.Tassone | 8091 C.Tassone |
Xray CHECKOUT/6433 | 6433 S.Bone | 6433 S.Bone | 6433 S.Bone | Xray CHECKOUT/8091 | 8091 C.Tassone | 8091 C.Tassone |
6433 S.Bone | 6433 S.Bone | 6433 S.Bone | 6433 S.Bone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
BEAM LINE 2-1 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
6664 S.Masina | FACI | 6679 M.Cosby | 6679 M.Cosby | 6679 M.Cosby | 5984 E.Corson | 5984 E.Corson |
FACI | Xray CHECKOUT/6679 | 6679 M.Cosby | 6679 M.Cosby | Xray CHECKOUT/5984 | 5984 E.Corson | 5984 E.Corson |
FACI | 6679 M.Cosby | 6679 M.Cosby | 6679 M.Cosby | 5984 E.Corson | 5984 E.Corson | 5984 E.Corson |
BEAM LINE 2-2 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
6668 S.Conradson | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
CHANGE/8091 C.Tass | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone | 8091 C.Tassone |
BEAM LINE 2-3 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
8067 S.Webb | 8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson | 6703 J.Pena | 6703 J.Pena | 6703 J.Pena |
CHANGE/8019 J.Rich | 8019 J.Richardson | 8019 J.Richardson | CHANGE/6703 J.Pena | 6703 J.Pena | 6703 J.Pena | 6703 J.Pena |
8019 J.Richardson | 8019 J.Richardson | 8019 J.Richardson | 6703 J.Pena | 6703 J.Pena | 6703 J.Pena | 6703 J.Pena |
BEAM LINE 4-1 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | FACI | 6175 L.Chen | 6175 L.Chen |
8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | FACI | CHANGE/6175 L.Chen | 6175 L.Chen | 6175 L.Chen |
8014 A.Hoffman | 8014 A.Hoffman | 8014 A.Hoffman | FACI | 6175 L.Chen | 6175 L.Chen | 6175 L.Chen |
BEAM LINE 4-2 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
5504 Y.Srinivasan | 5504 Y.Srinivasan | 12C4 M.Watkins | 12C4 M.Watkins | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai |
5504 Y.Srinivasan | CHANGE/12C4 M.Watk | 12C4 M.Watkins | CHANGE/6057 D.Mai | 6057 D.Mai | 6057 D.Mai | CHANGE/8877 T.Mats |
5504 Y.Srinivasan | 12C4 M.Watkins | 12C4 M.Watkins | 6057 D.Mai | 6057 D.Mai | 6057 D.Mai | 8877 T.Matsui |
BEAM LINE 4-3 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
Unscheduled | 6163 G.George | 6163 G.George | 6614 S.George | 6614 S.George | 6662 U.Bergmann | 6662 U.Bergmann |
SMB CHECKOUT/6163 | 6163 G.George | SMB CHECKOUT/6614 | 6614 S.George | SMB CHECKOUT/6662 | 6662 U.Bergmann | 6662 U.Bergmann |
6163 G.George | 6163 G.George | 6614 S.George | 6614 S.George | 6662 U.Bergmann | 6662 U.Bergmann | 6662 U.Bergmann |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
6307 E.Espinosa Vi | 8907 M.Preefer | 8907 M.Preefer | 8062 M.Preefer | 8062 M.Preefer | 5369 C.Tan | 5369 C.Tan |
CHANGE/8907 M.Pree | 8907 M.Preefer | CHANGE/8062 M.Pree | 8062 M.Preefer | CHANGE/5369 C.Tan | 5369 C.Tan | 5369 C.Tan |
8907 M.Preefer | 8907 M.Preefer | 8062 M.Preefer | 8062 M.Preefer | 5369 C.Tan | 5369 C.Tan | 5369 C.Tan |
BEAM LINE 7-2 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
6228 M.McNamara | 6228 M.McNamara | 6228 M.McNamara | FACI | FACI | FACI | FACI |
6228 M.McNamara | 6228 M.McNamara | FACI | FACI | FACI | FACI | FACI |
6228 M.McNamara | 6228 M.McNamara | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 7-3 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
6000 G.George | 6565 L.Mydy | 6628 N.Blackburn | 6628 N.Blackburn | 6628 N.Blackburn | 6616 T.Stemmler | 6616 T.Stemmler |
SMB CHECKOUT/6565 | SMB CHECKOUT/6628 | 6628 N.Blackburn | 6628 N.Blackburn | SMB CHECKOUT/6616 | 6616 T.Stemmler | 6616 T.Stemmler |
6565 L.Mydy | 6628 N.Blackburn | 6628 N.Blackburn | 6628 N.Blackburn | 6616 T.Stemmler | 6616 T.Stemmler | 6616 T.Stemmler |
BEAM LINE 9-3 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
Unscheduled | Unscheduled | 6163 G.George | 6096 M.Abernathy | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri |
Unscheduled | SMB CHECKOUT/6163 | SMB CHECKOUT/6096 | SMB CHECKOUT/6682 | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri |
Unscheduled | 6163 G.George | 6096 M.Abernathy | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri | 6682 J.Lopez-Garri |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 11-2 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
6516 A.Evers | 6397 J.Zhang | 6397 J.Zhang | 6262 A.Naranjo-Sol | 6262 A.Naranjo-Sol | 6270 S.Saslow | 6270 S.Saslow |
SMB CHECKOUT/6397 | 6397 J.Zhang | SMB CHECKOUT/6262 | 6262 A.Naranjo-Sol | SMB CHECKOUT/6270 | 6270 S.Saslow | 6270 S.Saslow |
6397 J.Zhang | 6397 J.Zhang | 6262 A.Naranjo-Sol | 6262 A.Naranjo-Sol | 6270 S.Saslow | 6270 S.Saslow | 6270 S.Saslow |
BEAM LINE 11-3 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
8091 C.Tassone | 8091 C.Tassone | 6479 G.Chen | 6479 G.Chen | 6479 G.Chen | 6429 H.Ramachandra | 6429 H.Ramachandra |
8091 C.Tassone | Xray CHECKOUT/6479 | 6479 G.Chen | 6479 G.Chen | Xray CHECKOUT/6429 | 6429 H.Ramachandra | 6429 H.Ramachandra |
8091 C.Tassone | 6479 G.Chen | 6479 G.Chen | 6479 G.Chen | 6429 H.Ramachandra | 6429 H.Ramachandra | 6429 H.Ramachandra |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
6574 G.Hettiarachc | 6522 J.Basinski | 6522 J.Basinski | 6144 L.Mu | 6144 L.Mu | 6101 M.Barnes | 6101 M.Barnes |
SMB CHECKOUT/6522 | 6522 J.Basinski | SMB CHECKOUT/6144 | 6144 L.Mu | SMB CHECKOUT/6101 | 6101 M.Barnes | 6101 M.Barnes |
6522 J.Basinski | 6522 J.Basinski | 6144 L.Mu | 6144 L.Mu | 6101 M.Barnes | 6101 M.Barnes | 6101 M.Barnes |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 15-2 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
6100 M.Reinhard | 6724 A.Narayanan N | 6724 A.Narayanan N | 6724 A.Narayanan N | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras |
CHANGE/6724 A.Nara | 6724 A.Narayanan N | 6724 A.Narayanan N | CHANGE/8892 D.Soka | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras |
6724 A.Narayanan N | 6724 A.Narayanan N | 6724 A.Narayanan N | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras | 8892 D.Sokaras |
BEAM LINE 17-2 | ||||||
Jul. 29, 2024 | Jul. 30, 2024 | Jul. 31, 2024 | Aug. 01, 2024 | Aug. 02, 2024 | Aug. 03, 2024 | Aug. 04, 2024 |
FACI | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
WEEK OF Aug. 05, 2024 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
BEAM LINE 1-5 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
8091 C.Tassone | 8091 C.Tassone | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
8091 C.Tassone | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
8091 C.Tassone | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
5984 E.Corson | 5984 E.Corson | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
5984 E.Corson | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
5984 E.Corson | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
8091 C.Tassone | 8091 C.Tassone | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
8091 C.Tassone | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
8091 C.Tassone | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
6703 J.Pena | 6703 J.Pena | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
6703 J.Pena | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
6703 J.Pena | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
6175 L.Chen | 6175 L.Chen | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
6175 L.Chen | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
6175 L.Chen | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
8877 T.Matsui | 8877 T.Matsui | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
8877 T.Matsui | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
8877 T.Matsui | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
6662 U.Bergmann | 6662 U.Bergmann | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
6662 U.Bergmann | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
6662 U.Bergmann | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
Unscheduled | Unscheduled | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
Unscheduled | Unscheduled | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
5369 C.Tan | 5369 C.Tan | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
5369 C.Tan | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
5369 C.Tan | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
FACI | FACI | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
FACI | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
FACI | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
6616 T.Stemmler | 6616 T.Stemmler | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
6616 T.Stemmler | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
6616 T.Stemmler | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
6682 J.Lopez-Garri | Unscheduled | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
Unscheduled | Unscheduled | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
6270 S.Saslow | 6622 B.Song | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
SMB CHECKOUT/6622 | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
6622 B.Song | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
6429 H.Ramachandra | 6429 H.Ramachandra | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
6429 H.Ramachandra | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
6429 H.Ramachandra | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
6101 M.Barnes | 6101 M.Barnes | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
6101 M.Barnes | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
6101 M.Barnes | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
Unscheduled | Unscheduled | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
8892 D.Sokaras | 8892 D.Sokaras | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
8892 D.Sokaras | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
8892 D.Sokaras | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Aug. 05, 2024 | Aug. 06, 2024 | Aug. 07, 2024 | Aug. 08, 2024 | Aug. 09, 2024 | Aug. 10, 2024 | Aug. 11, 2024 |
Unscheduled | Unscheduled | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
Unscheduled | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Aug. 12, 2024 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
BEAM LINE 1-5 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Aug. 12, 2024 | Aug. 13, 2024 | Aug. 14, 2024 | Aug. 15, 2024 | Aug. 16, 2024 | Aug. 17, 2024 | Aug. 18, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Aug. 19, 2024 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
BEAM LINE 1-5 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Aug. 19, 2024 | Aug. 20, 2024 | Aug. 21, 2024 | Aug. 22, 2024 | Aug. 23, 2024 | Aug. 24, 2024 | Aug. 25, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Aug. 26, 2024 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
BEAM LINE 1-5 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Aug. 26, 2024 | Aug. 27, 2024 | Aug. 28, 2024 | Aug. 29, 2024 | Aug. 30, 2024 | Aug. 31, 2024 | Sep. 01, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Sep. 02, 2024 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
BEAM LINE 1-5 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Sep. 02, 2024 | Sep. 03, 2024 | Sep. 04, 2024 | Sep. 05, 2024 | Sep. 06, 2024 | Sep. 07, 2024 | Sep. 08, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Sep. 09, 2024 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
BEAM LINE 1-5 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Sep. 09, 2024 | Sep. 10, 2024 | Sep. 11, 2024 | Sep. 12, 2024 | Sep. 13, 2024 | Sep. 14, 2024 | Sep. 15, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Sep. 16, 2024 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
BEAM LINE 1-5 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Sep. 16, 2024 | Sep. 17, 2024 | Sep. 18, 2024 | Sep. 19, 2024 | Sep. 20, 2024 | Sep. 21, 2024 | Sep. 22, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Sep. 23, 2024 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
BEAM LINE 1-5 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Sep. 23, 2024 | Sep. 24, 2024 | Sep. 25, 2024 | Sep. 26, 2024 | Sep. 27, 2024 | Sep. 28, 2024 | Sep. 29, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Sep. 30, 2024 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
BEAM LINE 1-5 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-2 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2c (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 15-2 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 17-2 | ||||||
Sep. 30, 2024 | Oct. 01, 2024 | Oct. 02, 2024 | Oct. 03, 2024 | Oct. 04, 2024 | Oct. 05, 2024 | Oct. 06, 2024 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |