SSRL Beam Port Schedule


X-ray beam lines are scheduled in three 8-hour shifts each day (11pm-7am; 7am-3pm; 3-11pm). Checkouts/changeovers are scheduled during the 7am-3pm shift. Most X-ray beam lines officially turn over to the next user much earlier than 3pm depending on the equipment requirements and staff availability. At least 1 week prior to arrival, users need to contact the designated beam line engineer/scientist (see SSRL Beam Lines by Number for contact information) to discuss beam line configuration needs and start times. Unless instructed otherwise, experiments end at 7am (6am when Maintenance (MA) or Accelerator Physics (AP) are scheduled).


Weeks of the Schedule
 Oct. 11, 2021   Oct. 18, 2021   Oct. 25, 2021   Nov. 01, 2021 
 Nov. 08, 2021   Nov. 15, 2021   Nov. 22, 2021   Nov. 29, 2021 
 Dec. 06, 2021   Dec. 13, 2021   Dec. 20, 2021   Dec. 27, 2021 
 Jan. 03, 2022   Jan. 10, 2022   Jan. 17, 2022   Jan. 24, 2022 
 Jan. 31, 2022   Feb. 07, 2022   Feb. 14, 2022   Feb. 21, 2022 
 Feb. 28, 2022   Mar. 07, 2022   Mar. 14, 2022   Mar. 21, 2022 
 Mar. 28, 2022   Apr. 04, 2022   Apr. 11, 2022   Apr. 18, 2022 
 Apr. 25, 2022   May 02, 2022   May 09, 2022   May 16, 2022 
 May 23, 2022   May 30, 2022   Jun. 06, 2022   Jun. 13, 2022 
 Jun. 20, 2022   Jun. 27, 2022   Jul. 04, 2022   Jul. 11, 2022 
 Jul. 18, 2022   Jul. 25, 2022 

Back to Table of Contents

WEEK OF Oct. 11, 2021
                                         
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
BEAM   LINE 1-5  
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               FACI               FACI               FACI              
DOWN               DOWN               DOWN               FACI               FACI               FACI               FACI              
DOWN               DOWN               DOWN               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               FACI               FACI               FACI              
DOWN               DOWN               DOWN               FACI               FACI               FACI               FACI              
DOWN               DOWN               DOWN               FACI               FACI               FACI               FACI              
BEAM   LINE 2-2  
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               11F3 F.Mangolini   8067 S.Webb        8067 S.Webb       
DOWN               DOWN               DOWN               CHANGE/11F3 F.Mang CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb       
DOWN               DOWN               DOWN               11F3 F.Mangolini   8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 4-1  
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
DOWN               DOWN               DOWN               CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
DOWN               DOWN               DOWN               8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               5919 A.Picard      5919 A.Picard     
DOWN               DOWN               DOWN               DOWN               SMB CHECKOUT/5919  5919 A.Picard      5919 A.Picard     
DOWN               DOWN               DOWN               DOWN               5919 A.Picard      5919 A.Picard      5919 A.Picard     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               8867 S.Webb        8867 S.Webb        8867 S.Webb       
DOWN               DOWN               DOWN               CHANGE/8867 S.Webb 8867 S.Webb        8867 S.Webb        8867 S.Webb       
DOWN               DOWN               DOWN               8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               FACI               FACI               FACI              
DOWN               DOWN               DOWN               FACI               FACI               FACI               FACI              
DOWN               DOWN               DOWN               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               FACI               92I8 A.Halavanau   92I8 A.Halavanau  
DOWN               DOWN               DOWN               FACI               Xray CHECKOUT/92I8 92I8 A.Halavanau   92I8 A.Halavanau  
DOWN               DOWN               DOWN               FACI               92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau  
BEAM   LINE 11-2 
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               FACI               FACI               FACI              
DOWN               DOWN               DOWN               FACI               FACI               FACI               FACI              
DOWN               DOWN               DOWN               FACI               FACI               FACI               FACI              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               Unscheduled        8098 T.Kroll       8098 T.Kroll      
DOWN               DOWN               DOWN               Unscheduled        Unscheduled        8098 T.Kroll       8098 T.Kroll      
DOWN               DOWN               DOWN               Unscheduled        CHANGE/8098 T.Krol 8098 T.Kroll       8098 T.Kroll      
BEAM   LINE 17-2 
Oct. 11, 2021      Oct. 12, 2021      Oct. 13, 2021      Oct. 14, 2021      Oct. 15, 2021      Oct. 16, 2021      Oct. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Oct. 18, 2021
                                         
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
BEAM   LINE 1-5  
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
FACI               8891 C.Tassone     8891 C.Tassone     8891 C.Tassone     8891 C.Tassone     8091 C.Tassone     8091 C.Tassone    
Xray CHECKOUT/8891 8891 C.Tassone     8891 C.Tassone     8891 C.Tassone     Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone    
8891 C.Tassone     8891 C.Tassone     8891 C.Tassone     8891 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
FACI               FACI               FACI               FACI               5778 J.Lee         5778 J.Lee         FACI              
FACI               FACI               FACI               Xray CHECKOUT/5778 5778 J.Lee         FACI               FACI              
FACI               FACI               FACI               5778 J.Lee         5778 J.Lee         FACI               FACI              
BEAM   LINE 2-2  
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
DOWN               5906 H.Wang        5906 H.Wang        5906 H.Wang        5358 S.Lee         5358 S.Lee         5358 S.Lee        
SMB CHECKOUT/5906  5906 H.Wang        5906 H.Wang        SMB CHECKOUT/5358  5358 S.Lee         5358 S.Lee         5358 S.Lee        
5906 H.Wang        5906 H.Wang        5906 H.Wang        5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee        
BEAM   LINE 2-3  
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        5553 R.Johnson     5553 R.Johnson     5553 R.Johnson    
8067 S.Webb        8067 S.Webb        8067 S.Webb        CHANGE/5553 R.John 5553 R.Johnson     5553 R.Johnson     5553 R.Johnson    
8067 S.Webb        8067 S.Webb        8067 S.Webb        5553 R.Johnson     5553 R.Johnson     5553 R.Johnson     5553 R.Johnson    
BEAM   LINE 4-1  
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
DOWN               5252 C.Wei         5252 C.Wei         5583 J.Pena        5583 J.Pena        4752 C.Van Genucht 4752 C.Van Genucht
SMB CHECKOUT/5252  5252 C.Wei         SMB CHECKOUT/5583  5583 J.Pena        SMB CHECKOUT/4752  4752 C.Van Genucht 4752 C.Van Genucht
5252 C.Wei         5252 C.Wei         5583 J.Pena        5583 J.Pena        4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht
BEAM   LINE 4-2  
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
5919 A.Picard      5614 Y.Tang        5614 Y.Tang        5614 Y.Tang        5614 Y.Tang        5942 R.Tinnacher   5942 R.Tinnacher  
SMB CHECKOUT/5614  5614 Y.Tang        5614 Y.Tang        5614 Y.Tang        SMB CHECKOUT/5942  5942 R.Tinnacher   5942 R.Tinnacher  
5614 Y.Tang        5614 Y.Tang        5614 Y.Tang        5614 Y.Tang        5942 R.Tinnacher   5942 R.Tinnacher   5942 R.Tinnacher  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
8867 S.Webb        4778 V.Noel        4778 V.Noel        4778 V.Noel        4778 V.Noel        4778 V.Noel        5508 A.van Veelen 
CHANGE/4778 V.Noel 4778 V.Noel        4778 V.Noel        4778 V.Noel        4778 V.Noel        CHANGE/5508 A.van  5508 A.van Veelen 
4778 V.Noel        4778 V.Noel        4778 V.Noel        4778 V.Noel        4778 V.Noel        5508 A.van Veelen  5508 A.van Veelen 
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
DOWN               8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi     5462 T.Large       5462 T.Large      
SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi     SMB CHECKOUT/5462  5462 T.Large       5462 T.Large      
8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi     5462 T.Large       5462 T.Large       5462 T.Large      
BEAM   LINE 9-3  
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
DOWN               8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8099 S.Bare        8099 S.Bare        8099 S.Bare       
SMB CHECKOUT/8014  8014 A.Hoffman     8014 A.Hoffman     SMB CHECKOUT/8099  8099 S.Bare        8099 S.Bare        8099 S.Bare       
8014 A.Hoffman     8014 A.Hoffman     8014 A.Hoffman     8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
92I8 A.Halavanau   92I8 A.Halavanau   FACI               FACI               FACI               FACI               8818 A.Mehta      
92I8 A.Halavanau   92I8 A.Halava/FACI FACI               FACI               FACI               Xray CHECKOUT/8818 8818 A.Mehta      
92I8 A.Halavanau   FACI               FACI               FACI               FACI               8818 A.Mehta       8818 A.Mehta      
BEAM   LINE 11-2 
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
DOWN               5837 K.Lim         5837 K.Lim         5837 K.Lim         5113 S.Bachas-Daun 5091 J.Catalano    5091 J.Catalano   
SMB CHECKOUT/5837  5837 K.Lim         5837 K.Lim         SMB CHECKOUT/5113  SMB CHECKOUT/5091  5091 J.Catalano    5091 J.Catalano   
5837 K.Lim         5837 K.Lim         5837 K.Lim         5113 S.Bachas-Daun 5091 J.Catalano    5091 J.Catalano    5091 J.Catalano   
BEAM   LINE 11-3 
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
FACI               FACI               FACI               8090 J.Nelson Weke 8090 J.Nelson Weke 5955 M.Preefer     5955 M.Preefer    
FACI               FACI               Xray CHECKOUT/8090 8090 J.Nelson Weke Xray CHECKOUT/5955 5955 M.Preefer     5955 M.Preefer    
FACI               FACI               8090 J.Nelson Weke 8090 J.Nelson Weke 5955 M.Preefer     5955 M.Preefer     5955 M.Preefer    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
DOWN               DOWN               5894 M.Raven       5894 M.Raven       5894 M.Raven       5894 M.Raven       5894 M.Raven      
DOWN               CHANGE/5894 M.Rave 5894 M.Raven       5894 M.Raven       5894 M.Raven       5894 M.Raven       CHANGE/5622 M.McNa
DOWN               5894 M.Raven       5894 M.Raven       5894 M.Raven       5894 M.Raven       5894 M.Raven       5622 M.McNamara   
BEAM   LINE 15-2 
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
8098 T.Kroll       COMM               COMM               COMM               COMM               5896 J.Zamora Zele 5896 J.Zamora Zele
8098 T.Kroll/COMM  COMM               COMM               COMM               CHANGE/5896 J.Zamo 5896 J.Zamora Zele 5896 J.Zamora Zele
COMM               COMM               COMM               COMM               5896 J.Zamora Zele 5896 J.Zamora Zele 5896 J.Zamora Zele
BEAM   LINE 17-2 
Oct. 18, 2021      Oct. 19, 2021      Oct. 20, 2021      Oct. 21, 2021      Oct. 22, 2021      Oct. 23, 2021      Oct. 24, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Oct. 25, 2021
                                         
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
BEAM   LINE 1-5  
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
8091 C.Tassone     8091 C.Tasson/FACI FACI               5414 C.Salamat     5443 G.Kashanchi   5443 G.Kashanchi   5443 G.Kashanchi  
8091 C.Tassone     FACI               Xray CHECKOUT/5414 Xray CHECKOUT/5443 5443 G.Kashanchi   5443 G.Kashanchi   5443 G.Kashanchi  
8091 C.Tassone     FACI               5414 C.Salamat     5443 G.Kashanchi   5443 G.Kashanchi   5443 G.Kashanchi   5443 G.Kashanchi  
BEAM   LINE 2-1  
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
FACI               5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen 
Xray CHECKOUT/5459 5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen 
5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen 
BEAM   LINE 2-2  
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
5358 S.Lee         FACI               FACI               5831 W.Fu          5831 W.Fu          5778 J.Lee         5778 J.Lee        
5358 S.Lee/FACI    FACI               SMB CHECKOUT/5831  5831 W.Fu          SMB CHECKOUT/5778  5778 J.Lee         5778 J.Lee        
FACI               FACI               5831 W.Fu          5831 W.Fu          5778 J.Lee         5778 J.Lee         5778 J.Lee        
BEAM   LINE 2-3  
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
5553 R.Johnson     5314 K.Boye        5314 K.Boye        5314 K.Boye        5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
CHANGE/5314 K.Boye 5314 K.Boye        5314 K.Boye        CHANGE/5622 M.McNa 5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
5314 K.Boye        5314 K.Boye        5314 K.Boye        5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
BEAM   LINE 4-1  
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
4752 C.Van Genucht 5547 A.Hu          5547 A.Hu          5547 A.Hu          5757 F.Bridges     5757 F.Bridges     5199 F.Bridges    
SMB CHECKOUT/5547  5547 A.Hu          5547 A.Hu          SMB CHECKOUT/5757  5757 F.Bridges     SMB CHECKOUT/5199  5199 F.Bridges    
5547 A.Hu          5547 A.Hu          5547 A.Hu          5757 F.Bridges     5757 F.Bridges     5199 F.Bridges     5199 F.Bridges    
BEAM   LINE 4-2  
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
5497 M.Georgiadis  5497 M.Georgiadis  8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
5497 M.Georgiadis  CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
5497 M.Georgiadis  8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
5942 R.Tinnacher   FACI               FACI               FACI               FACI               5903 W.Tong        5903 W.Tong       
5942 R.Tinnac/FACI FACI               FACI               FACI               SMB CHECKOUT/5903  5903 W.Tong        5903 W.Tong       
FACI               FACI               FACI               FACI               5903 W.Tong        5903 W.Tong        5903 W.Tong       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
5508 A.van Veelen  5508 A.van Veelen  FACI               5902 G.Chen        5902 G.Chen        5947 I.Zenyuk      8890 J.Nelson Weke
5508 A.van Veelen  5508 A.van Ve/FACI CHANGE/5902 G.Chen 5902 G.Chen        CHANGE/5947 I.Zeny CHANGE/8890 J.Nels 8890 J.Nelson Weke
5508 A.van Veelen  FACI               5902 G.Chen        5902 G.Chen        5947 I.Zenyuk      8890 J.Nelson Weke 8890 J.Nelson Weke
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
5462 T.Large       DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
SMB CHECKOUT/5897  DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
5897 G.Qian/DOWN   DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
8099 S.Bare        5543 B.Gates       5543 B.Gates       5543 B.Gates       5543 B.Gates       5499 A.Holewinski  5499 A.Holewinski 
SMB CHECKOUT/5543  5543 B.Gates       5543 B.Gates       5543 B.Gates       SMB CHECKOUT/5499  5499 A.Holewinski  5499 A.Holewinski 
5543 B.Gates       5543 B.Gates       5543 B.Gates       5543 B.Gates       5499 A.Holewinski  5499 A.Holewinski  5499 A.Holewinski 
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       5922 N.Johnson     5922 N.Johnson     5922 N.Johnson    
8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       Xray CHECKOUT/5922 5922 N.Johnson     5922 N.Johnson     Xray CHECKOUT/5781
8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       5922 N.Johnson     5922 N.Johnson     5922 N.Johnson     5781 A.Mehta      
BEAM   LINE 11-2 
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
5091 J.Catalano    5071 R.Tinnacher   5071 R.Tinnacher   5071 R.Tinnacher   5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor    
SMB CHECKOUT/5071  5071 R.Tinnacher   5071 R.Tinnacher   SMB CHECKOUT/5424  5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor    
5071 R.Tinnacher   5071 R.Tinnacher   5071 R.Tinnacher   5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor    
BEAM   LINE 11-3 
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
5955 M.Preefer     5897 G.Qian        5897 G.Qian        5844 X.Zheng       5844 X.Zheng       5529 C.Salamat     5529 C.Salamat    
Xray CHECKOUT/5897 5897 G.Qian        Xray CHECKOUT/5844 5844 X.Zheng       Xray CHECKOUT/5529 5529 C.Salamat     5529 C.Salamat    
5897 G.Qian        5897 G.Qian        5844 X.Zheng       5844 X.Zheng       5529 C.Salamat     5529 C.Salamat     5529 C.Salamat    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5643 J.Anne        5643 J.Anne       
5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    CHANGE/5643 J.Anne 5643 J.Anne        5643 J.Anne       
5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5643 J.Anne        5643 J.Anne        5643 J.Anne       
BEAM   LINE 15-2 
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
5896 J.Zamora Zele 5896 J.Zamora Zele 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        5799 M.Doyle       5799 M.Doyle      
5896 J.Zamora Zele CHANGE/9705 J.LiSA 9705 J.LiSA        9705 J.LiSA        CHANGE/5799 M.Doyl 5799 M.Doyle       5799 M.Doyle      
5896 J.Zamora Zele 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        5799 M.Doyle       5799 M.Doyle       5799 M.Doyle      
BEAM   LINE 17-2 
Oct. 25, 2021      Oct. 26, 2021      Oct. 27, 2021      Oct. 28, 2021      Oct. 29, 2021      Oct. 30, 2021      Oct. 31, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Nov. 01, 2021
                                         
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
BEAM   LINE 1-5  
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5443 G.Kashanch/AP AP                 AP                 FACI               8818 A.Mehta       8818 A.Mehta       5368 J.Schroers   
AP                 AP                 FACI               Xray CHECKOUT/8818 8818 A.Mehta       Xray CHECKOUT/5368 5368 J.Schroers   
AP                 AP                 FACI               8818 A.Mehta       8818 A.Mehta       5368 J.Schroers    5368 J.Schroers   
BEAM   LINE 2-1  
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5459 A.van Veel/AP AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-2  
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5778 J.Lee/AP      AP                 AP                 5870 S.Conradson   5870 S.Conradson   5870 S.Conradson   5870 S.Conradson  
AP                 AP                 SMB CHECKOUT/5870  5870 S.Conradson   5870 S.Conradson   5870 S.Conradson   5870 S.Conradson  
AP                 AP                 5870 S.Conradson   5870 S.Conradson   5870 S.Conradson   5870 S.Conradson   5870 S.Conradson  
BEAM   LINE 2-3  
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5622 M.McNamara/AP AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5199 F.Bridges/AP  AP                 AP                 5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor    
AP                 AP                 SMB CHECKOUT/5555  5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor    
AP                 AP                 5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor     5555 S.Kozimor    
BEAM   LINE 4-2  
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
8877 T.Matsui/AP   AP                 AP                 8877 T.Matsui      5253 S.Nikzad      5253 S.Nikzad      5253 S.Nikzad     
AP                 AP                 8877 T.Matsui      CHANGE/5253 S.Nikz 5253 S.Nikzad      5253 S.Nikzad      5253 S.Nikzad     
AP                 AP                 8877 T.Matsui      5253 S.Nikzad      5253 S.Nikzad      5253 S.Nikzad      5253 S.Nikzad     
BEAM   LINE 4-3  
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5903 W.Tong/AP     AP                 AP                 5936 J.Li          5936 J.Li          5858 O.Duckworth   5858 O.Duckworth  
AP                 AP                 SMB CHECKOUT/5936  5936 J.Li          SMB CHECKOUT/5858  5858 O.Duckworth   5858 O.Duckworth  
AP                 AP                 5936 J.Li          5936 J.Li          5858 O.Duckworth   5858 O.Duckworth   5858 O.Duckworth  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
8890 J.Nelson W/AP AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
DOWN/AP            AP                 AP                 8890 J.Nelson Weke 5823 H.Gao         5823 H.Gao         5845 M.Preefer    
AP                 AP                 CHANGE/8890 J.Nels CHANGE/5823 H.Gao  5823 H.Gao         CHANGE/5845 M.Pree 5845 M.Preefer    
AP                 AP                 8890 J.Nelson Weke 5823 H.Gao         5823 H.Gao         5845 M.Preefer     5845 M.Preefer    
BEAM   LINE 7-2  
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
FACI/AP            AP                 AP                 FACI               FACI               FACI               8067 S.Webb       
AP                 AP                 FACI               FACI               FACI               CHANGE/8067 S.Webb 8067 S.Webb       
AP                 AP                 FACI               FACI               FACI               8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
AP                 AP                 AP                 5393 C.Dewey       5393 C.Dewey       5126 J.Yano        5126 J.Yano       
AP                 AP                 SMB CHECKOUT/5393  5393 C.Dewey       SMB CHECKOUT/5126  5126 J.Yano        5126 J.Yano       
AP                 AP                 5393 C.Dewey       5393 C.Dewey       5126 J.Yano        5126 J.Yano        5126 J.Yano       
BEAM   LINE 9-3  
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5499 A.Holewins/AP AP                 AP                 8014 A.Hoffman     8014 A.Hoffman     5909 J.Finzel      5055 P.Christopher
AP                 AP                 SMB CHECKOUT/8014  8014 A.Hoffman     SMB CHECKOUT/5909  SMB CHECKOUT/5055  5055 P.Christopher
AP                 AP                 8014 A.Hoffman     8014 A.Hoffman     5909 J.Finzel      5055 P.Christopher 5055 P.Christopher
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5781 A.Mehta/AP    AP                 AP                 5781 A.Mehta       5781 A.Mehta       8015 A.Mehta       8015 A.Mehta      
AP                 AP                 5781 A.Mehta       5781 A.Mehta       Xray CHECKOUT/8015 8015 A.Mehta       8015 A.Mehta      
AP                 AP                 5781 A.Mehta       5781 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
BEAM   LINE 11-2 
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5424 S.Kozimor/AP  AP                 AP                 5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor    
AP                 AP                 SMB CHECKOUT/5009  5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor    
AP                 AP                 5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor    
BEAM   LINE 11-3 
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5529 C.Salamat/AP  AP                 AP                 5253 S.Nikzad      5473 T.Quill       5724 E.Gomez       5724 E.Gomez      
AP                 AP                 Xray CHECKOUT/5253 Xray CHECKOUT/5473 Xray CHECKOUT/5724 5724 E.Gomez       5724 E.Gomez      
AP                 AP                 5253 S.Nikzad      5473 T.Quill       5724 E.Gomez       5724 E.Gomez       5724 E.Gomez      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5643 J.Anne/AP     AP                 AP                 5714 J.Richardson  5714 J.Richardson  5853 E.Herndon     5853 E.Herndon    
AP                 AP                 CHANGE/5714 J.Rich 5714 J.Richardson  CHANGE/5853 E.Hern 5853 E.Herndon     5853 E.Herndon    
AP                 AP                 5714 J.Richardson  5714 J.Richardson  5853 E.Herndon     5853 E.Herndon     5853 E.Herndon    
BEAM   LINE 15-2 
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
5799 M.Doyle/AP    AP                 AP                 COMM               COMM               5798 I.Bogacz      5798 I.Bogacz     
AP                 AP                 COMM               COMM               CHANGE/5798 I.Boga 5798 I.Bogacz      5798 I.Bogacz     
AP                 AP                 COMM               COMM               5798 I.Bogacz      5798 I.Bogacz      5798 I.Bogacz     
BEAM   LINE 17-2 
Nov. 01, 2021      Nov. 02, 2021      Nov. 03, 2021      Nov. 04, 2021      Nov. 05, 2021      Nov. 06, 2021      Nov. 07, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Nov. 08, 2021
                                         
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
BEAM   LINE 1-5  
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5368 J.Schroers    5368 J.Schroers    11G6 A.Couet       5398 T.Wynn        5398 T.Wynn        5751 D.Kirsch      5364 H.Hou        
5368 J.Schroers    Xray CHECKOUT/11G6 Xray CHECKOUT/5398 5398 T.Wynn        Xray CHECKOUT/5751 Xray CHECKOUT/5364 5364 H.Hou        
5368 J.Schroers    11G6 A.Couet       5398 T.Wynn        5398 T.Wynn        5751 D.Kirsch      5364 H.Hou         5364 H.Hou        
BEAM   LINE 2-1  
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
FACI               FACI               5615 J.Ravichandra 5615 J.Ravichandra 8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
FACI               Xray CHECKOUT/5615 5615 J.Ravichandra Xray CHECKOUT/8015 8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
FACI               5615 J.Ravichandra 5615 J.Ravichandra 8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
BEAM   LINE 2-2  
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5870 S.Conradson   FACI               FACI               FACI               5880 Y.Roman       5880 Y.Roman       5880 Y.Roman      
5870 S.Conrad/FACI FACI               FACI               SMB CHECKOUT/5880  5880 Y.Roman       5880 Y.Roman       5880 Y.Roman      
FACI               FACI               FACI               5880 Y.Roman       5880 Y.Roman       5880 Y.Roman       5880 Y.Roman      
BEAM   LINE 2-3  
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
DOWN               5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew      5892 R.Bryant      5892 R.Bryant     
CHANGE/5083 L.Mayh 5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew      CHANGE/5892 R.Brya 5892 R.Bryant      5892 R.Bryant     
5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew      5892 R.Bryant      5892 R.Bryant      5892 R.Bryant     
BEAM   LINE 4-1  
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5555 S.Kozimor     FACI               FACI               FACI               5444 V.Noel        5444 V.Noel        5444 V.Noel       
5555 S.Kozimo/FACI FACI               FACI               SMB CHECKOUT/5444  5444 V.Noel        5444 V.Noel        5444 V.Noel       
FACI               FACI               FACI               5444 V.Noel        5444 V.Noel        5444 V.Noel        5444 V.Noel       
BEAM   LINE 4-2  
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5253 S.Nikzad      11G2 A.Bhattachary 8847 T.Weiss       12A4 S.Pokhrel     11G4 F.Yabukarski  5816 A.Ayzner      5816 A.Ayzner     
CHANGE/11G2 A.Bhat CHANGE/8847 T.Weis CHANGE/12A4 S.Pokh CHANGE/11G4 F.Yabu CHANGE/5816 A.Ayzn 5816 A.Ayzner      5816 A.Ayzner     
11G2 A.Bhattachary 8847 T.Weiss       12A4 S.Pokhrel     11G4 F.Yabukarski  5816 A.Ayzner      5816 A.Ayzner      5816 A.Ayzner     
BEAM   LINE 4-3  
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5858 O.Duckworth   5865 M.Shelby      5865 M.Shelby      8060 V.Noel        8060 V.Noel        8060 V.Noel        8060 V.Noel       
SMB CHECKOUT/5865  5865 M.Shelby      SMB CHECKOUT/8060  8060 V.Noel        8060 V.Noel        8060 V.Noel        Unscheduled       
5865 M.Shelby      5865 M.Shelby      8060 V.Noel        8060 V.Noel        8060 V.Noel        8060 V.Noel        Unscheduled       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5845 M.Preefer     5845 M.Preefer     5358 S.Lee         5358 S.Lee         5358 S.Lee         5651 Z.Xu          5651 Z.Xu         
5845 M.Preefer     CHANGE/5358 S.Lee  5358 S.Lee         5358 S.Lee         CHANGE/5651 Z.Xu   5651 Z.Xu          5651 Z.Xu         
5845 M.Preefer     5358 S.Lee         5358 S.Lee         5358 S.Lee         5651 Z.Xu          5651 Z.Xu          5651 Z.Xu         
BEAM   LINE 7-2  
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        5174 M.Stuckman    5174 M.Stuckman    5174 M.Stuckman   
8067 S.Webb        8067 S.Webb        8067 S.Webb        CHANGE/5174 M.Stuc 5174 M.Stuckman    5174 M.Stuckman    5174 M.Stuckman   
8067 S.Webb        8067 S.Webb        8067 S.Webb        5174 M.Stuckman    5174 M.Stuckman    5174 M.Stuckman    5174 M.Stuckman   
BEAM   LINE 7-3  
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5126 J.Yano        5617 K.Rush        5617 K.Rush        5617 K.Rush        Unscheduled        5314 K.Boye        5314 K.Boye       
SMB CHECKOUT/5617  5617 K.Rush        5617 K.Rush        Unscheduled        SMB CHECKOUT/5314  5314 K.Boye        5314 K.Boye       
5617 K.Rush        5617 K.Rush        5617 K.Rush        Unscheduled        5314 K.Boye        5314 K.Boye        5314 K.Boye       
BEAM   LINE 9-3  
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5055 P.Christopher FACI               5860 C.Joseph      5860 C.Joseph      8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
FACI               SMB CHECKOUT/5860  5860 C.Joseph      SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
FACI               5860 C.Joseph      5860 C.Joseph      8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
8015 A.Mehta       FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-2 
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5009 S.Kozimor     5009 S.Kozimor     5333 S.Minasian    5333 S.Minasian    5333 S.Minasian    5328 R.Abergel     5328 R.Abergel    
5009 S.Kozimor     SMB CHECKOUT/5333  5333 S.Minasian    5333 S.Minasian    SMB CHECKOUT/5328  5328 R.Abergel     5328 R.Abergel    
5009 S.Kozimor     5333 S.Minasian    5333 S.Minasian    5333 S.Minasian    5328 R.Abergel     5328 R.Abergel     5328 R.Abergel    
BEAM   LINE 11-3 
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5724 E.Gomez       5271 S.Nikzad      FACI               FACI               5677 Y.Lee         5956 P.Mukherjee   5956 P.Mukherjee  
Xray CHECKOUT/5271 FACI               FACI               Xray CHECKOUT/5677 Xray CHECKOUT/5956 5956 P.Mukherjee   5956 P.Mukherjee  
5271 S.Nikzad      FACI               FACI               5677 Y.Lee         5956 P.Mukherjee   5956 P.Mukherjee   5956 P.Mukherjee  
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5853 E.Herndon     5892 R.Bryant      5892 R.Bryant      5892 R.Bryant      5672 P.Zhang       5672 P.Zhang       8067 S.Webb       
CHANGE/5892 R.Brya 5892 R.Bryant      5892 R.Bryant      CHANGE/5672 P.Zhan 5672 P.Zhang       CHANGE/8067 S.Webb 8067 S.Webb       
5892 R.Bryant      5892 R.Bryant      5892 R.Bryant      5672 P.Zhang       5672 P.Zhang       8067 S.Webb        8067 S.Webb       
BEAM   LINE 15-2 
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
5798 I.Bogacz      5673 S.Jannuzzi    5673 S.Jannuzzi    5673 S.Jannuzzi    5673 S.Jannuzzi    5786 T.Hersbach    5786 T.Hersbach   
CHANGE/5673 S.Jann 5673 S.Jannuzzi    5673 S.Jannuzzi    5673 S.Jannuzzi    CHANGE/5786 T.Hers 5786 T.Hersbach    5786 T.Hersbach   
5673 S.Jannuzzi    5673 S.Jannuzzi    5673 S.Jannuzzi    5673 S.Jannuzzi    5786 T.Hersbach    5786 T.Hersbach    5786 T.Hersbach   
BEAM   LINE 17-2 
Nov. 08, 2021      Nov. 09, 2021      Nov. 10, 2021      Nov. 11, 2021      Nov. 12, 2021      Nov. 13, 2021      Nov. 14, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Nov. 15, 2021
                                         
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
BEAM   LINE 1-5  
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
5364 H.Hou/AP      AP                 AP                 FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
AP                 AP                 FACI               Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
AP                 AP                 FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
8015 A.Mehta/AP    AP                 AP                 5330 N.Strange     5330 N.Strange     5330 N.Strange     5330 N.Strange    
AP                 AP                 Xray CHECKOUT/5330 5330 N.Strange     5330 N.Strange     5330 N.Strange     5330 N.Strange    
AP                 AP                 5330 N.Strange     5330 N.Strange     5330 N.Strange     5330 N.Strange     5330 N.Strange    
BEAM   LINE 2-2  
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
5880 Y.Roman/AP    AP                 AP                 8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare       
AP                 AP                 SMB CHECKOUT/8099  8099 S.Bare        8099 S.Bare        8099 S.Bare        SMB CHECKOUT/5883 
AP                 AP                 8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        5883 N.Genz       
BEAM   LINE 2-3  
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
5892 R.Bryant/AP   AP                 AP                 8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
AP                 AP                 CHANGE/8015 A.Meht 8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
AP                 AP                 8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
BEAM   LINE 4-1  
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
5444 V.Noel/AP     AP                 AP                 5806 L.Moreau      5806 L.Moreau      5728 R.Bell        5728 R.Bell       
AP                 AP                 SMB CHECKOUT/5806  5806 L.Moreau      SMB CHECKOUT/5728  5728 R.Bell        5728 R.Bell       
AP                 AP                 5806 L.Moreau      5806 L.Moreau      5728 R.Bell        5728 R.Bell        5728 R.Bell       
BEAM   LINE 4-2  
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
5816 A.Ayzner/AP   AP                 AP                 5729 C.Cheng       5729 C.Cheng       5295 Y.Wu          5295 Y.Wu         
AP                 AP                 CHANGE/5729 C.Chen 5729 C.Cheng       CHANGE/5295 Y.Wu   5295 Y.Wu          5295 Y.Wu         
AP                 AP                 5729 C.Cheng       5729 C.Cheng       5295 Y.Wu          5295 Y.Wu          5295 Y.Wu         
BEAM   LINE 4-3  
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
AP                 AP                 AP                 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter
AP                 AP                 CHANGE/5524 C.Kron 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter
AP                 AP                 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
5651 Z.Xu/AP       AP                 AP                 5505 A.Parakh      5505 A.Parakh      5703 R.Bell        4875 J.Mazzetti   
AP                 AP                 CHANGE/5505 A.Para 5505 A.Parakh      CHANGE/5703 R.Bell CHANGE/4875 J.Mazz 4875 J.Mazzetti   
AP                 AP                 5505 A.Parakh      5505 A.Parakh      5703 R.Bell        4875 J.Mazzetti    4875 J.Mazzetti   
BEAM   LINE 7-2  
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
5174 M.Stuckman/AP AP                 AP                 5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
AP                 AP                 CHANGE/5622 M.McNa 5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
AP                 AP                 5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
BEAM   LINE 7-3  
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
5314 K.Boye/AP     AP                 AP                 5619 E.Farquhar    5619 E.Farquhar    8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 SMB CHECKOUT/5619  5619 E.Farquhar    SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 5619 E.Farquhar    5619 E.Farquhar    8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 9-3  
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
8071 R.Sarangi/AP  AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
FACI/AP            AP                 AP                 5873 C.Takacs      5873 C.Takacs      5873 C.Takacs      5873 C.Takacs     
AP                 AP                 Xray CHECKOUT/5873 5873 C.Takacs      5873 C.Takacs      5873 C.Takacs      5873 C.Takacs     
AP                 AP                 5873 C.Takacs      5873 C.Takacs      5873 C.Takacs      5873 C.Takacs      5873 C.Takacs     
BEAM   LINE 11-2 
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
5328 R.Abergel/AP  AP                 AP                 4919 S.Minasian    5926 L.Moreau      5926 L.Moreau      5926 L.Moreau     
AP                 AP                 SMB CHECKOUT/4919  SMB CHECKOUT/5926  5926 L.Moreau      5926 L.Moreau      5926 L.Moreau     
AP                 AP                 4919 S.Minasian    5926 L.Moreau      5926 L.Moreau      5926 L.Moreau      5926 L.Moreau     
BEAM   LINE 11-3 
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
5956 P.Mukherje/AP AP                 AP                 5932 G.Giri        5295 Y.Wu          5775 E.Ratcliff    5775 E.Ratcliff   
AP                 AP                 Xray CHECKOUT/5932 Xray CHECKOUT/5295 Xray CHECKOUT/5775 5775 E.Ratcliff    5775 E.Ratcliff   
AP                 AP                 5932 G.Giri        5295 Y.Wu          5775 E.Ratcliff    5775 E.Ratcliff    5775 E.Ratcliff   
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
8067 S.Webb/AP     AP                 AP                 5950 S.Bone        5950 S.Bone        5950 S.Bone        5320 H.Steinrueck 
AP                 AP                 CHANGE/5950 S.Bone 5950 S.Bone        5950 S.Bone        CHANGE/5320 H.Stei 5320 H.Steinrueck 
AP                 AP                 5950 S.Bone        5950 S.Bone        5950 S.Bone        5320 H.Steinrueck  5320 H.Steinrueck 
BEAM   LINE 15-2 
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
5786 T.Hersbach/AP AP                 AP                 COMM               COMM               5476 A.Garcia-Espa 5476 A.Garcia-Espa
AP                 AP                 COMM               COMM               CHANGE/5476 A.Garc 5476 A.Garcia-Espa 5476 A.Garcia-Espa
AP                 AP                 COMM               COMM               5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa
BEAM   LINE 17-2 
Nov. 15, 2021      Nov. 16, 2021      Nov. 17, 2021      Nov. 18, 2021      Nov. 19, 2021      Nov. 20, 2021      Nov. 21, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Nov. 22, 2021
                                         
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
BEAM   LINE 1-5  
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
8091 C.Tassone     FACI               9705 J.LiSA        DOWN               DOWN               9705 J.LiSA        9705 J.LiSA       
FACI               Xray CHECKOUT/9705 9705 J.LiSA        DOWN               DOWN               9705 J.LiSA        9705 J.LiSA       
FACI               9705 J.LiSA        9705 J.LiSA/DOWN   DOWN               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 2-1  
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
5330 N.Strange     FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               Unscheduled        DOWN               DOWN               FACI               FACI              
FACI               FACI               DOWN               DOWN               FACI               FACI               FACI              
BEAM   LINE 2-2  
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
5883 N.Genz        5883 N.Genz        5883 N.Genz        DOWN               DOWN               Unscheduled        5909 J.Finzel     
5883 N.Genz        5883 N.Genz        5883 N.Genz        DOWN               DOWN               SMB CHECKOUT/5909  5909 J.Finzel     
5883 N.Genz        5883 N.Genz        5883 N.Genz/DOWN   DOWN               Unscheduled        5909 J.Finzel      5909 J.Finzel     
BEAM   LINE 2-3  
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
8015 A.Mehta       FACI               FACI               DOWN               DOWN               11G7 J.Richardson  11G7 J.Richardson 
8015 A.Mehta/FACI  FACI               FACI               DOWN               DOWN               11G7 J.Richardson  11G7 J.Richardson 
FACI               FACI               FACI/DOWN          DOWN               11G7 J.Richardson  11G7 J.Richardson  11G7 J.Richardson 
BEAM   LINE 4-1  
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
5728 R.Bell        5535 S.Ying        5535 S.Ying        DOWN               DOWN               5843 S.Fakhreddine 5843 S.Fakhreddine
SMB CHECKOUT/5535  5535 S.Ying        SMB CHECKOUT/5843  DOWN               DOWN               5843 S.Fakhreddine 5843 S.Fakhreddine
5535 S.Ying        5535 S.Ying        5843 S.Fakhre/DOWN DOWN               5843 S.Fakhreddine 5843 S.Fakhreddine 5843 S.Fakhreddine
BEAM   LINE 4-2  
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
5295 Y.Wu          12A4 S.Pokhrel     12A5 T.Weiss       DOWN               DOWN               5497 M.Georgiadis  5497 M.Georgiadis 
CHANGE/12A4 S.Pokh CHANGE/12A5 T.Weis 12A5 T.Weiss       DOWN               DOWN               5497 M.Georgiadis  5497 M.Georgiadis 
12A4 S.Pokhrel     12A5 T.Weiss       12A5 T.Weiss/DOWN  DOWN               CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
5524 C.Kronawitter 5934 Y.Yang        5934 Y.Yang        DOWN               DOWN               Unscheduled        5499 A.Holewinski 
CHANGE/5934 Y.Yang 5934 Y.Yang        5934 Y.Yang        DOWN               DOWN               SMB CHECKOUT/5499  5499 A.Holewinski 
5934 Y.Yang        5934 Y.Yang        5934 Y.Yang/DOWN   DOWN               Unscheduled        5499 A.Holewinski  5499 A.Holewinski 
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
4875 J.Mazzetti    5924 J.Li          5924 J.Li          DOWN               DOWN               5739 G.Qian        5739 G.Qian       
CHANGE/5924 J.Li   5924 J.Li          5924 J.Li          DOWN               DOWN               5739 G.Qian        5739 G.Qian       
5924 J.Li          5924 J.Li          5924 J.Li/DOWN     DOWN               5739 G.Qian        5739 G.Qian        5739 G.Qian       
BEAM   LINE 7-2  
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
5622 M.McNamara    5093 M.Kelly       5093 M.Kelly       DOWN               DOWN               5093 M.Kelly       5093 M.Kelly      
CHANGE/5093 M.Kell 5093 M.Kelly       5093 M.Kelly       DOWN               DOWN               5093 M.Kelly       5093 M.Kelly      
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly/DOWN  DOWN               5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 7-3  
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
8071 R.Sarangi     5444 V.Noel        5444 V.Noel        DOWN               DOWN               8060 V.Noel        8060 V.Noel       
SMB CHECKOUT/5444  5444 V.Noel        CHANGE/8060 V.Noel DOWN               DOWN               8060 V.Noel        CHANGE/5907 M.Enge
5444 V.Noel        5444 V.Noel        8060 V.Noel/DOWN   DOWN               8060 V.Noel        8060 V.Noel        5907 M.Engel      
BEAM   LINE 9-3  
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
FACI               5955 M.Preefer     5955 M.Preefer     DOWN               DOWN               5220 W.Drisdell    5220 W.Drisdell   
SMB CHECKOUT/5955  5955 M.Preefer     SMB CHECKOUT/5220  DOWN               DOWN               5220 W.Drisdell    5220 W.Drisdell   
5955 M.Preefer     5955 M.Preefer     5220 W.Drisde/DOWN DOWN               5220 W.Drisdell    5220 W.Drisdell    5220 W.Drisdell   
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
5873 C.Takacs      5951 A.Dudchenko   5951 A.Dudchenko   DOWN               DOWN               5951 A.Dudchenko   5951 A.Dudchenko  
Xray CHECKOUT/5951 5951 A.Dudchenko   5951 A.Dudchenko   DOWN               DOWN               5951 A.Dudchenko   5951 A.Dudchenko  
5951 A.Dudchenko   5951 A.Dudchenko   5951 A.Dudche/DOWN DOWN               5951 A.Dudchenko   5951 A.Dudchenko   5951 A.Dudchenko  
BEAM   LINE 11-2 
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
5926 L.Moreau      5842 J.Lentz       5842 J.Lentz       DOWN               DOWN               5842 J.Lentz       5842 J.Lentz      
SMB CHECKOUT/5842  5842 J.Lentz       5842 J.Lentz       DOWN               DOWN               5842 J.Lentz       5842 J.Lentz      
5842 J.Lentz       5842 J.Lentz       5842 J.Lentz/DOWN  DOWN               5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
BEAM   LINE 11-3 
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
5775 E.Ratcliff    5706 N.Noel        5706 N.Noel        DOWN               DOWN               5903 W.Tong        5903 W.Tong       
Xray CHECKOUT/5706 5706 N.Noel        Xray CHECKOUT/5903 DOWN               DOWN               5903 W.Tong        5903 W.Tong       
5706 N.Noel        5706 N.Noel        5903 W.Tong/DOWN   DOWN               5903 W.Tong        5903 W.Tong        5903 W.Tong       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
DOWN               FACI               FACI               DOWN               DOWN               DOWN               DOWN              
DOWN/FACI/FACI     FACI               DOWN               DOWN               DOWN               DOWN               DOWN              
FACI               FACI               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
5320 H.Steinrueck  Unscheduled        Unscheduled        DOWN               DOWN               5149 N.Tosca       5149 N.Tosca      
5320 H.Steinrueck  Unscheduled        CHANGE/5149 N.Tosc DOWN               DOWN               5149 N.Tosca       5149 N.Tosca      
Unscheduled        Unscheduled        5149 N.Tosca/DOWN  DOWN               5149 N.Tosca       5149 N.Tosca       5149 N.Tosca      
BEAM   LINE 15-2 
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
5476 A.Garcia-Espa 5889 M.Kirk        5889 M.Kirk        DOWN               DOWN               5661 G.George      5661 G.George     
CHANGE/5889 M.Kirk 5889 M.Kirk        CHANGE/5661 G.Geor DOWN               DOWN               5661 G.George      5661 G.George     
5889 M.Kirk        5889 M.Kirk        5661 G.George/DOWN DOWN               5661 G.George      5661 G.George      5661 G.George     
BEAM   LINE 17-2 
Nov. 22, 2021      Nov. 23, 2021      Nov. 24, 2021      Nov. 25, 2021      Nov. 26, 2021      Nov. 27, 2021      Nov. 28, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Nov. 29, 2021
                                         
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
BEAM   LINE 1-5  
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
9705 J.LiSA        5631 A.Leibham     FACI               5941 N.Strange     FACI               5605 G.Wan         5605 G.Wan        
Xray CHECKOUT/5631 FACI               Xray CHECKOUT/5941 FACI               Xray CHECKOUT/5605 5605 G.Wan         5605 G.Wan        
5631 A.Leibham     FACI               5941 N.Strange     FACI               5605 G.Wan         5605 G.Wan         5605 G.Wan        
BEAM   LINE 2-1  
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
FACI               Unscheduled        5896 J.Zamora Zele 5896 J.Zamora Zele 5896 J.Zamora Zele 5680 Z.Jiang       5680 Z.Jiang      
FACI               Xray CHECKOUT/5896 5896 J.Zamora Zele 5896 J.Zamora Zele Xray CHECKOUT/5680 5680 Z.Jiang       5680 Z.Jiang      
Unscheduled        5896 J.Zamora Zele 5896 J.Zamora Zele 5896 J.Zamora Zele 5680 Z.Jiang       5680 Z.Jiang       5680 Z.Jiang      
BEAM   LINE 2-2  
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5909 J.Finzel      5909 J.Finzel      5402 J.Huang       5402 J.Huang       5402 J.Huang       5667 J.Harris      5667 J.Harris     
5909 J.Finzel      SMB CHECKOUT/5402  5402 J.Huang       5402 J.Huang       SMB CHECKOUT/5667  5667 J.Harris      5667 J.Harris     
5909 J.Finzel      5402 J.Huang       5402 J.Huang       5402 J.Huang       5667 J.Harris      5667 J.Harris      5667 J.Harris     
BEAM   LINE 2-3  
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
11G7 J.Richardson  5712 J.Shukle      5712 J.Shukle      5712 J.Shukle      5583 J.Pena        5583 J.Pena        5583 J.Pena       
CHANGE/5712 J.Shuk 5712 J.Shukle      5712 J.Shukle      CHANGE/5583 J.Pena 5583 J.Pena        5583 J.Pena        5583 J.Pena       
5712 J.Shukle      5712 J.Shukle      5712 J.Shukle      5583 J.Pena        5583 J.Pena        5583 J.Pena        5583 J.Pena       
BEAM   LINE 4-1  
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5843 S.Fakhreddine 5451 B.Stewart     5451 B.Stewart     5586 D.Olive       5586 D.Olive       5603 S.Hickam      5603 S.Hickam     
SMB CHECKOUT/5451  5451 B.Stewart     SMB CHECKOUT/5586  5586 D.Olive       SMB CHECKOUT/5603  5603 S.Hickam      5603 S.Hickam     
5451 B.Stewart     5451 B.Stewart     5586 D.Olive       5586 D.Olive       5603 S.Hickam      5603 S.Hickam      5603 S.Hickam     
BEAM   LINE 4-2  
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5497 M.Georgiadis  5497 M.Georgiadis  8877 T.Matsui      8877 T.Matsui      5119 G.Wong        5119 G.Wong        5119 G.Wong       
5497 M.Georgiadis  CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/5119 G.Wong 5119 G.Wong        5119 G.Wong        5119 G.Wong       
5497 M.Georgiadis  8877 T.Matsui      8877 T.Matsui      5119 G.Wong        5119 G.Wong        5119 G.Wong        5119 G.Wong       
BEAM   LINE 4-3  
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5499 A.Holewinski  FACI               5444 V.Noel        5444 V.Noel        5444 V.Noel        5885 U.Bergmann    5885 U.Bergmann   
5499 A.Holewi/FACI SMB CHECKOUT/5444  5444 V.Noel        5444 V.Noel        SMB CHECKOUT/5885  5885 U.Bergmann    5885 U.Bergmann   
FACI               5444 V.Noel        5444 V.Noel        5444 V.Noel        5885 U.Bergmann    5885 U.Bergmann    5885 U.Bergmann   
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5739 G.Qian        5738 D.Agyeman-Bud 5672 P.Zhang       5672 P.Zhang       5957 P.Mukherjee   5957 P.Mukherjee   5640 X.Zheng      
CHANGE/5738 D.Agye CHANGE/5672 P.Zhan 5672 P.Zhang       CHANGE/5957 P.Mukh 5957 P.Mukherjee   CHANGE/5640 X.Zhen 5640 X.Zheng      
5738 D.Agyeman-Bud 5672 P.Zhang       5672 P.Zhang       5957 P.Mukherjee   5957 P.Mukherjee   5640 X.Zheng       5640 X.Zheng      
BEAM   LINE 7-2  
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5093 M.Kelly       5093 M.Kelly       FACI               FACI               FACI               4791 M.Zeineh      4791 M.Zeineh     
5093 M.Kelly       5093 M.Kelly/FACI  FACI               FACI               CHANGE/4791 M.Zein 4791 M.Zeineh      4791 M.Zeineh     
5093 M.Kelly       FACI               FACI               FACI               4791 M.Zeineh      4791 M.Zeineh      4791 M.Zeineh     
BEAM   LINE 7-3  
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5907 M.Engel       5910 E.Pierce      5910 E.Pierce      5910 E.Pierce      5910 E.Pierce      5641 K.Chacon      5641 K.Chacon     
SMB CHECKOUT/5910  5910 E.Pierce      5910 E.Pierce      5910 E.Pierce      SMB CHECKOUT/5641  5641 K.Chacon      5641 K.Chacon     
5910 E.Pierce      5910 E.Pierce      5910 E.Pierce      5910 E.Pierce      5641 K.Chacon      5641 K.Chacon      5641 K.Chacon     
BEAM   LINE 9-3  
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5220 W.Drisdell    5190 L.Que         5190 L.Que         5190 L.Que         FACI               5393 C.Dewey       5393 C.Dewey      
SMB CHECKOUT/5190  5190 L.Que         5190 L.Que         FACI               SMB CHECKOUT/5393  5393 C.Dewey       5393 C.Dewey      
5190 L.Que         5190 L.Que         5190 L.Que         FACI               5393 C.Dewey       5393 C.Dewey       5393 C.Dewey      
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5951 A.Dudche/FACI FACI               Unscheduled        5839 B.Saini       5839 B.Saini       5839 B.Saini       5839 B.Saini      
FACI               Unscheduled        Xray CHECKOUT/5839 5839 B.Saini       5839 B.Saini       5839 B.Saini       5839 B.Saini      
FACI               Unscheduled        5839 B.Saini       5839 B.Saini       5839 B.Saini       5839 B.Saini       5839 B.Saini      
BEAM   LINE 11-2 
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5842 J.Lentz       FACI               Unscheduled        Unscheduled        FACI               5552 N.Rivera      5552 N.Rivera     
5842 J.Lentz/FACI  FACI               Unscheduled        FACI               SMB CHECKOUT/5552  5552 N.Rivera      5552 N.Rivera     
FACI               Unscheduled        Unscheduled        FACI               5552 N.Rivera      5552 N.Rivera      5552 N.Rivera     
BEAM   LINE 11-3 
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5903 W.Tong        8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     5231 P.Thornton    5590 N.Weadock     5590 N.Weadock    
Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     Xray CHECKOUT/5231 Xray CHECKOUT/5590 5590 N.Weadock     5590 N.Weadock    
8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     5231 P.Thornton    5590 N.Weadock     5590 N.Weadock     5590 N.Weadock    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5149 N.Tosca       5583 J.Pena        5583 J.Pena        5583 J.Pena        5712 J.Shukle      5712 J.Shukle      5712 J.Shukle     
CHANGE/5583 J.Pena 5583 J.Pena        5583 J.Pena        CHANGE/5712 J.Shuk 5712 J.Shukle      5712 J.Shukle      5712 J.Shukle     
5583 J.Pena        5583 J.Pena        5583 J.Pena        5712 J.Shukle      5712 J.Shukle      5712 J.Shukle      5712 J.Shukle     
BEAM   LINE 15-2 
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
5661 G.George      STUP               5732 M.Cendejas    5732 M.Cendejas    5866 M.Nielsen     5866 M.Nielsen     5866 M.Nielsen    
STUP               CHANGE/5732 M.Cend 5732 M.Cendejas    CHANGE/5866 M.Niel 5866 M.Nielsen     5866 M.Nielsen     5866 M.Nielsen    
STUP               5732 M.Cendejas    5732 M.Cendejas    5866 M.Nielsen     5866 M.Nielsen     5866 M.Nielsen     5866 M.Nielsen    
BEAM   LINE 17-2 
Nov. 29, 2021      Nov. 30, 2021      Dec. 01, 2021      Dec. 02, 2021      Dec. 03, 2021      Dec. 04, 2021      Dec. 05, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 06, 2021
                                         
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
BEAM   LINE 1-5  
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5605 G.Wan/AP      AP                 AP                 5677 Y.Lee         FACI               5833 E.Abdo        5833 E.Abdo       
AP                 AP                 Xray CHECKOUT/5677 FACI               Xray CHECKOUT/5833 5833 E.Abdo        5833 E.Abdo       
AP                 AP                 5677 Y.Lee         FACI               5833 E.Abdo        5833 E.Abdo        5833 E.Abdo       
BEAM   LINE 2-1  
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5680 Z.Jiang/AP    AP                 AP                 8095 K.Stone       8095 K.Stone       FACI               FACI              
AP                 AP                 Xray CHECKOUT/8095 8095 K.Stone       FACI               FACI               FACI              
AP                 AP                 8095 K.Stone       8095 K.Stone       FACI               FACI               FACI              
BEAM   LINE 2-2  
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5667 J.Harris/AP   AP                 AP                 5852 R.Daehn       5852 R.Daehn       5903 W.Tong        5903 W.Tong       
AP                 AP                 SMB CHECKOUT/5852  5852 R.Daehn       Xray CHECKOUT/5903 5903 W.Tong        5903 W.Tong       
AP                 AP                 5852 R.Daehn       5852 R.Daehn       5903 W.Tong        5903 W.Tong        5903 W.Tong       
BEAM   LINE 2-3  
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5583 J.Pena/AP     AP                 AP                 5444 V.Noel        5444 V.Noel        5490 R.Wogelius    5490 R.Wogelius   
AP                 AP                 CHANGE/5444 V.Noel 5444 V.Noel        CHANGE/5490 R.Woge 5490 R.Wogelius    5490 R.Wogelius   
AP                 AP                 5444 V.Noel        5444 V.Noel        5490 R.Wogelius    5490 R.Wogelius    5490 R.Wogelius   
BEAM   LINE 4-1  
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5603 S.Hickam/AP   AP                 AP                 5868 T.Borch       5868 T.Borch       5743 M.Zhu         5743 M.Zhu        
AP                 AP                 SMB CHECKOUT/5868  5868 T.Borch       SMB CHECKOUT/5743  5743 M.Zhu         5743 M.Zhu        
AP                 AP                 5868 T.Borch       5868 T.Borch       5743 M.Zhu         5743 M.Zhu         5743 M.Zhu        
BEAM   LINE 4-2  
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5119 G.Wong/AP     AP                 AP                 8877 T.Matsui      8877 T.Matsui      12A6 K.Lee         12A6 K.Lee        
AP                 AP                 CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/12A6 K.Lee  12A6 K.Lee         12A6 K.Lee        
AP                 AP                 8877 T.Matsui      8877 T.Matsui      12A6 K.Lee         12A6 K.Lee         12A6 K.Lee        
BEAM   LINE 4-3  
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5885 U.Bergmann/AP AP                 AP                 5204 W.Xiong       5204 W.Xiong       5226 J.Yano        5226 J.Yano       
AP                 AP                 SMB CHECKOUT/5204  5204 W.Xiong       SMB CHECKOUT/5226  5226 J.Yano        5226 J.Yano       
AP                 AP                 5204 W.Xiong       5204 W.Xiong       5226 J.Yano        5226 J.Yano        5226 J.Yano       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
DOWN/AP            AP                 AP                 5707 G.George      5707 G.George      5707 G.George      5707 G.George     
AP                 AP                 CHANGE/5707 G.Geor 5707 G.George      5707 G.George      5707 G.George      CHANGE/8892 D.Soka
AP                 AP                 5707 G.George      5707 G.George      5707 G.George      5707 G.George      8892 D.Sokaras    
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5640 X.Zheng/AP    AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
4791 M.Zeineh/AP   AP                 AP                 5490 R.Wogelius    5490 R.Wogelius    5490 R.Wogelius    5490 R.Wogelius   
AP                 AP                 CHANGE/5490 R.Woge 5490 R.Wogelius    5490 R.Wogelius    5490 R.Wogelius    CHANGE/5643 J.Anne
AP                 AP                 5490 R.Wogelius    5490 R.Wogelius    5490 R.Wogelius    5490 R.Wogelius    5643 J.Anne       
BEAM   LINE 7-3  
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5641 K.Chacon/AP   AP                 AP                 5740 T.Jackson     5740 T.Jackson     5764 C.Lee         5764 C.Lee        
AP                 AP                 SMB CHECKOUT/5740  5740 T.Jackson     SMB CHECKOUT/5764  5764 C.Lee         5764 C.Lee        
AP                 AP                 5740 T.Jackson     5740 T.Jackson     5764 C.Lee         5764 C.Lee         5764 C.Lee        
BEAM   LINE 9-3  
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5393 C.Dewey/AP    AP                 AP                 8818 A.Mehta       8818 A.Mehta       9705 J.LiSA        9705 J.LiSA       
AP                 AP                 SMB CHECKOUT/8818  8818 A.Mehta       SMB CHECKOUT/9705  9705 J.LiSA        9705 J.LiSA       
AP                 AP                 8818 A.Mehta       8818 A.Mehta       9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5839 B.Saini/AP    AP                 AP                 FACI               FACI               5931 B.Paulsen     5931 B.Paulsen    
AP                 AP                 FACI               FACI               Xray CHECKOUT/5931 5931 B.Paulsen     Xray CHECKOUT/5473
AP                 AP                 FACI               FACI               5931 B.Paulsen     5931 B.Paulsen     5473 T.Quill      
BEAM   LINE 11-2 
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5552 N.Rivera/AP   AP                 AP                 5858 O.Duckworth   5858 O.Duckworth   5289 J.Chorover    5289 J.Chorover   
AP                 AP                 SMB CHECKOUT/5858  5858 O.Duckworth   SMB CHECKOUT/5289  5289 J.Chorover    5289 J.Chorover   
AP                 AP                 5858 O.Duckworth   5858 O.Duckworth   5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
BEAM   LINE 11-3 
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5590 N.Weadock/AP  AP                 AP                 5856 L.Schelhas    5856 L.Schelhas    5908 L.Schelhas    5908 L.Schelhas   
AP                 AP                 Xray CHECKOUT/5856 5856 L.Schelhas    Xray CHECKOUT/5908 5908 L.Schelhas    5908 L.Schelhas   
AP                 AP                 5856 L.Schelhas    5856 L.Schelhas    5908 L.Schelhas    5908 L.Schelhas    5908 L.Schelhas   
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5712 J.Shukle/AP   AP                 AP                 5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
AP                 AP                 CHANGE/5093 M.Kell 5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
AP                 AP                 5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 15-2 
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
5866 M.Nielsen/AP  AP                 AP                 8898 T.Kroll       8898 T.Kroll       5798 I.Bogacz      5798 I.Bogacz     
AP                 AP                 CHANGE/8898 T.Krol 8898 T.Kroll       CHANGE/5798 I.Boga 5798 I.Bogacz      5798 I.Bogacz     
AP                 AP                 8898 T.Kroll       8898 T.Kroll       5798 I.Bogacz      5798 I.Bogacz      5798 I.Bogacz     
BEAM   LINE 17-2 
Dec. 06, 2021      Dec. 07, 2021      Dec. 08, 2021      Dec. 09, 2021      Dec. 10, 2021      Dec. 11, 2021      Dec. 12, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 13, 2021
                                         
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
BEAM   LINE 1-5  
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5833 E.Abdo        5358 S.Lee         5358 S.Lee         5358 S.Lee/AP      AP                 AP/DOWN            DOWN              
Xray CHECKOUT/5358 5358 S.Lee         5358 S.Lee         AP                 AP                 DOWN               DOWN              
5358 S.Lee         5358 S.Lee         5358 S.Lee         AP                 AP                 DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
FACI               Unscheduled        FACI               FACI/AP            AP                 AP/DOWN            DOWN              
Unscheduled        FACI               FACI               AP                 AP                 DOWN               DOWN              
Unscheduled        FACI               FACI               AP                 AP                 DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5903 W.Tong        5680 Z.Jiang       5680 Z.Jiang       5680 Z.Jiang/AP    AP                 AP/DOWN            DOWN              
SMB CHECKOUT/5680  5680 Z.Jiang       5680 Z.Jiang       AP                 AP                 DOWN               DOWN              
5680 Z.Jiang       5680 Z.Jiang       5680 Z.Jiang       AP                 AP                 DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5490 R.Wogelius    5903 W.Tong        5903 W.Tong        5903 W.Tong/AP     AP                 AP/DOWN            DOWN              
CHANGE/5903 W.Tong 5903 W.Tong        5903 W.Tong        AP                 AP                 DOWN               DOWN              
5903 W.Tong        5903 W.Tong        5903 W.Tong        AP                 AP                 DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5743 M.Zhu         5615 J.Ravichandra 5615 J.Ravichandra 5615 J.Ravichan/AP AP                 AP/DOWN            DOWN              
SMB CHECKOUT/5615  5615 J.Ravichandra 5615 J.Ravichandra AP                 AP                 DOWN               DOWN              
5615 J.Ravichandra 5615 J.Ravichandra 5615 J.Ravichandra AP                 AP                 DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
12A6 K.Lee         12A3 A.Sewa        12A3 A.Sewa        8877 T.Matsui/AP   AP                 AP/DOWN            DOWN              
CHANGE/12A3 A.Sewa 12A3 A.Sewa        CHANGE/8877 T.Mats AP                 AP                 DOWN               DOWN              
12A3 A.Sewa        12A3 A.Sewa        8877 T.Matsui      AP                 AP                 DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5226 J.Yano        5289 J.Chorover    5289 J.Chorover    5289 J.Chorover/AP AP                 AP/DOWN            DOWN              
SMB CHECKOUT/5289  5289 J.Chorover    5289 J.Chorover    AP                 AP                 DOWN               DOWN              
5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    AP                 AP                 DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras/AP  AP                 AP/DOWN            DOWN              
8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     AP                 AP                 DOWN               DOWN              
8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     AP                 AP                 DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
DOWN               DOWN               DOWN               DOWN/AP            AP                 AP/DOWN            DOWN              
DOWN               DOWN               DOWN               AP                 AP                 DOWN               DOWN              
DOWN               DOWN               DOWN               AP                 AP                 DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 AP/DOWN            DOWN              
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        AP                 AP                 DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5643 J.Anne        5643 J.Anne        5643 J.Anne        5643 J.Anne/AP     AP                 AP/DOWN            DOWN              
5643 J.Anne        5643 J.Anne        5643 J.Anne        AP                 AP                 DOWN               DOWN              
5643 J.Anne        5643 J.Anne        5643 J.Anne        AP                 AP                 DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5764 C.Lee         5764 C.Lee         5224 V.Yachandra   5224 V.Yachandr/AP AP                 AP/DOWN            DOWN              
5764 C.Lee         SMB CHECKOUT/5224  5224 V.Yachandra   AP                 AP                 DOWN               DOWN              
5764 C.Lee         5224 V.Yachandra   5224 V.Yachandra   AP                 AP                 DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
9705 J.LiSA        FACI               FACI               FACI/AP            AP                 AP/DOWN            DOWN              
FACI               FACI               FACI               AP                 AP                 DOWN               DOWN              
FACI               FACI               FACI               AP                 AP                 DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5473 T.Quill       5473 T.Quill/FACI  FACI               FACI/AP            AP                 AP/DOWN            DOWN              
5473 T.Quill       FACI               FACI               AP                 AP                 DOWN               DOWN              
5473 T.Quill       FACI               FACI               AP                 AP                 DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5289 J.Chorover    5813 M.Vejar       5813 M.Vejar       5813 M.Vejar/AP    AP                 AP/DOWN            DOWN              
SMB CHECKOUT/5813  5813 M.Vejar       5813 M.Vejar       AP                 AP                 DOWN               DOWN              
5813 M.Vejar       5813 M.Vejar       5813 M.Vejar       AP                 AP                 DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5908 L.Schelhas    5953 L.Schelhas    5291 Y.Zheng       5291 Y.Zheng/AP    AP                 AP/DOWN            DOWN              
Xray CHECKOUT/5953 Xray CHECKOUT/5291 5291 Y.Zheng       AP                 AP                 DOWN               DOWN              
5953 L.Schelhas    5291 Y.Zheng       5291 Y.Zheng       AP                 AP                 DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
DOWN               DOWN               DOWN               DOWN/AP            AP                 AP/DOWN            DOWN              
DOWN               DOWN               DOWN               AP                 AP                 DOWN               DOWN              
DOWN               DOWN               DOWN               AP                 AP                 DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5093 M.Kelly       5575 J.Basinski    5575 J.Basinski    5575 J.Basinski/AP AP                 AP/DOWN            DOWN              
CHANGE/5575 J.Basi 5575 J.Basinski    5575 J.Basinski    AP                 AP                 DOWN               DOWN              
5575 J.Basinski    5575 J.Basinski    5575 J.Basinski    AP                 AP                 DOWN               DOWN              
BEAM   LINE 15-2 
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
5798 I.Bogacz      5151 H.La Pierre   5151 H.La Pierre   5151 H.La Pierr/AP AP                 AP/DOWN            DOWN              
CHANGE/5151 H.La P 5151 H.La Pierre   5151 H.La Pierre   AP                 AP                 DOWN               DOWN              
5151 H.La Pierre   5151 H.La Pierre   5151 H.La Pierre   AP                 AP                 DOWN               DOWN              
BEAM   LINE 17-2 
Dec. 13, 2021      Dec. 14, 2021      Dec. 15, 2021      Dec. 16, 2021      Dec. 17, 2021      Dec. 18, 2021      Dec. 19, 2021     
DOWN               DOWN               DOWN               DOWN/AP            AP                 AP/DOWN            DOWN              
DOWN               DOWN               DOWN               AP                 AP                 DOWN               DOWN              
DOWN               DOWN               DOWN               AP                 AP                 DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 20, 2021
                                         
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
BEAM   LINE 1-5  
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Dec. 20, 2021      Dec. 21, 2021      Dec. 22, 2021      Dec. 23, 2021      Dec. 24, 2021      Dec. 25, 2021      Dec. 26, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 27, 2021
                                         
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
BEAM   LINE 1-5  
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Dec. 27, 2021      Dec. 28, 2021      Dec. 29, 2021      Dec. 30, 2021      Dec. 31, 2021      Jan. 01, 2022      Jan. 02, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Jan. 03, 2022
                                         
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
BEAM   LINE 1-5  
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 2-2  
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 4-1  
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 7-3  
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 9-3  
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
BEAM   LINE 15-2 
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               8898 T.Kroll      
DOWN               DOWN               DOWN               DOWN               DOWN               CHANGE/8898 T.Krol 8898 T.Kroll      
DOWN               DOWN               DOWN               DOWN               DOWN               8898 T.Kroll       8898 T.Kroll      
BEAM   LINE 17-2 
Jan. 03, 2022      Jan. 04, 2022      Jan. 05, 2022      Jan. 06, 2022      Jan. 07, 2022      Jan. 08, 2022      Jan. 09, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Jan. 10, 2022
                                         
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
BEAM   LINE 1-5  
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        FACI               FACI               FACI               8091 C.Tassone     8091 C.Tassone    
Unscheduled        FACI               FACI               FACI               Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone    
Unscheduled        FACI               FACI               FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        FACI               FACI               FACI               Unscheduled        Unscheduled       
Unscheduled        FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
Unscheduled        FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-2  
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        5444 V.Noel        5444 V.Noel        5444 V.Noel        5444 V.Noel        5444 V.Noel       
Unscheduled        SMB CHECKOUT/5444  5444 V.Noel        5444 V.Noel        5444 V.Noel        5444 V.Noel        5444 V.Noel       
Unscheduled        5444 V.Noel        5444 V.Noel        5444 V.Noel        5444 V.Noel        5444 V.Noel        5444 V.Noel       
BEAM   LINE 2-3  
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        5444 V.Noel        5444 V.Noel        5444 V.Noel        5472 P.O'Day       5472 P.O'Day      
Unscheduled        CHANGE/5444 V.Noel 5444 V.Noel        5444 V.Noel        CHANGE/5472 P.O'Da 5472 P.O'Day       5472 P.O'Day      
Unscheduled        5444 V.Noel        5444 V.Noel        5444 V.Noel        5472 P.O'Day       5472 P.O'Day       5472 P.O'Day      
BEAM   LINE 4-1  
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        5503 O.Gutierrez T 5503 O.Gutierrez T 5248 S.Bent        5248 S.Bent        5766 M.Boreen     
Unscheduled        CHANGE/5503 O.Guti 5503 O.Gutierrez T SMB CHECKOUT/5248  5248 S.Bent        CHANGE/5766 M.Bore CHANGE/5827 C.Kron
Unscheduled        5503 O.Gutierrez T 5503 O.Gutierrez T 5248 S.Bent        5248 S.Bent        5766 M.Boreen      5827 C.Kronawitter
BEAM   LINE 4-2  
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        8877 T.Matsui      5913 S.Sukenik     5913 S.Sukenik     5239 D.Shechter    5239 D.Shechter   
Unscheduled        CHANGE/8877 T.Mats CHANGE/5913 S.Suke 5913 S.Sukenik     CHANGE/5239 D.Shec 5239 D.Shechter    5239 D.Shechter   
Unscheduled        8877 T.Matsui      5913 S.Sukenik     5913 S.Sukenik     5239 D.Shechter    5239 D.Shechter    5239 D.Shechter   
BEAM   LINE 4-3  
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        5889 M.Kirk        5889 M.Kirk        5288 K.Lancaster   5288 K.Lancaster   5288 K.Lancaster  
Unscheduled        SMB CHECKOUT/5889  5889 M.Kirk        SMB CHECKOUT/5288  5288 K.Lancaster   5288 K.Lancaster   5288 K.Lancaster  
Unscheduled        5889 M.Kirk        5889 M.Kirk        5288 K.Lancaster   5288 K.Lancaster   5288 K.Lancaster   5288 K.Lancaster  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        5902 G.Chen        5902 G.Chen        5632 M.Doeff       5632 M.Doeff       5200 Y.Liu        
Unscheduled        CHANGE/5902 G.Chen 5902 G.Chen        CHANGE/5632 M.Doef 5632 M.Doeff       CHANGE/5200 Y.Liu  5200 Y.Liu        
Unscheduled        5902 G.Chen        5902 G.Chen        5632 M.Doeff       5632 M.Doeff       5200 Y.Liu         5200 Y.Liu        
BEAM   LINE 7-2  
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        FACI               FACI               FACI               5950 S.Bone        5950 S.Bone       
Unscheduled        FACI               FACI               FACI               CHANGE/5950 S.Bone 5950 S.Bone        5950 S.Bone       
Unscheduled        FACI               FACI               FACI               5950 S.Bone        5950 S.Bone        5950 S.Bone       
BEAM   LINE 7-3  
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        5889 M.Kirk        5889 M.Kirk        5889 M.Kirk        9705 J.LiSA        9705 J.LiSA       
Unscheduled        SMB CHECKOUT/5889  5889 M.Kirk        5889 M.Kirk        SMB CHECKOUT/9705  9705 J.LiSA        9705 J.LiSA       
Unscheduled        5889 M.Kirk        5889 M.Kirk        5889 M.Kirk        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 9-3  
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        5674 G.Kumar       5674 G.Kumar       5674 G.Kumar       5288 K.Lancaster   5288 K.Lancaster  
Unscheduled        SMB CHECKOUT/5674  5674 G.Kumar       5674 G.Kumar       SMB CHECKOUT/5288  5288 K.Lancaster   5288 K.Lancaster  
Unscheduled        5674 G.Kumar       5674 G.Kumar       5674 G.Kumar       5288 K.Lancaster   5288 K.Lancaster   5288 K.Lancaster  
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        FACI               FACI               FACI               5709 J.Mars        5709 J.Mars        5709 J.Mars       
Unscheduled        FACI               FACI               Xray CHECKOUT/5709 5709 J.Mars        5709 J.Mars        5709 J.Mars       
Unscheduled        FACI               FACI               5709 J.Mars        5709 J.Mars        5709 J.Mars        5709 J.Mars       
BEAM   LINE 11-2 
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        FACI               FACI               FACI               FACI               FACI              
Unscheduled        FACI               FACI               FACI               FACI               FACI               FACI              
Unscheduled        FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-3 
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        4814 E.Plunkett    4814 E.Plunkett    5452 A.Sinha       5941 N.Strange     5941 N.Strange    
Unscheduled        Xray CHECKOUT/4814 4814 E.Plunkett    Xray CHECKOUT/5452 Xray CHECKOUT/5941 5941 N.Strange     5941 N.Strange    
Unscheduled        4814 E.Plunkett    4814 E.Plunkett    5452 A.Sinha       5941 N.Strange     5941 N.Strange     5941 N.Strange    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
DOWN               DOWN               5755 J.Judy        5755 J.Judy        5755 J.Judy        5575 J.Basinski    5575 J.Basinski   
DOWN               SMB CHECKOUT/5755  5755 J.Judy        5755 J.Judy        SMB CHECKOUT/5575  5575 J.Basinski    5575 J.Basinski   
DOWN               5755 J.Judy        5755 J.Judy        5755 J.Judy        5575 J.Basinski    5575 J.Basinski    5575 J.Basinski   
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
8898 T.Kroll       8898 T.Kroll       8898 T.Kroll       8898 T.Kroll       8898 T.Kroll       5777 T.Large       5777 T.Large      
8898 T.Kroll       8898 T.Kroll       8898 T.Kroll       8898 T.Kroll       CHANGE/5777 T.Larg 5777 T.Large       5777 T.Large      
8898 T.Kroll       8898 T.Kroll       8898 T.Kroll       8898 T.Kroll       5777 T.Large       5777 T.Large       5777 T.Large      
BEAM   LINE 17-2 
Jan. 10, 2022      Jan. 11, 2022      Jan. 12, 2022      Jan. 13, 2022      Jan. 14, 2022      Jan. 15, 2022      Jan. 16, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Jan. 17, 2022
                                         
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
BEAM   LINE 1-5  
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
8091 C.Tasson/FACI FACI               Unscheduled        Unscheduled        FACI               FACI               FACI              
FACI               Unscheduled        Unscheduled        FACI               FACI               FACI               FACI              
FACI               Unscheduled        Unscheduled        FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
Unscheduled        Unscheduled        5548 M.Capano      5548 M.Capano      5548 M.Capano      5839 B.Saini       5839 B.Saini      
Unscheduled        Xray CHECKOUT/5548 5548 M.Capano      5548 M.Capano      Xray CHECKOUT/5839 5839 B.Saini       5839 B.Saini      
Unscheduled        5548 M.Capano      5548 M.Capano      5548 M.Capano      5839 B.Saini       5839 B.Saini       5839 B.Saini      
BEAM   LINE 2-2  
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5444 V.Noel        5444 V.Noel        5444 V.Noel        5444 V.Noel        Unscheduled        Unscheduled        Unscheduled       
5444 V.Noel        5444 V.Noel        5444 V.Noel        5444 V.Noel        Unscheduled        Unscheduled        Unscheduled       
5444 V.Noel        5444 V.Noel        5444 V.Noel        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5472 P.O'Day       5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5603 S.Hickam      5603 S.Hickam      5603 S.Hickam     
CHANGE/5715 J.Magy 5715 J.Magyar      5715 J.Magyar      CHANGE/5603 S.Hick 5603 S.Hickam      5603 S.Hickam      5603 S.Hickam     
5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5603 S.Hickam      5603 S.Hickam      5603 S.Hickam      5603 S.Hickam     
BEAM   LINE 4-1  
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5827 C.Kronawitter 5827 C.Kronawitter 5266 A.Uzun        5266 A.Uzun        5266 A.Uzun        5204 W.Xiong       5204 W.Xiong      
5827 C.Kronawitter SMB CHECKOUT/5266  5266 A.Uzun        5266 A.Uzun        SMB CHECKOUT/5204  5204 W.Xiong       5204 W.Xiong      
5827 C.Kronawitter 5266 A.Uzun        5266 A.Uzun        5266 A.Uzun        5204 W.Xiong       5204 W.Xiong       5204 W.Xiong      
BEAM   LINE 4-2  
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5239 D.Shechter    RA                 8877 T.Matsui      8877 T.Matsui      12A5 T.Weiss       5904 C.Cooper      5904 C.Cooper     
RA                 CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/12A5 T.Weis CHANGE/5904 C.Coop 5904 C.Cooper      5904 C.Cooper     
RA                 8877 T.Matsui      8877 T.Matsui      12A5 T.Weiss       5904 C.Cooper      5904 C.Cooper      5904 C.Cooper     
BEAM   LINE 4-3  
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5288 K.Lancaster   5288 K.Lancaster   5630 K.Lindquist   5630 K.Lindquist   5648 M.Siebecker   5648 M.Siebecker   5648 M.Siebecker  
5288 K.Lancaster   SMB CHECKOUT/5630  5630 K.Lindquist   SMB CHECKOUT/5648  5648 M.Siebecker   5648 M.Siebecker   5648 M.Siebecker  
5288 K.Lancaster   5630 K.Lindquist   5630 K.Lindquist   5648 M.Siebecker   5648 M.Siebecker   5648 M.Siebecker   5648 M.Siebecker  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5200 Y.Liu         5965 J.Li          5887 S.Welborn     5887 S.Welborn     5738 D.Agyeman-Bud 5738 D.Agyeman-Bud 5738 D.Agyeman-Bud
Xray CHECKOUT/5965 CHANGE/5887 S.Welb 5887 S.Welborn     CHANGE/5738 D.Agye 5738 D.Agyeman-Bud 5738 D.Agyeman-Bud CHANGE/5837 K.Lim 
5965 J.Li          5887 S.Welborn     5887 S.Welborn     5738 D.Agyeman-Bud 5738 D.Agyeman-Bud 5738 D.Agyeman-Bud 5837 K.Lim        
BEAM   LINE 7-2  
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5950 S.Bone        5320 H.Steinrueck  5320 H.Steinrueck  5320 H.Steinrueck  5320 H.Steinrueck  5711 A.Kravchenko  5711 A.Kravchenko 
CHANGE/5320 H.Stei 5320 H.Steinrueck  5320 H.Steinrueck  5320 H.Steinrueck  CHANGE/5711 A.Krav 5711 A.Kravchenko  5711 A.Kravchenko 
5320 H.Steinrueck  5320 H.Steinrueck  5320 H.Steinrueck  5320 H.Steinrueck  5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko 
BEAM   LINE 7-3  
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
9705 J.LiSA        9705 J.LiSA        4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler   
9705 J.LiSA        SMB CHECKOUT/4416  4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler   
9705 J.LiSA        4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler   
BEAM   LINE 9-3  
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5288 K.Lancaster   5288 K.Lancaster   5288 K.Lancaster   FACI               FACI               5901 A.Deb         5901 A.Deb        
5288 K.Lancaster   5288 K.Lancaster   FACI               FACI               SMB CHECKOUT/5901  5901 A.Deb         5901 A.Deb        
5288 K.Lancaster   5288 K.Lancaster   FACI               FACI               5901 A.Deb         5901 A.Deb         5901 A.Deb        
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5709 J.Mars        5709 J.Mars/FACI   FACI               8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
5709 J.Mars        FACI               Xray CHECKOUT/8818 8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
5709 J.Mars        FACI               8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
BEAM   LINE 11-2 
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
FACI               FACI               FACI               FACI               FACI               5839 B.Saini       5839 B.Saini      
FACI               FACI               FACI               FACI               SMB CHECKOUT/5839  5839 B.Saini       5839 B.Saini      
FACI               FACI               FACI               FACI               5839 B.Saini       5839 B.Saini       5839 B.Saini      
BEAM   LINE 11-3 
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5941 N.Strange     Unscheduled        Unscheduled        Unscheduled        Unscheduled        8091 C.Tassone     8091 C.Tassone    
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone    
Unscheduled        Unscheduled        Unscheduled        Unscheduled        8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5575 J.Basinski    5575 J.Basinski    Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
5575 J.Basinski    5575 J.Basinski    Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
5575 J.Basinski    Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
5777 T.Large       5777 T.Large       5809 R.Jay         5809 R.Jay         Unscheduled        5407 B.Gates       5407 B.Gates      
5777 T.Large       CHANGE/5809 R.Jay  5809 R.Jay         Unscheduled        CHANGE/5407 B.Gate 5407 B.Gates       5407 B.Gates      
5777 T.Large       5809 R.Jay         5809 R.Jay         Unscheduled        5407 B.Gates       5407 B.Gates       5407 B.Gates      
BEAM   LINE 17-2 
Jan. 17, 2022      Jan. 18, 2022      Jan. 19, 2022      Jan. 20, 2022      Jan. 21, 2022      Jan. 22, 2022      Jan. 23, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Jan. 24, 2022
                                         
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
BEAM   LINE 1-5  
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
FACI               5549 R.Smaha       5549 R.Smaha       5368 J.Schroers    5368 J.Schroers    5368 J.Schroers    5368 J.Schroers   
Xray CHECKOUT/5549 5549 R.Smaha       Xray CHECKOUT/5368 5368 J.Schroers    5368 J.Schroers    5368 J.Schroers    5368 J.Schroers   
5549 R.Smaha       5549 R.Smaha       5368 J.Schroers    5368 J.Schroers    5368 J.Schroers    5368 J.Schroers    5368 J.Schroers   
BEAM   LINE 2-1  
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
5839 B.Saini       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
Xray CHECKOUT/8015 8015 A.Mehta       8015 A.Mehta       Xray CHECKOUT/5398 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
BEAM   LINE 2-2  
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
Unscheduled        5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5955 M.Preefer     5955 M.Preefer     5955 M.Preefer    
SMB CHECKOUT/5459  5459 A.van Veelen  5459 A.van Veelen  SMB CHECKOUT/5955  5955 M.Preefer     5955 M.Preefer     5955 M.Preefer    
5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5955 M.Preefer     5955 M.Preefer     5955 M.Preefer     5955 M.Preefer    
BEAM   LINE 2-3  
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
5603 S.Hickam      5071 R.Tinnacher   5071 R.Tinnacher   5071 R.Tinnacher   5071 R.Tinnacher   5950 S.Bone        5950 S.Bone       
CHANGE/5071 R.Tinn 5071 R.Tinnacher   5071 R.Tinnacher   5071 R.Tinnacher   CHANGE/5950 S.Bone 5950 S.Bone        5950 S.Bone       
5071 R.Tinnacher   5071 R.Tinnacher   5071 R.Tinnacher   5071 R.Tinnacher   5950 S.Bone        5950 S.Bone        5950 S.Bone       
BEAM   LINE 4-1  
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
5204 W.Xiong       5891 D.Strawn      5891 D.Strawn      5472 P.O'Day       5472 P.O'Day       Unscheduled        Unscheduled       
SMB CHECKOUT/5891  5891 D.Strawn      SMB CHECKOUT/5472  5472 P.O'Day       5472 P.O'Day       Unscheduled        Unscheduled       
5891 D.Strawn      5891 D.Strawn      5472 P.O'Day       5472 P.O'Day       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
5904 C.Cooper      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
5648 M.Siebecker   5887 S.Welborn     5887 S.Welborn     5445 G.George      5445 G.George      5445 G.George      5445 G.George     
SMB CHECKOUT/5887  5887 S.Welborn     SMB CHECKOUT/5445  5445 G.George      5445 G.George      5445 G.George      5445 G.George     
5887 S.Welborn     5887 S.Welborn     5445 G.George      5445 G.George      5445 G.George      5445 G.George      5445 G.George     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
5837 K.Lim         5837 K.Lim         5654 Z.Yang        5654 Z.Yang        5654 Z.Yang        5897 G.Qian        5897 G.Qian       
5837 K.Lim         CHANGE/5654 Z.Yang 5654 Z.Yang        5654 Z.Yang        CHANGE/5897 G.Qian 5897 G.Qian        5897 G.Qian       
5837 K.Lim         5654 Z.Yang        5654 Z.Yang        5654 Z.Yang        5897 G.Qian        5897 G.Qian        5897 G.Qian       
BEAM   LINE 7-2  
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
5711 A.Kravchenko  5711 A.Kravchenko  5882 S.Tian        5882 S.Tian        5882 S.Tian        5644 S.Tian        5644 S.Tian       
5711 A.Kravchenko  CHANGE/5882 S.Tian 5882 S.Tian        5882 S.Tian        CHANGE/5644 S.Tian 5644 S.Tian        5644 S.Tian       
5711 A.Kravchenko  5882 S.Tian        5882 S.Tian        5882 S.Tian        5644 S.Tian        5644 S.Tian        5644 S.Tian       
BEAM   LINE 7-3  
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
4416 T.Stemmler    5560 A.Ambi        5560 A.Ambi        5560 A.Ambi        5661 G.George      5661 G.George      5661 G.George     
SMB CHECKOUT/5560  5560 A.Ambi        5560 A.Ambi        SMB CHECKOUT/5661  5661 G.George      5661 G.George      5661 G.George     
5560 A.Ambi        5560 A.Ambi        5560 A.Ambi        5661 G.George      5661 G.George      5661 G.George      5661 G.George     
BEAM   LINE 9-3  
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
5901 A.Deb         5901 A.Deb         5694 J.Penner-Hahn 5694 J.Penner-Hahn 5694 J.Penner-Hahn 5394 C.Dewey       5394 C.Dewey      
5901 A.Deb         SMB CHECKOUT/5694  5694 J.Penner-Hahn 5694 J.Penner-Hahn SMB CHECKOUT/5394  5394 C.Dewey       5394 C.Dewey      
5901 A.Deb         5694 J.Penner-Hahn 5694 J.Penner-Hahn 5694 J.Penner-Hahn 5394 C.Dewey       5394 C.Dewey       5394 C.Dewey      
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
8818 A.Mehta       5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri    
Xray CHECKOUT/5403 5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri    
5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri    
BEAM   LINE 11-2 
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
5839 B.Saini       5835 Y.Qiao        Unscheduled        Unscheduled        Unscheduled        5101 R.Davis       5101 R.Davis      
SMB CHECKOUT/5835  5835 Y.Qiao        Unscheduled        Unscheduled        SMB CHECKOUT/5101  5101 R.Davis       5101 R.Davis      
5835 Y.Qiao        Unscheduled        Unscheduled        Unscheduled        5101 R.Davis       5101 R.Davis       5101 R.Davis      
BEAM   LINE 11-3 
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
8091 C.Tassone     5549 R.Smaha       5549 R.Smaha       5902 G.Chen        5902 G.Chen        5948 J.Andrews     5948 J.Andrews    
Xray CHECKOUT/5549 5549 R.Smaha       Xray CHECKOUT/5902 5902 G.Chen        Xray CHECKOUT/5948 5948 J.Andrews     5948 J.Andrews    
5549 R.Smaha       5549 R.Smaha       5902 G.Chen        5902 G.Chen        5948 J.Andrews     5948 J.Andrews     5948 J.Andrews    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
Unscheduled        Unscheduled        Unscheduled        5891 D.Strawn      5891 D.Strawn      8071 R.Sarangi     8071 R.Sarangi    
Unscheduled        Unscheduled        SMB CHECKOUT/5891  5891 D.Strawn      SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi    
Unscheduled        Unscheduled        5891 D.Strawn      5891 D.Strawn      8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
5407 B.Gates       5055 P.Christopher 5055 P.Christopher 5055 P.Christopher 5055 P.Christopher 5055 P.Christopher 5055 P.Christopher
SMB CHECKOUT/5055  5055 P.Christopher 5055 P.Christopher 5055 P.Christopher 5055 P.Christopher 5055 P.Christopher 5055 P.Christopher
5055 P.Christopher 5055 P.Christopher 5055 P.Christopher 5055 P.Christopher 5055 P.Christopher 5055 P.Christopher 5055 P.Christopher
BEAM   LINE 17-2 
Jan. 24, 2022      Jan. 25, 2022      Jan. 26, 2022      Jan. 27, 2022      Jan. 28, 2022      Jan. 29, 2022      Jan. 30, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Jan. 31, 2022
                                         
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
BEAM   LINE 1-5  
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5368 J.Schroers/AP AP                 AP                 5368 J.Schroers    5368 J.Schroers    6020 J.Hattrick-Si 5781 A.Mehta      
AP                 AP                 5368 J.Schroers    5368 J.Schroers    Xray CHECKOUT/6020 Xray CHECKOUT/5781 5781 A.Mehta      
AP                 AP                 5368 J.Schroers    5368 J.Schroers    6020 J.Hattrick-Si 5781 A.Mehta       5781 A.Mehta      
BEAM   LINE 2-1  
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5398 T.Wynn/AP     AP                 AP                 FACI               5903 W.Tong        5903 W.Tong        5903 W.Tong       
AP                 AP                 FACI               Xray CHECKOUT/5903 5903 W.Tong        5903 W.Tong        5903 W.Tong       
AP                 AP                 FACI               5903 W.Tong        5903 W.Tong        5903 W.Tong        5903 W.Tong       
BEAM   LINE 2-2  
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5955 M.Preefer/AP  AP                 AP                 Unscheduled        5903 W.Tong        5903 W.Tong        5903 W.Tong       
AP                 AP                 Unscheduled        SMB CHECKOUT/5903  5903 W.Tong        5903 W.Tong        5903 W.Tong       
AP                 AP                 Unscheduled        5903 W.Tong        5903 W.Tong        5903 W.Tong        5903 W.Tong       
BEAM   LINE 2-3  
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5950 S.Bone/AP     AP                 AP                 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
AP                 AP                 CHANGE/8098 T.Krol 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
AP                 AP                 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
BEAM   LINE 4-1  
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
AP                 AP                 AP                 5728 R.Bell        5728 R.Bell        Unscheduled        Unscheduled       
AP                 AP                 SMB CHECKOUT/5728  5728 R.Bell        5728 R.Bell        Unscheduled        Unscheduled       
AP                 AP                 5728 R.Bell        5728 R.Bell        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
8877 T.Matsui/AP   AP                 AP                 11G7 Z.Bu          11G7 Z.Bu          12A2 K.Meador      12A4 S.Pokhrel    
AP                 AP                 CHANGE/11G7 Z.Bu   11G7 Z.Bu          CHANGE/12A2 K.Mead CHANGE/12A4 S.Pokh CHANGE/8877 T.Mats
AP                 AP                 11G7 Z.Bu          11G7 Z.Bu          12A2 K.Meador      12A4 S.Pokhrel     8877 T.Matsui     
BEAM   LINE 4-3  
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5445 G.George/AP   AP                 AP                 6005 X.Tong        6005 X.Tong        5340 P.Kennepohl   5340 P.Kennepohl  
AP                 AP                 SMB CHECKOUT/6005  6005 X.Tong        SMB CHECKOUT/5340  5340 P.Kennepohl   5340 P.Kennepohl  
AP                 AP                 6005 X.Tong        6005 X.Tong        5340 P.Kennepohl   5340 P.Kennepohl   5340 P.Kennepohl  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5897 G.Qian/AP     AP                 AP                 8890 J.Nelson Weke 8890 J.Nelson Weke 5444 V.Noel        5444 V.Noel       
AP                 AP                 CHANGE/8890 J.Nels 8890 J.Nelson Weke CHANGE/5444 V.Noel 5444 V.Noel        5444 V.Noel       
AP                 AP                 8890 J.Nelson Weke 8890 J.Nelson Weke 5444 V.Noel        5444 V.Noel        5444 V.Noel       
BEAM   LINE 7-2  
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5644 S.Tian/AP     AP                 AP                 5444 V.Noel        5444 V.Noel        5444 V.Noel        FACI              
AP                 AP                 CHANGE/5444 V.Noel 5444 V.Noel        5444 V.Noel        FACI               FACI              
AP                 AP                 5444 V.Noel        5444 V.Noel        5444 V.Noel        FACI               FACI              
BEAM   LINE 7-3  
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5661 G.George/AP   AP                 AP                 5340 P.Kennepohl   5340 P.Kennepohl   Unscheduled        Unscheduled       
AP                 AP                 SMB CHECKOUT/5340  5340 P.Kennepohl   CHANGE/5338 H.Zhou Unscheduled        Unscheduled       
AP                 AP                 5340 P.Kennepohl   5340 P.Kennepohl   5338 H.Zhou        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5394 C.Dewey/AP    AP                 AP                 5499 A.Holewinski  5499 A.Holewinski  5088 L.Greenlee    5088 L.Greenlee   
AP                 AP                 CHANGE/5499 A.Hole 5499 A.Holewinski  CHANGE/5088 L.Gree 5088 L.Greenlee    5088 L.Greenlee   
AP                 AP                 5499 A.Holewinski  5499 A.Holewinski  5088 L.Greenlee    5088 L.Greenlee    5088 L.Greenlee   
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5403 R.Bassiri/AP  AP                 AP                 FACI               92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau  
AP                 AP                 FACI               Xray CHECKOUT/92I8 92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau  
AP                 AP                 FACI               92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau  
BEAM   LINE 11-2 
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5101 R.Davis/AP    AP                 AP                 5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn
AP                 AP                 SMB CHECKOUT/5307  5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn
AP                 AP                 5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn
BEAM   LINE 11-3 
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5948 J.Andrews/AP  AP                 AP                 FACI               5837 K.Lim         5837 K.Lim         5837 K.Lim        
AP                 AP                 FACI               Xray CHECKOUT/5837 5837 K.Lim         5837 K.Lim         5837 K.Lim        
AP                 AP                 FACI               5837 K.Lim         5837 K.Lim         5837 K.Lim         5837 K.Lim        
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
8071 R.Sarangi/AP  AP                 AP                 5613 Y.Tang        5613 Y.Tang        5472 P.O'Day       5472 P.O'Day      
AP                 AP                 SMB CHECKOUT/5613  5613 Y.Tang        SMB CHECKOUT/5472  5472 P.O'Day       5472 P.O'Day      
AP                 AP                 5613 Y.Tang        5613 Y.Tang        5472 P.O'Day       5472 P.O'Day       5472 P.O'Day      
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
5055 P.Christop/AP AP                 AP                 COMM               COMM               6000 G.George      6000 G.George     
AP                 AP                 COMM               COMM               SMB CHECKOUT/6000  6000 G.George      6000 G.George     
AP                 AP                 COMM               COMM               6000 G.George      6000 G.George      6000 G.George     
BEAM   LINE 17-2 
Jan. 31, 2022      Feb. 01, 2022      Feb. 02, 2022      Feb. 03, 2022      Feb. 04, 2022      Feb. 05, 2022      Feb. 06, 2022     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Feb. 07, 2022
                                         
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
BEAM   LINE 1-5  
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
5781 A.Mehta       5781 A.Mehta       5781 A.Mehta       5781 A.Mehta       5781 A.Mehta       5781 A.Mehta       5781 A.Mehta      
5781 A.Mehta       5781 A.Mehta       Xray CHECKOUT/5781 5781 A.Mehta       5781 A.Mehta       5781 A.Mehta       5781 A.Mehta      
5781 A.Mehta       5781 A.Mehta       5781 A.Mehta       5781 A.Mehta       5781 A.Mehta       5781 A.Mehta       5781 A.Mehta      
BEAM   LINE 2-1  
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
5903 W.Tong        FACI               6034 J.Rorrer      6034 J.Rorrer      FACI               5830 J.Velazquez   5830 J.Velazquez  
FACI               Xray CHECKOUT/6034 6034 J.Rorrer      FACI               Xray CHECKOUT/5830 5830 J.Velazquez   5830 J.Velazquez  
FACI               6034 J.Rorrer      6034 J.Rorrer      FACI               5830 J.Velazquez   5830 J.Velazquez   5830 J.Velazquez  
BEAM   LINE 2-2  
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
5903 W.Tong        5723 G.Chen        5723 G.Chen        5723 G.Chen        5897 G.Qian        5897 G.Qian        5521 L.Li         
SMB CHECKOUT/5723  5723 G.Chen        5723 G.Chen        SMB CHECKOUT/5897  5897 G.Qian        CHANGE/5521 L.Li   5521 L.Li         
5723 G.Chen        5723 G.Chen        5723 G.Chen        5897 G.Qian        5897 G.Qian        5521 L.Li          5521 L.Li         
BEAM   LINE 2-3  
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
8098 T.Kroll       5892 R.Bryant      5892 R.Bryant      5892 R.Bryant      5892 R.Bryant      4791 M.Zeineh      4791 M.Zeineh     
CHANGE/5892 R.Brya 5892 R.Bryant      5892 R.Bryant      5892 R.Bryant      CHANGE/4791 M.Zein 4791 M.Zeineh      4791 M.Zeineh     
5892 R.Bryant      5892 R.Bryant      5892 R.Bryant      5892 R.Bryant      4791 M.Zeineh      4791 M.Zeineh      4791 M.Zeineh     
BEAM   LINE 4-1  
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
Unscheduled        5614 Y.Tang        5614 Y.Tang        8090 J.Nelson Weke 8090 J.Nelson Weke 5990 S.Zaccarine   5990 S.Zaccarine  
SMB CHECKOUT/5614  5614 Y.Tang        SMB CHECKOUT/8090  8090 J.Nelson Weke SMB CHECKOUT/5990  5990 S.Zaccarine   5990 S.Zaccarine  
5614 Y.Tang        5614 Y.Tang        8090 J.Nelson Weke 8090 J.Nelson Weke 5990 S.Zaccarine   5990 S.Zaccarine   5990 S.Zaccarine  
BEAM   LINE 4-2  
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      12A6 K.Lee         12A6 K.Lee         12A8 M.Guttman     12A8 M.Guttman    
8877 T.Matsui      8877 T.Matsui      CHANGE/12A6 K.Lee  12A6 K.Lee         CHANGE/12A8 M.Gutt 12A8 M.Guttman     12A8 M.Guttman    
8877 T.Matsui      8877 T.Matsui      12A6 K.Lee         12A6 K.Lee         12A8 M.Guttman     12A8 M.Guttman     12A8 M.Guttman    
BEAM   LINE 4-3  
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
5340 P.Kennepohl   5340 P.Kennepohl   5340 P.Kennepohl   5226 J.Yano        5226 J.Yano        5226 J.Yano        5226 J.Yano       
5340 P.Kennepohl   5340 P.Kennepohl   SMB CHECKOUT/5226  5226 J.Yano        5226 J.Yano        5226 J.Yano        5226 J.Yano       
5340 P.Kennepohl   5340 P.Kennepohl   5226 J.Yano        5226 J.Yano        5226 J.Yano        5226 J.Yano        5226 J.Yano       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
5444 V.Noel        5703 R.Bell        5703 R.Bell        90H2 D.Oh          90H2 D.Oh          8881 Y.Liu         8881 Y.Liu        
CHANGE/5703 R.Bell 5703 R.Bell        CHANGE/90H2 D.Oh   90H2 D.Oh          CHANGE/8881 Y.Liu  8881 Y.Liu         8881 Y.Liu        
5703 R.Bell        5703 R.Bell        90H2 D.Oh          90H2 D.Oh          8881 Y.Liu         8881 Y.Liu         8881 Y.Liu        
BEAM   LINE 7-2  
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
Unscheduled        6005 X.Tong        8098 T.Kroll       8098 T.Kroll       8060 V.Noel        8060 V.Noel        8060 V.Noel       
CHANGE/6005 X.Tong SMB CHECKOUT/8098  8098 T.Kroll       SMB CHECKOUT/8060  8060 V.Noel        8060 V.Noel        8060 V.Noel       
6005 X.Tong        8098 T.Kroll       8098 T.Kroll       8060 V.Noel        8060 V.Noel        8060 V.Noel        8060 V.Noel       
BEAM   LINE 9-3  
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
5088 L.Greenlee    6001 C.Zhou        6001 C.Zhou        6001 C.Zhou        6001 C.Zhou        5582 S.Khatib      5582 S.Khatib     
CHANGE/6001 C.Zhou 6001 C.Zhou        6001 C.Zhou        6001 C.Zhou        CHANGE/5582 S.Khat 5582 S.Khatib      5582 S.Khatib     
6001 C.Zhou        6001 C.Zhou        6001 C.Zhou        6001 C.Zhou        5582 S.Khatib      5582 S.Khatib      5582 S.Khatib     
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
92I8 A.Halavanau   FACI               FACI               5873 C.Takacs      5873 C.Takacs      5873 C.Takacs      5873 C.Takacs     
FACI               FACI               Xray CHECKOUT/5873 5873 C.Takacs      5873 C.Takacs      5873 C.Takacs      5873 C.Takacs     
FACI               FACI               5873 C.Takacs      5873 C.Takacs      5873 C.Takacs      5873 C.Takacs      5873 C.Takacs     
BEAM   LINE 11-2 
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
5307 J.Penner-Hahn FACI               Unscheduled        5310 M.Wang        5310 M.Wang        5310 M.Wang        5310 M.Wang       
5307 J.Penner/FACI FACI               SMB CHECKOUT/5310  5310 M.Wang        5310 M.Wang        5310 M.Wang        5310 M.Wang       
FACI               Unscheduled        5310 M.Wang        5310 M.Wang        5310 M.Wang        5310 M.Wang        5310 M.Wang       
BEAM   LINE 11-3 
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
5837 K.Lim         5295 Y.Wu          5295 Y.Wu          6012 Q.Liu         FACI               6006 Y.Wu          6006 Y.Wu         
Xray CHECKOUT/5295 5295 Y.Wu          Xray CHECKOUT/6012 FACI               Xray CHECKOUT/6006 6006 Y.Wu          6006 Y.Wu         
5295 Y.Wu          5295 Y.Wu          6012 Q.Liu         FACI               6006 Y.Wu          6006 Y.Wu          6006 Y.Wu         
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
5472 P.O'Day       Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
5472 P.O'Day       Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
Unscheduled        FACI               5892 R.Bryant      5892 R.Bryant      5892 R.Bryant      6014 D.Fike        6014 D.Fike       
FACI               CHANGE/5892 R.Brya 5892 R.Bryant      5892 R.Bryant      CHANGE/6014 D.Fike 6014 D.Fike        6014 D.Fike       
FACI               5892 R.Bryant      5892 R.Bryant      5892 R.Bryant      6014 D.Fike        6014 D.Fike        6014 D.Fike       
BEAM   LINE 15-2 
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
6000 G.George      STUP               5799 M.Doyle       5799 M.Doyle       STUP               5678 R.Hadt        5678 R.Hadt       
STUP               SMB CHECKOUT/5799  5799 M.Doyle       STUP               SMB CHECKOUT/5678  5678 R.Hadt        5678 R.Hadt       
STUP               5799 M.Doyle       5799 M.Doyle       STUP               5678 R.Hadt        5678 R.Hadt        5678 R.Hadt       
BEAM   LINE 17-2 
Feb. 07, 2022      Feb. 08, 2022      Feb. 09, 2022      Feb. 10, 2022      Feb. 11, 2022      Feb. 12, 2022      Feb. 13, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Feb. 14, 2022
                                         
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
BEAM   LINE 1-5  
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
5781 A.Mehta/AP    AP                 AP                 6020 J.Hattrick-Si 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
AP                 AP                 Xray CHECKOUT/6020 Xray CHECKOUT/5398 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
AP                 AP                 6020 J.Hattrick-Si 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
BEAM   LINE 2-1  
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
5830 J.Velazque/AP AP                 AP                 5967 Z.Cai         5967 Z.Cai         5835 Y.Qiao        5835 Y.Qiao       
AP                 AP                 Xray CHECKOUT/5967 5967 Z.Cai         Xray CHECKOUT/5835 5835 Y.Qiao        5835 Y.Qiao       
AP                 AP                 5967 Z.Cai         5967 Z.Cai         5835 Y.Qiao        5835 Y.Qiao        5835 Y.Qiao       
BEAM   LINE 2-2  
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
5521 L.Li/AP       AP                 AP                 5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
AP                 AP                 SMB CHECKOUT/5468  5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
AP                 AP                 5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
BEAM   LINE 2-3  
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
4791 M.Zeineh/AP   AP                 AP                 DOWN               5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
AP                 AP                 DOWN               CHANGE/5093 M.Kell 5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
AP                 AP                 DOWN               5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 4-1  
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
5990 S.Zaccarin/AP AP                 AP                 5535 S.Ying        5535 S.Ying        5842 J.Lentz       5842 J.Lentz      
AP                 AP                 CHANGE/5535 S.Ying 5535 S.Ying        SMB CHECKOUT/5842  5842 J.Lentz       5842 J.Lentz      
AP                 AP                 5535 S.Ying        5535 S.Ying        5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
BEAM   LINE 4-2  
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
12A8 M.Guttman/AP  AP                 AP                 12A7 N.Boyer       12A9 C.Gee         5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 CHANGE/12A7 N.Boye CHANGE/12A9 C.Gee  CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 12A7 N.Boyer       12A9 C.Gee         5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
5226 J.Yano/AP     AP                 AP                 5442 J.Velazquez   5442 J.Velazquez   5570 A.Garcia-Espa 5570 A.Garcia-Espa
AP                 AP                 SMB CHECKOUT/5442  5442 J.Velazquez   SMB CHECKOUT/5570  5570 A.Garcia-Espa 5570 A.Garcia-Espa
AP                 AP                 5442 J.Velazquez   5442 J.Velazquez   5570 A.Garcia-Espa 5570 A.Garcia-Espa 5570 A.Garcia-Espa
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
8881 Y.Liu/AP      AP                 AP                 5396 J.Nelson Weke 5396 J.Nelson Weke 5739 G.Qian        5739 G.Qian       
AP                 AP                 CHANGE/5396 J.Nels 5396 J.Nelson Weke CHANGE/5739 G.Qian 5739 G.Qian        5739 G.Qian       
AP                 AP                 5396 J.Nelson Weke 5396 J.Nelson Weke 5739 G.Qian        5739 G.Qian        Unscheduled       
BEAM   LINE 7-2  
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
FACI/AP            AP                 AP                 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
8060 V.Noel/AP     AP                 AP                 5910 E.Pierce      5910 E.Pierce      9705 J.LiSA        9705 J.LiSA       
AP                 AP                 SMB CHECKOUT/5910  5910 E.Pierce      SMB CHECKOUT/9705  9705 J.LiSA        9705 J.LiSA       
AP                 AP                 5910 E.Pierce      5910 E.Pierce      9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 9-3  
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
5582 S.Khatib/AP   AP                 AP                 5973 E.Nikolla     5973 E.Nikolla     6022 A.Kulkarni    6022 A.Kulkarni   
AP                 AP                 SMB CHECKOUT/5973  5973 E.Nikolla     CHANGE/6022 A.Kulk 6022 A.Kulkarni    6022 A.Kulkarni   
AP                 AP                 5973 E.Nikolla     5973 E.Nikolla     6022 A.Kulkarni    6022 A.Kulkarni    6022 A.Kulkarni   
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
5873 C.Takacs/AP   AP                 AP                 FACI               FACI               5922 N.Johnson     5922 N.Johnson    
AP                 AP                 FACI               FACI               Xray CHECKOUT/5922 5922 N.Johnson     5922 N.Johnson    
AP                 AP                 FACI               FACI               5922 N.Johnson     5922 N.Johnson     5922 N.Johnson    
BEAM   LINE 11-2 
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
5310 M.Wang/AP     AP                 AP                 5535 S.Ying        5535 S.Ying        5273 M.Abernathy   5273 M.Abernathy  
AP                 AP                 SMB CHECKOUT/5535  5535 S.Ying        SMB CHECKOUT/5273  5273 M.Abernathy   5273 M.Abernathy  
AP                 AP                 5535 S.Ying        5535 S.Ying        5273 M.Abernathy   5273 M.Abernathy   5273 M.Abernathy  
BEAM   LINE 11-3 
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
6006 Y.Wu/AP       AP                 AP                 5968 A.Pena-Alcant 5968 A.Pena-Alcant 8095 K.Stone       8095 K.Stone      
AP                 AP                 Xray CHECKOUT/5968 5968 A.Pena-Alcant Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone      
AP                 AP                 5968 A.Pena-Alcant 5968 A.Pena-Alcant 8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
6014 D.Fike/AP     AP                 AP                 11H1 A.Deb         11H1 A.Deb         8090 J.Nelson Weke 8090 J.Nelson Weke
AP                 AP                 CHANGE/11H1 A.Deb  11H1 A.Deb         CHANGE/8090 J.Nels 8090 J.Nelson Weke 8090 J.Nelson Weke
AP                 AP                 11H1 A.Deb         11H1 A.Deb         8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 15-2 
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
5678 R.Hadt/AP     AP                 AP                 STUP               STUP               9705 J.LiSA        9705 J.LiSA       
AP                 AP                 STUP               STUP               SMB CHECKOUT/9705  9705 J.LiSA        9705 J.LiSA       
AP                 AP                 STUP               STUP               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 17-2 
Feb. 14, 2022      Feb. 15, 2022      Feb. 16, 2022      Feb. 17, 2022      Feb. 18, 2022      Feb. 19, 2022      Feb. 20, 2022     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Feb. 21, 2022
                                         
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
BEAM   LINE 1-5  
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
5398 T.Wynn        6031 T.Wynn        6031 T.Wynn        6031 T.Wynn        6031 T.Wynn        Unscheduled        Unscheduled       
Xray CHECKOUT/6031 6031 T.Wynn        6031 T.Wynn        6031 T.Wynn        Xray CHECKOUT/5549 Unscheduled        Unscheduled       
6031 T.Wynn        6031 T.Wynn        6031 T.Wynn        6031 T.Wynn        5549 R.Smaha       Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
5835 Y.Qiao        5835 Y.Qiao        5703 R.Bell        8095 K.Stone       8095 K.Stone       8095 K.Stone       8095 K.Stone      
5835 Y.Qiao        Xray CHECKOUT/5703 Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone       8095 K.Stone       8095 K.Stone      
5835 Y.Qiao        5703 R.Bell        8095 K.Stone       8095 K.Stone       8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 2-2  
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
5468 N.Calta       5958 C.Tassone     5958 C.Tassone     5958 C.Tassone     5958 C.Tassone     8890 J.Nelson Weke 8890 J.Nelson Weke
CHANGE/5958 C.Tass 5958 C.Tassone     5958 C.Tassone     5958 C.Tassone     CHANGE/8890 J.Nels 8890 J.Nelson Weke 8890 J.Nelson Weke
5958 C.Tassone     5958 C.Tassone     5958 C.Tassone     5958 C.Tassone     8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
BEAM   LINE 2-3  
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
5093 M.Kelly       5093 M.Kelly       FACI               FACI               FACI               5393 C.Dewey       5393 C.Dewey      
5093 M.Kelly       5093 M.Kelly/FACI  FACI               FACI               CHANGE/5393 C.Dewe 5393 C.Dewey       5393 C.Dewey      
5093 M.Kelly       FACI               FACI               FACI               5393 C.Dewey       5393 C.Dewey       5393 C.Dewey      
BEAM   LINE 4-1  
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
5842 J.Lentz       5842 J.Lentz       5948 J.Andrews     5948 J.Andrews     5948 J.Andrews     4752 C.Van Genucht 4752 C.Van Genucht
5842 J.Lentz       SMB CHECKOUT/5948  5948 J.Andrews     5948 J.Andrews     SMB CHECKOUT/4752  4752 C.Van Genucht 4752 C.Van Genucht
5842 J.Lentz       5948 J.Andrews     5948 J.Andrews     5948 J.Andrews     4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht
BEAM   LINE 4-2  
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
5497 M.Georgiadis  5497 M.Georgiadis  RA                 5995 Z.Huang       6006 Y.Wu          6006 Y.Wu          8877 T.Matsui     
5497 M.Georgiadis  RA                 CHANGE/5995 Z.Huan CHANGE/6006 Y.Wu   6006 Y.Wu          CHANGE/8877 T.Mats 8877 T.Matsui     
5497 M.Georgiadis  RA                 5995 Z.Huang       6006 Y.Wu          6006 Y.Wu          8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
5570 A.Garcia-Espa 5570 A.Garcia-Espa FACI               FACI               FACI               FACI               FACI              
5570 A.Garcia-Espa 5570 A.Garcia/FACI FACI               FACI               FACI               FACI               FACI              
5570 A.Garcia-Espa FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
Unscheduled        5823 H.Gao         5823 H.Gao         5823 H.Gao         8081 Y.Liu         8081 Y.Liu         8081 Y.Liu        
CHANGE/5823 H.Gao  5823 H.Gao         5823 H.Gao         CHANGE/8081 Y.Liu  8081 Y.Liu         8081 Y.Liu         8081 Y.Liu        
5823 H.Gao         5823 H.Gao         5823 H.Gao         8081 Y.Liu         8081 Y.Liu         8081 Y.Liu         8081 Y.Liu        
BEAM   LINE 7-2  
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
8067 S.Webb        8067 S.Webb        8067 S.Webb        5711 A.Kravchenko  5711 A.Kravchenko  Unscheduled        Unscheduled       
8067 S.Webb        8067 S.Webb        CHANGE/5711 A.Krav 5711 A.Kravchenko  5711 A.Kravchenko  Unscheduled        Unscheduled       
8067 S.Webb        8067 S.Webb        5711 A.Kravchenko  5711 A.Kravchenko  Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-3  
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
9705 J.LiSA        9705 J.LiSA        5462 T.Large       5462 T.Large       5462 T.Large       5224 V.Yachandra   5224 V.Yachandra  
9705 J.LiSA        SMB CHECKOUT/5462  5462 T.Large       5462 T.Large       SMB CHECKOUT/5224  5224 V.Yachandra   5224 V.Yachandra  
9705 J.LiSA        5462 T.Large       5462 T.Large       5462 T.Large       5224 V.Yachandra   5224 V.Yachandra   5224 V.Yachandra  
BEAM   LINE 9-3  
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
6022 A.Kulkarni    6022 A.Kulkarni    5909 J.Finzel      5909 J.Finzel      5104 A.Karim       5104 A.Karim       5104 A.Karim      
6022 A.Kulkarni    CHANGE/5909 J.Finz 5909 J.Finzel      CHANGE/5104 A.Kari 5104 A.Karim       5104 A.Karim       5104 A.Karim      
6022 A.Kulkarni    5909 J.Finzel      5909 J.Finzel      5104 A.Karim       5104 A.Karim       5104 A.Karim       5104 A.Karim      
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
5922 N.Johnson     5922 N.Johnson     5922 N.Johnson     5922 N.Johnson     5922 N.Johnson     5781 A.Mehta       5781 A.Mehta      
5922 N.Johnson     5922 N.Johnson     5922 N.Johnson     5922 N.Johnson     Xray CHECKOUT/5781 5781 A.Mehta       5781 A.Mehta      
5922 N.Johnson     5922 N.Johnson     5922 N.Johnson     5922 N.Johnson     5781 A.Mehta       5781 A.Mehta       5781 A.Mehta      
BEAM   LINE 11-2 
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
5273 M.Abernathy   5273 M.Abernathy   5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor    
5273 M.Abernathy   SMB CHECKOUT/5009  5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor    
5273 M.Abernathy   5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor     CHANGE/5009 S.Kozi 5009 S.Kozimor     5009 S.Kozimor    
BEAM   LINE 11-3 
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
8095 K.Stone       Unscheduled        5983 S.Zhang       5983 S.Zhang       5529 C.Salamat     4814 E.Plunkett    4814 E.Plunkett   
Unscheduled        Xray CHECKOUT/5983 5983 S.Zhang       Xray CHECKOUT/5529 Xray CHECKOUT/4814 4814 E.Plunkett    4814 E.Plunkett   
Unscheduled        5983 S.Zhang       5983 S.Zhang       5529 C.Salamat     4814 E.Plunkett    4814 E.Plunkett    4814 E.Plunkett   
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
8090 J.Nelson Weke 5894 M.Raven       5894 M.Raven       5894 M.Raven       5894 M.Raven       5715 J.Magyar      5715 J.Magyar     
CHANGE/5894 M.Rave 5894 M.Raven       5894 M.Raven       5894 M.Raven       CHANGE/5715 J.Magy 5715 J.Magyar      5715 J.Magyar     
5894 M.Raven       5894 M.Raven       5894 M.Raven       5894 M.Raven       5715 J.Magyar      5715 J.Magyar      5715 J.Magyar     
BEAM   LINE 15-2 
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
9705 J.LiSA        9705 J.LiSA        8006 M.Reinhard    8006 M.Reinhard    8006 M.Reinhard    5786 T.Hersbach    5786 T.Hersbach   
9705 J.LiSA        SMB CHECKOUT/8006  8006 M.Reinhard    8006 M.Reinhard    SMB CHECKOUT/5786  5786 T.Hersbach    5786 T.Hersbach   
9705 J.LiSA        8006 M.Reinhard    8006 M.Reinhard    8006 M.Reinhard    5786 T.Hersbach    5786 T.Hersbach    5786 T.Hersbach   
BEAM   LINE 17-2 
Feb. 21, 2022      Feb. 22, 2022      Feb. 23, 2022      Feb. 24, 2022      Feb. 25, 2022      Feb. 26, 2022      Feb. 27, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Feb. 28, 2022
                                         
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
BEAM   LINE 1-5  
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
AP                 AP                 AP                 FACI               5672 P.Zhang       5672 P.Zhang       5672 P.Zhang      
AP                 AP                 FACI               Xray CHECKOUT/5672 5672 P.Zhang       5672 P.Zhang       5672 P.Zhang      
AP                 AP                 FACI               5672 P.Zhang       5672 P.Zhang       5672 P.Zhang       5672 P.Zhang      
BEAM   LINE 2-1  
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
8095 K.Stone/AP    AP                 AP                 5549 R.Smaha       5549 R.Smaha       5778 J.Lee         5778 J.Lee        
AP                 AP                 Xray CHECKOUT/5549 5549 R.Smaha       Xray CHECKOUT/5778 5778 J.Lee         5778 J.Lee        
AP                 AP                 5549 R.Smaha       5549 R.Smaha       5778 J.Lee         5778 J.Lee         5778 J.Lee        
BEAM   LINE 2-2  
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
8890 J.Nelson W/AP AP                 AP                 5870 S.Conradson   5870 S.Conradson   5870 S.Conradson   5870 S.Conradson  
AP                 AP                 SMB CHECKOUT/5870  5870 S.Conradson   5870 S.Conradson   5870 S.Conradson   5870 S.Conradson  
AP                 AP                 5870 S.Conradson   5870 S.Conradson   5870 S.Conradson   5870 S.Conradson   5870 S.Conradson  
BEAM   LINE 2-3  
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
5393 C.Dewey/AP    AP                 AP                 5712 J.Shukle      5712 J.Shukle      5735 A.Bhattacharj 5735 A.Bhattacharj
AP                 AP                 CHANGE/5712 J.Shuk 5712 J.Shukle      CHANGE/5735 A.Bhat 5735 A.Bhattacharj 5735 A.Bhattacharj
AP                 AP                 5712 J.Shukle      5712 J.Shukle      5735 A.Bhattacharj 5735 A.Bhattacharj 5735 A.Bhattacharj
BEAM   LINE 4-1  
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
4752 C.Van Genu/AP AP                 AP                 5104 A.Karim       5104 A.Karim       5543 B.Gates       5543 B.Gates      
AP                 AP                 CHANGE/5104 A.Kari 5104 A.Karim       CHANGE/5543 B.Gate 5543 B.Gates       5543 B.Gates      
AP                 AP                 5104 A.Karim       5104 A.Karim       5543 B.Gates       5543 B.Gates       5543 B.Gates      
BEAM   LINE 4-2  
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
8877 T.Matsui/AP   AP                 AP                 8877 T.Matsui      11G7 Z.Bu          11G7 Z.Bu          8877 T.Matsui     
AP                 AP                 CHANGE/8877 T.Mats CHANGE/11G7 Z.Bu   11G7 Z.Bu          CHANGE/8877 T.Mats 8877 T.Matsui     
AP                 AP                 8877 T.Matsui      11G7 Z.Bu          11G7 Z.Bu          8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
FACI/AP            AP                 AP                 5445 G.George      5445 G.George      5445 G.George      5445 G.George     
AP                 AP                 SMB CHECKOUT/5445  5445 G.George      5445 G.George      5445 G.George      5445 G.George     
AP                 AP                 5445 G.George      5445 G.George      5445 G.George      5445 G.George      5445 G.George     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
8081 Y.Liu/AP      AP                 AP                 Unscheduled        Unscheduled        5505 A.Parakh      5505 A.Parakh     
AP                 AP                 Unscheduled        Unscheduled        CHANGE/5505 A.Para 5505 A.Parakh      5505 A.Parakh     
AP                 AP                 Unscheduled        Unscheduled        5505 A.Parakh      5505 A.Parakh      5505 A.Parakh     
BEAM   LINE 7-2  
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
AP                 AP                 AP                 5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
AP                 AP                 CHANGE/5622 M.McNa 5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
AP                 AP                 5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
BEAM   LINE 7-3  
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
5224 V.Yachandr/AP AP                 AP                 5914 C.Petersen    5914 C.Petersen    5661 G.George      5661 G.George     
AP                 AP                 SMB CHECKOUT/5914  5914 C.Petersen    SMB CHECKOUT/5661  5661 G.George      5661 G.George     
AP                 AP                 5914 C.Petersen    5914 C.Petersen    5661 G.George      5661 G.George      5661 G.George     
BEAM   LINE 9-3  
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
5104 A.Karim/AP    AP                 AP                 8098 T.Kroll       8098 T.Kroll       11H0 J.Richardson  11H0 J.Richardson 
AP                 AP                 SMB CHECKOUT/8098  8098 T.Kroll       SMB CHECKOUT/11H0  11H0 J.Richardson  11H0 J.Richardson 
AP                 AP                 8098 T.Kroll       8098 T.Kroll       11H0 J.Richardson  11H0 J.Richardson  11H0 J.Richardson 
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
5781 A.Mehta/AP    AP                 AP                 FACI               5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri    
AP                 AP                 FACI               Xray CHECKOUT/5403 5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri    
AP                 AP                 FACI               5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri    
BEAM   LINE 11-2 
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
5009 S.Kozimor/AP  AP                 AP                 5843 S.Fakhreddine 5843 S.Fakhreddine 5843 S.Fakhreddine 5843 S.Fakhreddine
AP                 AP                 SMB CHECKOUT/5843  5843 S.Fakhreddine 5843 S.Fakhreddine 5843 S.Fakhreddine 5843 S.Fakhreddine
AP                 AP                 5843 S.Fakhreddine 5843 S.Fakhreddine 5843 S.Fakhreddine 5843 S.Fakhreddine 5843 S.Fakhreddine
BEAM   LINE 11-3 
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
4814 E.Plunkett/AP AP                 AP                 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
AP                 AP                 Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     Xray CHECKOUT/6024
AP                 AP                 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     6024 A.Maurya     
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
5715 J.Magyar/AP   AP                 AP                 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 15-2 
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
5786 T.Hersbach/AP AP                 AP                 6029 A.Asundi      6029 A.Asundi      5636 L.Gee         5636 L.Gee        
AP                 AP                 SMB CHECKOUT/6029  6029 A.Asundi      SMB CHECKOUT/5636  5636 L.Gee         5636 L.Gee        
AP                 AP                 6029 A.Asundi      6029 A.Asundi      5636 L.Gee         5636 L.Gee         5636 L.Gee        
BEAM   LINE 17-2 
Feb. 28, 2022      Mar. 01, 2022      Mar. 02, 2022      Mar. 03, 2022      Mar. 04, 2022      Mar. 05, 2022      Mar. 06, 2022     
DOWN/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Mar. 07, 2022
                                         
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
BEAM   LINE 1-5  
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5672 P.Zhang       5950 S.Bone        5950 S.Bone        5950 S.Bone        FACI               5338 H.Zhou        5338 H.Zhou       
Xray CHECKOUT/5950 5950 S.Bone        5950 S.Bone        FACI               Xray CHECKOUT/5338 5338 H.Zhou        5338 H.Zhou       
5950 S.Bone        5950 S.Bone        5950 S.Bone        FACI               5338 H.Zhou        5338 H.Zhou        5338 H.Zhou       
BEAM   LINE 2-1  
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5778 J.Lee         FACI               FACI               FACI               5698 W.Tarpeh      5698 W.Tarpeh      5698 W.Tarpeh     
FACI               FACI               FACI               Xray CHECKOUT/5698 5698 W.Tarpeh      5698 W.Tarpeh      5698 W.Tarpeh     
FACI               FACI               FACI               5698 W.Tarpeh      5698 W.Tarpeh      5698 W.Tarpeh      5698 W.Tarpeh     
BEAM   LINE 2-2  
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5870 S.Conradson   5870 S.Conradson   5680 Z.Jiang       5680 Z.Jiang       5680 Z.Jiang       5778 J.Lee         5778 J.Lee        
5870 S.Conradson   SMB CHECKOUT/5680  5680 Z.Jiang       5680 Z.Jiang       CHANGE/5778 J.Lee  5778 J.Lee         5778 J.Lee        
5870 S.Conradson   5680 Z.Jiang       5680 Z.Jiang       5680 Z.Jiang       5778 J.Lee         5778 J.Lee         5778 J.Lee        
BEAM   LINE 2-3  
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5735 A.Bhattacharj Unscheduled        11H6 V.Sagi        11H6 V.Sagi        11H6 V.Sagi        5622 M.McNamara    5622 M.McNamara   
5735 A.Bhattacharj CHANGE/11H6 V.Sagi 11H6 V.Sagi        11H6 V.Sagi        CHANGE/5622 M.McNa 5622 M.McNamara    5622 M.McNamara   
Unscheduled        11H6 V.Sagi        11H6 V.Sagi        11H6 V.Sagi        5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
BEAM   LINE 4-1  
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5543 B.Gates       5766 M.Boreen      5766 M.Boreen      8099 S.Bare        8099 S.Bare        5055 P.Christopher 5055 P.Christopher
CHANGE/5766 M.Bore 5766 M.Boreen      CHANGE/8099 S.Bare 8099 S.Bare        CHANGE/5055 P.Chri 5055 P.Christopher 5055 P.Christopher
5766 M.Boreen      5766 M.Boreen      8099 S.Bare        8099 S.Bare        5055 P.Christopher 5055 P.Christopher 5055 P.Christopher
BEAM   LINE 4-2  
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
8877 T.Matsui      12B0 A.Bhattachary 12B0 A.Bhattachary 5729 C.Cheng       8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
CHANGE/12B0 A.Bhat 12B0 A.Bhattachary CHANGE/5729 C.Chen CHANGE/8092 D.Soka 8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
12B0 A.Bhattachary 12B0 A.Bhattachary 5729 C.Cheng       8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 4-3  
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5445 G.George      5963 J.Shearer     5963 J.Shearer     5907 M.Engel       5907 M.Engel       8090 J.Nelson Weke 8090 J.Nelson Weke
SMB CHECKOUT/5963  5963 J.Shearer     SMB CHECKOUT/5907  5907 M.Engel       SMB CHECKOUT/8090  8090 J.Nelson Weke 8090 J.Nelson Weke
5963 J.Shearer     5963 J.Shearer     5907 M.Engel       5907 M.Engel       8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5505 A.Parakh      5485 X.Milhet      5965 J.Li          8091 C.Tassone     5990 S.Zaccarine   5990 S.Zaccarine   5990 S.Zaccarine  
CHANGE/5485 X.Milh CHANGE/5965 J.Li   CHANGE/8091 C.Tass CHANGE/5990 S.Zacc 5990 S.Zaccarine   5990 S.Zaccarine   5990 S.Zaccarine  
5485 X.Milhet      5965 J.Li          8091 C.Tassone     5990 S.Zaccarine   5990 S.Zaccarine   5990 S.Zaccarine   5990 S.Zaccarine  
BEAM   LINE 7-2  
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5622 M.McNamara    5535 S.Ying        5535 S.Ying        5163 S.Tian        5163 S.Tian        5163 S.Tian        5163 S.Tian       
CHANGE/5535 S.Ying 5535 S.Ying        CHANGE/5163 S.Tian 5163 S.Tian        5163 S.Tian        5163 S.Tian        5163 S.Tian       
5535 S.Ying        5535 S.Ying        5163 S.Tian        5163 S.Tian        5163 S.Tian        5163 S.Tian        5163 S.Tian       
BEAM   LINE 7-3  
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5661 G.George      5661 G.George      5963 J.Shearer     5963 J.Shearer     5963 J.Shearer     8071 R.Sarangi     8071 R.Sarangi    
5661 G.George      SMB CHECKOUT/5963  5963 J.Shearer     5963 J.Shearer     SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi    
5661 G.George      5963 J.Shearer     5963 J.Shearer     5963 J.Shearer     8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 9-3  
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
11H0 J.Richardson  5190 L.Que         5190 L.Que         5190 L.Que         5996 J.DuBois      5996 J.DuBois      5996 J.DuBois     
SMB CHECKOUT/5190  5190 L.Que         5190 L.Que         SMB CHECKOUT/5996  5996 J.DuBois      5996 J.DuBois      5996 J.DuBois     
5190 L.Que         5190 L.Que         5190 L.Que         5996 J.DuBois      5996 J.DuBois      5996 J.DuBois      5996 J.DuBois     
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5403 R.Bassiri     FACI               5449 D.Zakhidov    5449 D.Zakhidov    FACI               5949 Z.Jiang       5949 Z.Jiang      
FACI               Xray CHECKOUT/5449 5449 D.Zakhidov    FACI               Xray CHECKOUT/5949 5949 Z.Jiang       5949 Z.Jiang      
FACI               5449 D.Zakhidov    5449 D.Zakhidov    FACI               5949 Z.Jiang       5949 Z.Jiang       5949 Z.Jiang      
BEAM   LINE 11-2 
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5843 S.Fakhreddine 5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor    
SMB CHECKOUT/5424  5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor    
5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor     CHANGE/5424 S.Kozi 5424 S.Kozimor     5424 S.Kozimor    
BEAM   LINE 11-3 
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
6024 A.Maurya      6024 A.Maurya      6024 A.Maurya      5940 N.Strange     5940 N.Strange     5940 N.Strange     5940 N.Strange    
6024 A.Maurya      6024 A.Maurya      Xray CHECKOUT/5940 5940 N.Strange     5940 N.Strange     5940 N.Strange     5940 N.Strange    
6024 A.Maurya      6024 A.Maurya      5940 N.Strange     5940 N.Strange     5940 N.Strange     5940 N.Strange     5940 N.Strange    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
8067 S.Webb        5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5643 J.Anne        5643 J.Anne        5643 J.Anne       
CHANGE/5622 M.McNa 5622 M.McNamara    5622 M.McNamara    CHANGE/5643 J.Anne 5643 J.Anne        5643 J.Anne        5643 J.Anne       
5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5643 J.Anne        5643 J.Anne        5643 J.Anne        5643 J.Anne       
BEAM   LINE 15-2 
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
5636 L.Gee         5636 L.Gee         8098 T.Kroll       8098 T.Kroll       STUP               6013 M.Zoric       6013 M.Zoric      
5636 L.Gee         SMB CHECKOUT/8098  8098 T.Kroll       STUP               SMB CHECKOUT/6013  6013 M.Zoric       6013 M.Zoric      
5636 L.Gee         8098 T.Kroll       8098 T.Kroll       STUP               6013 M.Zoric       6013 M.Zoric       6013 M.Zoric      
BEAM   LINE 17-2 
Mar. 07, 2022      Mar. 08, 2022      Mar. 09, 2022      Mar. 10, 2022      Mar. 11, 2022      Mar. 12, 2022      Mar. 13, 2022     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Mar. 14, 2022
                                         
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
BEAM   LINE 1-5  
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
5338 H.Zhou/AP     AP                 AP                 5918 B.Paulsen     5918 B.Paulsen     5833 E.Abdo        5833 E.Abdo       
AP                 AP                 Xray CHECKOUT/5918 5918 B.Paulsen     Xray CHECKOUT/5833 5833 E.Abdo        5833 E.Abdo       
AP                 AP                 5918 B.Paulsen     5918 B.Paulsen     5833 E.Abdo        5833 E.Abdo        5833 E.Abdo       
BEAM   LINE 2-1  
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
5698 W.Tarpeh/AP   AP                 AP                 FACI               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-2  
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
5778 J.Lee/AP      AP                 AP                 5753 A.Braga       5753 A.Braga       5753 A.Braga       5753 A.Braga      
AP                 AP                 CHECKOUT/5753      5753 A.Braga       5753 A.Braga       5753 A.Braga       5753 A.Braga      
AP                 AP                 5753 A.Braga       5753 A.Braga       5753 A.Braga       5753 A.Braga       5753 A.Braga      
BEAM   LINE 2-3  
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
5622 M.McNamara/AP AP                 AP                 5955 M.Preefer     4770 C.Hansel      4770 C.Hansel      4770 C.Hansel     
AP                 AP                 CHANGE/5955 M.Pree CHANGE/4770 C.Hans 4770 C.Hansel      4770 C.Hansel      CHANGE/8067 S.Webb
AP                 AP                 5955 M.Preefer     4770 C.Hansel      4770 C.Hansel      4770 C.Hansel      8067 S.Webb       
BEAM   LINE 4-1  
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
5055 P.Christop/AP AP                 AP                 5508 A.van Veelen  5508 A.van Veelen  6030 V.Noel        6030 V.Noel       
AP                 AP                 SMB CHECKOUT/5508  5508 A.van Veelen  CHANGE/6030 V.Noel 6030 V.Noel        Unscheduled       
AP                 AP                 5508 A.van Veelen  5508 A.van Veelen  6030 V.Noel        6030 V.Noel        Unscheduled       
BEAM   LINE 4-2  
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
8092 D.Sokaras/AP  AP                 AP                 8877 T.Matsui      RA                 5119 G.Wong        5119 G.Wong       
AP                 AP                 CHANGE/8877 T.Mats RA                 CHANGE/5119 G.Wong 5119 G.Wong        5119 G.Wong       
AP                 AP                 8877 T.Matsui      RA                 5119 G.Wong        5119 G.Wong        5119 G.Wong       
BEAM   LINE 4-3  
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
8090 J.Nelson W/AP AP                 AP                 5865 M.Shelby      5865 M.Shelby      6029 A.Asundi      6029 A.Asundi     
AP                 AP                 SMB CHECKOUT/5865  5865 M.Shelby      SMB CHECKOUT/6029  6029 A.Asundi      6029 A.Asundi     
AP                 AP                 5865 M.Shelby      5865 M.Shelby      6029 A.Asundi      6029 A.Asundi      6029 A.Asundi     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
AP                 AP                 AP                 STUP               8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 STUP               SMB CHECKOUT/8092  8092 D.Sokaras     8092 D.Sokaras     SMB CHECKOUT/5664 
AP                 AP                 STUP               8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras     5664 R.Walroth    
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
5990 S.Zaccarin/AP AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
AP                 AP                 AP                 5884 T.Sowers      5884 T.Sowers      5884 T.Sowers      5884 T.Sowers     
AP                 AP                 CHANGE/5884 T.Sowe 5884 T.Sowers      5884 T.Sowers      5884 T.Sowers      5884 T.Sowers     
AP                 AP                 5884 T.Sowers      5884 T.Sowers      5884 T.Sowers      5884 T.Sowers      5884 T.Sowers     
BEAM   LINE 7-3  
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
8071 R.Sarangi/AP  AP                 AP                 6029 A.Asundi      6029 A.Asundi      5617 K.Rush        5617 K.Rush       
AP                 AP                 SMB CHECKOUT/6029  6029 A.Asundi      SMB CHECKOUT/5617  5617 K.Rush        5617 K.Rush       
AP                 AP                 6029 A.Asundi      6029 A.Asundi      5617 K.Rush        5617 K.Rush        5617 K.Rush       
BEAM   LINE 9-3  
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
5996 J.DuBois/AP   AP                 AP                 Unscheduled        Unscheduled        5126 J.Yano        5126 J.Yano       
AP                 AP                 Unscheduled        Unscheduled        SMB CHECKOUT/5126  5126 J.Yano        5126 J.Yano       
AP                 AP                 Unscheduled        Unscheduled        5126 J.Yano        5126 J.Yano        5126 J.Yano       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
5949 Z.Jiang/AP    AP                 AP                 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
AP                 AP                 Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
AP                 AP                 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
BEAM   LINE 11-2 
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
5424 S.Kozimor/AP  AP                 AP                 4770 C.Hansel      4770 C.Hansel      5587 M.Muehe       5587 M.Muehe      
AP                 AP                 SMB CHECKOUT/4770  4770 C.Hansel      SMB CHECKOUT/5587  5587 M.Muehe       5587 M.Muehe      
AP                 AP                 4770 C.Hansel      4770 C.Hansel      5587 M.Muehe       5587 M.Muehe       5587 M.Muehe      
BEAM   LINE 11-3 
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
5940 N.Strange/AP  AP                 AP                 5897 G.Qian        5897 G.Qian        5419 G.Giri        5419 G.Giri       
AP                 AP                 Xray CHECKOUT/5897 5897 G.Qian        Xray CHECKOUT/5419 5419 G.Giri        5419 G.Giri       
AP                 AP                 5897 G.Qian        5897 G.Qian        5419 G.Giri        5419 G.Giri        5419 G.Giri       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
5643 J.Anne/AP     AP                 AP                 5888 N.Tosca       5888 N.Tosca       5888 N.Tosca       5794 T.Varga      
AP                 AP                 CHANGE/5888 N.Tosc 5888 N.Tosca       5888 N.Tosca       CHANGE/5794 T.Varg 5794 T.Varga      
AP                 AP                 5888 N.Tosca       5888 N.Tosca       5888 N.Tosca       5794 T.Varga       5794 T.Varga      
BEAM   LINE 15-2 
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
6013 M.Zoric/AP    AP                 AP                 STUP               Unscheduled        DOWN               DOWN              
AP                 AP                 STUP               Unscheduled        DOWN               DOWN               DOWN              
AP                 AP                 STUP               Unscheduled        DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Mar. 14, 2022      Mar. 15, 2022      Mar. 16, 2022      Mar. 17, 2022      Mar. 18, 2022      Mar. 19, 2022      Mar. 20, 2022     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Mar. 21, 2022
                                         
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
BEAM   LINE 1-5  
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
5833 E.Abdo        FACI               6026 B.Kienitz     6026 B.Kienitz     FACI               9705 J.LiSA        9705 J.LiSA       
FACI               Xray CHECKOUT/6026 6026 B.Kienitz     FACI               Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA       
FACI               6026 B.Kienitz     6026 B.Kienitz     FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 2-1  
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
Unscheduled        Unscheduled        11H5 I.Abate       Unscheduled        5728 R.Bell        5703 R.Bell        5703 R.Bell       
Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/5728 Xray CHECKOUT/5703 5703 R.Bell        5703 R.Bell       
Unscheduled        Xray CHECKOUT/11H5 Unscheduled        5728 R.Bell        5703 R.Bell        5703 R.Bell        5703 R.Bell       
BEAM   LINE 2-2  
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
5753 A.Braga       5880 Y.Roman       5880 Y.Roman       5880 Y.Roman       5994 R.Zhu         5994 R.Zhu         5994 R.Zhu        
CHANGE/5880 Y.Roma 5880 Y.Roman       5880 Y.Roman       CHANGE/5994 R.Zhu  5994 R.Zhu         5994 R.Zhu         5994 R.Zhu        
5880 Y.Roman       5880 Y.Roman       5880 Y.Roman       5994 R.Zhu         5994 R.Zhu         5994 R.Zhu         5994 R.Zhu        
BEAM   LINE 2-3  
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
8067 S.Webb        8067 S.Webb        5794 T.Varga       5794 T.Varga       5794 T.Varga       5583 J.Pena        5583 J.Pena       
8067 S.Webb        CHANGE/5794 T.Varg 5794 T.Varga       5794 T.Varga       CHANGE/5583 J.Pena 5583 J.Pena        5583 J.Pena       
8067 S.Webb        5794 T.Varga       5794 T.Varga       5794 T.Varga       5583 J.Pena        5583 J.Pena        5583 J.Pena       
BEAM   LINE 4-1  
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
Unscheduled        Unscheduled        Unscheduled        5697 Y.Ren         5697 Y.Ren         5757 F.Bridges     5757 F.Bridges    
Unscheduled        Unscheduled        SMB CHECKOUT/5697  5697 Y.Ren         SMB CHECKOUT/5757  5757 F.Bridges     5757 F.Bridges    
Unscheduled        Unscheduled        5697 Y.Ren         5697 Y.Ren         5757 F.Bridges     5757 F.Bridges     5757 F.Bridges    
BEAM   LINE 4-2  
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
5119 G.Wong        5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  8877 T.Matsui      5414 C.Salamat     5414 C.Salamat    
CHANGE/5504 Y.Srin 5504 Y.Srinivasan  5504 Y.Srinivasan  CHANGE/8877 T.Mats CHANGE/5414 C.Sala 5414 C.Salamat     Unscheduled       
5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  8877 T.Matsui      5414 C.Salamat     5414 C.Salamat     Unscheduled       
BEAM   LINE 4-3  
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
6029 A.Asundi      Unscheduled        5648 M.Siebecker   5648 M.Siebecker   5648 M.Siebecker   5273 M.Abernathy   5273 M.Abernathy  
6029 A.Asundi      SMB CHECKOUT/5648  5648 M.Siebecker   5648 M.Siebecker   CHANGE/5273 M.Aber 5273 M.Abernathy   5273 M.Abernathy  
Unscheduled        5648 M.Siebecker   5648 M.Siebecker   5648 M.Siebecker   5273 M.Abernathy   5273 M.Abernathy   5273 M.Abernathy  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
5664 R.Walroth     Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
Unscheduled        Unscheduled        Unscheduled        CHANGE/8890 J.Nels 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
Unscheduled        Unscheduled        Unscheduled        8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
5884 T.Sowers      5884 T.Sowers      5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
5884 T.Sowers      CHANGE/5093 M.Kell 5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
5884 T.Sowers      5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 7-3  
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
5617 K.Rush        5617 K.Rush        5733 C.Van Stappen 5733 C.Van Stappen Unscheduled        5764 C.Lee         5764 C.Lee        
5617 K.Rush        SMB CHECKOUT/5733  5733 C.Van Stappen 5733 C.Van Stappen SMB CHECKOUT/5764  5764 C.Lee         5764 C.Lee        
5617 K.Rush        5733 C.Van Stappen 5733 C.Van Stappen 5733 C.Van Stappen 5764 C.Lee         5764 C.Lee         5764 C.Lee        
BEAM   LINE 9-3  
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
5126 J.Yano        5220 W.Drisdell    5220 W.Drisdell    5220 W.Drisdell    9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
SMB CHECKOUT/5220  5220 W.Drisdell    5220 W.Drisdell    SMB CHECKOUT/9705  9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
5220 W.Drisdell    5220 W.Drisdell    5220 W.Drisdell    9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
8895 K.Stone       FACI               FACI               5931 B.Paulsen     5931 B.Paulsen     5931 B.Paulsen     5473 T.Quill      
FACI               FACI               Xray CHECKOUT/5931 5931 B.Paulsen     5931 B.Paulsen     Xray CHECKOUT/5473 5473 T.Quill      
FACI               FACI               5931 B.Paulsen     5931 B.Paulsen     5931 B.Paulsen     5473 T.Quill       5473 T.Quill      
BEAM   LINE 11-2 
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
5587 M.Muehe       5653 W.Chiu        5653 W.Chiu        5653 W.Chiu        5653 W.Chiu        5113 S.Bachas-Daun 5113 S.Bachas-Daun
SMB CHECKOUT/5653  5653 W.Chiu        5653 W.Chiu        5653 W.Chiu        SMB CHECKOUT/5113  5113 S.Bachas-Daun 5113 S.Bachas-Daun
5653 W.Chiu        5653 W.Chiu        5653 W.Chiu        5653 W.Chiu        5113 S.Bachas-Daun 5113 S.Bachas-Daun 5113 S.Bachas-Daun
BEAM   LINE 11-3 
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
5419 G.Giri        5562 D.Robertson   5562 D.Robertson   5562 D.Robertson   5887 S.Welborn     4820 M.Chabinyc    4820 M.Chabinyc   
Xray CHECKOUT/5562 5562 D.Robertson   5562 D.Robertson   Xray CHECKOUT/5887 Xray CHECKOUT/4820 4820 M.Chabinyc    4820 M.Chabinyc   
5562 D.Robertson   5562 D.Robertson   5562 D.Robertson   5887 S.Welborn     4820 M.Chabinyc    4820 M.Chabinyc    4820 M.Chabinyc   
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
5794 T.Varga       5794 T.Varga       5583 J.Pena        5583 J.Pena        5583 J.Pena        5712 J.Shukle      5712 J.Shukle     
5794 T.Varga       CHANGE/5583 J.Pena 5583 J.Pena        5583 J.Pena        CHANGE/5712 J.Shuk 5712 J.Shukle      5712 J.Shukle     
5794 T.Varga       5583 J.Pena        5583 J.Pena        5583 J.Pena        5712 J.Shukle      5712 J.Shukle      5712 J.Shukle     
BEAM   LINE 15-2 
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               5857 N.LiBretto    5857 N.LiBretto   
DOWN               DOWN               DOWN               DOWN               SMB CHECKOUT/5857  5857 N.LiBretto    5857 N.LiBretto   
DOWN               DOWN               DOWN               DOWN               5857 N.LiBretto    5857 N.LiBretto    5857 N.LiBretto   
BEAM   LINE 17-2 
Mar. 21, 2022      Mar. 22, 2022      Mar. 23, 2022      Mar. 24, 2022      Mar. 25, 2022      Mar. 26, 2022      Mar. 27, 2022     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Mar. 28, 2022
                                         
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
BEAM   LINE 1-5  
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
9705 J.LiSA        5940 N.Strange     5940 N.Strange     5940 N.Strange     FACI               5544 J.Utterback   5544 J.Utterback  
Xray CHECKOUT/5940 5940 N.Strange     5940 N.Strange     FACI               Xray CHECKOUT/5544 5544 J.Utterback   5544 J.Utterback  
5940 N.Strange     5940 N.Strange     5940 N.Strange     FACI               5544 J.Utterback   5544 J.Utterback   5544 J.Utterback  
BEAM   LINE 2-1  
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
5703 R.Bell        FACI               5410 S.Blair       5410 S.Blair       5410 S.Blair       5410 S.Blair       5410 S.Blair      
FACI               Xray CHECKOUT/5410 5410 S.Blair       5410 S.Blair       5410 S.Blair       5410 S.Blair       5410 S.Blair      
FACI               5410 S.Blair       5410 S.Blair       5410 S.Blair       5410 S.Blair       5410 S.Blair       5410 S.Blair      
BEAM   LINE 2-2  
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
5994 R.Zhu         5934 Y.Yang        5909 J.Finzel      5909 J.Finzel      5909 J.Finzel      5302 L.Li          5302 L.Li         
SMB CHECKOUT/5934  CHANGE/5909 J.Finz 5909 J.Finzel      5909 J.Finzel      CHANGE/5302 L.Li   5302 L.Li          5302 L.Li         
5934 Y.Yang        5909 J.Finzel      5909 J.Finzel      5909 J.Finzel      5302 L.Li          5302 L.Li          5302 L.Li         
BEAM   LINE 2-3  
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
5583 J.Pena        5583 J.Pena        5603 S.Hickam      5603 S.Hickam      5603 S.Hickam      5703 R.Bell        5703 R.Bell       
5583 J.Pena        CHANGE/5603 S.Hick 5603 S.Hickam      5603 S.Hickam      CHANGE/5703 R.Bell 5703 R.Bell        5703 R.Bell       
5583 J.Pena        5603 S.Hickam      5603 S.Hickam      5603 S.Hickam      5703 R.Bell        5703 R.Bell        5703 R.Bell       
BEAM   LINE 4-1  
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
5757 F.Bridges     5199 F.Bridges     5199 F.Bridges     8095 K.Stone       8095 K.Stone       5583 J.Pena        5583 J.Pena       
SMB CHECKOUT/5199  5199 F.Bridges     SMB CHECKOUT/8095  8095 K.Stone       SMB CHECKOUT/5583  5583 J.Pena        5583 J.Pena       
5199 F.Bridges     5199 F.Bridges     8095 K.Stone       8095 K.Stone       5583 J.Pena        5583 J.Pena        5583 J.Pena       
BEAM   LINE 4-2  
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
Unscheduled        12A2 K.Meador      12A2 K.Meador      8877 T.Matsui      5968 A.Pena-Alcant 8877 T.Matsui      8877 T.Matsui     
CHANGE/12A2 K.Mead 12A2 K.Meador      CHANGE/8877 T.Mats CHANGE/5968 A.Pena CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui     
12A2 K.Meador      12A2 K.Meador      8877 T.Matsui      5968 A.Pena-Alcant 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
5273 M.Abernathy   5698 W.Tarpeh      5698 W.Tarpeh      8099 S.Bare        8099 S.Bare        5979 R.Runnebaum   5979 R.Runnebaum  
CHANGE/5698 W.Tarp 5698 W.Tarpeh      CHANGE/8099 S.Bare 8099 S.Bare        CHANGE/5979 R.Runn 5979 R.Runnebaum   5979 R.Runnebaum  
5698 W.Tarpeh      5698 W.Tarpeh      8099 S.Bare        8099 S.Bare        5979 R.Runnebaum   5979 R.Runnebaum   5979 R.Runnebaum  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
Unscheduled        8060 V.Noel        8060 V.Noel        8060 V.Noel        8060 V.Noel        5508 A.van Veelen  5508 A.van Veelen 
CHANGE/8060 V.Noel 8060 V.Noel        8060 V.Noel        8060 V.Noel        CHANGE/5508 A.van  5508 A.van Veelen  5508 A.van Veelen 
8060 V.Noel        8060 V.Noel        8060 V.Noel        8060 V.Noel        5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen 
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko 
5093 M.Kelly       5093 M.Kelly       CHANGE/5711 A.Krav 5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko 
5093 M.Kelly       5093 M.Kelly       5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko 
BEAM   LINE 7-3  
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
5764 C.Lee         5156 L.Li          5156 L.Li          5895 J.Gustafsson  5895 J.Gustafsson  5964 M.Green       5964 M.Green      
SMB CHECKOUT/5156  5156 L.Li          SMB CHECKOUT/5895  5895 J.Gustafsson  SMB CHECKOUT/5964  5964 M.Green       5964 M.Green      
5156 L.Li          5156 L.Li          5895 J.Gustafsson  5895 J.Gustafsson  5964 M.Green       5964 M.Green       5964 M.Green      
BEAM   LINE 9-3  
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
9705 J.LiSA        FACI               FACI               FACI               FACI               Unscheduled        Unscheduled       
FACI               FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
FACI               FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
5473 T.Quill       5473 T.Quill       6024 A.Maurya      5833 E.Abdo        5833 E.Abdo        5951 A.Dudchenko   5951 A.Dudchenko  
5473 T.Quill       VUV CHECKOUT       Xray CHECKOUT/5833 5833 E.Abdo        Xray CHECKOUT/5951 5951 A.Dudchenko   5951 A.Dudchenko  
5473 T.Quill       6024 A.Maurya      5833 E.Abdo        5833 E.Abdo        5951 A.Dudchenko   5951 A.Dudchenko   5951 A.Dudchenko  
BEAM   LINE 11-2 
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
5113 S.Bachas-Daun 5253 S.Nikzad      5253 S.Nikzad      5253 S.Nikzad      5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
SMB CHECKOUT/5253  5253 S.Nikzad      5253 S.Nikzad      SMB CHECKOUT/5842  5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
5253 S.Nikzad      5253 S.Nikzad      5253 S.Nikzad      5842 J.Lentz       5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
BEAM   LINE 11-3 
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
4820 M.Chabinyc    8095 K.Stone       8095 K.Stone       8095 K.Stone       8091 C.Tassone     5549 R.Smaha       5549 R.Smaha      
Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone       Xray CHECKOUT/8091 Xray CHECKOUT/5549 5549 R.Smaha       5549 R.Smaha      
8095 K.Stone       8095 K.Stone       8095 K.Stone       8091 C.Tassone     5549 R.Smaha       5549 R.Smaha       5549 R.Smaha      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
5712 J.Shukle      5712 J.Shukle      11H2 J.Richardson  5955 M.Preefer     5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
5712 J.Shukle      CHANGE/11H2 J.Rich SMB CHECKOUT/5955  CHANGE/5093 M.Kell 5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
5712 J.Shukle      11H2 J.Richardson  5955 M.Preefer     5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 15-2 
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
5857 N.LiBretto    STUP               11H1 P.O'Day       11H1 P.O'Day       STUP               5972 M.Delgado Jai 5972 M.Delgado Jai
STUP               SMB CHECKOUT/11H1  11H1 P.O'Day       STUP               SMB CHECKOUT/5972  5972 M.Delgado Jai 5972 M.Delgado Jai
STUP               11H1 P.O'Day       11H1 P.O'Day       STUP               5972 M.Delgado Jai 5972 M.Delgado Jai 5972 M.Delgado Jai
BEAM   LINE 17-2 
Mar. 28, 2022      Mar. 29, 2022      Mar. 30, 2022      Mar. 31, 2022      Apr. 01, 2022      Apr. 02, 2022      Apr. 03, 2022     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Apr. 04, 2022
                                         
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
BEAM   LINE 1-5  
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5544 J.Utterbac/AP AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5410 S.Blair/AP    AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5302 L.Li/AP       AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5703 R.Bell/AP     AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5583 J.Pena/AP     AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
8877 T.Matsui/AP   AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5979 R.Runnebau/AP AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
AP                 AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5508 A.van Veel/AP AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
AP                 AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5711 A.Kravchen/AP AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5964 M.Green/AP    AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
AP                 AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5951 A.Dudchenk/AP AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5842 J.Lentz/AP    AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5549 R.Smaha/AP    AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
AP                 AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5093 M.Kelly/AP    AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
5972 M.Delgado /AP AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 04, 2022      Apr. 05, 2022      Apr. 06, 2022      Apr. 07, 2022      Apr. 08, 2022      Apr. 09, 2022      Apr. 10, 2022     
COMM/AP            AP                 AP/DOWN            DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 11, 2022
                                         
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
BEAM   LINE 1-5  
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 11, 2022      Apr. 12, 2022      Apr. 13, 2022      Apr. 14, 2022      Apr. 15, 2022      Apr. 16, 2022      Apr. 17, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 18, 2022
                                         
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
BEAM   LINE 1-5  
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               FACI               FACI               FACI              
AP                 AP                 DOWN               DOWN               FACI               FACI               FACI              
AP                 AP                 DOWN               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               5615 J.Ravichandra 6031 T.Wynn        6031 T.Wynn       
AP                 AP                 DOWN               DOWN               Xray CHECKOUT/6031 6031 T.Wynn        6031 T.Wynn       
AP                 AP                 DOWN               5615 J.Ravichandra 6031 T.Wynn        6031 T.Wynn        6031 T.Wynn       
BEAM   LINE 2-2  
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               5508 A.van Veelen  Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               5508 A.van Veelen  Unscheduled        Unscheduled       
AP                 AP                 DOWN               5508 A.van Veelen  Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               5888 N.Tosca       5888 N.Tosca       5898 Q.Zhao       
AP                 AP                 DOWN               DOWN               5888 N.Tosca       CHANGE/5898 Q.Zhao 5898 Q.Zhao       
AP                 AP                 DOWN               5888 N.Tosca       5888 N.Tosca       5898 Q.Zhao        5898 Q.Zhao       
BEAM   LINE 4-1  
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               5472 P.O'Day       5513 C.Kim         5513 C.Kim        
AP                 AP                 DOWN               DOWN               SMB CHECKOUT/5513  5513 C.Kim         5513 C.Kim        
AP                 AP                 DOWN               5472 P.O'Day       5513 C.Kim         5513 C.Kim         5513 C.Kim        
BEAM   LINE 4-2  
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
AP                 AP                 DOWN               DOWN               8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
AP                 AP                 DOWN               CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               5887 S.Welborn     5858 O.Duckworth   5858 O.Duckworth  
AP                 AP                 DOWN               DOWN               SMB CHECKOUT/5858  5858 O.Duckworth   5858 O.Duckworth  
AP                 AP                 DOWN               5887 S.Welborn     5858 O.Duckworth   5858 O.Duckworth   5858 O.Duckworth  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               5738 D.Agyeman-Bud 5887 S.Welborn     5887 S.Welborn    
AP                 AP                 DOWN               DOWN               CHANGE/5887 S.Welb 5887 S.Welborn     5887 S.Welborn    
AP                 AP                 DOWN               5738 D.Agyeman-Bud 5887 S.Welborn     5887 S.Welborn     5887 S.Welborn    
BEAM   LINE 7-2  
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               5314 K.Boye        5314 K.Boye        5314 K.Boye       
AP                 AP                 DOWN               DOWN               5314 K.Boye        5314 K.Boye        5314 K.Boye       
AP                 AP                 DOWN               5314 K.Boye        5314 K.Boye        5314 K.Boye        5314 K.Boye       
BEAM   LINE 7-3  
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               Unscheduled        5113 S.Bachas-Daun 5113 S.Bachas-Daun
AP                 AP                 DOWN               DOWN               SMB CHECKOUT/5113  5113 S.Bachas-Daun 5113 S.Bachas-Daun
AP                 AP                 DOWN               Unscheduled        5113 S.Bachas-Daun 5113 S.Bachas-Daun 5113 S.Bachas-Daun
BEAM   LINE 9-3  
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               FACI               5899 C.Van Stappen 5899 C.Van Stappen
AP                 AP                 DOWN               DOWN               SMB CHECKOUT/5899  5899 C.Van Stappen 5899 C.Van Stappen
AP                 AP                 DOWN               FACI               5899 C.Van Stappen 5899 C.Van Stappen 5899 C.Van Stappen
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               5846 S.Hesse       5458 C.Takacs      5458 C.Takacs     
AP                 AP                 DOWN               DOWN               Xray CHECKOUT/5458 5458 C.Takacs      5458 C.Takacs     
AP                 AP                 DOWN               5846 S.Hesse       5458 C.Takacs      5458 C.Takacs      5458 C.Takacs     
BEAM   LINE 11-2 
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               5858 O.Duckworth   5858 O.Duckworth   5858 O.Duckworth  
AP                 AP                 DOWN               DOWN               5858 O.Duckworth   5858 O.Duckworth   5858 O.Duckworth  
AP                 AP                 DOWN               5858 O.Duckworth   5858 O.Duckworth   5858 O.Duckworth   Unscheduled       
BEAM   LINE 11-3 
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               5677 Y.Lee         5932 G.Giri        5932 G.Giri       
AP                 AP                 DOWN               DOWN               Xray CHECKOUT/5932 5932 G.Giri        5932 G.Giri       
AP                 AP                 DOWN               5677 Y.Lee         5932 G.Giri        5932 G.Giri        5932 G.Giri       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               FACI               FACI               FACI              
AP                 AP                 DOWN               DOWN               FACI               FACI               CHANGE/5950 S.Bone
AP                 AP                 DOWN               FACI               FACI               FACI               5950 S.Bone       
BEAM   LINE 15-2 
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Apr. 18, 2022      Apr. 19, 2022      Apr. 20, 2022      Apr. 21, 2022      Apr. 22, 2022      Apr. 23, 2022      Apr. 24, 2022     
DOWN/AP            AP                 AP                 DOWN               COMM               COMM               COMM              
AP                 AP                 DOWN               DOWN               COMM               COMM               COMM              
AP                 AP                 DOWN               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Apr. 25, 2022
                                         
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
BEAM   LINE 1-5  
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
FACI               FACI               6024 A.Maurya      6024 A.Maurya      6024 A.Maurya      FACI               FACI              
FACI               Xray CHECKOUT/6024 6024 A.Maurya      6024 A.Maurya      FACI               FACI               FACI              
FACI               6024 A.Maurya      6024 A.Maurya      6024 A.Maurya      FACI               FACI               FACI              
BEAM   LINE 2-1  
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
6031 T.Wynn        6031 T.Wynn        FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
6031 T.Wynn        FACI               Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
6031 T.Wynn        FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 2-2  
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
Unscheduled        8060 V.Noel        8060 V.Noel        8060 V.Noel        8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
SMB CHECKOUT/8060  8060 V.Noel        8060 V.Noel        SMB CHECKOUT/8090  8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
8060 V.Noel        8060 V.Noel        8060 V.Noel        8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 2-3  
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
5898 Q.Zhao        5634 G.Morin       5634 G.Morin       5634 G.Morin       5634 G.Morin       5895 J.Gustafsson  5895 J.Gustafsson 
CHANGE/5634 G.Mori 5634 G.Morin       5634 G.Morin       5634 G.Morin       CHANGE/5895 J.Gust 5895 J.Gustafsson  5895 J.Gustafsson 
5634 G.Morin       5634 G.Morin       5634 G.Morin       5634 G.Morin       5895 J.Gustafsson  5895 J.Gustafsson  5895 J.Gustafsson 
BEAM   LINE 4-1  
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
5513 C.Kim         5513 C.Kim         5444 V.Noel        5444 V.Noel        5444 V.Noel        6030 V.Noel        6030 V.Noel       
5513 C.Kim         SMB CHECKOUT/5444  5444 V.Noel        5444 V.Noel        SMB CHECKOUT/6030  6030 V.Noel        6030 V.Noel       
5513 C.Kim         5444 V.Noel        5444 V.Noel        5444 V.Noel        6030 V.Noel        6030 V.Noel        6030 V.Noel       
BEAM   LINE 4-2  
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
8877 T.Matsui      5996 J.DuBois      5996 J.DuBois      11C7 M.Brenner     12B1 T.Ye          8092 D.Sokaras     8092 D.Sokaras    
CHANGE/5996 J.DuBo 5996 J.DuBois      CHANGE/11C7 M.Bren CHANGE/12B1 T.Ye   CHANGE/8092 D.Soka 8092 D.Sokaras     CHANGE/8877 T.Mats
5996 J.DuBois      5996 J.DuBois      11C7 M.Brenner     12B1 T.Ye          8092 D.Sokaras     8092 D.Sokaras     8877 T.Matsui     
BEAM   LINE 4-3  
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
5858 O.Duckworth   5997 C.Hahn        5997 C.Hahn        5639 J.Catalano    5639 J.Catalano    5835 Y.Qiao        5835 Y.Qiao       
SMB CHECKOUT/5997  5997 C.Hahn        SMB CHECKOUT/5639  5639 J.Catalano    SMB CHECKOUT/5835  5835 Y.Qiao        5835 Y.Qiao       
5997 C.Hahn        5997 C.Hahn        5639 J.Catalano    5639 J.Catalano    5835 Y.Qiao        5835 Y.Qiao        5835 Y.Qiao       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
5887 S.Welborn     5672 P.Zhang       5672 P.Zhang       5369 C.Tan         5369 C.Tan         5369 C.Tan         5369 C.Tan        
CHANGE/5672 P.Zhan 5672 P.Zhang       CHANGE/5369 C.Tan  5369 C.Tan         5369 C.Tan         5369 C.Tan         5369 C.Tan        
5672 P.Zhang       5672 P.Zhang       5369 C.Tan         5369 C.Tan         5369 C.Tan         5369 C.Tan         5369 C.Tan        
BEAM   LINE 7-2  
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
5314 K.Boye        Xray CHECKOUT/93H6 93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim  
5314 K.Boye        93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim  
5314 K.Boye        93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim   93H6 E.Nisenboim  
BEAM   LINE 7-3  
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
5113 S.Bachas-Daun 5619 E.Farquhar    Unscheduled        5987 R.Austin      5987 R.Austin      5273 M.Abernathy   5273 M.Abernathy  
SMB CHECKOUT/5619  5619 E.Farquhar    SMB CHECKOUT/5987  5987 R.Austin      SMB CHECKOUT/5273  5273 M.Abernathy   5273 M.Abernathy  
5619 E.Farquhar    5619 E.Farquhar    5987 R.Austin      5987 R.Austin      5273 M.Abernathy   5273 M.Abernathy   5273 M.Abernathy  
BEAM   LINE 9-3  
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
5899 C.Van Stappen 5685 Z.Mathe       5685 Z.Mathe       5685 Z.Mathe       Unscheduled        Unscheduled        Unscheduled       
SMB CHECKOUT/5685  5685 Z.Mathe       5685 Z.Mathe       Unscheduled        Unscheduled        Unscheduled        Unscheduled       
5685 Z.Mathe       5685 Z.Mathe       5685 Z.Mathe       Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
5458 C.Takacs      5458 C.Takacs      Unscheduled        FACI               FACI               92I8 A.Halavanau   92I8 A.Halavanau  
5458 C.Takacs      Unscheduled        FACI               FACI               Xray CHECKOUT/92I8 92I8 A.Halavanau   Unscheduled       
5458 C.Takacs      Unscheduled        FACI               FACI               92I8 A.Halavanau   92I8 A.Halavanau   Unscheduled       
BEAM   LINE 11-2 
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
Unscheduled        5328 R.Abergel     5328 R.Abergel     5328 R.Abergel     5333 S.Minasian    5333 S.Minasian    5333 S.Minasian   
SMB CHECKOUT/5328  5328 R.Abergel     5328 R.Abergel     CHANGE/5333 S.Mina 5333 S.Minasian    5333 S.Minasian    CHANGE/4919 S.Mina
5328 R.Abergel     5328 R.Abergel     5328 R.Abergel     5333 S.Minasian    5333 S.Minasian    5333 S.Minasian    4919 S.Minasian   
BEAM   LINE 11-3 
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
5932 G.Giri        5691 S.Moffitt     5691 S.Moffitt     5691 S.Moffitt     5691 S.Moffitt     5691 S.Moffitt     5691 S.Moffitt    
Xray CHECKOUT/5691 5691 S.Moffitt     5691 S.Moffitt     5691 S.Moffitt     Xray CHECKOUT/5691 5691 S.Moffitt     5691 S.Moffitt    
5691 S.Moffitt     5691 S.Moffitt     5691 S.Moffitt     5691 S.Moffitt     5691 S.Moffitt     5691 S.Moffitt     5691 S.Moffitt    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
5950 S.Bone        5950 S.Bone        5714 J.Richardson  5714 J.Richardson  5714 J.Richardson  5583 J.Pena        5583 J.Pena       
5950 S.Bone        CHANGE/5714 J.Rich 5714 J.Richardson  5714 J.Richardson  CHANGE/5583 J.Pena 5583 J.Pena        5583 J.Pena       
5950 S.Bone        5714 J.Richardson  5714 J.Richardson  5714 J.Richardson  5583 J.Pena        5583 J.Pena        5583 J.Pena       
BEAM   LINE 15-2 
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        STUP               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        STUP               Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        STUP               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Apr. 25, 2022      Apr. 26, 2022      Apr. 27, 2022      Apr. 28, 2022      Apr. 29, 2022      Apr. 30, 2022      May 01, 2022      
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF May 02, 2022 
                                         
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
BEAM   LINE 1-5  
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
FACI/AP            AP                 AP                 DOWN               DOWN               Unscheduled        8091 C.Tassone    
AP                 AP                 DOWN               DOWN               DOWN               Xray CHECKOUT/8091 8091 C.Tassone    
AP                 AP                 DOWN               DOWN               Unscheduled        8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
9705 J.LiSA/AP     AP                 AP                 DOWN               DOWN               FACI               FACI              
AP                 AP                 DOWN               DOWN               DOWN               FACI               FACI              
AP                 AP                 DOWN               DOWN               FACI               FACI               FACI              
BEAM   LINE 2-2  
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
8090 J.Nelson W/AP AP                 AP                 DOWN               DOWN               5903 W.Tong        5903 W.Tong       
AP                 AP                 STUP/DOWN          DOWN               DOWN               5903 W.Tong        5903 W.Tong       
AP                 AP                 DOWN               DOWN               5903 W.Tong        5903 W.Tong        5903 W.Tong       
BEAM   LINE 2-3  
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
5895 J.Gustafss/AP AP                 AP                 DOWN               DOWN               6039 M.Kang        6039 M.Kang       
AP                 AP                 DOWN               DOWN               DOWN               6039 M.Kang        6039 M.Kang       
AP                 AP                 DOWN               DOWN               6039 M.Kang        6039 M.Kang        6039 M.Kang       
BEAM   LINE 4-1  
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
6030 V.Noel/AP     AP                 AP                 DOWN               DOWN               5266 A.Uzun        5266 A.Uzun       
AP                 AP                 DOWN               DOWN               DOWN               5266 A.Uzun        5266 A.Uzun       
AP                 AP                 DOWN               DOWN               5266 A.Uzun        5266 A.Uzun        5266 A.Uzun       
BEAM   LINE 4-2  
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
8877 T.Matsui/AP   AP                 AP                 DOWN               DOWN               5904 C.Cooper      5904 C.Cooper     
AP                 AP                 8877 T.Matsui/DOWN DOWN               DOWN               5904 C.Cooper      5904 C.Cooper     
AP                 AP                 DOWN               DOWN               5904 C.Cooper      5904 C.Cooper      5904 C.Cooper     
BEAM   LINE 4-3  
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
5835 Y.Qiao/AP     AP                 AP                 DOWN               DOWN               5903 W.Tong        5903 W.Tong       
AP                 AP                 DOWN               DOWN               DOWN               5903 W.Tong        5903 W.Tong       
AP                 AP                 DOWN               DOWN               5903 W.Tong        5903 W.Tong        5903 W.Tong       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
AP                 AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
AP                 AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
5369 C.Tan/AP      AP                 AP                 DOWN               DOWN               Unscheduled        5965 J.Li         
AP                 AP                 DOWN               DOWN               DOWN               CHANGE/5965 J.Li   5965 J.Li         
AP                 AP                 DOWN               DOWN               Unscheduled        5965 J.Li          5965 J.Li         
BEAM   LINE 7-2  
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
93H6 E.Nisenboi/AP AP                 AP                 DOWN               DOWN               5535 S.Ying        5535 S.Ying       
AP                 AP                 DOWN               DOWN               DOWN               5535 S.Ying        5535 S.Ying       
AP                 AP                 DOWN               DOWN               5535 S.Ying        5535 S.Ying        5535 S.Ying       
BEAM   LINE 7-3  
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
5273 M.Abernath/AP AP                 AP                 DOWN               DOWN               4756 K.Haas        4756 K.Haas       
AP                 AP                 DOWN               DOWN               DOWN               4756 K.Haas        4756 K.Haas       
AP                 AP                 DOWN               DOWN               4756 K.Haas        4756 K.Haas        4756 K.Haas       
BEAM   LINE 9-3  
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
AP                 AP                 AP                 DOWN               DOWN               FACI               FACI              
AP                 AP                 FACI/DOWN          DOWN               DOWN               FACI               FACI              
AP                 AP                 DOWN               DOWN               FACI               FACI               FACI              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
AP                 AP                 AP                 DOWN               DOWN               FACI               5958 C.Tassone    
AP                 AP                 DOWN               DOWN               DOWN               Xray CHECKOUT/5958 5958 C.Tassone    
AP                 AP                 DOWN               DOWN               FACI               5958 C.Tassone     5958 C.Tassone    
BEAM   LINE 11-2 
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
4919 S.Minasian/AP AP                 AP                 DOWN               DOWN               5394 C.Dewey       FACI              
AP                 AP                 DOWN               DOWN               DOWN               5394 C.Dewey/FACI  FACI              
AP                 AP                 DOWN               DOWN               CHANGE/5394 C.Dewe FACI               FACI              
BEAM   LINE 11-3 
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
5691 S.Moffitt/AP  AP                 AP                 DOWN               DOWN               5724 E.Gomez       5724 E.Gomez      
AP                 AP                 DOWN               DOWN               DOWN               5724 E.Gomez       5724 E.Gomez      
AP                 AP                 DOWN               DOWN               5724 E.Gomez       5724 E.Gomez       5724 E.Gomez      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
AP                 AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
5583 J.Pena/AP     AP                 AP                 DOWN               DOWN               5735 A.Bhattacharj 5735 A.Bhattacharj
AP                 AP                 DOWN               DOWN               DOWN               5735 A.Bhattacharj 5735 A.Bhattacharj
AP                 AP                 DOWN               DOWN               5735 A.Bhattacharj 5735 A.Bhattacharj 5735 A.Bhattacharj
BEAM   LINE 15-2 
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
AP                 AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
AP                 AP                 DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
May 02, 2022       May 03, 2022       May 04, 2022       May 05, 2022       May 06, 2022       May 07, 2022       May 08, 2022      
COMM/AP            AP                 AP                 DOWN               DOWN               COMM               COMM              
AP                 AP                 COMM/DOWN          DOWN               DOWN               COMM               COMM              
AP                 AP                 DOWN               DOWN               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF May 09, 2022 
                                         
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
BEAM   LINE 1-5  
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
8091 C.Tassone     5443 G.Kashanchi   5443 G.Kashanchi   5443 G.Kashanchi   5529 C.Salamat     5529 C.Salamat     Unscheduled       
Xray CHECKOUT/5443 5443 G.Kashanchi   5443 G.Kashanchi   Xray CHECKOUT/5529 5529 C.Salamat     Unscheduled        Unscheduled       
5443 G.Kashanchi   5443 G.Kashanchi   5443 G.Kashanchi   5529 C.Salamat     5529 C.Salamat     Unscheduled        Unscheduled       
BEAM   LINE 2-1  
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
FACI               FACI               8095 K.Stone       8095 K.Stone       8095 K.Stone       93H0 K.Stone       93H0 K.Stone      
FACI               Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone       Xray CHECKOUT/93H0 93H0 K.Stone       93H0 K.Stone      
FACI               8095 K.Stone       8095 K.Stone       8095 K.Stone       93H0 K.Stone       93H0 K.Stone       93H0 K.Stone      
BEAM   LINE 2-2  
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
5903 W.Tong        90H4 Y.Yue         90H4 Y.Yue         Unscheduled        Unscheduled        5683 Z.Jiang       5683 Z.Jiang      
SMB CHECKOUT/90H4  90H4 Y.Yue         90H4 Y.Yue         Unscheduled        SMB CHECKOUT/5683  5683 Z.Jiang       5683 Z.Jiang      
90H4 Y.Yue         90H4 Y.Yue         Unscheduled        Unscheduled        5683 Z.Jiang       5683 Z.Jiang       5683 Z.Jiang      
BEAM   LINE 2-3  
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
6039 M.Kang        5735 A.Bhattacharj 5735 A.Bhattacharj 5535 S.Ying        5535 S.Ying        6066 A.Foster      6066 A.Foster     
CHANGE/5735 A.Bhat 5735 A.Bhattacharj CHANGE/5535 S.Ying 5535 S.Ying        CHANGE/6066 A.Fost 6066 A.Foster      6066 A.Foster     
5735 A.Bhattacharj 5735 A.Bhattacharj 5535 S.Ying        5535 S.Ying        6066 A.Foster      6066 A.Foster      6066 A.Foster     
BEAM   LINE 4-1  
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
5266 A.Uzun        5543 B.Gates       5543 B.Gates       5543 B.Gates       5543 B.Gates       6053 A.Bhan        6053 A.Bhan       
CHANGE/5543 B.Gate 5543 B.Gates       5543 B.Gates       5543 B.Gates       CHANGE/6053 A.Bhan 6053 A.Bhan        6053 A.Bhan       
5543 B.Gates       5543 B.Gates       5543 B.Gates       5543 B.Gates       6053 A.Bhan        6053 A.Bhan        6053 A.Bhan       
BEAM   LINE 4-2  
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
5904 C.Cooper      5968 A.Pena-Alcant 12A4 S.Pokhrel     12A4 S.Pokhrel     8238 S.Russi       8238 S.Russi       5983 S.Zhang      
CHANGE/5968 A.Pena CHANGE/12A4 S.Pokh 12A4 S.Pokhrel     CHANGE/8238 S.Russ 8238 S.Russi       CHANGE/5983 S.Zhan 5983 S.Zhang      
5968 A.Pena-Alcant 12A4 S.Pokhrel     12A4 S.Pokhrel     8238 S.Russi       8238 S.Russi       5983 S.Zhang       5983 S.Zhang      
BEAM   LINE 4-3  
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
5903 W.Tong        FACI               FACI               FACI               FACI               5903 W.Tong        5903 W.Tong       
CHANGE/5889 M.Kirk FACI               FACI               FACI               SMB CHECKOUT/5903  5903 W.Tong        5903 W.Tong       
FACI               FACI               FACI               FACI               5903 W.Tong        5903 W.Tong        5903 W.Tong       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
5965 J.Li          5902 G.Chen        5902 G.Chen        5902 G.Chen        5485 X.Milhet      5485 X.Milhet      8081 Y.Liu        
CHANGE/5902 G.Chen 5902 G.Chen        5902 G.Chen        CHANGE/5485 X.Milh 5485 X.Milhet      CHANGE/8081 Y.Liu  8081 Y.Liu        
5902 G.Chen        5902 G.Chen        5902 G.Chen        5485 X.Milhet      5485 X.Milhet      8081 Y.Liu         8081 Y.Liu        
BEAM   LINE 7-2  
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
5535 S.Ying        5914 C.Petersen    5914 C.Petersen    5914 C.Petersen    5914 C.Petersen    FACI               FACI              
CHANGE/5914 C.Pete 5914 C.Petersen    5914 C.Petersen    5914 C.Petersen    5914 C.Peters/FACI FACI               FACI              
5914 C.Petersen    5914 C.Petersen    5914 C.Petersen    5914 C.Petersen    FACI               FACI               FACI              
BEAM   LINE 7-3  
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
4756 K.Haas        4756 K.Haas        5889 M.Kirk        5889 M.Kirk        5889 M.Kirk        Unscheduled        Unscheduled       
4756 K.Haas        SMB CHECKOUT/5889  5889 M.Kirk        5889 M.Kirk        5889 M.Kirk        Unscheduled        Unscheduled       
4756 K.Haas        5889 M.Kirk        5889 M.Kirk        5889 M.Kirk        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
FACI               5955 M.Preefer     5955 M.Preefer     5896 J.Zamora Zele 5896 J.Zamora Zele Unscheduled        Unscheduled       
SMB CHECKOUT/5955  5955 M.Preefer     SMB CHECKOUT/5896  5896 J.Zamora Zele 5896 J.Zamora Zele Unscheduled        Unscheduled       
5955 M.Preefer     5955 M.Preefer     5896 J.Zamora Zele 5896 J.Zamora Zele Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
5958 C.Tassone     5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
CHANGE/5468 N.Calt 5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       Unscheduled       
5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       Unscheduled       
BEAM   LINE 11-2 
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
FACI               FACI               FACI               FACI               FACI               5835 Y.Qiao        5835 Y.Qiao       
FACI               FACI               FACI               FACI               SMB CHECKOUT/5835  5835 Y.Qiao        5835 Y.Qiao       
FACI               FACI               FACI               FACI               5835 Y.Qiao        5835 Y.Qiao        5835 Y.Qiao       
BEAM   LINE 11-3 
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
5724 E.Gomez       FACI               6006 Y.Wu          6006 Y.Wu          5983 S.Zhang       5473 T.Quill       5473 T.Quill      
5724 E.Gomez/FACI  Xray CHECKOUT/6006 6006 Y.Wu          Xray CHECKOUT/5983 Xray CHECKOUT/5473 5473 T.Quill       5473 T.Quill      
FACI               6006 Y.Wu          6006 Y.Wu          5983 S.Zhang       5473 T.Quill       5473 T.Quill       5473 T.Quill      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
5735 A.Bhattacharj 5894 M.Raven       5894 M.Raven       5894 M.Raven       6014 D.Fike        6014 D.Fike        6014 D.Fike       
CHANGE/5894 M.Rave 5894 M.Raven       5894 M.Raven       CHANGE/6014 D.Fike 6014 D.Fike        6014 D.Fike        6014 D.Fike       
5894 M.Raven       5894 M.Raven       5894 M.Raven       6014 D.Fike        6014 D.Fike        6014 D.Fike        6014 D.Fike       
BEAM   LINE 15-2 
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
May 09, 2022       May 10, 2022       May 11, 2022       May 12, 2022       May 13, 2022       May 14, 2022       May 15, 2022      
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF May 16, 2022 
                                         
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
BEAM   LINE 1-5  
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
AP                 AP                 AP                 FACI               5950 S.Bone        5950 S.Bone        5950 S.Bone       
AP                 AP                 FACI               Xray CHECKOUT/5950 5950 S.Bone        5950 S.Bone        5950 S.Bone       
AP                 AP                 FACI               5950 S.Bone        5950 S.Bone        5950 S.Bone        5950 S.Bone       
BEAM   LINE 2-1  
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
93H0 K.Stone/AP    AP                 AP                 FACI               5984 E.Corson      5984 E.Corson      5984 E.Corson     
AP                 AP                 FACI               Xray CHECKOUT/5984 5984 E.Corson      5984 E.Corson      5984 E.Corson     
AP                 AP                 FACI               5984 E.Corson      5984 E.Corson      5984 E.Corson      5984 E.Corson     
BEAM   LINE 2-2  
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
5683 Z.Jiang/AP    AP                 AP                 STUP               5902 G.Chen        5902 G.Chen        5902 G.Chen       
AP                 AP                 STUP               SMB CHECKOUT/5902  5902 G.Chen        5902 G.Chen        5902 G.Chen       
AP                 AP                 STUP               5902 G.Chen        5902 G.Chen        5902 G.Chen        5902 G.Chen       
BEAM   LINE 2-3  
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
6066 A.Foster/AP   AP                 AP                 11H3 Q.Zhao        11H3 Q.Zhao        8067 S.Webb        8067 S.Webb       
AP                 AP                 CHANGE/11H3 Q.Zhao 11H3 Q.Zhao        CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb       
AP                 AP                 11H3 Q.Zhao        11H3 Q.Zhao        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 4-1  
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
6053 A.Bhan/AP     AP                 AP                 93H5 J.Regalbuto   93H5 J.Regalbuto   Unscheduled        Unscheduled       
AP                 AP                 CHANGE/93H5 J.Rega 93H5 J.Regalbuto   93H5 J.Regalbuto   Unscheduled        Unscheduled       
AP                 AP                 93H5 J.Regalbuto   93H5 J.Regalbuto   Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
5983 S.Zhang/AP    AP                 AP                 8877 T.Matsui      5558 A.Marras      5558 A.Marras      5558 A.Marras     
AP                 AP                 CHANGE/8877 T.Mats CHANGE/5558 A.Marr 5558 A.Marras      5558 A.Marras      CHANGE/8877 T.Mats
AP                 AP                 8877 T.Matsui      5558 A.Marras      5558 A.Marras      5558 A.Marras      8877 T.Matsui     
BEAM   LINE 4-3  
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
5903 W.Tong/AP     AP                 AP                 5976 S.Bent        5976 S.Bent        6069 C.Van Stappen 6069 C.Van Stappen
AP                 AP                 SMB CHECKOUT/5976  5976 S.Bent        SMB CHECKOUT/6069  6069 C.Van Stappen 6069 C.Van Stappen
AP                 AP                 5976 S.Bent        5976 S.Bent        6069 C.Van Stappen 6069 C.Van Stappen 6069 C.Van Stappen
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
AP                 AP                 AP                 6048 Y.Chen        6048 Y.Chen        Unscheduled        FACI              
AP                 AP                 CHANGE/6048 Y.Chen 6048 Y.Chen        6048 Y.Chen        FACI               FACI              
AP                 AP                 6048 Y.Chen        6048 Y.Chen        Unscheduled        FACI               FACI              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
8081 Y.Liu/AP      AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
FACI/AP            AP                 AP                 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
AP                 AP                 AP                 5935 R.Szilagyi    5935 R.Szilagyi    5665 T.Stemmler    5665 T.Stemmler   
AP                 AP                 SMB CHECKOUT/5935  5935 R.Szilagyi    SMB CHECKOUT/5665  5665 T.Stemmler    5665 T.Stemmler   
AP                 AP                 5935 R.Szilagyi    5935 R.Szilagyi    5665 T.Stemmler    5665 T.Stemmler    5665 T.Stemmler   
BEAM   LINE 9-3  
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
AP                 AP                 AP                 6069 C.Van Stappen 6069 C.Van Stappen 5220 W.Drisdell    5220 W.Drisdell   
AP                 AP                 SMB CHECKOUT/6069  6069 C.Van Stappen SMB CHECKOUT/5220  5220 W.Drisdell    5220 W.Drisdell   
AP                 AP                 6069 C.Van Stappen 6069 C.Van Stappen 5220 W.Drisdell    5220 W.Drisdell    5220 W.Drisdell   
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
AP                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
5835 Y.Qiao/AP     AP                 AP                 5993 K.Kovnir      5993 K.Kovnir      5839 B.Saini       5839 B.Saini      
AP                 AP                 SMB CHECKOUT/5993  5993 K.Kovnir      SMB CHECKOUT/5839  5839 B.Saini       5839 B.Saini      
AP                 AP                 5993 K.Kovnir      5993 K.Kovnir      5839 B.Saini       5839 B.Saini       5839 B.Saini      
BEAM   LINE 11-3 
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
5473 T.Quill/AP    AP                 AP                 FACI               5903 W.Tong        5903 W.Tong        5903 W.Tong       
AP                 AP                 FACI               Xray CHECKOUT/5903 5903 W.Tong        5903 W.Tong        5903 W.Tong       
AP                 AP                 FACI               5903 W.Tong        5903 W.Tong        5903 W.Tong        5903 W.Tong       
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
AP                 AP                 AP                 5575 J.Basinski    5575 J.Basinski    5093 M.Kelly       5093 M.Kelly      
AP                 AP                 SMB CHECKOUT/5575  5575 J.Basinski    SMB CHECKOUT/5093  5093 M.Kelly       5093 M.Kelly      
AP                 AP                 5575 J.Basinski    5575 J.Basinski    5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
6014 D.Fike/AP     AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
AP                 AP                 AP                 STUP               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
May 16, 2022       May 17, 2022       May 18, 2022       May 19, 2022       May 20, 2022       May 21, 2022       May 22, 2022      
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF May 23, 2022 
                                         
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
BEAM   LINE 1-5  
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
5950 S.Bone        8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     FACI               5833 E.Abdo        5833 E.Abdo       
Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     FACI               Xray CHECKOUT/5833 5833 E.Abdo        5833 E.Abdo       
8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     FACI               5833 E.Abdo        5833 E.Abdo        5833 E.Abdo       
BEAM   LINE 2-1  
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
5984 E.Corson      Xray CHECKOUT/5839 5839 B.Saini       5839 B.Saini       FACI               93H0 K.Stone       93H0 K.Stone      
5984 E.Corson/FACI 5839 B.Saini       5839 B.Saini       5839 B.Saini/FACI  Xray CHECKOUT/93H0 93H0 K.Stone       93H0 K.Stone      
FACI               5839 B.Saini       5839 B.Saini       FACI               93H0 K.Stone       93H0 K.Stone       93H0 K.Stone      
BEAM   LINE 2-2  
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
5902 G.Chen        5723 G.Chen        6132 E.Patheria    6132 E.Patheria    6132 E.Patheria    5746 Z.Cai         5746 Z.Cai        
CHANGE/5723 G.Chen SMB CHECKOUT/6132  6132 E.Patheria    6132 E.Patheria    SMB CHECKOUT/5746  5746 Z.Cai         5746 Z.Cai        
5723 G.Chen        6132 E.Patheria    6132 E.Patheria    6132 E.Patheria    5746 Z.Cai         5746 Z.Cai         5746 Z.Cai        
BEAM   LINE 2-3  
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
8067 S.Webb        5578 A.Barker      5578 A.Barker      5578 A.Barker      6080 E.Bailey      6080 E.Bailey      6080 E.Bailey     
CHANGE/5578 A.Bark 5578 A.Barker      5578 A.Barker      CHANGE/6080 E.Bail 6080 E.Bailey      6080 E.Bailey      6080 E.Bailey     
5578 A.Barker      5578 A.Barker      5578 A.Barker      6080 E.Bailey      6080 E.Bailey      6080 E.Bailey      6080 E.Bailey     
BEAM   LINE 4-1  
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
Unscheduled        FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-2  
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
8877 T.Matsui      5119 G.Wong        5119 G.Wong        5119 G.Wong        5504 Y.Srinivasan  5816 A.Ayzner      5816 A.Ayzner     
CHANGE/5119 G.Wong 5119 G.Wong        5119 G.Wong        CHANGE/5504 Y.Srin CHANGE/5816 A.Ayzn 5816 A.Ayzner      5816 A.Ayzner     
5119 G.Wong        5119 G.Wong        5119 G.Wong        5504 Y.Srinivasan  5816 A.Ayzner      5816 A.Ayzner      5816 A.Ayzner     
BEAM   LINE 4-3  
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
6069 C.Van Stappen 6068 A.Ghosh       6068 A.Ghosh       6068 A.Ghosh       5963 J.Shearer     5963 J.Shearer     5963 J.Shearer    
SMB CHECKOUT/6068  6068 A.Ghosh       6068 A.Ghosh       SMB CHECKOUT/5963  5963 J.Shearer     5963 J.Shearer     5963 J.Shearer    
6068 A.Ghosh       6068 A.Ghosh       6068 A.Ghosh       5963 J.Shearer     5963 J.Shearer     5963 J.Shearer     5963 J.Shearer    
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
FACI               5813 M.Vejar       6121 K.Hanson      6121 K.Hanson      6121 K.Hanson      Unscheduled        Unscheduled       
CHANGE/5813 M.Veja CHANGE/6121 K.Hans 6121 K.Hanson      6121 K.Hanson      6121 K.Hanson      Unscheduled        Unscheduled       
5813 M.Vejar       6121 K.Hanson      6121 K.Hanson      6121 K.Hanson      Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        Unscheduled        Unscheduled        Unscheduled       
8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        Unscheduled        Unscheduled        Unscheduled       
8067 S.Webb        8067 S.Webb        8067 S.Webb        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-3  
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
5665 T.Stemmler    5665 T.Stemmler    5428 A.Heyer       5428 A.Heyer       5963 J.Shearer     5963 J.Shearer     5963 J.Shearer    
5665 T.Stemmler    SMB CHECKOUT/5428  5428 A.Heyer       SMB CHECKOUT/5963  5963 J.Shearer     5963 J.Shearer     5963 J.Shearer    
5665 T.Stemmler    5428 A.Heyer       5428 A.Heyer       5963 J.Shearer     5963 J.Shearer     5963 J.Shearer     5963 J.Shearer    
BEAM   LINE 9-3  
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
5220 W.Drisdell    6074 J.Azadmanesh  6074 J.Azadmanesh  5393 C.Dewey       5393 C.Dewey       5694 J.Penner-Hahn 5694 J.Penner-Hahn
SMB CHECKOUT/6074  6074 J.Azadmanesh  SMB CHECKOUT/5393  5393 C.Dewey       SMB CHECKOUT/5694  5694 J.Penner-Hahn 5694 J.Penner-Hahn
6074 J.Azadmanesh  6074 J.Azadmanesh  5393 C.Dewey       5393 C.Dewey       5694 J.Penner-Hahn 5694 J.Penner-Hahn 5694 J.Penner-Hahn
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
5839 B.Saini       5976 S.Bent        5976 S.Bent        5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn
SMB CHECKOUT/5976  5976 S.Bent        SMB CHECKOUT/5307  5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn
5976 S.Bent        5976 S.Bent        5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn 5307 J.Penner-Hahn
BEAM   LINE 11-3 
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
5903 W.Tong        4814 E.Plunkett    4814 E.Plunkett    4814 E.Plunkett    5837 K.Lim         5837 K.Lim         5837 K.Lim        
Xray CHECKOUT/4814 4814 E.Plunkett    4814 E.Plunkett    Xray CHECKOUT/5837 5837 K.Lim         5837 K.Lim         5837 K.Lim        
4814 E.Plunkett    4814 E.Plunkett    4814 E.Plunkett    5837 K.Lim         5837 K.Lim         5837 K.Lim         5837 K.Lim        
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
5093 M.Kelly       6059 D.Broere      6059 D.Broere      6059 D.Broere      6101 M.Barnes      6101 M.Barnes      6101 M.Barnes     
SMB CHECKOUT/6059  6059 D.Broere      6059 D.Broere      SMB CHECKOUT/6101  6101 M.Barnes      6101 M.Barnes      6101 M.Barnes     
6059 D.Broere      6059 D.Broere      6059 D.Broere      6101 M.Barnes      6101 M.Barnes      6101 M.Barnes      6101 M.Barnes     
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
May 23, 2022       May 24, 2022       May 25, 2022       May 26, 2022       May 27, 2022       May 28, 2022       May 29, 2022      
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF May 30, 2022 
                                         
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
BEAM   LINE 1-5  
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
5833 E.Abdo/DOWN   DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
93H0 K.Stone/DOWN  DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
5746 Z.Cai/DOWN    DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
6080 E.Bailey/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
FACI/DOWN          DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
5816 A.Ayzner/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
5963 J.Sheare/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
5963 J.Sheare/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
5694 J.Penner/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
5307 J.Penner/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
5837 K.Lim/DOWN    DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
6101 M.Barnes/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
May 30, 2022       May 31, 2022       Jun. 01, 2022      Jun. 02, 2022      Jun. 03, 2022      Jun. 04, 2022      Jun. 05, 2022     
COMM/DOWN          DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Jun. 06, 2022
                                         
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
BEAM   LINE 1-5  
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 FACI               FACI               5615 J.Ravichandra 5615 J.Ravichandra
AP                 AP                 FACI               FACI               Xray CHECKOUT/5615 5615 J.Ravichandra 5615 J.Ravichandra
AP                 AP                 FACI               FACI               5615 J.Ravichandra 5615 J.Ravichandra 5615 J.Ravichandra
BEAM   LINE 2-2  
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-3  
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 8060 V.Noel        8060 V.Noel        11J0 S.Bone        11J0 S.Bone       
AP                 AP                 CHANGE/8060 V.Noel 8060 V.Noel        CHANGE/11J0 S.Bone 11J0 S.Bone        CHANGE/8067 S.Webb
AP                 AP                 8060 V.Noel        8060 V.Noel        11J0 S.Bone        11J0 S.Bone        8067 S.Webb       
BEAM   LINE 4-1  
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 8877 T.Matsui      5913 S.Sukenik     5913 S.Sukenik     6134 K.Meador     
AP                 AP                 CHANGE/8877 T.Mats CHANGE/5913 S.Suke 5913 S.Sukenik     CHANGE/6134 K.Mead 6134 K.Meador     
AP                 AP                 8877 T.Matsui      5913 S.Sukenik     5913 S.Sukenik     6134 K.Meador      6134 K.Meador     
BEAM   LINE 4-3  
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 8095 K.Stone       8095 K.Stone       5999 J.Guo         5999 J.Guo        
AP                 AP                 SMB CHECKOUT/8095  8095 K.Stone       SMB CHECKOUT/5999  5999 J.Guo         5999 J.Guo        
AP                 AP                 8095 K.Stone       8095 K.Stone       5999 J.Guo         5999 J.Guo         5999 J.Guo        
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 5632 M.Doeff       5632 M.Doeff       5632 M.Doeff       8881 Y.Liu        
AP                 AP                 CHANGE/5632 M.Doef 5632 M.Doeff       5632 M.Doeff       CHANGE/8881 Y.Liu  8881 Y.Liu        
AP                 AP                 5632 M.Doeff       5632 M.Doeff       5632 M.Doeff       8881 Y.Liu         8881 Y.Liu        
BEAM   LINE 7-2  
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 FACI               5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
AP                 AP                 FACI               CHANGE/5093 M.Kell 5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
AP                 AP                 FACI               5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 7-3  
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 5910 E.Pierce      5910 E.Pierce      6035 I.Bogacz      6035 I.Bogacz     
AP                 AP                 SMB CHECKOUT/5910  5910 E.Pierce      SMB CHECKOUT/6035  6035 I.Bogacz      6035 I.Bogacz     
AP                 AP                 5910 E.Pierce      5910 E.Pierce      6035 I.Bogacz      6035 I.Bogacz      6035 I.Bogacz     
BEAM   LINE 9-3  
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 6001 C.Zhou        6001 C.Zhou        6001 C.Zhou        6002 B.Werghi     
AP                 AP                 CHANGE/6001 C.Zhou 6001 C.Zhou        6001 C.Zhou        CHECKOUT/6002      6002 B.Werghi     
AP                 AP                 6001 C.Zhou        6001 C.Zhou        6001 C.Zhou        6002 B.Werghi      6002 B.Werghi     
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 5328 R.Abergel     5328 R.Abergel     Unscheduled        Unscheduled       
AP                 AP                 SMB CHECKOUT/5328  5328 R.Abergel     5328 R.Abergel     Unscheduled        Unscheduled       
AP                 AP                 5328 R.Abergel     5328 R.Abergel     Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 FACI               5683 Z.Jiang       5683 Z.Jiang       5683 Z.Jiang      
AP                 AP                 FACI               Xray CHECKOUT/5683 5683 Z.Jiang       5683 Z.Jiang       5683 Z.Jiang      
AP                 AP                 FACI               5683 Z.Jiang       5683 Z.Jiang       5683 Z.Jiang       5683 Z.Jiang      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 FACI               5853 E.Herndon     5853 E.Herndon     5853 E.Herndon    
AP                 AP                 FACI               CHANGE/5853 E.Hern 5853 E.Herndon     5853 E.Herndon     5853 E.Herndon    
AP                 AP                 FACI               5853 E.Herndon     5853 E.Herndon     5853 E.Herndon     5853 E.Herndon    
BEAM   LINE 15-2 
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 STUP               STUP               Unscheduled        Unscheduled       
AP                 AP                 STUP               STUP               STUP               Unscheduled        Unscheduled       
AP                 AP                 STUP               STUP               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Jun. 06, 2022      Jun. 07, 2022      Jun. 08, 2022      Jun. 09, 2022      Jun. 10, 2022      Jun. 11, 2022      Jun. 12, 2022     
DOWN/AP            AP                 AP                 5825 S.Patel       5825 S.Patel       5825 S.Patel       5825 S.Patel      
AP                 AP                 Xray CHECKOUT/5825 5825 S.Patel       5825 S.Patel       5825 S.Patel       5825 S.Patel      
AP                 AP                 5825 S.Patel       5825 S.Patel       5825 S.Patel       5825 S.Patel       5825 S.Patel      

Back to Table of Contents

WEEK OF Jun. 13, 2022
                                         
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
BEAM   LINE 1-5  
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
FACI               FACI               FACI               5615 J.Ravichandra 5615 J.Ravichandra 6024 A.Maurya      6024 A.Maurya     
FACI               FACI               Xray CHECKOUT/5615 5615 J.Ravichandra Xray CHECKOUT/6024 6024 A.Maurya      6024 A.Maurya     
FACI               FACI               5615 J.Ravichandra 5615 J.Ravichandra 6024 A.Maurya      6024 A.Maurya      6024 A.Maurya     
BEAM   LINE 2-1  
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
5615 J.Ravichandra FACI               5939 E.Allan-Cole  5939 E.Allan-Cole  6009 M.Dasog       6009 M.Dasog       6009 M.Dasog      
5615 J.Ravich/FACI Xray CHECKOUT/5939 5939 E.Allan-Cole  Xray CHECKOUT/6009 6009 M.Dasog       6009 M.Dasog       6009 M.Dasog      
FACI               5939 E.Allan-Cole  5939 E.Allan-Cole  6009 M.Dasog       6009 M.Dasog       6009 M.Dasog       6009 M.Dasog      
BEAM   LINE 2-2  
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
FACI               6038 S.Conradson   6038 S.Conradson   6038 S.Conradson   Unscheduled        5965 J.Li          5965 J.Li         
Xray CHECKOUT/6038 6038 S.Conradson   6038 S.Conradson   6038 S.Conradson   SMB CHECKOUT/5965  5965 J.Li          5965 J.Li         
6038 S.Conradson   6038 S.Conradson   6038 S.Conradson   Unscheduled        5965 J.Li          5965 J.Li          5965 J.Li         
BEAM   LINE 2-3  
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
8067 S.Webb        8067 S.Webb        11H6 V.Sagi        11H6 V.Sagi        5942 R.Tinnacher   5942 R.Tinnacher   5942 R.Tinnacher  
8067 S.Webb        CHANGE/11H6 V.Sagi 11H6 V.Sagi        CHANGE/5942 R.Tinn 5942 R.Tinnacher   5942 R.Tinnacher   5942 R.Tinnacher  
8067 S.Webb        11H6 V.Sagi        11H6 V.Sagi        5942 R.Tinnacher   5942 R.Tinnacher   5942 R.Tinnacher   5942 R.Tinnacher  
BEAM   LINE 4-1  
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
Unscheduled        6114 S.Veeranmaril 6114 S.Veeranmaril 5887 S.Welborn     5887 S.Welborn     6047 J.Catalano    6047 J.Catalano   
SMB CHECKOUT/6114  6114 S.Veeranmaril SMB CHECKOUT/5887  5887 S.Welborn     SMB CHECKOUT/6047  6047 J.Catalano    6047 J.Catalano   
6114 S.Veeranmaril 6114 S.Veeranmaril 5887 S.Welborn     5887 S.Welborn     6047 J.Catalano    6047 J.Catalano    6047 J.Catalano   
BEAM   LINE 4-2  
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
6134 K.Meador      8877 T.Matsui      6057 D.Mai         8847 T.Weiss       5928 T.Szyperski   5928 T.Szyperski   5729 C.Cheng      
CHANGE/8877 T.Mats CHANGE/6057 D.Mai  CHANGE/8847 T.Weis CHANGE/5928 T.Szyp 5928 T.Szyperski   CHANGE/5729 C.Chen 5729 C.Cheng      
8877 T.Matsui      6057 D.Mai         8847 T.Weiss       5928 T.Szyperski   5928 T.Szyperski   5729 C.Cheng       5729 C.Cheng      
BEAM   LINE 4-3  
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
5999 J.Guo         FACI               FACI               5887 S.Welborn     5887 S.Welborn     5151 H.La Pierre   5151 H.La Pierre  
5999 J.Guo/FACI    FACI               SMB CHECKOUT/5887  5887 S.Welborn     SMB CHECKOUT/5151  5151 H.La Pierre   5151 H.La Pierre  
FACI               FACI               5887 S.Welborn     5887 S.Welborn     5151 H.La Pierre   5151 H.La Pierre   5151 H.La Pierre  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
8881 Y.Liu         8881 Y.Liu         5697 Y.Ren         5697 Y.Ren         5957 P.Mukherjee   5957 P.Mukherjee   5957 P.Mukherjee  
8881 Y.Liu         CHANGE/5697 Y.Ren  5697 Y.Ren         CHANGE/5957 P.Mukh 5957 P.Mukherjee   5957 P.Mukherjee   5957 P.Mukherjee  
8881 Y.Liu         5697 Y.Ren         5697 Y.Ren         5957 P.Mukherjee   5957 P.Mukherjee   5957 P.Mukherjee   5957 P.Mukherjee  
BEAM   LINE 7-2  
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       8019 J.Richardson  6089 J.Chorover    6089 J.Chorover   
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       CHANGE/8019 J.Rich CHANGE/6089 J.Chor 6089 J.Chorover    6089 J.Chorover   
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       8019 J.Richardson  6089 J.Chorover    6089 J.Chorover    6089 J.Chorover   
BEAM   LINE 7-3  
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
6035 I.Bogacz      5156 L.Li          5156 L.Li          6123 H.La Pierre   6123 H.La Pierre   5113 S.Bachas-Daun 5113 S.Bachas-Daun
SMB CHECKOUT/5156  5156 L.Li          SMB CHECKOUT/6123  6123 H.La Pierre   SMB CHECKOUT/5113  5113 S.Bachas-Daun 5113 S.Bachas-Daun
5156 L.Li          5156 L.Li          6123 H.La Pierre   6123 H.La Pierre   5113 S.Bachas-Daun 5113 S.Bachas-Daun 5113 S.Bachas-Daun
BEAM   LINE 9-3  
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
6002 B.Werghi      6107 K.Goulas      6107 K.Goulas      6107 K.Goulas      5088 L.Greenlee    5088 L.Greenlee    5499 A.Holewinski 
CHECKOUT/6107      6107 K.Goulas      6107 K.Goulas      SMB CHECKOUT/5088  5088 L.Greenlee    CHECKOUT/5499      5499 A.Holewinski 
6107 K.Goulas      6107 K.Goulas      6107 K.Goulas      5088 L.Greenlee    5088 L.Greenlee    5499 A.Holewinski  5499 A.Holewinski 
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
Unscheduled        FACI               5653 W.Chiu        5653 W.Chiu        5653 W.Chiu        6086 R.Abergel     6086 R.Abergel    
FACI               SMB CHECKOUT/5653  5653 W.Chiu        5653 W.Chiu        5653 W.Chiu        6086 R.Abergel     CHANGE/4919 S.Mina
FACI               5653 W.Chiu        5653 W.Chiu        5653 W.Chiu        CHANGE/6086 R.Aber 6086 R.Abergel     4919 S.Minasian   
BEAM   LINE 11-3 
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
5683 Z.Jiang       FACI               FACI               FACI               90H4 Y.Yue         6058 P.Zhang       6058 P.Zhang      
5683 Z.Jiang/FACI  FACI               FACI               Xray CHECKOUT/90H4 Xray CHECKOUT/6058 6058 P.Zhang       6058 P.Zhang      
FACI               FACI               FACI               90H4 Y.Yue         6058 P.Zhang       6058 P.Zhang       6058 P.Zhang      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
5853 E.Herndon     8090 J.Nelson Weke 8090 J.Nelson Weke Unscheduled        5714 J.Richardson  5714 J.Richardson  5714 J.Richardson 
CHANGE/8090 J.Nels 8090 J.Nelson Weke 8090 J.Nelson Weke CHANGE/5714 J.Rich 5714 J.Richardson  5714 J.Richardson  5714 J.Richardson 
8090 J.Nelson Weke 8090 J.Nelson Weke Unscheduled        5714 J.Richardson  5714 J.Richardson  5714 J.Richardson  5714 J.Richardson 
BEAM   LINE 15-2 
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
Unscheduled        STUP               Unscheduled        Unscheduled        Unscheduled        STUP               Unscheduled       
STUP               STUP               Unscheduled        Unscheduled        STUP               STUP               Unscheduled       
STUP               Unscheduled        Unscheduled        Unscheduled        STUP               Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Jun. 13, 2022      Jun. 14, 2022      Jun. 15, 2022      Jun. 16, 2022      Jun. 17, 2022      Jun. 18, 2022      Jun. 19, 2022     
5825 S.Patel       COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jun. 20, 2022
                                         
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
BEAM   LINE 1-5  
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
6024 A.Maurya      FACI               6006 Y.Wu          FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
6024 A.Maurya/FACI Xray CHECKOUT/6006 6006 Y.Wu/FACI     Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
FACI               6006 Y.Wu          FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 2-1  
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
6009 M.Dasog       FACI               5842 J.Lentz       5842 J.Lentz       FACI               93H0 K.Stone       93H0 K.Stone      
6009 M.Dasog/FACI  Xray CHECKOUT/5842 5842 J.Lentz       5842 J.Lentz/FACI  Xray CHECKOUT/93H0 93H0 K.Stone       93H0 K.Stone      
FACI               5842 J.Lentz       5842 J.Lentz       FACI               93H0 K.Stone       93H0 K.Stone       93H0 K.Stone      
BEAM   LINE 2-2  
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
5965 J.Li          5965 J.Li          5965 J.Li          5936 J.Li          5936 J.Li          5930 G.Busse       5930 G.Busse      
5965 J.Li          5965 J.Li          SMB CHECKOUT/5936  5936 J.Li          SMB CHECKOUT/5930  5930 G.Busse       5930 G.Busse      
5965 J.Li          5965 J.Li          5936 J.Li          5936 J.Li          5930 G.Busse       5930 G.Busse       5930 G.Busse      
BEAM   LINE 2-3  
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
5942 R.Tinnacher   8067 S.Webb        8233 W.Fischer     8233 W.Fischer     8233 W.Fischer     5703 R.Bell        5703 R.Bell       
CHANGE/8067 S.Webb CHANGE/8233 W.Fisc 8233 W.Fischer     8233 W.Fischer     CHANGE/5703 R.Bell 5703 R.Bell        5703 R.Bell       
8067 S.Webb        8233 W.Fischer     8233 W.Fischer     8233 W.Fischer     5703 R.Bell        5703 R.Bell        5703 R.Bell       
BEAM   LINE 4-1  
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
6047 J.Catalano    5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5472 P.O'Day       5472 P.O'Day       5472 P.O'Day      
SMB CHECKOUT/5508  5508 A.van Veelen  5508 A.van Veelen  SMB CHECKOUT/5472  5472 P.O'Day       5472 P.O'Day       5472 P.O'Day      
5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5472 P.O'Day       5472 P.O'Day       5472 P.O'Day       5472 P.O'Day      
BEAM   LINE 4-2  
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
5729 C.Cheng       5975 A.Levin       6006 Y.Wu          6006 Y.Wu          8877 T.Matsui      5822 T.Choi        5822 T.Choi       
CHANGE/5975 A.Levi CHANGE/6006 Y.Wu   6006 Y.Wu          CHANGE/8877 T.Mats CHANGE/5822 T.Choi 5822 T.Choi        5822 T.Choi       
5975 A.Levin       6006 Y.Wu          6006 Y.Wu          8877 T.Matsui      5822 T.Choi        5822 T.Choi        5822 T.Choi       
BEAM   LINE 4-3  
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
5151 H.La Pierre   5639 J.Catalano    5639 J.Catalano    5831 W.Fu          5831 W.Fu          5858 O.Duckworth   5858 O.Duckworth  
SMB CHECKOUT/5639  5639 J.Catalano    SMB CHECKOUT/5831  5831 W.Fu          SMB CHECKOUT/5858  5858 O.Duckworth   5858 O.Duckworth  
5639 J.Catalano    5639 J.Catalano    5831 W.Fu          5831 W.Fu          5858 O.Duckworth   5858 O.Duckworth   5858 O.Duckworth  
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
5957 P.Mukherjee   5887 S.Welborn     5887 S.Welborn     5887 S.Welborn     6084 J.Mazzetti    6084 J.Mazzetti    6084 J.Mazzetti   
CHANGE/5887 S.Welb 5887 S.Welborn     5887 S.Welborn     CHANGE/6084 J.Mazz 6084 J.Mazzetti    6084 J.Mazzetti    6084 J.Mazzetti   
5887 S.Welborn     5887 S.Welborn     5887 S.Welborn     6084 J.Mazzetti    6084 J.Mazzetti    6084 J.Mazzetti    6084 J.Mazzetti   
BEAM   LINE 7-2  
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
6089 J.Chorover    6089 J.Chorover    8233 W.Fischer     8233 W.Fischer     8233 W.Fischer     Unscheduled        5914 C.Petersen   
6089 J.Chorover    CHANGE/8233 W.Fisc 8233 W.Fischer     8233 W.Fischer     8233 W.Fischer     CHANGE/5914 C.Pete 5914 C.Petersen   
6089 J.Chorover    8233 W.Fischer     8233 W.Fischer     8233 W.Fischer     Unscheduled        5914 C.Petersen    Unscheduled       
BEAM   LINE 7-3  
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
5113 S.Bachas-Daun FACI               FACI               FACI               FACI               FACI               FACI              
5113 S.Bachas/FACI FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 9-3  
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
5499 A.Holewinski  5499 A.Holewinski  5545 C.Roberts     5545 C.Roberts     5545 C.Roberts     5824 K.Abdul-Aziz  5824 K.Abdul-Aziz 
5499 A.Holewinski  CHANGE/5545 C.Robe 5545 C.Roberts     5545 C.Roberts     CHANGE/5824 K.Abdu 5824 K.Abdul-Aziz  5824 K.Abdul-Aziz 
5499 A.Holewinski  5545 C.Roberts     5545 C.Roberts     5545 C.Roberts     5824 K.Abdul-Aziz  5824 K.Abdul-Aziz  5824 K.Abdul-Aziz 
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
4919 S.Minasian    5333 S.Minasian    5333 S.Minasian    5672 P.Zhang       Unscheduled        5858 O.Duckworth   5858 O.Duckworth  
CHANGE/5333 S.Mina 5333 S.Minasian    SMB CHECKOUT/5672  5672 P.Zhang       SMB CHECKOUT/5858  5858 O.Duckworth   5858 O.Duckworth  
5333 S.Minasian    5333 S.Minasian    5672 P.Zhang       Unscheduled        5858 O.Duckworth   5858 O.Duckworth   5858 O.Duckworth  
BEAM   LINE 11-3 
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
6058 P.Zhang       5231 P.Thornton    6110 N.Leick       6110 N.Leick       6110 N.Leick       5562 D.Robertson   5562 D.Robertson  
Xray CHECKOUT/5231 Xray CHECKOUT/6110 6110 N.Leick       6110 N.Leick       Xray CHECKOUT/5562 5562 D.Robertson   5562 D.Robertson  
5231 P.Thornton    6110 N.Leick       6110 N.Leick       6110 N.Leick       5562 D.Robertson   5562 D.Robertson   5562 D.Robertson  
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
5714 J.Richardson  FACI               8233 W.Fischer     8233 W.Fischer     8233 W.Fischer     6089 J.Chorover    6089 J.Chorover   
5714 J.Richar/FACI CHANGE/8233 W.Fisc 8233 W.Fischer     8233 W.Fischer     CHANGE/6089 J.Chor 6089 J.Chorover    6089 J.Chorover   
FACI               8233 W.Fischer     8233 W.Fischer     8233 W.Fischer     6089 J.Chorover    6089 J.Chorover    6089 J.Chorover   
BEAM   LINE 15-2 
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
Unscheduled        Unscheduled        Unscheduled        STUP               Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        STUP               STUP               Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Jun. 20, 2022      Jun. 21, 2022      Jun. 22, 2022      Jun. 23, 2022      Jun. 24, 2022      Jun. 25, 2022      Jun. 26, 2022     
COMM               8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      

Back to Table of Contents

WEEK OF Jun. 27, 2022
                                         
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
BEAM   LINE 1-5  
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
9705 J.LiSA/AP     AP                 AP                 5231 P.Thornton    FACI               FACI               FACI              
AP                 AP                 Xray CHECKOUT/5231 5231 P.Thornt/FACI FACI               FACI               FACI              
AP                 AP                 5231 P.Thornton    FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
93H0 K.Stone/AP    AP                 AP                 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
AP                 AP                 Xray CHECKOUT/8010 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
AP                 AP                 8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange     8010 N.Strange    
BEAM   LINE 2-2  
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
5930 G.Busse/AP    AP                 AP                 5958 C.Tassone     5958 C.Tassone     5958 C.Tassone     5958 C.Tassone    
AP                 AP                 SMB CHECKOUT/5958  5958 C.Tassone     5958 C.Tassone     5958 C.Tassone     5958 C.Tassone    
AP                 AP                 5958 C.Tassone     5958 C.Tassone     5958 C.Tassone     5958 C.Tassone     5958 C.Tassone    
BEAM   LINE 2-3  
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
5703 R.Bell/AP     AP                 AP                 6089 J.Chorover    6089 J.Chorover    5093 M.Kelly       5093 M.Kelly      
AP                 AP                 CHANGE/6089 J.Chor 6089 J.Chorover    CHANGE/5093 M.Kell 5093 M.Kelly       5093 M.Kelly      
AP                 AP                 6089 J.Chorover    6089 J.Chorover    5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 4-1  
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
5472 P.O'Day/AP    AP                 AP                 6113 V.Noel        6113 V.Noel        5743 M.Zhu         5743 M.Zhu        
AP                 AP                 SMB CHECKOUT/6113  6113 V.Noel        SMB CHECKOUT/5743  5743 M.Zhu         5743 M.Zhu        
AP                 AP                 6113 V.Noel        6113 V.Noel        5743 M.Zhu         5743 M.Zhu         5743 M.Zhu        
BEAM   LINE 4-2  
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
5822 T.Choi/AP     AP                 AP                 8877 T.Matsui      5950 S.Bone        5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 CHANGE/8877 T.Mats CHANGE/5950 S.Bone CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 8877 T.Matsui      5950 S.Bone        5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
5858 O.Duckwort/AP AP                 AP                 5595 F.Bridges     5595 F.Bridges     5707 G.George      5707 G.George     
AP                 AP                 SMB CHECKOUT/5595  5595 F.Bridges     SMB CHECKOUT/5707  5707 G.George      5707 G.George     
AP                 AP                 5595 F.Bridges     5595 F.Bridges     5707 G.George      5707 G.George      5707 G.George     
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
6084 J.Mazzetti/AP AP                 AP                 5823 H.Gao         5823 H.Gao         5749 L.Carnevale   5749 L.Carnevale  
AP                 AP                 CHANGE/5823 H.Gao  5823 H.Gao         CHANGE/5749 L.Carn 5749 L.Carnevale   5749 L.Carnevale  
AP                 AP                 5823 H.Gao         5823 H.Gao         5749 L.Carnevale   5749 L.Carnevale   5749 L.Carnevale  
BEAM   LINE 7-2  
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
AP                 AP                 AP                 6095 L.Paulus      6095 L.Paulus      6095 L.Paulus      6095 L.Paulus     
AP                 AP                 CHANGE/6095 L.Paul 6095 L.Paulus      6095 L.Paulus      6095 L.Paulus      6095 L.Paulus     
AP                 AP                 6095 L.Paulus      6095 L.Paulus      6095 L.Paulus      6095 L.Paulus      6095 L.Paulus     
BEAM   LINE 7-3  
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
FACI/AP            AP                 AP                 6000 G.George      6000 G.George      6000 G.George      6000 G.George     
AP                 AP                 SMB CHECKOUT/6000  6000 G.George      6000 G.George      6000 G.George      CHANGE/5914 C.Pete
AP                 AP                 6000 G.George      6000 G.George      6000 G.George      6000 G.George      5914 C.Petersen   
BEAM   LINE 9-3  
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
5824 K.Abdul-Az/AP AP                 AP                 6096 M.Abernathy   6096 M.Abernathy   5901 A.Deb         5901 A.Deb        
AP                 AP                 SMB CHECKOUT/6096  6096 M.Abernathy   SMB CHECKOUT/5901  5901 A.Deb         5901 A.Deb        
AP                 AP                 6096 M.Abernathy   6096 M.Abernathy   5901 A.Deb         5901 A.Deb         5901 A.Deb        
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-2 
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
5858 O.Duckwort/AP AP                 AP                 5948 J.Andrews     5948 J.Andrews     5842 J.Lentz       5842 J.Lentz      
AP                 AP                 SMB CHECKOUT/5948  5948 J.Andrews     SMB CHECKOUT/5842  5842 J.Lentz       5842 J.Lentz      
AP                 AP                 5948 J.Andrews     5948 J.Andrews     5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
BEAM   LINE 11-3 
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
5562 D.Robertso/AP AP                 AP                 5775 E.Ratcliff    5775 E.Ratcliff    6012 Q.Liu         5968 A.Pena-Alcant
AP                 AP                 Xray CHECKOUT/5775 5775 E.Ratcliff    Xray CHECKOUT/6012 Xray CHECKOUT/5968 5968 A.Pena-Alcant
AP                 AP                 5775 E.Ratcliff    5775 E.Ratcliff    6012 Q.Liu         5968 A.Pena-Alcant 5968 A.Pena-Alcant
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
6089 J.Chorover/AP AP                 AP                 93H5 S.Bone        93H5 S.Bone        5643 J.Anne        5643 J.Anne       
AP                 AP                 CHANGE/93H5 S.Bone 93H5 S.Bone        CHANGE/5643 J.Anne 5643 J.Anne        5643 J.Anne       
AP                 AP                 93H5 S.Bone        93H5 S.Bone        5643 J.Anne        5643 J.Anne        5643 J.Anne       
BEAM   LINE 15-2 
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Jun. 27, 2022      Jun. 28, 2022      Jun. 29, 2022      Jun. 30, 2022      Jul. 01, 2022      Jul. 02, 2022      Jul. 03, 2022     
8895 K.Stone/AP    AP                 AP                 COMM               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
AP                 AP                 COMM               Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
AP                 AP                 COMM               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    

Back to Table of Contents

WEEK OF Jul. 04, 2022
                                         
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
BEAM   LINE 1-5  
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
FACI               FACI               FACI               6082 P.Nguyen      FACI               4854 E.Ratcliff    4854 E.Ratcliff   
FACI               FACI               Xray CHECKOUT/6082 6082 P.Nguyen/FACI Xray CHECKOUT/4854 4854 E.Ratcliff    4854 E.Ratcliff   
FACI               FACI               6082 P.Nguyen      FACI               4854 E.Ratcliff    4854 E.Ratcliff    4854 E.Ratcliff   
BEAM   LINE 2-1  
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
8010 N.Strange     8010 N.Strange     FACI               5945 J.Lee         5945 J.Lee         93H0 K.Stone       93H0 K.Stone      
8010 N.Strange     8010 N.Strang/FACI Xray CHECKOUT/5945 5945 J.Lee         Xray CHECKOUT/93H0 93H0 K.Stone       93H0 K.Stone      
8010 N.Strange     FACI               5945 J.Lee         5945 J.Lee         93H0 K.Stone       93H0 K.Stone       93H0 K.Stone      
BEAM   LINE 2-2  
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
5958 C.Tassone     5958 C.Tassone     5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
5958 C.Tassone     CHANGE/5468 N.Calt 5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
5958 C.Tassone     5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
BEAM   LINE 2-3  
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       11H9 D.Viana       11H9 D.Viana       5444 V.Noel        5444 V.Noel       
5093 M.Kelly       5093 M.Kelly       CHANGE/11H9 D.Vian 11H9 D.Viana       CHANGE/5444 V.Noel 5444 V.Noel        5444 V.Noel       
5093 M.Kelly       5093 M.Kelly       11H9 D.Viana       11H9 D.Viana       5444 V.Noel        5444 V.Noel        5444 V.Noel       
BEAM   LINE 4-1  
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
5743 M.Zhu         5743 M.Zhu         5615 J.Ravichandra 5615 J.Ravichandra 5199 F.Bridges     5757 F.Bridges     5757 F.Bridges    
5743 M.Zhu         SMB CHECKOUT/5615  5615 J.Ravichandra SMB CHECKOUT/5199  SMB CHECKOUT/5757  5757 F.Bridges     5757 F.Bridges    
5743 M.Zhu         5615 J.Ravichandra 5615 J.Ravichandra 5199 F.Bridges     5757 F.Bridges     5757 F.Bridges     5757 F.Bridges    
BEAM   LINE 4-2  
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
5497 M.Georgiadis  5497 M.Georgiadis  12A7 N.Boyer       8877 T.Matsui      8047 T.Weiss       6108 S.Hall        6108 S.Hall       
5497 M.Georgiadis  CHANGE/12A7 N.Boye CHANGE/8877 T.Mats CHANGE/8047 T.Weis CHANGE/6108 S.Hall 6108 S.Hall        CHANGE/8877 T.Mats
5497 M.Georgiadis  12A7 N.Boyer       8877 T.Matsui      8047 T.Weiss       6108 S.Hall        6108 S.Hall        8877 T.Matsui     
BEAM   LINE 4-3  
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
5707 G.George      5707 G.George      5885 U.Bergmann    5885 U.Bergmann    5885 U.Bergmann    5885 U.Bergmann    5885 U.Bergmann   
5707 G.George      SMB CHECKOUT/5885  5885 U.Bergmann    5885 U.Bergmann    5885 U.Bergmann    5885 U.Bergmann    5885 U.Bergmann   
5707 G.George      5885 U.Bergmann    5885 U.Bergmann    5885 U.Bergmann    5885 U.Bergmann    5885 U.Bergmann    5885 U.Bergmann   
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
5749 L.Carnevale   5749 L.Carnevale   5749 L.Carnevale   8890 J.Nelson Weke 5738 D.Agyeman-Bud 5738 D.Agyeman-Bud 8090 J.Nelson Weke
5749 L.Carnevale   5749 L.Carnevale   CHANGE/8890 J.Nels CHANGE/5738 D.Agye 5738 D.Agyeman-Bud CHANGE/8090 J.Nels 8090 J.Nelson Weke
5749 L.Carnevale   5749 L.Carnevale   8890 J.Nelson Weke 5738 D.Agyeman-Bud 5738 D.Agyeman-Bud 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 7-2  
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
6095 L.Paulus      5111 J.Lezama Pach 5111 J.Lezama Pach 5111 J.Lezama Pach 5882 S.Tian        5882 S.Tian        5882 S.Tian       
CHANGE/5111 J.Leza 5111 J.Lezama Pach 5111 J.Lezama Pach CHANGE/5882 S.Tian 5882 S.Tian        5882 S.Tian        5882 S.Tian       
5111 J.Lezama Pach 5111 J.Lezama Pach 5111 J.Lezama Pach 5882 S.Tian        5882 S.Tian        5882 S.Tian        5882 S.Tian       
BEAM   LINE 7-3  
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
5914 C.Petersen    5914 C.Petersen    5914 C.Petersen    6066 A.Foster      6066 A.Foster      6029 A.Asundi      6029 A.Asundi     
5914 C.Petersen    5914 C.Petersen    SMB CHECKOUT/6066  6066 A.Foster      SMB CHECKOUT/6029  6029 A.Asundi      6029 A.Asundi     
5914 C.Petersen    5914 C.Petersen    6066 A.Foster      6066 A.Foster      6029 A.Asundi      6029 A.Asundi      6029 A.Asundi     
BEAM   LINE 9-3  
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
5901 A.Deb         5901 A.Deb         6109 A.Jenkins     6109 A.Jenkins     5126 J.Yano        5126 J.Yano        5126 J.Yano       
5901 A.Deb         SMB CHECKOUT/6109  6109 A.Jenkins     SMB CHECKOUT/5126  5126 J.Yano        5126 J.Yano        5126 J.Yano       
5901 A.Deb         6109 A.Jenkins     6109 A.Jenkins     5126 J.Yano        5126 J.Yano        5126 J.Yano        5126 J.Yano       
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
FACI               FACI               5949 Z.Jiang       5949 Z.Jiang       5949 Z.Jiang       5949 Z.Jiang       5949 Z.Jiang      
FACI               Xray CHECKOUT/5949 5949 Z.Jiang       5949 Z.Jiang       5949 Z.Jiang       5949 Z.Jiang       5949 Z.Jiang      
FACI               5949 Z.Jiang       5949 Z.Jiang       5949 Z.Jiang       5949 Z.Jiang       5949 Z.Jiang       5949 Z.Jiang      
BEAM   LINE 11-2 
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
5842 J.Lentz       5842 J.Lentz       5611 K.Lau         5611 K.Lau         5611 K.Lau         Unscheduled        Unscheduled       
5842 J.Lentz       SMB CHECKOUT/5611  5611 K.Lau         5611 K.Lau         5611 K.Lau         Unscheduled        Unscheduled       
5842 J.Lentz       5611 K.Lau         5611 K.Lau         5611 K.Lau         Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
5968 A.Pena-Alcant 5968 A.Pena-Alcant 5562 D.Robertson   5529 C.Salamat     5529 C.Salamat     5529 C.Salamat     5529 C.Salamat    
5968 A.Pena-Alcant Xray CHECKOUT/5562 5562 D.Robertson   5529 C.Salamat     5529 C.Salamat     5529 C.Salamat     5529 C.Salamat    
5968 A.Pena-Alcant 5562 D.Robertson   CHANGE/5529 C.Sala 5529 C.Salamat     5529 C.Salamat     5529 C.Salamat     5529 C.Salamat    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
5643 J.Anne        FACI               5794 T.Varga       5794 T.Varga       Unscheduled        5718 J.Moran       5718 J.Moran      
5643 J.Anne/FACI   CHANGE/5794 T.Varg 5794 T.Varga       5794 T.Varga       CHANGE/5718 J.Mora 5718 J.Moran       5718 J.Moran      
FACI               5794 T.Varga       5794 T.Varga       Unscheduled        5718 J.Moran       5718 J.Moran       5718 J.Moran      
BEAM   LINE 15-2 
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
Unscheduled        Unscheduled        STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        STUP               STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Jul. 04, 2022      Jul. 05, 2022      Jul. 06, 2022      Jul. 07, 2022      Jul. 08, 2022      Jul. 09, 2022      Jul. 10, 2022     
8091 C.Tassone     8091 C.Tassone     COMM               COMM               COMM               COMM               COMM              
8091 C.Tassone     8091 C.Tasson/COMM COMM               COMM               COMM               COMM               COMM              
8091 C.Tassone     COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jul. 11, 2022
                                         
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
BEAM   LINE 1-5  
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
4854 E.Ratcliff/AP AP                 AP                 6026 B.Kienitz     6085 A.Rizvi       6085 A.Rizvi       6085 A.Rizvi      
AP                 AP                 Xray CHECKOUT/6026 Xray CHECKOUT/6085 6085 A.Rizvi       6085 A.Rizvi       6085 A.Rizvi      
AP                 AP                 6026 B.Kienitz     6085 A.Rizvi       6085 A.Rizvi       6085 A.Rizvi       6085 A.Rizvi      
BEAM   LINE 2-1  
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
93H0 K.Stone/AP    AP                 AP                 FACI               6078 F.Akinwole Br 6078 F.Akinwole Br 6078 F.Akinwole Br
AP                 AP                 FACI               Xray CHECKOUT/6078 6078 F.Akinwole Br 6078 F.Akinwole Br 6078 F.Akinwole Br
AP                 AP                 FACI               6078 F.Akinwole Br 6078 F.Akinwole Br 6078 F.Akinwole Br 6078 F.Akinwole Br
BEAM   LINE 2-2  
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
5468 N.Calta/AP    AP                 AP                 5667 J.Harris      5667 J.Harris      5302 L.Li          5302 L.Li         
AP                 AP                 SMB CHECKOUT/5667  5667 J.Harris      CHANGE/5302 L.Li   5302 L.Li          5302 L.Li         
AP                 AP                 5667 J.Harris      5667 J.Harris      5302 L.Li          5302 L.Li          5302 L.Li         
BEAM   LINE 2-3  
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
5444 V.Noel/AP     AP                 AP                 8090 J.Nelson Weke 8090 J.Nelson Weke 5888 N.Tosca       5888 N.Tosca      
AP                 AP                 CHANGE/8090 J.Nels 8090 J.Nelson Weke CHANGE/5888 N.Tosc 5888 N.Tosca       5888 N.Tosca      
AP                 AP                 8090 J.Nelson Weke 8090 J.Nelson Weke 5888 N.Tosca       5888 N.Tosca       5888 N.Tosca      
BEAM   LINE 4-1  
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
5757 F.Bridges/AP  AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-2  
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
8877 T.Matsui/AP   AP                 AP                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
AP                 AP                 CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
AP                 AP                 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
5885 U.Bergmann/AP AP                 AP                 5226 J.Yano        5226 J.Yano        6089 J.Chorover    6089 J.Chorover   
AP                 AP                 SMB CHECKOUT/5226  5226 J.Yano        SMB CHECKOUT/6089  6089 J.Chorover    6089 J.Chorover   
AP                 AP                 5226 J.Yano        5226 J.Yano        6089 J.Chorover    6089 J.Chorover    6089 J.Chorover   
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
8090 J.Nelson W/AP AP                 AP                 6058 P.Zhang       6058 P.Zhang       6063 A.White Smirn 6063 A.White Smirn
AP                 AP                 CHANGE/6058 P.Zhan 6058 P.Zhang       CHANGE/6063 A.Whit 6063 A.White Smirn 6063 A.White Smirn
AP                 AP                 6058 P.Zhang       6058 P.Zhang       6063 A.White Smirn 6063 A.White Smirn 6063 A.White Smirn
BEAM   LINE 7-2  
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
5882 S.Tian/AP     AP                 AP                 6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh     
AP                 AP                 CHANGE/6091 M.Zein 6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh     
AP                 AP                 6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh     
BEAM   LINE 7-3  
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
6029 A.Asundi/AP   AP                 AP                 5740 T.Jackson     5740 T.Jackson     8060 V.Noel        8060 V.Noel       
AP                 AP                 SMB CHECKOUT/5740  5740 T.Jackson     SMB CHECKOUT/8060  8060 V.Noel        8060 V.Noel       
AP                 AP                 5740 T.Jackson     5740 T.Jackson     8060 V.Noel        8060 V.Noel        8060 V.Noel       
BEAM   LINE 9-3  
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
5126 J.Yano/AP     AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
5949 Z.Jiang/AP    AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
AP                 AP                 AP                 5555 S.Kozimor     5555 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor    
AP                 AP                 SMB CHECKOUT/5555  5555 S.Kozimor     5555 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor    
AP                 AP                 5555 S.Kozimor     5555 S.Kozimor     CHANGE/5424 S.Kozi 5424 S.Kozimor     5424 S.Kozimor    
BEAM   LINE 11-3 
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
5529 C.Salamat/AP  AP                 AP                 5677 Y.Lee         5677 Y.Lee         8895 K.Stone       8895 K.Stone      
AP                 AP                 Xray CHECKOUT/5677 5677 Y.Lee         Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone      
AP                 AP                 5677 Y.Lee         5677 Y.Lee         8895 K.Stone       8895 K.Stone       8895 K.Stone      
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
5718 J.Moran/AP    AP                 AP                 6039 M.Kang        6039 M.Kang        6039 M.Kang        5888 N.Tosca      
AP                 AP                 CHANGE/6039 M.Kang 6039 M.Kang        6039 M.Kang        CHANGE/5888 N.Tosc 5888 N.Tosca      
AP                 AP                 6039 M.Kang        6039 M.Kang        6039 M.Kang        5888 N.Tosca       5888 N.Tosca      
BEAM   LINE 15-2 
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
AP                 AP                 AP                 STUP               STUP               Unscheduled        Unscheduled       
AP                 AP                 STUP               STUP               STUP               Unscheduled        Unscheduled       
AP                 AP                 STUP               STUP               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Jul. 11, 2022      Jul. 12, 2022      Jul. 13, 2022      Jul. 14, 2022      Jul. 15, 2022      Jul. 16, 2022      Jul. 17, 2022     
COMM/AP            AP                 AP                 5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    Unscheduled       
AP                 AP                 Xray CHECKOUT/5785 5785 J.Baniecki    5785 J.Baniecki    Unscheduled        Unscheduled       
AP                 AP                 5785 J.Baniecki    5785 J.Baniecki    5785 J.Baniecki    Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jul. 18, 2022
                                         
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
BEAM   LINE 1-5  
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
6085 A.Rizvi       FACI               8801 A.Fong        8801 A.Fong        FACI               FACI               FACI              
6085 A.Rizvi/FACI  Xray CHECKOUT/8801 8801 A.Fong        8801 A.Fong/FACI   FACI               FACI               FACI              
FACI               8801 A.Fong        8801 A.Fong        FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
6078 F.Akinwole Br FACI               FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
6078 F.Akinwo/FACI FACI               Xray CHECKOUT/9705 9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
FACI               FACI               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 2-2  
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
5302 L.Li          6094 M.Stone       6094 M.Stone       6094 M.Stone       5880 Y.Roman       5880 Y.Roman       5880 Y.Roman      
CHANGE/6094 M.Ston 6094 M.Stone       6094 M.Stone       STUP               5880 Y.Roman       5880 Y.Roman       5880 Y.Roman      
6094 M.Stone       6094 M.Stone       6094 M.Stone       CHANGE/5880 Y.Roma 5880 Y.Roman       5880 Y.Roman       5880 Y.Roman      
BEAM   LINE 2-3  
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
5888 N.Tosca       6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh      5794 T.Varga       5794 T.Varga      
CHANGE/6091 M.Zein 6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh      CHANGE/5794 T.Varg 5794 T.Varga       5794 T.Varga      
6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh      6091 M.Zeineh      5794 T.Varga       5794 T.Varga       5794 T.Varga      
BEAM   LINE 4-1  
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
FACI               FACI               FACI               FACI               FACI               5743 M.Zhu         5743 M.Zhu        
FACI               FACI               FACI               FACI               SMB CHECKOUT/5743  5743 M.Zhu         5743 M.Zhu        
FACI               FACI               FACI               FACI               5743 M.Zhu         5743 M.Zhu         5743 M.Zhu        
BEAM   LINE 4-2  
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
8877 T.Matsui      6057 D.Mai         5414 C.Salamat     6134 K.Meador      6134 K.Meador      5996 J.DuBois      5996 J.DuBois     
CHANGE/6057 D.Mai  CHANGE/5414 C.Sala CHANGE/6134 K.Mead 6134 K.Meador      CHANGE/5996 J.DuBo 5996 J.DuBois      5996 J.DuBois     
6057 D.Mai         5414 C.Salamat     6134 K.Meador      6134 K.Meador      5996 J.DuBois      5996 J.DuBois      5996 J.DuBois     
BEAM   LINE 4-3  
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
6089 J.Chorover    11G9 A.Bhattachary 11G9 A.Bhattachary 5648 M.Siebecker   5648 M.Siebecker   5997 C.Hahn        5997 C.Hahn       
SMB CHECKOUT/11G9  11G9 A.Bhattachary SMB CHECKOUT/5648  5648 M.Siebecker   SMB CHECKOUT/5997  5997 C.Hahn        5997 C.Hahn       
11G9 A.Bhattachary 11G9 A.Bhattachary 5648 M.Siebecker   5648 M.Siebecker   5997 C.Hahn        5997 C.Hahn        5997 C.Hahn       
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
6063 A.White Smirn 5854 N.Muralidhara 5854 N.Muralidhara 5703 R.Bell        5703 R.Bell        5396 J.Nelson Weke 5396 J.Nelson Weke
CHANGE/5854 N.Mura 5854 N.Muralidhara CHANGE/5703 R.Bell 5703 R.Bell        CHANGE/5396 J.Nels 5396 J.Nelson Weke 5396 J.Nelson Weke
5854 N.Muralidhara 5854 N.Muralidhara 5703 R.Bell        5703 R.Bell        5396 J.Nelson Weke 5396 J.Nelson Weke 5396 J.Nelson Weke
BEAM   LINE 7-2  
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
6091 M.Zeineh      5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko  5847 U.Bergmann    5847 U.Bergmann   
CHANGE/5711 A.Krav 5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko  CHANGE/5847 U.Berg 5847 U.Bergmann    5847 U.Bergmann   
5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko  5847 U.Bergmann    5847 U.Bergmann    5847 U.Bergmann   
BEAM   LINE 7-3  
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
8060 V.Noel        5981 J.Boergel     5981 J.Boergel     5981 J.Boergel     5617 K.Rush        5617 K.Rush        5617 K.Rush       
SMB CHECKOUT/5981  5981 J.Boergel     5981 J.Boergel     SMB CHECKOUT/5617  5617 K.Rush        5617 K.Rush        5617 K.Rush       
5981 J.Boergel     5981 J.Boergel     5981 J.Boergel     5617 K.Rush        5617 K.Rush        5617 K.Rush        5617 K.Rush       
BEAM   LINE 9-3  
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
FACI               STUP               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        5674 G.Kumar       5674 G.Kumar      
FACI/STUP          SMB CHECKOUT/9705  9705 J.LiSA        9705 J.LiSA        SMB CHECKOUT/5674  5674 G.Kumar       5674 G.Kumar      
STUP               9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        5674 G.Kumar       5674 G.Kumar       5674 G.Kumar      
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
5424 S.Kozimor     5071 R.Tinnacher   5071 R.Tinnacher   Unscheduled        5586 D.Olive       5586 D.Olive       5586 D.Olive      
SMB CHECKOUT/5071  5071 R.Tinnacher   5071 R.Tinnacher   SMB CHECKOUT/5586  5586 D.Olive       5586 D.Olive       5586 D.Olive      
5071 R.Tinnacher   5071 R.Tinnacher   Unscheduled        5586 D.Olive       5586 D.Olive       5586 D.Olive       5586 D.Olive      
BEAM   LINE 11-3 
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
8895 K.Stone       8895 K.Stone       6024 A.Maurya      6024 A.Maurya      FACI               8091 C.Tassone     8091 C.Tassone    
8895 K.Stone       Xray CHECKOUT/6024 6024 A.Maurya      6024 A.Maurya/FACI Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone    
8895 K.Stone       6024 A.Maurya      6024 A.Maurya      FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
5888 N.Tosca       5888 N.Tosca       11H7 K.Meyers      11H7 K.Meyers      11H7 K.Meyers      11J1 E.Gillispie   11J1 E.Gillispie  
5888 N.Tosca       CHANGE/11H7 K.Meye 11H7 K.Meyers      11H7 K.Meyers      CHANGE/11J1 E.Gill 11J1 E.Gillispie   11J1 E.Gillispie  
5888 N.Tosca       11H7 K.Meyers      11H7 K.Meyers      11H7 K.Meyers      11J1 E.Gillispie   11J1 E.Gillispie   11J1 E.Gillispie  
BEAM   LINE 15-2 
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Jul. 18, 2022      Jul. 19, 2022      Jul. 20, 2022      Jul. 21, 2022      Jul. 22, 2022      Jul. 23, 2022      Jul. 24, 2022     
Unscheduled        8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     93H6 E.Nisenboim   93H6 E.Nisenboim  
Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     CHANGE/93H6 E.Nise 93H6 E.Nisenboim   93H6 E.Nisenboim  
8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     93H6 E.Nisenboim   93H6 E.Nisenboim   Unscheduled       

Back to Table of Contents

WEEK OF Jul. 25, 2022
                                         
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
BEAM   LINE 1-5  
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
FACI               FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone/AP  AP/DOWN            DOWN              
FACI               Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     AP                 DOWN               DOWN              
FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     AP                 DOWN               DOWN              
BEAM   LINE 2-1  
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
9705 J.LiSA        FACI               5703 R.Bell        5703 R.Bell        5703 R.Bell/AP     AP/DOWN            DOWN              
9705 J.LiSA/FACI   Xray CHECKOUT/5703 5703 R.Bell        5703 R.Bell        AP                 DOWN               DOWN              
FACI               5703 R.Bell        5703 R.Bell        5703 R.Bell        AP                 DOWN               DOWN              
BEAM   LINE 2-2  
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
5880 Y.Roman       STUP               5722 G.Wan         5722 G.Wan         5722 G.Wan/AP      AP/DOWN            DOWN              
STUP               CHANGE/5722 G.Wan  5722 G.Wan         5722 G.Wan         AP                 DOWN               DOWN              
STUP               5722 G.Wan         5722 G.Wan         5722 G.Wan         AP                 DOWN               DOWN              
BEAM   LINE 2-3  
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
5794 T.Varga       6121 K.Hanson      6121 K.Hanson      6121 K.Hanson      6121 K.Hanson/AP   AP/DOWN            DOWN              
CHANGE/6121 K.Hans 6121 K.Hanson      6121 K.Hanson      6121 K.Hanson      AP                 DOWN               DOWN              
6121 K.Hanson      6121 K.Hanson      6121 K.Hanson      6121 K.Hanson      AP                 DOWN               DOWN              
BEAM   LINE 4-1  
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
5743 M.Zhu         6023 D.Hernandez   6023 D.Hernandez   5826 B.Dunn        5826 B.Dunn/AP     AP/DOWN            DOWN              
SMB CHECKOUT/6023  6023 D.Hernandez   SMB CHECKOUT/5826  5826 B.Dunn        AP                 DOWN               DOWN              
6023 D.Hernandez   6023 D.Hernandez   5826 B.Dunn        5826 B.Dunn        AP                 DOWN               DOWN              
BEAM   LINE 4-2  
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
5996 J.DuBois      8047 T.Weiss       8047 T.Weiss       6128 J.Pak         8877 T.Matsui/AP   AP/DOWN            DOWN              
CHANGE/8047 T.Weis 8047 T.Weiss       CHANGE/6128 J.Pak  CHANGE/8877 T.Mats AP                 DOWN               DOWN              
8047 T.Weiss       8047 T.Weiss       6128 J.Pak         8877 T.Matsui      AP                 DOWN               DOWN              
BEAM   LINE 4-3  
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
5997 C.Hahn        6040 B.Wan         6040 B.Wan         5810 M.Zhu         5810 M.Zhu/AP      AP/DOWN            DOWN              
SMB CHECKOUT/6040  6040 B.Wan         SMB CHECKOUT/5810  5810 M.Zhu         AP                 DOWN               DOWN              
6040 B.Wan         6040 B.Wan         5810 M.Zhu         5810 M.Zhu         AP                 DOWN               DOWN              
BEAM   LINE 6-2a  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 AP/DOWN            DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 DOWN               DOWN              
BEAM   LINE 6-2b  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
Unscheduled        Unscheduled        6104 K.Hatzell     6104 K.Hatzell     6104 K.Hatzell/AP  AP/DOWN            DOWN              
Unscheduled        X>MicroCT/6104     6104 K.Hatzell     6104 K.Hatzell     AP                 DOWN               DOWN              
Unscheduled        6104 K.Hatzell     6104 K.Hatzell     6104 K.Hatzell     AP                 DOWN               DOWN              
BEAM   LINE 6-2c  (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
5396 J.Nelson Weke Unscheduled        Unscheduled        Unscheduled        AP                 AP/DOWN            DOWN              
5396 J.Nelson Weke Unscheduled        Unscheduled        Unscheduled        AP                 DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 DOWN               DOWN              
BEAM   LINE 7-2  
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
5847 U.Bergmann    5847 U.Bergmann    5847 U.Bergmann    5847 U.Bergmann    5847 U.Bergmann/AP AP/DOWN            DOWN              
5847 U.Bergmann    5847 U.Bergmann    5847 U.Bergmann    5847 U.Bergmann    AP                 DOWN               DOWN              
5847 U.Bergmann    5847 U.Bergmann    5847 U.Bergmann    5847 U.Bergmann    AP                 DOWN               DOWN              
BEAM   LINE 7-3  
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
5617 K.Rush        5617 K.Rush        FACI               FACI               FACI/AP            AP/DOWN            DOWN              
5617 K.Rush        5617 K.Rush/FACI   FACI               FACI               AP                 DOWN               DOWN              
5617 K.Rush        FACI               FACI               FACI               AP                 DOWN               DOWN              
BEAM   LINE 9-3  
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
5674 G.Kumar       5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackbur/AP AP/DOWN            DOWN              
SMB CHECKOUT/5480  5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackburn   AP                 DOWN               DOWN              
5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackburn   AP                 DOWN               DOWN              
BEAM   LINE 10-2a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
DOWN               DOWN               DOWN               DOWN               DOWN/AP            AP/DOWN            DOWN              
DOWN               DOWN               DOWN               DOWN               AP                 DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               AP                 DOWN               DOWN              
BEAM   LINE 11-2 
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
5586 D.Olive/FACI  FACI               FACI               FACI               FACI/AP            AP/DOWN            DOWN              
FACI               FACI               FACI               FACI               AP                 DOWN               DOWN              
FACI               FACI               FACI               FACI               AP                 DOWN               DOWN              
BEAM   LINE 11-3 
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
8091 C.Tassone     FACI               FACI               6088 K.White       6088 K.White/AP    AP/DOWN            DOWN              
8091 C.Tasson/FACI FACI               Xray CHECKOUT/6088 6088 K.White       AP                 DOWN               DOWN              
FACI               FACI               6088 K.White       6088 K.White       AP                 DOWN               DOWN              
BEAM   LINE 14-3a (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
Unscheduled        5575 J.Basinski    5575 J.Basinski    6040 B.Wan         6040 B.Wan/AP      AP/DOWN            DOWN              
SMB CHECKOUT/5575  5575 J.Basinski    SMB CHECKOUT/6040  6040 B.Wan         AP                 DOWN               DOWN              
5575 J.Basinski    5575 J.Basinski    6040 B.Wan         6040 B.Wan         AP                 DOWN               DOWN              
BEAM   LINE 14-3b (Beam time is shared between beam line end stations which cannot run simultaneously)
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
11J1 E.Gillispie   Unscheduled        Unscheduled        Unscheduled        AP                 AP/DOWN            DOWN              
11J1 E.Gillispie   Unscheduled        Unscheduled        Unscheduled        AP                 DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 DOWN               DOWN              
BEAM   LINE 15-2 
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
Unscheduled        STUP               Unscheduled        Unscheduled        AP                 AP/DOWN            DOWN              
STUP               STUP               Unscheduled        Unscheduled        AP                 DOWN               DOWN              
STUP               Unscheduled        Unscheduled        Unscheduled        AP                 DOWN               DOWN              
BEAM   LINE 17-2 
Jul. 25, 2022      Jul. 26, 2022      Jul. 27, 2022      Jul. 28, 2022      Jul. 29, 2022      Jul. 30, 2022      Jul. 31, 2022     
Unscheduled        6072 M.Dean        6072 M.Dean        6072 M.Dean        6072 M.Dean/AP     AP/DOWN            DOWN              
Xray CHECKOUT/6072 6072 M.Dean        6072 M.Dean        6072 M.Dean        AP                 DOWN               DOWN              
6072 M.Dean        6072 M.Dean        6072 M.Dean        6072 M.Dean        AP                 DOWN               DOWN