SSRL Beam Port Schedule


X-ray beam lines are scheduled in three 8-hour shifts each day (11pm-7am; 7am-3pm; 3-11pm). Checkouts/changeovers are scheduled during the 7am-3pm shift. Most X-ray beam lines officially turn over to the next user much earlier than 3pm depending on the equipment requirements and staff availability. At least 1 week prior to arrival, users need to contact the designated beam line engineer/scientist (see SSRL Beam Lines by Number for contact information) to discuss beam line configuration needs and start times. Unless instructed otherwise, experiments end at 7am (6am when Maintenance (MA) or Accelerator Physics (AP) are scheduled).


Weeks of the Schedule
 Sep. 07, 2020   Sep. 14, 2020   Sep. 21, 2020   Sep. 28, 2020 
 Oct. 05, 2020   Oct. 12, 2020   Oct. 19, 2020   Oct. 26, 2020 
 Nov. 02, 2020   Nov. 09, 2020   Nov. 16, 2020   Nov. 23, 2020 
 Nov. 30, 2020   Dec. 07, 2020   Dec. 14, 2020   Dec. 21, 2020 
 Dec. 28, 2020   Jan. 04, 2021   Jan. 11, 2021   Jan. 18, 2021 
 Jan. 25, 2021   Feb. 01, 2021   Feb. 08, 2021   Feb. 15, 2021 
 Feb. 22, 2021   Mar. 01, 2021   Mar. 08, 2021   Mar. 15, 2021 
 Mar. 22, 2021   Mar. 29, 2021   Apr. 05, 2021   Apr. 12, 2021 
 Apr. 19, 2021   Apr. 26, 2021   May 03, 2021   May 10, 2021 
 May 17, 2021   May 24, 2021   May 31, 2021   Jun. 07, 2021 
 Jun. 14, 2021   Jun. 21, 2021   Jun. 28, 2021   Jul. 05, 2021 
 Jul. 12, 2021   Jul. 19, 2021   Jul. 26, 2021 

Back to Table of Contents

WEEK OF Sep. 07, 2020
                                         
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
BEAM   LINE 1-5  
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-1  
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               DOWN/FACI          FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-2  
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               DOWN/FACI          FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 6-2  
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 7-2  
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 9-3  
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               DOWN/FACI          FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               FACI               FACI               FACI               FACI               5474 S.Bone        5474 S.Bone       
DOWN               FACI               FACI               FACI               CHANGE/5474 S.Bone 5474 S.Bone        5474 S.Bone       
DOWN               FACI               FACI               FACI               5474 S.Bone        5474 S.Bone        5474 S.Bone       
BEAM   LINE 11-2 
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               DOWN/FACI          FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-3 
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 14-3 
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 15-2 
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               COMM               COMM               COMM               COMM               COMM               COMM              
DOWN               COMM               COMM               COMM               COMM               COMM               COMM              
DOWN               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 17-2 
Sep. 07, 2020      Sep. 08, 2020      Sep. 09, 2020      Sep. 10, 2020      Sep. 11, 2020      Sep. 12, 2020      Sep. 13, 2020     
DOWN               COMM               COMM               COMM               COMM               COMM               COMM              
DOWN               COMM               COMM               COMM               COMM               COMM               COMM              
DOWN               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Sep. 14, 2020
                                         
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
BEAM   LINE 1-5  
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
FACI/PAAM          FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
DOWN/PAAM          DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
PAAM               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
PAAM               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
DOWN/PAAM          DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
PAAM               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
PAAM               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
FACI/PAAM          FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-1  
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
FACI/PAAM          FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-2  
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
PAAM               Unscheduled        Unscheduled        8877 T.Matsui      11E9 N.Horikoshi   11E7 E.Traore      11E7 E.Traore     
PAAM               Unscheduled        CHANGE/8877 T.Mats CHANGE/11E9 N.Hori CHANGE/11E7 E.Trao 11E7 E.Traore      11E7 E.Traore     
PAAM               Unscheduled        8877 T.Matsui      11E9 N.Horikoshi   11E7 E.Traore      11E7 E.Traore      11E7 E.Traore     
BEAM   LINE 4-3  
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
FACI/PAAM          FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 6-2  
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
STUP/PAAM          Unscheduled        Unscheduled        5655 J.Zhang       5655 J.Zhang       5655 J.Zhang       5521 L.Li         
PAAM               Unscheduled        Unscheduled        5655 J.Zhang       5655 J.Zhang       CHANGE/5521 L.Li   5521 L.Li         
PAAM               Unscheduled        CHANGE/5655 J.Zhan 5655 J.Zhang       5655 J.Zhang       5521 L.Li          5521 L.Li         
BEAM   LINE 7-2  
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
DOWN/PAAM          DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
PAAM               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
PAAM               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
FACI/PAAM          FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 9-3  
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
FACI/PAAM          FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
5474 S.Bone/PAAM   Unscheduled        Unscheduled        5375 M.Besli       5375 M.Besli       4921 J.Evans       4921 J.Evans      
PAAM               Unscheduled        CHANGE/5375 M.Besl 5375 M.Besli       CHANGE/4921 J.Evan 4921 J.Evans       4921 J.Evans      
PAAM               Unscheduled        5375 M.Besli       5375 M.Besli       4921 J.Evans       4921 J.Evans       4921 J.Evans      
BEAM   LINE 11-2 
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
FACI/PAAM          FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-3 
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
FACI/PAAM          Unscheduled        Unscheduled        5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt      
PAAM               Unscheduled        Xray CHECKOUT/5600 5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt      
PAAM               Unscheduled        5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt      
BEAM   LINE 14-3 
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
FACI/PAAM          FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
PAAM               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 15-2 
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
COMM/PAAM          COMM               COMM               COMM               COMM               COMM               COMM              
PAAM               COMM               COMM               COMM               COMM               COMM               COMM              
PAAM               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 17-2 
Sep. 14, 2020      Sep. 15, 2020      Sep. 16, 2020      Sep. 17, 2020      Sep. 18, 2020      Sep. 19, 2020      Sep. 20, 2020     
COMM/PAAM          COMM               COMM               COMM               COMM               COMM               COMM              
PAAM               COMM               COMM               COMM               COMM               COMM               COMM              
PAAM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Sep. 21, 2020
                                         
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
BEAM   LINE 1-5  
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-1  
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
FACI               FACI               FACI               Unscheduled        5183 M.Zhu         5183 M.Zhu         5183 M.Zhu        
FACI               FACI               Unscheduled        SMB CHECKOUT/5183  5183 M.Zhu         5183 M.Zhu         5183 M.Zhu        
FACI               FACI               Unscheduled        5183 M.Zhu         5183 M.Zhu         5183 M.Zhu         5183 M.Zhu        
BEAM   LINE 4-2  
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
11E7 E.Traore      8077 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      5497 M.Georgiadis  5497 M.Georgiadis 
CHANGE/8077 T.Mats CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
8077 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 6-2  
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
5521 L.Li          5521 L.Li          5387 R.Bell        5387 R.Bell        5387 R.Bell        5550 S.Zaccarine   5550 S.Zaccarine  
5521 L.Li          CHANGE/5387 R.Bell 5387 R.Bell        5387 R.Bell        CHANGE/5550 S.Zacc 5550 S.Zaccarine   5550 S.Zaccarine  
5521 L.Li          5387 R.Bell        5387 R.Bell        5387 R.Bell        5550 S.Zaccarine   5550 S.Zaccarine   5550 S.Zaccarine  
BEAM   LINE 7-2  
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 9-3  
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
4921 J.Evans       11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie     
CHANGE/11F2 M.Push 11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      CHANGE/5711 A.Krav
11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      5711 A.Kravchenko 
BEAM   LINE 11-2 
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-3 
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
5600 L.Mundt       5633 L.Kelly       5633 L.Kelly       5633 L.Kelly       5633 L.Kelly       5440 S.Schneider   5440 S.Schneider  
Xray CHECKOUT/5633 5633 L.Kelly       5633 L.Kelly       5633 L.Kelly       Xray CHECKOUT/5440 5440 S.Schneider   Xray CHECKOUT/5112
5633 L.Kelly       5633 L.Kelly       5633 L.Kelly       5633 L.Kelly       5440 S.Schneider   5440 S.Schneider   5112 J.Vigil      
BEAM   LINE 14-3 
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 15-2 
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 17-2 
Sep. 21, 2020      Sep. 22, 2020      Sep. 23, 2020      Sep. 24, 2020      Sep. 25, 2020      Sep. 26, 2020      Sep. 27, 2020     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Sep. 28, 2020
                                         
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
BEAM   LINE 1-5  
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
FACI               FACI/AP            AP                 AP                 8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
FACI               AP                 AP                 Xray CHECKOUT/8818 8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
FACI               AP                 AP                 8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
BEAM   LINE 2-1  
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
DOWN               DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
DOWN               DOWN/AP            AP                 AP                 DOWN               FACI               FACI              
DOWN               AP                 AP                 FACI/DOWN          FACI               FACI               FACI              
DOWN               AP                 AP                 DOWN               FACI               FACI               FACI              
BEAM   LINE 2-3  
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
FACI               FACI/AP            AP                 AP                 FACI               FACI               FACI              
FACI               AP                 AP                 FACI               FACI               FACI               FACI              
FACI               AP                 AP                 FACI               FACI               FACI               FACI              
BEAM   LINE 4-1  
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
5183 M.Zhu         5183 M.Zhu/AP      AP                 AP                 Unscheduled        5253 H.Wu          5253 H.Wu         
5183 M.Zhu         AP                 AP                 Unscheduled        SMB CHECKOUT/5253  5253 H.Wu          5253 H.Wu         
5183 M.Zhu         AP                 AP                 Unscheduled        5253 H.Wu          5253 H.Wu          5253 H.Wu         
BEAM   LINE 4-2  
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
5497 M.Georgiadis  8877 T.Matsui/AP   AP                 AP                 8847 T.Weiss       8877 T.Matsui      8877 T.Matsui     
CHANGE/8877 T.Mats AP                 AP                 CHANGE/8847 T.Weis CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui     
8877 T.Matsui      AP                 AP                 8847 T.Weiss       8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
FACI               FACI/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled       
FACI               AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
FACI               AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
5550 S.Zaccarine   92J4 L.Wang/AP     AP                 AP                 5705 J.Lim         5705 J.Lim         5705 J.Lim        
CHANGE/92J4 L.Wang AP                 AP                 CHANGE/5705 J.Lim  5705 J.Lim         5705 J.Lim         CHANGE/5252 C.Wei 
92J4 L.Wang        AP                 AP                 5705 J.Lim         5705 J.Lim         5705 J.Lim         5252 C.Wei        
BEAM   LINE 7-2  
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
DOWN               DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
FACI               FACI/AP            AP                 AP                 5617 K.Rush        5617 K.Rush        5617 K.Rush       
FACI               AP                 AP                 REMOTE/5617        5617 K.Rush        5617 K.Rush        5617 K.Rush       
FACI               AP                 AP                 5617 K.Rush        5617 K.Rush        5617 K.Rush        5617 K.Rush       
BEAM   LINE 9-3  
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
FACI               FACI/AP            AP                 AP                 FACI               FACI               FACI              
FACI               AP                 AP                 FACI               FACI               FACI               FACI              
FACI               AP                 AP                 FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
5711 A.Kravchenko  5711 A.Kravchen/AP AP                 AP                 FACI               92I6 C.Takacs      92I6 C.Takacs     
5711 A.Kravchenko  AP                 AP                 FACI               Xray CHECKOUT/92I6 92I6 C.Takacs      CHANGE/5474 S.Bone
5711 A.Kravchenko  AP                 AP                 FACI               92I6 C.Takacs      92I6 C.Takacs      5474 S.Bone       
BEAM   LINE 11-2 
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
FACI               FACI/AP            AP                 AP                 FACI               FACI               FACI              
FACI               AP                 AP                 FACI               FACI               FACI               FACI              
FACI               AP                 AP                 FACI               FACI               FACI               FACI              
BEAM   LINE 11-3 
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
5112 J.Vigil       5112 J.Vigil/AP    AP                 AP                 5729 C.Cheng       5729 C.Cheng       5729 C.Cheng      
5112 J.Vigil       AP                 AP                 Xray CHECKOUT/5729 5729 C.Cheng       5729 C.Cheng       5729 C.Cheng      
5112 J.Vigil       AP                 AP                 5729 C.Cheng       5729 C.Cheng       5729 C.Cheng       5729 C.Cheng      
BEAM   LINE 14-3 
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
FACI               FACI/AP            AP                 AP                 FACI               FACI               FACI              
FACI               AP                 AP                 FACI               FACI               FACI               FACI              
FACI               AP                 AP                 FACI               FACI               FACI               FACI              
BEAM   LINE 15-2 
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
COMM               COMM/AP            AP                 AP                 COMM               COMM               COMM              
COMM               AP                 AP                 COMM               COMM               COMM               COMM              
COMM               AP                 AP                 COMM               COMM               COMM               COMM              
BEAM   LINE 17-2 
Sep. 28, 2020      Sep. 29, 2020      Sep. 30, 2020      Oct. 01, 2020      Oct. 02, 2020      Oct. 03, 2020      Oct. 04, 2020     
COMM               COMM/AP            AP                 AP                 COMM               COMM               COMM              
COMM               AP                 AP                 COMM               COMM               COMM               COMM              
COMM               AP                 AP                 COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Oct. 05, 2020
                                         
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
BEAM   LINE 1-5  
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
8818 A.Mehta       5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
Xray CHECKOUT/5398 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
BEAM   LINE 2-1  
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
FACI               FACI               8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare       
FACI               SMB CHECKOUT/8099  8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare       
FACI               8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare       
BEAM   LINE 2-3  
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
FACI               11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      FACI               FACI              
CHANGE/11F2 M.Push 11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie/FACI FACI               CHANGE/4921 J.Evan
11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      FACI               FACI               4921 J.Evans      
BEAM   LINE 4-1  
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
5253 H.Wu          5253 H.Wu          4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht
5253 H.Wu          SMB CHECKOUT/4752  4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht Unscheduled       
5253 H.Wu          4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht Unscheduled       
BEAM   LINE 4-2  
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
8877 T.Matsui      Unscheduled        Unscheduled        5443 G.Kashanchi   Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        CHANGE/5443 G.Kash Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        5443 G.Kashanchi   Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
Unscheduled        Unscheduled        92I7 J.Zak         92I7 J.Zak         Unscheduled        Unscheduled        Unscheduled       
Unscheduled        SMB CHECKOUT/92I7  92I7 J.Zak         Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        92I7 J.Zak         92I7 J.Zak         Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
5252 C.Wei         5252 C.Wei         5252 C.Wei         8090 J.Nelson Weke 8090 J.Nelson Weke 5697 Y.Ren         5697 Y.Ren        
5252 C.Wei         5252 C.Wei         CHANGE/8090 J.Nels 8090 J.Nelson Weke CHANGE/5697 Y.Ren  5697 Y.Ren         5697 Y.Ren        
5252 C.Wei         5252 C.Wei         8090 J.Nelson Weke 8090 J.Nelson Weke 5697 Y.Ren         5697 Y.Ren         5697 Y.Ren        
BEAM   LINE 7-2  
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
5617 K.Rush        8071 R.Sarangi     8071 R.Sarangi     5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee 
SMB CHECKOUT/8071  8071 R.Sarangi     SMB CHECKOUT/5224  5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee 
8071 R.Sarangi     8071 R.Sarangi     5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee 
BEAM   LINE 9-3  
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
5474 S.Bone        Unscheduled        Unscheduled        5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina    
5474 S.Bone        Unscheduled        Xray CHECKOUT/5530 5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina    
Unscheduled        Unscheduled        5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina    
BEAM   LINE 11-2 
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-3 
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
5729 C.Cheng       5173 G.Giri        5173 G.Giri        Unscheduled        8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
Xray CHECKOUT/5173 5173 G.Giri        5173 G.Giri        Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
5173 G.Giri        5173 G.Giri        Unscheduled        8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 14-3 
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 15-2 
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 17-2 
Oct. 05, 2020      Oct. 06, 2020      Oct. 07, 2020      Oct. 08, 2020      Oct. 09, 2020      Oct. 10, 2020      Oct. 11, 2020     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Oct. 12, 2020
                                         
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
BEAM   LINE 1-5  
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
5398 T.Wynn/AP     AP                 AP                 5368 J.Schroers    5368 J.Schroers    5368 J.Schroers    5368 J.Schroers   
AP                 AP                 Xray CHECKOUT/5368 5368 J.Schroers    5368 J.Schroers    5368 J.Schroers    5368 J.Schroers   
AP                 AP                 5368 J.Schroers    5368 J.Schroers    5368 J.Schroers    5368 J.Schroers    5368 J.Schroers   
BEAM   LINE 2-1  
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
8099 S.Bare/AP     AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
4921 J.Evans/AP    AP                 AP                 5286 K.Reinhart    5286 K.Reinhart    5286 K.Reinhart    5490 R.Wogelius   
AP                 AP                 CHANGE/5286 K.Rein 5286 K.Reinhart    5286 K.Reinhart    CHANGE/5490 R.Woge 5490 R.Wogelius   
AP                 AP                 5286 K.Reinhart    5286 K.Reinhart    5286 K.Reinhart    5490 R.Wogelius    5490 R.Wogelius   
BEAM   LINE 4-1  
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
AP                 AP                 AP                 Unscheduled        5630 K.Lindquist   5630 K.Lindquist   5630 K.Lindquist  
AP                 AP                 Unscheduled        SMB CHECKOUT/5630  5630 K.Lindquist   5630 K.Lindquist   5630 K.Lindquist  
AP                 AP                 Unscheduled        5630 K.Lindquist   5630 K.Lindquist   5630 K.Lindquist   5630 K.Lindquist  
BEAM   LINE 4-2  
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
5697 Y.Ren/AP      AP                 AP                 5551 Y.Yu          5551 Y.Yu          5551 Y.Yu          5375 M.Besli      
AP                 AP                 CHANGE/5551 Y.Yu   5551 Y.Yu          5551 Y.Yu          CHANGE/5375 M.Besl 5375 M.Besli      
AP                 AP                 5551 Y.Yu          5551 Y.Yu          5551 Y.Yu          5375 M.Besli       5375 M.Besli      
BEAM   LINE 7-2  
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
5224 R.Chatterj/AP AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
FACI/AP            AP                 AP                 5543 B.Gates       Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        5543 B.Gates       CHANGE/5543 B.Gate CHANGE/5693 K.Abdu Unscheduled       
AP                 AP                 SMB CHECKOUT/5543  Unscheduled        CHANGE/5736 A.Yang Unscheduled        Unscheduled       
BEAM   LINE 10-2 
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
5530 D.Gamzina/AP  AP                 AP                 5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina    
AP                 AP                 5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina    
AP                 AP                 5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina    
BEAM   LINE 11-2 
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
FACI/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
8091 C.Tassone/AP  AP                 AP                 FACI               5514 K.Lim         5514 K.Lim         5514 K.Lim        
AP                 AP                 FACI               Xray CHECKOUT/5514 5514 K.Lim         5514 K.Lim         5514 K.Lim        
AP                 AP                 FACI               5514 K.Lim         5514 K.Lim         5514 K.Lim         5514 K.Lim        
BEAM   LINE 14-3 
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
FACI/AP            AP                 AP                 FACI               FACI               8067 S.Webb        8067 S.Webb       
AP                 AP                 FACI               FACI               CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb       
AP                 AP                 FACI               FACI               8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 15-2 
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 17-2 
Oct. 12, 2020      Oct. 13, 2020      Oct. 14, 2020      Oct. 15, 2020      Oct. 16, 2020      Oct. 17, 2020      Oct. 18, 2020     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Oct. 19, 2020
                                         
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
BEAM   LINE 1-5  
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
5368 J.Schroers    8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
Xray CHECKOUT/8015 8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
BEAM   LINE 2-1  
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
DOWN/FACI          FACI               FACI               FACI               FACI               5514 K.Lim         5514 K.Lim        
FACI               FACI               FACI               FACI               Xray CHECKOUT/5514 5514 K.Lim         5514 K.Lim        
FACI               FACI               FACI               FACI               5514 K.Lim         5514 K.Lim         5514 K.Lim        
BEAM   LINE 2-2  
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
5490 R.Wogelius    5490 R.Wogelius    5614 Y.Tang        5614 Y.Tang        5614 Y.Tang        11E6 B.Bostick     11E6 B.Bostick    
5490 R.Wogelius    CHANGE/5614 Y.Tang 5614 Y.Tang        5614 Y.Tang        CHANGE/11E6 B.Bost 11E6 B.Bostick     11E6 B.Bostick    
5490 R.Wogelius    5614 Y.Tang        5614 Y.Tang        5614 Y.Tang        11E6 B.Bostick     11E6 B.Bostick     11E6 B.Bostick    
BEAM   LINE 4-1  
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
5630 K.Lindquist   5630 K.Lindquist   Unscheduled        92J2 J.Lentz       92J2 J.Lentz       5570 A.Garcia-Espa 5570 A.Garcia-Espa
5630 K.Lindquist   Unscheduled        SMB CHECKOUT/92J2  92J2 J.Lentz       SMB CHECKOUT/5570  5570 A.Garcia-Espa 5570 A.Garcia-Espa
5630 K.Lindquist   Unscheduled        92J2 J.Lentz       92J2 J.Lentz       5570 A.Garcia-Espa 5570 A.Garcia-Espa 5570 A.Garcia-Espa
BEAM   LINE 4-2  
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
Unscheduled        Unscheduled        11E2 D.Moses       Unscheduled        11F3 N.Jaiswal     11F3 N.Jaiswal     Unscheduled       
Unscheduled        CHANGE/11E2 D.Mose Unscheduled        CHANGE/11F3 N.Jais 11F3 N.Jaiswal     Unscheduled        CHANGE/8877 T.Mats
Unscheduled        11E2 D.Moses       Unscheduled        11F3 N.Jaiswal     11F3 N.Jaiswal     Unscheduled        8877 T.Matsui     
BEAM   LINE 4-3  
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
5375 M.Besli       5375 M.Besli       5738 D.Agyeman-Bud 5738 D.Agyeman-Bud 5738 D.Agyeman-Bud 5370 Q.Yan         5370 Q.Yan        
5375 M.Besli       CHANGE/5738 D.Agye 5738 D.Agyeman-Bud 5738 D.Agyeman-Bud CHANGE/5370 Q.Yan  5370 Q.Yan         5370 Q.Yan        
5375 M.Besli       5738 D.Agyeman-Bud 5738 D.Agyeman-Bud 5738 D.Agyeman-Bud 5370 Q.Yan         5370 Q.Yan         5370 Q.Yan        
BEAM   LINE 7-2  
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
Unscheduled        Unscheduled        11C1 E.Pierce      Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        SMB CHECKOUT/11C1  Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        11C1 E.Pierce      Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
Unscheduled        Unscheduled        5537 A.Bhan        Unscheduled        5500 O.Gutierrez   5500 O.Gutierrez   Unscheduled       
Unscheduled        SMB CHECKOUT/5537  5537 A.Bhan        SMB CHECKOUT/5500  5500 O.Gutierrez   CHANGE/8099 S.Bare Unscheduled       
Unscheduled        5537 A.Bhan        5537 A.Bhan        5500 O.Gutierrez   5500 O.Gutierrez   8099 S.Bare        Unscheduled       
BEAM   LINE 10-2 
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina    
5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     Unscheduled       
5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     Unscheduled       
BEAM   LINE 11-2 
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
Unscheduled        Unscheduled        5451 B.Stewart     5451 B.Stewart     5451 B.Stewart     5451 B.Stewart     5451 B.Stewart    
Unscheduled        mail-in/5451       5451 B.Stewart     5451 B.Stewart     5451 B.Stewart     5451 B.Stewart     5451 B.Stewart    
Unscheduled        5451 B.Stewart     5451 B.Stewart     5451 B.Stewart     5451 B.Stewart     5451 B.Stewart     5451 B.Stewart    
BEAM   LINE 11-3 
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
5514 K.Lim         5597 R.Kasse       5597 R.Kasse       5597 R.Kasse       5597 R.Kasse       5452 A.Sinha       5452 A.Sinha      
Xray CHECKOUT/5597 5597 R.Kasse       5597 R.Kasse       5597 R.Kasse       Xray CHECKOUT/5452 5452 A.Sinha       5452 A.Sinha      
5597 R.Kasse       5597 R.Kasse       5597 R.Kasse       5597 R.Kasse       5452 A.Sinha       5452 A.Sinha       5452 A.Sinha      
BEAM   LINE 14-3 
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
8067 S.Webb        8067 S.Webb        8067 S.Webb        FACI               5117 W.Fischer     5117 W.Fischer     5152 J.Magyar     
8067 S.Webb        8067 S.Webb        8067 S.Webb/FACI   CHANGE/5117 W.Fisc 5117 W.Fischer     CHANGE/5152 J.Magy 5152 J.Magyar     
8067 S.Webb        8067 S.Webb        FACI               5117 W.Fischer     5117 W.Fischer     5152 J.Magyar      5152 J.Magyar     
BEAM   LINE 15-2 
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
COMM               COMM               COMM               COMM               8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras    
COMM               COMM               COMM               CHANGE/8892 D.Soka 8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras    
COMM               COMM               COMM               8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras    
BEAM   LINE 17-2 
Oct. 19, 2020      Oct. 20, 2020      Oct. 21, 2020      Oct. 22, 2020      Oct. 23, 2020      Oct. 24, 2020      Oct. 25, 2020     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Oct. 26, 2020
                                         
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
BEAM   LINE 1-5  
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
8015 A.Mehta/AP    AP                 AP                 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
AP                 AP                 Xray CHECKOUT/5398 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
AP                 AP                 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
BEAM   LINE 2-1  
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
5514 K.Lim/AP      AP                 AP                 5717 J.Jin         5717 J.Jin         5538 A.Jeffries    5538 A.Jeffries   
AP                 AP                 mail-in/5717       5717 J.Jin         Xray CHECKOUT/5538 5538 A.Jeffries    5538 A.Jeffries   
AP                 AP                 5717 J.Jin         5717 J.Jin         5538 A.Jeffries    5538 A.Jeffries    5538 A.Jeffries   
BEAM   LINE 2-2  
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
11E6 B.Bostick/AP  AP                 AP                 8081 Y.Liu         8081 Y.Liu         5117 W.Fischer     5117 W.Fischer    
AP                 AP                 CHANGE/8081 Y.Liu  8081 Y.Liu         CHANGE/5117 W.Fisc 5117 W.Fischer     5117 W.Fischer    
AP                 AP                 8081 Y.Liu         8081 Y.Liu         5117 W.Fischer     5117 W.Fischer     5117 W.Fischer    
BEAM   LINE 4-1  
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
5570 A.Garcia-E/AP AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-2  
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
8877 T.Matsui/AP   AP                 AP                 5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
AP                 AP                 CHANGE/5504 Y.Srin 5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
AP                 AP                 5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
BEAM   LINE 4-3  
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        5474 S.Bone        5474 S.Bone       
AP                 AP                 Unscheduled        Unscheduled        SMB CHECKOUT/5474  5474 S.Bone        5474 S.Bone       
AP                 AP                 Unscheduled        Unscheduled        5474 S.Bone        5474 S.Bone        5474 S.Bone       
BEAM   LINE 6-2  
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
5370 Q.Yan/AP      AP                 AP                 COMM               COMM               COMM               8092 D.Sokaras    
AP                 AP                 COMM               COMM               COMM               CHANGE/8092 D.Soka 8092 D.Sokaras    
AP                 AP                 COMM               COMM               COMM               8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 7-2  
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
AP                 AP                 AP                 Unscheduled        8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 Unscheduled        CHANGE/8071 R.Sara 8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
AP                 AP                 Unscheduled        8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 9-3  
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
AP                 AP                 AP                 5302 L.Li          5302 L.Li          5543 B.Gates       5275 A.Aitbekova  
AP                 AP                 CHANGE/5302 L.Li   5302 L.Li          5302 L.Li          CHANGE/5275 A.Aitb Unscheduled       
AP                 AP                 5302 L.Li          5302 L.Li          CHANGE/5543 B.Gate 5275 A.Aitbekova   Unscheduled       
BEAM   LINE 10-2 
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
AP                 AP                 AP                 92I8 A.Halavanau   FACI               5173 G.Giri        5173 G.Giri       
AP                 AP                 Xray CHECKOUT/92I8 FACI               Xray CHECKOUT/5173 5173 G.Giri        5173 G.Giri       
AP                 AP                 92I8 A.Halavanau   FACI               5173 G.Giri        5173 G.Giri        5173 G.Giri       
BEAM   LINE 11-2 
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
5451 B.Stewart/AP  AP                 AP                 5318 R.Abergel     5318 R.Abergel     5318 R.Abergel     5318 R.Abergel    
AP                 AP                 SMB CHECKOUT/5318  5318 R.Abergel     5318 R.Abergel     5318 R.Abergel     5318 R.Abergel    
AP                 AP                 5318 R.Abergel     5318 R.Abergel     5318 R.Abergel     5318 R.Abergel     5318 R.Abergel    
BEAM   LINE 11-3 
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
5452 A.Sinha/AP    AP                 AP                 5706 N.Noel        5706 N.Noel        5710 L.Mundt       5710 L.Mundt      
AP                 AP                 Xray CHECKOUT/5706 5706 N.Noel        CHANGE/5710 L.Mund 5710 L.Mundt       5710 L.Mundt      
AP                 AP                 5706 N.Noel        5706 N.Noel        5710 L.Mundt       5710 L.Mundt       5710 L.Mundt      
BEAM   LINE 14-3 
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
5152 J.Magyar/AP   AP                 AP                 FACI               5714 J.Richardson  5714 J.Richardson  5359 M.Raven      
AP                 AP                 FACI               CHANGE/5714 J.Rich 5714 J.Richardson  CHANGE/5359 M.Rave 5359 M.Raven      
AP                 AP                 FACI               5714 J.Richardson  5714 J.Richardson  5359 M.Raven       5359 M.Raven      
BEAM   LINE 15-2 
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
8892 D.Sokaras/AP  AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Oct. 26, 2020      Oct. 27, 2020      Oct. 28, 2020      Oct. 29, 2020      Oct. 30, 2020      Oct. 31, 2020      Nov. 01, 2020     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Nov. 02, 2020
                                         
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
BEAM   LINE 1-5  
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
5398 T.Wynn        FACI               5452 A.Sinha       5452 A.Sinha       5452 A.Sinha       5597 R.Kasse       5597 R.Kasse      
FACI               Xray CHECKOUT/5452 5452 A.Sinha       5452 A.Sinha       Xray CHECKOUT/5597 5597 R.Kasse       5597 R.Kasse      
FACI               5452 A.Sinha       5452 A.Sinha       5452 A.Sinha       5597 R.Kasse       5597 R.Kasse       5597 R.Kasse      
BEAM   LINE 2-1  
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
5538 A.Jeffries    5538 A.Jeffries    FACI               5398 T.Wynn        5398 T.Wynn        FACI               FACI              
5538 A.Jeffries    FACI               Xray CHECKOUT/5398 5398 T.Wynn        FACI               FACI               FACI              
5538 A.Jeffries    FACI               5398 T.Wynn        5398 T.Wynn        FACI               FACI               FACI              
BEAM   LINE 2-2  
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
5117 W.Fischer     5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5553 R.Johnson    
CHANGE/5715 J.Magy 5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      CHANGE/5553 R.John 5553 R.Johnson    
5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5553 R.Johnson     5553 R.Johnson    
BEAM   LINE 4-1  
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-2  
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  Unscheduled        11F0 R.Panigrahi   8877 T.Matsui      8877 T.Matsui     
5504 Y.Srinivasan  5504 Y.Srinivasan  Unscheduled        CHANGE/11F0 R.Pani CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui     
5504 Y.Srinivasan  5504 Y.Srinivasan  Unscheduled        11F0 R.Panigrahi   8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
5474 S.Bone        5140 X.Zheng       5140 X.Zheng       5140 X.Zheng       5140 X.Zheng       5140 X.Zheng       5140 X.Zheng      
SMB CHECKOUT/5140  5140 X.Zheng       5140 X.Zheng       5140 X.Zheng       5140 X.Zheng       5140 X.Zheng       5140 X.Zheng      
5140 X.Zheng       5140 X.Zheng       5140 X.Zheng       5140 X.Zheng       5140 X.Zheng       5140 X.Zheng       5140 X.Zheng      
BEAM   LINE 6-2  
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras     5707 M.Qureshi     5707 M.Qureshi     5707 M.Qureshi     5707 M.Qureshi    
8092 D.Sokaras     8092 D.Sokaras     CHANGE/5707 M.Qure 5707 M.Qureshi     5707 M.Qureshi     5707 M.Qureshi     5707 M.Qureshi    
8092 D.Sokaras     8092 D.Sokaras     5707 M.Qureshi     5707 M.Qureshi     5707 M.Qureshi     5707 M.Qureshi     5707 M.Qureshi    
BEAM   LINE 7-2  
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
8071 R.Sarangi     Unscheduled        Unscheduled        Unscheduled        Unscheduled        5140 X.Zheng       5140 X.Zheng      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        SMB CHECKOUT/5140  5140 X.Zheng       5140 X.Zheng      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        5140 X.Zheng       5140 X.Zheng       5140 X.Zheng      
BEAM   LINE 9-3  
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
Unscheduled        8099 S.Bare        5055 P.Christopher 5355 B.Gates       5355 B.Gates       5355 B.Gates       5500 O.Gutierrez  
CHANGE/8099 S.Bare SMB CHECKOUT/5055  CHANGE/5355 B.Gate 5355 B.Gates       5355 B.Gates       5355 B.Gates       CHANGE/8099 S.Bare
8099 S.Bare        5055 P.Christopher 5355 B.Gates       5355 B.Gates       5355 B.Gates       CHANGE/5500 O.Guti 8099 S.Bare       
BEAM   LINE 10-2 
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
5173 G.Giri        FACI               8818 A.Mehta       8818 A.Mehta       5386 J.Gregoire    5386 J.Gregoire    5386 J.Gregoire   
FACI               Xray CHECKOUT/8818 8818 A.Mehta       Xray CHECKOUT/5386 5386 J.Gregoire    5386 J.Gregoire    5386 J.Gregoire   
FACI               8818 A.Mehta       8818 A.Mehta       5386 J.Gregoire    5386 J.Gregoire    5386 J.Gregoire    5386 J.Gregoire   
BEAM   LINE 11-2 
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
5318 R.Abergel     Unscheduled        Unscheduled        5214 S.White       5214 S.White       5214 S.White       5214 S.White      
5318 R.Abergel     Unscheduled        SMB CHECKOUT/5214  5214 S.White       5214 S.White       5214 S.White       5214 S.White      
5318 R.Abergel     Unscheduled        5214 S.White       5214 S.White       5214 S.White       5214 S.White       5214 S.White      
BEAM   LINE 11-3 
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
5710 L.Mundt       8081 Y.Liu         8081 Y.Liu         8081 Y.Liu         8081 Y.Liu         5734 B.Khau        5734 B.Khau       
Xray CHECKOUT/8081 8081 Y.Liu         8081 Y.Liu         8081 Y.Liu         Xray CHECKOUT/5734 5734 B.Khau        5734 B.Khau       
8081 Y.Liu         8081 Y.Liu         8081 Y.Liu         8081 Y.Liu         5734 B.Khau        5734 B.Khau        5734 B.Khau       
BEAM   LINE 14-3 
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
5359 M.Raven       5359 M.Raven       5451 B.Stewart     5451 B.Stewart     5451 B.Stewart     5474 S.Bone        5474 S.Bone       
5359 M.Raven       CHANGE/5451 B.Stew 5451 B.Stewart     5451 B.Stewart     CHANGE/5474 S.Bone 5474 S.Bone        5474 S.Bone       
5359 M.Raven       5451 B.Stewart     5451 B.Stewart     5451 B.Stewart     5474 S.Bone        5474 S.Bone        5474 S.Bone       
BEAM   LINE 15-2 
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Nov. 02, 2020      Nov. 03, 2020      Nov. 04, 2020      Nov. 05, 2020      Nov. 06, 2020      Nov. 07, 2020      Nov. 08, 2020     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Nov. 09, 2020
                                         
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
BEAM   LINE 1-5  
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
5597 R.Kasse       FACI               5631 A.Leibham     Unscheduled        FACI               FACI               FACI              
FACI               Xray CHECKOUT/5631 Xray CHECKOUT/5702 FACI               FACI               FACI               FACI              
FACI               5631 A.Leibham     5702 S.Li          FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
FACI               FACI               5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  FACI               FACI              
FACI               Xray CHECKOUT/5459 5459 A.van Veelen  5459 A.van Veelen  FACI               FACI               FACI              
FACI               5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  FACI               FACI               FACI              
BEAM   LINE 2-2  
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
Unscheduled        Unscheduled        5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        Unscheduled        Unscheduled       
Unscheduled        SMB CHECKOUT/5243  5243 Y.Arai        5243 Y.Arai        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
5553 R.Johnson     5553 R.Johnson     5553 R.Johnson     5553 R.Johnson     4921 J.Evans       4921 J.Evans       5712 J.Shukle     
5553 R.Johnson     5553 R.Johnson     5553 R.Johnson     CHANGE/4921 J.Evan 4921 J.Evans       CHANGE/5712 J.Shuk 5712 J.Shukle     
5553 R.Johnson     5553 R.Johnson     5553 R.Johnson     4921 J.Evans       4921 J.Evans       5712 J.Shukle      5712 J.Shukle     
BEAM   LINE 4-1  
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-2  
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
8877 T.Matsui      Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
5140 X.Zheng       5635 A.Cordones-Ha 5635 A.Cordones-Ha 5635 A.Cordones-Ha 5635 A.Cordones-Ha Unscheduled        Unscheduled       
SMB CHECKOUT/5635  5635 A.Cordones-Ha 5635 A.Cordones-Ha 5635 A.Cordones-Ha Unscheduled        Unscheduled        Unscheduled       
5635 A.Cordones-Ha 5635 A.Cordones-Ha 5635 A.Cordones-Ha 5635 A.Cordones-Ha Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
5707 M.Qureshi     Unscheduled        5213 M.Rahman      5213 M.Rahman      5213 M.Rahman      5626 X.He          5626 X.He         
Unscheduled        CHANGE/5213 M.Rahm 5213 M.Rahman      5213 M.Rahman      CHANGE/5626 X.He   5626 X.He          5626 X.He         
Unscheduled        5213 M.Rahman      5213 M.Rahman      5213 M.Rahman      5626 X.He          5626 X.He          5626 X.He         
BEAM   LINE 7-2  
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
5140 X.Zheng       Unscheduled        Unscheduled        Unscheduled        5333 S.Minasian    4900 A.Jasniewski  4900 A.Jasniewski 
Unscheduled        Unscheduled        Unscheduled        SMB CHECKOUT/5333  SMB CHECKOUT/4900  4900 A.Jasniewski  4900 A.Jasniewski 
Unscheduled        Unscheduled        Unscheduled        5333 S.Minasian    4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski 
BEAM   LINE 9-3  
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
Unscheduled        Unscheduled        5277 E.Nikolla     5666 L.Chen        5666 L.Chen        5696 C.Zhou        Unscheduled       
Unscheduled        SMB CHECKOUT/5277  CHANGE/5666 L.Chen 5666 L.Chen        SMB CHECKOUT/5696  CHANGE/8099 S.Bare Unscheduled       
Unscheduled        5277 E.Nikolla     5666 L.Chen        5666 L.Chen        5696 C.Zhou        8099 S.Bare        Unscheduled       
BEAM   LINE 10-2 
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
5386 J.Gregoire    5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri    
Xray CHECKOUT/5403 5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri    
5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri    
BEAM   LINE 11-2 
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
Unscheduled        Unscheduled        Unscheduled        5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
Unscheduled        Unscheduled        SMB CHECKOUT/5289  5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    Unscheduled       
Unscheduled        Unscheduled        5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    Unscheduled       
BEAM   LINE 11-3 
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
5734 B.Khau        5473 T.Quill       5473 T.Quill       5473 T.Quill       5295 Y.Wu          5295 Y.Wu          5295 Y.Wu         
Xray CHECKOUT/5473 5473 T.Quill       5473 T.Quill       Xray CHECKOUT/5295 5295 Y.Wu          5295 Y.Wu          5295 Y.Wu         
5473 T.Quill       5473 T.Quill       5473 T.Quill       5295 Y.Wu          5295 Y.Wu          5295 Y.Wu          5295 Y.Wu         
BEAM   LINE 14-3 
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
5474 S.Bone/FACI   FACI               FACI               5735 A.Bhattacharj 5735 A.Bhattacharj 5643 J.Anne        5643 J.Anne       
FACI               FACI               CHANGE/5735 A.Bhat 5735 A.Bhattacharj CHANGE/5643 J.Anne 5643 J.Anne        5643 J.Anne       
FACI               FACI               5735 A.Bhattacharj 5735 A.Bhattacharj 5643 J.Anne        5643 J.Anne        5643 J.Anne       
BEAM   LINE 15-2 
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
Unscheduled        Unscheduled        5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa
Unscheduled        CHANGE/5476 A.Garc 5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa
Unscheduled        5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa
BEAM   LINE 17-2 
Nov. 09, 2020      Nov. 10, 2020      Nov. 11, 2020      Nov. 12, 2020      Nov. 13, 2020      Nov. 14, 2020      Nov. 15, 2020     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Nov. 16, 2020
                                         
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
BEAM   LINE 1-5  
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
FACI/AP            AP                 AP                 Unscheduled        5251 G.Sethi       5251 G.Sethi       5251 G.Sethi      
AP                 AP                 Unscheduled        Xray CHECKOUT/5251 5251 G.Sethi       5251 G.Sethi       5251 G.Sethi      
AP                 AP                 Unscheduled        5251 G.Sethi       5251 G.Sethi       5251 G.Sethi       5251 G.Sethi      
BEAM   LINE 2-1  
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
FACI/AP            AP                 AP                 5209 C.Cao         5209 C.Cao         5209 C.Cao         5209 C.Cao        
AP                 AP                 Xray CHECKOUT/5209 5209 C.Cao         5209 C.Cao         5209 C.Cao         5209 C.Cao        
AP                 AP                 5209 C.Cao         5209 C.Cao         5209 C.Cao         5209 C.Cao         5209 C.Cao        
BEAM   LINE 2-2  
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
AP                 AP                 AP                 Unscheduled        5605 G.Wan         Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        SMB CHECKOUT/5605  5605 G.Wan         Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        5605 G.Wan         Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
5712 J.Shukle/AP   AP                 AP                 4885 M.Raven       4885 M.Raven       5474 S.Bone        5474 S.Bone       
AP                 AP                 CHANGE/4885 M.Rave 4885 M.Raven       CHANGE/5474 S.Bone 5474 S.Bone        5474 S.Bone       
AP                 AP                 4885 M.Raven       4885 M.Raven       5474 S.Bone        5474 S.Bone        5474 S.Bone       
BEAM   LINE 4-1  
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
FACI/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-2  
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 Unscheduled        Unscheduled        CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 Unscheduled        Unscheduled        5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
AP                 AP                 AP                 5314 K.Boye        5314 K.Boye        Unscheduled        Unscheduled       
AP                 AP                 SMB CHECKOUT/5314  5314 K.Boye        5314 K.Boye        Unscheduled        Unscheduled       
AP                 AP                 5314 K.Boye        5314 K.Boye        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
5626 X.He/AP       AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
4900 A.Jasniews/AP AP                 AP                 4900 A.Jasniewski  4900 A.Jasniewski  8099 S.Bare        8099 S.Bare       
AP                 AP                 4900 A.Jasniewski  4900 A.Jasniewski  SMB CHECKOUT/8099  8099 S.Bare        8099 S.Bare       
AP                 AP                 4900 A.Jasniewski  4900 A.Jasniewski  8099 S.Bare        8099 S.Bare        8099 S.Bare       
BEAM   LINE 9-3  
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
AP                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
5403 R.Bassiri/AP  AP                 AP                 FACI               5449 D.Zakhidov    5449 D.Zakhidov    5449 D.Zakhidov   
AP                 AP                 FACI               Xray CHECKOUT/5449 5449 D.Zakhidov    5449 D.Zakhidov    5449 D.Zakhidov   
AP                 AP                 FACI               5449 D.Zakhidov    5449 D.Zakhidov    5449 D.Zakhidov    5449 D.Zakhidov   
BEAM   LINE 11-2 
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
5295 Y.Wu/AP       AP                 AP                 5271 S.Nikzad      5271 S.Nikzad      5271 S.Nikzad      5271 S.Nikzad     
AP                 AP                 Xray CHECKOUT/5271 5271 S.Nikzad      5271 S.Nikzad      5271 S.Nikzad      5271 S.Nikzad     
AP                 AP                 5271 S.Nikzad      5271 S.Nikzad      5271 S.Nikzad      5271 S.Nikzad      5271 S.Nikzad     
BEAM   LINE 14-3 
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
5643 J.Anne/AP     AP                 AP                 FACI               FACI               FACI               11D9 J.Richardson 
AP                 AP                 FACI               FACI               FACI               CHANGE/11D9 J.Rich 11D9 J.Richardson 
AP                 AP                 FACI               FACI               FACI               11D9 J.Richardson  11D9 J.Richardson 
BEAM   LINE 15-2 
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
5476 A.Garcia-E/AP AP                 AP                 Unscheduled        5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen 
AP                 AP                 Unscheduled        CHANGE/5508 A.van  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen 
AP                 AP                 Unscheduled        5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen 
BEAM   LINE 17-2 
Nov. 16, 2020      Nov. 17, 2020      Nov. 18, 2020      Nov. 19, 2020      Nov. 20, 2020      Nov. 21, 2020      Nov. 22, 2020     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Nov. 23, 2020
                                         
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
BEAM   LINE 1-5  
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
5251 G.Sethi       5251 G.Sethi       CHANGE/5689 N.Shah DOWN               DOWN               5689 N.Shah        5689 N.Shah       
5251 G.Sethi       5251 G.Sethi       5689 N.Shah        DOWN               DOWN               5689 N.Shah        5689 N.Shah       
5251 G.Sethi       5251 G.Sethi       5689 N.Shah/DOWN   DOWN               5689 N.Shah        5689 N.Shah        5689 N.Shah       
BEAM   LINE 2-1  
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
5209 C.Cao         FACI               FACI               DOWN               DOWN               FACI               FACI              
5209 C.Cao/FACI    FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI/DOWN          DOWN               FACI               FACI               FACI              
BEAM   LINE 2-2  
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
Unscheduled        5242 X.He          5242 X.He          DOWN               DOWN               5242 X.He          5242 X.He         
SMB CHECKOUT/5242  5242 X.He          5242 X.He          DOWN               DOWN               5242 X.He          5242 X.He         
5242 X.He          5242 X.He          5242 X.He/DOWN     DOWN               5242 X.He          5242 X.He          5242 X.He         
BEAM   LINE 2-3  
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
5474 S.Bone        5375 M.Besli       5375 M.Besli       DOWN               DOWN               Unscheduled        5324 A.Jew        
CHANGE/5375 M.Besl 5375 M.Besli       5375 M.Besli       DOWN               DOWN               CHANGE/5324 A.Jew  5324 A.Jew        
5375 M.Besli       5375 M.Besli       5375 M.Besli/DOWN  DOWN               Unscheduled        5324 A.Jew         5324 A.Jew        
BEAM   LINE 4-1  
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
FACI               FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI/DOWN          DOWN               FACI               FACI               FACI              
BEAM   LINE 4-2  
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
5497 M.Georgiadis  5497 M.Georgiadis  Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
5497 M.Georgiadis  Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
5497 M.Georgiadis  Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
Unscheduled        92H8 M.Greaney     92H8 M.Greaney     DOWN               DOWN               5277 E.Nikolla     92H8 M.Greaney    
SMB CHECKOUT/92H8  92H8 M.Greaney     92H8 M.Greaney     DOWN               DOWN               CHANGE/92H8 M.Grea 92H8 M.Greaney    
92H8 M.Greaney     92H8 M.Greaney     92H8 M.Greane/DOWN DOWN               5277 E.Nikolla     92H8 M.Greaney     92H8 M.Greaney    
BEAM   LINE 6-2  
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
DOWN               DOWN               5200 Y.Liu         DOWN               DOWN               Unscheduled        5547 A.Hu         
DOWN               CHANGE/5200 Y.Liu  5200 Y.Liu         DOWN               DOWN               CHANGE/5547 A.Hu   5547 A.Hu         
DOWN               5200 Y.Liu         5200 Y.Liu/DOWN    DOWN               Unscheduled        5547 A.Hu          5547 A.Hu         
BEAM   LINE 7-2  
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
FACI               FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI/DOWN          DOWN               FACI               FACI               FACI              
BEAM   LINE 7-3  
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
8099 S.Bare        4900 A.Jasniewski  4900 A.Jasniewski  DOWN               DOWN               FACI               FACI              
SMB CHECKOUT/4900  4900 A.Jasniewski  4900 A.Jasniewski  DOWN               DOWN               FACI               FACI              
4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasnie/DOWN DOWN               FACI               FACI               FACI              
BEAM   LINE 9-3  
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
5449 D.Zakhidov    FACI               FACI               DOWN               DOWN               FACI               FACI              
5449 D.Zakhid/FACI FACI               FACI               DOWN               DOWN               FACI               FACI              
FACI               FACI               FACI/DOWN          DOWN               FACI               FACI               FACI              
BEAM   LINE 11-2 
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
Unscheduled        Unscheduled        4809 G.Lowry       DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        SMB CHECKOUT/4809  4809 G.Lowry       DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        4809 G.Lowry       4809 G.Lowry/DOWN  DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
5271 S.Nikzad      5710 L.Mundt       5710 L.Mundt       DOWN               DOWN               5710 L.Mundt       5710 L.Mundt      
Xray CHECKOUT/5710 5710 L.Mundt       5710 L.Mundt       DOWN               DOWN               5710 L.Mundt       5710 L.Mundt      
5710 L.Mundt       5710 L.Mundt       5710 L.Mundt/DOWN  DOWN               5710 L.Mundt       5710 L.Mundt       5710 L.Mundt      
BEAM   LINE 14-3 
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
11D9 J.Richardson  5715 J.Magyar      5715 J.Magyar      DOWN               DOWN               11D0 J.Richardson  11D0 J.Richardson 
CHANGE/5715 J.Magy 5715 J.Magyar      5715 J.Magyar      DOWN               DOWN               11D0 J.Richardson  11D0 J.Richardson 
5715 J.Magyar      5715 J.Magyar      5715 J.Magyar/DOWN DOWN               11D0 J.Richardson  11D0 J.Richardson  11D0 J.Richardson 
BEAM   LINE 15-2 
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
5508 A.van Veelen  Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Nov. 23, 2020      Nov. 24, 2020      Nov. 25, 2020      Nov. 26, 2020      Nov. 27, 2020      Nov. 28, 2020      Nov. 29, 2020     
COMM               COMM               COMM               DOWN               DOWN               COMM               COMM              
COMM               COMM               COMM               DOWN               DOWN               COMM               COMM              
COMM               COMM               COMM/DOWN          DOWN               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Nov. 30, 2020
                                         
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
BEAM   LINE 1-5  
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
5689 N.Shah        Unscheduled        5443 G.Kashanchi   5443 G.Kashanchi   FACI               FACI               FACI              
Unscheduled        Xray CHECKOUT/5443 5443 G.Kashanchi   FACI               FACI               FACI               FACI              
Unscheduled        5443 G.Kashanchi   5443 G.Kashanchi   FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
FACI               FACI               5548 M.Capano      5548 M.Capano      5548 M.Capano      Unscheduled        Unscheduled       
FACI               Xray CHECKOUT/5548 5548 M.Capano      5548 M.Capano      5548 M.Capano      CHANGE/90H0 A.Huq  Unscheduled       
FACI               5548 M.Capano      5548 M.Capano      5548 M.Capano      Unscheduled        90H0 A.Huq         Unscheduled       
BEAM   LINE 2-2  
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
5242 X.He          5242 X.He          Unscheduled        5374 C.Usubelli    5374 C.Usubelli    5374 C.Usubelli    Unscheduled       
5242 X.He          5242 X.He          SMB CHECKOUT/5374  5374 C.Usubelli    5374 C.Usubelli    5374 C.Usubelli    Unscheduled       
5242 X.He          5242 X.He          5374 C.Usubelli    5374 C.Usubelli    5374 C.Usubelli    Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
5324 A.Jew         5444 J.Bargar      5444 J.Bargar      8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
CHANGE/5444 J.Barg 5444 J.Bargar      CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
5444 J.Bargar      5444 J.Bargar      8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 4-1  
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-2  
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
Unscheduled        Unscheduled        Unscheduled        8877 T.Matsui      11F0 R.Panigrahi   11F0 R.Panigrahi   Unscheduled       
Unscheduled        Unscheduled        CHANGE/8877 T.Mats CHANGE/11F0 R.Pani 11F0 R.Panigrahi   Unscheduled        Unscheduled       
Unscheduled        Unscheduled        8877 T.Matsui      11F0 R.Panigrahi   11F0 R.Panigrahi   Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
92H8 M.Greaney     5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter FACI               FACI               5698 W.Tarpeh     
CHANGE/5524 C.Kron 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronaw/FACI FACI               CHANGE/5698 W.Tarp 5698 W.Tarpeh     
5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter FACI               FACI               5698 W.Tarpeh      5698 W.Tarpeh     
BEAM   LINE 6-2  
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
5547 A.Hu          5547 A.Hu          5056 R.Coridan     5056 R.Coridan     5672 P.Zhang       4875 A.Dawson      4875 A.Dawson     
5547 A.Hu          CHANGE/5056 R.Cori 5056 R.Coridan     CHANGE/5672 P.Zhan CHANGE/4875 A.Daws 4875 A.Dawson      4875 A.Dawson     
5547 A.Hu          5056 R.Coridan     5056 R.Coridan     5672 P.Zhang       4875 A.Dawson      4875 A.Dawson      4875 A.Dawson     
BEAM   LINE 7-2  
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
FACI               FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
FACI               FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-3  
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
FACI               FACI               5075 A.Braun       5075 A.Braun       5075 A.Braun       5075 A.Braun       Unscheduled       
FACI               SMB CHECKOUT/5075  5075 A.Braun       5075 A.Braun       5075 A.Braun       5075 A.Braun       Unscheduled       
FACI               5075 A.Braun       5075 A.Braun       5075 A.Braun       5075 A.Braun       Unscheduled        Unscheduled       
BEAM   LINE 9-3  
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
DOWN               DOWN               5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb        
DOWN               SMB CHECKOUT/5081  5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb        
DOWN               5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb        
BEAM   LINE 10-2 
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
FACI               FACI               FACI               92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau  
FACI               FACI               Xray CHECKOUT/92I8 92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau  
FACI               FACI               92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau  
BEAM   LINE 11-2 
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
Unscheduled        Unscheduled        Unscheduled        4770 C.Hansel      4770 C.Hansel      4770 C.Hansel      4770 C.Hansel     
Unscheduled        Unscheduled        SMB CHECKOUT/4770  4770 C.Hansel      4770 C.Hansel      4770 C.Hansel      4770 C.Hansel     
Unscheduled        Unscheduled        4770 C.Hansel      4770 C.Hansel      4770 C.Hansel      4770 C.Hansel      4770 C.Hansel     
BEAM   LINE 11-3 
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
5710 L.Mundt       8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 14-3 
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
11D0 J.Richardson  5712 J.Shukle      5712 J.Shukle      5718 J.Moran       5718 J.Moran       5643 J.Anne        5643 J.Anne       
CHANGE/5712 J.Shuk 5712 J.Shukle      CHANGE/5718 J.Mora 5718 J.Moran       CHANGE/5643 J.Anne 5643 J.Anne        5643 J.Anne       
5712 J.Shukle      5712 J.Shukle      5718 J.Moran       5718 J.Moran       5643 J.Anne        5643 J.Anne        5643 J.Anne       
BEAM   LINE 15-2 
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Nov. 30, 2020      Dec. 01, 2020      Dec. 02, 2020      Dec. 03, 2020      Dec. 04, 2020      Dec. 05, 2020      Dec. 06, 2020     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Dec. 07, 2020
                                         
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
BEAM   LINE 1-5  
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
FACI/AP            AP                 AP                 5060 K.Bagchi      5060 K.Bagchi      FACI               FACI              
AP                 AP                 CHANGE/5060 K.Bagc 5060 K.Bagchi      FACI               FACI               FACI              
AP                 AP                 5060 K.Bagchi      5060 K.Bagchi      FACI               FACI               FACI              
BEAM   LINE 2-1  
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
AP                 AP                 AP                 5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt      
AP                 AP                 5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt      
AP                 AP                 5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt      
BEAM   LINE 2-2  
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
AP                 AP                 AP                 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
AP                 AP                 SMB CHECKOUT/8890  8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
AP                 AP                 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
BEAM   LINE 2-3  
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
8067 S.Webb/AP     AP                 AP                 FACI               FACI               FACI               5149 N.Tosca      
AP                 AP                 FACI               FACI               FACI               CHANGE/5149 N.Tosc CHANGE/5643 J.Anne
AP                 AP                 FACI               FACI               FACI               5149 N.Tosca       5643 J.Anne       
BEAM   LINE 4-1  
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
FACI/AP            AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
AP                 AP                 AP                 11F4 M.Areyano     11F4 M.Areyano     5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 CHANGE/11F4 M.Arey 11F4 M.Areyano     CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 11F4 M.Areyano     11F4 M.Areyano     5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
5698 W.Tarpeh/AP   AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
4875 A.Dawson/AP   AP                 AP                 5493 Y.Liu         5493 Y.Liu         5493 Y.Liu         5493 Y.Liu        
AP                 AP                 CHANGE/5493 Y.Liu  5493 Y.Liu         5493 Y.Liu         5493 Y.Liu         5493 Y.Liu        
AP                 AP                 5493 Y.Liu         5493 Y.Liu         5493 Y.Liu         5493 Y.Liu         5493 Y.Liu        
BEAM   LINE 7-2  
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
AP                 AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
5081 A.Deb/AP      AP                 AP                 5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb        
AP                 AP                 5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb        
AP                 AP                 5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb         Unscheduled       
BEAM   LINE 10-2 
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
92I8 A.Halavana/AP AP                 AP                 8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
AP                 AP                 Xray CHECKOUT/8818 8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
AP                 AP                 8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
BEAM   LINE 11-2 
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
4770 C.Hansel/AP   AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
8091 C.Tassone/AP  AP                 AP                 5529 C.Salamat     5529 C.Salamat     5529 C.Salamat     5529 C.Salamat    
AP                 AP                 Xray CHECKOUT/5529 5529 C.Salamat     5529 C.Salamat     5529 C.Salamat     5529 C.Salamat    
AP                 AP                 5529 C.Salamat     5529 C.Salamat     5529 C.Salamat     5529 C.Salamat     5529 C.Salamat    
BEAM   LINE 14-3 
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
5643 J.Anne/AP     AP                 AP                 5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        Unscheduled       
AP                 AP                 SMB CHECKOUT/5243  5243 Y.Arai        5243 Y.Arai        Unscheduled        Unscheduled       
AP                 AP                 5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        Unscheduled        Unscheduled       
BEAM   LINE 15-2 
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
AP                 AP                 AP                 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
AP                 AP                 CHANGE/8098 T.Krol 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
AP                 AP                 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
BEAM   LINE 17-2 
Dec. 07, 2020      Dec. 08, 2020      Dec. 09, 2020      Dec. 10, 2020      Dec. 11, 2020      Dec. 12, 2020      Dec. 13, 2020     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Dec. 14, 2020
                                         
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
BEAM   LINE 1-5  
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
FACI               FACI               FACI               FACI               FACI/AP            DOWN               DOWN              
FACI               FACI               FACI               FACI               AP                 DOWN               DOWN              
FACI               FACI               FACI               FACI               AP/DOWN            DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
5710 L.Mundt       FACI               5698 W.Tarpeh      5698 W.Tarpeh      5698 W.Tarpeh/AP   DOWN               DOWN              
5710 L.Mundt/FACI  Xray CHECKOUT/5698 5698 W.Tarpeh      5698 W.Tarpeh      AP                 DOWN               DOWN              
FACI               5698 W.Tarpeh      5698 W.Tarpeh      5698 W.Tarpeh      AP/DOWN            DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
8890 J.Nelson Weke 8890 J.Nelson Weke 5699 T.Kim         5699 T.Kim         5699 T.Kim/AP      DOWN               DOWN              
8890 J.Nelson Weke SMB CHECKOUT/5699  5699 T.Kim         5699 T.Kim         AP                 DOWN               DOWN              
8890 J.Nelson Weke 5699 T.Kim         5699 T.Kim         5699 T.Kim         AP/DOWN            DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
5643 J.Anne        5643 J.Anne        5643 J.Anne        5643 J.Anne        5643 J.Anne/AP     DOWN               DOWN              
5643 J.Anne        5643 J.Anne        5643 J.Anne        5643 J.Anne        AP                 DOWN               DOWN              
5643 J.Anne        5643 J.Anne        5643 J.Anne        5643 J.Anne        AP/DOWN            DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP/DOWN            DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
5497 M.Georgiadis  8877 T.Matsui      8877 T.Matsui      8047 T.Weiss       8047 T.Weiss/AP    DOWN               DOWN              
CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/8047 T.Weis 8047 T.Weiss       AP                 DOWN               DOWN              
8877 T.Matsui      8877 T.Matsui      8047 T.Weiss       8047 T.Weiss       AP/DOWN            DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
Unscheduled        5382 M.Kreider     5382 M.Kreider     5477 E.Valle       5477 E.Valle/AP    DOWN               DOWN              
SMB CHECKOUT/5382  5382 M.Kreider     SMB CHECKOUT/5477  5477 E.Valle       AP                 DOWN               DOWN              
5382 M.Kreider     5382 M.Kreider     5477 E.Valle       5477 E.Valle       AP/DOWN            DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
5493 Y.Liu         5312 N.Seitzman    5312 N.Seitzman    5672 P.Zhang       5672 P.Zhang/AP    DOWN               DOWN              
CHANGE/5312 N.Seit 5312 N.Seitzman    CHANGE/5672 P.Zhan 5672 P.Zhang       AP                 DOWN               DOWN              
5312 N.Seitzman    5312 N.Seitzman    5672 P.Zhang       5672 P.Zhang       AP/DOWN            DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
FACI               FACI               FACI               FACI               FACI/AP            DOWN               DOWN              
FACI               FACI               FACI               FACI               AP                 DOWN               DOWN              
FACI               FACI               FACI               FACI               AP/DOWN            DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
Unscheduled        5635 A.Cordones-Ha 5635 A.Cordones-Ha 5635 A.Cordones-Ha 5635 A.Cordones/AP DOWN               DOWN              
SMB CHECKOUT/5635  5635 A.Cordones-Ha 5635 A.Cordones-Ha 5635 A.Cordones-Ha AP                 DOWN               DOWN              
5635 A.Cordones-Ha 5635 A.Cordones-Ha 5635 A.Cordones-Ha 5635 A.Cordones-Ha AP/DOWN            DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
Unscheduled        Unscheduled        5713 J.Berry       5713 J.Berry       5713 J.Berry/AP    DOWN               DOWN              
Unscheduled        SMB CHECKOUT/5713  5713 J.Berry       5713 J.Berry       AP                 DOWN               DOWN              
Unscheduled        5713 J.Berry       5713 J.Berry       5713 J.Berry       AP/DOWN            DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
8818 A.Mehta       FACI               8818 A.Mehta       8818 A.Mehta       8818 A.Mehta/AP    DOWN               DOWN              
8818 A.Mehta/FACI  8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       AP                 DOWN               DOWN              
FACI               8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       AP/DOWN            DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP                 DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        AP/DOWN            DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
5529 C.Salamat     5697 Y.Ren         5697 Y.Ren         5697 Y.Ren         5697 Y.Ren/AP      DOWN               DOWN              
Xray CHECKOUT/5697 5697 Y.Ren         5697 Y.Ren         5697 Y.Ren         AP                 DOWN               DOWN              
5697 Y.Ren         5697 Y.Ren         5697 Y.Ren         5697 Y.Ren         AP/DOWN            DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
Unscheduled        5614 Y.Tang        5614 Y.Tang        5477 E.Valle       5477 E.Valle/AP    DOWN               DOWN              
SMB CHECKOUT/5614  5614 Y.Tang        SMB CHECKOUT/5477  5477 E.Valle       AP                 DOWN               DOWN              
5614 Y.Tang        5614 Y.Tang        5477 E.Valle       5477 E.Valle       AP/DOWN            DOWN               DOWN              
BEAM   LINE 15-2 
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll/AP    DOWN               DOWN              
8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       AP                 DOWN               DOWN              
8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       AP/DOWN            DOWN               DOWN              
BEAM   LINE 17-2 
Dec. 14, 2020      Dec. 15, 2020      Dec. 16, 2020      Dec. 17, 2020      Dec. 18, 2020      Dec. 19, 2020      Dec. 20, 2020     
COMM               COMM               COMM               COMM               COMM/AP            DOWN               DOWN              
COMM               COMM               COMM               COMM               AP                 DOWN               DOWN              
COMM               COMM               COMM               COMM               AP/DOWN            DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 21, 2020
                                         
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
BEAM   LINE 1-5  
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Dec. 21, 2020      Dec. 22, 2020      Dec. 23, 2020      Dec. 24, 2020      Dec. 25, 2020      Dec. 26, 2020      Dec. 27, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 28, 2020
                                         
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
BEAM   LINE 1-5  
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Dec. 28, 2020      Dec. 29, 2020      Dec. 30, 2020      Dec. 31, 2020      Jan. 01, 2021      Jan. 02, 2021      Jan. 03, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Jan. 04, 2021
                                         
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
BEAM   LINE 1-5  
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-2  
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-3  
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-2  
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 FACI               FACI               5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 FACI               FACI               CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 FACI               FACI               5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               5324 A.Jew        
AP                 AP                 FACI               FACI               FACI               SMB CHECKOUT/5324  5324 A.Jew        
AP                 AP                 FACI               FACI               FACI               5324 A.Jew         5324 A.Jew        
BEAM   LINE 6-2  
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 STUP               5632 M.Doeff       5632 M.Doeff       5632 M.Doeff      
AP                 AP                 STUP               CHANGE/5632 M.Doef 5632 M.Doeff       5632 M.Doeff       5632 M.Doeff      
AP                 AP                 STUP               5632 M.Doeff       5632 M.Doeff       5632 M.Doeff       5632 M.Doeff      
BEAM   LINE 7-2  
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 9-3  
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 FACI               FACI               5530 D.Gamzina     5530 D.Gamzina    
AP                 AP                 FACI               FACI               Xray CHECKOUT/5530 5530 D.Gamzina     5530 D.Gamzina    
AP                 AP                 FACI               FACI               5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina    
BEAM   LINE 11-2 
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               8095 K.Stone      
AP                 AP                 FACI               FACI               FACI               CHANGE/8095 K.Ston 8095 K.Stone      
AP                 AP                 FACI               FACI               FACI               8095 K.Stone       8095 K.Stone      
BEAM   LINE 14-3 
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 15-2 
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Jan. 04, 2021      Jan. 05, 2021      Jan. 06, 2021      Jan. 07, 2021      Jan. 08, 2021      Jan. 09, 2021      Jan. 10, 2021     
DOWN/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jan. 11, 2021
                                         
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
BEAM   LINE 1-5  
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
FACI               5691 S.Moffitt     5691 S.Moffitt     FACI               FACI               Unscheduled        Unscheduled       
Xray CHECKOUT/5691 5691 S.Moffitt     FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
5691 S.Moffitt     5691 S.Moffitt     FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-2  
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
FACI               Unscheduled        5404 H.Xin         5404 H.Xin         5404 H.Xin         5243 Y.Arai        5243 Y.Arai       
Unscheduled        SMB CHECKOUT/5404  5404 H.Xin         5404 H.Xin         SMB CHECKOUT/5243  5243 Y.Arai        5243 Y.Arai       
Unscheduled        5404 H.Xin         5404 H.Xin         5404 H.Xin         5243 Y.Arai        5243 Y.Arai        5243 Y.Arai       
BEAM   LINE 2-3  
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
DOWN               5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      5584 E.Spielman-Su 5584 E.Spielman-Su
CHANGE/5771 C.Hans 5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      CHANGE/5584 E.Spie 5584 E.Spielman-Su 5584 E.Spielman-Su
5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      5584 E.Spielman-Su 5584 E.Spielman-Su 5584 E.Spielman-Su
BEAM   LINE 4-1  
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
5497 M.Georgiadis  Unscheduled        Unscheduled        5518 A.DeMaria     5518 A.DeMaria     8877 T.Matsui      8877 T.Matsui     
Unscheduled        Unscheduled        CHANGE/5518 A.DeMa 5518 A.DeMaria     CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui     
Unscheduled        Unscheduled        5518 A.DeMaria     5518 A.DeMaria     8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
5324 A.Jew         Unscheduled        5474 S.Bone        5474 S.Bone        5474 S.Bone        5474 S.Bone        5474 S.Bone       
Unscheduled        SMB CHECKOUT/5474  5474 S.Bone        5474 S.Bone        5474 S.Bone        5474 S.Bone        5474 S.Bone       
Unscheduled        5474 S.Bone        5474 S.Bone        5474 S.Bone        5474 S.Bone        5474 S.Bone        5474 S.Bone       
BEAM   LINE 6-2  
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
5632 M.Doeff       5211 L.Mu          5211 L.Mu          5687 V.Augustyn    5687 V.Augustyn    5687 V.Augustyn    8890 J.Nelson Weke
CHANGE/5211 L.Mu   5211 L.Mu          CHANGE/5687 V.Augu 5687 V.Augustyn    5687 V.Augustyn    CHANGE/8890 J.Nels 8890 J.Nelson Weke
5211 L.Mu          5211 L.Mu          5687 V.Augustyn    5687 V.Augustyn    5687 V.Augustyn    8890 J.Nelson Weke 8890 J.Nelson Weke
BEAM   LINE 7-2  
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
DOWN               DOWN               DOWN               5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
DOWN               DOWN               CHANGE/5289 J.Chor 5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
DOWN               DOWN               5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
BEAM   LINE 7-3  
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina    
5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina    
5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina     5530 D.Gamzina    
BEAM   LINE 11-2 
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
8095 K.Stone       Unscheduled        Unscheduled        Unscheduled        Unscheduled        5213 M.Rahman      5213 M.Rahman     
8095 K.Stone       Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/5213 5213 M.Rahman      5213 M.Rahman     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        5213 M.Rahman      5213 M.Rahman      5213 M.Rahman     
BEAM   LINE 14-3 
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
FACI               4758 M.Ganio       4758 M.Ganio       4758 M.Ganio       5474 S.Bone        5474 S.Bone        5474 S.Bone       
CHANGE/4758 M.Gani 4758 M.Ganio       4758 M.Ganio       CHANGE/5474 S.Bone 5474 S.Bone        5474 S.Bone        5474 S.Bone       
4758 M.Ganio       4758 M.Ganio       4758 M.Ganio       5474 S.Bone        5474 S.Bone        5474 S.Bone        5474 S.Bone       
BEAM   LINE 15-2 
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Jan. 11, 2021      Jan. 12, 2021      Jan. 13, 2021      Jan. 14, 2021      Jan. 15, 2021      Jan. 16, 2021      Jan. 17, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jan. 18, 2021
                                         
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
BEAM   LINE 1-5  
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
Unscheduled        Unscheduled        5669 D.Harbottle   5669 D.Harbottle   FACI               5669 D.Harbottle   5669 D.Harbottle  
Unscheduled        Xray CHECKOUT/5669 5669 D.Harbottle   5669 D.Harbot/FACI 5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle  
Unscheduled        5669 D.Harbottle   5669 D.Harbottle   FACI               5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle  
BEAM   LINE 2-1  
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-2  
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        Unscheduled        Unscheduled       
5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        Unscheduled        Unscheduled       
5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        5243 Y.Arai        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
5584 E.Spielman-Su 5472 P.O'Day       5472 P.O'Day       5472 P.O'Day       5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
CHANGE/5472 P.O'Da 5472 P.O'Day       5472 P.O'Day       CHANGE/5289 J.Chor 5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
5472 P.O'Day       5472 P.O'Day       5472 P.O'Day       5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
BEAM   LINE 4-1  
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        5584 E.Spielman-Su 5584 E.Spielman-Su 5584 E.Spielman-Su
Unscheduled        Unscheduled        Unscheduled        SMB CHECKOUT/5584  5584 E.Spielman-Su 5584 E.Spielman-Su 5584 E.Spielman-Su
Unscheduled        Unscheduled        Unscheduled        5584 E.Spielman-Su 5584 E.Spielman-Su 5584 E.Spielman-Su 5584 E.Spielman-Su
BEAM   LINE 4-2  
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
8877 T.Matsui      5253 H.Wu          5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  Unscheduled        Unscheduled       
CHANGE/5253 H.Wu   CHANGE/5504 Y.Srin 5504 Y.Srinivasan  5504 Y.Srinivasan  Unscheduled        Unscheduled        Unscheduled       
5253 H.Wu          5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
5474 S.Bone        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
5474 S.Bone        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
8890 J.Nelson Weke 8890 J.Nelson Weke 5651 Z.Xu          5651 Z.Xu          5651 Z.Xu          5200 Y.Liu         5200 Y.Liu        
8890 J.Nelson Weke CHANGE/5651 Z.Xu   5651 Z.Xu          5651 Z.Xu          CHANGE/5200 Y.Liu  5200 Y.Liu         5200 Y.Liu        
8890 J.Nelson Weke 5651 Z.Xu          5651 Z.Xu          5651 Z.Xu          5200 Y.Liu         5200 Y.Liu         5200 Y.Liu        
BEAM   LINE 7-2  
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
5289 J.Chorover    11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      5093 M.Kelly      
CHANGE/11F2 M.Push 11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      CHANGE/5093 M.Kell 5093 M.Kelly      
11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      11F2 M.Pushie      5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 7-3  
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
Unscheduled        Unscheduled        5661 G.George      5661 G.George      5661 G.George      5661 G.George      5661 G.George     
Unscheduled        SMB CHECKOUT/5661  5661 G.George      5661 G.George      5661 G.George      5661 G.George      5661 G.George     
Unscheduled        5661 G.George      5661 G.George      5661 G.George      5661 G.George      5661 G.George      5661 G.George     
BEAM   LINE 9-3  
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
5530 D.Gamzina     5530 D.Gamzina     Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
5530 D.Gamzina     5530 D.Gamzina     Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
5530 D.Gamzina     Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        5324 A.Jew         5324 A.Jew         5324 A.Jew        
Unscheduled        Unscheduled        Unscheduled        SMB CHECKOUT/5324  5324 A.Jew         5324 A.Jew         5324 A.Jew        
Unscheduled        Unscheduled        Unscheduled        5324 A.Jew         5324 A.Jew         5324 A.Jew         5324 A.Jew        
BEAM   LINE 11-3 
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
5213 M.Rahman      5213 M.Rahman      5213 M.Rahman      5213 M.Rahman      Unscheduled        Unscheduled        Unscheduled       
5213 M.Rahman      5213 M.Rahman      5213 M.Rahman      5213 M.Rahman      Unscheduled        Unscheduled        Unscheduled       
5213 M.Rahman      5213 M.Rahman      5213 M.Rahman      Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-3 
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
5474 S.Bone        5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5120 D.Fike        5120 D.Fike       
CHANGE/5289 J.Chor 5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    CHANGE/5120 D.Fike 5120 D.Fike        5120 D.Fike       
5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5120 D.Fike        5120 D.Fike        5120 D.Fike       
BEAM   LINE 15-2 
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
DOWN               DOWN               DOWN               DOWN               Unscheduled        5126 J.Yano        5126 J.Yano       
DOWN               DOWN               DOWN               DOWN               CHANGE/5126 J.Yano 5126 J.Yano        5126 J.Yano       
DOWN               DOWN               DOWN               Unscheduled        5126 J.Yano        5126 J.Yano        5126 J.Yano       
BEAM   LINE 17-2 
Jan. 18, 2021      Jan. 19, 2021      Jan. 20, 2021      Jan. 21, 2021      Jan. 22, 2021      Jan. 23, 2021      Jan. 24, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jan. 25, 2021
                                         
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
BEAM   LINE 1-5  
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
5669 D.Harbot/PAAM AP                 AP                 5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle  
PAAM               AP                 5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   Unscheduled       
PAAM/AP            AP                 5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   Unscheduled       
BEAM   LINE 2-1  
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
FACI/PAAM          AP                 AP                 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
PAAM               AP                 Xray CHECKOUT/5398 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
PAAM/AP            AP                 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
BEAM   LINE 2-2  
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
PAAM               AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
PAAM               AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
PAAM/AP            AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
5289 J.Chorov/PAAM AP                 AP                 5444 J.Bargar      5444 J.Bargar      5444 J.Bargar      5715 J.Magyar     
PAAM               AP                 CHANGE/5444 J.Barg 5444 J.Bargar      5444 J.Bargar      CHANGE/5715 J.Magy 5715 J.Magyar     
PAAM/AP            AP                 5444 J.Bargar      5444 J.Bargar      5444 J.Bargar      5715 J.Magyar      5715 J.Magyar     
BEAM   LINE 4-1  
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
5584 E.Spielm/PAAM AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
PAAM               AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
PAAM/AP            AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
PAAM               AP                 AP                 11F7 D.Monteiro    11F7 D.Monteiro    5253 H.Wu          Unscheduled       
PAAM               AP                 CHANGE/11F7 D.Mont 11F7 D.Monteiro    CHANGE/5253 H.Wu   Unscheduled        Unscheduled       
PAAM/AP            AP                 11F7 D.Monteiro    11F7 D.Monteiro    5253 H.Wu          Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
PAAM               AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
PAAM               AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
PAAM/AP            AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
5200 Y.Liu/PAAM    AP                 AP                 5485 X.Milhet      5485 X.Milhet      5485 X.Milhet      5396 J.Nelson Weke
PAAM               AP                 CHANGE/5485 X.Milh 5485 X.Milhet      5485 X.Milhet      CHANGE/5396 J.Nels 5396 J.Nelson Weke
PAAM/AP            AP                 5485 X.Milhet      5485 X.Milhet      5485 X.Milhet      5396 J.Nelson Weke 5396 J.Nelson Weke
BEAM   LINE 7-2  
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
5093 M.Kelly/PAAM  AP                 AP                 Unscheduled        Unscheduled        4791 M.Zeineh      4791 M.Zeineh     
PAAM               AP                 Unscheduled        Unscheduled        CHANGE/4791 M.Zein 4791 M.Zeineh      4791 M.Zeineh     
PAAM/AP            AP                 Unscheduled        Unscheduled        4791 M.Zeineh      4791 M.Zeineh      4791 M.Zeineh     
BEAM   LINE 7-3  
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
5661 G.George/PAAM AP                 AP                 Unscheduled        8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
PAAM               AP                 Unscheduled        SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
PAAM/AP            AP                 Unscheduled        8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 9-3  
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
FACI/PAAM          AP                 AP                 FACI               FACI               FACI               FACI              
PAAM               AP                 FACI               FACI               FACI               FACI               FACI              
PAAM/AP            AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
PAAM               AP                 AP                 COMM               COMM               COMM               COMM              
PAAM               AP                 COMM               COMM               COMM               COMM               COMM              
PAAM/AP            AP                 COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
5324 A.Jew/PAAM    AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
PAAM               AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
PAAM/AP            AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
PAAM               AP                 AP                 5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange    
PAAM               AP                 Xray CHECKOUT/5329 5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange    
PAAM/AP            AP                 5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange    
BEAM   LINE 14-3 
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
5120 D.Fike/PAAM   AP                 AP                 5474 S.Bone        5474 S.Bone        5474 S.Bone        5474 S.Bone       
PAAM               AP                 CHANGE/5474 S.Bone 5474 S.Bone        5474 S.Bone        5474 S.Bone        CHANGE/5359 M.Rave
PAAM/AP            AP                 5474 S.Bone        5474 S.Bone        5474 S.Bone        5474 S.Bone        5359 M.Raven      
BEAM   LINE 15-2 
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
5126 J.Yano/PAAM   AP                 AP                 5802 R.Hadt        5802 R.Hadt        5802 R.Hadt        5802 R.Hadt       
PAAM               AP                 CHANGE/5802 R.Hadt 5802 R.Hadt        5802 R.Hadt        5802 R.Hadt        5802 R.Hadt       
PAAM/AP            AP                 5802 R.Hadt        5802 R.Hadt        5802 R.Hadt        5802 R.Hadt        5802 R.Hadt       
BEAM   LINE 17-2 
Jan. 25, 2021      Jan. 26, 2021      Jan. 27, 2021      Jan. 28, 2021      Jan. 29, 2021      Jan. 30, 2021      Jan. 31, 2021     
COMM/PAAM          AP                 AP                 COMM               COMM               COMM               COMM              
PAAM               AP                 COMM               COMM               COMM               COMM               COMM              
PAAM/AP            AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Feb. 01, 2021
                                         
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
BEAM   LINE 1-5  
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
Unscheduled        Unscheduled        8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
Unscheduled        Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
Unscheduled        8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
5398 T.Wynn        92I9 B.Saini       92I9 B.Saini       92I9 B.Saini       92I9 B.Saini       92I9 B.Saini       92I9 B.Saini      
Xray CHECKOUT/92I9 92I9 B.Saini       92I9 B.Saini       92I9 B.Saini       92I9 B.Saini       92I9 B.Saini       92I9 B.Saini      
92I9 B.Saini       92I9 B.Saini       92I9 B.Saini       92I9 B.Saini       92I9 B.Saini       92I9 B.Saini       92I9 B.Saini      
BEAM   LINE 2-2  
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
Unscheduled        5374 C.Usubelli    5374 C.Usubelli    5374 C.Usubelli    5374 C.Usubelli    5723 G.Chen        5723 G.Chen       
SMB CHECKOUT/5374  5374 C.Usubelli    5374 C.Usubelli    5374 C.Usubelli    SMB CHECKOUT/5723  5723 G.Chen        5723 G.Chen       
5374 C.Usubelli    5374 C.Usubelli    5374 C.Usubelli    5374 C.Usubelli    5723 G.Chen        5723 G.Chen        5723 G.Chen       
BEAM   LINE 2-3  
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
5715 J.Magyar      5715 J.Magyar      5117 W.Fischer     5117 W.Fischer     5117 W.Fischer     5712 J.Shukle      5712 J.Shukle     
5715 J.Magyar      CHANGE/5117 W.Fisc 5117 W.Fischer     5117 W.Fischer     CHANGE/5712 J.Shuk 5712 J.Shukle      5712 J.Shukle     
5715 J.Magyar      5117 W.Fischer     5117 W.Fischer     5117 W.Fischer     5712 J.Shukle      5712 J.Shukle      5712 J.Shukle     
BEAM   LINE 4-1  
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
Unscheduled        Unscheduled        Unscheduled        11E8 A.Bhattachary 11E8 A.Bhattachary Unscheduled        8099 S.Bare       
Unscheduled        Unscheduled        SMB CHECKOUT/11E8  11E8 A.Bhattachary 11E8 A.Bhattachary CHANGE/8099 S.Bare 8099 S.Bare       
Unscheduled        Unscheduled        11E8 A.Bhattachary 11E8 A.Bhattachary Unscheduled        8099 S.Bare        8099 S.Bare       
BEAM   LINE 4-2  
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
Unscheduled        8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      11F0 R.Panigrahi   11F0 R.Panigrahi   8877 T.Matsui     
CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      CHANGE/11F0 R.Pani 11F0 R.Panigrahi   CHANGE/8877 T.Mats CHANGE/8877 T.Mats
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      11F0 R.Panigrahi   11F0 R.Panigrahi   8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
5396 J.Nelson Weke 5396 J.Nelson Weke 5655 J.Zhang       5655 J.Zhang       5655 J.Zhang       5213 M.Rahman      5213 M.Rahman     
5396 J.Nelson Weke CHANGE/5655 J.Zhan 5655 J.Zhang       5655 J.Zhang       CHANGE/5213 M.Rahm 5213 M.Rahman      5213 M.Rahman     
5396 J.Nelson Weke 5655 J.Zhang       5655 J.Zhang       5655 J.Zhang       5213 M.Rahman      5213 M.Rahman      5213 M.Rahman     
BEAM   LINE 7-2  
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
4791 M.Zeineh      4791 M.Zeineh      5712 J.Shukle      5712 J.Shukle      5712 J.Shukle      8067 S.Webb        8067 S.Webb       
4791 M.Zeineh      CHANGE/5712 J.Shuk 5712 J.Shukle      5712 J.Shukle      CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb       
4791 M.Zeineh      5712 J.Shukle      5712 J.Shukle      5712 J.Shukle      8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
8071 R.Sarangi     Unscheduled        5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       5587 M.Muehe      
8071 R.Sarangi     SMB CHECKOUT/5587  5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       5587 M.Muehe      
Unscheduled        5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       5587 M.Muehe      
BEAM   LINE 9-3  
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
FACI               Unscheduled        Unscheduled        5545 C.Roberts     5545 C.Roberts     Unscheduled        Unscheduled       
Unscheduled        Unscheduled        CHANGE/5545 C.Robe 5545 C.Roberts     Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        5545 C.Roberts     5545 C.Roberts     Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 10-2 
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
5329 N.Strange     5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt      
Xray CHECKOUT/5600 5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt      
5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt       5600 L.Mundt      
BEAM   LINE 14-3 
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
5359 M.Raven       5359 M.Raven       5359 M.Raven       5359 M.Raven       5771 C.Hansel      5771 C.Hansel      5771 C.Hansel     
5359 M.Raven       5359 M.Raven       5359 M.Raven       CHANGE/5771 C.Hans 5771 C.Hansel      5771 C.Hansel      5771 C.Hansel     
5359 M.Raven       5359 M.Raven       5359 M.Raven       5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      5771 C.Hansel     
BEAM   LINE 15-2 
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
5802 R.Hadt        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
5802 R.Hadt        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Feb. 01, 2021      Feb. 02, 2021      Feb. 03, 2021      Feb. 04, 2021      Feb. 05, 2021      Feb. 06, 2021      Feb. 07, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Feb. 08, 2021
                                         
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
BEAM   LINE 1-5  
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
8091 C.Tassone/AP  AP                 AP                 5544 J.Utterback   5544 J.Utterback   5544 J.Utterback   5544 J.Utterback  
AP                 AP                 Xray CHECKOUT/5544 5544 J.Utterback   5544 J.Utterback   5544 J.Utterback   5544 J.Utterback  
AP                 AP                 5544 J.Utterback   5544 J.Utterback   5544 J.Utterback   5544 J.Utterback   5544 J.Utterback  
BEAM   LINE 2-1  
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
92I9 B.Saini/AP    AP                 AP                 FACI               8095 K.Stone       8095 K.Stone       8095 K.Stone      
AP                 AP                 FACI               Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone       8095 K.Stone      
AP                 AP                 FACI               8095 K.Stone       8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 2-2  
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
5723 G.Chen/AP     AP                 AP                 5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen       
AP                 AP                 5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen       
AP                 AP                 5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen       
BEAM   LINE 2-3  
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
5712 J.Shukle/AP   AP                 AP                 FACI               FACI               FACI               4885 M.Raven      
AP                 AP                 FACI               FACI               FACI               CHANGE/4885 M.Rave 4885 M.Raven      
AP                 AP                 FACI               FACI               FACI               4885 M.Raven       4885 M.Raven      
BEAM   LINE 4-1  
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
8099 S.Bare/AP     AP                 AP                 Unscheduled        5640 X.Zheng       5640 X.Zheng       5640 X.Zheng      
AP                 AP                 Unscheduled        SMB CHECKOUT/5640  5640 X.Zheng       5640 X.Zheng       5640 X.Zheng      
AP                 AP                 Unscheduled        5640 X.Zheng       5640 X.Zheng       5640 X.Zheng       5640 X.Zheng      
BEAM   LINE 4-2  
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
8877 T.Matsui/AP   AP                 AP                 11F9 M.Perera      11F9 M.Perera      5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 CHANGE/11F9 M.Pere 11F9 M.Perera      CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
AP                 AP                 11F9 M.Perera      11F9 M.Perera      5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
5213 M.Rahman/AP   AP                 AP                 5640 X.Zheng       5672 P.Zhang       5672 P.Zhang       4875 A.Dawson     
AP                 AP                 CHANGE/5640 X.Zhen CHANGE/5672 P.Zhan 5672 P.Zhang       CHANGE/4875 A.Daws 4875 A.Dawson     
AP                 AP                 5640 X.Zheng       5672 P.Zhang       5672 P.Zhang       4875 A.Dawson      4875 A.Dawson     
BEAM   LINE 7-2  
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
8067 S.Webb/AP     AP                 AP                 8067 S.Webb        8067 S.Webb        5314 K.Boye        5314 K.Boye       
AP                 AP                 8067 S.Webb        8067 S.Webb        CHANGE/5314 K.Boye 5314 K.Boye        5314 K.Boye       
AP                 AP                 8067 S.Webb        8067 S.Webb        5314 K.Boye        5314 K.Boye        5314 K.Boye       
BEAM   LINE 7-3  
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
5587 M.Muehe/AP    AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-3  
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
AP                 AP                 AP                 5693 K.Abdul-Aziz  Unscheduled        8099 S.Bare        8099 S.Bare       
AP                 AP                 CHANGE/5693 K.Abdu 5693 K.Abdul-Aziz  SMB CHECKOUT/8099  8099 S.Bare        8099 S.Bare       
AP                 AP                 5693 K.Abdul-Aziz  CHANGE/5659 F.Zaer 8099 S.Bare        8099 S.Bare        8099 S.Bare       
BEAM   LINE 10-2 
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
5600 L.Mundt/AP    AP                 AP                 5271 S.Nikzad      FACI               FACI               FACI              
AP                 AP                 Xray CHECKOUT/5271 5271 S.Nikzad/FACI FACI               FACI               FACI              
AP                 AP                 5271 S.Nikzad      FACI               FACI               FACI               FACI              
BEAM   LINE 14-3 
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
5771 C.Hansel/AP   AP                 AP                 5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5117 W.Fischer    
AP                 AP                 CHANGE/5715 J.Magy 5715 J.Magyar      5715 J.Magyar      CHANGE/5117 W.Fisc 5117 W.Fischer    
AP                 AP                 5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5117 W.Fischer     5117 W.Fischer    
BEAM   LINE 15-2 
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
AP                 AP                 AP                 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       Unscheduled       
AP                 AP                 CHANGE/8098 T.Krol 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       Unscheduled       
AP                 AP                 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Feb. 08, 2021      Feb. 09, 2021      Feb. 10, 2021      Feb. 11, 2021      Feb. 12, 2021      Feb. 13, 2021      Feb. 14, 2021     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Feb. 15, 2021
                                         
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
BEAM   LINE 1-5  
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
5544 J.Utterback   5544 J.Utterback   5544 J.Utterback   5544 J.Utterback   FACI               8091 C.Tassone     8091 C.Tassone    
5544 J.Utterback   5544 J.Utterback   5544 J.Utterback   5544 J.Utterb/FACI Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone    
5544 J.Utterback   5544 J.Utterback   5544 J.Utterback   FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
8095 K.Stone       8095 K.Stone       5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange    
8095 K.Stone       Xray CHECKOUT/5329 5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange    
8095 K.Stone       5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange    
BEAM   LINE 2-2  
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen        Unscheduled       
5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen        Unscheduled       
5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen        Unscheduled       
BEAM   LINE 2-3  
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
4885 M.Raven       4885 M.Raven       4791 M.Zeineh      4791 M.Zeineh      4791 M.Zeineh      5622 M.McNamara    5622 M.McNamara   
4885 M.Raven       CHANGE/4791 M.Zein 4791 M.Zeineh      4791 M.Zeineh      CHANGE/5622 M.McNa 5622 M.McNamara    5622 M.McNamara   
4885 M.Raven       4791 M.Zeineh      4791 M.Zeineh      4791 M.Zeineh      5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
BEAM   LINE 4-1  
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
5640 X.Zheng       Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
5640 X.Zheng       Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
5497 M.Georgiadis  8897 I.Rajkovic    Unscheduled        Unscheduled        Unscheduled        11F8 K.Kilchrist   8877 T.Matsui     
CHANGE/8897 I.Rajk Unscheduled        Unscheduled        Unscheduled        CHANGE/11F8 K.Kilc CHANGE/8877 T.Mats 8877 T.Matsui     
8897 I.Rajkovic    Unscheduled        Unscheduled        Unscheduled        11F8 K.Kilchrist   8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
4875 A.Dawson      4875 A.Dawson      5252 C.Wei         5252 C.Wei         CHANGE/92J3 S.Rekh 5493 Y.Liu         5493 Y.Liu        
4875 A.Dawson      CHANGE/5252 C.Wei  5252 C.Wei         5252 C.Wei         CHANGE/5493 Y.Liu  5493 Y.Liu         5493 Y.Liu        
4875 A.Dawson      5252 C.Wei         5252 C.Wei         5252 C.Wei         5493 Y.Liu         5493 Y.Liu         5493 Y.Liu        
BEAM   LINE 7-2  
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
5314 K.Boye        5314 K.Boye        5314 K.Boye        5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
5314 K.Boye        5314 K.Boye        CHANGE/5622 M.McNa 5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
5314 K.Boye        5314 K.Boye        5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara    5622 M.McNamara   
BEAM   LINE 7-3  
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
Unscheduled        Unscheduled        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        8060 J.Bargar      8060 J.Bargar     
Unscheduled        SMB CHECKOUT/9705  9705 J.LiSA        9705 J.LiSA        SMB CHECKOUT/8060  8060 J.Bargar      8060 J.Bargar     
Unscheduled        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        8060 J.Bargar      8060 J.Bargar      8060 J.Bargar     
BEAM   LINE 9-3  
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
8099 S.Bare        Unscheduled        5666 L.Chen        5666 L.Chen        5277 E.Nikolla     5277 E.Nikolla     Unscheduled       
8099 S.Bare        Unscheduled        5666 L.Chen        CHANGE/5277 E.Niko 5277 E.Nikolla     5277 E.Nikolla     Unscheduled       
Unscheduled        CHANGE/5666 L.Chen 5666 L.Chen        5277 E.Nikolla     5277 E.Nikolla     Unscheduled        Unscheduled       
BEAM   LINE 10-2 
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 14-3 
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
5117 W.Fischer     FACI               FACI               5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar     
5117 W.Fische/FACI FACI               CHANGE/5715 J.Magy 5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar     
FACI               FACI               5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar     
BEAM   LINE 15-2 
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
Unscheduled        Unscheduled        5661 G.George      5661 G.George      5661 G.George      5126 J.Yano        5126 J.Yano       
Unscheduled        CHANGE/5661 G.Geor 5661 G.George      5661 G.George      CHANGE/5126 J.Yano 5126 J.Yano        5126 J.Yano       
Unscheduled        5661 G.George      5661 G.George      5661 G.George      5126 J.Yano        5126 J.Yano        5126 J.Yano       
BEAM   LINE 17-2 
Feb. 15, 2021      Feb. 16, 2021      Feb. 17, 2021      Feb. 18, 2021      Feb. 19, 2021      Feb. 20, 2021      Feb. 21, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Feb. 22, 2021
                                         
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
BEAM   LINE 1-5  
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
8091 C.Tasson/PAAM AP                 AP                 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
PAAM               AP                 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
PAAM/AP            AP                 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
5329 N.Strang/PAAM AP                 AP                 5329 N.Strange     5329 N.Strange     Unscheduled        Unscheduled       
PAAM               AP                 5329 N.Strange     5329 N.Strange     Unscheduled        Unscheduled        Unscheduled       
PAAM/AP            AP                 5329 N.Strange     5329 N.Strange     Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-2  
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
PAAM               AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
PAAM               AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
PAAM/AP            AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
5622 M.McNama/PAAM AP                 AP                 5622 M.McNamara    5622 M.McNamara    5794 T.Varga       5794 T.Varga      
PAAM               AP                 5622 M.McNamara    5622 M.McNamara    CHANGE/5794 T.Varg 5794 T.Varga       5794 T.Varga      
PAAM/AP            AP                 5622 M.McNamara    5622 M.McNamara    5794 T.Varga       5794 T.Varga       5794 T.Varga      
BEAM   LINE 4-1  
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
PAAM               AP                 AP                 5655 J.Zhang       5655 J.Zhang       5655 J.Zhang       5655 J.Zhang      
PAAM               AP                 SMB CHECKOUT/5655  5655 J.Zhang       5655 J.Zhang       5655 J.Zhang       5655 J.Zhang      
PAAM/AP            AP                 5655 J.Zhang       5655 J.Zhang       5655 J.Zhang       5655 J.Zhang       5655 J.Zhang      
BEAM   LINE 4-2  
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
8877 T.Matsui/PAAM AP                 AP                 8047 T.Weiss       8047 T.Weiss       5497 M.Georgiadis  5497 M.Georgiadis 
PAAM               AP                 CHANGE/8047 T.Weis 8047 T.Weiss       CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
PAAM/AP            AP                 8047 T.Weiss       8047 T.Weiss       5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
PAAM               AP                 AP                 5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
PAAM               AP                 SMB CHECKOUT/5289  5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
PAAM/AP            AP                 5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
BEAM   LINE 6-2  
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
5493 Y.Liu/PAAM    AP                 AP                 5505 A.Parakh      5505 A.Parakh      5505 A.Parakh      5369 C.Tan        
PAAM               AP                 CHANGE/5505 A.Para 5505 A.Parakh      5505 A.Parakh      CHANGE/5369 C.Tan  5369 C.Tan        
PAAM/AP            AP                 5505 A.Parakh      5505 A.Parakh      5505 A.Parakh      5369 C.Tan         5369 C.Tan        
BEAM   LINE 7-2  
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
5622 M.McNama/PAAM AP                 AP                 4822 N.Edwards     4822 N.Edwards     5286 K.Reinhart    5286 K.Reinhart   
PAAM               AP                 CHANGE/4822 N.Edwa 4822 N.Edwards     CHANGE/5286 K.Rein 5286 K.Reinhart    5286 K.Reinhart   
PAAM/AP            AP                 4822 N.Edwards     4822 N.Edwards     5286 K.Reinhart    5286 K.Reinhart    5286 K.Reinhart   
BEAM   LINE 7-3  
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
8060 J.Bargar/PAAM AP                 AP                 Unscheduled        Unscheduled        Unscheduled        11F5 S.Louisia    
PAAM               AP                 Unscheduled        Unscheduled        Unscheduled        SMB CHECKOUT/11F5  CHANGE/5302 L.Li  
PAAM/AP            AP                 Unscheduled        Unscheduled        Unscheduled        11F5 S.Louisia     5302 L.Li         
BEAM   LINE 9-3  
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
PAAM               AP                 AP                 5266 A.Uzun        5266 A.Uzun        5088 L.Greenlee    5088 L.Greenlee   
PAAM               AP                 CHANGE/5266 A.Uzun 5266 A.Uzun        CHANGE/5088 L.Gree 5088 L.Greenlee    5088 L.Greenlee   
PAAM/AP            AP                 5266 A.Uzun        5266 A.Uzun        5088 L.Greenlee    5088 L.Greenlee    5088 L.Greenlee   
BEAM   LINE 10-2 
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
COMM/PAAM          AP                 AP                 COMM               COMM               COMM               COMM              
PAAM               AP                 COMM               COMM               COMM               COMM               COMM              
PAAM/AP            AP                 COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
PAAM               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
PAAM               AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
PAAM/AP            AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
FACI/PAAM          AP                 AP                 DOWN               DOWN               DOWN               DOWN              
PAAM               AP                 FACI/DOWN          DOWN               DOWN               DOWN               DOWN              
PAAM/AP            AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
5715 J.Magyar/PAAM AP                 AP                 5712 J.Shukle      5712 J.Shukle      5712 J.Shukle      5149 N.Tosca      
PAAM               AP                 CHANGE/5712 J.Shuk 5712 J.Shukle      5712 J.Shukle      CHANGE/5149 N.Tosc 5149 N.Tosca      
PAAM/AP            AP                 5712 J.Shukle      5712 J.Shukle      5712 J.Shukle      5149 N.Tosca       5149 N.Tosca      
BEAM   LINE 15-2 
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
5126 J.Yano/PAAM   AP                 AP                 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
PAAM               AP                 CHANGE/8098 T.Krol 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
PAAM/AP            AP                 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
BEAM   LINE 17-2 
Feb. 22, 2021      Feb. 23, 2021      Feb. 24, 2021      Feb. 25, 2021      Feb. 26, 2021      Feb. 27, 2021      Feb. 28, 2021     
COMM/PAAM          AP                 AP                 COMM               COMM               COMM               COMM              
PAAM               AP                 COMM               COMM               COMM               COMM               COMM              
PAAM/AP            AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Mar. 01, 2021
                                         
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
BEAM   LINE 1-5  
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
8091 C.Tassone     5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee        
Xray CHECKOUT/5358 5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee        
5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee        
BEAM   LINE 2-1  
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        5527 N.Weadock     5527 N.Weadock     5527 N.Weadock    
Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/5527 5527 N.Weadock     5527 N.Weadock     5527 N.Weadock    
Unscheduled        Unscheduled        Unscheduled        5527 N.Weadock     5527 N.Weadock     5527 N.Weadock     5527 N.Weadock    
BEAM   LINE 2-2  
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        5778 P.Csernica    5778 P.Csernica    5778 P.Csernica   
Unscheduled        Unscheduled        Unscheduled        SMB CHECKOUT/5778  5778 P.Csernica    5778 P.Csernica    5778 P.Csernica   
Unscheduled        Unscheduled        Unscheduled        5778 P.Csernica    5778 P.Csernica    5778 P.Csernica    5778 P.Csernica   
BEAM   LINE 2-3  
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
5794 T.Varga       5574 M.Kang        5574 M.Kang        5574 M.Kang        4758 M.Ganio       4758 M.Ganio       4758 M.Ganio      
CHANGE/5574 M.Kang 5574 M.Kang        5574 M.Kang        CHANGE/4758 M.Gani 4758 M.Ganio       4758 M.Ganio       4758 M.Ganio      
5574 M.Kang        5574 M.Kang        5574 M.Kang        4758 M.Ganio       4758 M.Ganio       4758 M.Ganio       4758 M.Ganio      
BEAM   LINE 4-1  
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
5655 J.Zhang       Unscheduled        5513 C.Kim         5513 C.Kim         5513 C.Kim         5508 A.van Veelen  5508 A.van Veelen 
5655 J.Zhang       SMB CHECKOUT/5513  5513 C.Kim         5513 C.Kim         SMB CHECKOUT/5508  5508 A.van Veelen  5508 A.van Veelen 
Unscheduled        5513 C.Kim         5513 C.Kim         5513 C.Kim         5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen 
BEAM   LINE 4-2  
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
5497 M.Georgiadis  8897 I.Rajkovic    5181 D.Sokaras     5181 D.Sokaras     8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
CHANGE/8897 I.Rajk CHANGE/5181 D.Soka 5181 D.Sokaras     CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
8897 I.Rajkovic    5181 D.Sokaras     5181 D.Sokaras     8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
5289 J.Chorover    8099 S.Bare        8099 S.Bare        5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter
SMB CHECKOUT/8099  8099 S.Bare        CHANGE/5524 C.Kron 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter
8099 S.Bare        8099 S.Bare        5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter 5524 C.Kronawitter
BEAM   LINE 6-2  
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
5369 C.Tan         5369 C.Tan         5739 G.Qian        5739 G.Qian        5739 G.Qian        5739 G.Qian        5739 G.Qian       
5369 C.Tan         CHANGE/5739 G.Qian 5739 G.Qian        5739 G.Qian        5739 G.Qian        5739 G.Qian        5739 G.Qian       
5369 C.Tan         5739 G.Qian        5739 G.Qian        5739 G.Qian        5739 G.Qian        5739 G.Qian        5739 G.Qian       
BEAM   LINE 7-2  
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
5286 K.Reinhart    5644 S.Tian        5644 S.Tian        5644 S.Tian        5644 S.Tian        5647 L.Lu          5647 L.Lu         
CHANGE/5644 S.Tian 5644 S.Tian        5644 S.Tian        5644 S.Tian        CHANGE/5647 L.Lu   5647 L.Lu          5647 L.Lu         
5644 S.Tian        5644 S.Tian        5644 S.Tian        5644 S.Tian        5647 L.Lu          5647 L.Lu          5647 L.Lu         
BEAM   LINE 7-3  
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
5302 L.Li          Unscheduled        5393 C.Dewey       5393 C.Dewey       Unscheduled        11F1 J.Richardson  11F1 J.Richardson 
5302 L.Li          SMB CHECKOUT/5393  5393 C.Dewey       5393 C.Dewey       SMB CHECKOUT/11F1  11F1 J.Richardson  11F1 J.Richardson 
Unscheduled        5393 C.Dewey       5393 C.Dewey       Unscheduled        11F1 J.Richardson  11F1 J.Richardson  Unscheduled       
BEAM   LINE 9-3  
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
5088 L.Greenlee    Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
5088 L.Greenlee    Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 10-2 
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
5149 N.Tosca       5149 N.Tosca       5574 M.Kang        5574 M.Kang        11D5 A.Templeton   11D5 A.Templeton   11D5 A.Templeton  
5149 N.Tosca       CHANGE/5574 M.Kang 5574 M.Kang        CHANGE/11D5 A.Temp 11D5 A.Templeton   11D5 A.Templeton   11D5 A.Templeton  
5149 N.Tosca       5574 M.Kang        5574 M.Kang        11D5 A.Templeton   11D5 A.Templeton   11D5 A.Templeton   11D5 A.Templeton  
BEAM   LINE 15-2 
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
8098 T.Kroll       STUP               8092 D.Sokaras     8092 D.Sokaras     5732 M.Cendejas    5732 M.Cendejas    5732 M.Cendejas   
8098 T.Kroll/STUP  CHANGE/8092 D.Soka 8092 D.Sokaras     CHANGE/5732 M.Cend 5732 M.Cendejas    5732 M.Cendejas    5732 M.Cendejas   
STUP               8092 D.Sokaras     8092 D.Sokaras     5732 M.Cendejas    5732 M.Cendejas    5732 M.Cendejas    5732 M.Cendejas   
BEAM   LINE 17-2 
Mar. 01, 2021      Mar. 02, 2021      Mar. 03, 2021      Mar. 04, 2021      Mar. 05, 2021      Mar. 06, 2021      Mar. 07, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Mar. 08, 2021
                                         
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
BEAM   LINE 1-5  
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
5358 S.Lee/AP      AP                 AP                 FACI               8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
AP                 AP                 FACI               Xray CHECKOUT/8818 8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
AP                 AP                 FACI               8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
BEAM   LINE 2-1  
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
5527 N.Weadock/AP  AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-2  
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
5778 P.Csernica/AP AP                 AP                 5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
AP                 AP                 SMB CHECKOUT/5468  5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
AP                 AP                 5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
BEAM   LINE 2-3  
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
4758 M.Ganio/AP    AP                 AP                 5735 A.Bhattacharj 5735 A.Bhattacharj 5735 A.Bhattacharj 5735 A.Bhattacharj
AP                 AP                 CHANGE/5735 A.Bhat 5735 A.Bhattacharj 5735 A.Bhattacharj 5735 A.Bhattacharj 5735 A.Bhattacharj
AP                 AP                 5735 A.Bhattacharj 5735 A.Bhattacharj 5735 A.Bhattacharj 5735 A.Bhattacharj 5735 A.Bhattacharj
BEAM   LINE 4-1  
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
5508 A.van Veel/AP AP                 AP                 5552 N.Rivera      5552 N.Rivera      Unscheduled        Unscheduled       
AP                 AP                 SMB CHECKOUT/5552  5552 N.Rivera      5552 N.Rivera      Unscheduled        Unscheduled       
AP                 AP                 5552 N.Rivera      5552 N.Rivera      Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
8877 T.Matsui/AP   AP                 AP                 8877 T.Matsui      Unscheduled        Unscheduled        8877 T.Matsui     
AP                 AP                 CHANGE/8877 T.Mats Unscheduled        Unscheduled        CHANGE/8877 T.Mats 8877 T.Matsui     
AP                 AP                 8877 T.Matsui      Unscheduled        Unscheduled        8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
5524 C.Kronawit/AP AP                 AP                 5445 G.George      5445 G.George      5445 G.George      5445 G.George     
AP                 AP                 SMB CHECKOUT/5445  5445 G.George      5445 G.George      5445 G.George      5445 G.George     
AP                 AP                 5445 G.George      5445 G.George      5445 G.George      5445 G.George      5445 G.George     
BEAM   LINE 6-2  
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
5739 G.Qian/AP     AP                 AP                 8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       
AP                 AP                 Xray CHECKOUT/8224 8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       
AP                 AP                 8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       
BEAM   LINE 7-2  
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
5647 L.Lu/AP       AP                 AP                 5174 M.Stuckman    5174 M.Stuckman    5174 M.Stuckman    5174 M.Stuckman   
AP                 AP                 CHANGE/5174 M.Stuc 5174 M.Stuckman    5174 M.Stuckman    5174 M.Stuckman    5174 M.Stuckman   
AP                 AP                 5174 M.Stuckman    5174 M.Stuckman    5174 M.Stuckman    5174 M.Stuckman    5174 M.Stuckman   
BEAM   LINE 7-3  
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
AP                 AP                 AP                 5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackburn  
AP                 AP                 SMB CHECKOUT/5480  5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackburn  
AP                 AP                 5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackburn   5480 N.Blackburn  
BEAM   LINE 9-3  
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
AP                 AP                 AP                 4416 T.Stemmler    4416 T.Stemmler    5394 C.Dewey       5394 C.Dewey      
AP                 AP                 SMB CHECKOUT/4416  4416 T.Stemmler    SMB CHECKOUT/5394  5394 C.Dewey       5394 C.Dewey      
AP                 AP                 4416 T.Stemmler    4416 T.Stemmler    5394 C.Dewey       5394 C.Dewey       5394 C.Dewey      
BEAM   LINE 10-2 
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
11D5 A.Templeto/AP AP                 AP                 5240 J.Judy        5240 J.Judy        5240 J.Judy        5240 J.Judy       
AP                 AP                 SMB CHECKOUT/5240  5240 J.Judy        5240 J.Judy        5240 J.Judy        5240 J.Judy       
AP                 AP                 5240 J.Judy        5240 J.Judy        5240 J.Judy        5240 J.Judy        5240 J.Judy       
BEAM   LINE 15-2 
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
5732 M.Cendejas/AP AP                 AP                 5636 L.Gee         5636 L.Gee         5786 T.Hersbach    5786 T.Hersbach   
AP                 AP                 CHANGE/5636 L.Gee  5636 L.Gee         CHANGE/5786 T.Hers 5786 T.Hersbach    5786 T.Hersbach   
AP                 AP                 5636 L.Gee         5636 L.Gee         5786 T.Hersbach    5786 T.Hersbach    5786 T.Hersbach   
BEAM   LINE 17-2 
Mar. 08, 2021      Mar. 09, 2021      Mar. 10, 2021      Mar. 11, 2021      Mar. 12, 2021      Mar. 13, 2021      Mar. 14, 2021     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Mar. 15, 2021
                                         
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
BEAM   LINE 1-5  
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
8818 A.Mehta       8818 A.Mehta       8015 A.Mehta       5364 H.Hou         5364 H.Hou         5398 T.Wynn        5398 T.Wynn       
8818 A.Mehta       Xray CHECKOUT/8015 Xray CHECKOUT/5364 5364 H.Hou         Xray CHECKOUT/5398 5398 T.Wynn        5398 T.Wynn       
8818 A.Mehta       8015 A.Mehta       5364 H.Hou         5364 H.Hou         5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
BEAM   LINE 2-1  
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
FACI               FACI               5473 T.Quill       FACI               92J8 M.Trigo       92J8 M.Trigo       92J8 M.Trigo      
FACI               Xray CHECKOUT/5473 5473 T.Quill/FACI  Xray CHECKOUT/92J8 92J8 M.Trigo       92J8 M.Trigo       92J8 M.Trigo      
FACI               5473 T.Quill       FACI               92J8 M.Trigo       92J8 M.Trigo       92J8 M.Trigo       92J8 M.Trigo      
BEAM   LINE 2-2  
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
BEAM   LINE 2-3  
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
5735 A.Bhattacharj 5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5603 S.Hickam      5603 S.Hickam      5603 S.Hickam     
CHANGE/5459 A.van  5459 A.van Veelen  5459 A.van Veelen  CHANGE/5603 S.Hick 5603 S.Hickam      5603 S.Hickam      5603 S.Hickam     
5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5603 S.Hickam      5603 S.Hickam      5603 S.Hickam      5603 S.Hickam     
BEAM   LINE 4-1  
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
Unscheduled        8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        5248 S.Bent        5248 S.Bent       
SMB CHECKOUT/8099  8099 S.Bare        8099 S.Bare        8099 S.Bare        CHANGE/5248 S.Bent 5248 S.Bent        5248 S.Bent       
8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        5248 S.Bent        5248 S.Bent        5248 S.Bent       
BEAM   LINE 4-2  
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
8877 T.Matsui      11F0 R.Panigrahi   11F0 R.Panigrahi   5518 A.DeMaria     5518 A.DeMaria     5518 A.DeMaria     8877 T.Matsui     
CHANGE/11F0 R.Pani 11F0 R.Panigrahi   CHANGE/5518 A.DeMa 5518 A.DeMaria     5518 A.DeMaria     CHANGE/8877 T.Mats 8877 T.Matsui     
11F0 R.Panigrahi   11F0 R.Panigrahi   5518 A.DeMaria     5518 A.DeMaria     5518 A.DeMaria     8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
5445 G.George      5640 X.Zheng       5640 X.Zheng       5640 X.Zheng       5640 X.Zheng       5474 S.Bone        5474 S.Bone       
SMB CHECKOUT/5640  5640 X.Zheng       5640 X.Zheng       5640 X.Zheng       SMB CHECKOUT/5474  5474 S.Bone        5474 S.Bone       
5640 X.Zheng       5640 X.Zheng       5640 X.Zheng       5640 X.Zheng       5474 S.Bone        5474 S.Bone        5474 S.Bone       
BEAM   LINE 6-2  
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       
8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       
8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis        8224 D.Reis       
BEAM   LINE 7-2  
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
5174 M.Stuckman    5204 W.Xiong       5204 W.Xiong       5204 W.Xiong       5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko 
CHANGE/5204 W.Xion 5204 W.Xiong       5204 W.Xiong       CHANGE/5711 A.Krav 5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko 
5204 W.Xiong       5204 W.Xiong       5204 W.Xiong       5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko 
BEAM   LINE 7-3  
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
5480 N.Blackburn   5641 K.Chacon      5641 K.Chacon      5641 K.Chacon      5641 K.Chacon      8071 R.Sarangi     8071 R.Sarangi    
SMB CHECKOUT/5641  5641 K.Chacon      5641 K.Chacon      5641 K.Chacon      SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi    
5641 K.Chacon      5641 K.Chacon      5641 K.Chacon      5641 K.Chacon      8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 9-3  
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
5394 C.Dewey       4416 T.Stemmler    4416 T.Stemmler    5081 A.Deb         5081 A.Deb         5081 A.Deb         Unscheduled       
SMB CHECKOUT/4416  4416 T.Stemmler    SMB CHECKOUT/5081  5081 A.Deb         5081 A.Deb         5081 A.Deb         Unscheduled       
4416 T.Stemmler    4416 T.Stemmler    5081 A.Deb         5081 A.Deb         5081 A.Deb         Unscheduled        Unscheduled       
BEAM   LINE 10-2 
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
DOWN               DOWN               DOWN               5508 A.van Veelen  5508 A.van Veelen  5451 B.Stewart     5451 B.Stewart    
DOWN               DOWN               SMB CHECKOUT/5508  5508 A.van Veelen  SMB CHECKOUT/5451  5451 B.Stewart     5451 B.Stewart    
DOWN               DOWN               5508 A.van Veelen  5508 A.van Veelen  5451 B.Stewart     5451 B.Stewart     5451 B.Stewart    
BEAM   LINE 11-3 
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
DOWN               DOWN               4854 E.Ratcliff    4854 E.Ratcliff    8095 K.Stone       4820 R.Kennard     4820 R.Kennard    
DOWN               Xray CHECKOUT/4854 4854 E.Ratcliff    Xray CHECKOUT/8095 Xray CHECKOUT/4820 4820 R.Kennard     4820 R.Kennard    
DOWN               4854 E.Ratcliff    4854 E.Ratcliff    8095 K.Stone       4820 R.Kennard     4820 R.Kennard     4820 R.Kennard    
BEAM   LINE 14-3 
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
5240 J.Judy        5575 S.Bone        5575 S.Bone        5575 S.Bone        5575 S.Bone        5243 Y.Arai        5243 Y.Arai       
SMB CHECKOUT/5575  5575 S.Bone        5575 S.Bone        5575 S.Bone        SMB CHECKOUT/5243  5243 Y.Arai        5243 Y.Arai       
5575 S.Bone        5575 S.Bone        5575 S.Bone        5575 S.Bone        5243 Y.Arai        5243 Y.Arai        5243 Y.Arai       
BEAM   LINE 15-2 
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
5786 T.Hersbach    COMM               COMM               COMM               COMM               COMM               COMM              
5786 T.Hersba/COMM COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 17-2 
Mar. 15, 2021      Mar. 16, 2021      Mar. 17, 2021      Mar. 18, 2021      Mar. 19, 2021      Mar. 20, 2021      Mar. 21, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Mar. 22, 2021
                                         
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
BEAM   LINE 1-5  
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
5398 T.Wynn/DOWN   DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
92J8 M.Trigo/DOWN  DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
5468 N.Calta/DOWN  DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
5603 S.Hickam/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
5248 S.Bent/DOWN   DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
8877 T.Matsui/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
5474 S.Bone/DOWN   DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
8224 D.Reis/DOWN   DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
5711 A.Kravch/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
8071 R.Sarang/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
COMM/DOWN          DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
5451 B.Stewar/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
4820 R.Kennar/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
5243 Y.Arai/DOWN   DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
COMM/DOWN          DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Mar. 22, 2021      Mar. 23, 2021      Mar. 24, 2021      Mar. 25, 2021      Mar. 26, 2021      Mar. 27, 2021      Mar. 28, 2021     
COMM/DOWN          DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Mar. 29, 2021
                                         
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
BEAM   LINE 1-5  
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Mar. 29, 2021      Mar. 30, 2021      Mar. 31, 2021      Apr. 01, 2021      Apr. 02, 2021      Apr. 03, 2021      Apr. 04, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 05, 2021
                                         
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
BEAM   LINE 1-5  
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 05, 2021      Apr. 06, 2021      Apr. 07, 2021      Apr. 08, 2021      Apr. 09, 2021      Apr. 10, 2021      Apr. 11, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 12, 2021
                                         
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
BEAM   LINE 1-5  
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 12, 2021      Apr. 13, 2021      Apr. 14, 2021      Apr. 15, 2021      Apr. 16, 2021      Apr. 17, 2021      Apr. 18, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 19, 2021
                                         
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
BEAM   LINE 1-5  
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 19, 2021      Apr. 20, 2021      Apr. 21, 2021      Apr. 22, 2021      Apr. 23, 2021      Apr. 24, 2021      Apr. 25, 2021     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 26, 2021
                                         
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
BEAM   LINE 1-5  
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 26, 2021      Apr. 27, 2021      Apr. 28, 2021      Apr. 29, 2021      Apr. 30, 2021      May 01, 2021       May 02, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF May 03, 2021 
                                         
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
BEAM   LINE 1-5  
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
May 03, 2021       May 04, 2021       May 05, 2021       May 06, 2021       May 07, 2021       May 08, 2021       May 09, 2021      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF May 10, 2021 
                                         
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
BEAM   LINE 1-5  
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 FACI               FACI               8818 A.Mehta       8818 A.Mehta      
AP                 AP                 FACI               FACI               Xray CHECKOUT/8818 8818 A.Mehta       CHANGE/8015 A.Meht
AP                 AP                 FACI               FACI               8818 A.Mehta       8818 A.Mehta       8015 A.Mehta      
BEAM   LINE 2-1  
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 FACI               8895 K.Stone       8895 K.Stone       8895 K.Stone      
AP                 AP                 FACI               Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone       8895 K.Stone      
AP                 AP                 FACI               8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
BEAM   LINE 2-2  
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8060 J.Bargar     
AP                 AP                 >MicroCT/8890      8890 J.Nelson Weke 8890 J.Nelson Weke CHANGE/8060 J.Barg 8060 J.Bargar     
AP                 AP                 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8060 J.Bargar      8060 J.Bargar     
BEAM   LINE 2-3  
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 FACI               5712 J.Shukle      5712 J.Shukle      5149 N.Tosca      
AP                 AP                 FACI               CHANGE/5712 J.Shuk 5712 J.Shukle      CHANGE/5149 N.Tosc 5149 N.Tosca      
AP                 AP                 FACI               5712 J.Shukle      5712 J.Shukle      5149 N.Tosca       5149 N.Tosca      
BEAM   LINE 4-1  
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 5550 S.Zaccarine   5550 S.Zaccarine   5630 K.Lindquist   5630 K.Lindquist  
AP                 AP                 SMB CHECKOUT/5550  5550 S.Zaccarine   SMB CHECKOUT/5630  5630 K.Lindquist   5630 K.Lindquist  
AP                 AP                 5550 S.Zaccarine   5550 S.Zaccarine   5630 K.Lindquist   5630 K.Lindquist   5630 K.Lindquist  
BEAM   LINE 4-2  
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 8877 T.Matsui      8235 S.Russi       8235 S.Russi       8877 T.Matsui     
AP                 AP                 8877 T.Matsui      CHANGE/8235 S.Russ 8235 S.Russi       CHANGE/8877 T.Mats 8877 T.Matsui     
AP                 AP                 8877 T.Matsui      8235 S.Russi       8235 S.Russi       8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 5199 F.Bridges     5199 F.Bridges     5351 M.Doeff       5351 M.Doeff      
AP                 AP                 SMB CHECKOUT/5199  5199 F.Bridges     SMB CHECKOUT/5351  5351 M.Doeff       5351 M.Doeff      
AP                 AP                 5199 F.Bridges     5199 F.Bridges     5351 M.Doeff       5351 M.Doeff       5351 M.Doeff      
BEAM   LINE 6-2  
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 FACI               FACI               92J7 S.Peng        5550 S.Zaccarine  
AP                 AP                 FACI               FACI               CHANGE/92J7 S.Peng CHANGE/5550 S.Zacc 5550 S.Zaccarine  
AP                 AP                 FACI               FACI               92J7 S.Peng        5550 S.Zaccarine   5550 S.Zaccarine  
BEAM   LINE 7-2  
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 9-3  
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 5842 J.Lentz       5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
AP                 AP                 SMB CHECKOUT/5842  5842 J.Lentz       5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
AP                 AP                 5842 J.Lentz       5842 J.Lentz       5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
BEAM   LINE 11-3 
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 FACI               5474 S.Bone        5474 S.Bone        5474 S.Bone       
AP                 AP                 FACI               SMB CHECKOUT/5474  5474 S.Bone        5474 S.Bone        5474 S.Bone       
AP                 AP                 FACI               5474 S.Bone        5474 S.Bone        5474 S.Bone        5474 S.Bone       
BEAM   LINE 15-2 
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 17-2 
May 10, 2021       May 11, 2021       May 12, 2021       May 13, 2021       May 14, 2021       May 15, 2021       May 16, 2021      
DOWN/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF May 17, 2021 
                                         
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
BEAM   LINE 1-5  
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
8015 A.Mehta       8015 A.Mehta       5398 T.Wynn        5398 T.Wynn        5368 J.Schroers    5781 A.Mehta       5781 A.Mehta      
8015 A.Mehta       Xray CHECKOUT/5398 5398 T.Wynn        CHANGE/5368 J.Schr Xray CHECKOUT/5781 5781 A.Mehta       5781 A.Mehta      
8015 A.Mehta       5398 T.Wynn        5398 T.Wynn        5368 J.Schroers    5781 A.Mehta       5781 A.Mehta       5781 A.Mehta      
BEAM   LINE 2-1  
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
8895 K.Stone       FACI               5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt      
8895 K.Stone/FACI  Xray CHECKOUT/5710 5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt      
FACI               5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt      
BEAM   LINE 2-2  
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
8060 J.Bargar      8060 J.Bargar      5699 T.Kim         5699 T.Kim         5699 T.Kim         5444 J.Bargar      5444 J.Bargar     
8060 J.Bargar      CHANGE/5699 T.Kim  5699 T.Kim         5699 T.Kim         CHANGE/5444 J.Barg 5444 J.Bargar      5444 J.Bargar     
8060 J.Bargar      5699 T.Kim         5699 T.Kim         5699 T.Kim         5444 J.Bargar      5444 J.Bargar      5444 J.Bargar     
BEAM   LINE 2-3  
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
5149 N.Tosca       5149 N.Tosca       5472 P.O'Day       5472 P.O'Day       5472 P.O'Day       5204 W.Xiong       5204 W.Xiong      
5149 N.Tosca       CHANGE/5472 P.O'Da 5472 P.O'Day       5472 P.O'Day       CHANGE/5204 W.Xion 5204 W.Xiong       5204 W.Xiong      
5149 N.Tosca       5472 P.O'Day       5472 P.O'Day       5472 P.O'Day       5204 W.Xiong       5204 W.Xiong       5204 W.Xiong      
BEAM   LINE 4-1  
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
5630 K.Lindquist   Unscheduled        Unscheduled        Unscheduled        5595 F.Bridges     5595 F.Bridges     5595 F.Bridges    
5630 K.Lindquist   Unscheduled        Unscheduled        SMB CHECKOUT/5595  5595 F.Bridges     5595 F.Bridges     5595 F.Bridges    
Unscheduled        Unscheduled        Unscheduled        5595 F.Bridges     5595 F.Bridges     5595 F.Bridges     5595 F.Bridges    
BEAM   LINE 4-2  
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
8877 T.Matsui      8877 T.Matsui      11G3 T.Szyperski   11G3 T.Szyperski   11C7 M.Brenner     11C7 M.Brenner     8877 T.Matsui     
8877 T.Matsui      CHANGE/11G3 T.Szyp 11G3 T.Szyperski   CHANGE/11C7 M.Bren 11C7 M.Brenner     CHANGE/8877 T.Mats 8877 T.Matsui     
8877 T.Matsui      11G3 T.Szyperski   11G3 T.Szyperski   11C7 M.Brenner     11C7 M.Brenner     8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
5351 M.Doeff       5243 Y.Arai        5243 Y.Arai        5858 O.Duckworth   5858 O.Duckworth   5442 J.Velazquez   5442 J.Velazquez  
SMB CHECKOUT/5243  5243 Y.Arai        SMB CHECKOUT/5858  5858 O.Duckworth   SMB CHECKOUT/5442  5442 J.Velazquez   5442 J.Velazquez  
5243 Y.Arai        5243 Y.Arai        5858 O.Duckworth   5858 O.Duckworth   5442 J.Velazquez   5442 J.Velazquez   5442 J.Velazquez  
BEAM   LINE 6-2  
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
5550 S.Zaccarine   8090 J.Nelson Weke 8090 J.Nelson Weke 5200 Y.Liu         5200 Y.Liu         5200 Y.Liu         5739 G.Qian       
CHANGE/8090 J.Nels CHANGE/8090 J.Nels CHANGE/5200 Y.Liu  5200 Y.Liu         5200 Y.Liu         CHANGE/5739 G.Qian 5739 G.Qian       
8090 J.Nelson Weke 8090 J.Nelson Weke 5200 Y.Liu         5200 Y.Liu         5200 Y.Liu         5739 G.Qian        5739 G.Qian       
BEAM   LINE 7-2  
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
FACI               5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
SMB CHECKOUT/5587  5587 M.Muehe       5587 M.Muehe       SMB CHECKOUT/9705  9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       9705 J.LiSA        9705 J.LiSA        9705 J.LiSA        9705 J.LiSA       
BEAM   LINE 9-3  
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
FACI               FACI               FACI               FACI               5126 J.Yano        5126 J.Yano        5126 J.Yano       
FACI               FACI               FACI               SMB CHECKOUT/5126  5126 J.Yano        5126 J.Yano        5126 J.Yano       
FACI               FACI               FACI               5126 J.Yano        5126 J.Yano        5126 J.Yano        5126 J.Yano       
BEAM   LINE 10-2 
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
5842 J.Lentz       5842 J.Lentz       5858 O.Duckworth   5858 O.Duckworth   5858 O.Duckworth   Unscheduled        Unscheduled       
5842 J.Lentz       SMB CHECKOUT/5858  5858 O.Duckworth   5858 O.Duckworth   5858 O.Duckworth   Unscheduled        Unscheduled       
5842 J.Lentz       5858 O.Duckworth   5858 O.Duckworth   5858 O.Duckworth   Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
DOWN               5734 B.Khau        Unscheduled        5473 T.Quill       5231 P.Thornton    5452 A.Sinha       5452 A.Sinha      
Xray CHECKOUT/5734 5734 B.Khau        Xray CHECKOUT/5473 Xray CHECKOUT/5231 Xray CHECKOUT/5452 5452 A.Sinha       5452 A.Sinha      
5734 B.Khau        Unscheduled        5473 T.Quill       5231 P.Thornton    5452 A.Sinha       5452 A.Sinha       5452 A.Sinha      
BEAM   LINE 14-3 
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
5474 S.Bone        5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5474 S.Bone       
SMB CHECKOUT/5093  5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       SMB CHECKOUT/5474  5474 S.Bone       
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5474 S.Bone        5474 S.Bone       
BEAM   LINE 15-2 
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
COMM               COMM               COMM               COMM               5802 R.Hadt        5802 R.Hadt        5802 R.Hadt       
COMM               COMM               COMM               CHANGE/5802 R.Hadt 5802 R.Hadt        5802 R.Hadt        5802 R.Hadt       
COMM               COMM               COMM               5802 R.Hadt        5802 R.Hadt        5802 R.Hadt        5802 R.Hadt       
BEAM   LINE 17-2 
May 17, 2021       May 18, 2021       May 19, 2021       May 20, 2021       May 21, 2021       May 22, 2021       May 23, 2021      
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF May 24, 2021 
                                         
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
BEAM   LINE 1-5  
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
5781 A.Mehta/PAAM  AP                 AP                 FACI               FACI               FACI               FACI              
PAAM               AP                 FACI               FACI               FACI               FACI               FACI              
PAAM/AP            AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
5710 L.Mundt/PAAM  AP                 AP                 5330 N.Strange     5330 N.Strange     5330 N.Strange     5330 N.Strange    
PAAM               AP                 Xray CHECKOUT/5330 5330 N.Strange     5330 N.Strange     5330 N.Strange     5330 N.Strange    
PAAM/AP            AP                 5330 N.Strange     5330 N.Strange     5330 N.Strange     5330 N.Strange     5330 N.Strange    
BEAM   LINE 2-2  
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
5444 J.Bargar/PAAM AP                 AP                 11F5 S.Louisia     11F5 S.Louisia     Unscheduled        Unscheduled       
PAAM               AP                 SMB CHECKOUT/11F5  11F5 S.Louisia     11F5 S.Louisia     Unscheduled        Unscheduled       
PAAM/AP            AP                 11F5 S.Louisia     11F5 S.Louisia     Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
5204 W.Xiong/PAAM  AP                 AP                 5575 S.Bone        5575 S.Bone        5575 S.Bone        5451 B.Stewart    
PAAM               AP                 CHANGE/5575 S.Bone 5575 S.Bone        5575 S.Bone        CHANGE/5451 B.Stew 5451 B.Stewart    
PAAM/AP            AP                 5575 S.Bone        5575 S.Bone        5575 S.Bone        5451 B.Stewart     5451 B.Stewart    
BEAM   LINE 4-1  
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
5595 F.Bridge/PAAM AP                 AP                 5841 W.Tarpeh      5841 W.Tarpeh      8090 J.Nelson Weke 8090 J.Nelson Weke
PAAM               AP                 SMB CHECKOUT/5841  5841 W.Tarpeh      SMB CHECKOUT/8090  8090 J.Nelson Weke 8090 J.Nelson Weke
PAAM/AP            AP                 5841 W.Tarpeh      5841 W.Tarpeh      8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 4-2  
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
8877 T.Matsui/PAAM AP                 AP                 8877 T.Matsui      11G7 Z.Bu          11G7 Z.Bu          5816 A.Ayzner     
PAAM               AP                 CHANGE/8877 T.Mats CHANGE/11G7 Z.Bu   11G7 Z.Bu          CHANGE/5816 A.Ayzn 5816 A.Ayzner     
PAAM/AP            AP                 8877 T.Matsui      11G7 Z.Bu          11G7 Z.Bu          5816 A.Ayzner      5816 A.Ayzner     
BEAM   LINE 4-3  
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
5442 J.Velazq/PAAM AP                 AP                 FACI               FACI               11G6 C.Joe-Wong    11G6 C.Joe-Wong   
PAAM               AP                 FACI               FACI               SMB CHECKOUT/11G6  11G6 C.Joe-Wong    11G6 C.Joe-Wong   
PAAM/AP            AP                 FACI               FACI               11G6 C.Joe-Wong    11G6 C.Joe-Wong    11G6 C.Joe-Wong   
BEAM   LINE 6-2  
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
5739 G.Qian/PAAM   AP                 AP                 5845 M.Preefer     5845 M.Preefer     5845 M.Preefer     8090 J.Nelson Weke
PAAM               AP                 CHANGE/5845 M.Pree 5845 M.Preefer     5845 M.Preefer     CHANGE/8090 J.Nels CHANGE/5703 R.Bell
PAAM/AP            AP                 5845 M.Preefer     5845 M.Preefer     5845 M.Preefer     8090 J.Nelson Weke 5703 R.Bell       
BEAM   LINE 7-2  
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
FACI/PAAM          AP                 AP                 5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       5587 M.Muehe      
PAAM               AP                 CHANGE/5587 M.Mueh 5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       5587 M.Muehe      
PAAM/AP            AP                 5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       5587 M.Muehe       5587 M.Muehe      
BEAM   LINE 7-3  
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
9705 J.LiSA/PAAM   AP                 AP                 5564 P.Kiser       5564 P.Kiser       8071 R.Sarangi     8071 R.Sarangi    
PAAM               AP                 SMB CHECKOUT/5564  5564 P.Kiser       SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi    
PAAM/AP            AP                 5564 P.Kiser       5564 P.Kiser       8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 9-3  
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
5126 J.Yano/PAAM   AP                 AP                 5851 F.Lin         5851 F.Lin         5543 B.Gates       5543 B.Gates      
PAAM               AP                 CHANGE/5851 F.Lin  5851 F.Lin         CHANGE/5543 B.Gate 5543 B.Gates       CHANGE/5537 A.Bhan
PAAM/AP            AP                 5851 F.Lin         5851 F.Lin         5543 B.Gates       5543 B.Gates       5537 A.Bhan       
BEAM   LINE 10-2 
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
COMM/PAAM          AP                 AP                 COMM               COMM               COMM               COMM              
PAAM               AP                 COMM               COMM               COMM               COMM               COMM              
PAAM/AP            AP                 COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
PAAM               AP                 AP                 5310 M.Wang        5310 M.Wang        5584 E.Spielman-Su 5584 E.Spielman-Su
PAAM               AP                 SMB CHECKOUT/5310  5310 M.Wang        SMB CHECKOUT/5584  5584 E.Spielman-Su 5584 E.Spielman-Su
PAAM/AP            AP                 5310 M.Wang        5310 M.Wang        5584 E.Spielman-Su 5584 E.Spielman-Su 5584 E.Spielman-Su
BEAM   LINE 11-3 
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
5452 A.Sinha/PAAM  AP                 AP                 8895 K.Stone       8895 K.Stone       5597 R.Kasse       5597 R.Kasse      
PAAM               AP                 Xray CHECKOUT/8895 8895 K.Stone       Xray CHECKOUT/5597 5597 R.Kasse       5597 R.Kasse      
PAAM/AP            AP                 8895 K.Stone       8895 K.Stone       5597 R.Kasse       5597 R.Kasse       5597 R.Kasse      
BEAM   LINE 14-3 
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
5474 S.Bone/PAAM   AP                 AP                 Unscheduled        5149 N.Tosca       5149 N.Tosca       5712 J.Shukle     
PAAM               AP                 Unscheduled        CHANGE/5149 N.Tosc 5149 N.Tosca       CHANGE/5712 J.Shuk 5712 J.Shukle     
PAAM/AP            AP                 Unscheduled        5149 N.Tosca       5149 N.Tosca       5712 J.Shukle      5712 J.Shukle     
BEAM   LINE 15-2 
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
5802 R.Hadt/PAAM   AP                 AP                 COMM               COMM               8898 T.Kroll       8898 T.Kroll      
PAAM               AP                 COMM               COMM               CHANGE/8898 T.Krol 8898 T.Kroll       8898 T.Kroll      
PAAM/AP            AP                 COMM               COMM               8898 T.Kroll       8898 T.Kroll       8898 T.Kroll      
BEAM   LINE 17-2 
May 24, 2021       May 25, 2021       May 26, 2021       May 27, 2021       May 28, 2021       May 29, 2021       May 30, 2021      
COMM/PAAM          AP                 AP                 COMM               COMM               COMM               COMM              
PAAM               AP                 COMM               COMM               COMM               COMM               COMM              
PAAM/AP            AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF May 31, 2021 
                                         
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
BEAM   LINE 1-5  
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
FACI               FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
FACI               Xray CHECKOUT/8091 8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
FACI               8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 2-1  
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
5330 N.Strange     5330 N.Strange     8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
5330 N.Strange     Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
5330 N.Strange     8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
BEAM   LINE 2-2  
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
Unscheduled        Unscheduled        FACI               FACI               FACI               5778 P.Csernica    5778 P.Csernica   
Unscheduled        FACI               FACI               FACI               SMB CHECKOUT/5778  5778 P.Csernica    5778 P.Csernica   
Unscheduled        FACI               FACI               FACI               5778 P.Csernica    5778 P.Csernica    5778 P.Csernica   
BEAM   LINE 2-3  
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
5451 B.Stewart     5451 B.Stewart     5314 K.Boye        5314 K.Boye        5314 K.Boye        5444 J.Bargar      5444 J.Bargar     
5451 B.Stewart     CHANGE/5314 K.Boye 5314 K.Boye        5314 K.Boye        CHANGE/5444 J.Barg 5444 J.Bargar      5444 J.Bargar     
5451 B.Stewart     5314 K.Boye        5314 K.Boye        5314 K.Boye        5444 J.Bargar      5444 J.Bargar      5444 J.Bargar     
BEAM   LINE 4-1  
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
8090 J.Nelson Weke 8090 J.Nelson Weke 5472 P.O'Day       5472 P.O'Day       5472 P.O'Day       5688 R.Satish      5688 R.Satish     
8090 J.Nelson Weke SMB CHECKOUT/5472  5472 P.O'Day       5472 P.O'Day       SMB CHECKOUT/5688  5688 R.Satish      5688 R.Satish     
8090 J.Nelson Weke 5472 P.O'Day       5472 P.O'Day       5472 P.O'Day       5688 R.Satish      5688 R.Satish      5688 R.Satish     
BEAM   LINE 4-2  
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
5816 A.Ayzner      8877 T.Matsui      11F8 K.Kilchrist   8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
CHANGE/8877 T.Mats CHANGE/11F8 K.Kilc CHANGE/8877 T.Mats CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/8877 T.Mats 8877 T.Matsui     
8877 T.Matsui      11F8 K.Kilchrist   8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
11G6 C.Joe-Wong    11G6 C.Joe-Wong    5614 Y.Tang        5614 Y.Tang        5614 Y.Tang        5273 M.Abernathy   5273 M.Abernathy  
11G6 C.Joe-Wong    SMB CHECKOUT/5614  5614 Y.Tang        5614 Y.Tang        SMB CHECKOUT/5273  5273 M.Abernathy   5273 M.Abernathy  
11G6 C.Joe-Wong    5614 Y.Tang        5614 Y.Tang        5614 Y.Tang        5273 M.Abernathy   5273 M.Abernathy   5273 M.Abernathy  
BEAM   LINE 6-2  
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
5703 R.Bell        5703 R.Bell        5252 C.Wei         5252 C.Wei         5252 C.Wei         5213 M.Rahman      5213 M.Rahman     
5703 R.Bell        CHANGE/5252 C.Wei  5252 C.Wei         5252 C.Wei         CHANGE/5213 M.Rahm 5213 M.Rahman      5213 M.Rahman     
5703 R.Bell        5252 C.Wei         5252 C.Wei         5252 C.Wei         5213 M.Rahman      5213 M.Rahman      5213 M.Rahman     
BEAM   LINE 7-2  
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
5587 M.Muehe       5587 M.Muehe       FACI               5103 K.Reinhart    5103 K.Reinhart    5103 K.Reinhart    5103 K.Reinhart   
5587 M.Muehe       5587 M.Muehe/FACI  CHANGE/5103 K.Rein 5103 K.Reinhart    5103 K.Reinhart    5103 K.Reinhart    5103 K.Reinhart   
5587 M.Muehe       FACI               5103 K.Reinhart    5103 K.Reinhart    5103 K.Reinhart    5103 K.Reinhart    5103 K.Reinhart   
BEAM   LINE 7-3  
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
8071 R.Sarangi     8071 R.Sarangi     5273 M.Abernathy   5273 M.Abernathy   5273 M.Abernathy   5224 R.Chatterjee  5224 R.Chatterjee 
8071 R.Sarangi     SMB CHECKOUT/5273  5273 M.Abernathy   5273 M.Abernathy   SMB CHECKOUT/5224  5224 R.Chatterjee  5224 R.Chatterjee 
8071 R.Sarangi     5273 M.Abernathy   5273 M.Abernathy   5273 M.Abernathy   5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee 
BEAM   LINE 9-3  
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
5537 A.Bhan        5537 A.Bhan        5659 F.Zaera       5659 F.Zaera       8099 S.Bare        5275 A.Aitbekova   5275 A.Aitbekova  
5537 A.Bhan        CHANGE/5659 F.Zaer 5659 F.Zaera       CHANGE/8099 S.Bare CHANGE/5275 A.Aitb 5275 A.Aitbekova   5275 A.Aitbekova  
5537 A.Bhan        5659 F.Zaera       5659 F.Zaera       8099 S.Bare        5275 A.Aitbekova   5275 A.Aitbekova   5275 A.Aitbekova  
BEAM   LINE 10-2 
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
5584 E.Spielman-Su 5584 E.Spielman-Su Unscheduled        Unscheduled        Unscheduled        5535 S.Ying        5535 S.Ying       
5584 E.Spielman-Su 5584 E.Spielman-Su Unscheduled        Unscheduled        SMB CHECKOUT/5535  5535 S.Ying        5535 S.Ying       
5584 E.Spielman-Su Unscheduled        Unscheduled        Unscheduled        5535 S.Ying        5535 S.Ying        5535 S.Ying       
BEAM   LINE 11-3 
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
5597 R.Kasse       5597 R.Kasse       FACI               5351 M.Doeff       5351 M.Doeff       5252 C.Wei         5252 C.Wei        
5597 R.Kasse       5597 R.Kasse/FACI  Xray CHECKOUT/5351 5351 M.Doeff       Xray CHECKOUT/5252 5252 C.Wei         5252 C.Wei        
5597 R.Kasse       FACI               5351 M.Doeff       5351 M.Doeff       5252 C.Wei         5252 C.Wei         5252 C.Wei        
BEAM   LINE 14-3 
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
5712 J.Shukle      5712 J.Shukle      5718 J.Moran       5718 J.Moran       5718 J.Moran       11D5 A.Templeton   11D5 A.Templeton  
5712 J.Shukle      CHANGE/5718 J.Mora 5718 J.Moran       5718 J.Moran       CHANGE/11D5 A.Temp 11D5 A.Templeton   11D5 A.Templeton  
5712 J.Shukle      5718 J.Moran       5718 J.Moran       5718 J.Moran       11D5 A.Templeton   11D5 A.Templeton   11D5 A.Templeton  
BEAM   LINE 15-2 
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
8898 T.Kroll       COMM               5798 I.Bogacz      5798 I.Bogacz      5798 I.Bogacz      8892 D.Sokaras     8892 D.Sokaras    
8898 T.Kroll/COMM  CHANGE/5798 I.Boga 5798 I.Bogacz      5798 I.Bogacz      CHANGE/8892 D.Soka 8892 D.Sokaras     8892 D.Sokaras    
COMM               5798 I.Bogacz      5798 I.Bogacz      5798 I.Bogacz      8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras    
BEAM   LINE 17-2 
May 31, 2021       Jun. 01, 2021      Jun. 02, 2021      Jun. 03, 2021      Jun. 04, 2021      Jun. 05, 2021      Jun. 06, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jun. 07, 2021
                                         
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
BEAM   LINE 1-5  
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
8091 C.Tassone/AP  AP                 AP                 5846 S.Hesse       5846 S.Hesse       5846 S.Hesse       5846 S.Hesse      
AP                 AP                 Xray CHECKOUT/5846 5846 S.Hesse       5846 S.Hesse       5846 S.Hesse       5846 S.Hesse      
AP                 AP                 5846 S.Hesse       5846 S.Hesse       5846 S.Hesse       5846 S.Hesse       5846 S.Hesse      
BEAM   LINE 2-1  
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
8895 K.Stone/AP    AP                 AP                 FACI               5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
AP                 AP                 FACI               Xray CHECKOUT/5398 5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
AP                 AP                 FACI               5398 T.Wynn        5398 T.Wynn        5398 T.Wynn        5398 T.Wynn       
BEAM   LINE 2-2  
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
5778 P.Csernica/AP AP                 AP                 5545 C.Roberts     5545 C.Roberts     5880 Y.Roman       5880 Y.Roman      
AP                 AP                 CHANGE/5545 C.Robe 5545 C.Roberts     CHANGE/5880 Y.Roma 5880 Y.Roman       5880 Y.Roman      
AP                 AP                 5545 C.Roberts     5545 C.Roberts     5880 Y.Roman       5880 Y.Roman       5880 Y.Roman      
BEAM   LINE 2-3  
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
5444 J.Bargar/AP   AP                 AP                 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
AP                 AP                 CHANGE/8098 T.Krol 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
AP                 AP                 8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll       8098 T.Kroll      
BEAM   LINE 4-1  
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
5688 R.Satish/AP   AP                 AP                 5583 J.Pena        5583 J.Pena        5845 M.Preefer     5845 M.Preefer    
AP                 AP                 SMB CHECKOUT/5583  5583 J.Pena        SMB CHECKOUT/5845  5845 M.Preefer     5845 M.Preefer    
AP                 AP                 5583 J.Pena        5583 J.Pena        5845 M.Preefer     5845 M.Preefer     5845 M.Preefer    
BEAM   LINE 4-2  
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
8877 T.Matsui/AP   AP                 AP                 8877 T.Matsui      11G4 F.Yabukarski  Unscheduled        Unscheduled       
AP                 AP                 CHANGE/8877 T.Mats CHANGE/11G4 F.Yabu Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 8877 T.Matsui      11G4 F.Yabukarski  Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
5273 M.Abernath/AP AP                 AP                 Unscheduled        Unscheduled        5865 M.Shelby      5865 M.Shelby     
AP                 AP                 Unscheduled        Unscheduled        SMB CHECKOUT/5865  5865 M.Shelby      5865 M.Shelby     
AP                 AP                 Unscheduled        Unscheduled        5865 M.Shelby      5865 M.Shelby      5865 M.Shelby     
BEAM   LINE 6-2  
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
5213 M.Rahman/AP   AP                 AP                 8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
AP                 AP                 Xray CHECKOUT/8867 8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
AP                 AP                 8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
BEAM   LINE 7-2  
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
5103 K.Reinhart/AP AP                 AP                 5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
AP                 AP                 CHANGE/5289 J.Chor 5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
AP                 AP                 5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
BEAM   LINE 7-3  
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
5224 R.Chatterj/AP AP                 AP                 4416 T.Stemmler    4416 T.Stemmler    5314 K.Boye        5314 K.Boye       
AP                 AP                 SMB CHECKOUT/4416  4416 T.Stemmler    SMB CHECKOUT/5314  5314 K.Boye        5314 K.Boye       
AP                 AP                 4416 T.Stemmler    4416 T.Stemmler    5314 K.Boye        5314 K.Boye        5314 K.Boye       
BEAM   LINE 9-3  
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
5275 A.Aitbekov/AP AP                 AP                 4416 T.Stemmler    4416 T.Stemmler    5393 C.Dewey       5393 C.Dewey      
AP                 AP                 SMB CHECKOUT/4416  4416 T.Stemmler    SMB CHECKOUT/5393  5393 C.Dewey       5393 C.Dewey      
AP                 AP                 4416 T.Stemmler    4416 T.Stemmler    5393 C.Dewey       5393 C.Dewey       5393 C.Dewey      
BEAM   LINE 10-2 
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
5535 S.Ying/AP     AP                 AP                 4919 W.Lukens      5333 S.Minasian    5333 S.Minasian    5333 S.Minasian   
AP                 AP                 CHANGE/4919 W.Luke CHANGE/5333 S.Mina 5333 S.Minasian    5333 S.Minasian    SMB CHECKOUT/5261 
AP                 AP                 4919 W.Lukens      5333 S.Minasian    5333 S.Minasian    5333 S.Minasian    5261 E.Balboni    
BEAM   LINE 11-3 
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
5252 C.Wei/AP      AP                 AP                 5583 J.Pena        5213 M.Rahman      5213 M.Rahman      5213 M.Rahman     
AP                 AP                 Xray CHECKOUT/5583 Xray CHECKOUT/5213 5213 M.Rahman      5213 M.Rahman      5213 M.Rahman     
AP                 AP                 5583 J.Pena        5213 M.Rahman      5213 M.Rahman      5213 M.Rahman      5213 M.Rahman     
BEAM   LINE 14-3 
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
11D5 A.Templeto/AP AP                 AP                 FACI               5708 M.Rowley      5708 M.Rowley      5474 S.Bone       
AP                 AP                 FACI               CHANGE/5708 M.Rowl 5708 M.Rowley      CHANGE/5474 S.Bone 5474 S.Bone       
AP                 AP                 FACI               5708 M.Rowley      5708 M.Rowley      5474 S.Bone        5474 S.Bone       
BEAM   LINE 15-2 
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
8892 D.Sokaras/AP  AP                 AP                 COMM               COMM               5075 A.Braun       5075 A.Braun      
AP                 AP                 COMM               COMM               CHANGE/5075 A.Brau 5075 A.Braun       5075 A.Braun      
AP                 AP                 COMM               COMM               5075 A.Braun       5075 A.Braun       5075 A.Braun      
BEAM   LINE 17-2 
Jun. 07, 2021      Jun. 08, 2021      Jun. 09, 2021      Jun. 10, 2021      Jun. 11, 2021      Jun. 12, 2021      Jun. 13, 2021     
COMM/AP            AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jun. 14, 2021
                                         
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
BEAM   LINE 1-5  
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5846 S.Hesse       FACI               5702 S.Li          Unscheduled        5358 S.Lee         5358 S.Lee         5358 S.Lee        
5846 S.Hesse/FACI  Xray CHECKOUT/5702 5702 S.Li          Xray CHECKOUT/5358 5358 S.Lee         5358 S.Lee         5358 S.Lee        
FACI               5702 S.Li          Unscheduled        5358 S.Lee         5358 S.Lee         5358 S.Lee         5358 S.Lee        
BEAM   LINE 2-1  
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5398 T.Wynn        5234 Y.Takamura    5234 Y.Takamura    5234 Y.Takamura    8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
Xray CHECKOUT/5234 5234 Y.Takamura    5234 Y.Takamura    Xray CHECKOUT/8015 8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
5234 Y.Takamura    5234 Y.Takamura    5234 Y.Takamura    8015 A.Mehta       8015 A.Mehta       8015 A.Mehta       8015 A.Mehta      
BEAM   LINE 2-2  
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5880 Y.Roman       11G5 S.Najmi       5638 D.Simonetti   5638 D.Simonetti   5638 D.Simonetti   5302 L.Li          5302 L.Li         
CHANGE/11G5 S.Najm CHANGE/5638 D.Simo 5638 D.Simonetti   5638 D.Simonetti   CHANGE/5302 L.Li   5302 L.Li          5302 L.Li         
11G5 S.Najmi       5638 D.Simonetti   5638 D.Simonetti   5638 D.Simonetti   5302 L.Li          5302 L.Li          5302 L.Li         
BEAM   LINE 2-3  
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
8098 T.Kroll       FACI               FACI               FACI               5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
8098 T.Kroll/FACI  FACI               FACI               CHANGE/5289 J.Chor 5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
FACI               FACI               FACI               5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
BEAM   LINE 4-1  
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5845 M.Preefer     5748 L.Moreau      5748 L.Moreau      5748 L.Moreau      5748 L.Moreau      5252 C.Wei         5252 C.Wei        
SMB CHECKOUT/5748  5748 L.Moreau      5748 L.Moreau      5748 L.Moreau      SMB CHECKOUT/5252  5252 C.Wei         5252 C.Wei        
5748 L.Moreau      5748 L.Moreau      5748 L.Moreau      5748 L.Moreau      5252 C.Wei         5252 C.Wei         5252 C.Wei        
BEAM   LINE 4-2  
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
Unscheduled        8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      5497 M.Georgiadis  5497 M.Georgiadis 
CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5865 M.Shelby      5199 F.Bridges     5199 F.Bridges     5868 T.Borch       5868 T.Borch       5445 G.George      5445 G.George     
SMB CHECKOUT/5199  5199 F.Bridges     SMB CHECKOUT/5868  5868 T.Borch       SMB CHECKOUT/5445  5445 G.George      5445 G.George     
5199 F.Bridges     5199 F.Bridges     5868 T.Borch       5868 T.Borch       5445 G.George      5445 G.George      5445 G.George     
BEAM   LINE 6-2  
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
8867 S.Webb        8867 S.Webb        8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
8867 S.Webb        CHANGE/8890 J.Nels 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
8867 S.Webb        8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
BEAM   LINE 7-2  
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    FACI               FACI               FACI               FACI              
5289 J.Chorover    5289 J.Chorover    5289 J.Chorov/FACI FACI               FACI               FACI               FACI              
5289 J.Chorover    5289 J.Chorover    FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5314 K.Boye        4756 K.Haas        4756 K.Haas        4756 K.Haas        4756 K.Haas        5393 C.Dewey       5393 C.Dewey      
SMB CHECKOUT/4756  4756 K.Haas        4756 K.Haas        4756 K.Haas        SMB CHECKOUT/5393  5393 C.Dewey       5393 C.Dewey      
4756 K.Haas        4756 K.Haas        4756 K.Haas        4756 K.Haas        5393 C.Dewey       5393 C.Dewey       5393 C.Dewey      
BEAM   LINE 9-3  
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5393 C.Dewey       FACI               FACI               FACI               FACI               FACI               FACI              
5393 C.Dewey/FACI  FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5261 E.Balboni     5280 E.Balboni     5328 R.Abergel     5328 R.Abergel     5318 R.Abergel     5586 D.Olive       5586 D.Olive      
SMB CHECKOUT/5280  CHANGE/5328 R.Aber 5328 R.Abergel     CHANGE/5318 R.Aber CHANGE/5586 D.Oliv 5586 D.Olive       5586 D.Olive      
5280 E.Balboni     5328 R.Abergel     5328 R.Abergel     5318 R.Abergel     5586 D.Olive       5586 D.Olive       5586 D.Olive      
BEAM   LINE 11-3 
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5213 M.Rahman      5706 N.Noel        5706 N.Noel        5706 N.Noel        5846 S.Hesse       5846 S.Hesse       8091 C.Tassone    
Xray CHECKOUT/5706 5706 N.Noel        5706 N.Noel        Xray CHECKOUT/5846 5846 S.Hesse       Xray CHECKOUT/8091 8091 C.Tassone    
5706 N.Noel        5706 N.Noel        5706 N.Noel        5846 S.Hesse       5846 S.Hesse       8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 14-3 
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5474 S.Bone        5474 S.Bone        5149 N.Tosca       5149 N.Tosca       5359 M.Raven       5359 M.Raven       5359 M.Raven      
5474 S.Bone        CHANGE/5149 N.Tosc 5149 N.Tosca       CHANGE/5359 M.Rave 5359 M.Raven       5359 M.Raven       5359 M.Raven      
5474 S.Bone        5149 N.Tosca       5149 N.Tosca       5359 M.Raven       5359 M.Raven       5359 M.Raven       5359 M.Raven      
BEAM   LINE 15-2 
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
5075 A.Braun       5777 T.Large       5777 T.Large       5777 T.Large       5777 T.Large       5371 N.Schuth      5371 N.Schuth     
CHANGE/5777 T.Larg 5777 T.Large       5777 T.Large       5777 T.Large       CHANGE/5371 N.Schu 5371 N.Schuth      5371 N.Schuth     
5777 T.Large       5777 T.Large       5777 T.Large       5777 T.Large       5371 N.Schuth      5371 N.Schuth      5371 N.Schuth     
BEAM   LINE 17-2 
Jun. 14, 2021      Jun. 15, 2021      Jun. 16, 2021      Jun. 17, 2021      Jun. 18, 2021      Jun. 19, 2021      Jun. 20, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jun. 21, 2021
                                         
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
BEAM   LINE 1-5  
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
5358 S.Lee/PAAM/AP AP                 AP                 5231 P.Thornton    FACI               FACI               FACI              
AP                 AP                 Xray CHECKOUT/5231 5231 P.Thornt/FACI FACI               FACI               FACI              
AP                 AP                 5231 P.Thornton    FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
8015 A.Mehta/PA/AP AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-2  
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
5302 L.Li/PAAM/AP  AP                 AP                 5217 S.Conradson   5217 S.Conradson   5217 S.Conradson   5217 S.Conradson  
AP                 AP                 SMB CHECKOUT/5217  5217 S.Conradson   5217 S.Conradson   5217 S.Conradson   5217 S.Conradson  
AP                 AP                 5217 S.Conradson   5217 S.Conradson   5217 S.Conradson   5217 S.Conradson   5217 S.Conradson  
BEAM   LINE 2-3  
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
5289 J.Chorov/P/AP AP                 AP                 5490 R.Wogelius    5490 R.Wogelius    5490 R.Wogelius    5490 R.Wogelius   
AP                 AP                 CHANGE/5490 R.Woge 5490 R.Wogelius    5490 R.Wogelius    5490 R.Wogelius    CHANGE/5715 J.Magy
AP                 AP                 5490 R.Wogelius    5490 R.Wogelius    5490 R.Wogelius    5490 R.Wogelius    5715 J.Magyar     
BEAM   LINE 4-1  
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
5252 C.Wei/PAAM/AP AP                 AP                 FACI               FACI               5442 J.Velazquez   5442 J.Velazquez  
AP                 AP                 FACI               FACI               SMB CHECKOUT/5442  5442 J.Velazquez   5442 J.Velazquez  
AP                 AP                 FACI               FACI               5442 J.Velazquez   5442 J.Velazquez   5442 J.Velazquez  
BEAM   LINE 4-2  
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
5497 M.Georgi/P/AP AP                 AP                 12A0 A.Garcia      5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
AP                 AP                 CHANGE/12A0 A.Garc CHANGE/5504 Y.Srin 5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
AP                 AP                 12A0 A.Garcia      5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan  5504 Y.Srinivasan 
BEAM   LINE 4-3  
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
5445 G.George/P/AP AP                 AP                 5818 E.Foley       5818 E.Foley       8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 SMB CHECKOUT/5818  5818 E.Foley       SMB CHECKOUT/8092  8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 5818 E.Foley       5818 E.Foley       8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 6-2  
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
8890 J.Nelson/P/AP AP                 AP                 4875 A.Dawson      4875 A.Dawson      5738 D.Agyeman-Bud 5738 D.Agyeman-Bud
AP                 AP                 CHANGE/4875 A.Daws 4875 A.Dawson      CHANGE/5738 D.Agye 5738 D.Agyeman-Bud 5738 D.Agyeman-Bud
AP                 AP                 4875 A.Dawson      4875 A.Dawson      5738 D.Agyeman-Bud 5738 D.Agyeman-Bud 5738 D.Agyeman-Bud
BEAM   LINE 7-2  
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
FACI/PAAM/AP       AP                 AP                 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
AP                 AP                 8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 7-3  
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
5393 C.Dewey/PA/AP AP                 AP                 5619 E.Farquhar    5619 E.Farquhar    5156 L.Li          5156 L.Li         
AP                 AP                 SMB CHECKOUT/5619  5619 E.Farquhar    SMB CHECKOUT/5156  5156 L.Li          5156 L.Li         
AP                 AP                 5619 E.Farquhar    5619 E.Farquhar    5156 L.Li          5156 L.Li          5156 L.Li         
BEAM   LINE 9-3  
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
FACI/PAAM/AP       AP                 AP                 11F5 S.Louisia     11F5 S.Louisia     5428 A.Braun       5428 A.Braun      
AP                 AP                 SMB CHECKOUT/11F5  11F5 S.Louisia     SMB CHECKOUT/5428  5428 A.Braun       5428 A.Braun      
AP                 AP                 11F5 S.Louisia     11F5 S.Louisia     5428 A.Braun       5428 A.Braun       5428 A.Braun      
BEAM   LINE 10-2 
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
COMM/PAAM/AP       AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
BEAM   LINE 11-2 
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
5586 D.Olive/PA/AP AP                 AP                 5071 A.Bhattachary 5071 A.Bhattachary 5071 A.Bhattachary 5071 A.Bhattachary
AP                 AP                 SMB CHECKOUT/5071  5071 A.Bhattachary 5071 A.Bhattachary 5071 A.Bhattachary 5071 A.Bhattachary
AP                 AP                 5071 A.Bhattachary 5071 A.Bhattachary 5071 A.Bhattachary 5071 A.Bhattachary 5071 A.Bhattachary
BEAM   LINE 11-3 
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
8091 C.Tasson/P/AP AP                 AP                 90H0 A.Huq         90H0 A.Huq         8895 K.Stone       8895 K.Stone      
AP                 AP                 Xray CHECKOUT/90H0 90H0 A.Huq         Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone      
AP                 AP                 90H0 A.Huq         90H0 A.Huq         8895 K.Stone       8895 K.Stone       8895 K.Stone      
BEAM   LINE 14-3 
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
5359 M.Raven/PA/AP AP                 AP                 8233 W.Fischer     8233 W.Fischer     8233 W.Fischer     8233 W.Fischer    
AP                 AP                 CHANGE/8233 W.Fisc 8233 W.Fischer     8233 W.Fischer     8233 W.Fischer     CHANGE/5715 J.Magy
AP                 AP                 8233 W.Fischer     8233 W.Fischer     8233 W.Fischer     8233 W.Fischer     5715 J.Magyar     
BEAM   LINE 15-2 
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
5371 N.Schuth/P/AP AP                 AP                 5636 L.Gee         5636 L.Gee         5670 T.Hersbach    5670 T.Hersbach   
AP                 AP                 CHANGE/5636 L.Gee  5636 L.Gee         CHANGE/5670 T.Hers 5670 T.Hersbach    5670 T.Hersbach   
AP                 AP                 5636 L.Gee         5636 L.Gee         5670 T.Hersbach    5670 T.Hersbach    5670 T.Hersbach   
BEAM   LINE 17-2 
Jun. 21, 2021      Jun. 22, 2021      Jun. 23, 2021      Jun. 24, 2021      Jun. 25, 2021      Jun. 26, 2021      Jun. 27, 2021     
COMM/PAAM/AP       AP                 AP                 COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              
AP                 AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jun. 28, 2021
                                         
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
BEAM   LINE 1-5  
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
FACI               FACI               5452 A.Sinha       5452 A.Sinha       FACI               5251 G.Sethi       5251 G.Sethi      
FACI               Xray CHECKOUT/5452 5452 A.Sinha       5452 A.Sinha/FACI  Xray CHECKOUT/5251 5251 G.Sethi       5251 G.Sethi      
FACI               5452 A.Sinha       5452 A.Sinha       FACI               5251 G.Sethi       5251 G.Sethi       5251 G.Sethi      
BEAM   LINE 2-1  
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
FACI               FACI               5430 G.Wan         5430 G.Wan         5430 G.Wan         8895 K.Stone       8895 K.Stone      
FACI               Xray CHECKOUT/5430 5430 G.Wan         5430 G.Wan         Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone      
FACI               5430 G.Wan         5430 G.Wan         5430 G.Wan         8895 K.Stone       8895 K.Stone       8895 K.Stone      
BEAM   LINE 2-2  
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
5217 S.Conradson   5831 W.Fu          5831 W.Fu          5394 C.Dewey       5394 C.Dewey       8818 A.Mehta       8818 A.Mehta      
SMB CHECKOUT/5831  5831 W.Fu          SMB CHECKOUT/5394  5394 C.Dewey       SMB CHECKOUT/8818  8818 A.Mehta       8818 A.Mehta      
5831 W.Fu          5831 W.Fu          5394 C.Dewey       5394 C.Dewey       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
BEAM   LINE 2-3  
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5093 M.Kelly       5093 M.Kelly      
5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      CHANGE/5093 M.Kell 5093 M.Kelly       5093 M.Kelly      
5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 4-1  
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
5442 J.Velazquez   FACI               FACI               FACI               5808 S.Spence      5808 S.Spence      5808 S.Spence     
5442 J.Velazq/FACI FACI               FACI               SMB CHECKOUT/5808  5808 S.Spence      5808 S.Spence      5808 S.Spence     
FACI               FACI               FACI               5808 S.Spence      5808 S.Spence      5808 S.Spence      5808 S.Spence     
BEAM   LINE 4-2  
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
5504 Y.Srinivasan  11G2 A.Bhattachary 11G2 A.Bhattachary 8047 T.Weiss       11E2 D.Moses       5497 M.Georgiadis  5497 M.Georgiadis 
CHANGE/11G2 A.Bhat 11G2 A.Bhattachary CHANGE/8047 T.Weis CHANGE/11E2 D.Mose CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
11G2 A.Bhattachary 11G2 A.Bhattachary 8047 T.Weiss       11E2 D.Moses       5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
8092 D.Sokaras     5380 L.Whittaker   5380 L.Whittaker   5380 L.Whittaker   5380 L.Whittaker   Unscheduled        Unscheduled       
SMB CHECKOUT/5380  5380 L.Whittaker   5380 L.Whittaker   5380 L.Whittaker   5380 L.Whittaker   Unscheduled        Unscheduled       
5380 L.Whittaker   5380 L.Whittaker   5380 L.Whittaker   5380 L.Whittaker   Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
5738 D.Agyeman-Bud 5493 Y.Liu         5493 Y.Liu         5493 Y.Liu         5632 M.Doeff       5632 M.Doeff       5632 M.Doeff      
CHANGE/5493 Y.Liu  5493 Y.Liu         5493 Y.Liu         CHANGE/5632 M.Doef 5632 M.Doeff       5632 M.Doeff       CHANGE/5655 J.Zhan
5493 Y.Liu         5493 Y.Liu         5493 Y.Liu         5632 M.Doeff       5632 M.Doeff       5632 M.Doeff       5655 J.Zhang      
BEAM   LINE 7-2  
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
8067 S.Webb        8067 S.Webb        8067 S.Webb        5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
8067 S.Webb        8067 S.Webb        CHANGE/5093 M.Kell 5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
8067 S.Webb        8067 S.Webb        5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 7-3  
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
5156 L.Li          5105 M.Kirk        5105 M.Kirk        5105 M.Kirk        5105 M.Kirk        5764 A.Jasniewski  5764 A.Jasniewski 
SMB CHECKOUT/5105  5105 M.Kirk        5105 M.Kirk        5105 M.Kirk        SMB CHECKOUT/5764  5764 A.Jasniewski  5764 A.Jasniewski 
5105 M.Kirk        5105 M.Kirk        5105 M.Kirk        5105 M.Kirk        5764 A.Jasniewski  5764 A.Jasniewski  5764 A.Jasniewski 
BEAM   LINE 9-3  
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
5428 A.Braun       5190 L.Que         5190 L.Que         5190 L.Que         5190 L.Que         5635 A.Cordones-Ha 5635 A.Cordones-Ha
SMB CHECKOUT/5190  5190 L.Que         5190 L.Que         5190 L.Que         SMB CHECKOUT/5635  5635 A.Cordones-Ha 5635 A.Cordones-Ha
5190 L.Que         5190 L.Que         5190 L.Que         5190 L.Que         5635 A.Cordones-Ha 5635 A.Cordones-Ha 5635 A.Cordones-Ha
BEAM   LINE 10-2 
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
COMM               COMM               92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau  
COMM               Xray CHECKOUT/92I8 92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau  
COMM               92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau  
BEAM   LINE 11-2 
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
5071 A.Bhattachary 4809 G.Lowry       4809 G.Lowry       4831 A.Avellan     4831 A.Avellan     5009 S.Kozimor     5009 S.Kozimor    
SMB CHECKOUT/4809  4809 G.Lowry       CHANGE/4831 A.Avel 4831 A.Avellan     SMB CHECKOUT/5009  5009 S.Kozimor     5009 S.Kozimor    
4809 G.Lowry       4809 G.Lowry       4831 A.Avellan     4831 A.Avellan     5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor    
BEAM   LINE 11-3 
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
8895 K.Stone       5419 G.Giri        5419 G.Giri        5419 G.Giri        5419 G.Giri        FACI               FACI              
Xray CHECKOUT/5419 5419 G.Giri        5419 G.Giri        5419 G.Giri        5419 G.Giri/FACI   FACI               FACI              
5419 G.Giri        5419 G.Giri        5419 G.Giri        5419 G.Giri        FACI               FACI               FACI              
BEAM   LINE 14-3 
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5140 X.Zheng       5140 X.Zheng      
5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      CHANGE/5140 X.Zhen 5140 X.Zheng       5140 X.Zheng      
5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5715 J.Magyar      5140 X.Zheng       5140 X.Zheng       5140 X.Zheng      
BEAM   LINE 15-2 
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
5670 T.Hersbach    5670 T.Hersbach    5809 R.Jay         5809 R.Jay         5809 R.Jay         5670 T.Hersbach    5670 T.Hersbach   
5670 T.Hersbach    CHANGE/5809 R.Jay  5809 R.Jay         5809 R.Jay         CHANGE/5670 T.Hers 5670 T.Hersbach    5670 T.Hersbach   
5670 T.Hersbach    5809 R.Jay         5809 R.Jay         5809 R.Jay         5670 T.Hersbach    5670 T.Hersbach    5670 T.Hersbach   
BEAM   LINE 17-2 
Jun. 28, 2021      Jun. 29, 2021      Jun. 30, 2021      Jul. 01, 2021      Jul. 02, 2021      Jul. 03, 2021      Jul. 04, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jul. 05, 2021
                                         
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
BEAM   LINE 1-5  
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
5251 G.Sethi       5833 L.Grundy      5833 L.Grundy      5833 L.Grundy      DOWN               5597 R.Kasse       5597 R.Kasse      
Xray CHECKOUT/5833 5833 L.Grundy      5833 L.Grundy      5833 L.Grundy/DOWN Xray CHECKOUT/5597 5597 R.Kasse       5597 R.Kasse      
5833 L.Grundy      5833 L.Grundy      5833 L.Grundy      DOWN               5597 R.Kasse       5597 R.Kasse       5597 R.Kasse      
BEAM   LINE 2-1  
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
8895 K.Stone       8895 K.Stone       5698 W.Tarpeh      5698 W.Tarpeh      5549 R.Smaha       5549 R.Smaha       5549 R.Smaha      
8895 K.Stone       Xray CHECKOUT/5698 5698 W.Tarpeh      Xray CHECKOUT/5549 5549 R.Smaha       5549 R.Smaha       5549 R.Smaha      
8895 K.Stone       5698 W.Tarpeh      5698 W.Tarpeh      5549 R.Smaha       5549 R.Smaha       5549 R.Smaha       5549 R.Smaha      
BEAM   LINE 2-2  
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
8818 A.Mehta       8818 A.Mehta       5375 M.Besli       5375 M.Besli       5723 G.Chen        5723 G.Chen        5723 G.Chen       
8818 A.Mehta       SMB CHECKOUT/5375  5375 M.Besli       SMB CHECKOUT/5723  5723 G.Chen        5723 G.Chen        5723 G.Chen       
8818 A.Mehta       5375 M.Besli       5375 M.Besli       5723 G.Chen        5723 G.Chen        5723 G.Chen        5723 G.Chen       
BEAM   LINE 2-3  
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5614 Y.Tang        5614 Y.Tang        5614 Y.Tang       
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       CHANGE/5614 Y.Tang 5614 Y.Tang        5614 Y.Tang        5614 Y.Tang       
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5614 Y.Tang        5614 Y.Tang        5614 Y.Tang        5614 Y.Tang       
BEAM   LINE 4-1  
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
5808 S.Spence      5808 S.Spence      5808 S.Spence      Unscheduled        Unscheduled        8090 J.Nelson Weke 8090 J.Nelson Weke
5808 S.Spence      5808 S.Spence      5808 S.Spence      Unscheduled        SMB CHECKOUT/8090  8090 J.Nelson Weke 8090 J.Nelson Weke
5808 S.Spence      5808 S.Spence      Unscheduled        Unscheduled        8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 4-2  
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
5497 M.Georgiadis  8877 T.Matsui      5443 G.Kashanchi   5443 G.Kashanchi   5414 C.Salamat     5253 H.Wu          5253 H.Wu         
CHANGE/8877 T.Mats CHANGE/5443 G.Kash 5443 G.Kashanchi   CHANGE/5414 C.Sala CHANGE/5253 H.Wu   5253 H.Wu          5253 H.Wu         
8877 T.Matsui      5443 G.Kashanchi   5443 G.Kashanchi   5414 C.Salamat     5253 H.Wu          5253 H.Wu          5253 H.Wu         
BEAM   LINE 4-3  
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
Unscheduled        Unscheduled        5648 M.Siebecker   5648 M.Siebecker   5648 M.Siebecker   5708 M.Rowley      5708 M.Rowley     
Unscheduled        SMB CHECKOUT/5648  5648 M.Siebecker   5648 M.Siebecker   SMB CHECKOUT/5708  5708 M.Rowley      5708 M.Rowley     
Unscheduled        5648 M.Siebecker   5648 M.Siebecker   5648 M.Siebecker   5708 M.Rowley      5708 M.Rowley      5708 M.Rowley     
BEAM   LINE 6-2  
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
5655 J.Zhang       5655 J.Zhang       5655 J.Zhang       8090 J.Nelson Weke 5640 X.Zheng       8090 J.Nelson Weke 5672 P.Zhang      
5655 J.Zhang       5655 J.Zhang       CHANGE/8090 J.Nels CHANGE/5640 X.Zhen CHANGE/8090 J.Nels CHANGE/5672 P.Zhan 5672 P.Zhang      
5655 J.Zhang       5655 J.Zhang       8090 J.Nelson Weke 5640 X.Zheng       8090 J.Nelson Weke 5672 P.Zhang       5672 P.Zhang      
BEAM   LINE 7-2  
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5163 S.Tian        5163 S.Tian        5163 S.Tian       
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       CHANGE/5163 S.Tian 5163 S.Tian        5163 S.Tian        5163 S.Tian       
5093 M.Kelly       5093 M.Kelly       5093 M.Kelly       5163 S.Tian        5163 S.Tian        5163 S.Tian        5163 S.Tian       
BEAM   LINE 7-3  
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
5764 A.Jasniewski  5764 A.Jasniewski  5740 T.Jackson     5740 T.Jackson     5740 T.Jackson     5252 C.Wei         5252 C.Wei        
5764 A.Jasniewski  SMB CHECKOUT/5740  5740 T.Jackson     5740 T.Jackson     SMB CHECKOUT/5252  5252 C.Wei         5252 C.Wei        
5764 A.Jasniewski  5740 T.Jackson     5740 T.Jackson     5740 T.Jackson     5252 C.Wei         5252 C.Wei         5252 C.Wei        
BEAM   LINE 9-3  
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
5635 A.Cordones-Ha 5635 A.Cordones-Ha 5685 Z.Mathe       5685 Z.Mathe       5685 Z.Mathe       Unscheduled        Unscheduled       
5635 A.Cordones-Ha SMB CHECKOUT/5685  5685 Z.Mathe       5685 Z.Mathe       5685 Z.Mathe       Unscheduled        Unscheduled       
5635 A.Cordones-Ha 5685 Z.Mathe       5685 Z.Mathe       5685 Z.Mathe       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 10-2 
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   Unscheduled        5458 C.Takacs      5458 C.Takacs     
92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   Xray CHECKOUT/5458 5458 C.Takacs      5458 C.Takacs     
92I8 A.Halavanau   92I8 A.Halavanau   92I8 A.Halavanau   Unscheduled        5458 C.Takacs      5458 C.Takacs      5458 C.Takacs     
BEAM   LINE 11-2 
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
5009 S.Kozimor     5009 S.Kozimor     5771 C.Hansel      5771 C.Hansel      5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
5009 S.Kozimor     SMB CHECKOUT/5771  5771 C.Hansel      SMB CHECKOUT/5842  5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
5009 S.Kozimor     5771 C.Hansel      5771 C.Hansel      5842 J.Lentz       5842 J.Lentz       5842 J.Lentz       5842 J.Lentz      
BEAM   LINE 11-3 
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
FACI               5775 E.Ratcliff    5529 C.Salamat     5529 C.Salamat     5529 C.Salamat     4820 R.Kennard     4820 R.Kennard    
Xray CHECKOUT/5775 Xray CHECKOUT/5529 5529 C.Salamat     5529 C.Salamat     Xray CHECKOUT/4820 4820 R.Kennard     4820 R.Kennard    
5775 E.Ratcliff    5529 C.Salamat     5529 C.Salamat     5529 C.Salamat     4820 R.Kennard     4820 R.Kennard     4820 R.Kennard    
BEAM   LINE 14-3 
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
5140 X.Zheng       5140 X.Zheng       5853 E.Herndon     5853 E.Herndon     5853 E.Herndon     5714 J.Richardson  5714 J.Richardson 
5140 X.Zheng       CHANGE/5853 E.Hern 5853 E.Herndon     5853 E.Herndon     CHANGE/5714 J.Rich 5714 J.Richardson  5714 J.Richardson 
5140 X.Zheng       5853 E.Herndon     5853 E.Herndon     5853 E.Herndon     5714 J.Richardson  5714 J.Richardson  5714 J.Richardson 
BEAM   LINE 15-2 
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
5670 T.Hersbach    5670 T.Hersbach    COMM               COMM               COMM               5476 A.Garcia-Espa 5476 A.Garcia-Espa
5670 T.Hersbach    5670 T.Hersba/COMM COMM               COMM               CHANGE/5476 A.Garc 5476 A.Garcia-Espa 5476 A.Garcia-Espa
5670 T.Hersbach    COMM               COMM               COMM               5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia-Espa
BEAM   LINE 17-2 
Jul. 05, 2021      Jul. 06, 2021      Jul. 07, 2021      Jul. 08, 2021      Jul. 09, 2021      Jul. 10, 2021      Jul. 11, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jul. 12, 2021
                                         
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
BEAM   LINE 1-5  
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5597 R.Kasse/PAAM  AP                 AP                 FACI               5414 C.Salamat     5443 G.Kashanchi   5443 G.Kashanchi  
PAAM               AP                 FACI               Xray CHECKOUT/5414 Xray CHECKOUT/5443 5443 G.Kashanchi   5443 G.Kashanchi  
PAAM/AP            AP                 FACI               5414 C.Salamat     5443 G.Kashanchi   5443 G.Kashanchi   5443 G.Kashanchi  
BEAM   LINE 2-1  
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5549 R.Smaha/PAAM  AP                 AP                 5410 S.Blair       5410 S.Blair       5410 S.Blair       5410 S.Blair      
PAAM               AP                 Xray CHECKOUT/5410 5410 S.Blair       5410 S.Blair       5410 S.Blair       5410 S.Blair      
PAAM/AP            AP                 5410 S.Blair       5410 S.Blair       5410 S.Blair       5410 S.Blair       5410 S.Blair      
BEAM   LINE 2-2  
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5723 G.Chen/PAAM   AP                 AP                 5778 P.Csernica    5778 P.Csernica    92H0 A.Natan       92H0 A.Natan      
PAAM               AP                 SMB CHECKOUT/5778  5778 P.Csernica    SMB CHECKOUT/92H0  92H0 A.Natan       92H0 A.Natan      
PAAM/AP            AP                 5778 P.Csernica    5778 P.Csernica    92H0 A.Natan       92H0 A.Natan       92H0 A.Natan      
BEAM   LINE 2-3  
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5614 Y.Tang/PAAM   AP                 AP                 5325 S.Saslow      5325 S.Saslow      5325 S.Saslow      5325 S.Saslow     
PAAM               AP                 CHANGE/5325 S.Sasl 5325 S.Saslow      5325 S.Saslow      5325 S.Saslow      5325 S.Saslow     
PAAM/AP            AP                 5325 S.Saslow      5325 S.Saslow      5325 S.Saslow      5325 S.Saslow      5325 S.Saslow     
BEAM   LINE 4-1  
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
8090 J.Nelson/PAAM AP                 AP                 5055 P.Christopher 5055 P.Christopher 5836 G.Giannakakis 5836 G.Giannakakis
PAAM               AP                 CHANGE/5055 P.Chri 5055 P.Christopher CHANGE/5836 G.Gian 5836 G.Giannakakis CHANGE/5088 L.Gree
PAAM/AP            AP                 5055 P.Christopher 5055 P.Christopher 5836 G.Giannakakis 5836 G.Giannakakis 5088 L.Greenlee   
BEAM   LINE 4-2  
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5253 H.Wu/PAAM     AP                 AP                 8877 T.Matsui      Unscheduled        5497 M.Georgiadis  5497 M.Georgiadis 
PAAM               AP                 CHANGE/8877 T.Mats Unscheduled        CHANGE/5497 M.Geor 5497 M.Georgiadis  5497 M.Georgiadis 
PAAM/AP            AP                 8877 T.Matsui      Unscheduled        5497 M.Georgiadis  5497 M.Georgiadis  5497 M.Georgiadis 
BEAM   LINE 4-3  
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5708 M.Rowley/PAAM AP                 AP                 5289 J.Chorover    5289 J.Chorover    5226 J.Yano        5226 J.Yano       
PAAM               AP                 SMB CHECKOUT/5289  5289 J.Chorover    SMB CHECKOUT/5226  5226 J.Yano        5226 J.Yano       
PAAM/AP            AP                 5289 J.Chorover    5289 J.Chorover    5226 J.Yano        5226 J.Yano        5226 J.Yano       
BEAM   LINE 6-2  
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5672 P.Zhang/PAAM  AP                 AP                 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
PAAM               AP                 CHANGE/8890 J.Nels 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
PAAM/AP            AP                 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
BEAM   LINE 7-2  
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5163 S.Tian/PAAM   AP                 AP                 5647 L.Lu          5647 L.Lu          5647 L.Lu          5575 S.Bone       
PAAM               AP                 CHANGE/5647 L.Lu   5647 L.Lu          5647 L.Lu          CHANGE/5575 S.Bone 5575 S.Bone       
PAAM/AP            AP                 5647 L.Lu          5647 L.Lu          5647 L.Lu          5575 S.Bone        5575 S.Bone       
BEAM   LINE 7-3  
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5252 C.Wei/PAAM    AP                 AP                 FACI               FACI               8071 R.Sarangi     8071 R.Sarangi    
PAAM               AP                 FACI               FACI               SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi    
PAAM/AP            AP                 FACI               FACI               8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 9-3  
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
PAAM               AP                 AP                 FACI               FACI               FACI               FACI              
PAAM               AP                 FACI               FACI               FACI               FACI               FACI              
PAAM/AP            AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5458 C.Takacs/PAAM AP                 AP                 5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
PAAM               AP                 Xray CHECKOUT/5468 5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
PAAM/AP            AP                 5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
BEAM   LINE 11-2 
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5842 J.Lentz/PAAM  AP                 AP                 5289 J.Chorover    5289 J.Chorover    5091 J.Catalano    5091 J.Catalano   
PAAM               AP                 SMB CHECKOUT/5289  5289 J.Chorover    SMB CHECKOUT/5091  5091 J.Catalano    5091 J.Catalano   
PAAM/AP            AP                 5289 J.Chorover    5289 J.Chorover    5091 J.Catalano    5091 J.Catalano    5091 J.Catalano   
BEAM   LINE 11-3 
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
4820 R.Kennar/PAAM AP                 AP                 5351 M.Doeff       5351 M.Doeff       5710 L.Mundt       5710 L.Mundt      
PAAM               AP                 Xray CHECKOUT/5351 5351 M.Doeff       Xray CHECKOUT/5710 5710 L.Mundt       5710 L.Mundt      
PAAM/AP            AP                 5351 M.Doeff       5351 M.Doeff       5710 L.Mundt       5710 L.Mundt       5710 L.Mundt      
BEAM   LINE 14-3 
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5714 J.Richar/PAAM AP                 AP                 5132 J.Dhaliwal    5132 J.Dhaliwal    5132 J.Dhaliwal    5132 J.Dhaliwal   
PAAM               AP                 CHANGE/5132 J.Dhal 5132 J.Dhaliwal    5132 J.Dhaliwal    5132 J.Dhaliwal    5132 J.Dhaliwal   
PAAM/AP            AP                 5132 J.Dhaliwal    5132 J.Dhaliwal    5132 J.Dhaliwal    5132 J.Dhaliwal    5132 J.Dhaliwal   
BEAM   LINE 15-2 
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
5476 A.Garcia/PAAM AP                 AP                 STUP               STUP               STUP               5137 M.Delgado Jai
PAAM               AP                 STUP               STUP               STUP               CHANGE/5137 M.Delg 5137 M.Delgado Jai
PAAM/AP            AP                 STUP               STUP               STUP               5137 M.Delgado Jai 5137 M.Delgado Jai
BEAM   LINE 17-2 
Jul. 12, 2021      Jul. 13, 2021      Jul. 14, 2021      Jul. 15, 2021      Jul. 16, 2021      Jul. 17, 2021      Jul. 18, 2021     
COMM/PAAM          AP                 AP                 COMM               COMM               COMM               COMM              
PAAM               AP                 COMM               COMM               COMM               COMM               COMM              
PAAM/AP            AP                 COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jul. 19, 2021
                                         
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
BEAM   LINE 1-5  
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5443 G.Kashanchi   FACI               5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle  
FACI               Xray CHECKOUT/5669 5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle  
FACI               5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle   5669 D.Harbottle  
BEAM   LINE 2-1  
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5410 S.Blair       FACI               FACI               5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen 
5410 S.Blair/FACI  FACI               Xray CHECKOUT/5459 5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen 
FACI               FACI               5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen 
BEAM   LINE 2-2  
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
92H0 A.Natan       92H0 A.Natan       92H0 A.Natan       92H0 A.Natan       STUP               8090 J.Nelson Weke 8090 J.Nelson Weke
92H0 A.Natan       92H0 A.Natan       92H0 A.Natan       92H0 A.Natan/STUP  SMB CHECKOUT/8090  8090 J.Nelson Weke 8090 J.Nelson Weke
92H0 A.Natan       92H0 A.Natan       92H0 A.Natan       STUP               8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 2-3  
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5325 S.Saslow      8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        5771 C.Hansel      5771 C.Hansel     
CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        8067 S.Webb        CHANGE/5771 C.Hans 5771 C.Hansel      5771 C.Hansel     
8067 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        5771 C.Hansel      5771 C.Hansel      5771 C.Hansel     
BEAM   LINE 4-1  
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5088 L.Greenlee    5499 A.Holewinski  5827 C.Kronawitter 5827 C.Kronawitter STUP               5248 S.Bent        5248 S.Bent       
CHANGE/5499 A.Hole CHANGE/5827 C.Kron 5827 C.Kronawitter 5827 C.Kronaw/STUP CHANGE/5248 S.Bent 5248 S.Bent        5248 S.Bent       
5499 A.Holewinski  5827 C.Kronawitter 5827 C.Kronawitter STUP               5248 S.Bent        5248 S.Bent        5248 S.Bent       
BEAM   LINE 4-2  
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5497 M.Georgiadis  5822 T.Choi        5822 T.Choi        5822 T.Choi        11A9 F.Legrand     11A9 F.Legrand     11G3 T.Szyperski  
CHANGE/5822 T.Choi 5822 T.Choi        5822 T.Choi        CHANGE/11A9 F.Legr 11A9 F.Legrand     CHANGE/11G3 T.Szyp CHANGE/5181 D.Soka
5822 T.Choi        5822 T.Choi        5822 T.Choi        11A9 F.Legrand     11A9 F.Legrand     11G3 T.Szyperski   5181 D.Sokaras    
BEAM   LINE 4-3  
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5226 J.Yano        5105 M.Kirk        5105 M.Kirk        5646 H.La Pierre   5646 H.La Pierre   5151 H.La Pierre   5151 H.La Pierre  
SMB CHECKOUT/5105  5105 M.Kirk        SMB CHECKOUT/5646  5646 H.La Pierre   SMB CHECKOUT/5151  5151 H.La Pierre   5151 H.La Pierre  
5105 M.Kirk        5105 M.Kirk        5646 H.La Pierre   5646 H.La Pierre   5151 H.La Pierre   5151 H.La Pierre   5151 H.La Pierre  
BEAM   LINE 6-2  
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
8890 J.Nelson Weke 8890 J.Nelson Weke 5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen 
8890 J.Nelson Weke CHANGE/5508 A.van  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen 
8890 J.Nelson Weke 5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen 
BEAM   LINE 7-2  
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5575 S.Bone        4791 M.Zeineh      4791 M.Zeineh      11D4 A.Seyfferth   11D4 A.Seyfferth   11D4 A.Seyfferth   11D4 A.Seyfferth  
CHANGE/4791 M.Zein 4791 M.Zeineh      CHANGE/11D4 A.Seyf 11D4 A.Seyfferth   11D4 A.Seyfferth   11D4 A.Seyfferth   11D4 A.Seyfferth  
4791 M.Zeineh      4791 M.Zeineh      11D4 A.Seyfferth   11D4 A.Seyfferth   11D4 A.Seyfferth   11D4 A.Seyfferth   11D4 A.Seyfferth  
BEAM   LINE 7-3  
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
8071 R.Sarangi     5617 K.Rush        5617 K.Rush        5617 K.Rush        5617 K.Rush        5661 G.George      5661 G.George     
SMB CHECKOUT/5617  5617 K.Rush        5617 K.Rush        5617 K.Rush        SMB CHECKOUT/5661  5661 G.George      5661 G.George     
5617 K.Rush        5617 K.Rush        5617 K.Rush        5617 K.Rush        5661 G.George      5661 G.George      5661 G.George     
BEAM   LINE 9-3  
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
FACI               5733 C.Van Stappen 5733 C.Van Stappen 5733 C.Van Stappen Unscheduled        8818 A.Mehta       8818 A.Mehta      
SMB CHECKOUT/5733  5733 C.Van Stappen 5733 C.Van Stappen Unscheduled        SMB CHECKOUT/8818  8818 A.Mehta       8818 A.Mehta      
5733 C.Van Stappen 5733 C.Van Stappen 5733 C.Van Stappen Unscheduled        8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
BEAM   LINE 10-2 
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
BEAM   LINE 11-2 
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5091 J.Catalano    FACI               5302 L.Li          5302 L.Li          Unscheduled        5151 H.La Pierre   5151 H.La Pierre  
5091 J.Catala/FACI SMB CHECKOUT/5302  5302 L.Li          5302 L.Li          SMB CHECKOUT/5151  5151 H.La Pierre   5151 H.La Pierre  
FACI               5302 L.Li          5302 L.Li          Unscheduled        5151 H.La Pierre   5151 H.La Pierre   5151 H.La Pierre  
BEAM   LINE 11-3 
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5710 L.Mundt       5528 R.Chen        5528 R.Chen        5708 M.Rowley      Unscheduled        5562 D.Robertson   5562 D.Robertson  
Xray CHECKOUT/5528 5528 R.Chen        Xray CHECKOUT/5708 5708 M.Rowley      Xray CHECKOUT/5562 5562 D.Robertson   5562 D.Robertson  
5528 R.Chen        5528 R.Chen        5708 M.Rowley      Unscheduled        5562 D.Robertson   5562 D.Robertson   5562 D.Robertson  
BEAM   LINE 14-3 
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5132 J.Dhaliwal    5120 D.Fike        5120 D.Fike        5120 D.Fike        5120 D.Fike        8067 S.Webb        8067 S.Webb       
CHANGE/5120 D.Fike 5120 D.Fike        5120 D.Fike        5120 D.Fike        CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb       
5120 D.Fike        5120 D.Fike        5120 D.Fike        5120 D.Fike        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 15-2 
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
5137 M.Delgado Jai 5137 M.Delgado Jai 5137 M.Delgado Jai 5137 M.Delgado Jai COMM               COMM               COMM              
5137 M.Delgado Jai 5137 M.Delgado Jai 5137 M.Delgado Jai 5137 M.Delgad/COMM COMM               COMM               COMM              
5137 M.Delgado Jai 5137 M.Delgado Jai 5137 M.Delgado Jai COMM               COMM               COMM               COMM              
BEAM   LINE 17-2 
Jul. 19, 2021      Jul. 20, 2021      Jul. 21, 2021      Jul. 22, 2021      Jul. 23, 2021      Jul. 24, 2021      Jul. 25, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               COMM              

Back to Table of Contents

WEEK OF Jul. 26, 2021
                                         
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
BEAM   LINE 1-5  
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
5669 D.Harbottle   FACI               5060 K.Bagchi      5677 M.Fiori       FACI               5819 L.Kitsu Igles 5819 L.Kitsu Igles
5669 D.Harbot/FACI Xray CHECKOUT/5060 Xray CHECKOUT/5677 5677 M.Fiori/FACI  Xray CHECKOUT/5819 5819 L.Kitsu Igles 5819 L.Kitsu Igles
FACI               5060 K.Bagchi      5677 M.Fiori       FACI               5819 L.Kitsu Igles 5819 L.Kitsu Igles 5819 L.Kitsu Igles
BEAM   LINE 2-1  
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
5459 A.van Veelen  8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       Unscheduled        Unscheduled       
Xray CHECKOUT/8818 8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       Unscheduled        Unscheduled       
8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-2  
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke 8060 J.Bargar      8060 J.Bargar      8060 J.Bargar     
8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke CHANGE/8060 J.Barg 8060 J.Bargar      8060 J.Bargar      8060 J.Bargar     
8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke 8060 J.Bargar      8060 J.Bargar      8060 J.Bargar      8060 J.Bargar     
BEAM   LINE 2-3  
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
5771 C.Hansel      5771 C.Hansel      8098 T.Kroll       8098 T.Kroll       4791 M.Zeineh      4791 M.Zeineh      4791 M.Zeineh     
5771 C.Hansel      CHANGE/8098 T.Krol 8098 T.Kroll       CHANGE/4791 M.Zein 4791 M.Zeineh      4791 M.Zeineh      4791 M.Zeineh     
5771 C.Hansel      8098 T.Kroll       8098 T.Kroll       4791 M.Zeineh      4791 M.Zeineh      4791 M.Zeineh      4791 M.Zeineh     
BEAM   LINE 4-1  
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
5248 S.Bent        FACI               5174 M.Stuckman    5174 M.Stuckman    5528 R.Chen        5528 R.Chen        5528 R.Chen       
5248 S.Bent/FACI   SMB CHECKOUT/5174  5174 M.Stuckman    SMB CHECKOUT/5528  5528 R.Chen        5528 R.Chen        5528 R.Chen       
FACI               5174 M.Stuckman    5174 M.Stuckman    5528 R.Chen        5528 R.Chen        5528 R.Chen        5528 R.Chen       
BEAM   LINE 4-2  
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
5181 D.Sokaras     5181 D.Sokaras     5504 Y.Srinivasan  8047 T.Weiss       8047 T.Weiss       8877 T.Matsui      8877 T.Matsui     
5181 D.Sokaras     CHANGE/5504 Y.Srin CHANGE/8047 T.Weis 8047 T.Weiss       CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui     
5181 D.Sokaras     5504 Y.Srinivasan  8047 T.Weiss       8047 T.Weiss       8877 T.Matsui      8877 T.Matsui      8877 T.Matsui     
BEAM   LINE 4-3  
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
5151 H.La Pierre   Unscheduled        92H8 M.Greaney     92H8 M.Greaney     92H8 M.Greaney     5698 W.Tarpeh      5698 W.Tarpeh     
5151 H.La Pierre   CHANGE/92H8 M.Grea 92H8 M.Greaney     92H8 M.Greaney     CHANGE/5698 W.Tarp 5698 W.Tarpeh      5698 W.Tarpeh     
Unscheduled        92H8 M.Greaney     92H8 M.Greaney     92H8 M.Greaney     5698 W.Tarpeh      5698 W.Tarpeh      5698 W.Tarpeh     
BEAM   LINE 6-2  
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
5508 A.van Veelen  Unscheduled        8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras    
5508 A.van Veelen  Xray CHECKOUT/8892 8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras    
Unscheduled        8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras    
BEAM   LINE 7-2  
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
11D4 A.Seyfferth   11G8 H.Naughton    11G8 H.Naughton    11G8 H.Naughton    5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko 
CHANGE/11G8 H.Naug 11G8 H.Naughton    11G8 H.Naughton    CHANGE/5711 A.Krav 5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko 
11G8 H.Naughton    11G8 H.Naughton    11G8 H.Naughton    5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko  5711 A.Kravchenko 
BEAM   LINE 7-3  
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
5661 G.George      5661 G.George      5444 J.Bargar      5444 J.Bargar      5462 T.Large       5462 T.Large       5462 T.Large      
5661 G.George      SMB CHECKOUT/5444  5444 J.Bargar      SMB CHECKOUT/5462  5462 T.Large       5462 T.Large       5462 T.Large      
5661 G.George      5444 J.Bargar      5444 J.Bargar      5462 T.Large       5462 T.Large       5462 T.Large       5462 T.Large      
BEAM   LINE 9-3  
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
8818 A.Mehta       5284 N.Schuth      5284 N.Schuth      5284 N.Schuth      5284 N.Schuth      5220 W.Drisdell    5220 W.Drisdell   
SMB CHECKOUT/5284  5284 N.Schuth      5284 N.Schuth      5284 N.Schuth      SMB CHECKOUT/5220  5220 W.Drisdell    5220 W.Drisdell   
5284 N.Schuth      5284 N.Schuth      5284 N.Schuth      5284 N.Schuth      5220 W.Drisdell    5220 W.Drisdell    5220 W.Drisdell   
BEAM   LINE 10-2 
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
5468 N.Calta       5468 N.Calta       5473 T.Quill       5473 T.Quill       5473 T.Quill       5458 C.Takacs      5458 C.Takacs     
5468 N.Calta       Xray CHECKOUT/5473 5473 T.Quill       5473 T.Quill       Xray CHECKOUT/5458 5458 C.Takacs      5458 C.Takacs     
5468 N.Calta       5473 T.Quill       5473 T.Quill       5473 T.Quill       5458 C.Takacs      5458 C.Takacs      5458 C.Takacs     
BEAM   LINE 11-2 
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
5151 H.La Pierre   5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5275 A.Aitbekova   5275 A.Aitbekova  
SMB CHECKOUT/5508  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  SMB CHECKOUT/5275  5275 A.Aitbekova   5275 A.Aitbekova  
5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5508 A.van Veelen  5275 A.Aitbekova   5275 A.Aitbekova   5275 A.Aitbekova  
BEAM   LINE 11-3 
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
5562 D.Robertson   5562 D.Robertson   5562 D.Robertson   5562 D.Robertson   5846 S.Hesse       5846 S.Hesse       8091 C.Tassone    
5562 D.Robertson   5562 D.Robertson   5562 D.Robertson   Xray CHECKOUT/5846 5846 S.Hesse       Xray CHECKOUT/8091 8091 C.Tassone    
5562 D.Robertson   5562 D.Robertson   5562 D.Robertson   5846 S.Hesse       5846 S.Hesse       8091 C.Tassone     8091 C.Tassone    
BEAM   LINE 14-3 
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
8067 S.Webb        8067 S.Webb        8067 S.Webb        5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      5771 C.Hansel     
8067 S.Webb        8067 S.Webb        CHANGE/5771 C.Hans 5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      5771 C.Hansel     
8067 S.Webb        8067 S.Webb        5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      5771 C.Hansel      5771 C.Hansel     
BEAM   LINE 15-2 
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
COMM               STUP               5866 M.Nielsen     5866 M.Nielsen     5866 M.Nielsen     5790 D.Reis        5790 D.Reis       
COMM/STUP          CHANGE/5866 M.Niel 5866 M.Nielsen     5866 M.Nielsen     CHANGE/5790 D.Reis 5790 D.Reis        5790 D.Reis       
STUP               5866 M.Nielsen     5866 M.Nielsen     5866 M.Nielsen     5790 D.Reis        5790 D.Reis        5790 D.Reis       
BEAM   LINE 17-2 
Jul. 26, 2021      Jul. 27, 2021      Jul. 28, 2021      Jul. 29, 2021      Jul. 30, 2021      Jul. 31, 2021      Aug. 01, 2021     
COMM               COMM               COMM               COMM               COMM               COMM               COMM              
COMM               COMM               COMM               COMM               COMM               COMM               Unscheduled       
COMM               COMM               COMM               COMM               COMM               COMM               Unscheduled