X-ray beam lines are scheduled in three 8-hour shifts each day (11pm-7am; 7am-3pm; 3-11pm). Checkouts/changeovers are scheduled during the 7am-3pm shift. Most X-ray beam lines officially turn over to the next user much earlier than 3pm depending on the equipment requirements and staff availability. At least 1 week prior to arrival, users need to contact the designated beam line engineer/scientist (see SSRL Beam Lines by Number for contact information) to discuss beam line configuration needs and start times. Unless instructed otherwise, experiments end at 7am (6am when Maintenance (MA) or Accelerator Physics (AP) are scheduled).


Weeks of the Schedule
 Nov. 11, 2019   Nov. 18, 2019   Nov. 25, 2019   Dec. 02, 2019 
 Dec. 09, 2019   Dec. 16, 2019   Dec. 23, 2019   Dec. 30, 2019 
 Jan. 06, 2020   Jan. 13, 2020   Jan. 20, 2020   Jan. 27, 2020 
 Feb. 03, 2020   Feb. 10, 2020   Feb. 17, 2020   Feb. 24, 2020 
 Mar. 02, 2020   Mar. 09, 2020   Mar. 16, 2020   Mar. 23, 2020 
 Mar. 30, 2020   Apr. 06, 2020   Apr. 13, 2020   Apr. 20, 2020 
 Apr. 27, 2020   May 04, 2020   May 11, 2020 

Back to Table of Contents

WEEK OF Nov. 11, 2019
Begin Startup                                         
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
BEAM   LINE 1-5  
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               STUP               STUP               STUP               STUP               STUP               STUP              
STUP               STUP               STUP               STUP               STUP               STUP               STUP              
STUP               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 2-1  
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               STUP               STUP               5116 H.Steinrueck  5116 H.Steinrueck  9705 C.Jcap        9705 C.Jcap       
STUP               STUP               Xray CHECKOUT/5116 5116 H.Steinrueck  Xray CHECKOUT/9705 9705 C.Jcap        9705 C.Jcap       
STUP               STUP               5116 H.Steinrueck  5116 H.Steinrueck  9705 C.Jcap        9705 C.Jcap        9705 C.Jcap       
BEAM   LINE 2-2  
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               STUP               STUP               5221 I.Abate       5221 I.Abate       5216 C.Takacs      5216 C.Takacs     
STUP               STUP               SMB CHECKOUT/5221  5221 I.Abate       SMB CHECKOUT/5216  5216 C.Takacs      5216 C.Takacs     
STUP               STUP               5221 I.Abate       5221 I.Abate       5216 C.Takacs      5216 C.Takacs      5216 C.Takacs     
BEAM   LINE 2-3  
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               STUP               STUP               8867 S.Webb        8867 S.Webb        5339 V.Noel        5339 V.Noel       
STUP               STUP               CHANGE/8867 S.Webb 8867 S.Webb        CHANGE/5339 V.Noel 5339 V.Noel        5339 V.Noel       
STUP               STUP               8867 S.Webb        8867 S.Webb        5339 V.Noel        5339 V.Noel        5339 V.Noel       
BEAM   LINE 4-1  
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               4778 J.Bargar      4778 J.Bargar      4778 J.Bargar      4930 E.Troein      4930 E.Troein      4930 E.Troein     
SMB CHECKOUT/4778  4778 J.Bargar      4778 J.Bargar      SMB CHECKOUT/4930  4930 E.Troein      4930 E.Troein      4930 E.Troein     
4778 J.Bargar      4778 J.Bargar      4778 J.Bargar      4930 E.Troein      4930 E.Troein      4930 E.Troein      4930 E.Troein     
BEAM   LINE 4-2  
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      11C8 Z.Bu         
CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      CHANGE/11C8 Z.Bu   11C8 Z.Bu         
8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      8877 T.Matsui      11C8 Z.Bu          11C8 Z.Bu         
BEAM   LINE 4-3  
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               5314 K.Boye        5314 K.Boye        10Z7 X.Liu         10Z7 X.Liu         5155 D.Schlesinger 5155 D.Schlesinger
SMB CHECKOUT/5314  5314 K.Boye        SMB CHECKOUT/10Z7  10Z7 X.Liu         SMB CHECKOUT/5155  5155 D.Schlesinger 5155 D.Schlesinger
5314 K.Boye        5314 K.Boye        10Z7 X.Liu         10Z7 X.Liu         5155 D.Schlesinger 5155 D.Schlesinger 5155 D.Schlesinger
BEAM   LINE 6-2  
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               Unscheduled        5262 M.Chrysina    5262 M.Chrysina    5262 M.Chrysina    4996 G.Cutsail     4996 G.Cutsail    
Unscheduled        Xray CHECKOUT/5262 5262 M.Chrysina    5262 M.Chrysina    CHANGE/4996 G.Cuts 4996 G.Cutsail     4996 G.Cutsail    
Unscheduled        5262 M.Chrysina    5262 M.Chrysina    5262 M.Chrysina    4996 G.Cutsail     4996 G.Cutsail     4996 G.Cutsail    
BEAM   LINE 7-3  
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               STUP               STUP               STUP               STUP               5053 R.Sarangi     5053 R.Sarangi    
STUP               STUP               STUP               STUP               SMB CHECKOUT/5053  5053 R.Sarangi     5053 R.Sarangi    
STUP               STUP               STUP               STUP               5053 R.Sarangi     5053 R.Sarangi     5053 R.Sarangi    
BEAM   LINE 9-3  
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               STUP               STUP               STUP               4996 G.Cutsail     4996 G.Cutsail     4996 G.Cutsail    
STUP               STUP               STUP               SMB CHECKOUT/4996  4996 G.Cutsail     4996 G.Cutsail     4996 G.Cutsail    
STUP               STUP               STUP               4996 G.Cutsail     4996 G.Cutsail     4996 G.Cutsail     4996 G.Cutsail    
BEAM   LINE 10-2 
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               STUP               STUP               STUP               8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
STUP               STUP               STUP               Xray CHECKOUT/8818 8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
STUP               STUP               STUP               8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       8818 A.Mehta      
BEAM   LINE 11-2 
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               FACI               FACI               5333 S.Minasian    5333 S.Minasian    5328 C.Booth       5328 C.Booth      
FACI               FACI               SMB CHECKOUT/5333  5333 S.Minasian    SMB CHECKOUT/5328  5328 C.Booth       5328 C.Booth      
FACI               FACI               5333 S.Minasian    5333 S.Minasian    5328 C.Booth       5328 C.Booth       5328 C.Booth      
BEAM   LINE 11-3 
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               STUP               5112 J.Vigil       5112 J.Vigil       5112 J.Vigil       5380 L.Whittaker-  5380 L.Whittaker- 
STUP               Xray CHECKOUT/5112 5112 J.Vigil       5112 J.Vigil       Xray CHECKOUT/5380 5380 L.Whittaker-  5380 L.Whittaker- 
STUP               5112 J.Vigil       5112 J.Vigil       5112 J.Vigil       5380 L.Whittaker-  5380 L.Whittaker-  5380 L.Whittaker- 
BEAM   LINE 14-3 
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               STUP               STUP               STUP               STUP               STUP               8867 S.Webb       
STUP               STUP               STUP               STUP               STUP               CHANGE/8867 S.Webb 8867 S.Webb       
STUP               STUP               STUP               STUP               STUP               8867 S.Webb        8867 S.Webb       
BEAM   LINE 15-2 
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Nov. 11, 2019      Nov. 12, 2019      Nov. 13, 2019      Nov. 14, 2019      Nov. 15, 2019      Nov. 16, 2019      Nov. 17, 2019     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Nov. 18, 2019
                                         
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
BEAM   LINE 1-5  
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
STUP               STUP               8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       5401 R.Van Dover   5401 R.Van Dover  
STUP               Xray CHECKOUT/8818 8818 A.Mehta       8818 A.Mehta       Xray CHECKOUT/5401 5401 R.Van Dover   5401 R.Van Dover  
STUP               8818 A.Mehta       8818 A.Mehta       8818 A.Mehta       5401 R.Van Dover   5401 R.Van Dover   5401 R.Van Dover  
BEAM   LINE 2-1  
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
9705 C.Jcap        9705 C.Jcap        92H5 A.Schori      5136 I.Abate       5136 I.Abate       5464 L.Schelhas    5464 L.Schelhas   
9705 C.Jcap        Xray CHECKOUT/92H5 Xray CHECKOUT/5136 5136 I.Abate       Xray CHECKOUT/5464 5464 L.Schelhas    5464 L.Schelhas   
9705 C.Jcap        92H5 A.Schori      5136 I.Abate       5136 I.Abate       5464 L.Schelhas    5464 L.Schelhas    5464 L.Schelhas   
BEAM   LINE 2-2  
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
5216 C.Takacs      8899 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        5302 L.Li          5302 L.Li         
SMB CHECKOUT/8899  CHANGE/8099 S.Bare 8099 S.Bare        8099 S.Bare        SMB CHECKOUT/5302  5302 L.Li          5302 L.Li         
8899 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare        5302 L.Li          5302 L.Li          5302 L.Li         
BEAM   LINE 2-3  
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
5339 V.Noel        5375 M.Besli       8081 Y.Liu         8081 Y.Liu         11B7 Q.Li          5117 W.Fischer     5117 W.Fischer    
CHANGE/5375 M.Besl CHANGE/8081 Y.Liu  8081 Y.Liu         CHANGE/11B7 Q.Li   CHANGE/5117 W.Fisc 5117 W.Fischer     5117 W.Fischer    
5375 M.Besli       8081 Y.Liu         8081 Y.Liu         11B7 Q.Li          5117 W.Fischer     5117 W.Fischer     5117 W.Fischer    
BEAM   LINE 4-1  
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
4930 E.Troein      5156 L.Li          5156 L.Li          5156 L.Li          5071 M.Massey      5071 M.Massey      5071 M.Massey     
SMB CHECKOUT/5156  5156 L.Li          5156 L.Li          SMB CHECKOUT/5071  5071 M.Massey      5071 M.Massey      5071 M.Massey     
5156 L.Li          5156 L.Li          5156 L.Li          5071 M.Massey      5071 M.Massey      5071 M.Massey      5071 M.Massey     
BEAM   LINE 4-2  
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
11C8 Z.Bu          8077 T.Matsui      RA                 5181 D.Sokaras     5181 D.Sokaras     8047 T.Weiss       RA                
CHANGE/8077 T.Mats RA                 CHANGE/5181 D.Soka 5181 D.Sokaras     CHANGE/8047 T.Weis RA                 CHANGE/8877 T.Mats
8077 T.Matsui      RA                 5181 D.Sokaras     5181 D.Sokaras     8047 T.Weiss       RA                 8877 T.Matsui     
BEAM   LINE 4-3  
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
5155 D.Schlesinger 5155 D.Schlesinger 5214 S.White       5214 S.White       5214 S.White       5474 S.Bone        5474 S.Bone       
5155 D.Schlesinger SMB CHECKOUT/5214  5214 S.White       5214 S.White       SMB CHECKOUT/5474  5474 S.Bone        5474 S.Bone       
5155 D.Schlesinger 5214 S.White       5214 S.White       5214 S.White       5474 S.Bone        5474 S.Bone        5474 S.Bone       
BEAM   LINE 6-2  
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
4996 G.Cutsail     COMM               8898 T.Kroll       8898 T.Kroll       8898 T.Kroll       5400 M.Hubert      5400 M.Hubert     
COMM               CHANGE/8898 T.Krol 8898 T.Kroll       8898 T.Kroll       CHANGE/5400 M.Hube 5400 M.Hubert      5400 M.Hubert     
COMM               8898 T.Kroll       8898 T.Kroll       8898 T.Kroll       5400 M.Hubert      5400 M.Hubert      5400 M.Hubert     
BEAM   LINE 7-3  
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
5053 R.Sarangi     5053 R.Sarangi     5053 R.Sarangi     4580 S.Matzen      4580 S.Matzen      5105 M.Kirk        5105 M.Kirk       
5053 R.Sarangi     5053 R.Sarangi     SMB CHECKOUT/4580  4580 S.Matzen      SMB CHECKOUT/5105  5105 M.Kirk        5105 M.Kirk       
5053 R.Sarangi     5053 R.Sarangi     4580 S.Matzen      4580 S.Matzen      5105 M.Kirk        5105 M.Kirk        5105 M.Kirk       
BEAM   LINE 9-3  
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
4996 G.Cutsail     FACI               FACI               FACI               4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski 
FACI               FACI               FACI               SMB CHECKOUT/4900  4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski 
FACI               FACI               FACI               4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski 
BEAM   LINE 10-2 
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
8818 A.Mehta       90H0 A.Huq         5453 K.Stone       5453 K.Stone       5453 K.Stone       5403 R.Bassiri     5403 R.Bassiri    
Xray CHECKOUT/90H0 Xray CHECKOUT/5453 5453 K.Stone       5453 K.Stone       Xray CHECKOUT/5403 5403 R.Bassiri     5403 R.Bassiri    
90H0 A.Huq         5453 K.Stone       5453 K.Stone       5453 K.Stone       5403 R.Bassiri     5403 R.Bassiri     5403 R.Bassiri    
BEAM   LINE 11-2 
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
5328 C.Booth       4501 C.Booth       4919 C.Booth       5261 E.Balboni     5280 E.Balboni     5214 S.White       5214 S.White      
SMB CHECKOUT/4501  SMB CHECKOUT/4919  SMB CHECKOUT/5261  SMB CHECKOUT/5280  SMB CHECKOUT/5214  5214 S.White       5214 S.White      
4501 C.Booth       4919 C.Booth       5261 E.Balboni     5280 E.Balboni     5214 S.White       5214 S.White       5214 S.White      
BEAM   LINE 11-3 
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
5380 L.Whittaker-  5427 P.Paul        5427 P.Paul        5304 B.Chen        5304 B.Chen        5464 L.Schelhas    5464 L.Schelhas   
Xray CHECKOUT/5427 5427 P.Paul        Xray CHECKOUT/5304 5304 B.Chen        Xray CHECKOUT/5464 5464 L.Schelhas    5464 L.Schelhas   
5427 P.Paul        5427 P.Paul        5304 B.Chen        5304 B.Chen        5464 L.Schelhas    5464 L.Schelhas    5464 L.Schelhas   
BEAM   LINE 14-3 
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
8867 S.Webb        5474 S.Bone        5474 S.Bone        5144 Y.Nakayama    5144 Y.Nakayama    5117 W.Fischer     5117 W.Fischer    
CHANGE/5474 S.Bone 5474 S.Bone        CHANGE/5144 Y.Naka 5144 Y.Nakayama    CHANGE/5117 W.Fisc 5117 W.Fischer     5117 W.Fischer    
5474 S.Bone        5474 S.Bone        5144 Y.Nakayama    5144 Y.Nakayama    5117 W.Fischer     5117 W.Fischer     5117 W.Fischer    
BEAM   LINE 15-2 
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Nov. 18, 2019      Nov. 19, 2019      Nov. 20, 2019      Nov. 21, 2019      Nov. 22, 2019      Nov. 23, 2019      Nov. 24, 2019     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Nov. 25, 2019
            DOWN 4PM       Thanksgiving       Resume~12noon                 
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
BEAM   LINE 1-5  
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5401 R.Van Dover   5360 A.Ludwig      5360 A.Ludwig      DOWN               DOWN               5398 S.Sarker      5398 S.Sarker     
Xray CHECKOUT/5360 5360 A.Ludwig      Xray CHECKOUT/5398 DOWN               DOWN               5398 S.Sarker      5398 S.Sarker     
5360 A.Ludwig      5360 A.Ludwig      5398 S.Sarker/DOWN DOWN               5398 S.Sarker      5398 S.Sarker      5398 S.Sarker     
BEAM   LINE 2-1  
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5464 L.Schelhas    5464 L.Schelhas    8015 A.Mehta       DOWN               DOWN               4664 A.Landers     4664 A.Landers    
5464 L.Schelhas    Xray CHECKOUT/8015 Xray CHECKOUT/4664 DOWN               DOWN               4664 A.Landers     4664 A.Landers    
5464 L.Schelhas    8015 A.Mehta       4664 A.Lander/DOWN DOWN               4664 A.Landers     4664 A.Landers     4664 A.Landers    
BEAM   LINE 2-2  
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5302 L.Li          5302 L.Li          5266 A.Uzun        DOWN               DOWN               5266 A.Uzun        5266 A.Uzun       
5302 L.Li          SMB CHECKOUT/5266  5266 A.Uzun        DOWN               DOWN               5266 A.Uzun        5266 A.Uzun       
5302 L.Li          5266 A.Uzun        5266 A.Uzun/DOWN   DOWN               5266 A.Uzun        5266 A.Uzun        5266 A.Uzun       
BEAM   LINE 2-3  
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5117 W.Fischer     5152 J.Magyar      5152 J.Magyar      DOWN               DOWN               4778 J.Bargar      4778 J.Bargar     
CHANGE/5152 J.Magy 5152 J.Magyar      CHANGE/4778 J.Barg DOWN               DOWN               4778 J.Bargar      4778 J.Bargar     
5152 J.Magyar      5152 J.Magyar      4778 J.Bargar/DOWN DOWN               4778 J.Bargar      4778 J.Bargar      4778 J.Bargar     
BEAM   LINE 4-1  
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5071 M.Massey      5101 R.Davis       5101 R.Davis       DOWN               DOWN               5140 X.Zheng       5140 X.Zheng      
SMB CHECKOUT/5101  5101 R.Davis       SMB CHECKOUT/5140  DOWN               DOWN               5140 X.Zheng       5140 X.Zheng      
5101 R.Davis       5101 R.Davis       5140 X.Zheng/DOWN  DOWN               5140 X.Zheng       5140 X.Zheng       5140 X.Zheng      
BEAM   LINE 4-2  
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
8877 T.Matsui      11B5 M.Georgiadis  11B5 M.Georgiadis  DOWN               DOWN               11C6 R.Panigrahi   8220 T.Weiss      
CHANGE/11B5 M.Geor 11B5 M.Georgiadis  Unscheduled        DOWN               DOWN               CHANGE/8220 T.Weis 8220 T.Weiss      
11B5 M.Georgiadis  11B5 M.Georgiadis  DOWN               DOWN               CHANGE/11C6 R.Pani 8220 T.Weiss       8220 T.Weiss      
BEAM   LINE 4-3  
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5474 S.Bone        5105 M.Kirk        5105 M.Kirk        DOWN               DOWN               5445 G.George      5445 G.George     
SMB CHECKOUT/5105  5105 M.Kirk        SMB CHECKOUT/5445  DOWN               DOWN               5445 G.George      5445 G.George     
5105 M.Kirk        5105 M.Kirk        5445 G.George/DOWN DOWN               5445 G.George      5445 G.George      5445 G.George     
BEAM   LINE 6-2  
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5400 M.Hubert      5476 A.Garcia-Espa 5476 A.Garcia-Espa DOWN               DOWN               5407 B.Gates       5407 B.Gates      
CHANGE/5476 A.Garc 5476 A.Garcia-Espa 5476 A.Garcia-Espa DOWN               DOWN               5407 B.Gates       5407 B.Gates      
5476 A.Garcia-Espa 5476 A.Garcia-Espa 5476 A.Garcia/DOWN DOWN               5407 B.Gates       5407 B.Gates       5407 B.Gates      
BEAM   LINE 7-3  
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5105 M.Kirk        5105 M.Kirk        5428 A.Braun       DOWN               DOWN               5428 A.Braun       5428 A.Braun      
5105 M.Kirk        SMB CHECKOUT/5428  5428 A.Braun       DOWN               DOWN               5428 A.Braun       5428 A.Braun      
5105 M.Kirk        5428 A.Braun       5428 A.Braun/DOWN  DOWN               5428 A.Braun       5428 A.Braun       5428 A.Braun      
BEAM   LINE 9-3  
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
4900 A.Jasniewski  4900 A.Jasniewski  5126 J.Yano        DOWN               DOWN               5126 J.Yano        5126 J.Yano       
4900 A.Jasniewski  SMB CHECKOUT/5126  5126 J.Yano        DOWN               DOWN               5126 J.Yano        5126 J.Yano       
4900 A.Jasniewski  5126 J.Yano        5126 J.Yano/DOWN   DOWN               5126 J.Yano        5126 J.Yano        5126 J.Yano       
BEAM   LINE 10-2 
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5403 R.Bassiri     5403 R.Bassiri     FACI               DOWN               DOWN               5431 C.Takacs      5431 C.Takacs     
5403 R.Bassiri     FACI               Xray CHECKOUT/5431 DOWN               DOWN               5431 C.Takacs      5431 C.Takacs     
5403 R.Bassiri     FACI               5431 C.Takacs/DOWN DOWN               5431 C.Takacs      5431 C.Takacs      5431 C.Takacs     
BEAM   LINE 11-2 
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5214 S.White       5451 B.Stewart     5451 B.Stewart     DOWN               DOWN               8060 J.Bargar      8060 J.Bargar     
SMB CHECKOUT/5451  5451 B.Stewart     SMB CHECKOUT/8060  DOWN               DOWN               8060 J.Bargar      8060 J.Bargar     
5451 B.Stewart     5451 B.Stewart     8060 J.Bargar/DOWN DOWN               8060 J.Bargar      8060 J.Bargar      8060 J.Bargar     
BEAM   LINE 11-3 
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5464 L.Schelhas    4991 H.Wu          5342 S.Cheema      DOWN               DOWN               5342 S.Cheema      5342 S.Cheema     
Xray CHECKOUT/4991 Xray CHECKOUT/5342 5342 S.Cheema      DOWN               DOWN               5342 S.Cheema      5342 S.Cheema     
4991 H.Wu          5342 S.Cheema      5342 S.Cheema/DOWN DOWN               5342 S.Cheema      5342 S.Cheema      5342 S.Cheema     
BEAM   LINE 14-3 
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
5117 W.Fischer     5152 J.Magyar      5152 J.Magyar      DOWN               DOWN               8067 S.Webb        8067 S.Webb       
CHANGE/5152 J.Magy 5152 J.Magyar      CHANGE/8067 S.Webb DOWN               DOWN               8067 S.Webb        8067 S.Webb       
5152 J.Magyar      5152 J.Magyar      8067 S.Webb/DOWN   DOWN               8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 15-2 
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Nov. 25, 2019      Nov. 26, 2019      Nov. 27, 2019      Nov. 28, 2019      Nov. 29, 2019      Nov. 30, 2019      Dec. 01, 2019     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Dec. 02, 2019
PAMM       AP                                    
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
BEAM   LINE 1-5  
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
5398 S.Sarker/AP   AP                 AP                 5415 F.Zhao        5415 F.Zhao        5364 H.Hou         5364 H.Hou        
AP                 AP                 Xray CHECKOUT/5415 5415 F.Zhao        Xray CHECKOUT/5364 5364 H.Hou         5364 H.Hou        
AP                 AP                 5415 F.Zhao        5415 F.Zhao        5364 H.Hou         5364 H.Hou         5364 H.Hou        
BEAM   LINE 2-1  
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
4664 A.Lander/AP   AP                 AP                 5375 M.Besli       5375 M.Besli       5514 K.Lim         5514 K.Lim        
AP                 AP                 Xray CHECKOUT/5375 5375 M.Besli       Xray CHECKOUT/5293 5514 K.Lim         5514 K.Lim        
AP                 AP                 5375 M.Besli       5375 M.Besli       CHANGE/5514 K.Lim  5514 K.Lim         5514 K.Lim        
BEAM   LINE 2-2  
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
5266 A.Uzun/AP     AP                 AP                 FACI               8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
AP                 AP                 FACI               SMB CHECKOUT/8890  8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
AP                 AP                 FACI               8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke 8890 J.Nelson Weke
BEAM   LINE 2-3  
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
4778 J.Bargar/AP   AP                 AP                 FACI               FACI               5289 J.Chorover    5289 J.Chorover   
AP                 AP                 FACI               FACI               CHANGE/5289 J.Chor 5289 J.Chorover    5289 J.Chorover   
AP                 AP                 FACI               FACI               5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
BEAM   LINE 4-1  
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
5140 X.Zheng/AP    AP                 AP                 FACI               5055 P.Christopher 5055 P.Christopher 5055 P.Christopher
AP                 AP                 FACI               SMB CHECKOUT/5055  5055 P.Christopher 5055 P.Christopher 5055 P.Christopher
AP                 AP                 FACI               5055 P.Christopher 5055 P.Christopher 5055 P.Christopher 5055 P.Christopher
BEAM   LINE 4-2  
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
8220 T.Weiss/AP    AP                 AP                 8220 T.Weiss       8220 T.Weiss       5192 M.Guttman     5192 M.Guttman    
AP                 AP                 8220 T.Weiss       8220 T.Weiss       CHANGE/5192 M.Gutt 5192 M.Guttman     CHANGE/8077 T.Mats
AP                 AP                 8220 T.Weiss       8220 T.Weiss       5192 M.Guttman     5192 M.Guttman     8077 T.Matsui     
BEAM   LINE 4-3  
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
5445 G.George/AP   AP                 AP                 5285 J.Gustafsson  5285 J.Gustafsson  4889 F.Juillot     4889 F.Juillot    
AP                 AP                 SMB CHECKOUT/5285  5285 J.Gustafsson  SMB CHECKOUT/4889  4889 F.Juillot     4889 F.Juillot    
AP                 AP                 5285 J.Gustafsson  5285 J.Gustafsson  4889 F.Juillot     4889 F.Juillot     4889 F.Juillot    
BEAM   LINE 6-2  
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
5407 B.Gates/AP    AP                 AP                 FACI               8081 Y.Liu         8081 Y.Liu         5252 C.Wei        
AP                 AP                 FACI               CHANGE/8081 Y.Liu  8081 Y.Liu         CHANGE/5252 C.Wei  5252 C.Wei        
AP                 AP                 FACI               8081 Y.Liu         8081 Y.Liu         5252 C.Wei         5252 C.Wei        
BEAM   LINE 7-3  
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
5428 A.Braun/AP    AP                 AP                 4889 F.Juillot     4889 F.Juillot     5285 J.Gustafsson  5285 J.Gustafsson 
AP                 AP                 SMB CHECKOUT/4889  4889 F.Juillot     SMB CHECKOUT/5285  5285 J.Gustafsson  5285 J.Gustafsson 
AP                 AP                 4889 F.Juillot     4889 F.Juillot     5285 J.Gustafsson  5285 J.Gustafsson  5285 J.Gustafsson 
BEAM   LINE 9-3  
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
5126 J.Yano/AP     AP                 AP                 4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler   
AP                 AP                 SMB CHECKOUT/4416  4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler   
AP                 AP                 4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler    4416 T.Stemmler   
BEAM   LINE 10-2 
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
5431 C.Takacs/AP   AP                 AP                 5253 H.Wu          5253 H.Wu          5474 S.Bone        5474 S.Bone       
AP                 AP                 Xray CHECKOUT/5253 5253 H.Wu          Xray CHECKOUT/5474 5474 S.Bone        5474 S.Bone       
AP                 AP                 5253 H.Wu          5253 H.Wu          5474 S.Bone        5474 S.Bone        5474 S.Bone       
BEAM   LINE 11-2 
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
8060 J.Bargar/AP   AP                 AP                 5006 N.Rivera      5006 N.Rivera      4503 J.Catalano    4503 J.Catalano   
AP                 AP                 SMB CHECKOUT/5006  5006 N.Rivera      SMB CHECKOUT/4503  4503 J.Catalano    4503 J.Catalano   
AP                 AP                 5006 N.Rivera      5006 N.Rivera      4503 J.Catalano    4503 J.Catalano    4503 J.Catalano   
BEAM   LINE 11-3 
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
5342 S.Cheema/AP   AP                 AP                 5313 N.Geise       5313 N.Geise       4948 N.Geise       4948 N.Geise      
AP                 AP                 Xray CHECKOUT/5313 5313 N.Geise       Xray CHECKOUT/4948 4948 N.Geise       4948 N.Geise      
AP                 AP                 5313 N.Geise       5313 N.Geise       4948 N.Geise       4948 N.Geise       4948 N.Geise      
BEAM   LINE 14-3 
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
8067 S.Webb/AP     AP                 AP                 5359 M.Raven       5359 M.Raven       5289 J.Chorover    5289 J.Chorover   
AP                 AP                 CHANGE/5359 M.Rave 5359 M.Raven       CHANGE/5289 J.Chor 5289 J.Chorover    5289 J.Chorover   
AP                 AP                 5359 M.Raven       5359 M.Raven       5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
BEAM   LINE 15-2 
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Dec. 02, 2019      Dec. 03, 2019      Dec. 04, 2019      Dec. 05, 2019      Dec. 06, 2019      Dec. 07, 2019      Dec. 08, 2019     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Dec. 09, 2019
                                         
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
BEAM   LINE 1-5  
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
5364 H.Hou         8015 A.Mehta       8015 A.Mehta       FACI               5351 M.Doeff       5351 M.Doeff       5351 M.Doeff      
Xray CHECKOUT/8015 8015 A.Mehta       FACI               Xray CHECKOUT/5351 5351 M.Doeff       5351 M.Doeff       5351 M.Doeff      
8015 A.Mehta       8015 A.Mehta       FACI               5351 M.Doeff       5351 M.Doeff       5351 M.Doeff       5351 M.Doeff      
BEAM   LINE 2-1  
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
5514 K.Lim         5253 H.Wu          5253 H.Wu          4992 S.Zhai        4992 S.Zhai        8095 K.Stone       8095 K.Stone      
Xray CHECKOUT/5253 5253 H.Wu          Xray CHECKOUT/4992 4992 S.Zhai        Xray CHECKOUT/8095 8095 K.Stone       8095 K.Stone      
5253 H.Wu          5253 H.Wu          4992 S.Zhai        4992 S.Zhai        8095 K.Stone       8095 K.Stone       8095 K.Stone      
BEAM   LINE 2-2  
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
8890 J.Nelson Weke 8890 J.Nelson Weke 5459 A.van Veelen  5459 A.van Veelen  5425 A.Gundogar    5425 A.Gundogar    5425 A.Gundogar   
8890 J.Nelson Weke SMB CHECKOUT/5459  5459 A.van Veelen  SMB CHECKOUT/5425  5425 A.Gundogar    5425 A.Gundogar    5425 A.Gundogar   
8890 J.Nelson Weke 5459 A.van Veelen  5459 A.van Veelen  5425 A.Gundogar    5425 A.Gundogar    5425 A.Gundogar    5425 A.Gundogar   
BEAM   LINE 2-3  
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
5289 J.Chorover    5243 Y.Arai        5243 Y.Arai        5174 M.Stuckman    5174 M.Stuckman    5083 L.Mayhew      5083 L.Mayhew     
CHANGE/5243 Y.Arai 5243 Y.Arai        CHANGE/5174 M.Stuc 5174 M.Stuckman    CHANGE/5083 L.Mayh 5083 L.Mayhew      5083 L.Mayhew     
5243 Y.Arai        5243 Y.Arai        5174 M.Stuckman    5174 M.Stuckman    5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew     
BEAM   LINE 4-1  
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
5055 P.Christopher 5104 A.Karim       5104 A.Karim       5104 A.Karim       5104 A.Karim       5248 S.Bent        5248 S.Bent       
SMB CHECKOUT/5104  5104 A.Karim       5104 A.Karim       5104 A.Karim       SMB CHECKOUT/5248  5248 S.Bent        5248 S.Bent       
5104 A.Karim       5104 A.Karim       5104 A.Karim       5104 A.Karim       5248 S.Bent        5248 S.Bent        5248 S.Bent       
BEAM   LINE 4-2  
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
8077 T.Matsui      8877 T.Matsui      8847 T.Weiss       11B6 K.Short       11C9 E.Snell       11C9 E.Snell       5253 H.Wu         
CHANGE/8877 T.Mats CHANGE/8847 T.Weis CHANGE/11B6 K.Shor CHANGE/11C9 E.Snel 11C9 E.Snell       CHANGE/5253 H.Wu   5253 H.Wu         
8877 T.Matsui      8847 T.Weiss       11B6 K.Short       11C9 E.Snell       11C9 E.Snell       5253 H.Wu          5253 H.Wu         
BEAM   LINE 4-3  
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
4889 F.Juillot     4889 F.Juillot     4503 J.Catalano    4503 J.Catalano    4503 J.Catalano    4897 K.Chacon      4897 K.Chacon     
4889 F.Juillot     SMB CHECKOUT/4503  4503 J.Catalano    4503 J.Catalano    SMB CHECKOUT/4897  4897 K.Chacon      4897 K.Chacon     
4889 F.Juillot     4503 J.Catalano    4503 J.Catalano    4503 J.Catalano    4897 K.Chacon      4897 K.Chacon      4897 K.Chacon     
BEAM   LINE 6-2  
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
5252 C.Wei         5252 C.Wei         5200 Y.Liu         5200 Y.Liu         4875 A.Dawson      5312 N.Seitzman    5312 N.Seitzman   
5252 C.Wei         CHANGE/5200 Y.Liu  5200 Y.Liu         CHANGE/4875 A.Daws CHANGE/5312 N.Seit 5312 N.Seitzman    5312 N.Seitzman   
5252 C.Wei         5200 Y.Liu         5200 Y.Liu         4875 A.Dawson      5312 N.Seitzman    5312 N.Seitzman    5312 N.Seitzman   
BEAM   LINE 7-3  
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
5285 J.Gustafsson  5281 K.Ray         5281 K.Ray         5005 P.Kiser       5005 P.Kiser       5273 M.Abernathy   5273 M.Abernathy  
SMB CHECKOUT/5281  5281 K.Ray         SMB CHECKOUT/5005  5005 P.Kiser       SMB CHECKOUT/5273  5273 M.Abernathy   5273 M.Abernathy  
5281 K.Ray         5281 K.Ray         5005 P.Kiser       5005 P.Kiser       5273 M.Abernathy   5273 M.Abernathy   5273 M.Abernathy  
BEAM   LINE 9-3  
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
4416 T.Stemmler    5190 L.Que         5190 L.Que         5190 L.Que         5190 L.Que         5104 A.Karim       5104 A.Karim      
SMB CHECKOUT/5190  5190 L.Que         5190 L.Que         5190 L.Que         SMB CHECKOUT/5104  5104 A.Karim       5104 A.Karim      
5190 L.Que         5190 L.Que         5190 L.Que         5190 L.Que         5104 A.Karim       5104 A.Karim       5104 A.Karim      
BEAM   LINE 10-2 
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
5474 S.Bone        5473 C.Cendra Guin 5473 C.Cendra Guin 5458 C.Takacs      5458 C.Takacs      5458 C.Takacs      5458 C.Takacs     
Xray CHECKOUT/5473 5473 C.Cendra Guin Xray CHECKOUT/5458 5458 C.Takacs      5458 C.Takacs      5458 C.Takacs      5458 C.Takacs     
5473 C.Cendra Guin 5473 C.Cendra Guin 5458 C.Takacs      5458 C.Takacs      5458 C.Takacs      5458 C.Takacs      5458 C.Takacs     
BEAM   LINE 11-2 
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
4503 J.Catalano    5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor    
SMB CHECKOUT/5289  5289 J.Chorover    5289 J.Chorover    SMB CHECKOUT/5424  5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor    
5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor     5424 S.Kozimor    
BEAM   LINE 11-3 
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
4948 N.Geise       92H6 H.Lai         5254 J.Mun         5254 J.Mun         5254 J.Mun         5473 C.Cendra Guin 5473 C.Cendra Guin
Xray CHECKOUT/92H6 Xray CHECKOUT/5254 5254 J.Mun         5254 J.Mun         Xray CHECKOUT/5473 5473 C.Cendra Guin 5473 C.Cendra Guin
92H6 H.Lai         5254 J.Mun         5254 J.Mun         5254 J.Mun         5473 C.Cendra Guin 5473 C.Cendra Guin 5473 C.Cendra Guin
BEAM   LINE 14-3 
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
5289 J.Chorover    5120 D.Fike        5120 D.Fike        5243 Y.Arai        5243 Y.Arai        5149 N.Tosca       5149 N.Tosca      
CHANGE/5120 D.Fike 5120 D.Fike        CHANGE/5243 Y.Arai 5243 Y.Arai        CHANGE/5149 N.Tosc 5149 N.Tosca       5149 N.Tosca      
5120 D.Fike        5120 D.Fike        5243 Y.Arai        5243 Y.Arai        5149 N.Tosca       5149 N.Tosca       5149 N.Tosca      
BEAM   LINE 15-2 
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Dec. 09, 2019      Dec. 10, 2019      Dec. 11, 2019      Dec. 12, 2019      Dec. 13, 2019      Dec. 14, 2019      Dec. 15, 2019     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Dec. 16, 2019
                        AP       DOWN       DOWN      
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
BEAM   LINE 1-5  
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5351 M.Doeff       5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strang/DOWN DOWN               DOWN              
Xray CHECKOUT/5329 5329 N.Strange     5329 N.Strange     5329 N.Strange     DOWN               DOWN               DOWN              
5329 N.Strange     5329 N.Strange     5329 N.Strange     5329 N.Strange     DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
8095 K.Stone       FACI               5134 P.Csernica    5134 P.Csernica    5304 B.Chen/DOWN   DOWN               DOWN              
FACI               Xray CHECKOUT/5134 5134 P.Csernica    Xray CHECKOUT/5304 DOWN               DOWN               DOWN              
FACI               5134 P.Csernica    5134 P.Csernica    5304 B.Chen        DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5425 A.Gundogar    FACI               8095 K.Stone       8095 K.Stone       8095 K.Stone/DOWN  DOWN               DOWN              
FACI               SMB CHECKOUT/8095  8095 K.Stone       8095 K.Stone       DOWN               DOWN               DOWN              
FACI               8095 K.Stone       8095 K.Stone       8095 K.Stone       DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew/DOWN DOWN               DOWN              
5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew      DOWN               DOWN               DOWN              
5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew      5083 L.Mayhew      DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5248 S.Bent        5102 M.Polizzotto  5102 M.Polizzotto  5252 C.Wei         5252 C.Wei/DOWN    DOWN               DOWN              
SMB CHECKOUT/5102  5102 M.Polizzotto  SMB CHECKOUT/5252  5252 C.Wei         DOWN               DOWN               DOWN              
5102 M.Polizzotto  5102 M.Polizzotto  5252 C.Wei         5252 C.Wei         DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5253 H.Wu          5215 M.Abdelsamie  11C6 R.Panigrahi   11C8 Z.Bu          8077 T.Matsui/DOWN DOWN               DOWN              
CHANGE/5215 M.Abde CHANGE/11C6 R.Pani CHANGE/11C8 Z.Bu   CHANGE/8077 T.Mats DOWN               DOWN               DOWN              
5215 M.Abdelsamie  11C6 R.Panigrahi   11C8 Z.Bu          8077 T.Matsui      DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
4897 K.Chacon      5288 K.Lancaster   5288 K.Lancaster   5102 M.Polizzotto  5102 M.Polizz/DOWN DOWN               DOWN              
SMB CHECKOUT/5288  5288 K.Lancaster   SMB CHECKOUT/5102  5102 M.Polizzotto  DOWN               DOWN               DOWN              
5288 K.Lancaster   5288 K.Lancaster   5102 M.Polizzotto  5102 M.Polizzotto  DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5312 N.Seitzman    90H0 A.Huq         5466 N.Seitzman    5142 J.Nelson Weke 5142 J.Nelson/DOWN DOWN               DOWN              
CHANGE/90H0 A.Huq  CHANGE/5466 N.Seit CHANGE/5142 J.Nels 5142 J.Nelson Weke DOWN               DOWN               DOWN              
90H0 A.Huq         5466 N.Seitzman    5142 J.Nelson Weke 5142 J.Nelson Weke DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5273 M.Abernathy   5273 M.Abernathy   5200 Y.Liu         5200 Y.Liu         5200 Y.Liu/DOWN    DOWN               DOWN              
5273 M.Abernathy   SMB CHECKOUT/5200  5200 Y.Liu         5200 Y.Liu         DOWN               DOWN               DOWN              
5273 M.Abernathy   5200 Y.Liu         5200 Y.Liu         5200 Y.Liu         DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5104 A.Karim       5288 K.Lancaster   5288 K.Lancaster   5288 K.Lancaster   5288 K.Lancas/DOWN DOWN               DOWN              
SMB CHECKOUT/5288  5288 K.Lancaster   5288 K.Lancaster   5288 K.Lancaster   DOWN               DOWN               DOWN              
5288 K.Lancaster   5288 K.Lancaster   5288 K.Lancaster   5288 K.Lancaster   DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5458 C.Takacs      8904 S.Bone        8904 S.Bone        8904 S.Bone        8904 S.Bone/DOWN   DOWN               DOWN              
Xray CHECKOUT/8904 8904 S.Bone        8904 S.Bone        8904 S.Bone        DOWN               DOWN               DOWN              
8904 S.Bone        8904 S.Bone        8904 S.Bone        8904 S.Bone        DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5424 S.Kozimor     5424 S.Kozimor     5253 H.Wu          5253 H.Wu          5253 H.Wu/DOWN     DOWN               DOWN              
5424 S.Kozimor     SMB CHECKOUT/5253  5253 H.Wu          5253 H.Wu          DOWN               DOWN               DOWN              
5424 S.Kozimor     5253 H.Wu          5253 H.Wu          5253 H.Wu          DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5473 C.Cendra Guin 4814 K.Peterson    4814 K.Peterson    5271 S.Nikzad      5271 S.Nikzad/DOWN DOWN               DOWN              
Xray CHECKOUT/4814 4814 K.Peterson    Xray CHECKOUT/5271 5271 S.Nikzad      DOWN               DOWN               DOWN              
4814 K.Peterson    4814 K.Peterson    5271 S.Nikzad      5271 S.Nikzad      DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
5149 N.Tosca       5312 N.Seitzman    5312 N.Seitzman    11C4 J.Richardson  11C4 J.Richar/DOWN DOWN               DOWN              
CHANGE/5312 N.Seit 5312 N.Seitzman    CHANGE/11C4 J.Rich 11C4 J.Richardson  DOWN               DOWN               DOWN              
5312 N.Seitzman    5312 N.Seitzman    11C4 J.Richardson  11C4 J.Richardson  DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Dec. 16, 2019      Dec. 17, 2019      Dec. 18, 2019      Dec. 19, 2019      Dec. 20, 2019      Dec. 21, 2019      Dec. 22, 2019     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 23, 2019
DOWN       DOWN       DOWN       DOWN                        
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
BEAM   LINE 1-5  
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Dec. 23, 2019      Dec. 24, 2019      Dec. 25, 2019      Dec. 26, 2019      Dec. 27, 2019      Dec. 28, 2019      Dec. 29, 2019     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 30, 2019
                                         
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
BEAM   LINE 1-5  
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Dec. 30, 2019      Dec. 31, 2019      Jan. 01, 2020      Jan. 02, 2020      Jan. 03, 2020      Jan. 04, 2020      Jan. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Jan. 06, 2020
                                         
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
BEAM   LINE 1-5  
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 2-1  
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 2-2  
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 2-3  
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 4-1  
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 4-2  
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 4-3  
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 6-2  
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 7-3  
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 9-3  
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 10-2 
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 11-2 
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 11-3 
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 14-3 
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 15-2 
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
BEAM   LINE 17-2 
Jan. 06, 2020      Jan. 07, 2020      Jan. 08, 2020      Jan. 09, 2020      Jan. 10, 2020      Jan. 11, 2020      Jan. 12, 2020     
DOWN               DOWN/STUP          STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              
DOWN               STUP               STUP               STUP               STUP               STUP               STUP              

Back to Table of Contents

WEEK OF Jan. 13, 2020
Run Resumes                                          
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
BEAM   LINE 1-5  
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               5473 C.Cendra Guin 5271 S.Nikzad      5231 P.Thornton    Unscheduled        5443 S.King        5443 S.King       
Xray CHECKOUT/5473 Xray CHECKOUT/5271 Xray CHECKOUT/5231 Unscheduled        Xray CHECKOUT/5443 5443 S.King        Unscheduled       
5473 C.Cendra Guin 5271 S.Nikzad      5231 P.Thornton    Unscheduled        5443 S.King        5443 S.King        Unscheduled       
BEAM   LINE 2-1  
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5351 M.Doeff       5351 M.Doeff      
Xray CHECKOUT/5459 5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  Xray CHECKOUT/5351 5351 M.Doeff       5351 M.Doeff      
5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5459 A.van Veelen  5351 M.Doeff       5351 M.Doeff       5351 M.Doeff      
BEAM   LINE 2-2  
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               FACI               8899 S.Bare        8899 S.Bare        8899 S.Bare        5406 K.Abdul-Aziz  5406 K.Abdul-Aziz 
FACI               SMB CHECKOUT/8899  8899 S.Bare        8899 S.Bare        SMB CHECKOUT/5406  5406 K.Abdul-Aziz  5406 K.Abdul-Aziz 
FACI               8899 S.Bare        8899 S.Bare        8899 S.Bare        5406 K.Abdul-Aziz  5406 K.Abdul-Aziz  5406 K.Abdul-Aziz 
BEAM   LINE 2-3  
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               5351 M.Doeff       5351 M.Doeff       5351 M.Doeff       4909 P.Manning     4909 P.Manning     4909 P.Manning    
CHANGE/5351 M.Doef 5351 M.Doeff       5351 M.Doeff       CHANGE/4909 P.Mann 4909 P.Manning     4909 P.Manning     4909 P.Manning    
5351 M.Doeff       5351 M.Doeff       5351 M.Doeff       4909 P.Manning     4909 P.Manning     4909 P.Manning     4909 P.Manning    
BEAM   LINE 4-1  
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               FACI               5350 R.Bernier-Lat 5350 R.Bernier-Lat 5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee 
FACI               SMB CHECKOUT/5350  5350 R.Bernier-Lat SMB CHECKOUT/5224  5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee 
FACI               5350 R.Bernier-Lat 5350 R.Bernier-Lat 5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee  5224 R.Chatterjee 
BEAM   LINE 4-2  
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               8097 I.Rajkovic    8047 T.Weiss       5414 C.Salamat     5443 S.King        4911 C.Safinya     4911 C.Safinya    
CHANGE/8097 I.Rajk CHANGE/8047 T.Weis CHANGE/5414 C.Sala CHANGE/5443 S.King CHANGE/4911 C.Safi 4911 C.Safinya     4911 C.Safinya    
8097 I.Rajkovic    8047 T.Weiss       5414 C.Salamat     5443 S.King        4911 C.Safinya     4911 C.Safinya     4911 C.Safinya    
BEAM   LINE 4-3  
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               9707 S.Kelly       9707 S.Kelly       9707 S.Kelly       9707 S.Kelly       5289 J.Chorover    5289 J.Chorover   
SMB CHECKOUT/9707  9707 S.Kelly       9707 S.Kelly       9707 S.Kelly       SMB CHECKOUT/5289  5289 J.Chorover    5289 J.Chorover   
9707 S.Kelly       9707 S.Kelly       9707 S.Kelly       9707 S.Kelly       5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
BEAM   LINE 6-2  
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               FACI               8067 S.Webb        9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann   
FACI               CHANGE/8067 S.Webb CHANGE/9710 U.Berg 9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann   
FACI               8067 S.Webb        9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann   
BEAM   LINE 7-3  
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               5075 H.Lim         5075 H.Lim         4899 R.Chen        4899 R.Chen        9705 C.Jcap        9705 C.Jcap       
SMB CHECKOUT/5075  5075 H.Lim         SMB CHECKOUT/4899  4899 R.Chen        SMB CHECKOUT/9705  9705 C.Jcap        9705 C.Jcap       
5075 H.Lim         5075 H.Lim         4899 R.Chen        4899 R.Chen        9705 C.Jcap        9705 C.Jcap        9705 C.Jcap       
BEAM   LINE 9-3  
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               FACI               FACI               FACI               8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
FACI               FACI               FACI               SMB CHECKOUT/8071  8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
FACI               FACI               FACI               8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi     8071 R.Sarangi    
BEAM   LINE 10-2 
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               8867 S.Webb        8867 S.Webb        4909 P.Manning     4909 P.Manning     4909 P.Manning     4909 P.Manning    
CHANGE/8867 S.Webb 8867 S.Webb        CHANGE/4909 P.Mann 4909 P.Manning     4909 P.Manning     4909 P.Manning     4909 P.Manning    
8867 S.Webb        8867 S.Webb        4909 P.Manning     4909 P.Manning     4909 P.Manning     4909 P.Manning     4909 P.Manning    
BEAM   LINE 11-2 
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               5228 Y.Xiang       5228 Y.Xiang       5228 Y.Xiang       5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor    
SMB CHECKOUT/5228  5228 Y.Xiang       5228 Y.Xiang       SMB CHECKOUT/5009  5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor    
5228 Y.Xiang       5228 Y.Xiang       5228 Y.Xiang       5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor    
BEAM   LINE 11-3 
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               5202 A.Ritchhart   5202 A.Ritchhart   4820 R.Kennard     4820 R.Kennard     5414 C.Salamat     5414 C.Salamat    
Xray CHECKOUT/5202 5202 A.Ritchhart   Xray CHECKOUT/4820 4820 R.Kennard     Xray CHECKOUT/5414 5414 C.Salamat     5414 C.Salamat    
5202 A.Ritchhart   5202 A.Ritchhart   4820 R.Kennard     4820 R.Kennard     5414 C.Salamat     5414 C.Salamat     5414 C.Salamat    
BEAM   LINE 14-3 
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               5253 H.Wu          5253 H.Wu          8015 A.Mehta       8015 A.Mehta       5155 D.Schlesinger 5155 D.Schlesinger
CHANGE/5253 H.Wu   5253 H.Wu          CHANGE/8015 A.Meht 8015 A.Mehta       CHANGE/5155 D.Schl 5155 D.Schlesinger 5155 D.Schlesinger
5253 H.Wu          5253 H.Wu          8015 A.Mehta       8015 A.Mehta       5155 D.Schlesinger 5155 D.Schlesinger 5155 D.Schlesinger
BEAM   LINE 15-2 
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Jan. 13, 2020      Jan. 14, 2020      Jan. 15, 2020      Jan. 16, 2020      Jan. 17, 2020      Jan. 18, 2020      Jan. 19, 2020     
STUP               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jan. 20, 2020
HOLIDAY                                          
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
BEAM   LINE 1-5  
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
Unscheduled        Unscheduled        5060 K.Bagchi      5060 K.Bagchi      5202 A.Ritchhart   5251 G.Sethi       5251 G.Sethi      
Unscheduled        Xray CHECKOUT/5060 5060 K.Bagchi      Xray CHECKOUT/5202 Xray CHECKOUT/5251 5251 G.Sethi       5251 G.Sethi      
Unscheduled        5060 K.Bagchi      5060 K.Bagchi      5202 A.Ritchhart   5251 G.Sethi       5251 G.Sethi       5251 G.Sethi      
BEAM   LINE 2-1  
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
5351 M.Doeff       5351 M.Doeff       5300 G.Wan         5300 G.Wan         FACI               5329 N.Strange     5329 N.Strange    
5351 M.Doeff       Xray CHECKOUT/5300 5300 G.Wan         FACI               Xray CHECKOUT/5329 5329 N.Strange     5329 N.Strange    
5351 M.Doeff       5300 G.Wan         5300 G.Wan         FACI               5329 N.Strange     5329 N.Strange     5329 N.Strange    
BEAM   LINE 2-2  
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
5406 K.Abdul-Aziz  5406 K.Abdul-Aziz  5406 K.Abdul-Aziz  4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht
5406 K.Abdul-Aziz  5406 K.Abdul-Aziz  SMB CHECKOUT/4752  4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht
5406 K.Abdul-Aziz  5406 K.Abdul-Aziz  4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht 4752 C.Van Genucht
BEAM   LINE 2-3  
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
4909 P.Manning     4909 P.Manning     5155 D.Schlesinger 5155 D.Schlesinger 5240 J.Judy        8067 S.Webb        8067 S.Webb       
4909 P.Manning     CHANGE/5155 D.Schl 5155 D.Schlesinger CHANGE/5240 J.Judy CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb       
4909 P.Manning     5155 D.Schlesinger 5155 D.Schlesinger 5240 J.Judy        8067 S.Webb        8067 S.Webb        8067 S.Webb       
BEAM   LINE 4-1  
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
5224 R.Chatterjee  5224 R.Chatterjee  4488 J.Pena        4488 J.Pena        5387 R.Bell        5387 R.Bell        5387 R.Bell       
5224 R.Chatterjee  SMB CHECKOUT/4488  4488 J.Pena        SMB CHECKOUT/5387  5387 R.Bell        5387 R.Bell        5387 R.Bell       
5224 R.Chatterjee  4488 J.Pena        4488 J.Pena        5387 R.Bell        5387 R.Bell        5387 R.Bell        5387 R.Bell       
BEAM   LINE 4-2  
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
4911 C.Safinya     4911 C.Safinya     4911 C.Safinya     4911 C.Safinya     4911 C.Safinya     8231 A.Cohen       8231 A.Cohen      
4911 C.Safinya     4911 C.Safinya     4911 C.Safinya     4911 C.Safinya     CHANGE/8231 A.Cohe 8231 A.Cohen       8231 A.Cohen      
4911 C.Safinya     4911 C.Safinya     4911 C.Safinya     4911 C.Safinya     8231 A.Cohen       8231 A.Cohen       8231 A.Cohen      
BEAM   LINE 4-3  
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
5289 J.Chorover    5289 J.Chorover    5289 J.Chorover    5087 G.Morin       5087 G.Morin       4778 J.Bargar      4778 J.Bargar     
5289 J.Chorover    5289 J.Chorover    SMB CHECKOUT/5087  5087 G.Morin       SMB CHECKOUT/4778  4778 J.Bargar      4778 J.Bargar     
5289 J.Chorover    5289 J.Chorover    5087 G.Morin       5087 G.Morin       4778 J.Bargar      4778 J.Bargar      4778 J.Bargar     
BEAM   LINE 6-2  
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann    FACI               92H7 M.Burdette    5013 N.Seitzman    5396 J.Nelson Weke
9710 U.Bergmann    9710 U.Bergmann    FACI               CHANGE/92H7 M.Burd CHANGE/5013 N.Seit CHANGE/5396 J.Nels CHANGE/5385 G.Whan
9710 U.Bergmann    9710 U.Bergmann    FACI               92H7 M.Burdette    5013 N.Seitzman    5396 J.Nelson Weke 5385 G.Whang      
BEAM   LINE 7-3  
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
9705 C.Jcap        9705 C.Jcap        5000 M.Green       5000 M.Green       5000 M.Green       5000 M.Green       5000 M.Green      
9705 C.Jcap        SMB CHECKOUT/5000  5000 M.Green       5000 M.Green       5000 M.Green       5000 M.Green       5000 M.Green      
9705 C.Jcap        5000 M.Green       5000 M.Green       5000 M.Green       5000 M.Green       5000 M.Green       5000 M.Green      
BEAM   LINE 9-3  
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
8071 R.Sarangi     8071 R.Sarangi     5400 M.Hubert      5400 M.Hubert      5277 E.Nikolla     5277 E.Nikolla     5277 E.Nikolla    
8071 R.Sarangi     SMB CHECKOUT/5400  5400 M.Hubert      SMB CHECKOUT/5277  5277 E.Nikolla     5277 E.Nikolla     5277 E.Nikolla    
8071 R.Sarangi     5400 M.Hubert      5400 M.Hubert      5277 E.Nikolla     5277 E.Nikolla     5277 E.Nikolla     5277 E.Nikolla    
BEAM   LINE 10-2 
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
4909 P.Manning     4909 P.Manning     4791 M.Zeineh      4791 M.Zeineh      9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann   
4909 P.Manning     CHANGE/4791 M.Zein 4791 M.Zeineh      CHANGE/9710 U.Berg 9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann   
4909 P.Manning     4791 M.Zeineh      4791 M.Zeineh      9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann    9710 U.Bergmann   
BEAM   LINE 11-2 
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
5009 S.Kozimor     5009 S.Kozimor     5009 S.Kozimor     5087 G.Morin       5087 G.Morin       5263 E.Tomaszewski 5263 E.Tomaszewski
5009 S.Kozimor     5009 S.Kozimor     SMB CHECKOUT/5087  5087 G.Morin       SMB CHECKOUT/5263  5263 E.Tomaszewski 5263 E.Tomaszewski
5009 S.Kozimor     5009 S.Kozimor     5087 G.Morin       5087 G.Morin       5263 E.Tomaszewski 5263 E.Tomaszewski 5263 E.Tomaszewski
BEAM   LINE 11-3 
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
5414 C.Salamat     5414 C.Salamat     5253 H.Wu          5315 R.Belisle     5315 R.Belisle     5289 J.Chorover    5289 J.Chorover   
5414 C.Salamat     CHANGE/5253 H.Wu   Xray CHECKOUT/5315 5315 R.Belisle     Xray CHECKOUT/5289 5289 J.Chorover    5289 J.Chorover   
5414 C.Salamat     5253 H.Wu          5315 R.Belisle     5315 R.Belisle     5289 J.Chorover    5289 J.Chorover    5289 J.Chorover   
BEAM   LINE 14-3 
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
5155 D.Schlesinger 5155 D.Schlesinger 5240 J.Judy        5240 J.Judy        FACI               5240 J.Judy        5240 J.Judy       
5155 D.Schlesinger CHANGE/5240 J.Judy 5240 J.Judy        FACI               SMB CHECKOUT/5240  5240 J.Judy        5240 J.Judy       
5155 D.Schlesinger 5240 J.Judy        5240 J.Judy        FACI               5240 J.Judy        5240 J.Judy        5240 J.Judy       
BEAM   LINE 15-2 
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        8892 D.Sokaras     8892 D.Sokaras    
Unscheduled        Unscheduled        Unscheduled        Unscheduled        CHANGE/8892 D.Soka 8892 D.Sokaras     8892 D.Sokaras    
Unscheduled        Unscheduled        Unscheduled        Unscheduled        8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras    
BEAM   LINE 17-2 
Jan. 20, 2020      Jan. 21, 2020      Jan. 22, 2020      Jan. 23, 2020      Jan. 24, 2020      Jan. 25, 2020      Jan. 26, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jan. 27, 2020
PAMM       AP                                    
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
BEAM   LINE 1-5  
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
5251 G.Sethi/AP    AP                 AP                 5455 M.Bates       5455 M.Bates       5358 S.Lee         5358 S.Lee        
AP                 AP                 Xray CHECKOUT/5455 5455 M.Bates       Xray CHECKOUT/5358 5358 S.Lee         5358 S.Lee        
AP                 AP                 5455 M.Bates       5455 M.Bates       5358 S.Lee         5358 S.Lee         5358 S.Lee        
BEAM   LINE 2-1  
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
5329 N.Strang/AP   AP                 AP                 5387 R.Bell        5387 R.Bell        5387 R.Bell        5387 R.Bell       
AP                 AP                 Xray CHECKOUT/5387 5387 R.Bell        5387 R.Bell        5387 R.Bell        5387 R.Bell       
AP                 AP                 5387 R.Bell        5387 R.Bell        5387 R.Bell        5387 R.Bell        5387 R.Bell       
BEAM   LINE 2-2  
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
4752 C.Van Ge/AP   AP                 AP                 5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
AP                 AP                 SMB CHECKOUT/5468  5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
AP                 AP                 5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta       5468 N.Calta      
BEAM   LINE 2-3  
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
8067 S.Webb/AP     AP                 AP                 8015 A.Mehta       8015 A.Mehta       4550 C.Kim         4550 C.Kim        
AP                 AP                 CHANGE/8015 A.Meht 8015 A.Mehta       CHANGE/4550 C.Kim  4550 C.Kim         4550 C.Kim        
AP                 AP                 8015 A.Mehta       8015 A.Mehta       4550 C.Kim         4550 C.Kim         4550 C.Kim        
BEAM   LINE 4-1  
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
5387 R.Bell/AP     AP                 AP                 FACI               4525 P.Persson     4525 P.Persson     4525 P.Persson    
AP                 AP                 FACI               SMB CHECKOUT/4525  4525 P.Persson     4525 P.Persson     4525 P.Persson    
AP                 AP                 FACI               4525 P.Persson     4525 P.Persson     4525 P.Persson     4525 P.Persson    
BEAM   LINE 4-2  
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
8231 A.Cohen/AP    AP                 AP                 8877 T.Matsui      5119 G.Wong        5119 G.Wong        5119 G.Wong       
AP                 AP                 CHANGE/8877 T.Mats CHANGE/5119 G.Wong 5119 G.Wong        5119 G.Wong        5119 G.Wong       
AP                 AP                 8877 T.Matsui      5119 G.Wong        5119 G.Wong        5119 G.Wong        5119 G.Wong       
BEAM   LINE 4-3  
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
4778 J.Bargar/AP   AP                 AP                 5223 C.Kronawitter 5223 C.Kronawitter 4954 H.La Pierre   4954 H.La Pierre  
AP                 AP                 SMB CHECKOUT/5223  5223 C.Kronawitter SMB CHECKOUT/4954  4954 H.La Pierre   CHANGE/5151 H.La P
AP                 AP                 5223 C.Kronawitter 5223 C.Kronawitter 4954 H.La Pierre   4954 H.La Pierre   5151 H.La Pierre  
BEAM   LINE 6-2  
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
5385 G.Whang/AP    AP                 AP                 4877 M.Rivera-Torr 5056 R.Coridan     4906 Y.Yu          4906 Y.Yu         
AP                 AP                 CHANGE/4877 M.Rive CHANGE/5056 R.Cori CHANGE/4906 Y.Yu   4906 Y.Yu          4906 Y.Yu         
AP                 AP                 4877 M.Rivera-Torr 5056 R.Coridan     4906 Y.Yu          4906 Y.Yu          4906 Y.Yu         
BEAM   LINE 7-3  
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
5000 M.Green/AP    AP                 AP                 8060 J.Bargar      8060 J.Bargar      5339 V.Noel        5339 V.Noel       
AP                 AP                 SMB CHECKOUT/8060  8060 J.Bargar      SMB CHECKOUT/5339  5339 V.Noel        5339 V.Noel       
AP                 AP                 8060 J.Bargar      8060 J.Bargar      5339 V.Noel        5339 V.Noel        5339 V.Noel       
BEAM   LINE 9-3  
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
5277 E.Nikoll/AP   AP                 AP                 5055 P.Christopher 5055 P.Christopher 8099 S.Bare        8099 S.Bare       
AP                 AP                 SMB CHECKOUT/5055  5055 P.Christopher SMB CHECKOUT/8099  8099 S.Bare        8099 S.Bare       
AP                 AP                 5055 P.Christopher 5055 P.Christopher 8099 S.Bare        8099 S.Bare        8099 S.Bare       
BEAM   LINE 10-2 
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
9710 U.Bergma/AP   AP                 AP                 5325 S.Saslow      5325 S.Saslow      4550 C.Kim         4550 C.Kim        
AP                 AP                 CHANGE/5325 S.Sasl 5325 S.Saslow      CHANGE/4550 C.Kim  4550 C.Kim         4550 C.Kim        
AP                 AP                 5325 S.Saslow      5325 S.Saslow      4550 C.Kim         4550 C.Kim         4550 C.Kim        
BEAM   LINE 11-2 
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
5263 E.Tomasz/AP   AP                 AP                 5331 S.Zhai        5331 S.Zhai        4550 C.Kim         4550 C.Kim        
AP                 AP                 SMB CHECKOUT/5331  5331 S.Zhai        SMB CHECKOUT/4550  4550 C.Kim         4550 C.Kim        
AP                 AP                 5331 S.Zhai        5331 S.Zhai        4550 C.Kim         4550 C.Kim         4550 C.Kim        
BEAM   LINE 11-3 
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
5289 J.Chorov/AP   AP                 AP                 5129 K.Lim         5129 K.Lim         5213 M.Rahman      5213 M.Rahman     
AP                 AP                 Xray CHECKOUT/5129 5129 K.Lim         Xray CHECKOUT/5213 5213 M.Rahman      5213 M.Rahman     
AP                 AP                 5129 K.Lim         5129 K.Lim         5213 M.Rahman      5213 M.Rahman      5213 M.Rahman     
BEAM   LINE 14-3 
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
5240 J.Judy/AP     AP                 AP                 5122 L.Aristilde   5122 L.Aristilde   5093 M.Kelly       5093 M.Kelly      
AP                 AP                 SMB CHECKOUT/5122  5122 L.Aristilde   SMB CHECKOUT/5093  5093 M.Kelly       5093 M.Kelly      
AP                 AP                 5122 L.Aristilde   5122 L.Aristilde   5093 M.Kelly       5093 M.Kelly       5093 M.Kelly      
BEAM   LINE 15-2 
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
8892 D.Sokara/AP   AP                 AP                 8892 D.Sokaras     Unscheduled        8892 D.Sokaras     8892 D.Sokaras    
AP                 AP                 8892 D.Sokaras     Unscheduled        CHANGE/8892 D.Soka 8892 D.Sokaras     8892 D.Sokaras    
AP                 AP                 8892 D.Sokaras     Unscheduled        8892 D.Sokaras     8892 D.Sokaras     8892 D.Sokaras    
BEAM   LINE 17-2 
Jan. 27, 2020      Jan. 28, 2020      Jan. 29, 2020      Jan. 30, 2020      Jan. 31, 2020      Feb. 01, 2020      Feb. 02, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Feb. 03, 2020
                                         
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
BEAM   LINE 1-5  
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
5358 S.Lee         5460 B.Yu          5460 B.Yu          5178 A.Kannan      5178 A.Kannan      5452 A.Sinha       5452 A.Sinha      
Xray CHECKOUT/5460 5460 B.Yu          Xray CHECKOUT/5178 5178 A.Kannan      Xray CHECKOUT/5452 5452 A.Sinha       5452 A.Sinha      
5460 B.Yu          5460 B.Yu          5178 A.Kannan      5178 A.Kannan      5452 A.Sinha       5452 A.Sinha       5452 A.Sinha      
BEAM   LINE 2-1  
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
5387 R.Bell        5101 R.Davis       5101 R.Davis       5101 R.Davis       5342 S.Cheema      5342 S.Cheema      5342 S.Cheema     
Xray CHECKOUT/5101 5101 R.Davis       5101 R.Davis       Xray CHECKOUT/5342 5342 S.Cheema      5342 S.Cheema      5342 S.Cheema     
5101 R.Davis       5101 R.Davis       5101 R.Davis       5342 S.Cheema      5342 S.Cheema      5342 S.Cheema      5342 S.Cheema     
BEAM   LINE 2-2  
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
5468 N.Calta       5184 N.Spada       5184 N.Spada       5184 N.Spada       5048 X.Feng        5048 X.Feng        5048 X.Feng       
SMB CHECKOUT/5184  5184 N.Spada       5184 N.Spada       SMB CHECKOUT/5048  5048 X.Feng        5048 X.Feng        5048 X.Feng       
5184 N.Spada       5184 N.Spada       5184 N.Spada       5048 X.Feng        5048 X.Feng        5048 X.Feng        5048 X.Feng       
BEAM   LINE 2-3  
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
4550 C.Kim         5058 Y.Tang        5058 Y.Tang        4921 J.Evans       4921 J.Evans       4791 M.Zeineh      4791 M.Zeineh     
CHANGE/5058 Y.Tang 5058 Y.Tang        CHANGE/4921 J.Evan 4921 J.Evans       CHANGE/4791 M.Zein 4791 M.Zeineh      4791 M.Zeineh     
5058 Y.Tang        5058 Y.Tang        4921 J.Evans       4921 J.Evans       4791 M.Zeineh      4791 M.Zeineh      4791 M.Zeineh     
BEAM   LINE 4-1  
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
4525 P.Persson     4525 P.Persson     5091 J.Catalano    5091 J.Catalano    5091 J.Catalano    5059 Y.Tang        5059 Y.Tang       
4525 P.Persson     SMB CHECKOUT/5091  5091 J.Catalano    5091 J.Catalano    SMB CHECKOUT/5059  5059 Y.Tang        5059 Y.Tang       
4525 P.Persson     5091 J.Catalano    5091 J.Catalano    5091 J.Catalano    5059 Y.Tang        5059 Y.Tang        5059 Y.Tang       
BEAM   LINE 4-2  
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
5119 G.Wong        8847 T.Weiss       8897 I.Rajkovic    11B9 J.Ting        11B9 J.Ting        11C0 L.Zhang       11C0 L.Zhang      
CHANGE/8847 T.Weis CHANGE/8897 I.Rajk CHANGE/11B9 J.Ting 11B9 J.Ting        CHANGE/11C0 L.Zhan 11C0 L.Zhang       11C0 L.Zhang      
8847 T.Weiss       8897 I.Rajkovic    11B9 J.Ting        11B9 J.Ting        11C0 L.Zhang       11C0 L.Zhang       11C0 L.Zhang      
BEAM   LINE 4-3  
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
5151 H.La Pierre   5151 H.La Pierre   5048 X.Feng        5048 X.Feng        5048 X.Feng        5357 E.Troein      5357 E.Troein     
5151 H.La Pierre   SMB CHECKOUT/5048  5048 X.Feng        5048 X.Feng        SMB CHECKOUT/5357  5357 E.Troein      5357 E.Troein     
5151 H.La Pierre   5048 X.Feng        5048 X.Feng        5048 X.Feng        5357 E.Troein      5357 E.Troein      5357 E.Troein     
BEAM   LINE 6-2  
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
4906 Y.Yu          92H0 C.Xu          4977 M.Doeff       4977 M.Doeff       4977 M.Doeff       5213 M.Rahman      5213 M.Rahman     
CHANGE/92H0 C.Xu   CHANGE/4977 M.Doef 4977 M.Doeff       4977 M.Doeff       CHANGE/5213 M.Rahm 5213 M.Rahman      5213 M.Rahman     
92H0 C.Xu          4977 M.Doeff       4977 M.Doeff       4977 M.Doeff       5213 M.Rahman      5213 M.Rahman      5213 M.Rahman     
BEAM   LINE 7-3  
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
5339 V.Noel        5314 K.Boye        5314 K.Boye        4756 K.Haas        4756 K.Haas        4756 K.Haas        4756 K.Haas       
SMB CHECKOUT/5314  5314 K.Boye        SMB CHECKOUT/4756  4756 K.Haas        4756 K.Haas        4756 K.Haas        4756 K.Haas       
5314 K.Boye        5314 K.Boye        4756 K.Haas        4756 K.Haas        4756 K.Haas        4756 K.Haas        4756 K.Haas       
BEAM   LINE 9-3  
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
8099 S.Bare        8099 S.Bare        5275 A.Aitbekova   5275 A.Aitbekova   5302 L.Li          5302 L.Li          5302 L.Li         
8099 S.Bare        SMB CHECKOUT/5275  5275 A.Aitbekova   SMB CHECKOUT/5302  5302 L.Li          5302 L.Li          5302 L.Li         
8099 S.Bare        5275 A.Aitbekova   5275 A.Aitbekova   5302 L.Li          5302 L.Li          5302 L.Li          5302 L.Li         
BEAM   LINE 10-2 
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
4550 C.Kim         5093 M.Kelly       4921 J.Evans       8067 S.Webb        8067 S.Webb        4822 N.Edwards     4822 N.Edwards    
CHANGE/5093 M.Kell CHANGE/4921 J.Evan CHANGE/8067 S.Webb 8067 S.Webb        CHANGE/4822 N.Edwa 4822 N.Edwards     4822 N.Edwards    
5093 M.Kelly       4921 J.Evans       8067 S.Webb        8067 S.Webb        4822 N.Edwards     4822 N.Edwards     4822 N.Edwards    
BEAM   LINE 11-2 
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
4550 C.Kim         5151 H.La Pierre   5151 H.La Pierre   5151 H.La Pierre   5151 H.La Pierre   4770 C.Hansel      4770 C.Hansel     
SMB CHECKOUT/5151  5151 H.La Pierre   SMB CHECKOUT/5151  5151 H.La Pierre   SMB CHECKOUT/4770  4770 C.Hansel      4770 C.Hansel     
5151 H.La Pierre   5151 H.La Pierre   5151 H.La Pierre   5151 H.La Pierre   4770 C.Hansel      4770 C.Hansel      4770 C.Hansel     
BEAM   LINE 11-3 
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
5213 M.Rahman      8081 Y.Liu         8081 Y.Liu         Unscheduled        Unscheduled        5025 R.Kasse       5025 R.Kasse      
Xray CHECKOUT/8081 8081 Y.Liu         Unscheduled        Unscheduled        Xray CHECKOUT/5025 5025 R.Kasse       5025 R.Kasse      
8081 Y.Liu         8081 Y.Liu         Unscheduled        Unscheduled        5025 R.Kasse       5025 R.Kasse       5025 R.Kasse      
BEAM   LINE 14-3 
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
5093 M.Kelly       5122 L.Aristilde   5122 L.Aristilde   5057 Y.Tang        5057 Y.Tang        FACI               FACI              
SMB CHECKOUT/5122  5122 L.Aristilde   SMB CHECKOUT/5057  5057 Y.Tang        FACI               FACI               FACI              
5122 L.Aristilde   5122 L.Aristilde   5057 Y.Tang        5057 Y.Tang        FACI               FACI               FACI              
BEAM   LINE 15-2 
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
8892 D.Sokaras     Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Feb. 03, 2020      Feb. 04, 2020      Feb. 05, 2020      Feb. 06, 2020      Feb. 07, 2020      Feb. 08, 2020      Feb. 09, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Feb. 10, 2020
                                         
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
BEAM   LINE 1-5  
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
5452 A.Sinha/AP    AP                 AP                 5338 H.Zhou        5338 H.Zhou        5417 C.Meis        5417 C.Meis       
AP                 AP                 Xray CHECKOUT/5338 5338 H.Zhou        Xray CHECKOUT/5417 5417 C.Meis        5417 C.Meis       
AP                 AP                 5338 H.Zhou        5338 H.Zhou        5417 C.Meis        5417 C.Meis        5417 C.Meis       
BEAM   LINE 2-1  
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
5342 S.Cheema/AP   AP                 AP                 8091 C.Tassone     8091 C.Tassone     5234 Y.Takamura    5234 Y.Takamura   
AP                 AP                 Xray CHECKOUT/8091 8091 C.Tassone     Xray CHECKOUT/5234 5234 Y.Takamura    5234 Y.Takamura   
AP                 AP                 8091 C.Tassone     8091 C.Tassone     5234 Y.Takamura    5234 Y.Takamura    5234 Y.Takamura   
BEAM   LINE 2-2  
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
5048 X.Feng/AP     AP                 AP                 5133 S.Conradson   5133 S.Conradson   5217 S.Conradson   5217 S.Conradson  
AP                 AP                 SMB CHECKOUT/5133  5133 S.Conradson   SMB CHECKOUT/5217  5217 S.Conradson   5217 S.Conradson  
AP                 AP                 5133 S.Conradson   5133 S.Conradson   5217 S.Conradson   5217 S.Conradson   5217 S.Conradson  
BEAM   LINE 2-3  
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
4791 M.Zeineh/AP   AP                 AP                 5286 K.Reinhart    5472 P.O'Day       4770 C.Hansel      4770 C.Hansel     
AP                 AP                 CHANGE/5286 K.Rein CHANGE/5472 P.O'Da CHANGE/4770 C.Hans 4770 C.Hansel      4770 C.Hansel     
AP                 AP                 5286 K.Reinhart    5472 P.O'Day       4770 C.Hansel      4770 C.Hansel      4770 C.Hansel     
BEAM   LINE 4-1  
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
5059 Y.Tang/AP     AP                 AP                 5215 M.Abdelsamie  5215 M.Abdelsamie  5472 P.O'Day       5472 P.O'Day      
AP                 AP                 SMB CHECKOUT/5215  5215 M.Abdelsamie  SMB CHECKOUT/5472  5472 P.O'Day       5472 P.O'Day      
AP                 AP                 5215 M.Abdelsamie  5215 M.Abdelsamie  5472 P.O'Day       5472 P.O'Day       5472 P.O'Day      
BEAM   LINE 4-2  
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
11C0 L.Zhang/AP    AP                 AP                 8877 T.Matsui      8877 T.Matsui      8047 T.Weiss       8047 T.Weiss      
AP                 AP                 CHANGE/8877 T.Mats 8877 T.Matsui      CHANGE/8047 T.Weis 8047 T.Weiss       CHANGE/8877 T.Mats
AP                 AP                 8877 T.Matsui      8877 T.Matsui      8047 T.Weiss       8047 T.Weiss       8877 T.Matsui     
BEAM   LINE 4-3  
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
5357 E.Troein/AP   AP                 AP                 5330 N.Strange     5330 N.Strange     4770 C.Hansel      4770 C.Hansel     
AP                 AP                 SMB CHECKOUT/5330  5330 N.Strange     SMB CHECKOUT/4770  4770 C.Hansel      4770 C.Hansel     
AP                 AP                 5330 N.Strange     5330 N.Strange     4770 C.Hansel      4770 C.Hansel      4770 C.Hansel     
BEAM   LINE 6-2  
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
5213 M.Rahman/AP   AP                 AP                 COMM               COMM               8892 D.Sokaras     8892 D.Sokaras    
AP                 AP                 COMM               COMM               CHANGE/8892 D.Soka 8892 D.Sokaras     CHANGE/4646 G.Geor
AP                 AP                 COMM               COMM               8892 D.Sokaras     8892 D.Sokaras     4646 G.George     
BEAM   LINE 7-3  
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
4756 K.Haas/AP     AP                 AP                 FACI               5338 H.Zhou        5338 H.Zhou        5340 P.Kennepohl  
AP                 AP                 FACI               SMB CHECKOUT/5338  5338 H.Zhou        CHANGE/5340 P.Kenn 5340 P.Kennepohl  
AP                 AP                 FACI               5338 H.Zhou        5338 H.Zhou        5340 P.Kennepohl   5340 P.Kennepohl  
BEAM   LINE 9-3  
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
5302 L.Li/AP       AP                 AP                 FACI               5081 A.Deb         5081 A.Deb         5081 A.Deb        
AP                 AP                 FACI               SMB CHECKOUT/5081  5081 A.Deb         5081 A.Deb         5081 A.Deb        
AP                 AP                 FACI               5081 A.Deb         5081 A.Deb         5081 A.Deb         5081 A.Deb        
BEAM   LINE 10-2 
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
4822 N.Edward/AP   AP                 AP                 FACI               FACI               4907 D.Gamzina     4907 D.Gamzina    
AP                 AP                 FACI               FACI               Xray CHECKOUT/4907 4907 D.Gamzina     4907 D.Gamzina    
AP                 AP                 FACI               FACI               4907 D.Gamzina     4907 D.Gamzina     4907 D.Gamzina    
BEAM   LINE 11-2 
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
4770 C.Hansel/AP   AP                 AP                 STUP               8818 A.Mehta       8818 A.Mehta       5101 R.Davis      
AP                 AP                 STUP               >GIXAS/8818        8818 A.Mehta       CHANGE/5101 R.Davi 5101 R.Davis      
AP                 AP                 STUP               8818 A.Mehta       8818 A.Mehta       5101 R.Davis       5101 R.Davis      
BEAM   LINE 11-3 
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
5025 R.Kasse/AP    AP                 AP                 5446 Y.Wang        5446 Y.Wang        90H0 A.Huq         90H0 A.Huq        
AP                 AP                 Xray CHECKOUT/5446 5446 Y.Wang        Xray CHECKOUT/90H0 90H0 A.Huq         Xray CHECKOUT/8095
AP                 AP                 5446 Y.Wang        5446 Y.Wang        90H0 A.Huq         90H0 A.Huq         8095 K.Stone      
BEAM   LINE 14-3 
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
FACI/AP            AP                 AP                 5053 R.Sarangi     5053 R.Sarangi     4664 A.Landers     4664 A.Landers    
AP                 AP                 SMB CHECKOUT/5053  5053 R.Sarangi     SMB CHECKOUT/4664  4664 A.Landers     4664 A.Landers    
AP                 AP                 5053 R.Sarangi     5053 R.Sarangi     4664 A.Landers     4664 A.Landers     4664 A.Landers    
BEAM   LINE 15-2 
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Feb. 10, 2020      Feb. 11, 2020      Feb. 12, 2020      Feb. 13, 2020      Feb. 14, 2020      Feb. 15, 2020      Feb. 16, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Feb. 17, 2020
HOLIDAY                                          
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
BEAM   LINE 1-5  
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
5417 C.Meis        5417 C.Meis        4997 E.Ratcliff    4997 E.Ratcliff    5351 M.Doeff       5358 S.Lee         5358 S.Lee        
5417 C.Meis        Xray CHECKOUT/4997 4997 E.Ratcliff    Xray CHECKOUT/5351 Xray CHECKOUT/5358 5358 S.Lee         5358 S.Lee        
5417 C.Meis        4997 E.Ratcliff    4997 E.Ratcliff    5351 M.Doeff       5358 S.Lee         5358 S.Lee         5358 S.Lee        
BEAM   LINE 2-1  
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
5234 Y.Takamura    5234 Y.Takamura    5209 C.Cao         5209 C.Cao         5396 J.Nelson Weke 5410 S.Blair       5410 S.Blair      
5234 Y.Takamura    Xray CHECKOUT/5209 5209 C.Cao         Xray CHECKOUT/5396 Xray CHECKOUT/5410 5410 S.Blair       5410 S.Blair      
5234 Y.Takamura    5209 C.Cao         5209 C.Cao         5396 J.Nelson Weke 5410 S.Blair       5410 S.Blair       5410 S.Blair      
BEAM   LINE 2-2  
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
5217 S.Conradson   5217 S.Conradson   5217 S.Conradson   FACI               5349 J.Timosenko   5349 J.Timosenko   5349 J.Timosenko  
5217 S.Conradson   5217 S.Conradson   FACI               SMB CHECKOUT/5349  5349 J.Timosenko   5349 J.Timosenko   5349 J.Timosenko  
5217 S.Conradson   5217 S.Conradson   FACI               5349 J.Timosenko   5349 J.Timosenko   5349 J.Timosenko   5349 J.Timosenko  
BEAM   LINE 2-3  
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
4770 C.Hansel      4770 C.Hansel      5132 J.Dhaliwal    5132 J.Dhaliwal    5250 D.Paktunc     5250 D.Paktunc     5250 D.Paktunc    
4770 C.Hansel      CHANGE/5132 J.Dhal 5132 J.Dhaliwal    CHANGE/5250 D.Pakt 5250 D.Paktunc     5250 D.Paktunc     5250 D.Paktunc    
4770 C.Hansel      5132 J.Dhaliwal    5132 J.Dhaliwal    5250 D.Paktunc     5250 D.Paktunc     5250 D.Paktunc     5250 D.Paktunc    
BEAM   LINE 4-1  
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
5472 P.O'Day       5472 P.O'Day       5142 J.Nelson Weke 5142 J.Nelson Weke 5088 L.Greenlee    5088 L.Greenlee    5088 L.Greenlee   
5472 P.O'Day       SMB CHECKOUT/5142  5142 J.Nelson Weke SMB CHECKOUT/5088  5088 L.Greenlee    5088 L.Greenlee    5088 L.Greenlee   
5472 P.O'Day       5142 J.Nelson Weke 5142 J.Nelson Weke 5088 L.Greenlee    5088 L.Greenlee    5088 L.Greenlee    5088 L.Greenlee   
BEAM   LINE 4-2  
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
8877 T.Matsui      8877 T.Matsui      11C6 R.Panigrahi   Unscheduled        11D2 J.Pazol       11D2 J.Pazol       8047 T.Weiss      
8877 T.Matsui      CHANGE/11C6 R.Pani Unscheduled        CHANGE/11D2 J.Pazo 11D2 J.Pazol       CHANGE/8047 T.Weis 8047 T.Weiss      
8877 T.Matsui      11C6 R.Panigrahi   Unscheduled        11D2 J.Pazol       11D2 J.Pazol       8047 T.Weiss       8047 T.Weiss      
BEAM   LINE 4-3  
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
4770 C.Hansel      4770 C.Hansel      5142 J.Nelson Weke 5142 J.Nelson Weke 5367 W.Wan         5367 W.Wan         5367 W.Wan        
4770 C.Hansel      SMB CHECKOUT/5142  5142 J.Nelson Weke SMB CHECKOUT/5367  5367 W.Wan         5367 W.Wan         5367 W.Wan        
4770 C.Hansel      5142 J.Nelson Weke 5142 J.Nelson Weke 5367 W.Wan         5367 W.Wan         5367 W.Wan         5367 W.Wan        
BEAM   LINE 6-2  
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
4646 G.George      4646 G.George      5137 M.Delgado Jai 5137 M.Delgado Jai 5137 M.Delgado Jai 4771 G.George      4771 G.George     
4646 G.George      CHANGE/5137 M.Delg 5137 M.Delgado Jai 5137 M.Delgado Jai CHANGE/4771 G.Geor 4771 G.George      4771 G.George     
4646 G.George      5137 M.Delgado Jai 5137 M.Delgado Jai 5137 M.Delgado Jai 4771 G.George      4771 G.George      4771 G.George     
BEAM   LINE 7-3  
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
5340 P.Kennepohl   5340 P.Kennepohl   5340 P.Kennepohl   5111 J.Lezama Pach 5111 J.Lezama Pach 8060 J.Bargar      8060 J.Bargar     
5340 P.Kennepohl   5340 P.Kennepohl   SMB CHECKOUT/5111  5111 J.Lezama Pach SMB CHECKOUT/8060  8060 J.Bargar      8060 J.Bargar     
5340 P.Kennepohl   5340 P.Kennepohl   5111 J.Lezama Pach 5111 J.Lezama Pach 8060 J.Bargar      8060 J.Bargar      8060 J.Bargar     
BEAM   LINE 9-3  
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
5081 A.Deb         5081 A.Deb         5081 A.Deb         5314 K.Boye        5314 K.Boye        5393 C.Dewey       5393 C.Dewey      
5081 A.Deb         5081 A.Deb         SMB CHECKOUT/5314  5314 K.Boye        SMB CHECKOUT/5393  5393 C.Dewey       5393 C.Dewey      
5081 A.Deb         5081 A.Deb         5314 K.Boye        5314 K.Boye        5393 C.Dewey       5393 C.Dewey       5393 C.Dewey      
BEAM   LINE 10-2 
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
4907 D.Gamzina     4907 D.Gamzina     FACI               4934 H.Steinrueck  4934 H.Steinrueck  4934 H.Steinrueck  4934 H.Steinrueck 
4907 D.Gamzina     FACI               Xray CHECKOUT/4934 4934 H.Steinrueck  4934 H.Steinrueck  4934 H.Steinrueck  4934 H.Steinrueck 
4907 D.Gamzina     FACI               4934 H.Steinrueck  4934 H.Steinrueck  4934 H.Steinrueck  4934 H.Steinrueck  4934 H.Steinrueck 
BEAM   LINE 11-2 
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
5101 R.Davis       5101 R.Davis       5101 R.Davis       5387 R.Bell        5387 R.Bell        5140 X.Zheng       5140 X.Zheng      
5101 R.Davis       5101 R.Davis       SMB CHECKOUT/5387  5387 R.Bell        SMB CHECKOUT/5140  5140 X.Zheng       5140 X.Zheng      
5101 R.Davis       5101 R.Davis       5387 R.Bell        5387 R.Bell        5140 X.Zheng       5140 X.Zheng       5140 X.Zheng      
BEAM   LINE 11-3 
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
8095 K.Stone       8095 K.Stone       5060 K.Bagchi      5060 K.Bagchi      5473 C.Cendra Guin 5295 Y.Wu          5295 Y.Wu         
8095 K.Stone       Xray CHECKOUT/5060 5060 K.Bagchi      Xray CHECKOUT/5473 Xray CHECKOUT/5295 5295 Y.Wu          5295 Y.Wu         
8095 K.Stone       5060 K.Bagchi      5060 K.Bagchi      5473 C.Cendra Guin 5295 Y.Wu          5295 Y.Wu          5295 Y.Wu         
BEAM   LINE 14-3 
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
4664 A.Landers     4664 A.Landers     5256 A.Cordones-Ha 5256 A.Cordones-Ha 5256 A.Cordones-Ha 5243 Y.Arai        5243 Y.Arai       
4664 A.Landers     SMB CHECKOUT/5256  5256 A.Cordones-Ha 5256 A.Cordones-Ha XAS/5243           5243 Y.Arai        5243 Y.Arai       
4664 A.Landers     5256 A.Cordones-Ha 5256 A.Cordones-Ha 5256 A.Cordones-Ha 5243 Y.Arai        5243 Y.Arai        5243 Y.Arai       
BEAM   LINE 15-2 
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Feb. 17, 2020      Feb. 18, 2020      Feb. 19, 2020      Feb. 20, 2020      Feb. 21, 2020      Feb. 22, 2020      Feb. 23, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Feb. 24, 2020
                                         
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
BEAM   LINE 1-5  
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
5358 S.Lee/AP      AP                 AP                 FACI               FACI               Unscheduled        Unscheduled       
AP                 AP                 FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
5410 S.Blair/AP    AP                 AP                 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
AP                 AP                 Xray CHECKOUT/8895 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
AP                 AP                 8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone       8895 K.Stone      
BEAM   LINE 2-2  
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
5349 J.Timose/AP   AP                 AP                 5349 J.Timosenko   5349 J.Timosenko   5349 J.Timosenko   5154 G.Canning    
AP                 AP                 5349 J.Timosenko   5349 J.Timosenko   5349 J.Timosenko   CHANGE/5154 G.Cann 5154 G.Canning    
AP                 AP                 5349 J.Timosenko   5349 J.Timosenko   5349 J.Timosenko   5154 G.Canning     5154 G.Canning    
BEAM   LINE 2-3  
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
5250 D.Paktun/AP   AP                 AP                 5163 S.Tian        5200 Y.Liu         4778 J.Bargar      4778 J.Bargar     
AP                 AP                 CHANGE/5163 S.Tian CHANGE/5200 Y.Liu  CHANGE/4778 J.Barg 4778 J.Bargar      4778 J.Bargar     
AP                 AP                 5163 S.Tian        5200 Y.Liu         4778 J.Bargar      4778 J.Bargar      4778 J.Bargar     
BEAM   LINE 4-1  
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
5088 L.Greenl/AP   AP                 AP                 4752 C.Van Genucht 4752 C.Van Genucht 5550 S.Zaccarine   5550 S.Zaccarine  
AP                 AP                 SMB CHECKOUT/4752  4752 C.Van Genucht SMB CHECKOUT/5550  5550 S.Zaccarine   5550 S.Zaccarine  
AP                 AP                 4752 C.Van Genucht 4752 C.Van Genucht 5550 S.Zaccarine   5550 S.Zaccarine   5550 S.Zaccarine  
BEAM   LINE 4-2  
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
8047 T.Weiss/AP    AP                 AP                 8877 T.Matsui      11D8 D.Cogan       8847 T.Weiss       8047 T.Weiss      
AP                 AP                 CHANGE/8877 T.Mats CHANGE/11D8 D.Coga CHANGE/8847 T.Weis CHANGE/8047 T.Weis CHANGE/8897 I.Rajk
AP                 AP                 8877 T.Matsui      11D8 D.Cogan       8847 T.Weiss       8047 T.Weiss       8897 I.Rajkovic   
BEAM   LINE 4-3  
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
5367 W.Wan/AP      AP                 AP                 FACI               FACI               8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 FACI               FACI               SMB CHECKOUT/8092  8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 FACI               FACI               8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 6-2  
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
4771 G.George/AP   AP                 AP                 4875 A.Dawson      4875 A.Dawson      5369 C.Tan         5369 C.Tan        
AP                 AP                 Xray>TXM/4875      4875 A.Dawson      CHANGE/5369 C.Tan  5369 C.Tan         5369 C.Tan        
AP                 AP                 4875 A.Dawson      4875 A.Dawson      5369 C.Tan         5369 C.Tan         5369 C.Tan        
BEAM   LINE 7-3  
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
8060 J.Bargar/AP   AP                 AP                 4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski 
AP                 AP                 SMB CHECKOUT/4900  4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski 
AP                 AP                 4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski  4900 A.Jasniewski 
BEAM   LINE 9-3  
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
5393 C.Dewey/AP    AP                 AP                 5393 C.Dewey       5078 S.Sarker      5078 S.Sarker      5078 S.Sarker     
AP                 AP                 5393 C.Dewey       SMB CHECKOUT/5078  5078 S.Sarker      5078 S.Sarker      5078 S.Sarker     
AP                 AP                 5393 C.Dewey       5078 S.Sarker      5078 S.Sarker      5078 S.Sarker      5078 S.Sarker     
BEAM   LINE 10-2 
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
4934 H.Steinr/AP   AP                 AP                 5300 G.Wan         5300 G.Wan         5458 C.Takacs      5458 C.Takacs     
AP                 AP                 Xray CHECKOUT/5300 5300 G.Wan         Xray CHECKOUT/5458 5458 C.Takacs      5458 C.Takacs     
AP                 AP                 5300 G.Wan         5300 G.Wan         5458 C.Takacs      5458 C.Takacs      5458 C.Takacs     
BEAM   LINE 11-2 
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
5140 X.Zheng/AP    AP                 AP                 FACI               5421 A.Dadlani     5421 A.Dadlani     5421 A.Dadlani    
AP                 AP                 FACI               SMB CHECKOUT/5421  5421 A.Dadlani     5421 A.Dadlani     5421 A.Dadlani    
AP                 AP                 FACI               5421 A.Dadlani     5421 A.Dadlani     5421 A.Dadlani     5421 A.Dadlani    
BEAM   LINE 11-3 
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
5295 Y.Wu/AP       AP                 AP                 4854 E.Ratcliff    4854 E.Ratcliff    5581 M.Abdelsamie  5581 M.Abdelsamie 
AP                 AP                 Xray CHECKOUT/4854 4854 E.Ratcliff    Xray CHECKOUT/5581 5581 M.Abdelsamie  5581 M.Abdelsamie 
AP                 AP                 4854 E.Ratcliff    4854 E.Ratcliff    5581 M.Abdelsamie  5581 M.Abdelsamie  5581 M.Abdelsamie 
BEAM   LINE 14-3 
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
5243 Y.Arai/AP     AP                 AP                 8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
AP                 AP                 CHANGE/8867 S.Webb 8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
AP                 AP                 8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb        8867 S.Webb       
BEAM   LINE 15-2 
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Feb. 24, 2020      Feb. 25, 2020      Feb. 26, 2020      Feb. 27, 2020      Feb. 28, 2020      Feb. 29, 2020      Mar. 01, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Mar. 02, 2020
                                         
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
BEAM   LINE 1-5  
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
Unscheduled        5446 Y.Wang        5446 Y.Wang        5446 Y.Wang        FACI               5330 N.Strange     5330 N.Strange    
Xray CHECKOUT/5446 5446 Y.Wang        5446 Y.Wang        FACI               Xray CHECKOUT/5330 5330 N.Strange     5330 N.Strange    
5446 Y.Wang        5446 Y.Wang        5446 Y.Wang        FACI               5330 N.Strange     5330 N.Strange     5330 N.Strange    
BEAM   LINE 2-1  
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
8895 K.Stone       5253 H.Wu          5253 H.Wu          5464 L.Schelhas    5464 L.Schelhas    5464 L.Schelhas    5464 L.Schelhas   
Xray CHECKOUT/5253 5253 H.Wu          Xray CHECKOUT/5464 5464 L.Schelhas    5464 L.Schelhas    5464 L.Schelhas    5464 L.Schelhas   
5253 H.Wu          5253 H.Wu          5464 L.Schelhas    5464 L.Schelhas    5464 L.Schelhas    5464 L.Schelhas    5464 L.Schelhas   
BEAM   LINE 2-2  
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
5154 G.Canning     5154 G.Canning     5351 M.Doeff       5351 M.Doeff       5217 S.Conradson   5217 S.Conradson   5217 S.Conradson  
5154 G.Canning     SMB CHECKOUT/5351  5351 M.Doeff       SMB CHECKOUT/5217  5217 S.Conradson   5217 S.Conradson   5217 S.Conradson  
5154 G.Canning     5351 M.Doeff       5351 M.Doeff       5217 S.Conradson   5217 S.Conradson   5217 S.Conradson   5217 S.Conradson  
BEAM   LINE 2-3  
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
4778 J.Bargar      5490 R.Wogelius    5490 R.Wogelius    8015 A.Mehta       8015 A.Mehta       8081 Y.Liu         8081 Y.Liu        
CHANGE/5490 R.Woge 5490 R.Wogelius    CHANGE/8015 A.Meht 8015 A.Mehta       CHANGE/8081 Y.Liu  8081 Y.Liu         8081 Y.Liu        
5490 R.Wogelius    5490 R.Wogelius    8015 A.Mehta       8015 A.Mehta       8081 Y.Liu         8081 Y.Liu         8081 Y.Liu        
BEAM   LINE 4-1  
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
5550 S.Zaccarine   4889 F.Juillot     4889 F.Juillot     5481 F.Bridges     5481 F.Bridges     5176 A.Garcia-Espa 5176 A.Garcia-Espa
SMB CHECKOUT/4889  4889 F.Juillot     SMB CHECKOUT/5481  5481 F.Bridges     SMB CHECKOUT/5176  5176 A.Garcia-Espa 5176 A.Garcia-Espa
4889 F.Juillot     4889 F.Juillot     5481 F.Bridges     5481 F.Bridges     5176 A.Garcia-Espa 5176 A.Garcia-Espa 5176 A.Garcia-Espa
BEAM   LINE 4-2  
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
8897 I.Rajkovic    8897 I.Rajkovic    8897 I.Rajkovic    11D7 J.Lopez-Garri 11D3 C.Vorauer     11D3 C.Vorauer     5253 H.Wu         
8897 I.Rajkovic    8897 I.Rajkovic    CHANGE/11D7 J.Lope CHANGE/11D3 C.Vora 11D3 C.Vorauer     CHANGE/5253 H.Wu   5253 H.Wu         
8897 I.Rajkovic    8897 I.Rajkovic    11D7 J.Lopez-Garri 11D3 C.Vorauer     11D3 C.Vorauer     5253 H.Wu          5253 H.Wu         
BEAM   LINE 4-3  
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
8092 D.Sokaras     8092 D.Sokaras     4889 F.Juillot     4889 F.Juillot     5445 G.George      5445 G.George      5445 G.George     
8092 D.Sokaras     SMB CHECKOUT/4889  4889 F.Juillot     SMB CHECKOUT/5445  5445 G.George      5445 G.George      5445 G.George     
8092 D.Sokaras     4889 F.Juillot     4889 F.Juillot     5445 G.George      5445 G.George      5445 G.George      5445 G.George     
BEAM   LINE 6-2  
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
5369 C.Tan         5493 Y.Liu         5493 Y.Liu         4974 Y.Liu         4974 Y.Liu         4977 M.Doeff       4977 M.Doeff      
CHANGE/5493 Y.Liu  5493 Y.Liu         CHANGE/4974 Y.Liu  4974 Y.Liu         CHANGE/4977 M.Doef 4977 M.Doeff       4977 M.Doeff      
5493 Y.Liu         5493 Y.Liu         4974 Y.Liu         4974 Y.Liu         4977 M.Doeff       4977 M.Doeff       4977 M.Doeff      
BEAM   LINE 7-3  
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
4900 A.Jasniewski  11B8 S.Stieber     11B8 S.Stieber     4771 G.George      4771 G.George      4771 G.George      4771 G.George     
SMB CHECKOUT/11B8  11B8 S.Stieber     SMB CHECKOUT/4771  4771 G.George      4771 G.George      4771 G.George      4771 G.George     
11B8 S.Stieber     11B8 S.Stieber     4771 G.George      4771 G.George      4771 G.George      4771 G.George      4771 G.George     
BEAM   LINE 9-3  
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
5078 S.Sarker      5256 A.Cordones-Ha 5256 A.Cordones-Ha 8099 S.Bare        92H8 M.Greaney     92H8 M.Greaney     8099 S.Bare       
SMB CHECKOUT/5256  5256 A.Cordones-Ha SMB CHECKOUT/8099  SMB CHECKOUT/92H8  92H8 M.Greaney     CHANGE/8099 S.Bare 8099 S.Bare       
5256 A.Cordones-Ha 5256 A.Cordones-Ha 8099 S.Bare        92H8 M.Greaney     92H8 M.Greaney     8099 S.Bare        8099 S.Bare       
BEAM   LINE 10-2 
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
5458 C.Takacs      5458 C.Takacs      8867 S.Webb        8867 S.Webb        8060 J.Bargar      8060 J.Bargar      8060 J.Bargar     
5458 C.Takacs      Xray CHECKOUT/8867 8867 S.Webb        CHANGE/8060 J.Barg 8060 J.Bargar      8060 J.Bargar      8060 J.Bargar     
5458 C.Takacs      8867 S.Webb        8867 S.Webb        8060 J.Bargar      8060 J.Bargar      8060 J.Bargar      8060 J.Bargar     
BEAM   LINE 11-2 
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
5421 A.Dadlani     5307 J.Penner-Hahn 5307 J.Penner-Hahn 5362 J.Penner-Hahn 5362 J.Penner-Hahn 5362 J.Penner-Hahn 5362 J.Penner-Hahn
SMB CHECKOUT/5307  5307 J.Penner-Hahn SMB CHECKOUT/5362  5362 J.Penner-Hahn 5362 J.Penner-Hahn 5362 J.Penner-Hahn 5362 J.Penner-Hahn
5307 J.Penner-Hahn 5307 J.Penner-Hahn 5362 J.Penner-Hahn 5362 J.Penner-Hahn 5362 J.Penner-Hahn 5362 J.Penner-Hahn 5362 J.Penner-Hahn
BEAM   LINE 11-3 
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
5581 M.Abdelsamie  11B4 S.Heutz       11B4 S.Heutz       5231 P.Thornton    Unscheduled        5320 H.Steinrueck  5320 H.Steinrueck 
Xray CHECKOUT/11B4 11B4 S.Heutz       Xray CHECKOUT/5231 Unscheduled        Xray CHECKOUT/5320 5320 H.Steinrueck  5320 H.Steinrueck 
11B4 S.Heutz       11B4 S.Heutz       5231 P.Thornton    Unscheduled        5320 H.Steinrueck  5320 H.Steinrueck  5320 H.Steinrueck 
BEAM   LINE 14-3 
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
8867 S.Webb        8067 S.Webb        8067 S.Webb        8067 S.Webb        4885 M.Raven       5359 M.Raven       5359 M.Raven      
CHANGE/8067 S.Webb 8067 S.Webb        8067 S.Webb        CHANGE/4885 M.Rave CHANGE/5359 M.Rave 5359 M.Raven       5359 M.Raven      
8067 S.Webb        8067 S.Webb        8067 S.Webb        4885 M.Raven       5359 M.Raven       5359 M.Raven       5359 M.Raven      
BEAM   LINE 15-2 
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Mar. 02, 2020      Mar. 03, 2020      Mar. 04, 2020      Mar. 05, 2020      Mar. 06, 2020      Mar. 07, 2020      Mar. 08, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Mar. 09, 2020
                                         
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
BEAM   LINE 1-5  
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
5330 N.Strang/AP   AP                 AP                 FACI               8818 A.Mehta       8818 A.Mehta       8015 A.Mehta      
AP                 AP                 FACI               CHANGE/8818 A.Meht 8818 A.Mehta       CHANGE/8015 A.Meht 8015 A.Mehta      
AP                 AP                 FACI               8818 A.Mehta       8818 A.Mehta       8015 A.Mehta       8015 A.Mehta      
BEAM   LINE 2-1  
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
5464 L.Schelh/AP   AP                 AP                 FACI               5510 I.Abate       5510 I.Abate       5510 I.Abate      
AP                 AP                 FACI               Xray CHECKOUT/5510 5510 I.Abate       5510 I.Abate       5510 I.Abate      
AP                 AP                 FACI               5510 I.Abate       5510 I.Abate       5510 I.Abate       5510 I.Abate      
BEAM   LINE 2-2  
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
5217 S.Conrad/AP   AP                 AP                 FACI               5216 C.Takacs      5216 C.Takacs      5216 C.Takacs     
AP                 AP                 FACI               SMB CHECKOUT/5216  5216 C.Takacs      5216 C.Takacs      5216 C.Takacs     
AP                 AP                 FACI               5216 C.Takacs      5216 C.Takacs      5216 C.Takacs      5216 C.Takacs     
BEAM   LINE 2-3  
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
8081 Y.Liu/AP      AP                 AP                 5375 M.Besli       5375 M.Besli       5117 W.Fischer     5117 W.Fischer    
AP                 AP                 CHANGE/5375 M.Besl 5375 M.Besli       CHANGE/5117 W.Fisc 5117 W.Fischer     5117 W.Fischer    
AP                 AP                 5375 M.Besli       5375 M.Besli       5117 W.Fischer     5117 W.Fischer     5117 W.Fischer    
BEAM   LINE 4-1  
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
5176 A.Garcia/AP   AP                 AP                 5559 A.Pugmire     5559 A.Pugmire     5581 M.Abdelsamie  5581 M.Abdelsamie 
AP                 AP                 SMB CHECKOUT/5559  5559 A.Pugmire     SMB CHECKOUT/5581  5581 M.Abdelsamie  5581 M.Abdelsamie 
AP                 AP                 5559 A.Pugmire     5559 A.Pugmire     5581 M.Abdelsamie  5581 M.Abdelsamie  5581 M.Abdelsamie 
BEAM   LINE 4-2  
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
5253 H.Wu/AP       AP                 AP                 8877 T.Matsui      Unscheduled        5195 J.De Mel      8047 T.Weiss      
AP                 AP                 CHANGE/8877 T.Mats Unscheduled        CHANGE/5195 J.De M CHANGE/8047 T.Weis 8047 T.Weiss      
AP                 AP                 8877 T.Matsui      Unscheduled        5195 J.De Mel      8047 T.Weiss       8047 T.Weiss      
BEAM   LINE 4-3  
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
5445 G.George/AP   AP                 AP                 5442 J.Velazquez   5442 J.Velazquez   5176 A.Garcia-Espa 5176 A.Garcia-Espa
AP                 AP                 SMB CHECKOUT/5442  5442 J.Velazquez   SMB CHECKOUT/5176  5176 A.Garcia-Espa 5176 A.Garcia-Espa
AP                 AP                 5442 J.Velazquez   5442 J.Velazquez   5176 A.Garcia-Espa 5176 A.Garcia-Espa 5176 A.Garcia-Espa
BEAM   LINE 6-2  
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
4977 M.Doeff/AP    AP                 AP                 5104 A.Karim       5104 A.Karim       5302 L.Li          5302 L.Li         
AP                 AP                 Xray>XES/5104      5104 A.Karim       CHANGE/5302 L.Li   5302 L.Li          5302 L.Li         
AP                 AP                 5104 A.Karim       5104 A.Karim       5302 L.Li          5302 L.Li          5302 L.Li         
BEAM   LINE 7-3  
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
4771 G.George/AP   AP                 AP                 FACI               5053 R.Sarangi     5053 R.Sarangi     5053 R.Sarangi    
AP                 AP                 FACI               SMB CHECKOUT/5053  5053 R.Sarangi     5053 R.Sarangi     5053 R.Sarangi    
AP                 AP                 FACI               5053 R.Sarangi     5053 R.Sarangi     5053 R.Sarangi     5053 R.Sarangi    
BEAM   LINE 9-3  
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
8099 S.Bare/AP     AP                 AP                 FACI               8099 S.Bare        8099 S.Bare        8099 S.Bare       
AP                 AP                 FACI               CHANGE/8099 S.Bare 8099 S.Bare        8099 S.Bare        8099 S.Bare       
AP                 AP                 FACI               8099 S.Bare        8099 S.Bare        8099 S.Bare        8099 S.Bare       
BEAM   LINE 10-2 
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
8060 J.Bargar/AP   AP                 AP                 5325 S.Saslow      5325 S.Saslow      5325 S.Saslow      5325 S.Saslow     
AP                 AP                 CHANGE/5325 S.Sasl 5325 S.Saslow      5325 S.Saslow      5325 S.Saslow      5325 S.Saslow     
AP                 AP                 5325 S.Saslow      5325 S.Saslow      5325 S.Saslow      5325 S.Saslow      5325 S.Saslow     
BEAM   LINE 11-2 
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
5362 J.Penner/AP   AP                 AP                 5040 H.Xu          5040 H.Xu          Unscheduled        Unscheduled       
AP                 AP                 SMB CHECKOUT/5040  5040 H.Xu          SMB CHECKOUT/5382  Unscheduled        Unscheduled       
AP                 AP                 5040 H.Xu          5040 H.Xu          Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-3 
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
5320 H.Steinr/AP   AP                 AP                 5291 Y.Zheng       5291 Y.Zheng       5271 S.Nikzad      5271 S.Nikzad     
AP                 AP                 Xray CHECKOUT/5291 5291 Y.Zheng       Xray CHECKOUT/5271 5271 S.Nikzad      5271 S.Nikzad     
AP                 AP                 5291 Y.Zheng       5291 Y.Zheng       5271 S.Nikzad      5271 S.Nikzad      5271 S.Nikzad     
BEAM   LINE 14-3 
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
5359 M.Raven/AP    AP                 AP                 5325 S.Saslow      5325 S.Saslow      5117 W.Fischer     5117 W.Fischer    
AP                 AP                 CHANGE/5325 S.Sasl 5325 S.Saslow      CHANGE/5117 W.Fisc 5117 W.Fischer     5117 W.Fischer    
AP                 AP                 5325 S.Saslow      5325 S.Saslow      5117 W.Fischer     5117 W.Fischer     5117 W.Fischer    
BEAM   LINE 15-2 
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 17-2 
Mar. 09, 2020      Mar. 10, 2020      Mar. 11, 2020      Mar. 12, 2020      Mar. 13, 2020      Mar. 14, 2020      Mar. 15, 2020     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Mar. 16, 2020
                                         
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
BEAM   LINE 1-5  
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
8015 A.Mehta       DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
5510 I.Abate       DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
5216 C.Takacs      DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
5117 W.Fischer     DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
5581 M.Abdelsamie  DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
5581 M.Abdels/DOWN DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
8047 T.Weiss       Unscheduled        Unscheduled        RA                 RA                 RA                 Unscheduled       
Unscheduled        Unscheduled        RA                 RA                 RA                 Unscheduled        Unscheduled       
Unscheduled        Unscheduled        RA                 RA                 RA                 Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
5176 A.Garcia-Espa DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
5302 L.Li          DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
5053 R.Sarangi     DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
8099 S.Bare        DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
5325 S.Saslow      DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
Unscheduled        DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
5271 S.Nikzad      DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
5117 W.Fischer     DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
Unscheduled        DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Mar. 16, 2020      Mar. 17, 2020      Mar. 18, 2020      Mar. 19, 2020      Mar. 20, 2020      Mar. 21, 2020      Mar. 22, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Mar. 23, 2020
                                         
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
BEAM   LINE 1-5  
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Mar. 23, 2020      Mar. 24, 2020      Mar. 25, 2020      Mar. 26, 2020      Mar. 27, 2020      Mar. 28, 2020      Mar. 29, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Mar. 30, 2020
                                         
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
BEAM   LINE 1-5  
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
Unscheduled        8897 I.Rajkovic    8897 I.Rajkovic    11E3 -.COVID-19    11E3 -.COVID-19    11E3 -.COVID-19    Unscheduled       
CHANGE/8897 I.Rajk 8897 I.Rajkovic    CHANGE/11E3 -.COVI 11E3 -.COVID-19    11E3 -.COVID-19    Unscheduled        Unscheduled       
8897 I.Rajkovic    8897 I.Rajkovic    11E3 -.COVID-19    11E3 -.COVID-19    11E3 -.COVID-19    Unscheduled        Unscheduled       
BEAM   LINE 4-3  
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Mar. 30, 2020      Mar. 31, 2020      Apr. 01, 2020      Apr. 02, 2020      Apr. 03, 2020      Apr. 04, 2020      Apr. 05, 2020     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Apr. 06, 2020
                                         
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
BEAM   LINE 1-5  
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 06, 2020      Apr. 07, 2020      Apr. 08, 2020      Apr. 09, 2020      Apr. 10, 2020      Apr. 11, 2020      Apr. 12, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 13, 2020
                                         
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
BEAM   LINE 1-5  
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN              
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               92I5 H.Lee         92I5 H.Lee         Unscheduled        DOWN              
DOWN               DOWN               CHANGE/92I5 H.Lee  92I5 H.Lee         92I5 H.Lee         Unscheduled        DOWN              
DOWN               DOWN               92I5 H.Lee         92I5 H.Lee         92I5 H.Lee         DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 13, 2020      Apr. 14, 2020      Apr. 15, 2020      Apr. 16, 2020      Apr. 17, 2020      Apr. 18, 2020      Apr. 19, 2020     
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN              
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 20, 2020
                                         
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
BEAM   LINE 1-5  
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               Unscheduled        Unscheduled        8877 T.Matsui      8877 T.Matsui      DOWN               DOWN              
Unscheduled        Unscheduled        CHANGE/8877 T.Mats 8877 T.Matsui      8877 T.Matsui      DOWN               DOWN              
Unscheduled        Unscheduled        8877 T.Matsui      8877 T.Matsui      8877 T.Matsui/DOWN DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 20, 2020      Apr. 21, 2020      Apr. 22, 2020      Apr. 23, 2020      Apr. 24, 2020      Apr. 25, 2020      Apr. 26, 2020     
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 27, 2020
                                         
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
BEAM   LINE 1-5  
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
Apr. 27, 2020      Apr. 28, 2020      Apr. 29, 2020      Apr. 30, 2020      May 01, 2020       May 02, 2020       May 03, 2020      
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF May 04, 2020 
                                         
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
BEAM   LINE 1-5  
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               11E4 -.COVID-19    11E4 -.COVID-19    Unscheduled        Unscheduled        DOWN               DOWN              
CHANGE/11E4 -.COVI 11E4 -.COVID-19    Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
11E4 -.COVID-19    11E4 -.COVID-19    Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
May 04, 2020       May 05, 2020       May 06, 2020       May 07, 2020       May 08, 2020       May 09, 2020       May 10, 2020      
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF May 11, 2020 
                                         
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
BEAM   LINE 1-5  
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               Unscheduled        Unscheduled        8877 T.Matsui      Unscheduled        DOWN               DOWN              
DOWN               Unscheduled        CHANGE/8877 T.Mats Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        8877 T.Matsui      Unscheduled        DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 15-2 
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 17-2 
May 11, 2020       May 12, 2020       May 13, 2020       May 14, 2020       May 15, 2020       May 16, 2020       May 17, 2020      
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN