| WEEK OF Oct. 11, 2021 | ||||||
| Oct. 11, 2021 | Oct. 12, 2021 | Oct. 13, 2021 | Oct. 14, 2021 | Oct. 15, 2021 | Oct. 16, 2021 | Oct. 17, 2021 |
| BEAM LINE 5-4 | ||||||
| Oct. 11, 2021 | Oct. 12, 2021 | Oct. 13, 2021 | Oct. 14, 2021 | Oct. 15, 2021 | Oct. 16, 2021 | Oct. 17, 2021 |
| DOWN | DOWN | DOWN | DOWN | STUP | STUP | STUP |
| DOWN | DOWN | DOWN | STUP | STUP | STUP | STUP |
| DOWN | DOWN | DOWN | STUP | STUP | STUP | STUP |
| BEAM LINE 8-2 | ||||||
| Oct. 11, 2021 | Oct. 12, 2021 | Oct. 13, 2021 | Oct. 14, 2021 | Oct. 15, 2021 | Oct. 16, 2021 | Oct. 17, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Oct. 11, 2021 | Oct. 12, 2021 | Oct. 13, 2021 | Oct. 14, 2021 | Oct. 15, 2021 | Oct. 16, 2021 | Oct. 17, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Oct. 11, 2021 | Oct. 12, 2021 | Oct. 13, 2021 | Oct. 14, 2021 | Oct. 15, 2021 | Oct. 16, 2021 | Oct. 17, 2021 |
| DOWN | DOWN | DOWN | DOWN | Unscheduled | Unscheduled | FACI |
| DOWN | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | FACI |
| DOWN | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | FACI |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Oct. 11, 2021 | Oct. 12, 2021 | Oct. 13, 2021 | Oct. 14, 2021 | Oct. 15, 2021 | Oct. 16, 2021 | Oct. 17, 2021 |
| DOWN | DOWN | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled |
| DOWN | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | FACI |
| DOWN | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled | FACI |
| BEAM LINE 16-2 | ||||||
| Oct. 11, 2021 | Oct. 12, 2021 | Oct. 13, 2021 | Oct. 14, 2021 | Oct. 15, 2021 | Oct. 16, 2021 | Oct. 17, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Oct. 18, 2021 | ||||||
| Oct. 18, 2021 | Oct. 19, 2021 | Oct. 20, 2021 | Oct. 21, 2021 | Oct. 22, 2021 | Oct. 23, 2021 | Oct. 24, 2021 |
| BEAM LINE 5-4 | ||||||
| Oct. 18, 2021 | Oct. 19, 2021 | Oct. 20, 2021 | Oct. 21, 2021 | Oct. 22, 2021 | Oct. 23, 2021 | Oct. 24, 2021 |
| STUP | STUP | STUP | STUP | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu |
| STUP | STUP | STUP | VUV CHECKOUT | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu |
| STUP | STUP | STUP | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu |
| BEAM LINE 8-2 | ||||||
| Oct. 18, 2021 | Oct. 19, 2021 | Oct. 20, 2021 | Oct. 21, 2021 | Oct. 22, 2021 | Oct. 23, 2021 | Oct. 24, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Oct. 18, 2021 | Oct. 19, 2021 | Oct. 20, 2021 | Oct. 21, 2021 | Oct. 22, 2021 | Oct. 23, 2021 | Oct. 24, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Oct. 18, 2021 | Oct. 19, 2021 | Oct. 20, 2021 | Oct. 21, 2021 | Oct. 22, 2021 | Oct. 23, 2021 | Oct. 24, 2021 |
| FACI | FACI | FACI | FACI | FACI | FACI | FACI |
| FACI | FACI | FACI | FACI | FACI | FACI | FACI |
| FACI | FACI | FACI | FACI | FACI | FACI | FACI |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Oct. 18, 2021 | Oct. 19, 2021 | Oct. 20, 2021 | Oct. 21, 2021 | Oct. 22, 2021 | Oct. 23, 2021 | Oct. 24, 2021 |
| FACI | FACI | FACI | FACI | FACI | FACI | FACI |
| FACI | FACI | FACI | FACI | FACI | FACI | FACI |
| FACI | FACI | FACI | FACI | FACI | FACI | FACI |
| BEAM LINE 16-2 | ||||||
| Oct. 18, 2021 | Oct. 19, 2021 | Oct. 20, 2021 | Oct. 21, 2021 | Oct. 22, 2021 | Oct. 23, 2021 | Oct. 24, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Oct. 25, 2021 | ||||||
| Oct. 25, 2021 | Oct. 26, 2021 | Oct. 27, 2021 | Oct. 28, 2021 | Oct. 29, 2021 | Oct. 30, 2021 | Oct. 31, 2021 |
| BEAM LINE 5-4 | ||||||
| Oct. 25, 2021 | Oct. 26, 2021 | Oct. 27, 2021 | Oct. 28, 2021 | Oct. 29, 2021 | Oct. 30, 2021 | Oct. 31, 2021 |
| 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu |
| 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu |
| 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu | 8820 D.Lu |
| BEAM LINE 8-2 | ||||||
| Oct. 25, 2021 | Oct. 26, 2021 | Oct. 27, 2021 | Oct. 28, 2021 | Oct. 29, 2021 | Oct. 30, 2021 | Oct. 31, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Oct. 25, 2021 | Oct. 26, 2021 | Oct. 27, 2021 | Oct. 28, 2021 | Oct. 29, 2021 | Oct. 30, 2021 | Oct. 31, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Oct. 25, 2021 | Oct. 26, 2021 | Oct. 27, 2021 | Oct. 28, 2021 | Oct. 29, 2021 | Oct. 30, 2021 | Oct. 31, 2021 |
| FACI | FACI | FACI | FACI | FACI | FACI | FACI |
| FACI | FACI | FACI | FACI | FACI | FACI | FACI |
| FACI | FACI | FACI | FACI | FACI | FACI | FACI |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Oct. 25, 2021 | Oct. 26, 2021 | Oct. 27, 2021 | Oct. 28, 2021 | Oct. 29, 2021 | Oct. 30, 2021 | Oct. 31, 2021 |
| VUV CHECKOUT | 5741 H.Huang | 5741 H.Huang | 5741 H.Huang | 5741 H.Huang | Unscheduled | Unscheduled |
| 5741 H.Huang | 5741 H.Huang | 5741 H.Huang | 5741 H.Huang | Unscheduled | Unscheduled | Unscheduled |
| 5741 H.Huang | 5741 H.Huang | 5741 H.Huang | 5741 H.Huang | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 16-2 | ||||||
| Oct. 25, 2021 | Oct. 26, 2021 | Oct. 27, 2021 | Oct. 28, 2021 | Oct. 29, 2021 | Oct. 30, 2021 | Oct. 31, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Nov. 01, 2021 | ||||||
| Nov. 01, 2021 | Nov. 02, 2021 | Nov. 03, 2021 | Nov. 04, 2021 | Nov. 05, 2021 | Nov. 06, 2021 | Nov. 07, 2021 |
| BEAM LINE 5-4 | ||||||
| Nov. 01, 2021 | Nov. 02, 2021 | Nov. 03, 2021 | Nov. 04, 2021 | Nov. 05, 2021 | Nov. 06, 2021 | Nov. 07, 2021 |
| 8820 D.Lu/AP | AP | AP | 8820 D.Lu | 5719 I.Vishik | 5719 I.Vishik | 8020 D.Lu |
| AP | AP | 8820 D.Lu | VUV CHECKOUT | 5719 I.Vishik | VUV CHECKOUT | 8020 D.Lu |
| AP | AP | 8820 D.Lu | 5719 I.Vishik | 5719 I.Vishik | 8020 D.Lu | 8020 D.Lu |
| BEAM LINE 8-2 | ||||||
| Nov. 01, 2021 | Nov. 02, 2021 | Nov. 03, 2021 | Nov. 04, 2021 | Nov. 05, 2021 | Nov. 06, 2021 | Nov. 07, 2021 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Nov. 01, 2021 | Nov. 02, 2021 | Nov. 03, 2021 | Nov. 04, 2021 | Nov. 05, 2021 | Nov. 06, 2021 | Nov. 07, 2021 |
| DOWN/AP | AP | AP | 5483 O.Monti | 5483 O.Monti | 5483 O.Monti | 5483 O.Monti |
| AP | AP | VUV CHECKOUT | 5483 O.Monti | 5483 O.Monti | 5483 O.Monti | 5483 O.Monti |
| AP | AP | 5483 O.Monti | 5483 O.Monti | 5483 O.Monti | 5483 O.Monti | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Nov. 01, 2021 | Nov. 02, 2021 | Nov. 03, 2021 | Nov. 04, 2021 | Nov. 05, 2021 | Nov. 06, 2021 | Nov. 07, 2021 |
| FACI/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Nov. 01, 2021 | Nov. 02, 2021 | Nov. 03, 2021 | Nov. 04, 2021 | Nov. 05, 2021 | Nov. 06, 2021 | Nov. 07, 2021 |
| AP | AP | AP | 5615 J.Ravichandra | VUV CHECKOUT | 5897 G.Qian | 5897 G.Qian |
| AP | AP | 5615 J.Ravichandra | 5615 J.Ravichandra | 5897 G.Qian | 5897 G.Qian | Unscheduled |
| AP | AP | 5615 J.Ravichandra | 5615 J.Ravichandra | 5897 G.Qian | 5897 G.Qian | Unscheduled |
| BEAM LINE 16-2 | ||||||
| Nov. 01, 2021 | Nov. 02, 2021 | Nov. 03, 2021 | Nov. 04, 2021 | Nov. 05, 2021 | Nov. 06, 2021 | Nov. 07, 2021 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Nov. 08, 2021 | ||||||
| Nov. 08, 2021 | Nov. 09, 2021 | Nov. 10, 2021 | Nov. 11, 2021 | Nov. 12, 2021 | Nov. 13, 2021 | Nov. 14, 2021 |
| BEAM LINE 5-4 | ||||||
| Nov. 08, 2021 | Nov. 09, 2021 | Nov. 10, 2021 | Nov. 11, 2021 | Nov. 12, 2021 | Nov. 13, 2021 | Nov. 14, 2021 |
| 8020 D.Lu | 5465 T.Kondo | 5465 T.Kondo | 5532 D.Dessau | 5532 D.Dessau | 5805 Y.He | 5805 Y.He |
| VUV CHECKOUT | 5465 T.Kondo | VUV CHECKOUT | 5532 D.Dessau | VUV CHECKOUT | 5805 Y.He | 5805 Y.He |
| 5465 T.Kondo | 5465 T.Kondo | 5532 D.Dessau | 5532 D.Dessau | 5805 Y.He | 5805 Y.He | 5805 Y.He |
| BEAM LINE 8-2 | ||||||
| Nov. 08, 2021 | Nov. 09, 2021 | Nov. 10, 2021 | Nov. 11, 2021 | Nov. 12, 2021 | Nov. 13, 2021 | Nov. 14, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Nov. 08, 2021 | Nov. 09, 2021 | Nov. 10, 2021 | Nov. 11, 2021 | Nov. 12, 2021 | Nov. 13, 2021 | Nov. 14, 2021 |
| Unscheduled | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee |
| VUV CHECKOUT | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee | VUV CHECKOUT |
| 5863 J.Lee | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee | 8902 S.Lee |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Nov. 08, 2021 | Nov. 09, 2021 | Nov. 10, 2021 | Nov. 11, 2021 | Nov. 12, 2021 | Nov. 13, 2021 | Nov. 14, 2021 |
| Unscheduled | Unscheduled | STUP | VUV CHECKOUT | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski |
| Unscheduled | Unscheduled | STUP | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski |
| Unscheduled | Unscheduled | STUP | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Nov. 08, 2021 | Nov. 09, 2021 | Nov. 10, 2021 | Nov. 11, 2021 | Nov. 12, 2021 | Nov. 13, 2021 | Nov. 14, 2021 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 16-2 | ||||||
| Nov. 08, 2021 | Nov. 09, 2021 | Nov. 10, 2021 | Nov. 11, 2021 | Nov. 12, 2021 | Nov. 13, 2021 | Nov. 14, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Nov. 15, 2021 | ||||||
| Nov. 15, 2021 | Nov. 16, 2021 | Nov. 17, 2021 | Nov. 18, 2021 | Nov. 19, 2021 | Nov. 20, 2021 | Nov. 21, 2021 |
| BEAM LINE 5-4 | ||||||
| Nov. 15, 2021 | Nov. 16, 2021 | Nov. 17, 2021 | Nov. 18, 2021 | Nov. 19, 2021 | Nov. 20, 2021 | Nov. 21, 2021 |
| 5805 Y.He/AP | AP | AP | 8820 D.Lu | 5792 T.Cochran | 5792 T.Cochran | 9702 C.Simes |
| AP | AP | VUV CHECKOUT | VUV CHECKOUT | 5792 T.Cochran | VUV CHECKOUT | 9702 C.Simes |
| AP | AP | 8820 D.Lu | 5792 T.Cochran | 5792 T.Cochran | 9702 C.Simes | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Nov. 15, 2021 | Nov. 16, 2021 | Nov. 17, 2021 | Nov. 18, 2021 | Nov. 19, 2021 | Nov. 20, 2021 | Nov. 21, 2021 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Nov. 15, 2021 | Nov. 16, 2021 | Nov. 17, 2021 | Nov. 18, 2021 | Nov. 19, 2021 | Nov. 20, 2021 | Nov. 21, 2021 |
| 8902 S.Lee/AP | AP | AP | 8902 S.Lee | 8902 S.Lee | 8902 S.Lee | 8902 S.Lee |
| AP | AP | 8902 S.Lee | 8902 S.Lee | 8902 S.Lee | 8902 S.Lee | 8902 S.Lee |
| AP | AP | 8902 S.Lee | 8902 S.Lee | 8902 S.Lee | 8902 S.Lee | 8902 S.Lee |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Nov. 15, 2021 | Nov. 16, 2021 | Nov. 17, 2021 | Nov. 18, 2021 | Nov. 19, 2021 | Nov. 20, 2021 | Nov. 21, 2021 |
| 5767 A.Holewins/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Nov. 15, 2021 | Nov. 16, 2021 | Nov. 17, 2021 | Nov. 18, 2021 | Nov. 19, 2021 | Nov. 20, 2021 | Nov. 21, 2021 |
| AP | AP | AP | 5175 H.Jang | 5175 H.Jang | 5175 H.Jang | 5175 H.Jang/FACI |
| AP | AP | VUV CHECKOUT | 5175 H.Jang | 5175 H.Jang | 5175 H.Jang | FACI |
| AP | AP | 5175 H.Jang | 5175 H.Jang | 5175 H.Jang | 5175 H.Jang | FACI |
| BEAM LINE 16-2 | ||||||
| Nov. 15, 2021 | Nov. 16, 2021 | Nov. 17, 2021 | Nov. 18, 2021 | Nov. 19, 2021 | Nov. 20, 2021 | Nov. 21, 2021 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Nov. 22, 2021 | ||||||
| Nov. 22, 2021 | Nov. 23, 2021 | Nov. 24, 2021 | Nov. 25, 2021 | Nov. 26, 2021 | Nov. 27, 2021 | Nov. 28, 2021 |
| BEAM LINE 5-4 | ||||||
| Nov. 22, 2021 | Nov. 23, 2021 | Nov. 24, 2021 | Nov. 25, 2021 | Nov. 26, 2021 | Nov. 27, 2021 | Nov. 28, 2021 |
| 9702 C.Simes | 5921 J.Oh | 5921 J.Oh | DOWN | DOWN | 9702 C.Simes | 9702 C.Simes |
| VUV CHECKOUT | 5921 J.Oh | 5921 J.Oh | DOWN | DOWN | 9702 C.Simes | 9702 C.Simes |
| 5921 J.Oh | 5921 J.Oh | 5921 J.Oh/DOWN | DOWN | 9702 C.Simes | 9702 C.Simes | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Nov. 22, 2021 | Nov. 23, 2021 | Nov. 24, 2021 | Nov. 25, 2021 | Nov. 26, 2021 | Nov. 27, 2021 | Nov. 28, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Nov. 22, 2021 | Nov. 23, 2021 | Nov. 24, 2021 | Nov. 25, 2021 | Nov. 26, 2021 | Nov. 27, 2021 | Nov. 28, 2021 |
| 8902 S.Lee | 5903 W.Tong | 5903 W.Tong | DOWN | DOWN | 5903 W.Tong | 5903 W.Tong |
| VUV CHECKOUT | 5903 W.Tong | 5903 W.Tong | DOWN | DOWN | 5903 W.Tong | 5903 W.Tong |
| 5903 W.Tong | 5903 W.Tong | 5903 W.Tong/DOWN | DOWN | 5903 W.Tong | 5903 W.Tong | 5903 W.Tong |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Nov. 22, 2021 | Nov. 23, 2021 | Nov. 24, 2021 | Nov. 25, 2021 | Nov. 26, 2021 | Nov. 27, 2021 | Nov. 28, 2021 |
| Unscheduled | Unscheduled | FACI | DOWN | DOWN | FACI | FACI |
| Unscheduled | Unscheduled | FACI | DOWN | DOWN | FACI | Unscheduled |
| Unscheduled | Unscheduled | FACI/DOWN | DOWN | FACI | FACI | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Nov. 22, 2021 | Nov. 23, 2021 | Nov. 24, 2021 | Nov. 25, 2021 | Nov. 26, 2021 | Nov. 27, 2021 | Nov. 28, 2021 |
| FACI | FACI | FACI | DOWN | DOWN | FACI | FACI |
| FACI | FACI | FACI | DOWN | DOWN | FACI | Unscheduled |
| FACI | FACI | FACI/DOWN | DOWN | FACI | FACI | Unscheduled |
| BEAM LINE 16-2 | ||||||
| Nov. 22, 2021 | Nov. 23, 2021 | Nov. 24, 2021 | Nov. 25, 2021 | Nov. 26, 2021 | Nov. 27, 2021 | Nov. 28, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Nov. 29, 2021 | ||||||
| Nov. 29, 2021 | Nov. 30, 2021 | Dec. 01, 2021 | Dec. 02, 2021 | Dec. 03, 2021 | Dec. 04, 2021 | Dec. 05, 2021 |
| BEAM LINE 5-4 | ||||||
| Nov. 29, 2021 | Nov. 30, 2021 | Dec. 01, 2021 | Dec. 02, 2021 | Dec. 03, 2021 | Dec. 04, 2021 | Dec. 05, 2021 |
| 9702 C.Simes | 5353 J.He | 5353 J.He | 5066 G.Zong | 5066 G.Zong | 5066 G.Zong | 8020 D.Lu |
| VUV CHECKOUT | 5353 J.He | VUV CHECKOUT | 5066 G.Zong | 5066 G.Zong | VUV CHECKOUT | 8020 D.Lu |
| 5353 J.He | 5353 J.He | 5066 G.Zong | 5066 G.Zong | 5066 G.Zong | 8020 D.Lu | 8020 D.Lu |
| BEAM LINE 8-2 | ||||||
| Nov. 29, 2021 | Nov. 30, 2021 | Dec. 01, 2021 | Dec. 02, 2021 | Dec. 03, 2021 | Dec. 04, 2021 | Dec. 05, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Nov. 29, 2021 | Nov. 30, 2021 | Dec. 01, 2021 | Dec. 02, 2021 | Dec. 03, 2021 | Dec. 04, 2021 | Dec. 05, 2021 |
| 5903 W.Tong | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski |
| VUV CHECKOUT | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski |
| 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Nov. 29, 2021 | Nov. 30, 2021 | Dec. 01, 2021 | Dec. 02, 2021 | Dec. 03, 2021 | Dec. 04, 2021 | Dec. 05, 2021 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Nov. 29, 2021 | Nov. 30, 2021 | Dec. 01, 2021 | Dec. 02, 2021 | Dec. 03, 2021 | Dec. 04, 2021 | Dec. 05, 2021 |
| VUV CHECKOUT | 9711 D.Swetz | VUV CHECKOUT | VUV CHECKOUT | 9711 D.Swetz | VUV CHECKOUT | 5849 C.Kuo |
| 9711 D.Swetz | 9711 D.Swetz | 8880 J.Lee | 9711 D.Swetz | 9711 D.Swetz | 5849 C.Kuo | 5849 C.Kuo |
| 9711 D.Swetz | 9711 D.Swetz | 8880 J.Lee | 9711 D.Swetz | 9711 D.Swetz | 5849 C.Kuo | 5849 C.Kuo |
| BEAM LINE 16-2 | ||||||
| Nov. 29, 2021 | Nov. 30, 2021 | Dec. 01, 2021 | Dec. 02, 2021 | Dec. 03, 2021 | Dec. 04, 2021 | Dec. 05, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Dec. 06, 2021 | ||||||
| Dec. 06, 2021 | Dec. 07, 2021 | Dec. 08, 2021 | Dec. 09, 2021 | Dec. 10, 2021 | Dec. 11, 2021 | Dec. 12, 2021 |
| BEAM LINE 5-4 | ||||||
| Dec. 06, 2021 | Dec. 07, 2021 | Dec. 08, 2021 | Dec. 09, 2021 | Dec. 10, 2021 | Dec. 11, 2021 | Dec. 12, 2021 |
| 8020 D.Lu/AP | AP | AP | 8820 D.Lu | 5637 H.Li | 5637 H.Li | 5803 Y.Chen |
| AP | AP | VUV CHECKOUT | VUV CHECKOUT | 5637 H.Li | VUV CHECKOUT | 5803 Y.Chen |
| AP | AP | 8820 D.Lu | 5637 H.Li | 5637 H.Li | 5803 Y.Chen | 5803 Y.Chen |
| BEAM LINE 8-2 | ||||||
| Dec. 06, 2021 | Dec. 07, 2021 | Dec. 08, 2021 | Dec. 09, 2021 | Dec. 10, 2021 | Dec. 11, 2021 | Dec. 12, 2021 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | VUV CHECKOUT |
| AP | AP | DOWN | DOWN | DOWN | DOWN | 5483 O.Monti//DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Dec. 06, 2021 | Dec. 07, 2021 | Dec. 08, 2021 | Dec. 09, 2021 | Dec. 10, 2021 | Dec. 11, 2021 | Dec. 12, 2021 |
| AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Dec. 06, 2021 | Dec. 07, 2021 | Dec. 08, 2021 | Dec. 09, 2021 | Dec. 10, 2021 | Dec. 11, 2021 | Dec. 12, 2021 |
| AP | AP | AP | 5867 H.Chen | 5867 H.Chen | 5867 H.Chen | 5867 H.Chen/FACI |
| AP | AP | 5867 H.Chen | 5867 H.Chen | 5867 H.Chen | 5867 H.Chen | FACI |
| AP | AP | 5867 H.Chen | 5867 H.Chen | 5867 H.Chen | 5867 H.Chen | FACI |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Dec. 06, 2021 | Dec. 07, 2021 | Dec. 08, 2021 | Dec. 09, 2021 | Dec. 10, 2021 | Dec. 11, 2021 | Dec. 12, 2021 |
| 5849 C.Kuo/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 16-2 | ||||||
| Dec. 06, 2021 | Dec. 07, 2021 | Dec. 08, 2021 | Dec. 09, 2021 | Dec. 10, 2021 | Dec. 11, 2021 | Dec. 12, 2021 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Dec. 13, 2021 | ||||||
| Dec. 13, 2021 | Dec. 14, 2021 | Dec. 15, 2021 | Dec. 16, 2021 | Dec. 17, 2021 | Dec. 18, 2021 | Dec. 19, 2021 |
| BEAM LINE 5-4 | ||||||
| Dec. 13, 2021 | Dec. 14, 2021 | Dec. 15, 2021 | Dec. 16, 2021 | Dec. 17, 2021 | Dec. 18, 2021 | Dec. 19, 2021 |
| 5803 Y.Chen | 9702 C.Simes | 9702 C.Simes | 9702 C.Simes/AP | AP | AP/DOWN | DOWN |
| VUV CHECKOUT | 9702 C.Simes | 9702 C.Simes | AP | AP | DOWN | DOWN |
| 9702 C.Simes | 9702 C.Simes | 9702 C.Simes | AP | AP | DOWN | DOWN |
| BEAM LINE 8-2 | ||||||
| Dec. 13, 2021 | Dec. 14, 2021 | Dec. 15, 2021 | Dec. 16, 2021 | Dec. 17, 2021 | Dec. 18, 2021 | Dec. 19, 2021 |
| DOWN | DOWN | DOWN | DOWN/AP | AP | AP/DOWN | DOWN |
| DOWN | DOWN | DOWN | AP | AP | DOWN | DOWN |
| DOWN | DOWN | DOWN | AP | AP | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Dec. 13, 2021 | Dec. 14, 2021 | Dec. 15, 2021 | Dec. 16, 2021 | Dec. 17, 2021 | Dec. 18, 2021 | Dec. 19, 2021 |
| Unscheduled | 5728 R.Bell | 5728 R.Bell | 5728 R.Bell/AP | AP | AP/DOWN | DOWN |
| VUV CHECKOUT | 5728 R.Bell | 5728 R.Bell | AP | AP | DOWN | DOWN |
| 5728 R.Bell | 5728 R.Bell | 5728 R.Bell | AP | AP | DOWN | DOWN |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Dec. 13, 2021 | Dec. 14, 2021 | Dec. 15, 2021 | Dec. 16, 2021 | Dec. 17, 2021 | Dec. 18, 2021 | Dec. 19, 2021 |
| FACI | 5732 M.Cendejas | 5732 M.Cendejas | 5732 M.Cendejas/AP | AP | AP/DOWN | DOWN |
| VUV CHECKOUT | 5732 M.Cendejas | 5732 M.Cendejas | AP | AP | DOWN | DOWN |
| 5732 M.Cendejas | 5732 M.Cendejas | 5732 M.Cendejas | AP | AP | DOWN | DOWN |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Dec. 13, 2021 | Dec. 14, 2021 | Dec. 15, 2021 | Dec. 16, 2021 | Dec. 17, 2021 | Dec. 18, 2021 | Dec. 19, 2021 |
| Unscheduled | Unscheduled | Unscheduled | AP | AP | AP/DOWN | DOWN |
| Unscheduled | Unscheduled | Unscheduled | AP | AP | DOWN | DOWN |
| Unscheduled | Unscheduled | Unscheduled | AP | AP | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Dec. 13, 2021 | Dec. 14, 2021 | Dec. 15, 2021 | Dec. 16, 2021 | Dec. 17, 2021 | Dec. 18, 2021 | Dec. 19, 2021 |
| DOWN | DOWN | DOWN | DOWN/AP | AP | AP/DOWN | DOWN |
| DOWN | DOWN | DOWN | AP | AP | DOWN | DOWN |
| DOWN | DOWN | DOWN | AP | AP | DOWN | DOWN |
| WEEK OF Dec. 20, 2021 | ||||||
| Dec. 20, 2021 | Dec. 21, 2021 | Dec. 22, 2021 | Dec. 23, 2021 | Dec. 24, 2021 | Dec. 25, 2021 | Dec. 26, 2021 |
| BEAM LINE 5-4 | ||||||
| Dec. 20, 2021 | Dec. 21, 2021 | Dec. 22, 2021 | Dec. 23, 2021 | Dec. 24, 2021 | Dec. 25, 2021 | Dec. 26, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 8-2 | ||||||
| Dec. 20, 2021 | Dec. 21, 2021 | Dec. 22, 2021 | Dec. 23, 2021 | Dec. 24, 2021 | Dec. 25, 2021 | Dec. 26, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Dec. 20, 2021 | Dec. 21, 2021 | Dec. 22, 2021 | Dec. 23, 2021 | Dec. 24, 2021 | Dec. 25, 2021 | Dec. 26, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Dec. 20, 2021 | Dec. 21, 2021 | Dec. 22, 2021 | Dec. 23, 2021 | Dec. 24, 2021 | Dec. 25, 2021 | Dec. 26, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Dec. 20, 2021 | Dec. 21, 2021 | Dec. 22, 2021 | Dec. 23, 2021 | Dec. 24, 2021 | Dec. 25, 2021 | Dec. 26, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Dec. 20, 2021 | Dec. 21, 2021 | Dec. 22, 2021 | Dec. 23, 2021 | Dec. 24, 2021 | Dec. 25, 2021 | Dec. 26, 2021 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Dec. 27, 2021 | ||||||
| Dec. 27, 2021 | Dec. 28, 2021 | Dec. 29, 2021 | Dec. 30, 2021 | Dec. 31, 2021 | Jan. 01, 2022 | Jan. 02, 2022 |
| BEAM LINE 5-4 | ||||||
| Dec. 27, 2021 | Dec. 28, 2021 | Dec. 29, 2021 | Dec. 30, 2021 | Dec. 31, 2021 | Jan. 01, 2022 | Jan. 02, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 8-2 | ||||||
| Dec. 27, 2021 | Dec. 28, 2021 | Dec. 29, 2021 | Dec. 30, 2021 | Dec. 31, 2021 | Jan. 01, 2022 | Jan. 02, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Dec. 27, 2021 | Dec. 28, 2021 | Dec. 29, 2021 | Dec. 30, 2021 | Dec. 31, 2021 | Jan. 01, 2022 | Jan. 02, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Dec. 27, 2021 | Dec. 28, 2021 | Dec. 29, 2021 | Dec. 30, 2021 | Dec. 31, 2021 | Jan. 01, 2022 | Jan. 02, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Dec. 27, 2021 | Dec. 28, 2021 | Dec. 29, 2021 | Dec. 30, 2021 | Dec. 31, 2021 | Jan. 01, 2022 | Jan. 02, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Dec. 27, 2021 | Dec. 28, 2021 | Dec. 29, 2021 | Dec. 30, 2021 | Dec. 31, 2021 | Jan. 01, 2022 | Jan. 02, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Jan. 03, 2022 | ||||||
| Jan. 03, 2022 | Jan. 04, 2022 | Jan. 05, 2022 | Jan. 06, 2022 | Jan. 07, 2022 | Jan. 08, 2022 | Jan. 09, 2022 |
| BEAM LINE 5-4 | ||||||
| Jan. 03, 2022 | Jan. 04, 2022 | Jan. 05, 2022 | Jan. 06, 2022 | Jan. 07, 2022 | Jan. 08, 2022 | Jan. 09, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled |
| DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled | Unscheduled |
| DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled | Unscheduled |
| BEAM LINE 8-2 | ||||||
| Jan. 03, 2022 | Jan. 04, 2022 | Jan. 05, 2022 | Jan. 06, 2022 | Jan. 07, 2022 | Jan. 08, 2022 | Jan. 09, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jan. 03, 2022 | Jan. 04, 2022 | Jan. 05, 2022 | Jan. 06, 2022 | Jan. 07, 2022 | Jan. 08, 2022 | Jan. 09, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled |
| DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled | Unscheduled |
| DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jan. 03, 2022 | Jan. 04, 2022 | Jan. 05, 2022 | Jan. 06, 2022 | Jan. 07, 2022 | Jan. 08, 2022 | Jan. 09, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled |
| DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled | Unscheduled |
| DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jan. 03, 2022 | Jan. 04, 2022 | Jan. 05, 2022 | Jan. 06, 2022 | Jan. 07, 2022 | Jan. 08, 2022 | Jan. 09, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled |
| DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled | Unscheduled |
| DOWN | DOWN | DOWN | DOWN | DOWN | Unscheduled | Unscheduled |
| BEAM LINE 16-2 | ||||||
| Jan. 03, 2022 | Jan. 04, 2022 | Jan. 05, 2022 | Jan. 06, 2022 | Jan. 07, 2022 | Jan. 08, 2022 | Jan. 09, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Jan. 10, 2022 | ||||||
| Jan. 10, 2022 | Jan. 11, 2022 | Jan. 12, 2022 | Jan. 13, 2022 | Jan. 14, 2022 | Jan. 15, 2022 | Jan. 16, 2022 |
| BEAM LINE 5-4 | ||||||
| Jan. 10, 2022 | Jan. 11, 2022 | Jan. 12, 2022 | Jan. 13, 2022 | Jan. 14, 2022 | Jan. 15, 2022 | Jan. 16, 2022 |
| Unscheduled | Unscheduled | 8820 D.Lu | 5832 X.Chen | 5832 X.Chen | 5569 M.Yi | 5569 M.Yi |
| Unscheduled | VUV CHECKOUT | VUV CHECKOUT | 5832 X.Chen | VUV CHECKOUT | 5569 M.Yi | VUV CHECKOUT |
| Unscheduled | 8820 D.Lu | 5832 X.Chen | 5832 X.Chen | 5569 M.Yi | 5569 M.Yi | 8020 D.Lu |
| BEAM LINE 8-2 | ||||||
| Jan. 10, 2022 | Jan. 11, 2022 | Jan. 12, 2022 | Jan. 13, 2022 | Jan. 14, 2022 | Jan. 15, 2022 | Jan. 16, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jan. 10, 2022 | Jan. 11, 2022 | Jan. 12, 2022 | Jan. 13, 2022 | Jan. 14, 2022 | Jan. 15, 2022 | Jan. 16, 2022 |
| Unscheduled | Unscheduled | 5200 Y.Liu | 5200 Y.Liu | Unscheduled | 5288 K.Lancaster | 5288 K.Lancaster |
| Unscheduled | VUV CHECKOUT | 5200 Y.Liu | 5200 Y.Liu | VUV CHECKOUT | 5288 K.Lancaster | 5288 K.Lancaster |
| Unscheduled | 5200 Y.Liu | 5200 Y.Liu | Unscheduled | 5288 K.Lancaster | 5288 K.Lancaster | 5288 K.Lancaster |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jan. 10, 2022 | Jan. 11, 2022 | Jan. 12, 2022 | Jan. 13, 2022 | Jan. 14, 2022 | Jan. 15, 2022 | Jan. 16, 2022 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jan. 10, 2022 | Jan. 11, 2022 | Jan. 12, 2022 | Jan. 13, 2022 | Jan. 14, 2022 | Jan. 15, 2022 | Jan. 16, 2022 |
| Unscheduled | FACI | FACI | SMB CHECKOUT/5789 | 5789 J.Lee | VUV CHECKOUT | 5020 J.Wen |
| Unscheduled | FACI | FACI | 5789 J.Lee | 5789 J.Lee | 5020 J.Wen | 5020 J.Wen |
| Unscheduled | FACI | FACI | 5789 J.Lee | 5789 J.Lee | 5020 J.Wen | 5020 J.Wen |
| BEAM LINE 16-2 | ||||||
| Jan. 10, 2022 | Jan. 11, 2022 | Jan. 12, 2022 | Jan. 13, 2022 | Jan. 14, 2022 | Jan. 15, 2022 | Jan. 16, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Jan. 17, 2022 | ||||||
| Jan. 17, 2022 | Jan. 18, 2022 | Jan. 19, 2022 | Jan. 20, 2022 | Jan. 21, 2022 | Jan. 22, 2022 | Jan. 23, 2022 |
| BEAM LINE 5-4 | ||||||
| Jan. 17, 2022 | Jan. 18, 2022 | Jan. 19, 2022 | Jan. 20, 2022 | Jan. 21, 2022 | Jan. 22, 2022 | Jan. 23, 2022 |
| 8020 D.Lu | 8020 D.Lu | 5491 M.Hasan | 5491 M.Hasan | 5789 J.Lee | 5719 I.Vishik | 9702 C.Simes |
| 8020 D.Lu | VUV CHECKOUT | 5491 M.Hasan | VUV CHECKOUT | VUV CHECKOUT | VUV CHECKOUT | 9702 C.Simes |
| 8020 D.Lu | 5491 M.Hasan | 5491 M.Hasan | 5789 J.Lee | 5719 I.Vishik | 9702 C.Simes | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Jan. 17, 2022 | Jan. 18, 2022 | Jan. 19, 2022 | Jan. 20, 2022 | Jan. 21, 2022 | Jan. 22, 2022 | Jan. 23, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jan. 17, 2022 | Jan. 18, 2022 | Jan. 19, 2022 | Jan. 20, 2022 | Jan. 21, 2022 | Jan. 22, 2022 | Jan. 23, 2022 |
| 5288 K.Lancaster | 5288 K.Lancaster | 5288 K.Lancaster | Unscheduled | 5924 J.Li | 5924 J.Li | 5924 J.Li |
| 5288 K.Lancaster | 5288 K.Lancaster | 5288 K.Lancaster | VUV CHECKOUT | 5924 J.Li | 5924 J.Li | 5924 J.Li |
| 5288 K.Lancaster | 5288 K.Lancaster | Unscheduled | 5924 J.Li | 5924 J.Li | 5924 J.Li | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jan. 17, 2022 | Jan. 18, 2022 | Jan. 19, 2022 | Jan. 20, 2022 | Jan. 21, 2022 | Jan. 22, 2022 | Jan. 23, 2022 |
| FACI | FACI | FACI | FACI | FACI | Unscheduled | Unscheduled |
| FACI | FACI | FACI | FACI | FACI | Unscheduled | Unscheduled |
| FACI | FACI | FACI | FACI | FACI | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jan. 17, 2022 | Jan. 18, 2022 | Jan. 19, 2022 | Jan. 20, 2022 | Jan. 21, 2022 | Jan. 22, 2022 | Jan. 23, 2022 |
| 5020 J.Wen | Unscheduled | Unscheduled | Unscheduled | Unscheduled | VUV CHECKOUT | 5924 J.Li |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | 5924 J.Li | 5924 J.Li |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | STUP | 5924 J.Li | VUV CHECKOUT |
| BEAM LINE 16-2 | ||||||
| Jan. 17, 2022 | Jan. 18, 2022 | Jan. 19, 2022 | Jan. 20, 2022 | Jan. 21, 2022 | Jan. 22, 2022 | Jan. 23, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Jan. 24, 2022 | ||||||
| Jan. 24, 2022 | Jan. 25, 2022 | Jan. 26, 2022 | Jan. 27, 2022 | Jan. 28, 2022 | Jan. 29, 2022 | Jan. 30, 2022 |
| BEAM LINE 5-4 | ||||||
| Jan. 24, 2022 | Jan. 25, 2022 | Jan. 26, 2022 | Jan. 27, 2022 | Jan. 28, 2022 | Jan. 29, 2022 | Jan. 30, 2022 |
| 9702 C.Simes | 5789 J.Lee | 5719 I.Vishik | 5532 D.Dessau | 5532 D.Dessau | 9702 C.Simes | 9702 C.Simes |
| VUV CHECKOUT | VUV CHECKOUT | VUV CHECKOUT | 5532 D.Dessau | VUV CHECKOUT | 9702 C.Simes | 9702 C.Simes |
| 5789 J.Lee | 5719 I.Vishik | 5532 D.Dessau | 5532 D.Dessau | 9702 C.Simes | 9702 C.Simes | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Jan. 24, 2022 | Jan. 25, 2022 | Jan. 26, 2022 | Jan. 27, 2022 | Jan. 28, 2022 | Jan. 29, 2022 | Jan. 30, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jan. 24, 2022 | Jan. 25, 2022 | Jan. 26, 2022 | Jan. 27, 2022 | Jan. 28, 2022 | Jan. 29, 2022 | Jan. 30, 2022 |
| Unscheduled | 5549 R.Smaha | 5549 R.Smaha | 5549 R.Smaha | 8098 T.Kroll | 8098 T.Kroll | 8098 T.Kroll |
| VUV CHECKOUT | 5549 R.Smaha | 5549 R.Smaha | VUV CHECKOUT | 8098 T.Kroll | 8098 T.Kroll | 8098 T.Kroll |
| 5549 R.Smaha | 5549 R.Smaha | 5549 R.Smaha | 8098 T.Kroll | 8098 T.Kroll | 8098 T.Kroll | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jan. 24, 2022 | Jan. 25, 2022 | Jan. 26, 2022 | Jan. 27, 2022 | Jan. 28, 2022 | Jan. 29, 2022 | Jan. 30, 2022 |
| Unscheduled | Unscheduled | Unscheduled | VUV CHECKOUT | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara |
| Unscheduled | Unscheduled | Unscheduled | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara |
| Unscheduled | Unscheduled | Unscheduled | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jan. 24, 2022 | Jan. 25, 2022 | Jan. 26, 2022 | Jan. 27, 2022 | Jan. 28, 2022 | Jan. 29, 2022 | Jan. 30, 2022 |
| 92J6 W.Lee | VUV CHECKOUT | 5436 J.Turner | 5436 J.Turner | Unscheduled | Unscheduled | Unscheduled |
| 92J6 W.Lee | 5436 J.Turner | 5436 J.Turner | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| 92J6 W.Lee | 5436 J.Turner | 5436 J.Turner | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 16-2 | ||||||
| Jan. 24, 2022 | Jan. 25, 2022 | Jan. 26, 2022 | Jan. 27, 2022 | Jan. 28, 2022 | Jan. 29, 2022 | Jan. 30, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Jan. 31, 2022 | ||||||
| Jan. 31, 2022 | Feb. 01, 2022 | Feb. 02, 2022 | Feb. 03, 2022 | Feb. 04, 2022 | Feb. 05, 2022 | Feb. 06, 2022 |
| BEAM LINE 5-4 | ||||||
| Jan. 31, 2022 | Feb. 01, 2022 | Feb. 02, 2022 | Feb. 03, 2022 | Feb. 04, 2022 | Feb. 05, 2022 | Feb. 06, 2022 |
| 9702 C.Simes/AP | AP | AP | 5760 H.Inbar | 5760 H.Inbar | 9702 C.Simes | 9702 C.Simes |
| AP | AP | VUV CHECKOUT | 5760 H.Inbar | VUV CHECKOUT | 9702 C.Simes | 9702 C.Simes |
| AP | AP | 5760 H.Inbar | 5760 H.Inbar | 9702 C.Simes | 9702 C.Simes | Unscheduled |
| BEAM LINE 8-2 | ||||||
| Jan. 31, 2022 | Feb. 01, 2022 | Feb. 02, 2022 | Feb. 03, 2022 | Feb. 04, 2022 | Feb. 05, 2022 | Feb. 06, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jan. 31, 2022 | Feb. 01, 2022 | Feb. 02, 2022 | Feb. 03, 2022 | Feb. 04, 2022 | Feb. 05, 2022 | Feb. 06, 2022 |
| AP | AP | AP | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez |
| AP | AP | VUV CHECKOUT | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | Unscheduled |
| AP | AP | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jan. 31, 2022 | Feb. 01, 2022 | Feb. 02, 2022 | Feb. 03, 2022 | Feb. 04, 2022 | Feb. 05, 2022 | Feb. 06, 2022 |
| 8055 H.Ogasawar/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jan. 31, 2022 | Feb. 01, 2022 | Feb. 02, 2022 | Feb. 03, 2022 | Feb. 04, 2022 | Feb. 05, 2022 | Feb. 06, 2022 |
| AP | AP | AP | VUV CHECKOUT | 5741 H.Huang | 5741 H.Huang | 5741 H.Huang |
| AP | AP | Unscheduled | 5741 H.Huang | 5741 H.Huang | 5741 H.Huang | 5741 H.Huang |
| AP | AP | Unscheduled | 5741 H.Huang | 5741 H.Huang | 5741 H.Huang | 5741 H.Huang |
| BEAM LINE 16-2 | ||||||
| Jan. 31, 2022 | Feb. 01, 2022 | Feb. 02, 2022 | Feb. 03, 2022 | Feb. 04, 2022 | Feb. 05, 2022 | Feb. 06, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Feb. 07, 2022 | ||||||
| Feb. 07, 2022 | Feb. 08, 2022 | Feb. 09, 2022 | Feb. 10, 2022 | Feb. 11, 2022 | Feb. 12, 2022 | Feb. 13, 2022 |
| BEAM LINE 5-4 | ||||||
| Feb. 07, 2022 | Feb. 08, 2022 | Feb. 09, 2022 | Feb. 10, 2022 | Feb. 11, 2022 | Feb. 12, 2022 | Feb. 13, 2022 |
| Unscheduled | 5812 Y.Chen | 5812 Y.Chen | 5465 T.Kondo | 5465 T.Kondo | 5491 M.Hasan | 5491 M.Hasan |
| VUV CHECKOUT | 5812 Y.Chen | VUV CHECKOUT | 5465 T.Kondo | VUV CHECKOUT | 5491 M.Hasan | VUV CHECKOUT |
| 5812 Y.Chen | 5812 Y.Chen | 5465 T.Kondo | 5465 T.Kondo | 5491 M.Hasan | 5491 M.Hasan | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Feb. 07, 2022 | Feb. 08, 2022 | Feb. 09, 2022 | Feb. 10, 2022 | Feb. 11, 2022 | Feb. 12, 2022 | Feb. 13, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Feb. 07, 2022 | Feb. 08, 2022 | Feb. 09, 2022 | Feb. 10, 2022 | Feb. 11, 2022 | Feb. 12, 2022 | Feb. 13, 2022 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | 5549 R.Smaha | 5549 R.Smaha | 5549 R.Smaha |
| Unscheduled | Unscheduled | Unscheduled | VUV CHECKOUT | 5549 R.Smaha | 5549 R.Smaha | 5549 R.Smaha |
| Unscheduled | Unscheduled | Unscheduled | 5549 R.Smaha | 5549 R.Smaha | 5549 R.Smaha | 5549 R.Smaha |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Feb. 07, 2022 | Feb. 08, 2022 | Feb. 09, 2022 | Feb. 10, 2022 | Feb. 11, 2022 | Feb. 12, 2022 | Feb. 13, 2022 |
| Unscheduled | STUP | STUP | VUV CHECKOUT | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara |
| Unscheduled | STUP | STUP | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara |
| Unscheduled | STUP | STUP | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Feb. 07, 2022 | Feb. 08, 2022 | Feb. 09, 2022 | Feb. 10, 2022 | Feb. 11, 2022 | Feb. 12, 2022 | Feb. 13, 2022 |
| 5741 H.Huang | 5741 H.Huang | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| 5741 H.Huang | 5741 H.Huang | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| 5741 H.Huang | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 16-2 | ||||||
| Feb. 07, 2022 | Feb. 08, 2022 | Feb. 09, 2022 | Feb. 10, 2022 | Feb. 11, 2022 | Feb. 12, 2022 | Feb. 13, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Feb. 14, 2022 | ||||||
| Feb. 14, 2022 | Feb. 15, 2022 | Feb. 16, 2022 | Feb. 17, 2022 | Feb. 18, 2022 | Feb. 19, 2022 | Feb. 20, 2022 |
| BEAM LINE 5-4 | ||||||
| Feb. 14, 2022 | Feb. 15, 2022 | Feb. 16, 2022 | Feb. 17, 2022 | Feb. 18, 2022 | Feb. 19, 2022 | Feb. 20, 2022 |
| 9702 C.Simes/AP | AP | AP | 5921 J.Oh | 5921 J.Oh | 8820 D.Lu | 9702 C.Simes |
| AP | AP | VUV CHECKOUT | 5921 J.Oh | VUV CHECKOUT | VUV CHECKOUT | 9702 C.Simes |
| AP | AP | 5921 J.Oh | 5921 J.Oh | 8820 D.Lu | 9702 C.Simes | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Feb. 14, 2022 | Feb. 15, 2022 | Feb. 16, 2022 | Feb. 17, 2022 | Feb. 18, 2022 | Feb. 19, 2022 | Feb. 20, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Feb. 14, 2022 | Feb. 15, 2022 | Feb. 16, 2022 | Feb. 17, 2022 | Feb. 18, 2022 | Feb. 19, 2022 | Feb. 20, 2022 |
| 5549 R.Smaha/AP | AP | AP | 5728 R.Bell | 5728 R.Bell | 5728 R.Bell | 5728 R.Bell |
| AP | AP | VUV CHECKOUT | 5728 R.Bell | 5728 R.Bell | 5728 R.Bell | Unscheduled |
| AP | AP | 5728 R.Bell | 5728 R.Bell | 5728 R.Bell | 5728 R.Bell | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Feb. 14, 2022 | Feb. 15, 2022 | Feb. 16, 2022 | Feb. 17, 2022 | Feb. 18, 2022 | Feb. 19, 2022 | Feb. 20, 2022 |
| 8855 H.Ogasawar/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Feb. 14, 2022 | Feb. 15, 2022 | Feb. 16, 2022 | Feb. 17, 2022 | Feb. 18, 2022 | Feb. 19, 2022 | Feb. 20, 2022 |
| AP | AP | AP | VUV CHECKOUT | 5063 W.He | 5063 W.He | 5063 W.He |
| AP | AP | Unscheduled | 5063 W.He | 5063 W.He | 5063 W.He | 5063 W.He |
| AP | AP | Unscheduled | 5063 W.He | 5063 W.He | 5063 W.He | 5063 W.He |
| BEAM LINE 16-2 | ||||||
| Feb. 14, 2022 | Feb. 15, 2022 | Feb. 16, 2022 | Feb. 17, 2022 | Feb. 18, 2022 | Feb. 19, 2022 | Feb. 20, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Feb. 21, 2022 | ||||||
| Feb. 21, 2022 | Feb. 22, 2022 | Feb. 23, 2022 | Feb. 24, 2022 | Feb. 25, 2022 | Feb. 26, 2022 | Feb. 27, 2022 |
| BEAM LINE 5-4 | ||||||
| Feb. 21, 2022 | Feb. 22, 2022 | Feb. 23, 2022 | Feb. 24, 2022 | Feb. 25, 2022 | Feb. 26, 2022 | Feb. 27, 2022 |
| 9702 C.Simes | 9702 C.Simes | 9702 C.Simes | 9702 C.Simes | 5805 Y.He | 5805 Y.He | 5805 Y.He |
| VUV CHECKOUT | 9702 C.Simes | 9702 C.Simes | VUV CHECKOUT | 5805 Y.He | 5805 Y.He | 5805 Y.He |
| 9702 C.Simes | 9702 C.Simes | 9702 C.Simes | 5805 Y.He | 5805 Y.He | 5805 Y.He | 5805 Y.He |
| BEAM LINE 8-2 | ||||||
| Feb. 21, 2022 | Feb. 22, 2022 | Feb. 23, 2022 | Feb. 24, 2022 | Feb. 25, 2022 | Feb. 26, 2022 | Feb. 27, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Feb. 21, 2022 | Feb. 22, 2022 | Feb. 23, 2022 | Feb. 24, 2022 | Feb. 25, 2022 | Feb. 26, 2022 | Feb. 27, 2022 |
| Unscheduled | Unscheduled | 5697 Y.Ren | 5697 Y.Ren | 5697 Y.Ren | Unscheduled | Unscheduled |
| Unscheduled | VUV CHECKOUT | 5697 Y.Ren | 5697 Y.Ren | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | 5697 Y.Ren | 5697 Y.Ren | 5697 Y.Ren | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Feb. 21, 2022 | Feb. 22, 2022 | Feb. 23, 2022 | Feb. 24, 2022 | Feb. 25, 2022 | Feb. 26, 2022 | Feb. 27, 2022 |
| Unscheduled | VUV CHECKOUT | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez |
| Unscheduled | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez |
| Unscheduled | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Feb. 21, 2022 | Feb. 22, 2022 | Feb. 23, 2022 | Feb. 24, 2022 | Feb. 25, 2022 | Feb. 26, 2022 | Feb. 27, 2022 |
| 5063 W.He | Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN |
| Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| Unscheduled | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Feb. 21, 2022 | Feb. 22, 2022 | Feb. 23, 2022 | Feb. 24, 2022 | Feb. 25, 2022 | Feb. 26, 2022 | Feb. 27, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Feb. 28, 2022 | ||||||
| Feb. 28, 2022 | Mar. 01, 2022 | Mar. 02, 2022 | Mar. 03, 2022 | Mar. 04, 2022 | Mar. 05, 2022 | Mar. 06, 2022 |
| BEAM LINE 5-4 | ||||||
| Feb. 28, 2022 | Mar. 01, 2022 | Mar. 02, 2022 | Mar. 03, 2022 | Mar. 04, 2022 | Mar. 05, 2022 | Mar. 06, 2022 |
| 5805 Y.He/AP | AP | AP | 9702 C.Simes | 9702 C.Simes | 5719 I.Vishik | 5719 I.Vishik |
| AP | AP | VUV CHECKOUT | 9702 C.Simes | VUV CHECKOUT | 5719 I.Vishik | CHANGE/9702 C.Sime |
| AP | AP | 9702 C.Simes | 9702 C.Simes | 5719 I.Vishik | 5719 I.Vishik | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Feb. 28, 2022 | Mar. 01, 2022 | Mar. 02, 2022 | Mar. 03, 2022 | Mar. 04, 2022 | Mar. 05, 2022 | Mar. 06, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Feb. 28, 2022 | Mar. 01, 2022 | Mar. 02, 2022 | Mar. 03, 2022 | Mar. 04, 2022 | Mar. 05, 2022 | Mar. 06, 2022 |
| AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Feb. 28, 2022 | Mar. 01, 2022 | Mar. 02, 2022 | Mar. 03, 2022 | Mar. 04, 2022 | Mar. 05, 2022 | Mar. 06, 2022 |
| 5442 J.Velazque/AP | AP | AP | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez |
| AP | AP | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez |
| AP | AP | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Feb. 28, 2022 | Mar. 01, 2022 | Mar. 02, 2022 | Mar. 03, 2022 | Mar. 04, 2022 | Mar. 05, 2022 | Mar. 06, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Feb. 28, 2022 | Mar. 01, 2022 | Mar. 02, 2022 | Mar. 03, 2022 | Mar. 04, 2022 | Mar. 05, 2022 | Mar. 06, 2022 |
| DOWN/AP | AP | AP | COMM | COMM | COMM | COMM |
| AP | AP | COMM | COMM | COMM | COMM | COMM |
| AP | AP | COMM | COMM | COMM | COMM | COMM |
| WEEK OF Mar. 07, 2022 | ||||||
| Mar. 07, 2022 | Mar. 08, 2022 | Mar. 09, 2022 | Mar. 10, 2022 | Mar. 11, 2022 | Mar. 12, 2022 | Mar. 13, 2022 |
| BEAM LINE 5-4 | ||||||
| Mar. 07, 2022 | Mar. 08, 2022 | Mar. 09, 2022 | Mar. 10, 2022 | Mar. 11, 2022 | Mar. 12, 2022 | Mar. 13, 2022 |
| 9702 C.Simes | 5465 T.Kondo | 5465 T.Kondo | 5316 S.Kim | 5316 S.Kim | 5316 S.Kim | 9702 C.Simes |
| VUV CHECKOUT | 5465 T.Kondo | VUV CHECKOUT | 5316 S.Kim | 5316 S.Kim | VUV CHECKOUT | 9702 C.Simes |
| 5465 T.Kondo | 5465 T.Kondo | 5316 S.Kim | 5316 S.Kim | 5316 S.Kim | 9702 C.Simes | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Mar. 07, 2022 | Mar. 08, 2022 | Mar. 09, 2022 | Mar. 10, 2022 | Mar. 11, 2022 | Mar. 12, 2022 | Mar. 13, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Mar. 07, 2022 | Mar. 08, 2022 | Mar. 09, 2022 | Mar. 10, 2022 | Mar. 11, 2022 | Mar. 12, 2022 | Mar. 13, 2022 |
| Unscheduled | 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | Unscheduled | Unscheduled |
| VUV CHECKOUT | 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | Unscheduled | Unscheduled | Unscheduled |
| 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Mar. 07, 2022 | Mar. 08, 2022 | Mar. 09, 2022 | Mar. 10, 2022 | Mar. 11, 2022 | Mar. 12, 2022 | Mar. 13, 2022 |
| 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez |
| 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | Unscheduled |
| 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Mar. 07, 2022 | Mar. 08, 2022 | Mar. 09, 2022 | Mar. 10, 2022 | Mar. 11, 2022 | Mar. 12, 2022 | Mar. 13, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Mar. 07, 2022 | Mar. 08, 2022 | Mar. 09, 2022 | Mar. 10, 2022 | Mar. 11, 2022 | Mar. 12, 2022 | Mar. 13, 2022 |
| COMM | COMM | COMM | COMM | COMM | COMM | COMM |
| COMM | COMM | COMM | COMM | COMM | COMM | COMM |
| COMM | COMM | COMM | COMM | COMM | COMM | COMM |
| WEEK OF Mar. 14, 2022 | ||||||
| Mar. 14, 2022 | Mar. 15, 2022 | Mar. 16, 2022 | Mar. 17, 2022 | Mar. 18, 2022 | Mar. 19, 2022 | Mar. 20, 2022 |
| BEAM LINE 5-4 | ||||||
| Mar. 14, 2022 | Mar. 15, 2022 | Mar. 16, 2022 | Mar. 17, 2022 | Mar. 18, 2022 | Mar. 19, 2022 | Mar. 20, 2022 |
| 9702 C.Simes/AP | AP | AP | 8820 D.Lu | 5353 J.He | 5353 J.He | 8020 D.Lu |
| AP | AP | VUV CHECKOUT | VUV CHECKOUT | 5353 J.He | VUV CHECKOUT | 8020 D.Lu |
| AP | AP | 8820 D.Lu | 5353 J.He | 5353 J.He | 8020 D.Lu | 8020 D.Lu |
| BEAM LINE 8-2 | ||||||
| Mar. 14, 2022 | Mar. 15, 2022 | Mar. 16, 2022 | Mar. 17, 2022 | Mar. 18, 2022 | Mar. 19, 2022 | Mar. 20, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Mar. 14, 2022 | Mar. 15, 2022 | Mar. 16, 2022 | Mar. 17, 2022 | Mar. 18, 2022 | Mar. 19, 2022 | Mar. 20, 2022 |
| AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Mar. 14, 2022 | Mar. 15, 2022 | Mar. 16, 2022 | Mar. 17, 2022 | Mar. 18, 2022 | Mar. 19, 2022 | Mar. 20, 2022 |
| AP | AP | AP | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA |
| AP | AP | VUV CHECKOUT | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | Unscheduled |
| AP | AP | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | 9705 J.LiSA | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Mar. 14, 2022 | Mar. 15, 2022 | Mar. 16, 2022 | Mar. 17, 2022 | Mar. 18, 2022 | Mar. 19, 2022 | Mar. 20, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Mar. 14, 2022 | Mar. 15, 2022 | Mar. 16, 2022 | Mar. 17, 2022 | Mar. 18, 2022 | Mar. 19, 2022 | Mar. 20, 2022 |
| COMM/AP | AP | AP | COMM | COMM | COMM | COMM |
| AP | AP | COMM | COMM | COMM | COMM | Unscheduled |
| AP | AP | COMM | COMM | COMM | COMM | Unscheduled |
| WEEK OF Mar. 21, 2022 | ||||||
| Mar. 21, 2022 | Mar. 22, 2022 | Mar. 23, 2022 | Mar. 24, 2022 | Mar. 25, 2022 | Mar. 26, 2022 | Mar. 27, 2022 |
| BEAM LINE 5-4 | ||||||
| Mar. 21, 2022 | Mar. 22, 2022 | Mar. 23, 2022 | Mar. 24, 2022 | Mar. 25, 2022 | Mar. 26, 2022 | Mar. 27, 2022 |
| 8020 D.Lu | 5803 Y.Chen | 5803 Y.Chen | 9702 C.Simes | 9702 C.Simes | 5532 D.Dessau | 5532 D.Dessau |
| VUV CHECKOUT | 5803 Y.Chen | VUV CHECKOUT | 9702 C.Simes | VUV CHECKOUT | 5532 D.Dessau | 5532 D.Dessau |
| 5803 Y.Chen | 5803 Y.Chen | 9702 C.Simes | 9702 C.Simes | 5532 D.Dessau | 5532 D.Dessau | 5532 D.Dessau |
| BEAM LINE 8-2 | ||||||
| Mar. 21, 2022 | Mar. 22, 2022 | Mar. 23, 2022 | Mar. 24, 2022 | Mar. 25, 2022 | Mar. 26, 2022 | Mar. 27, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Mar. 21, 2022 | Mar. 22, 2022 | Mar. 23, 2022 | Mar. 24, 2022 | Mar. 25, 2022 | Mar. 26, 2022 | Mar. 27, 2022 |
| Unscheduled | 5445 G.George | 5445 G.George | 5445 G.George | 5445 G.George | 5445 G.George | 5445 G.George |
| VUV CHECKOUT | 5445 G.George | 5445 G.George | 5445 G.George | 5445 G.George | 5445 G.George | Unscheduled |
| 5445 G.George | 5445 G.George | 5445 G.George | 5445 G.George | 5445 G.George | 5445 G.George | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Mar. 21, 2022 | Mar. 22, 2022 | Mar. 23, 2022 | Mar. 24, 2022 | Mar. 25, 2022 | Mar. 26, 2022 | Mar. 27, 2022 |
| VUV CHECKOUT | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara |
| 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara |
| 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Mar. 21, 2022 | Mar. 22, 2022 | Mar. 23, 2022 | Mar. 24, 2022 | Mar. 25, 2022 | Mar. 26, 2022 | Mar. 27, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Mar. 21, 2022 | Mar. 22, 2022 | Mar. 23, 2022 | Mar. 24, 2022 | Mar. 25, 2022 | Mar. 26, 2022 | Mar. 27, 2022 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| WEEK OF Mar. 28, 2022 | ||||||
| Mar. 28, 2022 | Mar. 29, 2022 | Mar. 30, 2022 | Mar. 31, 2022 | Apr. 01, 2022 | Apr. 02, 2022 | Apr. 03, 2022 |
| BEAM LINE 5-4 | ||||||
| Mar. 28, 2022 | Mar. 29, 2022 | Mar. 30, 2022 | Mar. 31, 2022 | Apr. 01, 2022 | Apr. 02, 2022 | Apr. 03, 2022 |
| 5532 D.Dessau | 8020 D.Lu | 8020 D.Lu | 5569 M.Yi | 5569 M.Yi | 5792 T.Cochran | 5792 T.Cochran |
| VUV CHECKOUT | 8020 D.Lu | VUV CHECKOUT | 5569 M.Yi | VUV CHECKOUT | 5792 T.Cochran | 5792 T.Cochran |
| 8020 D.Lu | 8020 D.Lu | 5569 M.Yi | 5569 M.Yi | 5792 T.Cochran | 5792 T.Cochran | 5792 T.Cochran |
| BEAM LINE 8-2 | ||||||
| Mar. 28, 2022 | Mar. 29, 2022 | Mar. 30, 2022 | Mar. 31, 2022 | Apr. 01, 2022 | Apr. 02, 2022 | Apr. 03, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Mar. 28, 2022 | Mar. 29, 2022 | Mar. 30, 2022 | Mar. 31, 2022 | Apr. 01, 2022 | Apr. 02, 2022 | Apr. 03, 2022 |
| Unscheduled | 5411 E.Biasin | 5411 E.Biasin | 5411 E.Biasin | 8098 T.Kroll | 8098 T.Kroll | 8098 T.Kroll |
| VUV CHECKOUT | 5411 E.Biasin | 5411 E.Biasin | VUV CHECKOUT | 8098 T.Kroll | 8098 T.Kroll | Unscheduled |
| 5411 E.Biasin | 5411 E.Biasin | 5411 E.Biasin | 8098 T.Kroll | 8098 T.Kroll | 8098 T.Kroll | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Mar. 28, 2022 | Mar. 29, 2022 | Mar. 30, 2022 | Mar. 31, 2022 | Apr. 01, 2022 | Apr. 02, 2022 | Apr. 03, 2022 |
| 8055 H.Ogasawara | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Mar. 28, 2022 | Mar. 29, 2022 | Mar. 30, 2022 | Mar. 31, 2022 | Apr. 01, 2022 | Apr. 02, 2022 | Apr. 03, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Mar. 28, 2022 | Mar. 29, 2022 | Mar. 30, 2022 | Mar. 31, 2022 | Apr. 01, 2022 | Apr. 02, 2022 | Apr. 03, 2022 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| WEEK OF Apr. 04, 2022 | ||||||
| Apr. 04, 2022 | Apr. 05, 2022 | Apr. 06, 2022 | Apr. 07, 2022 | Apr. 08, 2022 | Apr. 09, 2022 | Apr. 10, 2022 |
| BEAM LINE 5-4 | ||||||
| Apr. 04, 2022 | Apr. 05, 2022 | Apr. 06, 2022 | Apr. 07, 2022 | Apr. 08, 2022 | Apr. 09, 2022 | Apr. 10, 2022 |
| 5792 T.Cochran/AP | AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 8-2 | ||||||
| Apr. 04, 2022 | Apr. 05, 2022 | Apr. 06, 2022 | Apr. 07, 2022 | Apr. 08, 2022 | Apr. 09, 2022 | Apr. 10, 2022 |
| DOWN/AP | AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Apr. 04, 2022 | Apr. 05, 2022 | Apr. 06, 2022 | Apr. 07, 2022 | Apr. 08, 2022 | Apr. 09, 2022 | Apr. 10, 2022 |
| AP | AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Apr. 04, 2022 | Apr. 05, 2022 | Apr. 06, 2022 | Apr. 07, 2022 | Apr. 08, 2022 | Apr. 09, 2022 | Apr. 10, 2022 |
| AP | AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Apr. 04, 2022 | Apr. 05, 2022 | Apr. 06, 2022 | Apr. 07, 2022 | Apr. 08, 2022 | Apr. 09, 2022 | Apr. 10, 2022 |
| DOWN/AP | AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Apr. 04, 2022 | Apr. 05, 2022 | Apr. 06, 2022 | Apr. 07, 2022 | Apr. 08, 2022 | Apr. 09, 2022 | Apr. 10, 2022 |
| AP | AP | AP/DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Apr. 11, 2022 | ||||||
| Apr. 11, 2022 | Apr. 12, 2022 | Apr. 13, 2022 | Apr. 14, 2022 | Apr. 15, 2022 | Apr. 16, 2022 | Apr. 17, 2022 |
| BEAM LINE 5-4 | ||||||
| Apr. 11, 2022 | Apr. 12, 2022 | Apr. 13, 2022 | Apr. 14, 2022 | Apr. 15, 2022 | Apr. 16, 2022 | Apr. 17, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 8-2 | ||||||
| Apr. 11, 2022 | Apr. 12, 2022 | Apr. 13, 2022 | Apr. 14, 2022 | Apr. 15, 2022 | Apr. 16, 2022 | Apr. 17, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Apr. 11, 2022 | Apr. 12, 2022 | Apr. 13, 2022 | Apr. 14, 2022 | Apr. 15, 2022 | Apr. 16, 2022 | Apr. 17, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Apr. 11, 2022 | Apr. 12, 2022 | Apr. 13, 2022 | Apr. 14, 2022 | Apr. 15, 2022 | Apr. 16, 2022 | Apr. 17, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Apr. 11, 2022 | Apr. 12, 2022 | Apr. 13, 2022 | Apr. 14, 2022 | Apr. 15, 2022 | Apr. 16, 2022 | Apr. 17, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Apr. 11, 2022 | Apr. 12, 2022 | Apr. 13, 2022 | Apr. 14, 2022 | Apr. 15, 2022 | Apr. 16, 2022 | Apr. 17, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Apr. 18, 2022 | ||||||
| Apr. 18, 2022 | Apr. 19, 2022 | Apr. 20, 2022 | Apr. 21, 2022 | Apr. 22, 2022 | Apr. 23, 2022 | Apr. 24, 2022 |
| BEAM LINE 5-4 | ||||||
| Apr. 18, 2022 | Apr. 19, 2022 | Apr. 20, 2022 | Apr. 21, 2022 | Apr. 22, 2022 | Apr. 23, 2022 | Apr. 24, 2022 |
| DOWN/AP | AP | AP | DOWN | 8820 D.Lu | 9702 C.Simes | 8020 D.Lu |
| AP | AP | DOWN | DOWN | VUV CHECKOUT | CHANGE/8020 D.Lu | 8020 D.Lu |
| AP | AP | DOWN | 8820 D.Lu | 9702 C.Simes | 8020 D.Lu | 8020 D.Lu |
| BEAM LINE 8-2 | ||||||
| Apr. 18, 2022 | Apr. 19, 2022 | Apr. 20, 2022 | Apr. 21, 2022 | Apr. 22, 2022 | Apr. 23, 2022 | Apr. 24, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Apr. 18, 2022 | Apr. 19, 2022 | Apr. 20, 2022 | Apr. 21, 2022 | Apr. 22, 2022 | Apr. 23, 2022 | Apr. 24, 2022 |
| DOWN/AP | AP | AP | DOWN | 5430 G.Wan | 5430 G.Wan | 5430 G.Wan |
| AP | AP | DOWN | DOWN | 5430 G.Wan | 5430 G.Wan | 5430 G.Wan |
| AP | AP | DOWN | VUV CHECKOUT | 5430 G.Wan | 5430 G.Wan | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Apr. 18, 2022 | Apr. 19, 2022 | Apr. 20, 2022 | Apr. 21, 2022 | Apr. 22, 2022 | Apr. 23, 2022 | Apr. 24, 2022 |
| DOWN/AP | AP | AP | DOWN | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Apr. 18, 2022 | Apr. 19, 2022 | Apr. 20, 2022 | Apr. 21, 2022 | Apr. 22, 2022 | Apr. 23, 2022 | Apr. 24, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Apr. 18, 2022 | Apr. 19, 2022 | Apr. 20, 2022 | Apr. 21, 2022 | Apr. 22, 2022 | Apr. 23, 2022 | Apr. 24, 2022 |
| DOWN/AP | AP | AP | DOWN | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | DOWN | DOWN | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | DOWN | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| WEEK OF Apr. 25, 2022 | ||||||
| Apr. 25, 2022 | Apr. 26, 2022 | Apr. 27, 2022 | Apr. 28, 2022 | Apr. 29, 2022 | Apr. 30, 2022 | May 01, 2022 |
| BEAM LINE 5-4 | ||||||
| Apr. 25, 2022 | Apr. 26, 2022 | Apr. 27, 2022 | Apr. 28, 2022 | Apr. 29, 2022 | Apr. 30, 2022 | May 01, 2022 |
| 8020 D.Lu | 5465 T.Kondo | 5465 T.Kondo | 5532 D.Dessau | 5532 D.Dessau | 9702 C.Simes | 9702 C.Simes |
| VUV CHECKOUT | 5465 T.Kondo | VUV CHECKOUT | 5532 D.Dessau | VUV CHECKOUT | 9702 C.Simes | 9702 C.Simes |
| 5465 T.Kondo | 5465 T.Kondo | 5532 D.Dessau | 5532 D.Dessau | 9702 C.Simes | 9702 C.Simes | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Apr. 25, 2022 | Apr. 26, 2022 | Apr. 27, 2022 | Apr. 28, 2022 | Apr. 29, 2022 | Apr. 30, 2022 | May 01, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Apr. 25, 2022 | Apr. 26, 2022 | Apr. 27, 2022 | Apr. 28, 2022 | Apr. 29, 2022 | Apr. 30, 2022 | May 01, 2022 |
| Unscheduled | 5985 L.Li | 5985 L.Li | 5985 L.Li | 6025 R.Colina Ruiz | 6025 R.Colina Ruiz | 5664 R.Walroth |
| VUV CHECKOUT | 5985 L.Li | 5985 L.Li | VUV CHECKOUT | 6025 R.Colina Ruiz | VUV CHECKOUT | 5664 R.Walroth |
| 5985 L.Li | 5985 L.Li | 5985 L.Li | 6025 R.Colina Ruiz | 6025 R.Colina Ruiz | 5664 R.Walroth | 5664 R.Walroth |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Apr. 25, 2022 | Apr. 26, 2022 | Apr. 27, 2022 | Apr. 28, 2022 | Apr. 29, 2022 | Apr. 30, 2022 | May 01, 2022 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Apr. 25, 2022 | Apr. 26, 2022 | Apr. 27, 2022 | Apr. 28, 2022 | Apr. 29, 2022 | Apr. 30, 2022 | May 01, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Apr. 25, 2022 | Apr. 26, 2022 | Apr. 27, 2022 | Apr. 28, 2022 | Apr. 29, 2022 | Apr. 30, 2022 | May 01, 2022 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| WEEK OF May 02, 2022 | ||||||
| May 02, 2022 | May 03, 2022 | May 04, 2022 | May 05, 2022 | May 06, 2022 | May 07, 2022 | May 08, 2022 |
| BEAM LINE 5-4 | ||||||
| May 02, 2022 | May 03, 2022 | May 04, 2022 | May 05, 2022 | May 06, 2022 | May 07, 2022 | May 08, 2022 |
| 9702 C.Simes/AP | AP | AP | DOWN | DOWN | 5933 M.Yi | 5933 M.Yi |
| AP | AP | DOWN | DOWN | DOWN | 5933 M.Yi | VUV CHECKOUT |
| AP | AP | DOWN | DOWN | 5933 M.Yi | 5933 M.Yi | 5812 Y.Chen |
| BEAM LINE 8-2 | ||||||
| May 02, 2022 | May 03, 2022 | May 04, 2022 | May 05, 2022 | May 06, 2022 | May 07, 2022 | May 08, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| May 02, 2022 | May 03, 2022 | May 04, 2022 | May 05, 2022 | May 06, 2022 | May 07, 2022 | May 08, 2022 |
| 5664 R.Walroth/AP | AP | AP | DOWN | DOWN | VUV CHECKOUT | 5442 J.Velazquez |
| AP | AP | DOWN | DOWN | DOWN | 5442 J.Velazquez | 5442 J.Velazquez |
| AP | AP | DOWN | DOWN | 5340 P.Kennepohl | 5442 J.Velazquez | 5442 J.Velazquez |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| May 02, 2022 | May 03, 2022 | May 04, 2022 | May 05, 2022 | May 06, 2022 | May 07, 2022 | May 08, 2022 |
| AP | AP | AP | DOWN | DOWN | 8055 H.Ogasawara | 8055 H.Ogasawara |
| AP | AP | STUP/DOWN | DOWN | DOWN | 8055 H.Ogasawara | 8055 H.Ogasawara |
| AP | AP | DOWN | DOWN | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| May 02, 2022 | May 03, 2022 | May 04, 2022 | May 05, 2022 | May 06, 2022 | May 07, 2022 | May 08, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| May 02, 2022 | May 03, 2022 | May 04, 2022 | May 05, 2022 | May 06, 2022 | May 07, 2022 | May 08, 2022 |
| AP | AP | AP | DOWN | DOWN | 9709 K.Moy | 9709 K.Moy |
| AP | AP | DOWN | DOWN | DOWN | 9709 K.Moy | 9709 K.Moy |
| AP | AP | DOWN | DOWN | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| WEEK OF May 09, 2022 | ||||||
| May 09, 2022 | May 10, 2022 | May 11, 2022 | May 12, 2022 | May 13, 2022 | May 14, 2022 | May 15, 2022 |
| BEAM LINE 5-4 | ||||||
| May 09, 2022 | May 10, 2022 | May 11, 2022 | May 12, 2022 | May 13, 2022 | May 14, 2022 | May 15, 2022 |
| 5812 Y.Chen | 5812 Y.Chen | 9702 C.Simes | 5719 I.Vishik | 5719 I.Vishik | 9702 C.Simes | 9702 C.Simes |
| 5812 Y.Chen | VUV CHECKOUT | VUV CHECKOUT | 5719 I.Vishik | VUV CHECKOUT | 9702 C.Simes | 9702 C.Simes |
| 5812 Y.Chen | 9702 C.Simes | 5719 I.Vishik | 5719 I.Vishik | 9702 C.Simes | 9702 C.Simes | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| May 09, 2022 | May 10, 2022 | May 11, 2022 | May 12, 2022 | May 13, 2022 | May 14, 2022 | May 15, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| May 09, 2022 | May 10, 2022 | May 11, 2022 | May 12, 2022 | May 13, 2022 | May 14, 2022 | May 15, 2022 |
| 5442 J.Velazquez | VUV CHECKOUT | 5767 A.Holewinski | 5767 A.Holewinski | VUV CHECKOUT | 5728 R.Bell | 5728 R.Bell |
| 5442 J.Velazquez | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5728 R.Bell | 5728 R.Bell | Unscheduled |
| 5442 J.Velazquez | 5767 A.Holewinski | 5767 A.Holewinski | 5767 A.Holewinski | 5728 R.Bell | 5728 R.Bell | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| May 09, 2022 | May 10, 2022 | May 11, 2022 | May 12, 2022 | May 13, 2022 | May 14, 2022 | May 15, 2022 |
| 8055 H.Ogasawara | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| May 09, 2022 | May 10, 2022 | May 11, 2022 | May 12, 2022 | May 13, 2022 | May 14, 2022 | May 15, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| May 09, 2022 | May 10, 2022 | May 11, 2022 | May 12, 2022 | May 13, 2022 | May 14, 2022 | May 15, 2022 |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| WEEK OF May 16, 2022 | ||||||
| May 16, 2022 | May 17, 2022 | May 18, 2022 | May 19, 2022 | May 20, 2022 | May 21, 2022 | May 22, 2022 |
| BEAM LINE 5-4 | ||||||
| May 16, 2022 | May 17, 2022 | May 18, 2022 | May 19, 2022 | May 20, 2022 | May 21, 2022 | May 22, 2022 |
| 9702 C.Simes/AP | AP | AP | 5921 J.Oh | 5921 J.Oh | 5921 J.Oh | 8020 D.Lu |
| AP | AP | VUV CHECKOUT | 5921 J.Oh | 5921 J.Oh | VUV CHECKOUT | 8020 D.Lu |
| AP | AP | 5921 J.Oh | 5921 J.Oh | 5921 J.Oh | 8020 D.Lu | 8020 D.Lu |
| BEAM LINE 8-2 | ||||||
| May 16, 2022 | May 17, 2022 | May 18, 2022 | May 19, 2022 | May 20, 2022 | May 21, 2022 | May 22, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| May 16, 2022 | May 17, 2022 | May 18, 2022 | May 19, 2022 | May 20, 2022 | May 21, 2022 | May 22, 2022 |
| AP | AP | AP | FACI | VUV CHECKOUT | 90H4 Y.Yue | 90H4 Y.Yue |
| AP | AP | FACI | FACI | 90H4 Y.Yue | 90H4 Y.Yue | 90H4 Y.Yue |
| AP | AP | FACI | FACI | 90H4 Y.Yue | 90H4 Y.Yue | 90H4 Y.Yue |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| May 16, 2022 | May 17, 2022 | May 18, 2022 | May 19, 2022 | May 20, 2022 | May 21, 2022 | May 22, 2022 |
| AP | AP | AP | VUV CHECKOUT | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez |
| AP | AP | STUP | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez |
| AP | AP | STUP | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez | 5442 J.Velazquez |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| May 16, 2022 | May 17, 2022 | May 18, 2022 | May 19, 2022 | May 20, 2022 | May 21, 2022 | May 22, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| May 16, 2022 | May 17, 2022 | May 18, 2022 | May 19, 2022 | May 20, 2022 | May 21, 2022 | May 22, 2022 |
| 9709 K.Moy/AP | AP | AP | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| AP | AP | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| AP | AP | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| WEEK OF May 23, 2022 | ||||||
| May 23, 2022 | May 24, 2022 | May 25, 2022 | May 26, 2022 | May 27, 2022 | May 28, 2022 | May 29, 2022 |
| BEAM LINE 5-4 | ||||||
| May 23, 2022 | May 24, 2022 | May 25, 2022 | May 26, 2022 | May 27, 2022 | May 28, 2022 | May 29, 2022 |
| 8020 D.Lu | 9702 C.Simes | 5615 J.Ravichandra | 5532 D.Dessau | 5532 D.Dessau | 5491 M.Hasan | 5491 M.Hasan |
| CHANGE/9702 C.Sime | VUV CHECKOUT | VUV CHECKOUT | 5532 D.Dessau | VUV CHECKOUT | 5491 M.Hasan | VUV CHECKOUT |
| 9702 C.Simes | 5615 J.Ravichandra | 5532 D.Dessau | 5532 D.Dessau | 5491 M.Hasan | 5491 M.Hasan | 8020 D.Lu |
| BEAM LINE 8-2 | ||||||
| May 23, 2022 | May 24, 2022 | May 25, 2022 | May 26, 2022 | May 27, 2022 | May 28, 2022 | May 29, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| May 23, 2022 | May 24, 2022 | May 25, 2022 | May 26, 2022 | May 27, 2022 | May 28, 2022 | May 29, 2022 |
| Unscheduled | VUV CHECKOUT | 93H1 A.PUJARI | 93H1 A.PUJARI | 93H1 A.PUJARI | 93H1 A.PUJARI | 93H1 A.PUJARI |
| Unscheduled | 93H1 A.PUJARI | 93H1 A.PUJARI | 93H1 A.PUJARI | 93H1 A.PUJARI | 93H1 A.PUJARI | 93H1 A.PUJARI |
| Unscheduled | 93H1 A.PUJARI | 93H1 A.PUJARI | 93H1 A.PUJARI | 93H1 A.PUJARI | 93H1 A.PUJARI | 93H1 A.PUJARI |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| May 23, 2022 | May 24, 2022 | May 25, 2022 | May 26, 2022 | May 27, 2022 | May 28, 2022 | May 29, 2022 |
| 5442 J.Velazquez | VUV CHECKOUT | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara |
| Unscheduled | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara | Unscheduled |
| Unscheduled | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara | 8855 H.Ogasawara | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| May 23, 2022 | May 24, 2022 | May 25, 2022 | May 26, 2022 | May 27, 2022 | May 28, 2022 | May 29, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| May 23, 2022 | May 24, 2022 | May 25, 2022 | May 26, 2022 | May 27, 2022 | May 28, 2022 | May 29, 2022 |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| WEEK OF May 30, 2022 | ||||||
| May 30, 2022 | May 31, 2022 | Jun. 01, 2022 | Jun. 02, 2022 | Jun. 03, 2022 | Jun. 04, 2022 | Jun. 05, 2022 |
| BEAM LINE 5-4 | ||||||
| May 30, 2022 | May 31, 2022 | Jun. 01, 2022 | Jun. 02, 2022 | Jun. 03, 2022 | Jun. 04, 2022 | Jun. 05, 2022 |
| 8020 D.Lu/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 8-2 | ||||||
| May 30, 2022 | May 31, 2022 | Jun. 01, 2022 | Jun. 02, 2022 | Jun. 03, 2022 | Jun. 04, 2022 | Jun. 05, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| May 30, 2022 | May 31, 2022 | Jun. 01, 2022 | Jun. 02, 2022 | Jun. 03, 2022 | Jun. 04, 2022 | Jun. 05, 2022 |
| 93H1 A.PUJARI/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| May 30, 2022 | May 31, 2022 | Jun. 01, 2022 | Jun. 02, 2022 | Jun. 03, 2022 | Jun. 04, 2022 | Jun. 05, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| May 30, 2022 | May 31, 2022 | Jun. 01, 2022 | Jun. 02, 2022 | Jun. 03, 2022 | Jun. 04, 2022 | Jun. 05, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| May 30, 2022 | May 31, 2022 | Jun. 01, 2022 | Jun. 02, 2022 | Jun. 03, 2022 | Jun. 04, 2022 | Jun. 05, 2022 |
| 9709 K.Moy/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| WEEK OF Jun. 06, 2022 | ||||||
| Jun. 06, 2022 | Jun. 07, 2022 | Jun. 08, 2022 | Jun. 09, 2022 | Jun. 10, 2022 | Jun. 11, 2022 | Jun. 12, 2022 |
| BEAM LINE 5-4 | ||||||
| Jun. 06, 2022 | Jun. 07, 2022 | Jun. 08, 2022 | Jun. 09, 2022 | Jun. 10, 2022 | Jun. 11, 2022 | Jun. 12, 2022 |
| DOWN/AP | AP | AP | 8820 D.Lu | 5465 T.Kondo | 5465 T.Kondo | 8020 D.Lu |
| AP | AP | CHANGE/8820 D.Lu | VUV CHECKOUT | 5465 T.Kondo | VUV CHECKOUT | 8020 D.Lu |
| AP | AP | 8820 D.Lu | 5465 T.Kondo | 5465 T.Kondo | 8020 D.Lu | 8020 D.Lu |
| BEAM LINE 8-2 | ||||||
| Jun. 06, 2022 | Jun. 07, 2022 | Jun. 08, 2022 | Jun. 09, 2022 | Jun. 10, 2022 | Jun. 11, 2022 | Jun. 12, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jun. 06, 2022 | Jun. 07, 2022 | Jun. 08, 2022 | Jun. 09, 2022 | Jun. 10, 2022 | Jun. 11, 2022 | Jun. 12, 2022 |
| DOWN/AP | AP | AP | VUV CHECKOUT | 8902 S.Lee | 8902 S.Lee | VUV CHECKOUT |
| AP | AP | FACI | 8902 S.Lee | 8902 S.Lee | Unscheduled | 5903 W.Tong |
| AP | AP | FACI | 8902 S.Lee | 8902 S.Lee | Unscheduled | 5903 W.Tong |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jun. 06, 2022 | Jun. 07, 2022 | Jun. 08, 2022 | Jun. 09, 2022 | Jun. 10, 2022 | Jun. 11, 2022 | Jun. 12, 2022 |
| DOWN/AP | AP | AP | 93H2 M.Soldemo | 93H2 M.Soldemo | 93H2 M.Soldemo | 93H2 M.Soldemo |
| AP | AP | 93H2 M.Soldemo | 93H2 M.Soldemo | 93H2 M.Soldemo | 93H2 M.Soldemo | Unscheduled |
| AP | AP | 93H2 M.Soldemo | 93H2 M.Soldemo | 93H2 M.Soldemo | 93H2 M.Soldemo | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jun. 06, 2022 | Jun. 07, 2022 | Jun. 08, 2022 | Jun. 09, 2022 | Jun. 10, 2022 | Jun. 11, 2022 | Jun. 12, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Jun. 06, 2022 | Jun. 07, 2022 | Jun. 08, 2022 | Jun. 09, 2022 | Jun. 10, 2022 | Jun. 11, 2022 | Jun. 12, 2022 |
| DOWN/AP | AP | AP | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| AP | AP | VUV CHECKOUT | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| AP | AP | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| WEEK OF Jun. 13, 2022 | ||||||
| Jun. 13, 2022 | Jun. 14, 2022 | Jun. 15, 2022 | Jun. 16, 2022 | Jun. 17, 2022 | Jun. 18, 2022 | Jun. 19, 2022 |
| BEAM LINE 5-4 | ||||||
| Jun. 13, 2022 | Jun. 14, 2022 | Jun. 15, 2022 | Jun. 16, 2022 | Jun. 17, 2022 | Jun. 18, 2022 | Jun. 19, 2022 |
| 8020 D.Lu | 5832 X.Chen | 5832 X.Chen | 5812 Y.Chen | 5812 Y.Chen | 5793 Z.Cheng | 5793 Z.Cheng |
| VUV CHECKOUT | 5832 X.Chen | VUV CHECKOUT | 5812 Y.Chen | VUV CHECKOUT | 5793 Z.Cheng | VUV CHECKOUT |
| 5832 X.Chen | 5832 X.Chen | 5812 Y.Chen | 5812 Y.Chen | 5793 Z.Cheng | 5793 Z.Cheng | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Jun. 13, 2022 | Jun. 14, 2022 | Jun. 15, 2022 | Jun. 16, 2022 | Jun. 17, 2022 | Jun. 18, 2022 | Jun. 19, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jun. 13, 2022 | Jun. 14, 2022 | Jun. 15, 2022 | Jun. 16, 2022 | Jun. 17, 2022 | Jun. 18, 2022 | Jun. 19, 2022 |
| 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | 5897 G.Qian | 5897 G.Qian |
| 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | VUV CHECKOUT | 5897 G.Qian | 5897 G.Qian |
| 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | 5903 W.Tong | 5897 G.Qian | 5897 G.Qian | 5897 G.Qian |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jun. 13, 2022 | Jun. 14, 2022 | Jun. 15, 2022 | Jun. 16, 2022 | Jun. 17, 2022 | Jun. 18, 2022 | Jun. 19, 2022 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | VUV CHECKOUT | 93H2 M.Soldemo |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | 93H2 M.Soldemo | 93H2 M.Soldemo |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | 93H2 M.Soldemo | 93H2 M.Soldemo |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jun. 13, 2022 | Jun. 14, 2022 | Jun. 15, 2022 | Jun. 16, 2022 | Jun. 17, 2022 | Jun. 18, 2022 | Jun. 19, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Jun. 13, 2022 | Jun. 14, 2022 | Jun. 15, 2022 | Jun. 16, 2022 | Jun. 17, 2022 | Jun. 18, 2022 | Jun. 19, 2022 |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| WEEK OF Jun. 20, 2022 | ||||||
| Jun. 20, 2022 | Jun. 21, 2022 | Jun. 22, 2022 | Jun. 23, 2022 | Jun. 24, 2022 | Jun. 25, 2022 | Jun. 26, 2022 |
| BEAM LINE 5-4 | ||||||
| Jun. 20, 2022 | Jun. 21, 2022 | Jun. 22, 2022 | Jun. 23, 2022 | Jun. 24, 2022 | Jun. 25, 2022 | Jun. 26, 2022 |
| 9702 C.Simes | 9702 C.Simes | 9702 C.Simes | 6037 S.Kim | 6037 S.Kim | 5719 I.Vishik | 8020 D.Lu |
| 9702 C.Simes | 9702 C.Simes | VUV CHECKOUT | 6037 S.Kim | VUV CHECKOUT | VUV CHECKOUT | 8020 D.Lu |
| 9702 C.Simes | 9702 C.Simes | 6037 S.Kim | 6037 S.Kim | 5719 I.Vishik | 8020 D.Lu | 8020 D.Lu |
| BEAM LINE 8-2 | ||||||
| Jun. 20, 2022 | Jun. 21, 2022 | Jun. 22, 2022 | Jun. 23, 2022 | Jun. 24, 2022 | Jun. 25, 2022 | Jun. 26, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jun. 20, 2022 | Jun. 21, 2022 | Jun. 22, 2022 | Jun. 23, 2022 | Jun. 24, 2022 | Jun. 25, 2022 | Jun. 26, 2022 |
| 5897 G.Qian | Unscheduled | VUV CHECKOUT | 5211 L.Mu | 5211 L.Mu | 5211 L.Mu | 5211 L.Mu |
| 5897 G.Qian | Unscheduled | 5211 L.Mu | 5211 L.Mu | 5211 L.Mu | 5211 L.Mu | 5211 L.Mu |
| Unscheduled | Unscheduled | 5211 L.Mu | 5211 L.Mu | 5211 L.Mu | 5211 L.Mu | 5211 L.Mu |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jun. 20, 2022 | Jun. 21, 2022 | Jun. 22, 2022 | Jun. 23, 2022 | Jun. 24, 2022 | Jun. 25, 2022 | Jun. 26, 2022 |
| 93H2 M.Soldemo | 93H2 M.Soldemo | 93H2 M.Soldemo | 93H2 M.Soldemo | VUV CHECKOUT | 8055 H.Ogasawara | 8055 H.Ogasawara |
| 93H2 M.Soldemo | 93H2 M.Soldemo | 93H2 M.Soldemo | Unscheduled | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara |
| 93H2 M.Soldemo | 93H2 M.Soldemo | 93H2 M.Soldemo | Unscheduled | 8055 H.Ogasawara | 8055 H.Ogasawara | 8055 H.Ogasawara |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jun. 20, 2022 | Jun. 21, 2022 | Jun. 22, 2022 | Jun. 23, 2022 | Jun. 24, 2022 | Jun. 25, 2022 | Jun. 26, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Jun. 20, 2022 | Jun. 21, 2022 | Jun. 22, 2022 | Jun. 23, 2022 | Jun. 24, 2022 | Jun. 25, 2022 | Jun. 26, 2022 |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| VUV CHECKOUT | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| WEEK OF Jun. 27, 2022 | ||||||
| Jun. 27, 2022 | Jun. 28, 2022 | Jun. 29, 2022 | Jun. 30, 2022 | Jul. 01, 2022 | Jul. 02, 2022 | Jul. 03, 2022 |
| BEAM LINE 5-4 | ||||||
| Jun. 27, 2022 | Jun. 28, 2022 | Jun. 29, 2022 | Jun. 30, 2022 | Jul. 01, 2022 | Jul. 02, 2022 | Jul. 03, 2022 |
| 8020 D.Lu/AP | AP | AP | 5353 J.He | 5353 J.He | 9702 C.Simes | 9702 C.Simes |
| AP | AP | VUV CHECKOUT | 5353 J.He | VUV CHECKOUT | 9702 C.Simes | 9702 C.Simes |
| AP | AP | 5353 J.He | 5353 J.He | 9702 C.Simes | 9702 C.Simes | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Jun. 27, 2022 | Jun. 28, 2022 | Jun. 29, 2022 | Jun. 30, 2022 | Jul. 01, 2022 | Jul. 02, 2022 | Jul. 03, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jun. 27, 2022 | Jun. 28, 2022 | Jun. 29, 2022 | Jun. 30, 2022 | Jul. 01, 2022 | Jul. 02, 2022 | Jul. 03, 2022 |
| 5211 L.Mu/AP | AP | AP | FACI | FACI | FACI | FACI |
| AP | AP | FACI | FACI | FACI | FACI | FACI |
| AP | AP | FACI | FACI | FACI | FACI | FACI |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jun. 27, 2022 | Jun. 28, 2022 | Jun. 29, 2022 | Jun. 30, 2022 | Jul. 01, 2022 | Jul. 02, 2022 | Jul. 03, 2022 |
| 8055 H.Ogasawar/AP | AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jun. 27, 2022 | Jun. 28, 2022 | Jun. 29, 2022 | Jun. 30, 2022 | Jul. 01, 2022 | Jul. 02, 2022 | Jul. 03, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Jun. 27, 2022 | Jun. 28, 2022 | Jun. 29, 2022 | Jun. 30, 2022 | Jul. 01, 2022 | Jul. 02, 2022 | Jul. 03, 2022 |
| 9709 K.Moy/AP | AP | AP | 9709 K.Moy | 9709 K.Moy | Unscheduled | 9709 K.Moy |
| AP | AP | 9709 K.Moy | 9709 K.Moy | Unscheduled | VUV CHECKOUT | 9709 K.Moy |
| AP | AP | 9709 K.Moy | 9709 K.Moy | Unscheduled | 9709 K.Moy | 9709 K.Moy |
| WEEK OF Jul. 04, 2022 | ||||||
| Jul. 04, 2022 | Jul. 05, 2022 | Jul. 06, 2022 | Jul. 07, 2022 | Jul. 08, 2022 | Jul. 09, 2022 | Jul. 10, 2022 |
| BEAM LINE 5-4 | ||||||
| Jul. 04, 2022 | Jul. 05, 2022 | Jul. 06, 2022 | Jul. 07, 2022 | Jul. 08, 2022 | Jul. 09, 2022 | Jul. 10, 2022 |
| 9702 C.Simes | 9702 C.Simes | 5569 M.Yi | 5569 M.Yi | 5066 G.Zong | 5066 G.Zong | 9702 C.Simes |
| 9702 C.Simes | VUV CHECKOUT | 5569 M.Yi | VUV CHECKOUT | 5066 G.Zong | VUV CHECKOUT | 9702 C.Simes |
| 9702 C.Simes | 5569 M.Yi | 5569 M.Yi | 5066 G.Zong | 5066 G.Zong | 9702 C.Simes | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Jul. 04, 2022 | Jul. 05, 2022 | Jul. 06, 2022 | Jul. 07, 2022 | Jul. 08, 2022 | Jul. 09, 2022 | Jul. 10, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jul. 04, 2022 | Jul. 05, 2022 | Jul. 06, 2022 | Jul. 07, 2022 | Jul. 08, 2022 | Jul. 09, 2022 | Jul. 10, 2022 |
| FACI | VUV CHECKOUT | 5674 G.Kumar | 5674 G.Kumar | 5674 G.Kumar | 93H8 A.Cordones-Ha | 93H8 A.Cordones-Ha |
| FACI | 5674 G.Kumar | 5674 G.Kumar | 5674 G.Kumar | CHANGE/93H8 A.Cord | 93H8 A.Cordones-Ha | 93H8 A.Cordones-Ha |
| FACI | 5674 G.Kumar | 5674 G.Kumar | 5674 G.Kumar | 93H8 A.Cordones-Ha | 93H8 A.Cordones-Ha | 93H8 A.Cordones-Ha |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jul. 04, 2022 | Jul. 05, 2022 | Jul. 06, 2022 | Jul. 07, 2022 | Jul. 08, 2022 | Jul. 09, 2022 | Jul. 10, 2022 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | VUV CHECKOUT | 5900 J.LaRue | 5900 J.LaRue |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | 5900 J.LaRue | 5900 J.LaRue | 5900 J.LaRue |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | 5900 J.LaRue | 5900 J.LaRue | 5900 J.LaRue |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jul. 04, 2022 | Jul. 05, 2022 | Jul. 06, 2022 | Jul. 07, 2022 | Jul. 08, 2022 | Jul. 09, 2022 | Jul. 10, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Jul. 04, 2022 | Jul. 05, 2022 | Jul. 06, 2022 | Jul. 07, 2022 | Jul. 08, 2022 | Jul. 09, 2022 | Jul. 10, 2022 |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| WEEK OF Jul. 11, 2022 | ||||||
| Jul. 11, 2022 | Jul. 12, 2022 | Jul. 13, 2022 | Jul. 14, 2022 | Jul. 15, 2022 | Jul. 16, 2022 | Jul. 17, 2022 |
| BEAM LINE 5-4 | ||||||
| Jul. 11, 2022 | Jul. 12, 2022 | Jul. 13, 2022 | Jul. 14, 2022 | Jul. 15, 2022 | Jul. 16, 2022 | Jul. 17, 2022 |
| 9702 C.Simes/AP | AP | AP | 6044 H.Pfau | 6044 H.Pfau | 5532 D.Dessau | 5532 D.Dessau |
| AP | AP | VUV CHECKOUT | 6044 H.Pfau | VUV CHECKOUT | 5532 D.Dessau | VUV CHECKOUT |
| AP | AP | 6044 H.Pfau | 6044 H.Pfau | 5532 D.Dessau | 5532 D.Dessau | 9702 C.Simes |
| BEAM LINE 8-2 | ||||||
| Jul. 11, 2022 | Jul. 12, 2022 | Jul. 13, 2022 | Jul. 14, 2022 | Jul. 15, 2022 | Jul. 16, 2022 | Jul. 17, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jul. 11, 2022 | Jul. 12, 2022 | Jul. 13, 2022 | Jul. 14, 2022 | Jul. 15, 2022 | Jul. 16, 2022 | Jul. 17, 2022 |
| AP | AP | AP | 8098 T.Kroll | 8098 T.Kroll | 8098 T.Kroll | 8098 T.Kroll |
| AP | AP | 8098 T.Kroll | 8098 T.Kroll | 8098 T.Kroll | 8098 T.Kroll | Unscheduled |
| AP | AP | 8098 T.Kroll | 8098 T.Kroll | 8098 T.Kroll | 8098 T.Kroll | Unscheduled |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jul. 11, 2022 | Jul. 12, 2022 | Jul. 13, 2022 | Jul. 14, 2022 | Jul. 15, 2022 | Jul. 16, 2022 | Jul. 17, 2022 |
| 5900 J.LaRue/AP | AP | AP | VUV CHECKOUT | 93H2 M.Soldemo | 93H2 M.Soldemo | Unscheduled |
| AP | AP | Unscheduled | 93H2 M.Soldemo | 93H2 M.Soldemo | Unscheduled | Unscheduled |
| AP | AP | Unscheduled | 93H2 M.Soldemo | 93H2 M.Soldemo | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jul. 11, 2022 | Jul. 12, 2022 | Jul. 13, 2022 | Jul. 14, 2022 | Jul. 15, 2022 | Jul. 16, 2022 | Jul. 17, 2022 |
| DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Jul. 11, 2022 | Jul. 12, 2022 | Jul. 13, 2022 | Jul. 14, 2022 | Jul. 15, 2022 | Jul. 16, 2022 | Jul. 17, 2022 |
| 9709 K.Moy/AP | AP | AP | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| AP | AP | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| AP | AP | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| WEEK OF Jul. 18, 2022 | ||||||
| Jul. 18, 2022 | Jul. 19, 2022 | Jul. 20, 2022 | Jul. 21, 2022 | Jul. 22, 2022 | Jul. 23, 2022 | Jul. 24, 2022 |
| BEAM LINE 5-4 | ||||||
| Jul. 18, 2022 | Jul. 19, 2022 | Jul. 20, 2022 | Jul. 21, 2022 | Jul. 22, 2022 | Jul. 23, 2022 | Jul. 24, 2022 |
| 9702 C.Simes | 9702 C.Simes | 9702 C.Simes | 9702 C.Simes | 5719 I.Vishik | 6064 Y.He | 6064 Y.He |
| 9702 C.Simes | 9702 C.Simes | 9702 C.Simes | VUV CHECKOUT | VUV CHECKOUT | 6064 Y.He | VUV CHECKOUT |
| 9702 C.Simes | 9702 C.Simes | 9702 C.Simes | 5719 I.Vishik | 6064 Y.He | 6064 Y.He | 5803 Y.Chen |
| BEAM LINE 8-2 | ||||||
| Jul. 18, 2022 | Jul. 19, 2022 | Jul. 20, 2022 | Jul. 21, 2022 | Jul. 22, 2022 | Jul. 23, 2022 | Jul. 24, 2022 |
| DOWN | DOWN | 5545 C.Roberts | 5545 C.Roberts | 5545 C.Roberts | FACI | FACI |
| DOWN | VUV CHECKOUT | 5545 C.Roberts | 5545 C.Roberts | 5545 C.Robert/FACI | FACI | FACI |
| DOWN | 5545 C.Roberts | 5545 C.Roberts | 5545 C.Roberts | FACI | FACI | FACI |
| BEAM LINE 10-1 | ||||||
| Jul. 18, 2022 | Jul. 19, 2022 | Jul. 20, 2022 | Jul. 21, 2022 | Jul. 22, 2022 | Jul. 23, 2022 | Jul. 24, 2022 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | 5319 A.Wolcott | 5319 A.Wolcott | 5319 A.Wolcott |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | 5319 A.Wolcott | 5319 A.Wolcott | 5319 A.Wolcott |
| Unscheduled | Unscheduled | Unscheduled | CHANGE/5319 A.Wolc | 5319 A.Wolcott | 5319 A.Wolcott | 5319 A.Wolcott |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jul. 18, 2022 | Jul. 19, 2022 | Jul. 20, 2022 | Jul. 21, 2022 | Jul. 22, 2022 | Jul. 23, 2022 | Jul. 24, 2022 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jul. 18, 2022 | Jul. 19, 2022 | Jul. 20, 2022 | Jul. 21, 2022 | Jul. 22, 2022 | Jul. 23, 2022 | Jul. 24, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Jul. 18, 2022 | Jul. 19, 2022 | Jul. 20, 2022 | Jul. 21, 2022 | Jul. 22, 2022 | Jul. 23, 2022 | Jul. 24, 2022 |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy |
| WEEK OF Jul. 25, 2022 | ||||||
| Jul. 25, 2022 | Jul. 26, 2022 | Jul. 27, 2022 | Jul. 28, 2022 | Jul. 29, 2022 | Jul. 30, 2022 | Jul. 31, 2022 |
| BEAM LINE 5-4 | ||||||
| Jul. 25, 2022 | Jul. 26, 2022 | Jul. 27, 2022 | Jul. 28, 2022 | Jul. 29, 2022 | Jul. 30, 2022 | Jul. 31, 2022 |
| 5803 Y.Chen | 5803 Y.Chen | 6062 S.Regmi | 6062 S.Regmi | 8820 D.Lu/AP | AP/DOWN | DOWN |
| 5803 Y.Chen | VUV CHECKOUT | 6062 S.Regmi | CHANGE/8820 D.Lu | AP | DOWN | DOWN |
| 5803 Y.Chen | 6062 S.Regmi | 6062 S.Regmi | 8820 D.Lu | AP | DOWN | DOWN |
| BEAM LINE 8-2 | ||||||
| Jul. 25, 2022 | Jul. 26, 2022 | Jul. 27, 2022 | Jul. 28, 2022 | Jul. 29, 2022 | Jul. 30, 2022 | Jul. 31, 2022 |
| FACI | FACI | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee/AP | AP/DOWN | DOWN |
| FACI | VUV CHECKOUT | 5863 J.Lee | 5863 J.Lee | AP | DOWN | DOWN |
| FACI | 5863 J.Lee | 5863 J.Lee | 5863 J.Lee | AP | DOWN | DOWN |
| BEAM LINE 10-1 | ||||||
| Jul. 25, 2022 | Jul. 26, 2022 | Jul. 27, 2022 | Jul. 28, 2022 | Jul. 29, 2022 | Jul. 30, 2022 | Jul. 31, 2022 |
| 5319 A.Wolcott | 5319 A.Wolcott | 5319 A.Wolcott | Unscheduled | AP | AP/DOWN | DOWN |
| 5319 A.Wolcott | 5319 A.Wolcott | 5319 A.Wolcott | Unscheduled | AP | DOWN | DOWN |
| 5319 A.Wolcott | 5319 A.Wolcott | Unscheduled | Unscheduled | AP | DOWN | DOWN |
| BEAM LINE 13-2 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jul. 25, 2022 | Jul. 26, 2022 | Jul. 27, 2022 | Jul. 28, 2022 | Jul. 29, 2022 | Jul. 30, 2022 | Jul. 31, 2022 |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | AP | AP/DOWN | DOWN |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | AP | DOWN | DOWN |
| Unscheduled | Unscheduled | Unscheduled | Unscheduled | AP | DOWN | DOWN |
| BEAM LINE 13-3 (Beam time is shared between beam line end stations which cannot run simultaneously) | ||||||
| Jul. 25, 2022 | Jul. 26, 2022 | Jul. 27, 2022 | Jul. 28, 2022 | Jul. 29, 2022 | Jul. 30, 2022 | Jul. 31, 2022 |
| DOWN | DOWN | DOWN | DOWN | DOWN/AP | AP/DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | AP | DOWN | DOWN |
| DOWN | DOWN | DOWN | DOWN | AP | DOWN | DOWN |
| BEAM LINE 16-2 | ||||||
| Jul. 25, 2022 | Jul. 26, 2022 | Jul. 27, 2022 | Jul. 28, 2022 | Jul. 29, 2022 | Jul. 30, 2022 | Jul. 31, 2022 |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy/AP | AP/DOWN | DOWN |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | AP | DOWN | DOWN |
| 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | 9709 K.Moy | AP | DOWN | DOWN |