SSRL Beam Port Schedule

                

Weeks of the Schedule
 Oct. 12, 2026   Oct. 19, 2026   Oct. 26, 2026   Nov. 02, 2026 
 Nov. 09, 2026   Nov. 16, 2026   Nov. 23, 2026   Nov. 30, 2026 
 Dec. 07, 2026   Dec. 14, 2026   Dec. 21, 2026   Dec. 28, 2026 
 Jan. 04, 2027   Jan. 11, 2027   Jan. 18, 2027   Jan. 25, 2027 
 Feb. 01, 2027 

Back to Table of Contents

WEEK OF Oct. 12, 2026
                                         
Oct. 12, 2026      Oct. 13, 2026      Oct. 14, 2026      Oct. 15, 2026      Oct. 16, 2026      Oct. 17, 2026      Oct. 18, 2026     
BEAM   LINE 9-2  
Oct. 12, 2026      Oct. 13, 2026      Oct. 14, 2026      Oct. 15, 2026      Oct. 16, 2026      Oct. 17, 2026      Oct. 18, 2026     
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 12-1 
Oct. 12, 2026      Oct. 13, 2026      Oct. 14, 2026      Oct. 15, 2026      Oct. 16, 2026      Oct. 17, 2026      Oct. 18, 2026     
DOWN               FACI               FACI               CHANGE/8844 S.Solt 8844 S.Soltis      8844 S.Soltis      8844 S.Soltis     
FACI               FACI               FACI               8844 S.Soltis      8844 S.Soltis      8844 S.Soltis      8844 S.Soltis     
FACI               FACI               FACI               8844 S.Soltis      8844 S.Soltis      8844 S.Soltis      8844 S.Soltis     
BEAM   LINE 12-2 
Oct. 12, 2026      Oct. 13, 2026      Oct. 14, 2026      Oct. 15, 2026      Oct. 16, 2026      Oct. 17, 2026      Oct. 18, 2026     
DOWN               FACI               FACI               FACI               FACI               FACI               9A55 K.Garcia     
FACI               FACI               FACI               FACI               FACI               CHANGE/9A55 K.Garc CHANGE/9A66 S.Waka
FACI               FACI               FACI               FACI               FACI               9A55 K.Garcia      9A66 S.Wakatsuki  
BEAM   LINE 14-1 
Oct. 12, 2026      Oct. 13, 2026      Oct. 14, 2026      Oct. 15, 2026      Oct. 16, 2026      Oct. 17, 2026      Oct. 18, 2026     
DOWN               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              

Back to Table of Contents

WEEK OF Oct. 19, 2026
                                         
Oct. 19, 2026      Oct. 20, 2026      Oct. 21, 2026      Oct. 22, 2026      Oct. 23, 2026      Oct. 24, 2026      Oct. 25, 2026     
BEAM   LINE 9-2  
Oct. 19, 2026      Oct. 20, 2026      Oct. 21, 2026      Oct. 22, 2026      Oct. 23, 2026      Oct. 24, 2026      Oct. 25, 2026     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 12-1 
Oct. 19, 2026      Oct. 20, 2026      Oct. 21, 2026      Oct. 22, 2026      Oct. 23, 2026      Oct. 24, 2026      Oct. 25, 2026     
8844 S.Soltis      8844 S.Soltis      7B75 R.Stanfield   7B75 R.Stanfield   GM01               7B96 H.Kratochvil  7B96 H.Kratochvil 
8844 S.Soltis      CHANGE/7B75 R.Stan 7B75 R.Stanfield   GM01               CHANGE/7B96 H.Krat 7B96 H.Kratochvil  CHANGE/7B76 J.Rabb
8844 S.Soltis      7B75 R.Stanfield   7B75 R.Stanfield   GM01               7B96 H.Kratochvil  7B96 H.Kratochvil  7B76 J.Rabb       
BEAM   LINE 12-2 
Oct. 19, 2026      Oct. 20, 2026      Oct. 21, 2026      Oct. 22, 2026      Oct. 23, 2026      Oct. 24, 2026      Oct. 25, 2026     
9A66 S.Wakatsuki   6R65 M.Burkart     6R66 E.Kissman     7B87 T.Makris      6B68 A.Lamb        7B58 E.Pozharskiy  7B58 E.Pozharskiy 
CHANGE/6R65 M.Burk CHANGE/6R66 E.Kiss CHANGE/7B87 T.Makr CHANGE/6B68 A.Lamb CHANGE/7B58 E.Pozh 7B58 E.Pozharskiy  CHANGE/7B41 W.Chan
6R65 M.Burkart     6R66 E.Kissman     7B87 T.Makris      6B68 A.Lamb        7B58 E.Pozharskiy  7B58 E.Pozharskiy  7B41 W.Chang      
BEAM   LINE 14-1 
Oct. 19, 2026      Oct. 20, 2026      Oct. 21, 2026      Oct. 22, 2026      Oct. 23, 2026      Oct. 24, 2026      Oct. 25, 2026     
FACI               Unscheduled        Unscheduled        Unscheduled        6B99 S.Cramer      Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        CHANGE/6B99 S.Cram Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        6B99 S.Cramer      Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Oct. 26, 2026
                                         
Oct. 26, 2026      Oct. 27, 2026      Oct. 28, 2026      Oct. 29, 2026      Oct. 30, 2026      Oct. 31, 2026      Nov. 01, 2026     
BEAM   LINE 9-2  
Oct. 26, 2026      Oct. 27, 2026      Oct. 28, 2026      Oct. 29, 2026      Oct. 30, 2026      Oct. 31, 2026      Nov. 01, 2026     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 12-1 
Oct. 26, 2026      Oct. 27, 2026      Oct. 28, 2026      Oct. 29, 2026      Oct. 30, 2026      Oct. 31, 2026      Nov. 01, 2026     
7B76 J.Rabb        8124 A.Cohen       7B91 M.Gaynes      CHANGE/9A35 G.de l Unscheduled        GM01               6B89 V.Cherezov   
CHANGE/8124 A.Cohe CHANGE/7B91 M.Gayn CHANGE/8B05 N.Capr 9A35 G.de leon Boe GM01               CHANGE/6B89 V.Cher CHANGE/7B78 N.Chim
8124 A.Cohen       7B91 M.Gaynes      8B05 N.Capra       9A35 G.de leon Boe GM01               6B89 V.Cherezov    7B78 N.Chim       
BEAM   LINE 12-2 
Oct. 26, 2026      Oct. 27, 2026      Oct. 28, 2026      Oct. 29, 2026      Oct. 30, 2026      Oct. 31, 2026      Nov. 01, 2026     
7B41 W.Chang       SSCI               SSCI               8B01 M.Neugebauer  7B47 J.Moody       7B84 S.Copp        Unscheduled       
SSCI               SSCI               CHANGE/8B01 M.Neug CHANGE/7B47 J.Mood CHANGE/7B84 S.Copp Unscheduled        CHANGE/7B62 G.Loui
SSCI               SSCI               8B01 M.Neugebauer  7B47 J.Moody       7B84 S.Copp        Unscheduled        7B62 G.Louie      
BEAM   LINE 14-1 
Oct. 26, 2026      Oct. 27, 2026      Oct. 28, 2026      Oct. 29, 2026      Oct. 30, 2026      Oct. 31, 2026      Nov. 01, 2026     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Nov. 02, 2026
                                         
Nov. 02, 2026      Nov. 03, 2026      Nov. 04, 2026      Nov. 05, 2026      Nov. 06, 2026      Nov. 07, 2026      Nov. 08, 2026     
BEAM   LINE 9-2  
Nov. 02, 2026      Nov. 03, 2026      Nov. 04, 2026      Nov. 05, 2026      Nov. 06, 2026      Nov. 07, 2026      Nov. 08, 2026     
FACI               FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Nov. 02, 2026      Nov. 03, 2026      Nov. 04, 2026      Nov. 05, 2026      Nov. 06, 2026      Nov. 07, 2026      Nov. 08, 2026     
7B78 N.Chim        Unscheduled        Unscheduled        8124 A.Cohen       8124 A.Cohen       GM01               7B45 N.Noinaj     
Unscheduled        Unscheduled        CHANGE/8124 A.Cohe 8124 A.Cohen       GM01               CHANGE/7B45 N.Noin CHANGE/7B05 L.Siba
Unscheduled        Unscheduled        8124 A.Cohen       8124 A.Cohen       GM01               7B45 N.Noinaj      7B05 L.Sibaud     
BEAM   LINE 12-2 
Nov. 02, 2026      Nov. 03, 2026      Nov. 04, 2026      Nov. 05, 2026      Nov. 06, 2026      Nov. 07, 2026      Nov. 08, 2026     
7B62 G.Louie       Unscheduled        Unscheduled        9A70 S.Boxer       7B71 C.Goulding    7B42 L.Hung        7B63 K.Nguyen     
Unscheduled        Unscheduled        CHANGE/9A70 S.Boxe CHANGE/7B71 C.Goul CHANGE/7B42 L.Hung CHANGE/7B63 K.Nguy CHANGE/6B91 S.Pega
Unscheduled        Unscheduled        9A70 S.Boxer       7B71 C.Goulding    7B42 L.Hung        7B63 K.Nguyen      6B91 S.Pegan      
BEAM   LINE 14-1 
Nov. 02, 2026      Nov. 03, 2026      Nov. 04, 2026      Nov. 05, 2026      Nov. 06, 2026      Nov. 07, 2026      Nov. 08, 2026     
Unscheduled        Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Nov. 09, 2026
                                         
Nov. 09, 2026      Nov. 10, 2026      Nov. 11, 2026      Nov. 12, 2026      Nov. 13, 2026      Nov. 14, 2026      Nov. 15, 2026     
BEAM   LINE 9-2  
Nov. 09, 2026      Nov. 10, 2026      Nov. 11, 2026      Nov. 12, 2026      Nov. 13, 2026      Nov. 14, 2026      Nov. 15, 2026     
Unscheduled        Unscheduled        Unscheduled        7B83 V.Mahankal    Unscheduled        7B77 A.Liu         Unscheduled       
Unscheduled        Unscheduled        CHANGE/7B83 V.Maha Unscheduled        CHANGE/7B77 A.Liu  Unscheduled        Unscheduled       
Unscheduled        Unscheduled        7B83 V.Mahankal    Unscheduled        7B77 A.Liu         Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Nov. 09, 2026      Nov. 10, 2026      Nov. 11, 2026      Nov. 12, 2026      Nov. 13, 2026      Nov. 14, 2026      Nov. 15, 2026     
7B05 L.Sibaud      Unscheduled        7B73 M.Fischer     CHANGE/9A35 G.de l Unscheduled        7B65 P.Kiser       7B88 J.Kern       
Unscheduled        CHANGE/7B73 M.Fisc CHANGE/7B36 J.Jams 9A35 G.de leon Boe CHANGE/7B65 P.Kise CHANGE/7B88 J.Kern GM01              
Unscheduled        7B73 M.Fischer     7B36 J.Jamsen      9A35 G.de leon Boe 7B65 P.Kiser       7B88 J.Kern        GM01              
BEAM   LINE 12-2 
Nov. 09, 2026      Nov. 10, 2026      Nov. 11, 2026      Nov. 12, 2026      Nov. 13, 2026      Nov. 14, 2026      Nov. 15, 2026     
6B91 S.Pegan       8B02 B.Kannadasan  7B93 X.Zang        B011 H.Fung        7B82 L.Yang        8B03 F.Tezcan      8B03 F.Tezcan     
CHANGE/8B02 B.Kann CHANGE/7B93 X.Zang CHANGE/B011 H.Fung CHANGE/7B82 L.Yang CHANGE/8B03 F.Tezc 8B03 F.Tezcan      CHANGE/7B51 X.Wilc
8B02 B.Kannadasan  7B93 X.Zang        B011 H.Fung        7B82 L.Yang        8B03 F.Tezcan      8B03 F.Tezcan      7B51 X.Wilcox     
BEAM   LINE 14-1 
Nov. 09, 2026      Nov. 10, 2026      Nov. 11, 2026      Nov. 12, 2026      Nov. 13, 2026      Nov. 14, 2026      Nov. 15, 2026     
Unscheduled        Unscheduled        7B68 J.Pizarro     Unscheduled        Unscheduled        6B99 S.Cramer      Unscheduled       
Unscheduled        CHANGE/7B68 J.Piza Unscheduled        Unscheduled        CHANGE/6B99 S.Cram Unscheduled        Unscheduled       
Unscheduled        7B68 J.Pizarro     Unscheduled        Unscheduled        6B99 S.Cramer      Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Nov. 16, 2026
                                         
Nov. 16, 2026      Nov. 17, 2026      Nov. 18, 2026      Nov. 19, 2026      Nov. 20, 2026      Nov. 21, 2026      Nov. 22, 2026     
BEAM   LINE 9-2  
Nov. 16, 2026      Nov. 17, 2026      Nov. 18, 2026      Nov. 19, 2026      Nov. 20, 2026      Nov. 21, 2026      Nov. 22, 2026     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        8B04 J.Clinger     Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        CHANGE/8B04 J.Clin Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        8B04 J.Clinger     Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Nov. 16, 2026      Nov. 17, 2026      Nov. 18, 2026      Nov. 19, 2026      Nov. 20, 2026      Nov. 21, 2026      Nov. 22, 2026     
GM01               Unscheduled        Unscheduled        7B75 R.Stanfield   7B75 R.Stanfield   7B06 J.Mills       7B59 K.Ryan       
Unscheduled        Unscheduled        CHANGE/7B75 R.Stan 7B75 R.Stanfield   CHANGE/7B06 J.Mill CHANGE/7B59 K.Ryan Unscheduled       
Unscheduled        Unscheduled        7B75 R.Stanfield   7B75 R.Stanfield   7B06 J.Mills       7B59 K.Ryan        Unscheduled       
BEAM   LINE 12-2 
Nov. 16, 2026      Nov. 17, 2026      Nov. 18, 2026      Nov. 19, 2026      Nov. 20, 2026      Nov. 21, 2026      Nov. 22, 2026     
7B51 X.Wilcox      Unscheduled        Unscheduled        Unscheduled        7B69 M.Wilson      Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        CHANGE/7B69 M.Wils Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        7B69 M.Wilson      Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-1 
Nov. 16, 2026      Nov. 17, 2026      Nov. 18, 2026      Nov. 19, 2026      Nov. 20, 2026      Nov. 21, 2026      Nov. 22, 2026     
Unscheduled        Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Nov. 23, 2026
                                         
Nov. 23, 2026      Nov. 24, 2026      Nov. 25, 2026      Nov. 26, 2026      Nov. 27, 2026      Nov. 28, 2026      Nov. 29, 2026     
BEAM   LINE 9-2  
Nov. 23, 2026      Nov. 24, 2026      Nov. 25, 2026      Nov. 26, 2026      Nov. 27, 2026      Nov. 28, 2026      Nov. 29, 2026     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Nov. 23, 2026      Nov. 24, 2026      Nov. 25, 2026      Nov. 26, 2026      Nov. 27, 2026      Nov. 28, 2026      Nov. 29, 2026     
Unscheduled        Unscheduled        GM01               DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        GM01               Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        GM01               DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-2 
Nov. 23, 2026      Nov. 24, 2026      Nov. 25, 2026      Nov. 26, 2026      Nov. 27, 2026      Nov. 28, 2026      Nov. 29, 2026     
Unscheduled        7B95 F.Van Petegem 7B95 F.Van Petegem DOWN               DOWN               Unscheduled        Unscheduled       
CHANGE/7B95 F.Van  7B95 F.Van Petegem Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
7B95 F.Van Petegem 7B95 F.Van Petegem DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-1 
Nov. 23, 2026      Nov. 24, 2026      Nov. 25, 2026      Nov. 26, 2026      Nov. 27, 2026      Nov. 28, 2026      Nov. 29, 2026     
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Nov. 30, 2026
                                         
Nov. 30, 2026      Dec. 01, 2026      Dec. 02, 2026      Dec. 03, 2026      Dec. 04, 2026      Dec. 05, 2026      Dec. 06, 2026     
BEAM   LINE 9-2  
Nov. 30, 2026      Dec. 01, 2026      Dec. 02, 2026      Dec. 03, 2026      Dec. 04, 2026      Dec. 05, 2026      Dec. 06, 2026     
Unscheduled        Unscheduled        6B84 G.Chang       7B86 S.Bowman      Unscheduled        Unscheduled        Unscheduled       
Unscheduled        CHANGE/6B84 G.Chan CHANGE/7B86 S.Bowm Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        6B84 G.Chang       7B86 S.Bowman      Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Nov. 30, 2026      Dec. 01, 2026      Dec. 02, 2026      Dec. 03, 2026      Dec. 04, 2026      Dec. 05, 2026      Dec. 06, 2026     
Unscheduled        8124 A.Cohen       8124 A.Cohen       GM01               7B86 S.Bowman      Unscheduled        Unscheduled       
CHANGE/8124 A.Cohe 8124 A.Cohen       GM01               CHANGE/7B86 S.Bowm Unscheduled        Unscheduled        Unscheduled       
8124 A.Cohen       8124 A.Cohen       GM01               7B86 S.Bowman      Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-2 
Nov. 30, 2026      Dec. 01, 2026      Dec. 02, 2026      Dec. 03, 2026      Dec. 04, 2026      Dec. 05, 2026      Dec. 06, 2026     
Unscheduled        7B72 A.Fisher      Unscheduled        8B06 R.Pham        7B41 W.Chang       7B78 N.Chim        6B82 L.Cuello     
CHANGE/7B72 A.Fish Unscheduled        CHANGE/8B06 R.Pham CHANGE/7B41 W.Chan CHANGE/7B78 N.Chim CHANGE/6B82 L.Cuel 6B82 L.Cuello     
7B72 A.Fisher      Unscheduled        8B06 R.Pham        7B41 W.Chang       7B78 N.Chim        6B82 L.Cuello      6B82 L.Cuello     
BEAM   LINE 14-1 
Nov. 30, 2026      Dec. 01, 2026      Dec. 02, 2026      Dec. 03, 2026      Dec. 04, 2026      Dec. 05, 2026      Dec. 06, 2026     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Dec. 07, 2026
                                         
Dec. 07, 2026      Dec. 08, 2026      Dec. 09, 2026      Dec. 10, 2026      Dec. 11, 2026      Dec. 12, 2026      Dec. 13, 2026     
BEAM   LINE 9-2  
Dec. 07, 2026      Dec. 08, 2026      Dec. 09, 2026      Dec. 10, 2026      Dec. 11, 2026      Dec. 12, 2026      Dec. 13, 2026     
Unscheduled        Unscheduled        Unscheduled        7B86 S.Bowman      Unscheduled        Unscheduled        7B77 A.Liu        
Unscheduled        Unscheduled        CHANGE/7B86 S.Bowm Unscheduled        Unscheduled        CHANGE/7B77 A.Liu  Unscheduled       
Unscheduled        Unscheduled        7B86 S.Bowman      Unscheduled        Unscheduled        7B77 A.Liu         Unscheduled       
BEAM   LINE 12-1 
Dec. 07, 2026      Dec. 08, 2026      Dec. 09, 2026      Dec. 10, 2026      Dec. 11, 2026      Dec. 12, 2026      Dec. 13, 2026     
Unscheduled        Unscheduled        Unscheduled        GM01               6B86 X.Wang        7B79 R.Bjork       7B75 R.Stanfield  
Unscheduled        Unscheduled        GM01               CHANGE/6B86 X.Wang CHANGE/7B79 R.Bjor CHANGE/7B75 R.Stan 7B75 R.Stanfield  
Unscheduled        Unscheduled        GM01               6B86 X.Wang        7B79 R.Bjork       7B75 R.Stanfield   7B75 R.Stanfield  
BEAM   LINE 12-2 
Dec. 07, 2026      Dec. 08, 2026      Dec. 09, 2026      Dec. 10, 2026      Dec. 11, 2026      Dec. 12, 2026      Dec. 13, 2026     
6B82 L.Cuello      Unscheduled        Unscheduled        Unscheduled        6B92 S.Johnson     7B99 J.Pizarro     Unscheduled       
Unscheduled        Unscheduled        Unscheduled        CHANGE/6B92 S.John CHANGE/7B99 J.Piza Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        6B92 S.Johnson     7B99 J.Pizarro     Unscheduled        Unscheduled       
BEAM   LINE 14-1 
Dec. 07, 2026      Dec. 08, 2026      Dec. 09, 2026      Dec. 10, 2026      Dec. 11, 2026      Dec. 12, 2026      Dec. 13, 2026     
Unscheduled        Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Dec. 14, 2026
                                         
Dec. 14, 2026      Dec. 15, 2026      Dec. 16, 2026      Dec. 17, 2026      Dec. 18, 2026      Dec. 19, 2026      Dec. 20, 2026     
BEAM   LINE 9-2  
Dec. 14, 2026      Dec. 15, 2026      Dec. 16, 2026      Dec. 17, 2026      Dec. 18, 2026      Dec. 19, 2026      Dec. 20, 2026     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Dec. 14, 2026      Dec. 15, 2026      Dec. 16, 2026      Dec. 17, 2026      Dec. 18, 2026      Dec. 19, 2026      Dec. 20, 2026     
7B75 R.Stanfield   Unscheduled        Unscheduled        GM01               Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        GM01               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        GM01               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-2 
Dec. 14, 2026      Dec. 15, 2026      Dec. 16, 2026      Dec. 17, 2026      Dec. 18, 2026      Dec. 19, 2026      Dec. 20, 2026     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-1 
Dec. 14, 2026      Dec. 15, 2026      Dec. 16, 2026      Dec. 17, 2026      Dec. 18, 2026      Dec. 19, 2026      Dec. 20, 2026     
Unscheduled        Unscheduled        6B99 S.Cramer      Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        CHANGE/6B99 S.Cram Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        6B99 S.Cramer      Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Dec. 21, 2026
                                         
Dec. 21, 2026      Dec. 22, 2026      Dec. 23, 2026      Dec. 24, 2026      Dec. 25, 2026      Dec. 26, 2026      Dec. 27, 2026     
BEAM   LINE 9-2  
Dec. 21, 2026      Dec. 22, 2026      Dec. 23, 2026      Dec. 24, 2026      Dec. 25, 2026      Dec. 26, 2026      Dec. 27, 2026     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Dec. 21, 2026      Dec. 22, 2026      Dec. 23, 2026      Dec. 24, 2026      Dec. 25, 2026      Dec. 26, 2026      Dec. 27, 2026     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-2 
Dec. 21, 2026      Dec. 22, 2026      Dec. 23, 2026      Dec. 24, 2026      Dec. 25, 2026      Dec. 26, 2026      Dec. 27, 2026     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-1 
Dec. 21, 2026      Dec. 22, 2026      Dec. 23, 2026      Dec. 24, 2026      Dec. 25, 2026      Dec. 26, 2026      Dec. 27, 2026     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Dec. 28, 2026
                                         
Dec. 28, 2026      Dec. 29, 2026      Dec. 30, 2026      Dec. 31, 2026      Jan. 01, 2027      Jan. 02, 2027      Jan. 03, 2027     
BEAM   LINE 9-2  
Dec. 28, 2026      Dec. 29, 2026      Dec. 30, 2026      Dec. 31, 2026      Jan. 01, 2027      Jan. 02, 2027      Jan. 03, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Dec. 28, 2026      Dec. 29, 2026      Dec. 30, 2026      Dec. 31, 2026      Jan. 01, 2027      Jan. 02, 2027      Jan. 03, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-2 
Dec. 28, 2026      Dec. 29, 2026      Dec. 30, 2026      Dec. 31, 2026      Jan. 01, 2027      Jan. 02, 2027      Jan. 03, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-1 
Dec. 28, 2026      Dec. 29, 2026      Dec. 30, 2026      Dec. 31, 2026      Jan. 01, 2027      Jan. 02, 2027      Jan. 03, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jan. 04, 2027
                                         
Jan. 04, 2027      Jan. 05, 2027      Jan. 06, 2027      Jan. 07, 2027      Jan. 08, 2027      Jan. 09, 2027      Jan. 10, 2027     
BEAM   LINE 9-2  
Jan. 04, 2027      Jan. 05, 2027      Jan. 06, 2027      Jan. 07, 2027      Jan. 08, 2027      Jan. 09, 2027      Jan. 10, 2027     
Unscheduled        Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Jan. 04, 2027      Jan. 05, 2027      Jan. 06, 2027      Jan. 07, 2027      Jan. 08, 2027      Jan. 09, 2027      Jan. 10, 2027     
Unscheduled        Unscheduled        Unscheduled        8124 A.Cohen       8124 A.Cohen       7B88 J.Kern        Unscheduled       
Unscheduled        Unscheduled        CHANGE/8124 A.Cohe 8124 A.Cohen       CHANGE/7B88 J.Kern Unscheduled        Unscheduled       
Unscheduled        Unscheduled        8124 A.Cohen       8124 A.Cohen       7B88 J.Kern        Unscheduled        Unscheduled       
BEAM   LINE 12-2 
Jan. 04, 2027      Jan. 05, 2027      Jan. 06, 2027      Jan. 07, 2027      Jan. 08, 2027      Jan. 09, 2027      Jan. 10, 2027     
Unscheduled        Unscheduled        Unscheduled        FACI               GM01               7B54 B.Mooers      7B54 B.Mooers     
Unscheduled        Unscheduled        FACI               GM01               CHANGE/7B54 B.Mooe 7B54 B.Mooers      7B54 B.Mooers     
Unscheduled        Unscheduled        FACI               GM01               7B54 B.Mooers      7B54 B.Mooers      7B54 B.Mooers     
BEAM   LINE 14-1 
Jan. 04, 2027      Jan. 05, 2027      Jan. 06, 2027      Jan. 07, 2027      Jan. 08, 2027      Jan. 09, 2027      Jan. 10, 2027     
Unscheduled        Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jan. 11, 2027
                                         
Jan. 11, 2027      Jan. 12, 2027      Jan. 13, 2027      Jan. 14, 2027      Jan. 15, 2027      Jan. 16, 2027      Jan. 17, 2027     
BEAM   LINE 9-2  
Jan. 11, 2027      Jan. 12, 2027      Jan. 13, 2027      Jan. 14, 2027      Jan. 15, 2027      Jan. 16, 2027      Jan. 17, 2027     
Unscheduled        Unscheduled        B013 L.Thomas      8B03 F.Tezcan      8B03 F.Tezcan      7B77 A.Liu         Unscheduled       
Unscheduled        CHANGE/B013 L.Thom CHANGE/8B03 F.Tezc 8B03 F.Tezcan      CHANGE/7B77 A.Liu  Unscheduled        Unscheduled       
Unscheduled        B013 L.Thomas      8B03 F.Tezcan      8B03 F.Tezcan      7B77 A.Liu         Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Jan. 11, 2027      Jan. 12, 2027      Jan. 13, 2027      Jan. 14, 2027      Jan. 15, 2027      Jan. 16, 2027      Jan. 17, 2027     
Unscheduled        8B04 J.Clinger     8B04 J.Clinger     CHANGE/9A35 G.de l GM01               Unscheduled        7B39 E.Scott      
CHANGE/8B04 J.Clin 8B04 J.Clinger     CHANGE/7B73 M.Fisc 9A35 G.de leon Boe Unscheduled        CHANGE/7B39 E.Scot 7B39 E.Scott      
8B04 J.Clinger     8B04 J.Clinger     7B73 M.Fischer     9A35 G.de leo/GM01 Unscheduled        7B39 E.Scott       7B39 E.Scott      
BEAM   LINE 12-2 
Jan. 11, 2027      Jan. 12, 2027      Jan. 13, 2027      Jan. 14, 2027      Jan. 15, 2027      Jan. 16, 2027      Jan. 17, 2027     
7B54 B.Mooers      9A70 S.Boxer       7B71 C.Goulding    7B04 M.Higgins     7B42 L.Hung        7B70 M.Pazgier     7B70 M.Pazgier    
CHANGE/9A70 S.Boxe CHANGE/7B71 C.Goul CHANGE/7B04 M.Higg CHANGE/7B42 L.Hung CHANGE/7B70 M.Pazg 7B70 M.Pazgier     CHANGE/7B22 S.Brix
9A70 S.Boxer       7B71 C.Goulding    7B04 M.Higgins     7B42 L.Hung        7B70 M.Pazgier     7B70 M.Pazgier     7B22 S.Brixius-And
BEAM   LINE 14-1 
Jan. 11, 2027      Jan. 12, 2027      Jan. 13, 2027      Jan. 14, 2027      Jan. 15, 2027      Jan. 16, 2027      Jan. 17, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jan. 18, 2027
                                         
Jan. 18, 2027      Jan. 19, 2027      Jan. 20, 2027      Jan. 21, 2027      Jan. 22, 2027      Jan. 23, 2027      Jan. 24, 2027     
BEAM   LINE 9-2  
Jan. 18, 2027      Jan. 19, 2027      Jan. 20, 2027      Jan. 21, 2027      Jan. 22, 2027      Jan. 23, 2027      Jan. 24, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Jan. 18, 2027      Jan. 19, 2027      Jan. 20, 2027      Jan. 21, 2027      Jan. 22, 2027      Jan. 23, 2027      Jan. 24, 2027     
7B39 E.Scott       Unscheduled        GM01               7B75 R.Stanfield   7B75 R.Stanfield   Unscheduled        Unscheduled       
Unscheduled        GM01               CHANGE/7B75 R.Stan 7B75 R.Stanfield   Unscheduled        Unscheduled        Unscheduled       
Unscheduled        GM01               7B75 R.Stanfield   7B75 R.Stanfield   Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-2 
Jan. 18, 2027      Jan. 19, 2027      Jan. 20, 2027      Jan. 21, 2027      Jan. 22, 2027      Jan. 23, 2027      Jan. 24, 2027     
7B22 S.Brixius-And Unscheduled        9A55 K.Garcia      7B80 J.Pruneda     B011 H.Fung        7B69 M.Wilson      7B41 W.Chang      
Unscheduled        CHANGE/9A55 K.Garc CHANGE/7B80 J.Prun CHANGE/B011 H.Fung CHANGE/7B69 M.Wils CHANGE/7B41 W.Chan CHANGE/7B82 L.Yang
Unscheduled        9A55 K.Garcia      7B80 J.Pruneda     B011 H.Fung        7B69 M.Wilson      7B41 W.Chang       7B82 L.Yang       
BEAM   LINE 14-1 
Jan. 18, 2027      Jan. 19, 2027      Jan. 20, 2027      Jan. 21, 2027      Jan. 22, 2027      Jan. 23, 2027      Jan. 24, 2027     
Unscheduled        Unscheduled        6B99 S.Cramer      Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        CHANGE/6B99 S.Cram Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        6B99 S.Cramer      Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jan. 25, 2027
                                         
Jan. 25, 2027      Jan. 26, 2027      Jan. 27, 2027      Jan. 28, 2027      Jan. 29, 2027      Jan. 30, 2027      Jan. 31, 2027     
BEAM   LINE 9-2  
Jan. 25, 2027      Jan. 26, 2027      Jan. 27, 2027      Jan. 28, 2027      Jan. 29, 2027      Jan. 30, 2027      Jan. 31, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Jan. 25, 2027      Jan. 26, 2027      Jan. 27, 2027      Jan. 28, 2027      Jan. 29, 2027      Jan. 30, 2027      Jan. 31, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        GM01               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        GM01               Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        GM01               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-2 
Jan. 25, 2027      Jan. 26, 2027      Jan. 27, 2027      Jan. 28, 2027      Jan. 29, 2027      Jan. 30, 2027      Jan. 31, 2027     
7B82 L.Yang        Unscheduled        Unscheduled        7B47 J.Moody       7B55 D.Flaherty    Unscheduled        Unscheduled       
Unscheduled        Unscheduled        CHANGE/7B47 J.Mood CHANGE/7B55 D.Flah Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        7B47 J.Moody       7B55 D.Flaherty    Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-1 
Jan. 25, 2027      Jan. 26, 2027      Jan. 27, 2027      Jan. 28, 2027      Jan. 29, 2027      Jan. 30, 2027      Jan. 31, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Feb. 01, 2027
                                         
Feb. 01, 2027      Feb. 02, 2027      Feb. 03, 2027      Feb. 04, 2027      Feb. 05, 2027      Feb. 06, 2027      Feb. 07, 2027     
BEAM   LINE 9-2  
Feb. 01, 2027      Feb. 02, 2027      Feb. 03, 2027      Feb. 04, 2027      Feb. 05, 2027      Feb. 06, 2027      Feb. 07, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-1 
Feb. 01, 2027      Feb. 02, 2027      Feb. 03, 2027      Feb. 04, 2027      Feb. 05, 2027      Feb. 06, 2027      Feb. 07, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 12-2 
Feb. 01, 2027      Feb. 02, 2027      Feb. 03, 2027      Feb. 04, 2027      Feb. 05, 2027      Feb. 06, 2027      Feb. 07, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 14-1 
Feb. 01, 2027      Feb. 02, 2027      Feb. 03, 2027      Feb. 04, 2027      Feb. 05, 2027      Feb. 06, 2027      Feb. 07, 2027     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled