LCLS

LCLS Week
January 25 - 27, 2005 

                                                       Printable Block Style Agenda    

                                                       Printable Full Agenda                                                                                                                                                                               Return to Full Agenda

                                                                   

Breakout Sessions Agenda

Wednesday

   
 

 

 
Project Office Breakout: Earned Value Management / Risk Management  (Redwood A) Reichanadter

Project Office (PO): Galayda, Reichanadter, Sisson, RM Boyce, Evans, Jamison, PMCS Team

 
 9:00 am  Injector / Linac Bong, CAMs, PO
10:30 am Undulator Milton, CAMs, PO
12:00 Lunch  
 1:00 pm XTOD Bionta, CAMs, PO
 2:30 pm X-Ray End Stations Arthur, CAMs, PO
 4:00 pm Conventional Facilities Saenz, CAMs, PO
 5:30 pm Project Management / Global Controls Dalesio, CAMs, PO

 Conventional Facilities Breakout  (Redwood B) Saenz
 9:00  Review of Title 1 Design Workshop: Research Yard and Beam Transport Hall Jacobs Engineering
 9:30 Review of Title 1 Design Workshop: Undulator Hall, Beam Dump, Front End Enclosure Jacobs Engineering
10:00 Review of Title 1 Design Workshop: Near Experimental Hall Jacobs Engineering
10:30 Break  
10:45 Review of Title 1 Design Workshop: Far Experimental Hall Jacobs Engineering
11:00 Review of Title 1 Design Workshop: CLOC Jacobs Engineering
11:15 Review of Title 1 Design Workshop: Sector 20 Folger
11:30 Review of Title 1 Design Workshop: Magnetic Measurement Facility Folger
12:00 Lunch  
 1:00 - 2:30  Undulator Hall Layout and Interface Saenz, Welch, Jacobs Engineering

Accelerator Systems Breakout: Injector/Linac (Redwood C) Bong
10:30 - 11:00 Injector Optimization Using Elliposidal Laser Pulses Limborg
11:00 - 11:30 RF Gun Studies Limborg
11:00 - 12:00 Gun RF Design Li / Xiao
12:00 Lunch  
1:00 - 1:30 Low-Charge Linac Operating Point including Recent FEL Simulations Huang
1:30 - 2:00 Injector Laser Gilevich
2:00 - 3:00 Drive Laser Dazzler R&D (BNL & LLNL) Dowell
3:00 - 4:00 Feedback Simulations Wu

Undulator Breakout (Redwood D) Milton
 2:30 - 4:00 Undulator System Integration (Mock-Up) Milton
 5:30 - 6:30 FY05 Planning Milton, CAMs, PMCS

Photon Breakout: XTOD / X-Ray End Stations (Redwood C) Bionta / Arthur
  9:00 - 9:30 XTOD: Baseline Layout, Commissioning Strategy and Issues Bionta
  9:30 - 9:45 XTOD: Project Engineering McMahn
  9:45 - 10:00 XTOD: Simulations Ott
 10:00 - 10:15 XTOD: Camera Selection Abels
 10:15  Break  
 4:00 - 4:30 XTOD: Damage Experiment London
 4:30 - 4:45 XTOD: Total Energy Measurement System Friedrich
 4:45 - 5:30 XTOD: Spectrometer Bionta
 5:30 - 6:30 FY05 Planning - X-Ray End Station Arthur, CAMs, PMCS

Controls Breakout (Redwood D) Dalesio
 9:00 - 10:30 Bunch Length Monitors Krejcik
10:30 - 12:00 Cavity BPMs Krejcik
12:00 Lunch  
 1:00 - 2:30 SLC-Aware IOC Allison
 2:30 Break  
 3:00 - 4:00 Motor Discussion (Location: Redwood B) Stein
 4:00 - 5:30 Vacuum Hardware and Controls Dalesio
 5:30 FY05 Planning (Location: Redwood B) Dalesio, CAMS, PMCS
 6:00 Global Controls (Redwood A) Dalesio, PO

Thursday    
Conventional Facilities Breakout (Redwood B) Saenz
 9:00 - 10:30 Title 1 Review and Prep for Title 2 Saenz, Welch, Jacobs Engineering
11:00 - 12:00 FY05 Planning Saenz, Welch, CAMs, PMCS
12:00 Lunch  

Accelerator Systems Breakout: Injector/Linac (Redwood C) Bong
 10:00 - 11:00 FY05 Planning Bong, CAMs, PMCS

Undulator Breakout (Redwood D) Milton
 9:00 AC Conductivity: Impact Analysis Overview Milton
 9:20 AC Conductivity: Calculations Bane
 9:40 AC Conductivity: Analytical Estimation of Wakefield Effects on SASE Huang
10:00 AC Conductivity: Genesis / Ginger Simulations Reiche
10:20 AC Conductivity: THz Reflectivity Measurements Walters
10:40 Discussion  
11:00 Break  
11:20 Alignment/Tuning Tolerance Budget: Introduction Nuhn
11:35 Alignment/Tuning Tolerance Budget: Ground Motion Welch
12:00 Alignment/Tuning Tolerance Budget: Genesis Simulations Reiche
12:25 Lunch  

Photon Breakout: XTOD / X-Ray End Stations (Redwood C) Bionta/Arthur
 9:00 - 10:00 X-Ray End Station Shielding Discussion Arthur
11:00 - 12:00 FY05 Planning - XTOD Bionta, CAMs, PMCS
12:00 Lunch  

Controls (Redwood A) Dalesio
 9:00 Discussion on Vacuum Instrumentation: Suggestion Eriksson / Rago
  Discussion on Vacuum Instrumentation: Experience from SLC Debbie, Ron
  Discussion on Vacuum Instrumentation: Experience from ORNL Dalesio
 10:00 LLRF Design Kotturi
 11:00 FY05 Planning (continued) Dalesio, CAMS, PMCS
 12:00 Lunch