LCLS

Index of WBS Tables in the Presentations for the

Department of Energy Review
of the
Linac Coherent Light Source (LCLS) Project
April 23 - 25, 2002

#

Speaker

Title

Level 3 Level 4 Level 5

1

J. Dorfan Welcome - - -
2 K. Hodgson LCLS History and Science Overview - - -
3 J. Galayda LCLS Overview - - -
4 L. Klaisner LCLS Project Management Overview 1.1.1-1.4.6
5 C. Pellegrini Status of FEL Physics Research Worldwide - - -
6 H.-D. Nuhn LCLS FEL Parameters - - -
7 P. Emma Accelerator Physics Considerations for the LCLS Linac - - -
8 J. Hastings LCLS Experimental Program and Endstn System (WBS 1.3.2) 1.3.2 ?
9 J. Clendenin Injector (WBS 1.2.1) 1.2.1
10 V. Bharadwaj Linac (WBS 1.2.2) 1.2.2
11 E. Gluskin Undulator Systems (WBS 1.2.3) 1.2.3 1.2.3.1
12 A. Wootton X-Ray Transport Optics and Diagnostics (WBS 1.3.2) 1.3.1
13 D. Saenz Conventional Facilities (WBS 1.4) 1.4
14 J. Galayda Wrap-Up ?
15 S. Reiche Gain Computation - - -
16 C. Limborg Simulations for the LCLS Photo-Injector - - -
17 D. Dowell

LCLS Injector / Diagnostics

- - -
18 P. Bolton Laser - - -
19 J. Schmerge Injector Experimental Results - - -
20 P. Krejcik Linac Diagnostics - - -
21 P. Emma Beam-Based Alignment of the LCLS Undulator - - -
22 L. Moog Undulator Line Design - - -
23 E. Trakhtenberg LCLS Prototype Undulator Mech. Design and First Test Exp. - - -
24 I. Vasserman Undulator Magnetic Measurements - - -
25 G. Stupakov Undulator Vacuum Chamber Roughness - - -
26 P. Iliniski Undulator X-Ray Diagnostics - - -
27 G. Decker Undulator Electron Beam Diagnostics - - -
28 J. Hastings Endstation Systems 1.3.2.1-6?
29 A. Wootton Overview, Layout and Damage - - -
30 J. Arthur Optics 1.3.1.3
1.3.1.4
1.3.1.5
31 R. Bionta Diagnostics (1.3.1.1.6)
1.3.1.6
32 A. Wootton Mechanical and Vacuum 1.3.1.2
33 J. W. Humphrey SLC Control System - - -
34 R. Chestnut LCLS EPICS Control Software - - -
35 D. Saenz Overview - - -
36 V. Bharadwaj Methodology, 1.2.1+1.2.2 Costs/Schedule ?.?.? ?.?.?.?
37 P. Den Hartog Undulator Costs & Schedule 1.2.3 ?
38 R. Bionta X-Ray TOD Costs & Schedule 1.3.1 1.3.1.1
39 J. Hastings X-Ray Endstn. Sys. Cost & Schedule 1.3.2.?
40 L. Klaisner Project Contingency / Sched. Analysis 1.1.1-1.4.6
41 J. Chan PMCS Plan for SLAC Projects - - -
42 J. Galayda PED Plan for FY2003 / 2004, Org. ?.?.?.?
43 I. Evans Safety - - -
44 T. Byler Environmental - - -
45 S. Rokni/W. Nelson /
S. Mao
LCLS Radiological Considerations - - -

 

Speaker Column Color Interpretation
. Needs Slide Correction.

 

Tile Column Color Interpretation
. Needs Cost Numbers Checked or Inserted.

 

Final Status Color Interpretation
. Not Ready.
. Presentation has been sent to the print shop.
. Presentation printed and in binder.

 


Last Updated: 30 Apr 2002
Content Owners: Heinz-Dieter Nuhn, SSRL
Page Editor: Heinz-Dieter Nuhn, SSRL

Disclaimer