Wednesday, August
11 - Breakout Sessions (click for printable version) |
|
| SC1 / SC2 |
|
Accelerator Physics / Injector &
Linac
|
|
Madrone
(Bldg 48, 2nd floor) |
|
|
|
|
|
|
|
Start |
|
Topic |
|
Speaker |
| 8:00 am
|
|
Physics Requirements for
Injector/Commissioning |
|
C. Limborg |
| 8:30 am
|
|
Injector Scope, Management & Organization |
|
D. Dowell |
| 9:00 am |
|
Physics Requirements for Linac/Commissioning |
|
P. Emma |
| 9:30 am |
|
Linac Scope, Management & Organization |
|
E. Bong |
| 10:00 am |
|
Break |
|
|
| 10:20 am |
|
Drive Laser
|
|
S. Gilevich |
| 10:30 am |
|
RF Gun Design |
|
D. Dowell/J. Schmerge |
| 10:40 am |
|
E-Beam Diagnostics Overview |
|
P. Krejcik |
| 11:00 am |
|
Enhanced
Self-Amplified Spontaneous Emission |
|
A. Zholents |
| 11:00 am |
|
Discussions |
|
Breakout Group |
| |
|
|
|
|
|
| SC3 |
|
Undulator
|
|
Redwood Room A |
| |
|
|
|
|
| Start |
|
Topic |
|
Speaker |
| 8:00 am
|
|
Physics Requirements for
Undulator/Commissioning |
|
H-D. Nuhn |
| 8:30 am
|
|
Undulator Scope, Management & Organization |
|
S. Milton |
| 9:00 am |
|
Undulator Magnet Design/Measurement |
|
L. Moog |
| 9:30 am |
|
Break |
|
|
| 9:50 am |
|
Magnetic Measurement and Alignment at SLAC |
|
R. Ruland |
| 10:20 am |
|
Undulator Vacuum System/Chamber Design |
|
D. Walters |
| 10:40 am |
|
Undulator X-Ray Diagnostics, R&D Plans |
|
B.X. Yang |
| 11:00 am |
|
Discussions |
|
Breakout Group
|
| |
|
| SC4 |
|
Photon Beam Handling Systems
|
|
Redwood Room B |
| |
|
|
|
|
| Start |
|
Topic |
|
Speaker |
| 8:00 am
|
|
Physics Requirements for XTOD |
|
J. Arthur |
| 8:30 am
|
|
XTOD Scope &
Management/Diagnostics & Commissioning and XTOD Beam
Diagnostics, Mechanical & Vacuum Systems |
|
R. Bionta/D. McMahon |
| 9:30 am |
|
Break |
|
|
| 9:50 am |
|
Endstation System Physics Requirements |
|
J. Hastings |
| 10:20 am |
|
X-Ray Endstation Design &
Management/Commissioning |
|
S. Moeller |
| 11:00 |
|
Discussions |
|
Breakout Group
|
| |
|
|
|
|
|
| SC5 |
|
Control Systems |
|
Pine (Bldg
48, 2nd floor) |
| |
|
|
|
|
| Start |
|
Topic |
|
Speaker |
| 8:00 am
|
|
Physics Requirements for
LCLS Control System |
|
P. Krejcik |
| 8:30 am
|
|
LCLS Control
System Design, Management & Organization |
|
L. Dalesio |
| 9:00 am |
|
LCLS Integration with SLC |
|
S. Allison |
| 9:30 am |
|
Break |
|
|
| 10:00 am |
|
RF/Timing Design |
|
R. Akre |
| 10:30 am |
|
Discussions |
|
Breakout Group
|
| |
|
| SC6
/ SC9 |
|
Conventional Facilities / ES&H |
|
Redwood Room C |
| |
|
|
|
|
| Start |
|
Topic |
|
Speaker |
| 8:00 am
|
|
Physics Requirements for
Conventional Facilities |
|
J. Welch |
| 8:30 am
|
|
Conventional Facilities Scope,
Management & Organization |
|
D. Saenz |
| 9:00 am |
|
LCLS Architectural / Engineering Overview |
|
S. Hill |
| 9:30 am |
|
Break |
|
|
| 10:00 am |
|
LCLS ES&H Overview |
|
I. Evans |
| 10:30 am |
|
LCLS Radiological Considerations |
|
S.Mao |
| 11:00 am |
|
Discussions |
|
Breakout Group
|
| |
|
|
|
|
|
| SC7
/ SC8 |
|
Cost & Schedule /
Project Management / Procurement and Pre-Operations |
|
Redwood Room D |
| |
|
|
|
|
| Start |
|
Topic |
|
Speaker |
| 8:00 am
|
|
Project Management Planning & Controls |
|
M. Reichanadter |
| 8:40 am
|
|
LCLS PMCS Overview |
|
T. Mast |
| 9:00 am |
|
LCLS Startup, Commissioning & Future
Scenarios |
|
J. Galayda |
| 9:40 am |
|
Break |
|
|
| 10:00 am |
|
Coordination of LCLS Procurements |
|
B. Todaro |
| 10:20 am |
|
Linac Long-lead Procurement Preparation |
|
P. McIntosh |
| 10:40 am |
|
Injector Long-Lead Procurement Preparation |
|
D. Dowell |
| 11:00 am |
|
Undulator Long-Lead Procurement Preparation |
|
M. White |
| 11:20 am |
|
Discussions |
|
Breakout Group
|