LCLS

Agenda for the

Department of Energy Review
of the
Linac Coherent Light Source (LCLS) Project
April 23 - 25, 2002

23 April 2002 - Redwood Room

  7:30 AM Buffet Breakfast
  8:00 Executive Session P. Dehmer, H. Lee, D. Lehman
  9:00 Welcome J. Dorfan
  9:20 LCLS History and Science Overview K. Hodgson
  9:40 LCLS Overview J. Galayda
10:10 Break
10:30 LCLS Project Management Overview L. Klaisner
11:00 Status of FEL Physics Research Worldwide C. Pellegrini
11:20 LCLS FEL Parameters H.-D. Nuhn
11:40 Accelerator Physics Considerations for the LCLS Linac P. Emma
12:10 PM LCLS Experimental Program and Endstn System (WBS 1.3.2)1 J. Hastings
12:30 Lunch
  1:30 Injector (WBS 1.2.1)1 J. Clendenin
  2:00 Linac (WBS 1.2.2)1 V. Bharadwaj
  2:30 Undulator Systems (WBS 1.2.3)1 E. Gluskin
  3:00 Break
  3:20 X-Ray Transport, Optics and Diagnostics (WBS 1.3.1)1 A. Wootton
  3:50 Conventional Facilities (WBS 1.4)1 D. Saenz
  4:20 Breakout Groups Meet with LCLS Breakout Teams
  4:50 Executive Session  (Plenary)
  7:00 PM Dinner at SLAC Cafeteria
 

24 April 2002 - Redwood Room

  7:30 AM Buffet Breakfast
  8:00 Breakout Sessions  (see below)
12:00 PM Lunch
  1:00 Tour
  2:00 Wrap-Up (Plenary) J. Galayda
  2:30 Executive Session (Subcommittees)
  4:00 Executive Session (Plenary)
  6:30 PM Adjourn
 

25 April 2002 - Redwood Room

  7:30 AM Buffet Breakfast
  8:00 Executive Session (Plenary)
10:00 Closeout Dry Run
11:00 Closeout
12:00 PM Adjourn


Breakout Sessions

 

1. Accelerator Physics / 2. Injector & Linac

SSRL 3rd Floor Conference Room

  8:00  AM Gain Computation S. Reiche
  8:30 Simulations for the LCLS Photo-Injector C. Limborg
  9:00 LCLS Injector /  Diagnostics D. Dowell
  9:30 Break
  9:45 Laser P. Bolton
10:15 Injector Experimental Results J. Schmerge
10:45 Linac Diagnostics P. Krejcik
11:15 Beam-Based Alignment of the LCLS Undulator P. Emma
11:45 Discussion
 

3. Undulator

Redwood Room A

  8:00 Undulator Line Design L. Moog
  8:30 LCLS Prototype Undulator Mech. Design and First Test Experience E. Trakhtenberg
  9:00 Undulator Magnetic Measurements I. Vasserman
  9:30 Break
  9:45 Undulator Vacuum Chamber Roughness G. Stupakov
10:15 Undulator X-Ray Diagnostics P. Ilinski
10:45

Undulator Section e- Diagnostics

G. Decker
11:15 Discussions
 

4. Photon Beam Handling Systems

Redwood Room B

  8:00 Endstation Systems J. Hastings
  8:30 Overview, Layout and Damage A. Wootton
  9:00 Break
  9:15 Optics J. Arthur
  9:45 Diagnostics R. Bionta
10:15 Mechanical and Vacuum A. Wootton
10:25 Discussions
 

5. Control Systems

Sierra Room

SLC Control System J. W. Humphrey
LCLS EPICS Control Software R. Chestnut
 

6. Conventional Facilities

Redwood Room C

Overview D. Saenz
 

7. Cost & Schedule /
8. Project Management Procurement & Pre-Ops

Redwood Room D

  8:00 Methodology, 1.2.1+1.2.2 Costs/Schedule V. Bharadwaj
  8:20 Undulator Costs & Schedule P. Den Hartog
  8:40 X-Ray TOD Costs & Schedule R. Bionta
  9:00 Break
  9:15 X-Ray Endstn. Sys. Cost & Schedule J. Hastings
  9:45 Project Contingeny / Sched. Analysis L. Klaisner
10:15 Project Management Control System (PMCS) at SLAC J. Chan
10:35 PED Plan for FY2003 / 2004, Org. J. Galayda
11:05 Discussions
 

9. ES&H

Orange Room

Safety I. Evans
Environmental T. Byler
LCLS Radiological Considerations S. Rokni / W. Nelson / S. Mao

 

Standby Presentation Index


Last Updated: 28 Apr 2003
Content Owners: John Galayda, SLAC/SSRL
Page Editor: Heinz-Dieter Nuhn, SSRL

Disclaimer