SSRL Beam Port Schedule


X-ray beam lines are scheduled in three 8-hour shifts each day (11pm-7am; 7am-3pm; 3-11pm). Checkouts/changeovers are scheduled during the 7am-3pm shift. Most X-ray beam lines officially turn over to the next user much earlier than 3pm depending on the equipment requirements and staff availability. At least 1 week prior to arrival, users need to contact the designated beam line engineer/scientist (see SSRL Beam Lines by Number for contact information) to discuss beam line configuration needs and start times. Unless instructed otherwise, experiments end at 7am (6am when Maintenance (MA) or Accelerator Physics (AP) are scheduled).


Weeks of the Schedule
 Nov. 04, 2013   Nov. 11, 2013   Nov. 18, 2013   Nov. 25, 2013 
 Dec. 02, 2013   Dec. 09, 2013   Dec. 16, 2013   Dec. 23, 2013 
 Dec. 30, 2013   Jan. 06, 2014   Jan. 13, 2014   Jan. 20, 2014 
 Jan. 27, 2014   Feb. 03, 2014   Feb. 10, 2014   Feb. 17, 2014 
 Feb. 24, 2014   Mar. 03, 2014   Mar. 10, 2014   Mar. 17, 2014 
 Mar. 24, 2014   Mar. 31, 2014   Apr. 07, 2014   Apr. 14, 2014 
 Apr. 21, 2014   Apr. 28, 2014   May 05, 2014   May 12, 2014 
 May 19, 2014   May 26, 2014   Jun. 02, 2014   Jun. 09, 2014 
 Jun. 16, 2014   Jun. 23, 2014   Jun. 30, 2014   Jul. 07, 2014 
 Jul. 14, 2014   Jul. 21, 2014   Jul. 28, 2014   Aug. 04, 2014 

Back to Table of Contents

WEEK OF Nov. 04, 2013
Ops Re-start                                          
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
BEAM   LINE 1-5  
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        3417 A.TEMPLETON   3417 A.TEMPLETON   3417 A.TEMPLETON   3417 A.TEMPLETON  
8867 S.WEBB        8867 S.WEBB        CHANGE/3417 A.TEMP 3417 A.TEMPLETON   3417 A.TEMPLETON   3417 A.TEMPLETON   3417 A.TEMPLETON  
8867 S.WEBB        8867 S.WEBB        3417 A.TEMPLETON   3417 A.TEMPLETON   3417 A.TEMPLETON   3417 A.TEMPLETON   3417 A.TEMPLETON  
BEAM   LINE 4-1  
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
DOWN               DOWN               DOWN               DOWN               3600 F.BRIDGES     3600 F.BRIDGES     3627 F.BRIDGES    
DOWN               DOWN               DOWN               SMB CHECKOUT/3600  3600 F.BRIDGES     CHANGE/3627 F.BRID 3627 F.BRIDGES    
DOWN               DOWN               DOWN               3600 F.BRIDGES     3600 F.BRIDGES     3627 F.BRIDGES     3627 F.BRIDGES    
BEAM   LINE 4-2  
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
Unscheduled        8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI     
CHANGE/8877 T.MATS 8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI     
8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI     
BEAM   LINE 4-3  
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
DOWN               DOWN               DOWN               3818 M.DOEFF       3818 M.DOEFF       3603 J.CHOROVER    3603 J.CHOROVER   
DOWN               DOWN               SMB CHECKOUT/3818  3818 M.DOEFF       SMB CHECKOUT/3603  3603 J.CHOROVER    3603 J.CHOROVER   
DOWN               DOWN               3818 M.DOEFF       3818 M.DOEFF       3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
BEAM   LINE 6-2  
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
8881 Y.LIU         3848 J.HAYTER      3848 J.HAYTER      1F97 S.Fleischman  4046 J.Nanda       8041 J.HAYTER      91W0 B.Shyam      
CHECKOUT/3848      3848 J.HAYTER      CHANGE/1F97 S.Flei CHANGE/91N6 N.Wu   CHANGE/8086 A.Sakd CHANGE/91W0 B.Shya CHANGE/8090 J.Nels
3848 J.HAYTER      3848 J.HAYTER      1F97 S.Fleischman  CHANGE/4046 J.Nand CHANGE/8041 J.HAYT 91W0 B.Shyam       8090 J.Nelson Weke
BEAM   LINE 7-2  
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
Unscheduled        FACI               FACI               FACI               FACI               8818 A.MEHTA       8818 A.MEHTA      
Xray CHECKOUT/FACI FACI               FACI               FACI               Xray CHECKOUT/8818 8818 A.MEHTA       8818 A.MEHTA      
FACI               FACI               FACI               FACI               8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
BEAM   LINE 7-3  
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
8867 S.WEBB        3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3797 L.LU          3797 L.LU         
SMB CHECKOUT/3505  3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      CHANGE/3797 L.LU   3797 L.LU          3797 L.LU         
3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3797 L.LU          3797 L.LU          3797 L.LU         
BEAM   LINE 11-2 
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               3603 J.CHOROVER    3603 J.CHOROVER   
DOWN               DOWN               DOWN               DOWN               SMB CHECKOUT/3603  3603 J.CHOROVER    3603 J.CHOROVER   
DOWN               DOWN               DOWN               DOWN               3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
BEAM   LINE 11-3 
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               3855 M.Scarpulla   3855 M.Scarpulla  
DOWN               DOWN               DOWN               DOWN               GIXRD/3855         3855 M.Scarpulla   3855 M.Scarpulla  
DOWN               DOWN               DOWN               DOWN               3855 M.Scarpulla   3855 M.Scarpulla   3855 M.Scarpulla  
BEAM   LINE 14-3 
Nov. 04, 2013      Nov. 05, 2013      Nov. 06, 2013      Nov. 07, 2013      Nov. 08, 2013      Nov. 09, 2013      Nov. 10, 2013     
DOWN               DOWN               DOWN               8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
DOWN               DOWN               SMB CHECKOUT/8867  8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
DOWN               DOWN               8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       

Back to Table of Contents

WEEK OF Nov. 11, 2013
                                         
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
BEAM   LINE 1-5  
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
DOWN               DOWN               3877 M.Ahmad       3877 M.Ahmad       3877 M.Ahmad       3855 M.Scarpulla   3855 M.Scarpulla  
DOWN               Xray CHECKOUT/3877 3877 M.Ahmad       3877 M.Ahmad       Xray CHECKOUT/3855 3855 M.Scarpulla   3855 M.Scarpulla  
DOWN               3877 M.Ahmad       3877 M.Ahmad       3877 M.Ahmad       3855 M.Scarpulla   3855 M.Scarpulla   3855 M.Scarpulla  
BEAM   LINE 2-2  
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
3417 A.TEMPLETON   3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3736 C.KIM         3736 C.KIM        
CHANGE/3658 W.Fisc 3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     CHANGE/3736 C.KIM  3736 C.KIM         3736 C.KIM        
3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3736 C.KIM         3736 C.KIM         3736 C.KIM        
BEAM   LINE 4-1  
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
3627 F.BRIDGES     3557 F.BRIDGES     3557 F.BRIDGES     3557 F.BRIDGES     3557 F.BRIDGES     3833 J.CABANA-JIME 3833 J.CABANA-JIME
CHANGE/3557 F.BRID 3557 F.BRIDGES     3557 F.BRIDGES     3557 F.BRIDGES     SMB CHECKOUT/3833  3833 J.CABANA-JIME 3833 J.CABANA-JIME
3557 F.BRIDGES     3557 F.BRIDGES     3557 F.BRIDGES     3557 F.BRIDGES     3833 J.CABANA-JIME 3833 J.CABANA-JIME 3833 J.CABANA-JIME
BEAM   LINE 4-2  
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
8877 T.MATSUI      8877 T.MATSUI      8077 T.MATSUI      8877 T.MATSUI      3744 A.SCHOEFFLER  3744 A.SCHOEFFLER  8085 L.CARTER     
8877 T.MATSUI      CHANGE/8077 T.MATS CHANGE/8877 T.MATS CHANGE/3744 A.SCHO 3744 A.SCHOEFFLER  CHANGE/8085 L.CART CHANGE/10N3 J.Lath
8877 T.MATSUI      8077 T.MATSUI      8877 T.MATSUI      3744 A.SCHOEFFLER  3744 A.SCHOEFFLER  8085 L.CARTER      10N3 J.Latham     
BEAM   LINE 4-3  
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
3603 J.CHOROVER    3907 O.Trejo       3907 O.Trejo       3907 O.Trejo       3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
SMB CHECKOUT/3907  3907 O.Trejo       3907 O.Trejo       SMB CHECKOUT/3729  3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
3907 O.Trejo       3907 O.Trejo       3907 O.Trejo       3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
BEAM   LINE 6-2  
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
8090 J.Nelson Weke 8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG       
CHECKOUT/8879      8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG       
8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG       
BEAM   LINE 7-2  
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       Xray CHECKOUT/3844 3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
BEAM   LINE 7-3  
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
DOWN               3998 A.Deb         3998 A.Deb         3998 A.Deb         3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
SMB CHECKOUT/3998  3998 A.Deb         3998 A.Deb         SMB CHECKOUT/3729  3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
3998 A.Deb         3998 A.Deb         3998 A.Deb         3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
BEAM   LINE 9-3  
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
DOWN               DOWN               DOWN               DOWN               3912 N.BLACKBURN   3912 N.BLACKBURN   3912 N.BLACKBURN  
DOWN               DOWN               DOWN               SMB CHECKOUT/3912  3912 N.BLACKBURN   3912 N.BLACKBURN   3912 N.BLACKBURN  
DOWN               DOWN               DOWN               3912 N.BLACKBURN   3912 N.BLACKBURN   3912 N.BLACKBURN   3912 N.BLACKBURN  
BEAM   LINE 10-2 
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
3797 L.LU          3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     8867 S.WEBB        3667 S.TIAN        3667 S.TIAN       
CHANGE/3658 W.Fisc 3658 W.Fischer     3658 W.Fischer     CHANGE/8867 S.WEBB CHANGE/3667 S.TIAN 3667 S.TIAN        3667 S.TIAN       
3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     8867 S.WEBB        3667 S.TIAN        3667 S.TIAN        3667 S.TIAN       
BEAM   LINE 11-2 
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
3603 J.CHOROVER    3555 J.Wilcox      3555 J.Wilcox      3429 O.DUCKWORTH   3429 O.DUCKWORTH   3946 C.KIM         3946 C.KIM        
SMB CHECKOUT/3555  3555 J.Wilcox      SMB CHECKOUT/3429  3429 O.DUCKWORTH   SMB CHECKOUT/3946  3946 C.KIM         3946 C.KIM        
3555 J.Wilcox      3555 J.Wilcox      3429 O.DUCKWORTH   3429 O.DUCKWORTH   3946 C.KIM         3946 C.KIM         3946 C.KIM        
BEAM   LINE 11-3 
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
3855 M.Scarpulla   3651 A.Sharenko    3651 A.Sharenko    3625 S.SWEETNAM    3625 S.SWEETNAM    3853 A.Briseno     3853 A.Briseno    
CHANGE/3651 A.Shar 3651 A.Sharenko    CHANGE/3625 S.SWEE 3625 S.SWEETNAM    CHANGE/3853 A.Bris 3853 A.Briseno     3853 A.Briseno    
3651 A.Sharenko    3651 A.Sharenko    3625 S.SWEETNAM    3625 S.SWEETNAM    3853 A.Briseno     3853 A.Briseno     3853 A.Briseno    
BEAM   LINE 14-3 
Nov. 11, 2013      Nov. 12, 2013      Nov. 13, 2013      Nov. 14, 2013      Nov. 15, 2013      Nov. 16, 2013      Nov. 17, 2013     
8867 S.WEBB        3711 A.TEMPLETON   3711 A.TEMPLETON   3711 A.TEMPLETON   8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
CHANGE/3711 A.TEMP 3711 A.TEMPLETON   3711 A.TEMPLETON   CHANGE/8067 S.WEBB 8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
3711 A.TEMPLETON   3711 A.TEMPLETON   3711 A.TEMPLETON   8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       

Back to Table of Contents

WEEK OF Nov. 18, 2013
MA       AP                                    
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
BEAM   LINE 1-5  
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
DOWN/MA            AP                 AP                 DOWN               8209 A.LINDENBERG  N002 A.VAILIONIS   N002 A.VAILIONIS  
MA                 AP                 DOWN               Xray CHECKOUT/8209 Xray CHECKOUT/N002 N002 A.VAILIONIS   N002 A.VAILIONIS  
MA/AP              AP                 DOWN               8209 A.LINDENBERG  N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS  
BEAM   LINE 2-1  
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
3855 M.Scarpull/MA AP                 AP                 3978 J.ACRIVOS     3978 J.ACRIVOS     3978 J.ACRIVOS     3978 J.ACRIVOS    
MA                 AP                 Xray CHECKOUT/3978 3978 J.ACRIVOS     3978 J.ACRIVOS     3978 J.ACRIVOS     3978 J.ACRIVOS    
MA/AP              AP                 3978 J.ACRIVOS     3978 J.ACRIVOS     3978 J.ACRIVOS     3978 J.ACRIVOS     3978 J.ACRIVOS    
BEAM   LINE 2-2  
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
DOWN/MA            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
MA/AP              AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
3736 C.KIM/MA      AP                 AP                 3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
MA                 AP                 CHANGE/3754 B.POPE 3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
MA/AP              AP                 3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
BEAM   LINE 4-1  
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
3833 J.CABANA-J/MA AP                 AP                 8060 J.BARGAR      8060 J.BARGAR      8090 J.Nelson Weke 8090 J.Nelson Weke
MA                 AP                 SMB CHECKOUT/8060  8060 J.BARGAR      SMB CHECKOUT/8090  8090 J.Nelson Weke 8090 J.Nelson Weke
MA/AP              AP                 8060 J.BARGAR      8060 J.BARGAR      8090 J.Nelson Weke 8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 4-2  
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
10N3 J.Latham/MA   AP                 AP                 8877 T.MATSUI      3873 A.VAN BUUREN  10N1 B.Stadtmuelle 3765 T.Bryan      
MA                 AP                 CHANGE/8877 T.MATS CHANGE/3873 A.VAN  CHANGE/10N1 B.Stad CHANGE/3765 T.Brya 3765 T.Bryan      
MA/AP              AP                 8877 T.MATSUI      3873 A.VAN BUUREN  10N1 B.Stadtmuelle 3765 T.Bryan       3765 T.Bryan      
BEAM   LINE 4-3  
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
3729 V.YACHANDR/MA AP                 AP                 3989 K.Stone       3989 K.Stone       3757 R.Bassiri     3757 R.Bassiri    
MA                 AP                 SMB CHECKOUT/3989  3989 K.Stone       SMB CHECKOUT/3757  3757 R.Bassiri     3757 R.Bassiri    
MA/AP              AP                 3989 K.Stone       3989 K.Stone       3757 R.Bassiri     3757 R.Bassiri     3757 R.Bassiri    
BEAM   LINE 6-2  
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
8879 T.WENG/MA     AP                 AP                 8079 T.WENG        8079 T.WENG        8079 T.WENG        8079 T.WENG       
MA                 AP                 Xray CHECKOUT/8079 8079 T.WENG        8079 T.WENG        8079 T.WENG        CHANGE/3921 W.Chue
MA/AP              AP                 8079 T.WENG        8079 T.WENG        8079 T.WENG        8079 T.WENG        3921 W.Chueh      
BEAM   LINE 7-2  
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
3844 Y.TAKAMURA/MA AP                 AP                 4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski  
MA                 AP                 Xray CHECKOUT/4002 4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski  
MA/AP              AP                 4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski  
BEAM   LINE 7-3  
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
3729 V.YACHANDR/MA AP                 AP                 8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
MA                 AP                 SMB CHECKOUT/8071  8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
MA/AP              AP                 8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
BEAM   LINE 9-3  
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
3912 N.BLACKBUR/MA AP                 AP                 FACI               FACI               3836 Y.Lu          3836 Y.Lu         
MA                 AP                 SMB CHECKOUT/FACI  FACI               SMB CHECKOUT/3836  3836 Y.Lu          3836 Y.Lu         
MA/AP              AP                 FACI               FACI               3836 Y.Lu          3836 Y.Lu          3836 Y.Lu         
BEAM   LINE 10-2 
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
3667 S.TIAN/MA     AP                 AP                 Unscheduled        Unscheduled        3754 B.POPESCU     3754 B.POPESCU    
MA                 AP                 Unscheduled        Unscheduled        CHANGE/3754 B.POPE 3754 B.POPESCU     3754 B.POPESCU    
MA/AP              AP                 Unscheduled        Unscheduled        3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
BEAM   LINE 11-2 
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
3946 C.KIM/MA      AP                 AP                 3592 B.KIMBALL     3592 B.KIMBALL     3749 R.DAEHN       3749 R.DAEHN      
MA                 AP                 SMB CHECKOUT/3592  3592 B.KIMBALL     SMB CHECKOUT/3749  3749 R.DAEHN       3749 R.DAEHN      
MA/AP              AP                 3592 B.KIMBALL     3592 B.KIMBALL     3749 R.DAEHN       3749 R.DAEHN       3749 R.DAEHN      
BEAM   LINE 11-3 
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
3853 A.Briseno/MA  AP                 AP                 3706 S.TOLBERT     8209 A.LINDENBERG  3787 A.LLORDES     3787 A.LLORDES    
MA                 AP                 CHANGE/3706 S.TOLB Xray CHECKOUT/8209 CHANGE/3787 A.LLOR 3787 A.LLORDES     3787 A.LLORDES    
MA/AP              AP                 3706 S.TOLBERT     8209 A.LINDENBERG  3787 A.LLORDES     3787 A.LLORDES     3787 A.LLORDES    
BEAM   LINE 14-3 
Nov. 18, 2013      Nov. 19, 2013      Nov. 20, 2013      Nov. 21, 2013      Nov. 22, 2013      Nov. 23, 2013      Nov. 24, 2013     
8067 S.WEBB/MA     AP                 AP                 3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3658 W.Fischer    
MA                 AP                 CHANGE/3658 W.Fisc 3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3658 W.Fischer    
MA/AP              AP                 3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3658 W.Fischer    

Back to Table of Contents

WEEK OF Nov. 25, 2013
            Down 4 pm       Thanksgiving       Reopen ~12n                  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
BEAM   LINE 1-5  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
N002 A.VAILIONIS   8067 S.WEBB        N002 A.VAILIONIS   DOWN               DOWN               DOWN               DOWN              
Xray CHECKOUT/8067 Xray CHECKOUT/N002 N002 A.VAILIONIS   DOWN               DOWN               DOWN               DOWN              
8067 S.WEBB        N002 A.VAILIONIS   N002 A.VAILIO/DOWN DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
3978 J.ACRIVOS     3978 J.ACRIVOS     3815 D.Xie         DOWN               DOWN               3815 D.Xie         3815 D.Xie        
3978 J.ACRIVOS     Xray CHECKOUT/3815 3815 D.Xie         DOWN               DOWN               3815 D.Xie         3815 D.Xie        
3978 J.ACRIVOS     3815 D.Xie         3815 D.Xie/DOWN    DOWN               3815 D.Xie         3815 D.Xie         3815 D.Xie        
BEAM   LINE 2-2  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               91W2 D.REIS        91W2 D.REIS       
DOWN               DOWN               CHANGE/91W2 D.REIS DOWN               DOWN               91W2 D.REIS        91W2 D.REIS       
DOWN               DOWN               91W2 D.REIS/DOWN   DOWN               91W2 D.REIS        91W2 D.REIS        91W2 D.REIS       
BEAM   LINE 2-3  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
3754 B.POPESCU     3947 B.Shyam       3947 B.Shyam       DOWN               DOWN               3796 A.DEONARINE   3796 A.DEONARINE  
CHANGE/3947 B.Shya 3947 B.Shyam       CHANGE/3796 A.DEON DOWN               DOWN               3796 A.DEONARINE   3796 A.DEONARINE  
3947 B.Shyam       3947 B.Shyam       3796 A.DEONAR/DOWN DOWN               3796 A.DEONARINE   3796 A.DEONARINE   3796 A.DEONARINE  
BEAM   LINE 4-1  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
8090 J.Nelson Weke 3658 W.Fischer     3658 W.Fischer     DOWN               DOWN               3928 B.BOSTICK     3928 B.BOSTICK    
SMB CHECKOUT/3658  3658 W.Fischer     SMB CHECKOUT/3928  DOWN               DOWN               3928 B.BOSTICK     3928 B.BOSTICK    
3658 W.Fischer     3658 W.Fischer     3928 B.BOSTIC/DOWN DOWN               3928 B.BOSTICK     3928 B.BOSTICK     3928 B.BOSTICK    
BEAM   LINE 4-2  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
3765 T.Bryan       3434 A.Sali        8047 T.WEISS       DOWN               DOWN               8077 T.MATSUI      8077 T.MATSUI     
CHANGE/3434 A.Sali CHANGE/8047 T.WEIS 8047 T.WEISS       DOWN               DOWN               8077 T.MATSUI      8077 T.MATSUI     
3434 A.Sali        8047 T.WEISS       8047 T.WEISS/DOWN  DOWN               8077 T.MATSUI      8077 T.MATSUI      8077 T.MATSUI     
BEAM   LINE 4-3  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
3757 R.Bassiri     3757 R.Bassiri     3871 M.ACOSTA      DOWN               DOWN               3871 M.ACOSTA      3871 M.ACOSTA     
3757 R.Bassiri     SMB CHECKOUT/3871  3871 M.ACOSTA      DOWN               DOWN               3871 M.ACOSTA      3871 M.ACOSTA     
3757 R.Bassiri     3871 M.ACOSTA      3871 M.ACOSTA/DOWN DOWN               3871 M.ACOSTA      3871 M.ACOSTA      3871 M.ACOSTA     
BEAM   LINE 6-2  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
3921 W.Chueh       3921 W.Chueh       3921 W.Chueh       DOWN               DOWN               3921 W.Chueh       3921 W.Chueh      
3921 W.Chueh       3921 W.Chueh       3921 W.Chueh       DOWN               DOWN               3921 W.Chueh       3921 W.Chueh      
3921 W.Chueh       3921 W.Chueh       3921 W.Chueh/DOWN  DOWN               3921 W.Chueh       3921 W.Chueh       3921 W.Chueh      
BEAM   LINE 7-2  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
4002 M.Biegalski   3942 M.Samant      3942 M.Samant      DOWN               DOWN               3942 M.Samant      3942 M.Samant     
Xray CHECKOUT/3942 3942 M.Samant      3942 M.Samant      DOWN               DOWN               3942 M.Samant      3942 M.Samant     
3942 M.Samant      3942 M.Samant      3942 M.Samant/DOWN DOWN               3942 M.Samant      3942 M.Samant      3942 M.Samant     
BEAM   LINE 7-3  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
8071 R.SARANGI     3900 B.HEDMAN      3900 B.HEDMAN      DOWN               DOWN               3900 B.HEDMAN      3900 B.HEDMAN     
SMB CHECKOUT/3900  3900 B.HEDMAN      3900 B.HEDMAN      DOWN               DOWN               3900 B.HEDMAN      3900 B.HEDMAN     
3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN/DOWN DOWN               3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
BEAM   LINE 9-3  
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
3836 Y.Lu          3836 Y.Lu          Unscheduled        DOWN               DOWN               3593 T.STEMMLER    3593 T.STEMMLER   
3836 Y.Lu          Unscheduled        SMB CHECKOUT/3593  DOWN               DOWN               3593 T.STEMMLER    3593 T.STEMMLER   
3836 Y.Lu          Unscheduled        3593 T.STEMML/DOWN DOWN               3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER   
BEAM   LINE 10-2 
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     DOWN               DOWN               3754 B.POPESCU     3754 B.POPESCU    
3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     DOWN               DOWN               3754 B.POPESCU     3754 B.POPESCU    
3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESC/DOWN DOWN               3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
BEAM   LINE 11-2 
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
3749 R.DAEHN       3749 R.DAEHN       3832 G.LOWRY       DOWN               DOWN               3999 G.LOWRY       3999 G.LOWRY      
3749 R.DAEHN       SMB CHECKOUT/3832  CHANGE/3999 G.LOWR DOWN               DOWN               3999 G.LOWRY       3999 G.LOWRY      
3749 R.DAEHN       3832 G.LOWRY       3999 G.LOWRY/DOWN  DOWN               3999 G.LOWRY       3999 G.LOWRY       3999 G.LOWRY      
BEAM   LINE 11-3 
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
3787 A.LLORDES     3999 G.LOWRY       Unscheduled        DOWN               DOWN               3731 A.Ayzner      3731 A.Ayzner     
CHANGE/3999 G.LOWR Unscheduled        CHANGE/3731 A.Ayzn DOWN               DOWN               3731 A.Ayzner      3731 A.Ayzner     
3999 G.LOWRY       Unscheduled        3731 A.Ayzner/DOWN DOWN               3731 A.Ayzner      3731 A.Ayzner      3731 A.Ayzner     
BEAM   LINE 14-3 
Nov. 25, 2013      Nov. 26, 2013      Nov. 27, 2013      Nov. 28, 2013      Nov. 29, 2013      Nov. 30, 2013      Dec. 01, 2013     
3658 W.Fischer     3754 B.POPESCU     3754 B.POPESCU     DOWN               DOWN               3754 B.POPESCU     3754 B.POPESCU    
CHANGE/3754 B.POPE 3754 B.POPESCU     3754 B.POPESCU     DOWN               DOWN               3754 B.POPESCU     3754 B.POPESCU    
3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESC/DOWN DOWN               3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    

Back to Table of Contents

WEEK OF Dec. 02, 2013
                                         
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
BEAM   LINE 1-5  
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
DOWN               3960 L.Lim         3960 L.Lim         3960 L.Lim         N002 A.VAILIONIS   N002 A.VAILIONIS   DOWN              
Xray CHECKOUT/3960 3960 L.Lim         3960 L.Lim         Xray CHECKOUT/N002 N002 A.VAILIONIS   DOWN               DOWN              
3960 L.Lim         3960 L.Lim         3960 L.Lim         N002 A.VAILIONIS   N002 A.VAILIONIS   DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3815 D.Xie         3979 G.SU          3979 G.SU          3979 G.SU          3989 K.Stone       3989 K.Stone       3989 K.Stone      
Xray CHECKOUT/3979 3979 G.SU          3979 G.SU          Xray CHECKOUT/3989 3989 K.Stone       3989 K.Stone       3989 K.Stone      
3979 G.SU          3979 G.SU          3979 G.SU          3989 K.Stone       3989 K.Stone       3989 K.Stone       3989 K.Stone      
BEAM   LINE 2-2  
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
91W2 D.REIS        91W2 D.REIS        91W2 D.REIS        91W2 D.REIS        DOWN               DOWN               DOWN              
91W2 D.REIS        91W2 D.REIS        91W2 D.REIS        Xray CHECKOUT/DOWN DOWN               DOWN               DOWN              
91W2 D.REIS        91W2 D.REIS        91W2 D.REIS        DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3796 A.DEONARINE   3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3947 B.Shyam       3947 B.Shyam       3947 B.Shyam      
CHANGE/3603 J.CHOR 3603 J.CHOROVER    3603 J.CHOROVER    CHANGE/3947 B.Shya 3947 B.Shyam       3947 B.Shyam       3947 B.Shyam      
3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3947 B.Shyam       3947 B.Shyam       3947 B.Shyam       3947 B.Shyam      
BEAM   LINE 4-1  
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3928 B.BOSTICK     3962 R.Bernier-Lat 3962 R.Bernier-Lat 3977 A.WISE        3977 A.WISE        3867 L.Lim         3867 L.Lim        
SMB CHECKOUT/3962  3962 R.Bernier-Lat SMB CHECKOUT/3977  3977 A.WISE        SMB CHECKOUT/3867  3867 L.Lim         3867 L.Lim        
3962 R.Bernier-Lat 3962 R.Bernier-Lat 3977 A.WISE        3977 A.WISE        3867 L.Lim         3867 L.Lim         3867 L.Lim        
BEAM   LINE 4-2  
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
8077 T.MATSUI      8077 T.MATSUI      3434 A.Sali        8047 T.WEISS       8885 L.CARTER      3974 M.BRADY       3974 M.BRADY      
8077 T.MATSUI      CHANGE/3434 A.Sali CHANGE/8047 T.WEIS CHANGE/8885 L.CART CHANGE/3974 M.BRAD 3974 M.BRADY       CHANGE/3963 D.Hers
8077 T.MATSUI      3434 A.Sali        8047 T.WEISS       8885 L.CARTER      3974 M.BRADY       3974 M.BRADY       3963 D.Herschlag  
BEAM   LINE 4-3  
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3871 M.ACOSTA      3962 R.Bernier-Lat 3962 R.Bernier-Lat Unscheduled        Unscheduled        3983 M.Barney      3983 M.Barney     
SMB CHECKOUT/3962  3962 R.Bernier-Lat Unscheduled        Unscheduled        SMB CHECKOUT/3983  3983 M.Barney      3983 M.Barney     
3962 R.Bernier-Lat 3962 R.Bernier-Lat Unscheduled        Unscheduled        3983 M.Barney      3983 M.Barney      3983 M.Barney     
BEAM   LINE 6-2  
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3921 W.Chueh       3994 A.Deb         3994 A.Deb         3994 A.Deb         3994 A.Deb         3994 A.Deb         8053 D.NORDLUND   
CHANGE/3994 A.Deb  3994 A.Deb         3994 A.Deb         3994 A.Deb         3994 A.Deb         CHANGE/8053 D.NORD 8053 D.NORDLUND   
3994 A.Deb         3994 A.Deb         3994 A.Deb         3994 A.Deb         3994 A.Deb         8053 D.NORDLUND    8053 D.NORDLUND   
BEAM   LINE 7-2  
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3942 M.Samant      3942 M.Samant      1F94 A.VAILIONIS   1F94 A.VAILIONIS   1F94 A.VAILIONIS   1F94 A.VAILIONIS   1F94 A.VAILIONIS  
3942 M.Samant      Xray CHECKOUT/1F94 1F94 A.VAILIONIS   1F94 A.VAILIONIS   1F94 A.VAILIONIS   1F94 A.VAILIONIS   1F94 A.VAILIONIS  
3942 M.Samant      1F94 A.VAILIONIS   1F94 A.VAILIONIS   1F94 A.VAILIONIS   1F94 A.VAILIONIS   1F94 A.VAILIONIS   1F94 A.VAILIONIS  
BEAM   LINE 7-3  
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3900 B.HEDMAN      8060 J.BARGAR      8060 J.BARGAR      3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger  
SMB CHECKOUT/8060  8060 J.BARGAR      SMB CHECKOUT/3966  3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger  
8060 J.BARGAR      8060 J.BARGAR      3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger  
BEAM   LINE 9-3  
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER    3912 N.BLACKBURN   3912 N.BLACKBURN  
3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER    SMB CHECKOUT/3912  3912 N.BLACKBURN   3912 N.BLACKBURN  
3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER    3912 N.BLACKBURN   3912 N.BLACKBURN   3912 N.BLACKBURN  
BEAM   LINE 10-2 
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3754 B.POPESCU     4006 A.Bhattachary 4006 A.Bhattachary 4006 A.Bhattachary 91V3 Y.Lee         3797 L.LU          3797 L.LU         
CHANGE/4006 A.Bhat 4006 A.Bhattachary 4006 A.Bhattachary CHANGE/91V3 Y.Lee  CHANGE/3797 L.LU   3797 L.LU          3797 L.LU         
4006 A.Bhattachary 4006 A.Bhattachary 4006 A.Bhattachary 91V3 Y.Lee         3797 L.LU          3797 L.LU          3797 L.LU         
BEAM   LINE 11-2 
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3999 G.LOWRY       FACI               FACI               FACI               3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
GIXAS/FACI         FACI               FACI               SMB CHECKOUT/3937  3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
FACI               FACI               FACI               3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
BEAM   LINE 11-3 
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3731 A.Ayzner      3925 J.REINSPACH   3949 D.Barbero     3949 D.Barbero     3949 D.Barbero     3923 Y.Diao        3923 Y.Diao       
CHANGE/3925 J.REIN 3925 J.REINSPACH   3949 D.Barbero     3949 D.Barbero     CHANGE/3923 Y.Diao 3923 Y.Diao        3923 Y.Diao       
3925 J.REINSPACH   CHANGE/3949 D.Barb 3949 D.Barbero     3949 D.Barbero     3923 Y.Diao        3923 Y.Diao        3923 Y.Diao       
BEAM   LINE 14-3 
Dec. 02, 2013      Dec. 03, 2013      Dec. 04, 2013      Dec. 05, 2013      Dec. 06, 2013      Dec. 07, 2013      Dec. 08, 2013     
3754 B.POPESCU     4012 J.BARGAR      4012 J.BARGAR      4012 J.BARGAR      3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
CHANGE/4012 J.BARG 4012 J.BARGAR      4012 J.BARGAR      CHANGE/3603 J.CHOR 3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
4012 J.BARGAR      4012 J.BARGAR      4012 J.BARGAR      3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   

Back to Table of Contents

WEEK OF Dec. 09, 2013
AP       AP                                    
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
BEAM   LINE 1-5  
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               Xray CHECKOUT/3700
AP                 AP                 DOWN               DOWN               DOWN               DOWN               3700 T.GAO        
BEAM   LINE 2-1  
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
3989 K.Stone/AP    AP                 AP                 91W3 B.Shyam       91W3 B.Shyam       3949 D.Barbero     3949 D.Barbero    
AP                 AP                 Xray CHECKOUT/91W3 91W3 B.Shyam       Xray CHECKOUT/3949 3949 D.Barbero     3949 D.Barbero    
AP                 AP                 91W3 B.Shyam       91W3 B.Shyam       3949 D.Barbero     3949 D.Barbero     3949 D.Barbero    
BEAM   LINE 2-2  
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
3947 B.Shyam/AP    AP                 AP                 4006 A.Bhattachary 4006 A.Bhattachary 3981 S.TIAN        3981 S.TIAN       
AP                 AP                 CHANGE/4006 A.Bhat 4006 A.Bhattachary CHANGE/3981 S.TIAN 3981 S.TIAN        CHANGE/3667 S.TIAN
AP                 AP                 4006 A.Bhattachary 4006 A.Bhattachary 3981 S.TIAN        3981 S.TIAN        3667 S.TIAN       
BEAM   LINE 4-1  
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
3867 L.Lim/AP      AP                 AP                 4006 A.Bhattachary 4006 A.Bhattachary 3851 T.BORCH       3851 T.BORCH      
AP                 AP                 SMB CHECKOUT/4006  4006 A.Bhattachary SMB CHECKOUT/3851  3851 T.BORCH       3851 T.BORCH      
AP                 AP                 4006 A.Bhattachary 4006 A.Bhattachary 3851 T.BORCH       3851 T.BORCH       3851 T.BORCH      
BEAM   LINE 4-2  
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
3963 D.Herschla/AP AP                 AP                 8877 T.MATSUI      3814 P.Grochulski  3577 C.SAFINYA     3577 C.SAFINYA    
AP                 AP                 CHANGE/8877 T.MATS CHANGE/3814 P.Groc CHANGE/3577 C.SAFI 3577 C.SAFINYA     3577 C.SAFINYA    
AP                 AP                 8877 T.MATSUI      3814 P.Grochulski  3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
BEAM   LINE 4-3  
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
3983 M.Barney/AP   AP                 AP                 3984 K.BOYE        3984 K.BOYE        3532 B.HEDMAN      3532 B.HEDMAN     
AP                 AP                 SMB CHECKOUT/3984  3984 K.BOYE        SMB CHECKOUT/3532  3532 B.HEDMAN      3532 B.HEDMAN     
AP                 AP                 3984 K.BOYE        3984 K.BOYE        3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN     
BEAM   LINE 6-2  
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
8053 D.NORDLUND/AP AP                 AP                 8053 D.NORDLUND    3722 S.CHRISTENSEN 3722 S.CHRISTENSEN 3722 S.CHRISTENSEN
AP                 AP                 8053 D.NORDLUND    CHANGE/3722 S.CHRI 3722 S.CHRISTENSEN 3722 S.CHRISTENSEN 3722 S.CHRISTENSEN
AP                 AP                 8053 D.NORDLUND    3722 S.CHRISTENSEN 3722 S.CHRISTENSEN 3722 S.CHRISTENSEN 3722 S.CHRISTENSEN
BEAM   LINE 7-2  
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
1F94 A.VAILIONI/AP AP                 AP                 9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
AP                 AP                 Xray CHECKOUT/9704 9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
AP                 AP                 9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
BEAM   LINE 7-3  
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
3966 J.Bollinge/AP AP                 AP                 3557 F.BRIDGES     3600 F.BRIDGES     3600 F.BRIDGES     3627 F.BRIDGES    
AP                 AP                 SMB CHECKOUT/3557  3557 F.BRIDGES     3600 F.BRIDGES     3600 F.BRIDGES     3627 F.BRIDGES    
AP                 AP                 3557 F.BRIDGES     SMB CHECKOUT/3600  3600 F.BRIDGES     SMB CHECKOUT/3627  3627 F.BRIDGES    
BEAM   LINE 9-3  
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
3912 N.BLACKBUR/AP AP                 AP                 8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 SMB CHECKOUT/8071  8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
BEAM   LINE 10-2 
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
3797 L.LU/AP       AP                 AP                 FACI               8818 A.MEHTA       8818 A.MEHTA       3826 J.Komadina   
AP                 AP                 Xray CHECKOUT/FACI Xray CHECKOUT/8818 8818 A.MEHTA       Xray CHECKOUT/3826 3826 J.Komadina   
AP                 AP                 FACI               8818 A.MEHTA       8818 A.MEHTA       3826 J.Komadina    3826 J.Komadina   
BEAM   LINE 11-2 
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
3937 I.Chorkend/AP AP                 AP                 3953 M.KANAN       3953 M.KANAN       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 SMB CHECKOUT/3953  3953 M.KANAN       SMB CHECKOUT/8015  8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 3953 M.KANAN       3953 M.KANAN       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 11-3 
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
3923 Y.Diao/AP     AP                 AP                 3853 A.Briseno     3853 A.Briseno     3979 G.SU          3979 G.SU         
AP                 AP                 CHANGE/3853 A.Bris 3853 A.Briseno     CHANGE/3979 G.SU   3979 G.SU          3979 G.SU         
AP                 AP                 3853 A.Briseno     3853 A.Briseno     3979 G.SU          3979 G.SU          3979 G.SU         
BEAM   LINE 14-3 
Dec. 09, 2013      Dec. 10, 2013      Dec. 11, 2013      Dec. 12, 2013      Dec. 13, 2013      Dec. 14, 2013      Dec. 15, 2013     
3603 J.CHOROVER/AP AP                 AP                 3750 M.WALTON      3750 M.WALTON      3750 M.WALTON      3750 M.WALTON     
AP                 AP                 CHANGE/3750 M.WALT 3750 M.WALTON      3750 M.WALTON      3750 M.WALTON      3750 M.WALTON     
AP                 AP                 3750 M.WALTON      3750 M.WALTON      3750 M.WALTON      3750 M.WALTON      3750 M.WALTON     

Back to Table of Contents

WEEK OF Dec. 16, 2013
                        AP       Down       Down      
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
BEAM   LINE 1-5  
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
3700 T.GAO         3700 T.GAO         3700 T.GAO         3700 T.GAO         AP                 AP/DOWN            DOWN              
3700 T.GAO         3700 T.GAO         3700 T.GAO         Unscheduled        AP                 DOWN               DOWN              
3700 T.GAO         3700 T.GAO         3700 T.GAO         Unscheduled        AP                 DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
3949 D.Barbero     3949 D.Barbero     3949 D.Barbero     3731 A.Ayzner      3731 A.Ayzner/AP   AP/DOWN            DOWN              
3949 D.Barbero     3949 D.Barbero     Xray CHECKOUT/3731 3731 A.Ayzner      AP                 DOWN               DOWN              
3949 D.Barbero     3949 D.Barbero     3731 A.Ayzner      3731 A.Ayzner      AP                 DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN/AP            AP/DOWN            DOWN              
DOWN               DOWN               DOWN               DOWN               AP                 DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               AP                 DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
3667 S.TIAN        3667 S.TIAN        3667 S.TIAN        3848 J.HAYTER      3848 J.HAYTER/AP   AP/DOWN            DOWN              
3667 S.TIAN        3667 S.TIAN        CHANGE/3848 J.HAYT 3848 J.HAYTER      AP                 DOWN               DOWN              
3667 S.TIAN        3667 S.TIAN        3848 J.HAYTER      3848 J.HAYTER      AP                 DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
3851 T.BORCH       3818 M.DOEFF       3818 M.DOEFF       1F97 S.Fleischman  1F97 S.Fleischm/AP AP/DOWN            DOWN              
SMB CHECKOUT/3818  3818 M.DOEFF       SMB CHECKOUT/1F97  1F97 S.Fleischman  AP                 DOWN               DOWN              
3818 M.DOEFF       3818 M.DOEFF       1F97 S.Fleischman  1F97 S.Fleischman  AP                 DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3873 A.VAN BUUR/AP AP/DOWN            DOWN              
3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     CHANGE/3873 A.VAN  AP                 DOWN               DOWN              
3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3873 A.VAN BUUREN  AP                 DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
3532 B.HEDMAN      3658 W.Fischer     3658 W.Fischer     3919 M.KIRK        3919 M.KIRK/AP     AP/DOWN            DOWN              
SMB CHECKOUT/3658  3658 W.Fischer     SMB CHECKOUT/3919  3919 M.KIRK        AP                 DOWN               DOWN              
3658 W.Fischer     3658 W.Fischer     3919 M.KIRK        3919 M.KIRK        AP                 DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
3722 S.CHRISTENSEN FACI               3710 Y.LIN         3710 Y.LIN         3710 Y.LIN/AP      AP/DOWN            DOWN              
Xray>TXM/FACI      CHANGE/3710 Y.LIN  3710 Y.LIN         3710 Y.LIN         AP                 DOWN               DOWN              
FACI               3710 Y.LIN         3710 Y.LIN         3710 Y.LIN         AP                 DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee/AP      AP/DOWN            DOWN              
9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         AP                 DOWN               DOWN              
9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         AP                 DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
3627 F.BRIDGES     3919 M.KIRK        3919 M.KIRK        3919 M.KIRK        3919 M.KIRK/AP     AP/DOWN            DOWN              
SMB CHECKOUT/3919  3919 M.KIRK        3919 M.KIRK        3919 M.KIRK        AP                 DOWN               DOWN              
3919 M.KIRK        3919 M.KIRK        3919 M.KIRK        3919 M.KIRK        AP                 DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
8071 R.SARANGI     8071 R.SARANGI     FACI               FACI               FACI/AP            AP/DOWN            DOWN              
8071 R.SARANGI     SMB CHECKOUT/FACI  FACI               FACI               AP                 DOWN               DOWN              
8071 R.SARANGI     FACI               FACI               FACI               AP                 DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
3826 J.Komadina    3777 G.Carini      3777 G.Carini      FACI               9704 Y.Lee/AP      AP/DOWN            DOWN              
Xray CHECKOUT/3777 3777 G.Carini      Xray CHECKOUT/FACI Xray CHECKOUT/9704 AP                 DOWN               DOWN              
3777 G.Carini      3777 G.Carini      FACI               9704 Y.Lee         AP                 DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA/AP    AP/DOWN            DOWN              
8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       AP                 DOWN               DOWN              
8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       AP                 DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
3979 G.SU          3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3734 C.TASSONE     3734 C.TASSONE/AP  AP/DOWN            DOWN              
CHANGE/3922 S.HIMM 3922 S.HIMMELBERGE CHANGE/3734 C.TASS 3734 C.TASSONE     AP                 DOWN               DOWN              
3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3734 C.TASSONE     3734 C.TASSONE     AP                 DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 16, 2013      Dec. 17, 2013      Dec. 18, 2013      Dec. 19, 2013      Dec. 20, 2013      Dec. 21, 2013      Dec. 22, 2013     
3750 M.WALTON      1F99 D.Fike        1F99 D.Fike        3797 L.LU          3797 L.LU/AP       AP/DOWN            DOWN              
CHANGE/1F99 D.Fike 1F99 D.Fike        CHANGE/3797 L.LU   3797 L.LU          AP                 DOWN               DOWN              
1F99 D.Fike        1F99 D.Fike        3797 L.LU          3797 L.LU          AP                 DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 23, 2013
Down       Down       Down       Down       Down       Down       Down      
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
BEAM   LINE 1-5  
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 23, 2013      Dec. 24, 2013      Dec. 25, 2013      Dec. 26, 2013      Dec. 27, 2013      Dec. 28, 2013      Dec. 29, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 30, 2013
Down       Down       Down       Down       Down       Down       Down      
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
BEAM   LINE 1-5  
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 30, 2013      Dec. 31, 2013      Jan. 01, 2014      Jan. 02, 2014      Jan. 03, 2014      Jan. 04, 2014      Jan. 05, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Jan. 06, 2014
AP       Ops Re-start                                    
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
BEAM   LINE 1-5  
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 Unscheduled        Unscheduled        Unscheduled        N002 A.VAILIONIS   N002 A.VAILIONIS  
AP                 Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/N002 N002 A.VAILIONIS   N002 A.VAILIONIS  
AP                 Unscheduled        Unscheduled        Unscheduled        N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS  
BEAM   LINE 2-1  
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 3625 S.SWEETNAM    4066 K.Stone       4066 K.Stone       8015 A.MEHTA       8015 A.MEHTA      
AP                 Xray CHECKOUT/3625 Xray CHECKOUT/4066 4066 K.Stone       Xray CHECKOUT/8015 8015 A.MEHTA       8015 A.MEHTA      
AP                 3625 S.SWEETNAM    4066 K.Stone       4066 K.Stone       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 2-2  
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 8051 M.TONEY       8051 M.TONEY       8867 S.WEBB        3683 M.PUSHIE      3683 M.PUSHIE     
AP                 CHANGE/8051 M.TONE 8051 M.TONEY       CHANGE/8867 S.WEBB CHANGE/3683 M.PUSH 3683 M.PUSHIE      3683 M.PUSHIE     
AP                 8051 M.TONEY       8051 M.TONEY       8867 S.WEBB        3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE     
BEAM   LINE 4-1  
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3975 J.Nelson      3501 P.O'DAY       3501 P.O'DAY      
AP                 SMB CHECKOUT/3835  3835 G.WAYCHUNAS   SMB CHECKOUT/3975  SMB CHECKOUT/3501  3501 P.O'DAY       3501 P.O'DAY      
AP                 3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3975 J.Nelson      3501 P.O'DAY       3501 P.O'DAY       3501 P.O'DAY      
BEAM   LINE 4-2  
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 3909 S.Turley      3963 D.Herschlag   8885 L.CARTER      8077 T.MATSUI      3742 H.LIANG      
AP                 CHANGE/3909 S.Turl CHANGE/3963 D.Hers CHANGE/8885 L.CART CHANGE/8077 T.MATS CHANGE/3742 H.LIAN 3742 H.LIANG      
AP                 3909 S.Turley      3963 D.Herschlag   8885 L.CARTER      8077 T.MATSUI      3742 H.LIANG       3742 H.LIANG      
BEAM   LINE 4-3  
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       3678 S.MYNENI      3678 S.MYNENI     
AP                 SMB CHECKOUT/3447  3447 S.CHEAH       3447 S.CHEAH       SMB CHECKOUT/3678  3678 S.MYNENI      3678 S.MYNENI     
AP                 3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       3678 S.MYNENI      3678 S.MYNENI      3678 S.MYNENI     
BEAM   LINE 6-2  
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 FACI               8081 Y.LIU         8081 Y.LIU         3855 M.Scarpulla   3977 A.WISE       
AP                 Xray CHECKOUT/FACI CHANGE/8081 Y.LIU  8081 Y.LIU         CHANGE/3855 M.Scar CHANGE/3977 A.WISE 3977 A.WISE       
AP                 FACI               8081 Y.LIU         8081 Y.LIU         3855 M.Scarpulla   3977 A.WISE        3977 A.WISE       
BEAM   LINE 7-2  
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 3877 M.Ahmad       3877 M.Ahmad       3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3922 S.HIMMELBERGE
AP                 Xray CHECKOUT/3877 3877 M.Ahmad       3877 M.Ahmad       3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3922 S.HIMMELBERGE
AP                 3877 M.Ahmad       3877 M.Ahmad       Xray CHECKOUT/3922 3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3922 S.HIMMELBERGE
BEAM   LINE 7-3  
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER    3857 G.GEORGE      3857 G.GEORGE     
AP                 SMB CHECKOUT/3838  3838 E.WASINGER    3838 E.WASINGER    SMB CHECKOUT/3857  3857 G.GEORGE      3857 G.GEORGE     
AP                 3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER    3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
BEAM   LINE 9-3  
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
AP                 SMB CHECKOUT/3900  3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
AP                 3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
BEAM   LINE 10-2 
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
AP                 Xray CHECKOUT/8015 8015 A.MEHTA       8015 A.MEHTA       Xray CHECKOUT/8818 8818 A.MEHTA       8818 A.MEHTA      
AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
BEAM   LINE 11-2 
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 3893 D.WANG        3893 D.WANG        Unscheduled        3746 W.LUKENS      3746 W.LUKENS     
AP                 SMB CHECKOUT/3893  3893 D.WANG        Unscheduled        SMB CHECKOUT/3746  3746 W.LUKENS      3746 W.LUKENS     
AP                 3893 D.WANG        3893 D.WANG        Unscheduled        3746 W.LUKENS      3746 W.LUKENS      3746 W.LUKENS     
BEAM   LINE 11-3 
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 3709 J.CHANG       3709 J.CHANG       3973 M.BRADY       3973 M.BRADY       3973 M.BRADY      
AP                 Xray CHECKOUT/3709 3709 J.CHANG       CHANGE/3973 M.BRAD 3973 M.BRADY       3973 M.BRADY       3973 M.BRADY      
AP                 3709 J.CHANG       3709 J.CHANG       3973 M.BRADY       3973 M.BRADY       3973 M.BRADY       3973 M.BRADY      
BEAM   LINE 14-3 
Jan. 06, 2014      Jan. 07, 2014      Jan. 08, 2014      Jan. 09, 2014      Jan. 10, 2014      Jan. 11, 2014      Jan. 12, 2014     
DOWN/AP            AP                 3984 K.BOYE        3984 K.BOYE        3984 K.BOYE        3514 C.LOPANO      3514 C.LOPANO     
AP                 CHANGE/3984 K.BOYE 3984 K.BOYE        3984 K.BOYE        CHANGE/3514 C.LOPA 3514 C.LOPANO      3514 C.LOPANO     
AP                 3984 K.BOYE        3984 K.BOYE        3984 K.BOYE        3514 C.LOPANO      3514 C.LOPANO      3514 C.LOPANO     

Back to Table of Contents

WEEK OF Jan. 13, 2014
MA       AP                                    
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
BEAM   LINE 1-5  
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
N002 A.VAILIONI/MA AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
8015 A.MEHTA/MA    AP                 AP                 8818 A.MEHTA       3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
MA                 AP                 Xray CHECKOUT/8818 Xray CHECKOUT/3844 3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
MA/AP              AP                 8818 A.MEHTA       3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
BEAM   LINE 2-2  
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
DOWN/MA            AP                 AP                 91W2 D.REIS        91W2 D.REIS        91W2 D.REIS        91W2 D.REIS       
MA                 AP                 Xray CHECKOUT/91W2 91W2 D.REIS        91W2 D.REIS        91W2 D.REIS        91W2 D.REIS       
MA/AP              AP                 91W2 D.REIS        91W2 D.REIS        91W2 D.REIS        91W2 D.REIS        91W2 D.REIS       
BEAM   LINE 2-3  
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
3683 M.PUSHIE/MA   AP                 AP                 3505 H.NICHOL      3505 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
MA                 AP                 CHANGE/3505 H.NICH 3505 H.NICHOL      CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL     
MA/AP              AP                 3505 H.NICHOL      3505 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
BEAM   LINE 4-1  
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
3501 P.O'DAY/MA    AP                 AP                 3936 L.Trotochaud  3936 L.Trotochaud  3927 A.FOSTER      3927 A.FOSTER     
MA                 AP                 SMB CHECKOUT/3936  3936 L.Trotochaud  SMB CHECKOUT/3927  3927 A.FOSTER      3927 A.FOSTER     
MA/AP              AP                 3936 L.Trotochaud  3936 L.Trotochaud  3927 A.FOSTER      3927 A.FOSTER      3927 A.FOSTER     
BEAM   LINE 4-2  
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
3742 H.LIANG/MA    AP                 AP                 8077 T.MATSUI      3660 S.TOLBERT     3704 L.HIRST       3704 L.HIRST      
MA                 AP                 CHANGE/8077 T.MATS CHANGE/3660 S.TOLB CHANGE/3704 L.HIRS 3704 L.HIRST       3704 L.HIRST      
MA/AP              AP                 8077 T.MATSUI      3660 S.TOLBERT     3704 L.HIRST       3704 L.HIRST       3704 L.HIRST      
BEAM   LINE 4-3  
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
3678 S.MYNENI/MA   AP                 AP                 3501 P.O'DAY       3501 P.O'DAY       3614 H.NICHOL      3614 H.NICHOL     
MA                 AP                 SMB CHECKOUT/3501  3501 P.O'DAY       SMB CHECKOUT/3614  3614 H.NICHOL      3614 H.NICHOL     
MA/AP              AP                 3501 P.O'DAY       3501 P.O'DAY       3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
BEAM   LINE 6-2  
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
3977 A.WISE/MA     AP                 AP                 FACI               3959 P.MANNING     3959 P.MANNING     3959 P.MANNING    
MA                 AP                 Xray CHECKOUT/FACI Xray CHECKOUT/3959 3959 P.MANNING     3959 P.MANNING     3959 P.MANNING    
MA/AP              AP                 FACI               3959 P.MANNING     3959 P.MANNING     3959 P.MANNING     3959 P.MANNING    
BEAM   LINE 7-2  
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
3922 S.HIMMELBE/MA AP                 AP                 3660 S.TOLBERT     3660 S.TOLBERT     3791 C.TASSONE     3791 C.TASSONE    
MA                 AP                 Xray CHECKOUT/3660 3660 S.TOLBERT     Xray CHECKOUT/3791 3791 C.TASSONE     3791 C.TASSONE    
MA/AP              AP                 3660 S.TOLBERT     3660 S.TOLBERT     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE    
BEAM   LINE 7-3  
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
3857 G.GEORGE/MA   AP                 AP                 3857 G.GEORGE      3857 G.GEORGE      3683 M.PUSHIE      3683 M.PUSHIE     
MA                 AP                 3857 G.GEORGE      3857 G.GEORGE      SMB CHECKOUT/3683  3683 M.PUSHIE      3683 M.PUSHIE     
MA/AP              AP                 3857 G.GEORGE      3857 G.GEORGE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE     
BEAM   LINE 9-3  
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
3900 B.HEDMAN/MA   AP                 AP                 3900 B.HEDMAN      3900 B.HEDMAN      3859 I.PICKERING   3859 I.PICKERING  
MA                 AP                 3900 B.HEDMAN      3900 B.HEDMAN      SMB CHECKOUT/3859  3859 I.PICKERING   3859 I.PICKERING  
MA/AP              AP                 3900 B.HEDMAN      3900 B.HEDMAN      3859 I.PICKERING   3859 I.PICKERING   3859 I.PICKERING  
BEAM   LINE 10-2 
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
8818 A.MEHTA/MA    AP                 AP                 3842 W.Chueh       3842 W.Chueh       91T2 F.BRIDGES     91T2 F.BRIDGES    
MA                 AP                 Xray CHECKOUT/3842 3842 W.Chueh       Xray CHECKOUT/91T2 91T2 F.BRIDGES     91T2 F.BRIDGES    
MA/AP              AP                 3842 W.Chueh       3842 W.Chueh       91T2 F.BRIDGES     91T2 F.BRIDGES     91T2 F.BRIDGES    
BEAM   LINE 11-2 
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
3746 W.LUKENS/MA   AP                 AP                 3987 G.DUBLET      3987 G.DUBLET      3995 T.Bank        3995 T.Bank       
MA                 AP                 SMB CHECKOUT/3987  3987 G.DUBLET      SMB CHECKOUT/3995  3995 T.Bank        3995 T.Bank       
MA/AP              AP                 3987 G.DUBLET      3987 G.DUBLET      3995 T.Bank        3995 T.Bank        3995 T.Bank       
BEAM   LINE 11-3 
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
3973 M.BRADY/MA    AP                 AP                 3660 S.TOLBERT     3660 S.TOLBERT     3964 A.El Labban   3964 A.El Labban  
MA                 AP                 CHANGE/3660 S.TOLB 3660 S.TOLBERT     CHANGE/3964 A.El L 3964 A.El Labban   3964 A.El Labban  
MA/AP              AP                 3660 S.TOLBERT     3660 S.TOLBERT     3964 A.El Labban   3964 A.El Labban   3964 A.El Labban  
BEAM   LINE 14-3 
Jan. 13, 2014      Jan. 14, 2014      Jan. 15, 2014      Jan. 16, 2014      Jan. 17, 2014      Jan. 18, 2014      Jan. 19, 2014     
3514 C.LOPANO/MA   AP                 AP                 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
MA                 AP                 CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
MA/AP              AP                 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     

Back to Table of Contents

WEEK OF Jan. 20, 2014
HOLIDAY                                          
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
BEAM   LINE 1-5  
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
Unscheduled        Unscheduled        3937 I.Chorkendorf 3937 I.Chorkendorf Unscheduled        3960 L.Lim         3960 L.Lim        
Unscheduled        Xray CHECKOUT/3937 3937 I.Chorkendorf Unscheduled        c/3960             3960 L.Lim         3960 L.Lim        
Unscheduled        3937 I.Chorkendorf 3937 I.Chorkendorf Unscheduled        3960 L.Lim         3960 L.Lim         3960 L.Lim        
BEAM   LINE 2-1  
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3844 Y.TAKAMURA    3844 Y.TAKAMURA    3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3977 A.WISE        3977 A.WISE        3977 A.WISE       
3844 Y.TAKAMURA    Xray CHECKOUT/3922 3922 S.HIMMELBERGE Xray CHECKOUT/3977 3977 A.WISE        3977 A.WISE        3977 A.WISE       
3844 Y.TAKAMURA    3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3977 A.WISE        3977 A.WISE        3977 A.WISE        3977 A.WISE       
BEAM   LINE 2-2  
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
91W2 D.REIS        91W2 D.REIS        DOWN               4022 T.Cahill      4022 T.Cahill      4019 T.CAHILL      4019 T.CAHILL     
91W2 D.REIS        DOWN               Xray CHECKOUT/4022 4022 T.Cahill      CHANGE/4019 T.CAHI 4019 T.CAHILL      4019 T.CAHILL     
91W2 D.REIS        DOWN               4022 T.Cahill      4022 T.Cahill      4019 T.CAHILL      4019 T.CAHILL      4019 T.CAHILL     
BEAM   LINE 2-3  
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3614 H.NICHOL      3614 H.NICHOL      3995 T.Bank        3995 T.Bank        3995 T.Bank        3726 A.SEYFFERTH   3726 A.SEYFFERTH  
3614 H.NICHOL      CHANGE/3995 T.Bank 3995 T.Bank        3995 T.Bank        CHANGE/3726 A.SEYF 3726 A.SEYFFERTH   3726 A.SEYFFERTH  
3614 H.NICHOL      3995 T.Bank        3995 T.Bank        3995 T.Bank        3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
BEAM   LINE 4-1  
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3927 A.FOSTER      3927 A.FOSTER      Unscheduled        3510 C.Van Genucht 3510 C.Van Genucht 3712 J.PENA        3712 J.PENA       
3927 A.FOSTER      Unscheduled        SMB CHECKOUT/3510  3510 C.Van Genucht SMB CHECKOUT/3712  3712 J.PENA        3712 J.PENA       
3927 A.FOSTER      Unscheduled        3510 C.Van Genucht 3510 C.Van Genucht 3712 J.PENA        3712 J.PENA        3712 J.PENA       
BEAM   LINE 4-2  
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3704 L.HIRST       91V4 W.Mieher      91V4 W.Mieher      3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
CHANGE/91V4 W.Mieh 91V4 W.Mieher      CHANGE/3577 C.SAFI 3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
91V4 W.Mieher      91V4 W.Mieher      3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
BEAM   LINE 4-3  
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3614 H.NICHOL      3614 H.NICHOL      3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3778 P.Kennepohl   3778 P.Kennepohl   3755 P.Kennepohl  
3614 H.NICHOL      SMB CHECKOUT/3835  3835 G.WAYCHUNAS   SMB CHECKOUT/3778  3778 P.Kennepohl   CHANGE/3755 P.Kenn 3755 P.Kennepohl  
3614 H.NICHOL      3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3778 P.Kennepohl   3778 P.Kennepohl   3755 P.Kennepohl   3755 P.Kennepohl  
BEAM   LINE 6-2  
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3959 P.MANNING     3959 P.MANNING     FACI               3842 W.Chueh       3842 W.Chueh       3821 Y.Yu          3821 Y.Yu         
3959 P.MANNING     Xray CHECKOUT/FACI CHANGE/3842 W.Chue 3842 W.Chueh       CHANGE/3821 Y.Yu   3821 Y.Yu          3821 Y.Yu         
3959 P.MANNING     FACI               3842 W.Chueh       3842 W.Chueh       3821 Y.Yu          3821 Y.Yu          3821 Y.Yu         
BEAM   LINE 7-2  
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     8078 S.MANNSFELD   8078 S.MANNSFELD  
3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     Xray CHECKOUT/8078 8078 S.MANNSFELD   8078 S.MANNSFELD  
3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD  
BEAM   LINE 7-3  
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3755 P.Kennepohl   3755 P.Kennepohl   3778 P.Kennepohl   3778 P.Kennepohl  
3683 M.PUSHIE      3683 M.PUSHIE      SMB CHECKOUT/3755  3755 P.Kennepohl   SMB CHECKOUT/3778  3778 P.Kennepohl   3778 P.Kennepohl  
3683 M.PUSHIE      3683 M.PUSHIE      3755 P.Kennepohl   3755 P.Kennepohl   3778 P.Kennepohl   3778 P.Kennepohl   3778 P.Kennepohl  
BEAM   LINE 9-3  
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3859 I.PICKERING   3859 I.PICKERING   3859 I.PICKERING   3582 L.QUE         3582 L.QUE         3582 L.QUE         3582 L.QUE        
3859 I.PICKERING   3859 I.PICKERING   SMB CHECKOUT/3582  3582 L.QUE         3582 L.QUE         3582 L.QUE         3582 L.QUE        
3859 I.PICKERING   3859 I.PICKERING   3582 L.QUE         3582 L.QUE         3582 L.QUE         3582 L.QUE         3582 L.QUE        
BEAM   LINE 10-2 
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
91T2 F.BRIDGES     91T2 F.BRIDGES     3931 W.LEE         3931 W.LEE         3931 W.LEE         3819 R.Wang        3819 R.Wang       
91T2 F.BRIDGES     Xray CHECKOUT/3931 3931 W.LEE         3931 W.LEE         Xray CHECKOUT/3819 3819 R.Wang        3819 R.Wang       
91T2 F.BRIDGES     3931 W.LEE         3931 W.LEE         3931 W.LEE         3819 R.Wang        3819 R.Wang        3819 R.Wang       
BEAM   LINE 11-2 
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3995 T.Bank        3995 T.Bank        3940 H.BOUKHALFA   3940 H.BOUKHALFA   3875 S.CONRADSON   3875 S.CONRADSON   3875 S.CONRADSON  
3995 T.Bank        SMB CHECKOUT/3940  3940 H.BOUKHALFA   SMB CHECKOUT/3875  3875 S.CONRADSON   3875 S.CONRADSON   3875 S.CONRADSON  
3995 T.Bank        3940 H.BOUKHALFA   3940 H.BOUKHALFA   3875 S.CONRADSON   3875 S.CONRADSON   3875 S.CONRADSON   3875 S.CONRADSON  
BEAM   LINE 11-3 
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3964 A.El Labban   3964 A.El Labban   Unscheduled        Unscheduled        3712 J.PENA        8051 M.TONEY       8051 M.TONEY      
3964 A.El Labban   Unscheduled        Unscheduled        Xray CHECKOUT/3712 Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY      
3964 A.El Labban   Unscheduled        Unscheduled        3712 J.PENA        8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 14-3 
Jan. 20, 2014      Jan. 21, 2014      Jan. 22, 2014      Jan. 23, 2014      Jan. 24, 2014      Jan. 25, 2014      Jan. 26, 2014     
3614 H.NICHOL      3614 H.NICHOL      3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       91V9 M.ZHU         91V9 M.ZHU        
3614 H.NICHOL      CHANGE/3447 S.CHEA 3447 S.CHEAH       3447 S.CHEAH       CHANGE/91V9 M.ZHU  91V9 M.ZHU         91V9 M.ZHU        
3614 H.NICHOL      3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       91V9 M.ZHU         91V9 M.ZHU         91V9 M.ZHU        

Back to Table of Contents

WEEK OF Jan. 27, 2014
AP       AP                                    
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
BEAM   LINE 1-5  
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
3960 L.Lim/AP      AP                 AP                 3877 M.Ahmad       3877 M.Ahmad       3877 M.Ahmad       Unscheduled       
AP                 AP                 Xray CHECKOUT/3877 3877 M.Ahmad       3877 M.Ahmad       Unscheduled        Unscheduled       
AP                 AP                 3877 M.Ahmad       3877 M.Ahmad       3877 M.Ahmad       Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
3977 A.WISE/AP     AP                 AP                 3952 B.Shyam       3952 B.Shyam       3819 R.Wang        3819 R.Wang       
AP                 AP                 Xray CHECKOUT/3952 3952 B.Shyam       Xray CHECKOUT/3819 3819 R.Wang        3819 R.Wang       
AP                 AP                 3952 B.Shyam       3952 B.Shyam       3819 R.Wang        3819 R.Wang        3819 R.Wang       
BEAM   LINE 2-2  
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
4019 T.CAHILL/AP   AP                 AP                 8802 T.HOSTETLER   8802 T.HOSTETLER   8802 T.HOSTETLER   DOWN              
AP                 AP                 Xray CHECKOUT/8802 8802 T.HOSTETLER   8802 T.HOSTETLER   DOWN               DOWN              
AP                 AP                 8802 T.HOSTETLER   8802 T.HOSTETLER   8802 T.HOSTETLER   DOWN               DOWN              
BEAM   LINE 2-3  
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
3726 A.SEYFFERT/AP AP                 AP                 3984 K.BOYE        3984 K.BOYE        3817 P.Kraal       3817 P.Kraal      
AP                 AP                 CHANGE/3984 K.BOYE 3984 K.BOYE        CHANGE/3817 P.Kraa 3817 P.Kraal       3817 P.Kraal      
AP                 AP                 3984 K.BOYE        3984 K.BOYE        3817 P.Kraal       3817 P.Kraal       3817 P.Kraal      
BEAM   LINE 4-1  
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
3712 J.PENA/AP     AP                 AP                 8051 M.TONEY       8051 M.TONEY       3937 I.Chorkendorf 3937 I.Chorkendorf
AP                 AP                 SMB CHECKOUT/8051  8051 M.TONEY       SMB CHECKOUT/3937  3937 I.Chorkendorf 3937 I.Chorkendorf
AP                 AP                 8051 M.TONEY       8051 M.TONEY       3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
BEAM   LINE 4-2  
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
3577 C.SAFINYA/AP  AP                 AP                 8877 T.MATSUI      3535 G.WONG        3535 G.WONG        3535 G.WONG       
AP                 AP                 CHANGE/8877 T.MATS CHANGE/3535 G.WONG 3535 G.WONG        3535 G.WONG        3535 G.WONG       
AP                 AP                 8877 T.MATSUI      3535 G.WONG        3535 G.WONG        3535 G.WONG        3535 G.WONG       
BEAM   LINE 4-3  
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
3755 P.Kennepoh/AP AP                 AP                 3970 I.LEVIN       3970 I.LEVIN       3702 Y.ARAI        3702 Y.ARAI       
AP                 AP                 SMB CHECKOUT/3970  3970 I.LEVIN       SMB CHECKOUT/3702  3702 Y.ARAI        3702 Y.ARAI       
AP                 AP                 3970 I.LEVIN       3970 I.LEVIN       3702 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI       
BEAM   LINE 6-2  
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
3821 Y.Yu/AP       AP                 AP                 3728 R.DAVIS       3728 R.DAVIS       3696 Y.Shi         3696 Y.Shi        
AP                 AP                 CHANGE/3728 R.DAVI 3728 R.DAVIS       CHANGE/3696 Y.Shi  3696 Y.Shi         3696 Y.Shi        
AP                 AP                 3728 R.DAVIS       3728 R.DAVIS       3696 Y.Shi         3696 Y.Shi         3696 Y.Shi        
BEAM   LINE 7-2  
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
8078 S.MANNSFEL/AP AP                 AP                 Unscheduled        8080 J.Lee         8080 J.Lee         8080 J.Lee        
AP                 AP                 Unscheduled        Xray CHECKOUT/8080 8080 J.Lee         8080 J.Lee         8080 J.Lee        
AP                 AP                 Unscheduled        8080 J.Lee         8080 J.Lee         8080 J.Lee         8080 J.Lee        
BEAM   LINE 7-3  
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
3778 P.Kennepoh/AP AP                 AP                 3850 J.YANO        3850 J.YANO        3850 J.YANO        3850 J.YANO       
AP                 AP                 SMB CHECKOUT/3850  3850 J.YANO        3850 J.YANO        3850 J.YANO        3850 J.YANO       
AP                 AP                 3850 J.YANO        3850 J.YANO        3850 J.YANO        3850 J.YANO        3850 J.YANO       
BEAM   LINE 9-3  
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
3582 L.QUE/AP      AP                 AP                 3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE  
AP                 AP                 SMB CHECKOUT/3874  3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE  
AP                 AP                 3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE  
BEAM   LINE 10-2 
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
3819 R.Wang/AP     AP                 AP                 3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA     
AP                 AP                 Xray CHECKOUT/3845 3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA     
AP                 AP                 3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA     
BEAM   LINE 11-2 
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
3875 S.CONRADSO/AP AP                 AP                 3851 T.BORCH       3851 T.BORCH       3702 Y.ARAI        3702 Y.ARAI       
AP                 AP                 SMB CHECKOUT/3851  3851 T.BORCH       SMB CHECKOUT/3702  3702 Y.ARAI        3702 Y.ARAI       
AP                 AP                 3851 T.BORCH       3851 T.BORCH       3702 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI       
BEAM   LINE 11-3 
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
8051 M.TONEY/AP    AP                 AP                 3818 M.DOEFF       3818 M.DOEFF       3603 J.CHOROVER    3603 J.CHOROVER   
AP                 AP                 Xray CHECKOUT/3818 3818 M.DOEFF       Xray CHECKOUT/3603 3603 J.CHOROVER    3603 J.CHOROVER   
AP                 AP                 3818 M.DOEFF       3818 M.DOEFF       3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
BEAM   LINE 14-3 
Jan. 27, 2014      Jan. 28, 2014      Jan. 29, 2014      Jan. 30, 2014      Jan. 31, 2014      Feb. 01, 2014      Feb. 02, 2014     
91V9 M.ZHU/AP      AP                 AP                 FACI               3870 S.Daly        3870 S.Daly        3870 S.Daly       
AP                 AP                 SMB CHECKOUT/FACI  SMB CHECKOUT/3870  3870 S.Daly        3870 S.Daly        3870 S.Daly       
AP                 AP                 FACI               3870 S.Daly        3870 S.Daly        3870 S.Daly        3870 S.Daly       

Back to Table of Contents

WEEK OF Feb. 03, 2014
                        LowAlpha       LowAlpha       LowAlpha      
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
BEAM   LINE 1-5  
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
Unscheduled        3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan        
Xray CHECKOUT/3892 3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan        
3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan        
BEAM   LINE 2-1  
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3819 R.Wang        3953 M.KANAN       3953 M.KANAN       3953 M.KANAN       8878 S.MANNSFELD   8878 S.MANNSFELD   8878 S.MANNSFELD  
Xray CHECKOUT/3953 3953 M.KANAN       3953 M.KANAN       Xray CHECKOUT/8878 8878 S.MANNSFELD   8878 S.MANNSFELD   8878 S.MANNSFELD  
3953 M.KANAN       3953 M.KANAN       3953 M.KANAN       8878 S.MANNSFELD   8878 S.MANNSFELD   8878 S.MANNSFELD   8878 S.MANNSFELD  
BEAM   LINE 2-2  
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3817 P.Kraal       3817 P.Kraal       3702 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI        8072 J.HAYTER      8072 J.HAYTER     
3817 P.Kraal       CHANGE/3702 Y.ARAI 3702 Y.ARAI        3702 Y.ARAI        CHANGE/8072 J.HAYT 8072 J.HAYTER      8072 J.HAYTER     
3817 P.Kraal       3702 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI        8072 J.HAYTER      8072 J.HAYTER      8072 J.HAYTER     
BEAM   LINE 4-1  
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3937 I.Chorkendorf 3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       Unscheduled        Unscheduled       
SMB CHECKOUT/3728  3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       Unscheduled        Unscheduled        Unscheduled       
3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 4-2  
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3535 G.WONG        8047 T.WEISS       3434 A.Sali        8085 L.CARTER      10N4 J.COTELESAGE  8877 T.MATSUI      8877 T.MATSUI     
CHANGE/8047 T.WEIS CHANGE/3434 A.Sali CHANGE/8085 L.CART CHANGE/10N4 J.COTE CHANGE/8877 T.MATS 8877 T.MATSUI      8877 T.MATSUI     
8047 T.WEISS       3434 A.Sali        8085 L.CARTER      10N4 J.COTELESAGE  8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI     
BEAM   LINE 4-3  
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3702 Y.ARAI        91V8 V.Murugesan   91V8 V.Murugesan   3870 S.Daly        3870 S.Daly        3870 S.Daly        3870 S.Daly       
SMB CHECKOUT/91V8  91V8 V.Murugesan   SMB CHECKOUT/3870  3870 S.Daly        3870 S.Daly        3870 S.Daly        3870 S.Daly       
91V8 V.Murugesan   91V8 V.Murugesan   3870 S.Daly        3870 S.Daly        3870 S.Daly        3870 S.Daly        3870 S.Daly       
BEAM   LINE 6-2  
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3696 Y.Shi         4009 W.YANG        3848 J.HAYTER      3848 J.HAYTER      3848 J.HAYTER      3941 B.Vega-Martin 3941 B.Vega-Martin
CHANGE/4009 W.YANG CHANGE/3848 J.HAYT 3848 J.HAYTER      3848 J.HAYTER      CHANGE/3941 B.Vega 3941 B.Vega-Martin 3941 B.Vega-Martin
4009 W.YANG        3848 J.HAYTER      3848 J.HAYTER      3848 J.HAYTER      3941 B.Vega-Martin 3941 B.Vega-Martin 3941 B.Vega-Martin
BEAM   LINE 7-2  
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
8080 J.Lee         8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS   Unscheduled        Unscheduled       
Xray CHECKOUT/8082 8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled       
8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-3  
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3850 J.YANO        3850 J.YANO        3850 J.YANO        3850 J.YANO        3998 A.Deb         3998 A.Deb         3998 A.Deb        
3850 J.YANO        3850 J.YANO        3850 J.YANO        SMB CHECKOUT/3998  3998 A.Deb         3998 A.Deb         3998 A.Deb        
3850 J.YANO        3850 J.YANO        3850 J.YANO        3998 A.Deb         3998 A.Deb         3998 A.Deb         3998 A.Deb        
BEAM   LINE 9-3  
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3874 N.PINGITORE   3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY     8071 R.SARANGI     8071 R.SARANGI    
SMB CHECKOUT/3743  3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY     SMB CHECKOUT/8071  8071 R.SARANGI     8071 R.SARANGI    
3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
BEAM   LINE 10-2 
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3918 A.LINDENBERG  3918 A.LINDENBERG  3918 A.LINDENBERG  3918 A.LINDENBERG 
3845 M.KOZINA      3845 M.KOZINA      Xray CHECKOUT/3918 3918 A.LINDENBERG  3918 A.LINDENBERG  3918 A.LINDENBERG  3918 A.LINDENBERG 
3845 M.KOZINA      3845 M.KOZINA      3918 A.LINDENBERG  3918 A.LINDENBERG  3918 A.LINDENBERG  3918 A.LINDENBERG  3918 A.LINDENBERG 
BEAM   LINE 11-2 
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3702 Y.ARAI        3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
SMB CHECKOUT/3810  3810 S.KOZIMOR     3810 S.KOZIMOR     SMB CHECKOUT/3924  3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
BEAM   LINE 11-3 
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3603 J.CHOROVER    3892 S.Fan         3892 S.Fan         3892 S.Fan         3834 S.Kuppan      3834 S.Kuppan      3834 S.Kuppan     
Xray CHECKOUT/3892 3892 S.Fan         3892 S.Fan         Xray CHECKOUT/3834 3834 S.Kuppan      3834 S.Kuppan      3834 S.Kuppan     
3892 S.Fan         3892 S.Fan         3892 S.Fan         3834 S.Kuppan      3834 S.Kuppan      3834 S.Kuppan      3834 S.Kuppan     
BEAM   LINE 14-3 
Feb. 03, 2014      Feb. 04, 2014      Feb. 05, 2014      Feb. 06, 2014      Feb. 07, 2014      Feb. 08, 2014      Feb. 09, 2014     
3870 S.Daly        3870 S.Daly        3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH      
3870 S.Daly        SMB CHECKOUT/3447  3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH      
3870 S.Daly        3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH      

Back to Table of Contents

WEEK OF Feb. 10, 2014
MA       AP                                    
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
BEAM   LINE 1-5  
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
3892 S.Fan/MA      AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
8878 S.MANNSFEL/MA AP                 AP                 3952 B.Shyam       3952 B.Shyam       8051 M.TONEY       8051 M.TONEY      
MA                 AP                 Xray CHECKOUT/3952 3952 B.Shyam       Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY      
MA/AP              AP                 3952 B.Shyam       3952 B.Shyam       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 2-2  
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
DOWN/MA            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
MA/AP              AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
8072 J.HAYTER/MA   AP                 AP                 FACI               8210 S.FENDORF     3945 S.CONRADSON   3945 S.CONRADSON  
MA                 AP                 FACI               CHANGE/8210 S.FEND CHANGE/3945 S.CONR 3945 S.CONRADSON   3945 S.CONRADSON  
MA/AP              AP                 FACI               8210 S.FENDORF     3945 S.CONRADSON   3945 S.CONRADSON   3945 S.CONRADSON  
BEAM   LINE 4-1  
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
MA                 AP                 AP                 3938 J.Nelson Weke 3938 J.Nelson Weke 3456 I.PERSSON     3456 I.PERSSON    
MA                 AP                 SMB CHECKOUT/3938  3938 J.Nelson Weke SMB CHECKOUT/3456  3456 I.PERSSON     3456 I.PERSSON    
MA/AP              AP                 3938 J.Nelson Weke 3938 J.Nelson Weke 3456 I.PERSSON     3456 I.PERSSON     3456 I.PERSSON    
BEAM   LINE 4-2  
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
8877 T.MATSUI/MA   AP                 AP                 8877 T.MATSUI      10N5 E.Sundberg    3933 K.LEE         3933 K.LEE        
MA                 AP                 CHANGE/8877 T.MATS CHANGE/10N5 E.Sund CHANGE/3933 K.LEE  3933 K.LEE         3933 K.LEE        
MA/AP              AP                 8877 T.MATSUI      10N5 E.Sundberg    3933 K.LEE         3933 K.LEE         3933 K.LEE        
BEAM   LINE 4-3  
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
3870 S.Daly/MA     AP                 AP                 3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3924 S.KOZIMOR    
MA                 AP                 SMB CHECKOUT/3810  3810 S.KOZIMOR     3810 S.KOZIMOR     CHANGE/3924 S.KOZI 3924 S.KOZIMOR    
MA/AP              AP                 3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
BEAM   LINE 6-2  
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
3941 B.Vega-Mar/MA AP                 AP                 3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   FACI              
MA                 AP                 CHANGE/3529 V.YACH 3529 V.YACHANDRA   3529 V.YACHANDRA   FACI               FACI              
MA/AP              AP                 3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   FACI               FACI              
BEAM   LINE 7-2  
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
MA                 AP                 AP                 3979 G.SU          3979 G.SU          4013 T.Petach      4013 T.Petach     
MA                 AP                 Xray CHECKOUT/3979 3979 G.SU          Xray CHECKOUT/4013 4013 T.Petach      4013 T.Petach     
MA/AP              AP                 3979 G.SU          3979 G.SU          4013 T.Petach      4013 T.Petach      4013 T.Petach     
BEAM   LINE 7-3  
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
3998 A.Deb/MA      AP                 AP                 3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN      
MA                 AP                 SMB CHECKOUT/3730  3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN      
MA/AP              AP                 3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN      
BEAM   LINE 9-3  
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
8071 R.SARANGI/MA  AP                 AP                 3697 G.Meloni      3697 G.Meloni      DOWN               DOWN              
MA                 AP                 SMB CHECKOUT/3697  3697 G.Meloni      DOWN               DOWN               DOWN              
MA/AP              AP                 3697 G.Meloni      3697 G.Meloni      DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
3918 A.LINDENBE/MA AP                 AP                 FACI               9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
MA                 AP                 Xray CHECKOUT/FACI Xray CHECKOUT/9704 9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
MA/AP              AP                 FACI               9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
BEAM   LINE 11-2 
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
3924 S.KOZIMOR/MA  AP                 AP                 3726 A.SEYFFERTH   3726 A.SEYFFERTH   8060 J.BARGAR      8060 J.BARGAR     
MA                 AP                 SMB CHECKOUT/3726  3726 A.SEYFFERTH   SMB CHECKOUT/8060  8060 J.BARGAR      8060 J.BARGAR     
MA/AP              AP                 3726 A.SEYFFERTH   3726 A.SEYFFERTH   8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR     
BEAM   LINE 11-3 
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
3834 S.Kuppan/MA   AP                 AP                 3918 A.LINDENBERG  3918 A.LINDENBERG  3867 L.Lim         3867 L.Lim        
MA                 AP                 Xray CHECKOUT/3918 3918 A.LINDENBERG  Xray CHECKOUT/3867 3867 L.Lim         3867 L.Lim        
MA/AP              AP                 3918 A.LINDENBERG  3918 A.LINDENBERG  3867 L.Lim         3867 L.Lim         3867 L.Lim        
BEAM   LINE 14-3 
Feb. 10, 2014      Feb. 11, 2014      Feb. 12, 2014      Feb. 13, 2014      Feb. 14, 2014      Feb. 15, 2014      Feb. 16, 2014     
3447 S.CHEAH/MA    AP                 AP                 STUP               8210 S.FENDORF     3984 K.BOYE        3984 K.BOYE       
MA                 AP                 SMB CHECKOUT/STUP  CHANGE/8210 S.FEND CHANGE/3984 K.BOYE 3984 K.BOYE        3984 K.BOYE       
MA/AP              AP                 STUP               8210 S.FENDORF     3984 K.BOYE        3984 K.BOYE        3984 K.BOYE       

Back to Table of Contents

WEEK OF Feb. 17, 2014
HOLIDAY                                          
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
BEAM   LINE 1-5  
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
Unscheduled        3960 L.Lim         3960 L.Lim         3960 L.Lim         3960 L.Lim         3960 L.Lim         3960 L.Lim        
CHANGE/3960 L.Lim  3960 L.Lim         3960 L.Lim         3960 L.Lim         3960 L.Lim         3960 L.Lim         3960 L.Lim        
3960 L.Lim         3960 L.Lim         3960 L.Lim         3960 L.Lim         3960 L.Lim         3960 L.Lim         3960 L.Lim        
BEAM   LINE 2-1  
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
8051 M.TONEY       8051 M.TONEY       3989 K.Stone       3989 K.Stone       3989 K.Stone       3787 A.LLORDES     3787 A.LLORDES    
8051 M.TONEY       Xray CHECKOUT/3989 3989 K.Stone       3989 K.Stone       Xray CHECKOUT/3787 3787 A.LLORDES     3787 A.LLORDES    
8051 M.TONEY       3989 K.Stone       3989 K.Stone       3989 K.Stone       3787 A.LLORDES     3787 A.LLORDES     3787 A.LLORDES    
BEAM   LINE 2-2  
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
3945 S.CONRADSON   3945 S.CONRADSON   3875 S.CONRADSON   3916 S.CONRADSON   8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
3945 S.CONRADSON   CHANGE/3875 S.CONR CHANGE/3916 S.CONR CHANGE/8015 A.MEHT 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
3945 S.CONRADSON   3875 S.CONRADSON   3916 S.CONRADSON   8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 4-1  
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
3456 I.PERSSON     3456 I.PERSSON     3945 S.CONRADSON   3945 S.CONRADSON   4025 B.GATES       4025 B.GATES       4025 B.GATES      
3456 I.PERSSON     SMB CHECKOUT/3945  3945 S.CONRADSON   SMB CHECKOUT/4025  4025 B.GATES       4025 B.GATES       4025 B.GATES      
3456 I.PERSSON     3945 S.CONRADSON   3945 S.CONRADSON   4025 B.GATES       4025 B.GATES       4025 B.GATES       4025 B.GATES      
BEAM   LINE 4-2  
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
3933 K.LEE         8077 T.MATSUI      8847 T.WEISS       3967 D.DAS         3873 A.VAN BUUREN  8047 T.WEISS       3625 S.SWEETNAM   
CHANGE/8077 T.MATS CHANGE/8847 T.WEIS CHANGE/3967 D.DAS  CHANGE/3873 A.VAN  CHANGE/8047 T.WEIS CHANGE/3625 S.SWEE 3625 S.SWEETNAM   
8077 T.MATSUI      8847 T.WEISS       3967 D.DAS         3873 A.VAN BUUREN  8047 T.WEISS       3625 S.SWEETNAM    3625 S.SWEETNAM   
BEAM   LINE 4-3  
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     Unscheduled        Unscheduled        4015 M.ZHU         4015 M.ZHU        
3924 S.KOZIMOR     3924 S.KOZIMOR     Unscheduled        Unscheduled        SMB CHECKOUT/4015  4015 M.ZHU         4015 M.ZHU        
3924 S.KOZIMOR     3924 S.KOZIMOR     Unscheduled        Unscheduled        4015 M.ZHU         4015 M.ZHU         4015 M.ZHU        
BEAM   LINE 6-2  
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
FACI               3650 Y.Gorlin      3650 Y.Gorlin      3650 Y.Gorlin      3650 Y.Gorlin      3717 E.SOLOMON     3717 E.SOLOMON    
CHANGE/3650 Y.Gorl 3650 Y.Gorlin      3650 Y.Gorlin      3650 Y.Gorlin      CHANGE/3717 E.SOLO 3717 E.SOLOMON     3717 E.SOLOMON    
3650 Y.Gorlin      3650 Y.Gorlin      3650 Y.Gorlin      3650 Y.Gorlin      3717 E.SOLOMON     3717 E.SOLOMON     3717 E.SOLOMON    
BEAM   LINE 7-2  
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
4013 T.Petach      4013 T.Petach      8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
4013 T.Petach      Xray CHECKOUT/8015 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
4013 T.Petach      8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 7-3  
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
3730 M.GREEN       3730 M.GREEN       4082 J.Suh         4082 J.Suh         3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
3730 M.GREEN       SMB CHECKOUT/4082  4082 J.Suh         SMB CHECKOUT/3900  3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
3730 M.GREEN       4082 J.Suh         4082 J.Suh         3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
BEAM   LINE 9-3  
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
BEAM   LINE 11-2 
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
8060 J.BARGAR      8060 J.BARGAR      4064 S.FENDORF     4064 S.FENDORF     3678 S.MYNENI      3678 S.MYNENI      3678 S.MYNENI     
8060 J.BARGAR      SMB CHECKOUT/4064  4064 S.FENDORF     SMB CHECKOUT/3678  3678 S.MYNENI      3678 S.MYNENI      3678 S.MYNENI     
8060 J.BARGAR      4064 S.FENDORF     4064 S.FENDORF     3678 S.MYNENI      3678 S.MYNENI      3678 S.MYNENI      3678 S.MYNENI     
BEAM   LINE 11-3 
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
3867 L.Lim         3867 L.Lim         FACI               3726 A.SEYFFERTH   3892 S.Fan         3892 S.Fan         3892 S.Fan        
3867 L.Lim         Xray CHECKOUT/FACI Xray CHECKOUT/3726 Xray CHECKOUT/3892 3892 S.Fan         3892 S.Fan         3892 S.Fan        
3867 L.Lim         FACI               3726 A.SEYFFERTH   3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan        
BEAM   LINE 14-3 
Feb. 17, 2014      Feb. 18, 2014      Feb. 19, 2014      Feb. 20, 2014      Feb. 21, 2014      Feb. 22, 2014      Feb. 23, 2014     
3984 K.BOYE        3984 K.BOYE        Unscheduled        Unscheduled        3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
3984 K.BOYE        Unscheduled        Unscheduled        CHANGE/3726 A.SEYF 3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
3984 K.BOYE        Unscheduled        Unscheduled        3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  

Back to Table of Contents

WEEK OF Feb. 24, 2014
AP       AP                                    
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
BEAM   LINE 1-5  
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
3960 L.Lim/AP      AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
3787 A.LLORDES/AP  AP                 AP                 3979 G.SU          3979 G.SU          3815 D.Xie         3815 D.Xie        
AP                 AP                 Xray CHECKOUT/3979 3979 G.SU          Xray CHECKOUT/3815 3815 D.Xie         3815 D.Xie        
AP                 AP                 3979 G.SU          3979 G.SU          3815 D.Xie         3815 D.Xie         3815 D.Xie        
BEAM   LINE 2-2  
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
8015 A.MEHTA/AP    AP                 AP                 8081 Y.LIU         8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
AP                 AP                 CHANGE/8081 Y.LIU  CHANGE/8067 S.WEBB 8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
AP                 AP                 8081 Y.LIU         8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
BEAM   LINE 4-1  
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
4025 B.GATES/AP    AP                 AP                 91X2 M.Stauffer    91X2 M.Stauffer    3937 I.Chorkendorf 3937 I.Chorkendorf
AP                 AP                 SMB CHECKOUT/91X2  91X2 M.Stauffer    SMB CHECKOUT/3937  3937 I.Chorkendorf 3937 I.Chorkendorf
AP                 AP                 91X2 M.Stauffer    91X2 M.Stauffer    3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
BEAM   LINE 4-2  
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
3625 S.SWEETNAM/AP AP                 AP                 10N6 A.Spormann    8047 T.WEISS       3873 A.VAN BUUREN  8085 L.CARTER     
AP                 AP                 CHANGE/10N6 A.Spor CHANGE/8047 T.WEIS 8047 T.WEISS       CHANGE/8085 L.CART CHANGE/8077 T.MATS
AP                 AP                 10N6 A.Spormann    8047 T.WEISS       CHANGE/3873 A.VAN  8085 L.CARTER      8077 T.MATSUI     
BEAM   LINE 4-3  
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
4015 M.ZHU/AP      AP                 AP                 3781 K.Wujcik      3781 K.Wujcik      3757 R.Bassiri     3757 R.Bassiri    
AP                 AP                 SMB CHECKOUT/3781  3781 K.Wujcik      SMB CHECKOUT/3757  3757 R.Bassiri     3757 R.Bassiri    
AP                 AP                 3781 K.Wujcik      3781 K.Wujcik      3757 R.Bassiri     3757 R.Bassiri     3757 R.Bassiri    
BEAM   LINE 6-2  
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
3717 E.SOLOMON/AP  AP                 AP                 FACI               8041 J.HAYTER      8041 J.HAYTER      8081 Y.LIU        
AP                 AP                 Xray CHECKOUT/FACI Xray CHECKOUT/8041 8041 J.HAYTER      CHANGE/8081 Y.LIU  8081 Y.LIU        
AP                 AP                 FACI               8041 J.HAYTER      8041 J.HAYTER      8081 Y.LIU         8081 Y.LIU        
BEAM   LINE 7-2  
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
8015 A.MEHTA/AP    AP                 AP                 3878 Y.SHI         3878 Y.SHI         3842 W.Chueh       3842 W.Chueh      
AP                 AP                 Xray CHECKOUT/3878 3878 Y.SHI         CHANGE/3842 W.Chue 3842 W.Chueh       3842 W.Chueh      
AP                 AP                 3878 Y.SHI         3878 Y.SHI         3842 W.Chueh       3842 W.Chueh       3842 W.Chueh      
BEAM   LINE 7-3  
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
3900 B.HEDMAN/AP   AP                 AP                 3900 B.HEDMAN      8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 3900 B.HEDMAN      SMB CHECKOUT/8071  8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 3900 B.HEDMAN      8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
BEAM   LINE 9-3  
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
9704 Y.Lee/AP      AP                 AP                 3952 B.Shyam       3952 B.Shyam       8818 A.MEHTA       8818 A.MEHTA      
AP                 AP                 CHANGE/3952 B.Shya 3952 B.Shyam       Xray CHECKOUT/8818 8818 A.MEHTA       8818 A.MEHTA      
AP                 AP                 3952 B.Shyam       3952 B.Shyam       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
BEAM   LINE 11-2 
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
3678 S.MYNENI/AP   AP                 AP                 3803 H.Hsu-Kim     3803 H.Hsu-Kim     3810 S.KOZIMOR     3810 S.KOZIMOR    
AP                 AP                 SMB CHECKOUT/3803  3803 H.Hsu-Kim     SMB CHECKOUT/3810  3810 S.KOZIMOR     3810 S.KOZIMOR    
AP                 AP                 3803 H.Hsu-Kim     3803 H.Hsu-Kim     3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR    
BEAM   LINE 11-3 
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
3892 S.Fan/AP      AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 Xray CHECKOUT/8015 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 14-3 
Feb. 24, 2014      Feb. 25, 2014      Feb. 26, 2014      Feb. 27, 2014      Feb. 28, 2014      Mar. 01, 2014      Mar. 02, 2014     
3726 A.SEYFFERT/AP AP                 AP                 8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
AP                 AP                 CHANGE/8067 S.WEBB 8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
AP                 AP                 8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       

Back to Table of Contents

WEEK OF Mar. 03, 2014
                              SPEAR Access       SPEAR Access      
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
BEAM   LINE 1-5  
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
3815 D.Xie         4037 C.Grand       4037 C.Grand       3989 K.Stone       3989 K.Stone       3989 K.Stone/DOWN  DOWN              
Xray CHECKOUT/4037 4037 C.Grand       Xray CHECKOUT/3989 3989 K.Stone       3989 K.Stone       DOWN               DOWN              
4037 C.Grand       4037 C.Grand       3989 K.Stone       3989 K.Stone       3989 K.Stone       DOWN               DOWN              
BEAM   LINE 2-2  
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
8067 S.WEBB        8060 J.BARGAR      8060 J.BARGAR      4012 J.BARGAR      4012 J.BARGAR      4012 J.BARGAR/DOWN DOWN              
CHANGE/8060 J.BARG 8060 J.BARGAR      CHANGE/4012 J.BARG 4012 J.BARGAR      4012 J.BARGAR      DOWN               DOWN              
8060 J.BARGAR      8060 J.BARGAR      4012 J.BARGAR      4012 J.BARGAR      4012 J.BARGAR      DOWN               DOWN              
BEAM   LINE 4-1  
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
3937 I.Chorkendorf 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       3962 R.Bernier-Lat 3962 R.Bernie/DOWN DOWN              
SMB CHECKOUT/8015  8015 A.MEHTA       8015 A.MEHTA       SMB CHECKOUT/3962  3962 R.Bernier-Lat DOWN               DOWN              
8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       3962 R.Bernier-Lat 3962 R.Bernier-Lat DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
8077 T.MATSUI      8077 T.MATSUI      4061 K.Shen        3963 D.Herschlag   4109 S.KIM         8877 T.MATSUI/DOWN DOWN              
8077 T.MATSUI      CHANGE/4061 K.Shen CHANGE/3963 D.Hers CHANGE/4109 S.KIM  CHANGE/8877 T.MATS DOWN               DOWN              
8077 T.MATSUI      4061 K.Shen        3963 D.Herschlag   4109 S.KIM         8877 T.MATSUI      DOWN               DOWN              
BEAM   LINE 4-3  
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
3757 R.Bassiri     3962 R.Bernier-Lat 3962 R.Bernier-Lat 3831 S.CHRISTENSEN 3831 S.CHRISTENSEN 3831 S.CHRIST/DOWN DOWN              
SMB CHECKOUT/3962  3962 R.Bernier-Lat SMB CHECKOUT/3831  3831 S.CHRISTENSEN 3831 S.CHRISTENSEN DOWN               DOWN              
3962 R.Bernier-Lat 3962 R.Bernier-Lat 3831 S.CHRISTENSEN 3831 S.CHRISTENSEN 3831 S.CHRISTENSEN DOWN               DOWN              
BEAM   LINE 6-2  
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
8081 Y.LIU         3710 Y.LIN         3710 Y.LIN         3710 Y.LIN         8072 J.HAYTER      8072 J.HAYTER/DOWN DOWN              
CHANGE/3710 Y.LIN  3710 Y.LIN         3710 Y.LIN         CHANGE/8072 J.HAYT 8072 J.HAYTER      DOWN               DOWN              
3710 Y.LIN         3710 Y.LIN         3710 Y.LIN         8072 J.HAYTER      8072 J.HAYTER      DOWN               DOWN              
BEAM   LINE 7-2  
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
3842 W.Chueh       8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CA/DOWN DOWN              
Xray CHECKOUT/8875 8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  DOWN               DOWN              
8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  DOWN               DOWN              
BEAM   LINE 7-3  
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     4045 T.GUO         4045 T.GUO         4045 T.GUO/DOWN    DOWN              
8071 R.SARANGI     8071 R.SARANGI     SMB CHECKOUT/4045  4045 T.GUO         4045 T.GUO         DOWN               DOWN              
8071 R.SARANGI     8071 R.SARANGI     4045 T.GUO         4045 T.GUO         4045 T.GUO         DOWN               DOWN              
BEAM   LINE 9-3  
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
8818 A.MEHTA       4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegal/DOWN DOWN              
Xray CHECKOUT/4002 4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski   DOWN               DOWN              
4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski   4002 M.Biegalski   DOWN               DOWN              
BEAM   LINE 11-2 
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3987 G.DUBLET      3987 G.DUBLET      3987 G.DUBLET/DOWN DOWN              
3810 S.KOZIMOR     3810 S.KOZIMOR     SMB CHECKOUT/3987  3987 G.DUBLET      3987 G.DUBLET      DOWN               DOWN              
3810 S.KOZIMOR     3810 S.KOZIMOR     3987 G.DUBLET      3987 G.DUBLET      3987 G.DUBLET      DOWN               DOWN              
BEAM   LINE 11-3 
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
8015 A.MEHTA       3977 A.WISE        3977 A.WISE        4037 C.Grand       4037 C.Grand       4037 C.Grand/DOWN  DOWN              
Xray CHECKOUT/3977 3977 A.WISE        Xray CHECKOUT/4037 4037 C.Grand       4037 C.Grand       DOWN               DOWN              
3977 A.WISE        3977 A.WISE        4037 C.Grand       4037 C.Grand       4037 C.Grand       DOWN               DOWN              
BEAM   LINE 14-3 
Mar. 03, 2014      Mar. 04, 2014      Mar. 05, 2014      Mar. 06, 2014      Mar. 07, 2014      Mar. 08, 2014      Mar. 09, 2014     
8067 S.WEBB        FACI               FACI               FACI               8015 A.MEHTA       8015 A.MEHTA/DOWN  DOWN              
SMB CHECKOUT/FACI  FACI               FACI               CHANGE/8015 A.MEHT 8015 A.MEHTA       DOWN               DOWN              
FACI               FACI               FACI               8015 A.MEHTA       8015 A.MEHTA       DOWN               DOWN              

Back to Table of Contents

WEEK OF Mar. 10, 2014
SPEAR Access       SPEAR Access                                    
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
BEAM   LINE 1-5  
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               3625 S.SWEETNAM    3625 S.SWEETNAM    4020 V.HASSAN      4020 V.HASSAN     
DOWN               DOWN               Xray CHECKOUT/3625 3625 S.SWEETNAM    Xray CHECKOUT/4020 4020 V.HASSAN      4020 V.HASSAN     
DOWN               DOWN               3625 S.SWEETNAM    3625 S.SWEETNAM    4020 V.HASSAN      4020 V.HASSAN      4020 V.HASSAN     
BEAM   LINE 2-2  
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               3603 J.CHOROVER    3603 J.CHOROVER    3984 K.BOYE        3984 K.BOYE       
DOWN               DOWN               CHANGE/3603 J.CHOR 3603 J.CHOROVER    CHANGE/3984 K.BOYE 3984 K.BOYE        3984 K.BOYE       
DOWN               DOWN               3603 J.CHOROVER    3603 J.CHOROVER    3984 K.BOYE        3984 K.BOYE        3984 K.BOYE       
BEAM   LINE 4-1  
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               3658 W.Fischer     3658 W.Fischer     3867 L.Lim         3867 L.Lim        
DOWN               DOWN               SMB CHECKOUT/3658  3658 W.Fischer     SMB CHECKOUT/3867  3867 L.Lim         3867 L.Lim        
DOWN               DOWN               3658 W.Fischer     3658 W.Fischer     3867 L.Lim         3867 L.Lim         3867 L.Lim        
BEAM   LINE 4-2  
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               8877 T.MATSUI      10O0 S.WAKATSUKI   3792 E.Snell       3792 E.Snell      
DOWN               DOWN               CHANGE/8877 T.MATS CHANGE/10O0 S.WAKA CHANGE/3792 E.Snel 3792 E.Snell       3792 E.Snell      
DOWN               DOWN               8877 T.MATSUI      10O0 S.WAKATSUKI   3792 E.Snell       3792 E.Snell       3792 E.Snell      
BEAM   LINE 4-3  
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               4018 R.Tinnacher   4018 R.Tinnacher   3775 A.Scott       3775 A.Scott      
DOWN               DOWN               SMB CHECKOUT/4018  4018 R.Tinnacher   SMB CHECKOUT/3775  3775 A.Scott       3775 A.Scott      
DOWN               DOWN               4018 R.Tinnacher   4018 R.Tinnacher   3775 A.Scott       3775 A.Scott       3775 A.Scott      
BEAM   LINE 6-2  
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               8051 M.TONEY       4068 J.YAN         4068 J.YAN         4068 J.YAN        
DOWN               DOWN               CHANGE/8051 M.TONE CHANGE/4068 J.YAN  4068 J.YAN         4068 J.YAN         4068 J.YAN        
DOWN               DOWN               8051 M.TONEY       4068 J.YAN         4068 J.YAN         4068 J.YAN         4068 J.YAN        
BEAM   LINE 7-2  
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               8851 M.TONEY       8851 M.TONEY       8051 M.TONEY       8051 M.TONEY      
DOWN               DOWN               Xray CHECKOUT/8851 8851 M.TONEY       Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY      
DOWN               DOWN               8851 M.TONEY       8851 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 7-3  
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               3900 B.HEDMAN      3900 B.HEDMAN      3775 A.Scott       3775 A.Scott      
DOWN               DOWN               SMB CHECKOUT/3900  3900 B.HEDMAN      SMB CHECKOUT/3775  3775 A.Scott       3775 A.Scott      
DOWN               DOWN               3900 B.HEDMAN      3900 B.HEDMAN      3775 A.Scott       3775 A.Scott       3775 A.Scott      
BEAM   LINE 9-3  
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               STUP               STUP               8867 S.WEBB        8867 S.WEBB       
DOWN               DOWN               STUP               STUP               CHANGE/8867 S.WEBB 8867 S.WEBB        CHANGE/3726 A.SEYF
DOWN               DOWN               STUP               STUP               8867 S.WEBB        8867 S.WEBB        3726 A.SEYFFERTH  
BEAM   LINE 11-2 
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               3726 A.SEYFFERTH   3726 A.SEYFFERTH   3603 J.CHOROVER    3603 J.CHOROVER   
DOWN               DOWN               SMB CHECKOUT/3726  3726 A.SEYFFERTH   SMB CHECKOUT/3603  3603 J.CHOROVER    3603 J.CHOROVER   
DOWN               DOWN               3726 A.SEYFFERTH   3726 A.SEYFFERTH   3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
BEAM   LINE 11-3 
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               3925 J.REINSPACH   3706 S.TOLBERT     3964 A.El Labban   3964 A.El Labban  
DOWN               DOWN               Xray CHECKOUT/3925 Xray CHECKOUT/3706 Xray CHECKOUT/3964 3964 A.El Labban   3964 A.El Labban  
DOWN               DOWN               3925 J.REINSPACH   3706 S.TOLBERT     3964 A.El Labban   3964 A.El Labban   3964 A.El Labban  
BEAM   LINE 14-3 
Mar. 10, 2014      Mar. 11, 2014      Mar. 12, 2014      Mar. 13, 2014      Mar. 14, 2014      Mar. 15, 2014      Mar. 16, 2014     
DOWN               DOWN               DOWN               3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
DOWN               DOWN               CHANGE/3603 J.CHOR 3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
DOWN               DOWN               3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   

Back to Table of Contents

WEEK OF Mar. 17, 2014
                                         
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
BEAM   LINE 1-5  
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
4020 V.HASSAN      4020 V.HASSAN      Unscheduled        8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
4020 V.HASSAN      Unscheduled        Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
4020 V.HASSAN      Unscheduled        8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 2-2  
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
3984 K.BOYE        STUP               3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH   3658 W.Fischer     3658 W.Fischer    
STUP               CHANGE/3726 A.SEYF 3726 A.SEYFFERTH   3726 A.SEYFFERTH   CHANGE/3658 W.Fisc 3658 W.Fischer     3658 W.Fischer    
STUP               3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH   3658 W.Fischer     3658 W.Fischer     3658 W.Fischer    
BEAM   LINE 4-1  
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
3867 L.Lim         4012 J.BARGAR      4012 J.BARGAR      4072 D.Coller      4072 D.Coller      4072 D.Coller      4072 D.Coller     
SMB CHECKOUT/4012  4012 J.BARGAR      SMB CHECKOUT/4072  4072 D.Coller      4072 D.Coller      4072 D.Coller      4072 D.Coller     
4012 J.BARGAR      4012 J.BARGAR      4072 D.Coller      4072 D.Coller      4072 D.Coller      4072 D.Coller      4072 D.Coller     
BEAM   LINE 4-2  
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
3792 E.Snell       8077 T.MATSUI      4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA    
CHANGE/8077 T.MATS CHANGE/4021 C.SAFI 4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA    
8077 T.MATSUI      4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA    
BEAM   LINE 4-3  
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
3775 A.Scott       Unscheduled        3603 J.CHOROVER    3603 J.CHOROVER    3781 K.Wujcik      3781 K.Wujcik      3781 K.Wujcik     
Unscheduled        SMB CHECKOUT/3603  3603 J.CHOROVER    SMB CHECKOUT/3781  3781 K.Wujcik      3781 K.Wujcik      3781 K.Wujcik     
Unscheduled        3603 J.CHOROVER    3603 J.CHOROVER    3781 K.Wujcik      3781 K.Wujcik      3781 K.Wujcik      3781 K.Wujcik     
BEAM   LINE 6-2  
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
4068 J.YAN         3830 T.Lu          3830 T.Lu          3830 T.Lu          3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH      
CHANGE/3830 T.Lu   3830 T.Lu          3830 T.Lu          CHANGE/3521 C.BOOT 3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH      
3830 T.Lu          3830 T.Lu          3830 T.Lu          3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH      
BEAM   LINE 7-2  
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
8051 M.TONEY       8051 M.TONEY       8082 A.VAILIONIS   3942 M.Samant      3942 M.Samant      3942 M.Samant      3942 M.Samant     
8051 M.TONEY       CHANGE/8082 A.VAIL Xray CHECKOUT/3942 3942 M.Samant      3942 M.Samant      3942 M.Samant      3942 M.Samant     
8051 M.TONEY       8082 A.VAILIONIS   3942 M.Samant      3942 M.Samant      3942 M.Samant      3942 M.Samant      3942 M.Samant     
BEAM   LINE 7-3  
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
3775 A.Scott       3775 A.Scott       3900 B.HEDMAN      3900 B.HEDMAN      9705 J.JCAP        9705 J.JCAP        9705 J.JCAP       
3775 A.Scott       SMB CHECKOUT/3900  3900 B.HEDMAN      SMB CHECKOUT/9705  9705 J.JCAP        9705 J.JCAP        9705 J.JCAP       
3775 A.Scott       3900 B.HEDMAN      3900 B.HEDMAN      9705 J.JCAP        9705 J.JCAP        9705 J.JCAP        9705 J.JCAP       
BEAM   LINE 9-3  
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
3726 A.SEYFFERTH   8067 S.WEBB        8067 S.WEBB        91W6 S.Gwara       91W6 S.Gwara       3981 S.TIAN        3981 S.TIAN       
CHANGE/8067 S.WEBB 8067 S.WEBB        CHANGE/91W6 S.Gwar 91W6 S.Gwara       CHANGE/3981 S.TIAN 3981 S.TIAN        3981 S.TIAN       
8067 S.WEBB        8067 S.WEBB        91W6 S.Gwara       91W6 S.Gwara       3981 S.TIAN        3981 S.TIAN        3981 S.TIAN       
BEAM   LINE 11-2 
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
3603 J.CHOROVER    FACI               FACI               FACI               3953 M.KANAN       3953 M.KANAN       3953 M.KANAN      
>GIXAS/FACI        FACI               FACI               SMB CHECKOUT/3953  3953 M.KANAN       3953 M.KANAN       3953 M.KANAN      
FACI               FACI               FACI               3953 M.KANAN       3953 M.KANAN       3953 M.KANAN       3953 M.KANAN      
BEAM   LINE 11-3 
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
3964 A.El Labban   3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3923 Y.Diao        3923 Y.Diao        3791 C.TASSONE     3791 C.TASSONE    
Xray CHECKOUT/3922 3922 S.HIMMELBERGE Xray CHECKOUT/3923 3923 Y.Diao        Xray CHECKOUT/3791 3791 C.TASSONE     3791 C.TASSONE    
3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3923 Y.Diao        3923 Y.Diao        3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE    
BEAM   LINE 14-3 
Mar. 17, 2014      Mar. 18, 2014      Mar. 19, 2014      Mar. 20, 2014      Mar. 21, 2014      Mar. 22, 2014      Mar. 23, 2014     
3603 J.CHOROVER    Unscheduled        Unscheduled        Unscheduled        3658 W.Fischer     3658 W.Fischer     3658 W.Fischer    
Unscheduled        Unscheduled        Unscheduled        CHANGE/3658 W.Fisc 3658 W.Fischer     3658 W.Fischer     3658 W.Fischer    
Unscheduled        Unscheduled        Unscheduled        3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3658 W.Fischer    

Back to Table of Contents

WEEK OF Mar. 24, 2014
AP       AP                                    
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
BEAM   LINE 1-5  
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
8051 M.TONEY/AP    AP                 AP                 8051 M.TONEY       4038 R.Wang        4038 R.Wang        4038 R.Wang       
AP                 AP                 8051 M.TONEY       Xray CHECKOUT/4038 4038 R.Wang        4038 R.Wang        4038 R.Wang       
AP                 AP                 8051 M.TONEY       4038 R.Wang        4038 R.Wang        4038 R.Wang        4038 R.Wang       
BEAM   LINE 2-2  
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
3658 W.Fischer/AP  AP                 AP                 3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3505 H.NICHOL     
AP                 AP                 CHANGE/3683 M.PUSH 3683 M.PUSHIE      3683 M.PUSHIE      CHANGE/3505 H.NICH 3505 H.NICHOL     
AP                 AP                 3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3505 H.NICHOL      3505 H.NICHOL     
BEAM   LINE 4-1  
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
4072 D.Coller/AP   AP                 AP                 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR
AP                 AP                 SMB CHECKOUT/4052  4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR
AP                 AP                 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR
BEAM   LINE 4-2  
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
4021 C.SAFINYA/AP  AP                 AP                 4061 K.Shen        10N9 A.FYFE        3967 D.DAS         8085 L.CARTER     
AP                 AP                 CHANGE/4061 K.Shen CHANGE/10N9 A.FYFE CHANGE/3967 D.DAS  CHANGE/8085 L.CART 8085 L.CARTER     
AP                 AP                 4061 K.Shen        10N9 A.FYFE        3967 D.DAS         8085 L.CARTER      8085 L.CARTER     
BEAM   LINE 4-3  
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
3781 K.Wujcik/AP   AP                 AP                 3827 G.GIULI       3827 G.GIULI       3614 H.NICHOL      3614 H.NICHOL     
AP                 AP                 SMB CHECKOUT/3827  3827 G.GIULI       SMB CHECKOUT/3614  3614 H.NICHOL      3614 H.NICHOL     
AP                 AP                 3827 G.GIULI       3827 G.GIULI       3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
BEAM   LINE 6-2  
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
3521 C.BOOTH/AP    AP                 AP                 FACI               3811 W.Chiu        3811 W.Chiu        3811 W.Chiu       
AP                 AP                 Xray CHECKOUT/FACI CHANGE/3811 W.Chiu 3811 W.Chiu        3811 W.Chiu        CHANGE/8090 J.Nels
AP                 AP                 FACI               3811 W.Chiu        3811 W.Chiu        3811 W.Chiu        8090 J.Nelson Weke
BEAM   LINE 7-2  
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
3942 M.Samant/AP   AP                 AP                 3979 G.SU          3979 G.SU          3878 Y.SHI         3878 Y.SHI        
AP                 AP                 Xray CHECKOUT/3979 3979 G.SU          Xray CHECKOUT/3878 3878 Y.SHI         3878 Y.SHI        
AP                 AP                 3979 G.SU          3979 G.SU          3878 Y.SHI         3878 Y.SHI         3878 Y.SHI        
BEAM   LINE 7-3  
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
9705 J.JCAP/AP     AP                 AP                 3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
AP                 AP                 SMB CHECKOUT/3857  3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
AP                 AP                 3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
BEAM   LINE 9-3  
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
3981 S.TIAN/AP     AP                 AP                 3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
AP                 AP                 CHANGE/3754 B.POPE 3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
AP                 AP                 3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
BEAM   LINE 11-2 
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
3953 M.KANAN/AP    AP                 AP                 4074 B.Shyam       4074 B.Shyam       3937 I.Chorkendorf 3937 I.Chorkendorf
AP                 AP                 SMB CHECKOUT/4074  4074 B.Shyam       SMB CHECKOUT/3937  3937 I.Chorkendorf 3937 I.Chorkendorf
AP                 AP                 4074 B.Shyam       4074 B.Shyam       3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
BEAM   LINE 11-3 
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
3791 C.TASSONE/AP  AP                 AP                 3853 A.Briseno     3853 A.Briseno     3979 G.SU          3979 G.SU         
AP                 AP                 Xray CHECKOUT/3853 3853 A.Briseno     Xray CHECKOUT/3979 3979 G.SU          3979 G.SU         
AP                 AP                 3853 A.Briseno     3853 A.Briseno     3979 G.SU          3979 G.SU          3979 G.SU         
BEAM   LINE 14-3 
Mar. 24, 2014      Mar. 25, 2014      Mar. 26, 2014      Mar. 27, 2014      Mar. 28, 2014      Mar. 29, 2014      Mar. 30, 2014     
3658 W.Fischer/AP  AP                 AP                 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
AP                 AP                 CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
AP                 AP                 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     

Back to Table of Contents

WEEK OF Mar. 31, 2014
                                         
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
BEAM   LINE 1-5  
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
4038 R.Wang        3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3953 M.KANAN       3953 M.KANAN       3953 M.KANAN      
Xray CHECKOUT/3922 3922 S.HIMMELBERGE 3922 S.HIMMELBERGE Xray CHECKOUT/3953 3953 M.KANAN       3953 M.KANAN       3953 M.KANAN      
3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3953 M.KANAN       3953 M.KANAN       3953 M.KANAN       3953 M.KANAN      
BEAM   LINE 2-2  
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
3505 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3754 B.POPESCU     3754 B.POPESCU    
CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      CHANGE/3754 B.POPE 3754 B.POPESCU     3754 B.POPESCU    
3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
BEAM   LINE 4-1  
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
4052 R.KRETZSCHMAR 3827 G.GIULI       3827 G.GIULI       3875 S.CONRADSON   3875 S.CONRADSON   3945 S.CONRADSON   3945 S.CONRADSON  
SMB CHECKOUT/3827  3827 G.GIULI       SMB CHECKOUT/3875  3875 S.CONRADSON   SMB CHECKOUT/3945  3945 S.CONRADSON   3945 S.CONRADSON  
3827 G.GIULI       3827 G.GIULI       3875 S.CONRADSON   3875 S.CONRADSON   3945 S.CONRADSON   3945 S.CONRADSON   3945 S.CONRADSON  
BEAM   LINE 4-2  
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
8085 L.CARTER      8047 T.WEISS       10N8 Z.Bu          10N7 M.Wright      8047 T.WEISS       8877 T.MATSUI      8877 T.MATSUI     
CHANGE/8047 T.WEIS CHANGE/10N8 Z.Bu   CHANGE/10N7 M.Wrig CHANGE/8047 T.WEIS CHANGE/8877 T.MATS 8877 T.MATSUI      CHANGE/4109 S.KIM 
8047 T.WEISS       10N8 Z.Bu          10N7 M.Wright      8047 T.WEISS       8877 T.MATSUI      8877 T.MATSUI      4109 S.KIM        
BEAM   LINE 4-3  
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
3614 H.NICHOL      3614 H.NICHOL      4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 3532 B.HEDMAN      3532 B.HEDMAN     
3614 H.NICHOL      SMB CHECKOUT/4052  4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR SMB CHECKOUT/3532  3532 B.HEDMAN      3532 B.HEDMAN     
3614 H.NICHOL      4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN     
BEAM   LINE 6-2  
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
8090 J.Nelson Weke 8090 J.Nelson Weke 4046 J.Nanda       4046 J.Nanda       3842 W.Chueh       3842 W.Chueh       3842 W.Chueh      
8090 J.Nelson Weke CHANGE/4046 J.Nand 4046 J.Nanda       CHANGE/3842 W.Chue 3842 W.Chueh       3842 W.Chueh       3842 W.Chueh      
8090 J.Nelson Weke 4046 J.Nanda       4046 J.Nanda       3842 W.Chueh       3842 W.Chueh       3842 W.Chueh       3842 W.Chueh      
BEAM   LINE 7-2  
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
3878 Y.SHI         4038 R.Wang        4038 R.Wang        4038 R.Wang        4047 B.Worfolk     4047 B.Worfolk     4047 B.Worfolk    
Xray CHECKOUT/4038 4038 R.Wang        4038 R.Wang        Xray CHECKOUT/4047 4047 B.Worfolk     4047 B.Worfolk     4047 B.Worfolk    
4038 R.Wang        4038 R.Wang        4038 R.Wang        4047 B.Worfolk     4047 B.Worfolk     4047 B.Worfolk     4047 B.Worfolk    
BEAM   LINE 7-3  
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
3857 G.GEORGE      3857 G.GEORGE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE     
3857 G.GEORGE      SMB CHECKOUT/3683  3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE     
3857 G.GEORGE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE     
BEAM   LINE 9-3  
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
3754 B.POPESCU     3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3614 H.NICHOL     
CHANGE/3505 H.NICH 3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      CHANGE/3614 H.NICH 3614 H.NICHOL     
3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
BEAM   LINE 11-2 
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
3937 I.Chorkendorf 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR
SMB CHECKOUT/8015  8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       SMB CHECKOUT/4052  4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR
8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR 4052 R.KRETZSCHMAR
BEAM   LINE 11-3 
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
3979 G.SU          4054 E.Davidson    4054 E.Davidson    3651 A.Sharenko    3651 A.Sharenko    3973 M.BRADY       3973 M.BRADY      
Xray CHECKOUT/4054 4054 E.Davidson    Xray CHECKOUT/3651 3651 A.Sharenko    Xray CHECKOUT/3973 3973 M.BRADY       3973 M.BRADY      
4054 E.Davidson    4054 E.Davidson    3651 A.Sharenko    3651 A.Sharenko    3973 M.BRADY       3973 M.BRADY       3973 M.BRADY      
BEAM   LINE 14-3 
Mar. 31, 2014      Apr. 01, 2014      Apr. 02, 2014      Apr. 03, 2014      Apr. 04, 2014      Apr. 05, 2014      Apr. 06, 2014     
3614 H.NICHOL      3614 H.NICHOL      3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
3614 H.NICHOL      CHANGE/3754 B.POPE 3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
3614 H.NICHOL      3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    

Back to Table of Contents

WEEK OF Apr. 07, 2014
AP       AP                                    
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
BEAM   LINE 1-5  
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
3953 M.KANAN/AP    AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 Xray CHECKOUT/8015 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 2-2  
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
3754 B.POPESCU/AP  AP                 AP                 3754 B.POPESCU     3754 B.POPESCU     4001 E.SMITH       4001 E.SMITH      
AP                 AP                 3754 B.POPESCU     3754 B.POPESCU     CHANGE/4001 E.SMIT 4001 E.SMITH       4001 E.SMITH      
AP                 AP                 3754 B.POPESCU     3754 B.POPESCU     4001 E.SMITH       4001 E.SMITH       4001 E.SMITH      
BEAM   LINE 4-1  
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
3945 S.CONRADSO/AP AP                 AP                 3557 F.BRIDGES     3557 F.BRIDGES     3627 F.BRIDGES     3627 F.BRIDGES    
AP                 AP                 SMB CHECKOUT/3557  3557 F.BRIDGES     SMB CHECKOUT/3627  3627 F.BRIDGES     3627 F.BRIDGES    
AP                 AP                 3557 F.BRIDGES     3557 F.BRIDGES     3627 F.BRIDGES     3627 F.BRIDGES     3627 F.BRIDGES    
BEAM   LINE 4-2  
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
4109 S.KIM/AP      AP                 AP                 8877 T.MATSUI      8077 T.MATSUI      3974 M.BRADY       3974 M.BRADY      
AP                 AP                 CHANGE/8877 T.MATS CHANGE/8077 T.MATS CHANGE/3974 M.BRAD 3974 M.BRADY       3974 M.BRADY      
AP                 AP                 8877 T.MATSUI      8077 T.MATSUI      3974 M.BRADY       3974 M.BRADY       3974 M.BRADY      
BEAM   LINE 4-3  
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
3532 B.HEDMAN/AP   AP                 AP                 3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA  
AP                 AP                 SMB CHECKOUT/3529  3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA  
AP                 AP                 3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA  
BEAM   LINE 6-2  
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
3842 W.Chueh/AP    AP                 AP                 3936 L.Trotochaud  3936 L.Trotochaud  3936 L.Trotochaud  3818 M.DOEFF      
AP                 AP                 CHANGE/3936 L.Trot 3936 L.Trotochaud  3936 L.Trotochaud  CHANGE/3818 M.DOEF 3818 M.DOEFF      
AP                 AP                 3936 L.Trotochaud  3936 L.Trotochaud  3936 L.Trotochaud  3818 M.DOEFF       3818 M.DOEFF      
BEAM   LINE 7-2  
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
4047 B.Worfolk/AP  AP                 AP                 8051 M.TONEY       8051 M.TONEY       3925 J.REINSPACH   3925 J.REINSPACH  
AP                 AP                 Xray CHECKOUT/8051 8051 M.TONEY       Xray CHECKOUT/3925 3925 J.REINSPACH   3925 J.REINSPACH  
AP                 AP                 8051 M.TONEY       8051 M.TONEY       3925 J.REINSPACH   3925 J.REINSPACH   3925 J.REINSPACH  
BEAM   LINE 7-3  
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
3683 M.PUSHIE/AP   AP                 AP                 3998 A.Deb         3998 A.Deb         3998 A.Deb         3998 A.Deb        
AP                 AP                 SMB CHECKOUT/3998  3998 A.Deb         3998 A.Deb         3998 A.Deb         3998 A.Deb        
AP                 AP                 3998 A.Deb         3998 A.Deb         3998 A.Deb         3998 A.Deb         3998 A.Deb        
BEAM   LINE 9-3  
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
3614 H.NICHOL/AP   AP                 AP                 8067 S.WEBB        8067 S.WEBB        8867 S.WEBB        8867 S.WEBB       
AP                 AP                 CHANGE/8067 S.WEBB 8067 S.WEBB        CHANGE/8867 S.WEBB 8867 S.WEBB        8867 S.WEBB       
AP                 AP                 8067 S.WEBB        8067 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
BEAM   LINE 11-2 
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
4052 R.KRETZSCH/AP AP                 AP                 8060 J.BARGAR      8060 J.BARGAR      3521 C.BOOTH       3521 C.BOOTH      
AP                 AP                 SMB CHECKOUT/8060  8060 J.BARGAR      SMB CHECKOUT/3521  3521 C.BOOTH       3521 C.BOOTH      
AP                 AP                 8060 J.BARGAR      8060 J.BARGAR      3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH      
BEAM   LINE 11-3 
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
3973 M.BRADY/AP    AP                 AP                 3731 A.Ayzner      3731 A.Ayzner      3660 S.TOLBERT     3660 S.TOLBERT    
AP                 AP                 Xray CHECKOUT/3731 3731 A.Ayzner      Xray CHECKOUT/3660 3660 S.TOLBERT     3660 S.TOLBERT    
AP                 AP                 3731 A.Ayzner      3731 A.Ayzner      3660 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT    
BEAM   LINE 14-3 
Apr. 07, 2014      Apr. 08, 2014      Apr. 09, 2014      Apr. 10, 2014      Apr. 11, 2014      Apr. 12, 2014      Apr. 13, 2014     
3754 B.POPESCU/AP  AP                 AP                 4001 E.SMITH       4001 E.SMITH       3447 S.CHEAH       3447 S.CHEAH      
AP                 AP                 CHANGE/4001 E.SMIT 4001 E.SMITH       CHANGE/3447 S.CHEA 3447 S.CHEAH       3447 S.CHEAH      
AP                 AP                 4001 E.SMITH       4001 E.SMITH       3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH      

Back to Table of Contents

WEEK OF Apr. 14, 2014
                        LowAlpha       LowAlpha       LowAlpha      
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
BEAM   LINE 1-5  
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
8015 A.MEHTA       3977 A.WISE        3977 A.WISE        3977 A.WISE        3977 A.WISE        Unscheduled        Unscheduled       
Xray CHECKOUT/3977 3977 A.WISE        3977 A.WISE        3977 A.WISE        Unscheduled        Unscheduled        Unscheduled       
3977 A.WISE        3977 A.WISE        3977 A.WISE        3977 A.WISE        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-2  
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
4001 E.SMITH       3764 T.PUNSHON     3764 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON    
CHANGE/3764 T.PUNS 3764 T.PUNSHON     CHANGE/3763 T.PUNS 3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON    
3764 T.PUNSHON     3764 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON    
BEAM   LINE 4-1  
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
3627 F.BRIDGES     3927 A.FOSTER      3927 A.FOSTER      3977 A.WISE        3977 A.WISE        3977 A.WISE        3977 A.WISE       
SMB CHECKOUT/3927  3927 A.FOSTER      SMB CHECKOUT/3977  3977 A.WISE        3977 A.WISE        3977 A.WISE        3977 A.WISE       
3927 A.FOSTER      3927 A.FOSTER      3977 A.WISE        3977 A.WISE        3977 A.WISE        3977 A.WISE        3977 A.WISE       
BEAM   LINE 4-2  
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
3974 M.BRADY       8085 L.CARTER      3744 A.SCHOEFFLER  3963 D.Herschlag   8085 L.CARTER      8085 L.CARTER      8085 L.CARTER     
CHANGE/8085 L.CART CHANGE/3744 A.SCHO CHANGE/3963 D.Hers CHANGE/8085 L.CART 8085 L.CARTER      8085 L.CARTER      8085 L.CARTER     
8085 L.CARTER      3744 A.SCHOEFFLER  3963 D.Herschlag   8085 L.CARTER      8085 L.CARTER      8085 L.CARTER      8085 L.CARTER     
BEAM   LINE 4-3  
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
3529 V.YACHANDRA   3975 J.Nelson      3975 J.Nelson      3975 J.Nelson      3927 A.FOSTER      3927 A.FOSTER      3927 A.FOSTER     
SMB CHECKOUT/3975  3975 J.Nelson      3975 J.Nelson      SMB CHECKOUT/3927  3927 A.FOSTER      3927 A.FOSTER      3927 A.FOSTER     
3975 J.Nelson      3975 J.Nelson      3975 J.Nelson      3927 A.FOSTER      3927 A.FOSTER      3927 A.FOSTER      3927 A.FOSTER     
BEAM   LINE 6-2  
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
3818 M.DOEFF       3818 M.DOEFF       3872 J.Lee         3872 J.Lee         3872 J.Lee         Unscheduled        Unscheduled       
3818 M.DOEFF       CHANGE/3872 J.Lee  3872 J.Lee         3872 J.Lee         Unscheduled        Unscheduled        Unscheduled       
3818 M.DOEFF       3872 J.Lee         3872 J.Lee         3872 J.Lee         Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
3925 J.REINSPACH   8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   3937 I.Chorkendorf 3937 I.Chorkendorf
Xray CHECKOUT/8078 8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   Xray CHECKOUT/3937 3937 I.Chorkendorf 3937 I.Chorkendorf
8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
BEAM   LINE 7-3  
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
3998 A.Deb         3998 A.Deb         3600 F.BRIDGES     3600 F.BRIDGES     3600 F.BRIDGES     3600 F.BRIDGES     3600 F.BRIDGES    
3998 A.Deb         SMB CHECKOUT/3600  3600 F.BRIDGES     3600 F.BRIDGES     3600 F.BRIDGES     3600 F.BRIDGES     Unscheduled       
3998 A.Deb         3600 F.BRIDGES     3600 F.BRIDGES     3600 F.BRIDGES     3600 F.BRIDGES     3600 F.BRIDGES     Unscheduled       
BEAM   LINE 9-3  
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
8867 S.WEBB        4012 J.BARGAR      4012 J.BARGAR      3797 L.LU          3797 L.LU          Unscheduled        Unscheduled       
CHANGE/4012 J.BARG 4012 J.BARGAR      CHANGE/3797 L.LU   3797 L.LU          Unscheduled        Unscheduled        Unscheduled       
4012 J.BARGAR      4012 J.BARGAR      3797 L.LU          3797 L.LU          Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 11-2 
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
3521 C.BOOTH       4069 C.BOOTH       3972 A.Pugmire     3972 A.Pugmire     8884 R.DAVIS       8884 R.DAVIS       8884 R.DAVIS      
SMB CHECKOUT/4069  SMB CHECKOUT/3972  3972 A.Pugmire     SMB CHECKOUT/8884  8884 R.DAVIS       8884 R.DAVIS       8884 R.DAVIS      
4069 C.BOOTH       3972 A.Pugmire     3972 A.Pugmire     8884 R.DAVIS       8884 R.DAVIS       8884 R.DAVIS       8884 R.DAVIS      
BEAM   LINE 11-3 
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
3660 S.TOLBERT     3949 D.Barbero     3949 D.Barbero     3651 A.Sharenko    3651 A.Sharenko    3625 S.SWEETNAM    3625 S.SWEETNAM   
Xray CHECKOUT/3949 3949 D.Barbero     Xray CHECKOUT/3651 3651 A.Sharenko    Xray CHECKOUT/3625 3625 S.SWEETNAM    3625 S.SWEETNAM   
3949 D.Barbero     3949 D.Barbero     3651 A.Sharenko    3651 A.Sharenko    3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM   
BEAM   LINE 14-3 
Apr. 14, 2014      Apr. 15, 2014      Apr. 16, 2014      Apr. 17, 2014      Apr. 18, 2014      Apr. 19, 2014      Apr. 20, 2014     
3447 S.CHEAH       3447 S.CHEAH       3447 S.CHEAH       8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
3447 S.CHEAH       3447 S.CHEAH       CHANGE/8067 S.WEBB 8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
3447 S.CHEAH       3447 S.CHEAH       8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       

Back to Table of Contents

WEEK OF Apr. 21, 2014
AP       AP                                    
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
BEAM   LINE 1-5  
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
AP                 AP                 AP                 3777 G.Carini      3777 G.Carini      3777 G.Carini      3777 G.Carini     
AP                 AP                 Xray CHECKOUT/3777 3777 G.Carini      3777 G.Carini      3777 G.Carini      3777 G.Carini     
AP                 AP                 3777 G.Carini      3777 G.Carini      3777 G.Carini      3777 G.Carini      3777 G.Carini     
BEAM   LINE 2-2  
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
3763 T.PUNSHON/AP  AP                 AP                 3939 M.Fuentes-Mon 3939 M.Fuentes-Mon 3736 C.KIM         3736 C.KIM        
AP                 AP                 CHANGE/3939 M.Fuen 3939 M.Fuentes-Mon CHANGE/3736 C.KIM  3736 C.KIM         3736 C.KIM        
AP                 AP                 3939 M.Fuentes-Mon 3939 M.Fuentes-Mon 3736 C.KIM         3736 C.KIM         3736 C.KIM        
BEAM   LINE 4-1  
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
3977 A.WISE/AP     AP                 AP                 3987 G.DUBLET      3987 G.DUBLET      3932 D.ALESSI      3932 D.ALESSI     
AP                 AP                 SMB CHECKOUT/3987  3987 G.DUBLET      SMB CHECKOUT/3932  3932 D.ALESSI      3932 D.ALESSI     
AP                 AP                 3987 G.DUBLET      3987 G.DUBLET      3932 D.ALESSI      3932 D.ALESSI      3932 D.ALESSI     
BEAM   LINE 4-2  
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
8085 L.CARTER/AP   AP                 AP                 8085 L.CARTER      8877 T.MATSUI      3873 A.VAN BUUREN  3873 A.VAN BUUREN 
AP                 AP                 CHANGE/8085 L.CART CHANGE/8877 T.MATS CHANGE/3873 A.VAN  3873 A.VAN BUUREN  CHANGE/8077 T.MATS
AP                 AP                 8085 L.CARTER      8877 T.MATSUI      3873 A.VAN BUUREN  3873 A.VAN BUUREN  8077 T.MATSUI     
BEAM   LINE 4-3  
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
3927 A.FOSTER/AP   AP                 AP                 3532 B.HEDMAN      3532 B.HEDMAN      3508 S.HAYES       3508 S.HAYES      
AP                 AP                 SMB CHECKOUT/3532  3532 B.HEDMAN      SMB CHECKOUT/3508  3508 S.HAYES       3508 S.HAYES      
AP                 AP                 3532 B.HEDMAN      3532 B.HEDMAN      3508 S.HAYES       3508 S.HAYES       3508 S.HAYES      
BEAM   LINE 6-2  
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
AP                 AP                 AP                 4058 B.Wigington   4058 B.Wigington   4058 B.Wigington   4058 B.Wigington  
AP                 AP                 CHANGE/4058 B.Wigi 4058 B.Wigington   4058 B.Wigington   4058 B.Wigington   CHANGE/8071 R.SARA
AP                 AP                 4058 B.Wigington   4058 B.Wigington   4058 B.Wigington   4058 B.Wigington   8071 R.SARANGI    
BEAM   LINE 7-2  
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
3937 I.Chorkend/AP AP                 AP                 4029 S.BENT        4029 S.BENT        4029 S.BENT        4029 S.BENT       
AP                 AP                 Xray CHECKOUT/4029 4029 S.BENT        4029 S.BENT        4029 S.BENT        4029 S.BENT       
AP                 AP                 4029 S.BENT        4029 S.BENT        4029 S.BENT        4029 S.BENT        4029 S.BENT       
BEAM   LINE 7-3  
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
AP                 AP                 AP                 3860 V.YACHANDRA   3860 V.YACHANDRA   3860 V.YACHANDRA   3860 V.YACHANDRA  
AP                 AP                 SMB CHECKOUT/3860  3860 V.YACHANDRA   3860 V.YACHANDRA   3860 V.YACHANDRA   3860 V.YACHANDRA  
AP                 AP                 3860 V.YACHANDRA   3860 V.YACHANDRA   3860 V.YACHANDRA   3860 V.YACHANDRA   3860 V.YACHANDRA  
BEAM   LINE 9-3  
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
AP                 AP                 AP                 3592 B.KIMBALL     3592 B.KIMBALL     3534 A.LAM         3534 A.LAM        
AP                 AP                 CHANGE/3592 B.KIMB 3592 B.KIMBALL     CHANGE/3534 A.LAM  3534 A.LAM         3534 A.LAM        
AP                 AP                 3592 B.KIMBALL     3592 B.KIMBALL     3534 A.LAM         3534 A.LAM         3534 A.LAM        
BEAM   LINE 11-2 
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
8884 R.DAVIS/AP    AP                 AP                 3736 C.KIM         3736 C.KIM         3946 C.KIM         3946 C.KIM        
AP                 AP                 SMB CHECKOUT/3736  3736 C.KIM         CHANGE/3946 C.KIM  3946 C.KIM         3946 C.KIM        
AP                 AP                 3736 C.KIM         3736 C.KIM         3946 C.KIM         3946 C.KIM         3946 C.KIM        
BEAM   LINE 11-3 
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
3625 S.SWEETNAM/AP AP                 AP                 3975 J.Nelson      3939 M.Fuentes-Mon 8051 M.TONEY       8051 M.TONEY      
AP                 AP                 Xray CHECKOUT/3975 Xray CHECKOUT/3939 Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY      
AP                 AP                 3975 J.Nelson      3939 M.Fuentes-Mon 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 14-3 
Apr. 21, 2014      Apr. 22, 2014      Apr. 23, 2014      Apr. 24, 2014      Apr. 25, 2014      Apr. 26, 2014      Apr. 27, 2014     
8067 S.WEBB/AP     AP                 AP                 3508 S.HAYES       3508 S.HAYES       3797 L.LU          3797 L.LU         
AP                 AP                 CHANGE/3508 S.HAYE 3508 S.HAYES       CHANGE/3797 L.LU   3797 L.LU          3797 L.LU         
AP                 AP                 3508 S.HAYES       3508 S.HAYES       3797 L.LU          3797 L.LU          3797 L.LU         

Back to Table of Contents

WEEK OF Apr. 28, 2014
                                         
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
BEAM   LINE 1-5  
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
3777 G.Carini      3625 S.SWEETNAM    3625 S.SWEETNAM    4066 K.Stone       4066 K.Stone       4066 K.Stone       4066 K.Stone      
Xray CHECKOUT/3625 3625 S.SWEETNAM    Xray CHECKOUT/4066 4066 K.Stone       4066 K.Stone       4066 K.Stone       4066 K.Stone      
3625 S.SWEETNAM    3625 S.SWEETNAM    4066 K.Stone       4066 K.Stone       4066 K.Stone       4066 K.Stone       4066 K.Stone      
BEAM   LINE 2-2  
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
3736 C.KIM         3534 A.LAM         3534 A.LAM         3534 A.LAM         3875 S.CONRADSON   3945 S.CONRADSON   3945 S.CONRADSON  
CHANGE/3534 A.LAM  3534 A.LAM         3534 A.LAM         CHANGE/3875 S.CONR CHANGE/3945 S.CONR 3945 S.CONRADSON   3945 S.CONRADSON  
3534 A.LAM         3534 A.LAM         3534 A.LAM         3875 S.CONRADSON   3945 S.CONRADSON   3945 S.CONRADSON   3945 S.CONRADSON  
BEAM   LINE 4-1  
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
3932 D.ALESSI      4038 R.Wang        4038 R.Wang        8090 J.Nelson Weke 8090 J.Nelson Weke 3936 L.Trotochaud  3936 L.Trotochaud 
SMB CHECKOUT/4038  4038 R.Wang        SMB CHECKOUT/8090  8090 J.Nelson Weke SMB CHECKOUT/3936  3936 L.Trotochaud  3936 L.Trotochaud 
4038 R.Wang        4038 R.Wang        8090 J.Nelson Weke 8090 J.Nelson Weke 3936 L.Trotochaud  3936 L.Trotochaud  3936 L.Trotochaud 
BEAM   LINE 4-2  
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
8077 T.MATSUI      8877 T.MATSUI      3963 D.Herschlag   10N5 E.Sundberg    3535 G.WONG        3535 G.WONG        3535 G.WONG       
CHANGE/8877 T.MATS CHANGE/3963 D.Hers CHANGE/10N5 E.Sund CHANGE/3535 G.WONG 3535 G.WONG        3535 G.WONG        3535 G.WONG       
8877 T.MATSUI      3963 D.Herschlag   10N5 E.Sundberg    3535 G.WONG        3535 G.WONG        3535 G.WONG        3535 G.WONG       
BEAM   LINE 4-3  
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
3508 S.HAYES       4067 C.Wu          4067 C.Wu          3501 P.O'DAY       3501 P.O'DAY       3984 K.BOYE        3984 K.BOYE       
SMB CHECKOUT/4067  4067 C.Wu          SMB CHECKOUT/3501  3501 P.O'DAY       SMB CHECKOUT/3984  3984 K.BOYE        3984 K.BOYE       
4067 C.Wu          4067 C.Wu          3501 P.O'DAY       3501 P.O'DAY       3984 K.BOYE        3984 K.BOYE        3984 K.BOYE       
BEAM   LINE 6-2  
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
8071 R.SARANGI     8071 R.SARANGI     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
8071 R.SARANGI     CHANGE/3924 S.KOZI 3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
8071 R.SARANGI     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
BEAM   LINE 7-2  
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
4029 S.BENT        3949 D.Barbero     3949 D.Barbero     3949 D.Barbero     3949 D.Barbero     91Y0 M.TRIGO       91Y0 M.TRIGO      
Xray CHECKOUT/3949 3949 D.Barbero     3949 D.Barbero     3949 D.Barbero     Xray CHECKOUT/91Y0 91Y0 M.TRIGO       91Y0 M.TRIGO      
3949 D.Barbero     3949 D.Barbero     3949 D.Barbero     3949 D.Barbero     91Y0 M.TRIGO       91Y0 M.TRIGO       91Y0 M.TRIGO      
BEAM   LINE 7-3  
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
3860 V.YACHANDRA   3860 V.YACHANDRA   3860 V.YACHANDRA   3860 V.YACHANDRA   3850 J.YANO        3850 J.YANO        3850 J.YANO       
3860 V.YACHANDRA   3860 V.YACHANDRA   3860 V.YACHANDRA   SMB CHECKOUT/3850  3850 J.YANO        3850 J.YANO        3850 J.YANO       
3860 V.YACHANDRA   3860 V.YACHANDRA   3860 V.YACHANDRA   3850 J.YANO        3850 J.YANO        3850 J.YANO        3850 J.YANO       
BEAM   LINE 9-3  
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
3534 A.LAM         3508 S.HAYES       3508 S.HAYES       8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
CHANGE/3508 S.HAYE 3508 S.HAYES       CHANGE/8867 S.WEBB 8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
3508 S.HAYES       3508 S.HAYES       8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
BEAM   LINE 11-2 
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
3946 C.KIM         3746 W.LUKENS      3746 W.LUKENS      3508 S.HAYES       3508 S.HAYES       3501 P.O'DAY       3501 P.O'DAY      
SMB CHECKOUT/3746  3746 W.LUKENS      SMB CHECKOUT/3508  3508 S.HAYES       SMB CHECKOUT/3501  3501 P.O'DAY       3501 P.O'DAY      
3746 W.LUKENS      3746 W.LUKENS      3508 S.HAYES       3508 S.HAYES       3501 P.O'DAY       3501 P.O'DAY       3501 P.O'DAY      
BEAM   LINE 11-3 
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
8051 M.TONEY       3834 S.Kuppan      3834 S.Kuppan      8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  3603 J.CHOROVER    3603 J.CHOROVER   
Xray CHECKOUT/3834 3834 S.Kuppan      Xray CHECKOUT/8875 8875 D.VAN CAMPEN  Xray CHECKOUT/3603 3603 J.CHOROVER    3603 J.CHOROVER   
3834 S.Kuppan      3834 S.Kuppan      8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
BEAM   LINE 14-3 
Apr. 28, 2014      Apr. 29, 2014      Apr. 30, 2014      May 01, 2014       May 02, 2014       May 03, 2014       May 04, 2014      
3797 L.LU          3797 L.LU          3501 P.O'DAY       3501 P.O'DAY       3999 G.LOWRY       3999 G.LOWRY       3999 G.LOWRY      
3797 L.LU          CHANGE/3501 P.O'DA 3501 P.O'DAY       CHANGE/3999 G.LOWR 3999 G.LOWRY       3999 G.LOWRY       3999 G.LOWRY      
3797 L.LU          3501 P.O'DAY       3501 P.O'DAY       3999 G.LOWRY       3999 G.LOWRY       3999 G.LOWRY       3999 G.LOWRY      

Back to Table of Contents

WEEK OF May 05, 2014 
AP       AP                                    
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
BEAM   LINE 1-5  
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
DOWN/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 Xray CHECKOUT/FACI FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
4066 K.Stone/AP    AP                 AP                 3989 K.Stone       3989 K.Stone       3989 K.Stone       3989 K.Stone      
AP                 AP                 Xray CHECKOUT/3989 3989 K.Stone       3989 K.Stone       3989 K.Stone       3989 K.Stone      
AP                 AP                 3989 K.Stone       3989 K.Stone       3989 K.Stone       3989 K.Stone       3989 K.Stone      
BEAM   LINE 2-2  
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
DOWN/AP            AP                 AP                 8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
AP                 AP                 CHANGE/8867 S.WEBB 8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
AP                 AP                 8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
BEAM   LINE 2-3  
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
3945 S.CONRADSO/AP AP                 AP                 3783 C.FULLER      3783 C.FULLER      3417 A.TEMPLETON   3417 A.TEMPLETON  
AP                 AP                 CHANGE/3783 C.FULL 3783 C.FULLER      CHANGE/3417 A.TEMP 3417 A.TEMPLETON   3417 A.TEMPLETON  
AP                 AP                 3783 C.FULLER      3783 C.FULLER      3417 A.TEMPLETON   3417 A.TEMPLETON   3417 A.TEMPLETON  
BEAM   LINE 4-1  
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
3936 L.Trotocha/AP AP                 AP                 3510 C.Van Genucht 3510 C.Van Genucht 4030 J.Catalano    4030 J.Catalano   
AP                 AP                 SMB CHECKOUT/3510  3510 C.Van Genucht SMB CHECKOUT/4030  4030 J.Catalano    4030 J.Catalano   
AP                 AP                 3510 C.Van Genucht 3510 C.Van Genucht 4030 J.Catalano    4030 J.Catalano    4030 J.Catalano   
BEAM   LINE 4-2  
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
3535 G.WONG/AP     AP                 AP                 4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA    
AP                 AP                 CHANGE/4021 C.SAFI 4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA    
AP                 AP                 4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA    
BEAM   LINE 4-3  
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
3984 K.BOYE/AP     AP                 AP                 3711 A.TEMPLETON   3711 A.TEMPLETON   4072 D.Coller      4072 D.Coller     
AP                 AP                 CHANGE/3711 A.TEMP 3711 A.TEMPLETON   SMB CHECKOUT/4072  4072 D.Coller      4072 D.Coller     
AP                 AP                 3711 A.TEMPLETON   3711 A.TEMPLETON   4072 D.Coller      4072 D.Coller      4072 D.Coller     
BEAM   LINE 6-2  
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
3924 S.KOZIMOR/AP  AP                 AP                 CHANGE/91V2 F.YANG 3824 Z.Ristanovic  3824 Z.Ristanovic  3824 Z.Ristanovic 
AP                 AP                 Xray CHECKOUT/91Y4 Xray CHECKOUT/3824 3824 Z.Ristanovic  3824 Z.Ristanovic  3824 Z.Ristanovic 
AP                 AP                 CHANGE/3710 Y.LIN  3824 Z.Ristanovic  3824 Z.Ristanovic  3824 Z.Ristanovic  3824 Z.Ristanovic 
BEAM   LINE 7-2  
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
91Y0 M.TRIGO/AP    AP                 AP                 FACI               4013 T.Petach      4013 T.Petach      4013 T.Petach     
AP                 AP                 Xray CHECKOUT/FACI Xray CHECKOUT/4013 4013 T.Petach      4013 T.Petach      4013 T.Petach     
AP                 AP                 FACI               4013 T.Petach      4013 T.Petach      4013 T.Petach      4013 T.Petach     
BEAM   LINE 7-3  
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
3850 J.YANO/AP     AP                 AP                 4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       4065 M.GREEN      
AP                 AP                 SMB CHECKOUT/4065  4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       4065 M.GREEN      
AP                 AP                 4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       4065 M.GREEN      
BEAM   LINE 9-3  
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
8867 S.WEBB/AP     AP                 AP                 FACI               4039 F.BRIDGES     4039 F.BRIDGES     4039 F.BRIDGES    
AP                 AP                 >Bk XRD/FACI       Xray CHECKOUT/4039 4039 F.BRIDGES     4039 F.BRIDGES     4039 F.BRIDGES    
AP                 AP                 FACI               4039 F.BRIDGES     4039 F.BRIDGES     4039 F.BRIDGES     4039 F.BRIDGES    
BEAM   LINE 11-2 
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
3501 P.O'DAY/AP    AP                 AP                 3702 Y.ARAI        3702 Y.ARAI        3749 R.DAEHN       3749 R.DAEHN      
AP                 AP                 SMB CHECKOUT/3702  3702 Y.ARAI        SMB CHECKOUT/3749  3749 R.DAEHN       3749 R.DAEHN      
AP                 AP                 3702 Y.ARAI        3702 Y.ARAI        3749 R.DAEHN       3749 R.DAEHN       3749 R.DAEHN      
BEAM   LINE 11-3 
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
3603 J.CHOROVER/AP AP                 AP                 3999 G.LOWRY       3999 G.LOWRY       4057 A.Singh       4057 A.Singh      
AP                 AP                 Xray CHECKOUT/3999 3999 G.LOWRY       Xray CHECKOUT/4057 4057 A.Singh       4057 A.Singh      
AP                 AP                 3999 G.LOWRY       3999 G.LOWRY       4057 A.Singh       4057 A.Singh       4057 A.Singh      
BEAM   LINE 14-3 
May 05, 2014       May 06, 2014       May 07, 2014       May 08, 2014       May 09, 2014       May 10, 2014       May 11, 2014      
3999 G.LOWRY/AP    AP                 AP                 3981 S.TIAN        3981 S.TIAN        3702 Y.ARAI        3702 Y.ARAI       
AP                 AP                 CHANGE/3981 S.TIAN 3981 S.TIAN        CHANGE/3702 Y.ARAI 3702 Y.ARAI        3702 Y.ARAI       
AP                 AP                 3981 S.TIAN        3981 S.TIAN        3702 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI       

Back to Table of Contents

WEEK OF May 12, 2014 
                                         
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
BEAM   LINE 1-5  
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
3989 K.Stone       3815 D.Xie         3815 D.Xie         3815 D.Xie         3815 D.Xie         4066 K.Stone       4066 K.Stone      
Xray>HiRes/3815    3815 D.Xie         3815 D.Xie         3815 D.Xie         Xray CHECKOUT/4066 4066 K.Stone       4066 K.Stone      
3815 D.Xie         3815 D.Xie         3815 D.Xie         3815 D.Xie         4066 K.Stone       4066 K.Stone       4066 K.Stone      
BEAM   LINE 2-2  
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
BEAM   LINE 2-3  
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
3417 A.TEMPLETON   3702 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI        8867 S.WEBB        3884 J.Fischel     3884 J.Fischel    
CHANGE/3702 Y.ARAI 3702 Y.ARAI        3702 Y.ARAI        CHANGE/8867 S.WEBB CHANGE/3884 J.Fisc 3884 J.Fischel     3884 J.Fischel    
3702 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI        8867 S.WEBB        3884 J.Fischel     3884 J.Fischel     3884 J.Fischel    
BEAM   LINE 4-1  
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
4030 J.Catalano    3417 A.TEMPLETON   3417 A.TEMPLETON   3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS      
SMB CHECKOUT/3417  3417 A.TEMPLETON   SMB CHECKOUT/3728  3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS      
3417 A.TEMPLETON   3417 A.TEMPLETON   3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS      
BEAM   LINE 4-2  
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
4021 C.SAFINYA     4021 C.SAFINYA     4041 W.Mieher      4041 W.Mieher      4041 W.Mieher      3933 K.LEE         3933 K.LEE        
4021 C.SAFINYA     CHANGE/4041 W.Mieh 4041 W.Mieher      4041 W.Mieher      CHANGE/3933 K.LEE  3933 K.LEE         3933 K.LEE        
4021 C.SAFINYA     4041 W.Mieher      4041 W.Mieher      4041 W.Mieher      3933 K.LEE         3933 K.LEE         3933 K.LEE        
BEAM   LINE 4-3  
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
4072 D.Coller      91W7 E.WASINGER    91W7 E.WASINGER    3702 Y.ARAI        3702 Y.ARAI        3983 M.Barney      3983 M.Barney     
SMB CHECKOUT/STUP  91W7 E.WASINGER    SMB CHECKOUT/3702  3702 Y.ARAI        SMB CHECKOUT/3983  3983 M.Barney      3983 M.Barney     
SMB CHECKOUT/91W7  CHANGE/91W7 E.WASI 3702 Y.ARAI        3702 Y.ARAI        3983 M.Barney      3983 M.Barney      3983 M.Barney     
BEAM   LINE 6-2  
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
3824 Z.Ristanovic  3799 J.WANG        3799 J.WANG        4009 W.YANG        8051 M.TONEY       3977 A.WISE        3977 A.WISE       
CHANGE/3799 J.WANG 3799 J.WANG        CHANGE/4009 W.YANG CHANGE/8051 M.TONE CHANGE/3977 A.WISE 3977 A.WISE        3977 A.WISE       
3799 J.WANG        3799 J.WANG        4009 W.YANG        8051 M.TONEY       3977 A.WISE        3977 A.WISE        3977 A.WISE       
BEAM   LINE 7-2  
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
4013 T.Petach      4066 K.Stone       4066 K.Stone       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
Xray CHECKOUT/4066 4066 K.Stone       Xray CHECKOUT/8818 8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
4066 K.Stone       4066 K.Stone       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
BEAM   LINE 7-3  
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER   
4065 M.GREEN       4065 M.GREEN       SMB CHECKOUT/3838  3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER   
4065 M.GREEN       4065 M.GREEN       3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER   
BEAM   LINE 9-3  
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
4039 F.BRIDGES     8080 J.Lee         8080 J.Lee         8080 J.Lee         STUP               4074 B.Shyam       4074 B.Shyam      
Xray CHECKOUT/8080 8080 J.Lee         8080 J.Lee         Xray CHECKOUT/STUP Xray CHECKOUT/4074 4074 B.Shyam       4074 B.Shyam      
8080 J.Lee         8080 J.Lee         8080 J.Lee         STUP               4074 B.Shyam       4074 B.Shyam       4074 B.Shyam      
BEAM   LINE 11-2 
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
3749 R.DAEHN       4064 S.FENDORF     4064 S.FENDORF     4039 F.BRIDGES     3999 G.LOWRY       3999 G.LOWRY       3999 G.LOWRY      
SMB CHECKOUT/4064  4064 S.FENDORF     SMB CHECKOUT/4039  SMB CHECKOUT/3999  3999 G.LOWRY       3999 G.LOWRY       Unscheduled       
4064 S.FENDORF     4064 S.FENDORF     4039 F.BRIDGES     3999 G.LOWRY       3999 G.LOWRY       3999 G.LOWRY       Unscheduled       
BEAM   LINE 11-3 
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
4057 A.Singh       3867 L.Lim         3867 L.Lim         3867 L.Lim         3867 L.Lim         3867 L.Lim         3867 L.Lim        
Xray CHECKOUT/3867 3867 L.Lim         3867 L.Lim         3867 L.Lim         3867 L.Lim         3867 L.Lim         3867 L.Lim        
3867 L.Lim         3867 L.Lim         3867 L.Lim         3867 L.Lim         3867 L.Lim         3867 L.Lim         3867 L.Lim        
BEAM   LINE 14-3 
May 12, 2014       May 13, 2014       May 14, 2014       May 15, 2014       May 16, 2014       May 17, 2014       May 18, 2014      
3702 Y.ARAI        FACI               4053 K.Kubicek     4053 K.Kubicek     4053 K.Kubicek     91V9 M.ZHU         91V9 M.ZHU        
>XAS/FACI          SMB CHECKOUT/4053  4053 K.Kubicek     4053 K.Kubicek     SMB CHECKOUT/91V9  91V9 M.ZHU         91V9 M.ZHU        
FACI               4053 K.Kubicek     4053 K.Kubicek     4053 K.Kubicek     91V9 M.ZHU         91V9 M.ZHU         91V9 M.ZHU        

Back to Table of Contents

WEEK OF May 19, 2014 
AP       AP                                    
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
BEAM   LINE 1-5  
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
FACI/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
4066 K.Stone/AP    AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 Xray CHECKOUT/8015 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 2-2  
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
8867 S.WEBB/AP     AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
3884 J.Fischel/AP  AP                 AP                 8867 S.WEBB        8867 S.WEBB        8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 CHANGE/8867 S.WEBB 8867 S.WEBB        CHANGE/8092 D.Soka 8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 8867 S.WEBB        8867 S.WEBB        8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 4-1  
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
3728 R.DAVIS/AP    AP                 AP                 8051 M.TONEY       8051 M.TONEY       4026 O.DUCKWORTH   4026 O.DUCKWORTH  
AP                 AP                 SMB CHECKOUT/8051  8051 M.TONEY       SMB CHECKOUT/4026  4026 O.DUCKWORTH   4026 O.DUCKWORTH  
AP                 AP                 8051 M.TONEY       8051 M.TONEY       4026 O.DUCKWORTH   4026 O.DUCKWORTH   4026 O.DUCKWORTH  
BEAM   LINE 4-2  
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
3933 K.LEE/AP      AP                 AP                 8877 T.MATSUI      RA                 4133 Y.HUANG       4126 L.HIRST      
AP                 AP                 CHANGE/8877 T.MATS RA                 CHANGE/4133 Y.HUAN CHANGE/4126 L.HIRS 4126 L.HIRST      
AP                 AP                 8877 T.MATSUI      RA                 4133 Y.HUANG       4126 L.HIRST       4126 L.HIRST      
BEAM   LINE 4-3  
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
3983 M.Barney/AP   AP                 AP                 4015 M.ZHU         4015 M.ZHU         8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 SMB CHECKOUT/4015  4015 M.ZHU         SMB CHECKOUT/8092  8092 D.Sokaras     8092 D.Sokaras    
AP                 AP                 4015 M.ZHU         4015 M.ZHU         8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras    
BEAM   LINE 6-2  
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
3977 A.WISE/AP     AP                 AP                 3728 R.DAVIS       3728 R.DAVIS       3988 A.Goode       3988 A.Goode      
AP                 AP                 CHANGE/3728 R.DAVI 3728 R.DAVIS       CHANGE/3988 A.Good 3988 A.Goode       3988 A.Goode      
AP                 AP                 3728 R.DAVIS       3728 R.DAVIS       3988 A.Goode       3988 A.Goode       3988 A.Goode      
BEAM   LINE 7-2  
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
8818 A.MEHTA/AP    AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       3844 Y.TAKAMURA    3844 Y.TAKAMURA   
AP                 AP                 Xray CHECKOUT/8015 8015 A.MEHTA       CHANGE/3844 Y.TAKA 3844 Y.TAKAMURA    3844 Y.TAKAMURA   
AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
BEAM   LINE 7-3  
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
3838 E.WASINGER/AP AP                 AP                 4135 A.WISE        4103 O.Trejo       4103 O.Trejo       4103 O.Trejo      
AP                 AP                 SMB CHECKOUT/4135  SMB CHECKOUT/4103  4103 O.Trejo       4103 O.Trejo       4103 O.Trejo      
AP                 AP                 4135 A.WISE        4103 O.Trejo       4103 O.Trejo       4103 O.Trejo       4103 O.Trejo      
BEAM   LINE 9-3  
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
4074 B.Shyam/AP    AP                 AP                 4074 B.Shyam       4074 B.Shyam       8051 M.TONEY       8051 M.TONEY      
AP                 AP                 4074 B.Shyam       4074 B.Shyam       CHANGE/8051 M.TONE 8051 M.TONEY       8051 M.TONEY      
AP                 AP                 4074 B.Shyam       4074 B.Shyam       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 11-2 
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
AP                 AP                 AP                 3984 K.BOYE        3984 K.BOYE        4016 M.Polizzotto  4016 M.Polizzotto 
AP                 AP                 SMB CHECKOUT/3984  3984 K.BOYE        SMB CHECKOUT/4016  4016 M.Polizzotto  4016 M.Polizzotto 
AP                 AP                 3984 K.BOYE        3984 K.BOYE        4016 M.Polizzotto  4016 M.Polizzotto  4016 M.Polizzotto 
BEAM   LINE 11-3 
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
3867 L.Lim/AP      AP                 AP                 4136 C.TASSONE     4136 C.TASSONE     3979 G.SU          3979 G.SU         
AP                 AP                 Xray>GIXD/4136     4136 C.TASSONE     CHANGE/3979 G.SU   3979 G.SU          3979 G.SU         
AP                 AP                 4136 C.TASSONE     4136 C.TASSONE     3979 G.SU          3979 G.SU          3979 G.SU         
BEAM   LINE 14-3 
May 19, 2014       May 20, 2014       May 21, 2014       May 22, 2014       May 23, 2014       May 24, 2014       May 25, 2014      
91V9 M.ZHU/AP      AP                 AP                 STUP               STUP               3984 K.BOYE        3984 K.BOYE       
AP                 AP                 SMB CHECKOUT/STUP  STUP               >Imaging/3984      3984 K.BOYE        3984 K.BOYE       
AP                 AP                 STUP               STUP               3984 K.BOYE        3984 K.BOYE        3984 K.BOYE       

Back to Table of Contents

WEEK OF May 26, 2014 
HOLIDAY                                          
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
BEAM   LINE 1-5  
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
8015 A.MEHTA       8015 A.MEHTA       3625 S.SWEETNAM    3780 J.Li          3780 J.Li          3917 A.WISE        3917 A.WISE       
8015 A.MEHTA       Xray CHECKOUT/3625 Xray CHECKOUT/3780 3780 J.Li          Xray CHECKOUT/3917 3917 A.WISE        3917 A.WISE       
8015 A.MEHTA       3625 S.SWEETNAM    3780 J.Li          3780 J.Li          3917 A.WISE        3917 A.WISE        3917 A.WISE       
BEAM   LINE 2-2  
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
8092 D.Sokaras     8092 D.Sokaras     4012 J.BARGAR      4012 J.BARGAR      Unscheduled        4115 K.Keune       4115 K.Keune      
8092 D.Sokaras     CHANGE/4012 J.BARG 4012 J.BARGAR      Unscheduled        CHANGE/4115 K.Keun 4115 K.Keune       4115 K.Keune      
8092 D.Sokaras     4012 J.BARGAR      4012 J.BARGAR      Unscheduled        4115 K.Keune       4115 K.Keune       4115 K.Keune      
BEAM   LINE 4-1  
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
4026 O.DUCKWORTH   4026 O.DUCKWORTH   3818 M.DOEFF       3818 M.DOEFF       3846 O.ALEXEEV     3846 O.ALEXEEV     3846 O.ALEXEEV    
4026 O.DUCKWORTH   SMB CHECKOUT/3818  3818 M.DOEFF       SMB CHECKOUT/3846  3846 O.ALEXEEV     3846 O.ALEXEEV     3846 O.ALEXEEV    
4026 O.DUCKWORTH   3818 M.DOEFF       3818 M.DOEFF       3846 O.ALEXEEV     3846 O.ALEXEEV     3846 O.ALEXEEV     3846 O.ALEXEEV    
BEAM   LINE 4-2  
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
4126 L.HIRST       4126 L.HIRST       3963 D.Herschlag   8085 L.CARTER      8085 L.CARTER      3909 S.Turley      3765 T.Bryan      
4126 L.HIRST       CHANGE/3963 D.Hers CHANGE/8085 L.CART 8085 L.CARTER      CHANGE/3909 S.Turl CHANGE/3765 T.Brya 3765 T.Bryan      
4126 L.HIRST       3963 D.Herschlag   8085 L.CARTER      8085 L.CARTER      3909 S.Turley      3765 T.Bryan       3765 T.Bryan      
BEAM   LINE 4-3  
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
8092 D.Sokaras     8092 D.Sokaras     3911 K.LANCASTER   3911 K.LANCASTER   4103 O.Trejo       4103 O.Trejo       4103 O.Trejo      
8092 D.Sokaras     SMB CHECKOUT/3911  3911 K.LANCASTER   SMB CHECKOUT/4103  4103 O.Trejo       4103 O.Trejo       4103 O.Trejo      
8092 D.Sokaras     3911 K.LANCASTER   3911 K.LANCASTER   4103 O.Trejo       4103 O.Trejo       4103 O.Trejo       4103 O.Trejo      
BEAM   LINE 6-2  
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
3988 A.Goode       3821 Y.Yu          3821 Y.Yu          3821 Y.Yu          4046 J.Nanda       4046 J.Nanda       3842 W.Chueh      
CHANGE/3821 Y.Yu   3821 Y.Yu          3821 Y.Yu          CHANGE/4046 J.Nand 4046 J.Nanda       CHANGE/3842 W.Chue 3842 W.Chueh      
3821 Y.Yu          3821 Y.Yu          3821 Y.Yu          4046 J.Nanda       4046 J.Nanda       3842 W.Chueh       3842 W.Chueh      
BEAM   LINE 7-2  
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
3844 Y.TAKAMURA    3844 Y.TAKAMURA    3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS  
3844 Y.TAKAMURA    Xray CHECKOUT/3922 3922 S.HIMMELBERGE Xray CHECKOUT/8082 8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS  
3844 Y.TAKAMURA    3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS  
BEAM   LINE 7-3  
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
4103 O.Trejo       4103 O.Trejo       3911 K.LANCASTER   3911 K.LANCASTER   3919 M.KIRK        3919 M.KIRK        3919 M.KIRK       
4103 O.Trejo       SMB CHECKOUT/3911  3911 K.LANCASTER   SMB CHECKOUT/3919  3919 M.KIRK        3919 M.KIRK        3919 M.KIRK       
4103 O.Trejo       3911 K.LANCASTER   3911 K.LANCASTER   3919 M.KIRK        3919 M.KIRK        3919 M.KIRK        3919 M.KIRK       
BEAM   LINE 9-3  
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
8051 M.TONEY       8051 M.TONEY       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       3937 I.Chorkendorf 3937 I.Chorkendorf
8051 M.TONEY       Xray CHECKOUT/8015 8015 A.MEHTA       8015 A.MEHTA       Xray CHECKOUT/3937 3937 I.Chorkendorf 3937 I.Chorkendorf
8051 M.TONEY       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
BEAM   LINE 11-2 
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
4016 M.Polizzotto  4016 M.Polizzotto  3975 J.Nelson      3975 J.Nelson      3946 C.KIM         3946 C.KIM         3946 C.KIM        
4016 M.Polizzotto  SMB CHECKOUT/3975  3975 J.Nelson      SMB CHECKOUT/3946  3946 C.KIM         3946 C.KIM         3946 C.KIM        
4016 M.Polizzotto  3975 J.Nelson      3975 J.Nelson      3946 C.KIM         3946 C.KIM         3946 C.KIM         3946 C.KIM        
BEAM   LINE 11-3 
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
3979 G.SU          3979 G.SU          3651 A.Sharenko    3925 J.REINSPACH   3925 J.REINSPACH   3964 A.El Labban   3964 A.El Labban  
3979 G.SU          CHANGE/3651 A.Shar CHANGE/3925 J.REIN 3925 J.REINSPACH   Xray CHECKOUT/3964 3964 A.El Labban   3964 A.El Labban  
3979 G.SU          3651 A.Sharenko    3925 J.REINSPACH   3925 J.REINSPACH   3964 A.El Labban   3964 A.El Labban   3964 A.El Labban  
BEAM   LINE 14-3 
May 26, 2014       May 27, 2014       May 28, 2014       May 29, 2014       May 30, 2014       May 31, 2014       Jun. 01, 2014     
3984 K.BOYE        3984 K.BOYE        8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       3603 J.CHOROVER    3603 J.CHOROVER   
3984 K.BOYE        CHANGE/8015 A.MEHT 8015 A.MEHTA       8015 A.MEHTA       CHANGE/3603 J.CHOR 3603 J.CHOROVER    3603 J.CHOROVER   
3984 K.BOYE        8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   

Back to Table of Contents

WEEK OF Jun. 02, 2014
AP       AP       XRD School       XRD School                        
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
BEAM   LINE 1-5  
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
FACI/AP            AP                 AP                 8213 A.MEHTA       8213 A.MEHTA       Unscheduled        Unscheduled       
AP                 AP                 Xray CHECKOUT/8213 8213 A.MEHTA       Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 8213 A.MEHTA       8213 A.MEHTA       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
3917 A.WISE/AP     AP                 AP                 8213 A.MEHTA       8213 A.MEHTA       91Y2 S.Kelly       91Y2 S.Kelly      
AP                 AP                 Xray CHECKOUT/8213 8213 A.MEHTA       Xray CHECKOUT/91Y2 91Y2 S.Kelly       91Y2 S.Kelly      
AP                 AP                 8213 A.MEHTA       8213 A.MEHTA       91Y2 S.Kelly       91Y2 S.Kelly       91Y2 S.Kelly      
BEAM   LINE 2-2  
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
4115 K.Keune/AP    AP                 AP                 3603 J.CHOROVER    3603 J.CHOROVER    8067 S.WEBB        8067 S.WEBB       
AP                 AP                 CHANGE/3603 J.CHOR 3603 J.CHOROVER    CHANGE/8067 S.WEBB 8067 S.WEBB        8067 S.WEBB       
AP                 AP                 3603 J.CHOROVER    3603 J.CHOROVER    8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
BEAM   LINE 4-1  
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
3846 O.ALEXEEV/AP  AP                 AP                 4046 J.Nanda       4046 J.Nanda       3936 L.Trotochaud  3936 L.Trotochaud 
AP                 AP                 SMB CHECKOUT/4046  4046 J.Nanda       SMB CHECKOUT/3936  3936 L.Trotochaud  3936 L.Trotochaud 
AP                 AP                 4046 J.Nanda       4046 J.Nanda       3936 L.Trotochaud  3936 L.Trotochaud  3936 L.Trotochaud 
BEAM   LINE 4-2  
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
3765 T.Bryan/AP    AP                 AP                 8877 T.MATSUI      8877 T.MATSUI      3742 H.LIANG       3742 H.LIANG      
AP                 AP                 CHANGE/8877 T.MATS 8877 T.MATSUI      CHANGE/3742 H.LIAN 3742 H.LIANG       CHANGE/4109 S.KIM 
AP                 AP                 8877 T.MATSUI      8877 T.MATSUI      3742 H.LIANG       3742 H.LIANG       4109 S.KIM        
BEAM   LINE 4-3  
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
4103 O.Trejo/AP    AP                 AP                 3603 J.CHOROVER    3603 J.CHOROVER    3984 K.BOYE        3984 K.BOYE       
AP                 AP                 SMB CHECKOUT/3603  3603 J.CHOROVER    SMB CHECKOUT/3984  3984 K.BOYE        3984 K.BOYE       
AP                 AP                 3603 J.CHOROVER    3603 J.CHOROVER    3984 K.BOYE        3984 K.BOYE        3984 K.BOYE       
BEAM   LINE 6-2  
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
3842 W.Chueh/AP    AP                 AP                 8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras     3921 W.Chueh      
AP                 AP                 Xray>XES/8092      8092 D.Sokaras     8092 D.Sokaras     CHANGE/3921 W.Chue 3921 W.Chueh      
AP                 AP                 8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras     3921 W.Chueh       3921 W.Chueh      
BEAM   LINE 7-2  
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
8082 A.VAILIONI/AP AP                 AP                 8213 A.MEHTA       8213 A.MEHTA       8078 S.MANNSFELD   8078 S.MANNSFELD  
AP                 AP                 Xray CHECKOUT/8213 8213 A.MEHTA       Xray CHECKOUT/8078 8078 S.MANNSFELD   8078 S.MANNSFELD  
AP                 AP                 8213 A.MEHTA       8213 A.MEHTA       8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD  
BEAM   LINE 7-3  
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
3919 M.KIRK/AP     AP                 AP                 4045 T.GUO         4045 T.GUO         8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 SMB CHECKOUT/4045  4045 T.GUO         SMB CHECKOUT/8071  8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 4045 T.GUO         4045 T.GUO         8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
BEAM   LINE 9-3  
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
3937 I.Chorkend/AP AP                 AP                 3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA     
AP                 AP                 Xray CHECKOUT/3845 3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA     
AP                 AP                 3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA     
BEAM   LINE 11-2 
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
3946 C.KIM/AP      AP                 AP                 STUP               STUP               3555 J.Wilcox      3555 J.Wilcox     
AP                 AP                 SMB CHECKOUT/STUP  STUP               SMB CHECKOUT/3555  3555 J.Wilcox      3555 J.Wilcox     
AP                 AP                 STUP               STUP               3555 J.Wilcox      3555 J.Wilcox      3555 J.Wilcox     
BEAM   LINE 11-3 
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
3964 A.El Labba/AP AP                 AP                 8213 A.MEHTA       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
AP                 AP                 Xray CHECKOUT/8213 CHANGE/8051 M.TONE 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
AP                 AP                 8213 A.MEHTA       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 14-3 
Jun. 02, 2014      Jun. 03, 2014      Jun. 04, 2014      Jun. 05, 2014      Jun. 06, 2014      Jun. 07, 2014      Jun. 08, 2014     
3603 J.CHOROVER/AP AP                 AP                 3981 S.TIAN        3981 S.TIAN        3981 S.TIAN        3981 S.TIAN       
AP                 AP                 CHANGE/3981 S.TIAN 3981 S.TIAN        3981 S.TIAN        3981 S.TIAN        3981 S.TIAN       
AP                 AP                 3981 S.TIAN        3981 S.TIAN        3981 S.TIAN        3981 S.TIAN        3981 S.TIAN       

Back to Table of Contents

WEEK OF Jun. 09, 2014
                        LowAlpha       LowAlpha       LowAlpha      
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
BEAM   LINE 1-5  
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
Unscheduled        4027 D.Nelson      4027 D.Nelson      4027 D.Nelson      8091 C.TASSONE     8091 C.TASSONE     8091 C.TASSONE    
Xray CHECKOUT/4027 4027 D.Nelson      4027 D.Nelson      Xray CHECKOUT/8091 8091 C.TASSONE     8091 C.TASSONE     8091 C.TASSONE    
4027 D.Nelson      4027 D.Nelson      4027 D.Nelson      8091 C.TASSONE     8091 C.TASSONE     8091 C.TASSONE     8091 C.TASSONE    
BEAM   LINE 2-1  
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
91Y2 S.Kelly       4020 V.HASSAN      4020 V.HASSAN      4020 V.HASSAN      4020 V.HASSAN/LOWA LOWA               LOWA              
Xray CHECKOUT/4020 4020 V.HASSAN      4020 V.HASSAN      4020 V.HASSAN      LOWA               LOWA               LOWA              
4020 V.HASSAN      4020 V.HASSAN      4020 V.HASSAN      4020 V.HASSAN      LOWA               LOWA               LOWA              
BEAM   LINE 2-2  
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
DOWN               DOWN               91Y6 E.GALTIER     91Y6 E.GALTIER     91Y6 E.GALTIER     DOWN               DOWN              
DOWN               Xray CHECKOUT/91Y6 91Y6 E.GALTIER     91Y6 E.GALTIER     DOWN               DOWN               DOWN              
DOWN               91Y6 E.GALTIER     91Y6 E.GALTIER     91Y6 E.GALTIER     DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
8067 S.WEBB        91Z1 D.Drennan     91Z1 D.Drennan     91Z1 D.Drennan     4092 B.Shyam       4092 B.Shyam       4092 B.Shyam      
CHANGE/91Z1 D.Dren 91Z1 D.Drennan     91Z1 D.Drennan     CHANGE/4092 B.Shya 4092 B.Shyam       4092 B.Shyam       4092 B.Shyam      
91Z1 D.Drennan     91Z1 D.Drennan     91Z1 D.Drennan     4092 B.Shyam       4092 B.Shyam       4092 B.Shyam       4092 B.Shyam      
BEAM   LINE 4-1  
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
3936 L.Trotochaud  STUP               STUP               8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
SMB CHECKOUT/STUP  STUP               SMB CHECKOUT/8051  8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
STUP               STUP               8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 4-2  
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
4109 S.KIM         10O2 A.Tezcan      4061 K.Shen        3967 D.DAS         10O1 G.Hura        8877 T.MATSUI      8877 T.MATSUI     
CHANGE/10O2 A.Tezc CHANGE/4061 K.Shen CHANGE/3967 D.DAS  CHANGE/10O1 G.Hura CHANGE/8877 T.MATS 8877 T.MATSUI      8877 T.MATSUI     
10O2 A.Tezcan      4061 K.Shen        3967 D.DAS         10O1 G.Hura        8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI     
BEAM   LINE 4-3  
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
3984 K.BOYE        8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
SMB CHECKOUT/8051  8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 6-2  
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
3921 W.Chueh       3921 W.Chueh       4058 B.Wigington   4058 B.Wigington   4058 B.Wigington   3521 C.BOOTH       3521 C.BOOTH      
3921 W.Chueh       CHANGE/4058 B.Wigi 4058 B.Wigington   4058 B.Wigington   CHANGE/3521 C.BOOT 3521 C.BOOTH       3521 C.BOOTH      
3921 W.Chueh       4058 B.Wigington   4058 B.Wigington   4058 B.Wigington   3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH      
BEAM   LINE 7-2  
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
8078 S.MANNSFELD   3877 M.Ahmad       3877 M.Ahmad       91Y8 M.KOZINA      4100 G.Ndabashimiy 4100 G.Ndabashimiy 4100 G.Ndabashimiy
Xray CHECKOUT/3877 3877 M.Ahmad       Xray CHECKOUT/91Y8 Xray CHECKOUT/4100 4100 G.Ndabashimiy 4100 G.Ndabashimiy 4100 G.Ndabashimiy
3877 M.Ahmad       3877 M.Ahmad       91Y8 M.KOZINA      4100 G.Ndabashimiy 4100 G.Ndabashimiy 4100 G.Ndabashimiy 4100 G.Ndabashimiy
BEAM   LINE 7-3  
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     3900 B.HEDMAN      3900 B.HEDMAN      LOWA               LOWA              
8071 R.SARANGI     8071 R.SARANGI     SMB CHECKOUT/3900  3900 B.HEDMAN      LOWA               LOWA               LOWA              
8071 R.SARANGI     8071 R.SARANGI     3900 B.HEDMAN      3900 B.HEDMAN      LOWA               LOWA               LOWA              
BEAM   LINE 9-3  
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
3845 M.KOZINA      4134 C.Chantler    4134 C.Chantler    4134 C.Chantler    4134 C.Chantler    4134 C.Chantler    4134 C.Chantler   
Xray CHECKOUT/4134 4134 C.Chantler    4134 C.Chantler    4134 C.Chantler    4134 C.Chantler    4134 C.Chantler    4134 C.Chantler   
4134 C.Chantler    4134 C.Chantler    4134 C.Chantler    4134 C.Chantler    4134 C.Chantler    4134 C.Chantler    4134 C.Chantler   
BEAM   LINE 11-2 
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
3555 J.Wilcox      3803 H.Hsu-Kim     3803 H.Hsu-Kim     4089 C.Richardson  4089 C.Richardson  4064 S.FENDORF     4064 S.FENDORF    
SMB CHECKOUT/3803  3803 H.Hsu-Kim     SMB CHECKOUT/4089  4089 C.Richardson  SMB CHECKOUT/4064  4064 S.FENDORF     4064 S.FENDORF    
3803 H.Hsu-Kim     3803 H.Hsu-Kim     4089 C.Richardson  4089 C.Richardson  4064 S.FENDORF     4064 S.FENDORF     4064 S.FENDORF    
BEAM   LINE 11-3 
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
8051 M.TONEY       4046 J.Nanda       4046 J.Nanda       4046 J.Nanda       3977 A.WISE        3977 A.WISE        3977 A.WISE       
Xray CHECKOUT/4046 4046 J.Nanda       4046 J.Nanda       Xray CHECKOUT/3977 3977 A.WISE        3977 A.WISE        3977 A.WISE       
4046 J.Nanda       4046 J.Nanda       4046 J.Nanda       3977 A.WISE        3977 A.WISE        3977 A.WISE        3977 A.WISE       
BEAM   LINE 14-3 
Jun. 09, 2014      Jun. 10, 2014      Jun. 11, 2014      Jun. 12, 2014      Jun. 13, 2014      Jun. 14, 2014      Jun. 15, 2014     
3981 S.TIAN        3797 L.LU          3797 L.LU          3797 L.LU          3797 L.LU          LOWA               LOWA              
CHANGE/3797 L.LU   3797 L.LU          3797 L.LU          3797 L.LU          LOWA               LOWA               LOWA              
3797 L.LU          3797 L.LU          3797 L.LU          3797 L.LU          LOWA               LOWA               LOWA              

Back to Table of Contents

WEEK OF Jun. 16, 2014
AP       AP                                    
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
BEAM   LINE 1-5  
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
8091 C.TASSONE/AP  AP                 AP                 4094 E.Davidson    4094 E.Davidson    8051 M.TONEY       8051 M.TONEY      
AP                 AP                 Xray CHECKOUT/4094 4094 E.Davidson    Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY      
AP                 AP                 4094 E.Davidson    4094 E.Davidson    8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 2-1  
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
LOWA/AP            AP                 AP                 3625 S.SWEETNAM    3625 S.SWEETNAM    3953 M.KANAN       3953 M.KANAN      
AP                 AP                 Xray CHECKOUT/3625 3625 S.SWEETNAM    Xray CHECKOUT/3953 3953 M.KANAN       3953 M.KANAN      
AP                 AP                 3625 S.SWEETNAM    3625 S.SWEETNAM    3953 M.KANAN       3953 M.KANAN       3953 M.KANAN      
BEAM   LINE 2-2  
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
4092 B.Shyam/AP    AP                 AP                 3927 A.FOSTER      3927 A.FOSTER      4099 I.Cianchetta  4099 I.Cianchetta 
AP                 AP                 CHANGE/3927 A.FOST 3927 A.FOSTER      CHANGE/4099 I.Cian 4099 I.Cianchetta  4099 I.Cianchetta 
AP                 AP                 3927 A.FOSTER      3927 A.FOSTER      4099 I.Cianchetta  4099 I.Cianchetta  4099 I.Cianchetta 
BEAM   LINE 4-1  
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
8051 M.TONEY/AP    AP                 AP                 3867 L.Lim         3867 L.Lim         4030 J.Catalano    4030 J.Catalano   
AP                 AP                 SMB CHECKOUT/3867  3867 L.Lim         SMB CHECKOUT/4030  4030 J.Catalano    4030 J.Catalano   
AP                 AP                 3867 L.Lim         3867 L.Lim         4030 J.Catalano    4030 J.Catalano    4030 J.Catalano   
BEAM   LINE 4-2  
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
8877 T.MATSUI/AP   AP                 AP                 8047 T.WEISS       8877 T.MATSUI      10O3 A.Sivasubrama 10O3 A.Sivasubrama
AP                 AP                 CHANGE/8047 T.WEIS CHANGE/8877 T.MATS CHANGE/10O3 A.Siva 10O3 A.Sivasubrama CHANGE/8077 T.MATS
AP                 AP                 8047 T.WEISS       8877 T.MATSUI      10O3 A.Sivasubrama 10O3 A.Sivasubrama 8077 T.MATSUI     
BEAM   LINE 4-3  
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
8051 M.TONEY/AP    AP                 AP                 4136 C.TASSONE     4136 C.TASSONE     4015 M.ZHU         4015 M.ZHU        
AP                 AP                 SMB CHECKOUT/4136  4136 C.TASSONE     SMB CHECKOUT/4015  4015 M.ZHU         4015 M.ZHU        
AP                 AP                 4136 C.TASSONE     4136 C.TASSONE     4015 M.ZHU         4015 M.ZHU         4015 M.ZHU        
BEAM   LINE 6-2  
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
3521 C.BOOTH/AP    AP                 AP                 8881 Y.LIU         4128 P.Paalanen    4128 P.Paalanen    4128 P.Paalanen   
AP                 AP                 Xray>TXM/8881      CHANGE/4128 P.Paal 4128 P.Paalanen    4128 P.Paalanen    CHANGE/8072 J.HAYT
AP                 AP                 8881 Y.LIU         4128 P.Paalanen    4128 P.Paalanen    4128 P.Paalanen    8072 J.HAYTER     
BEAM   LINE 7-2  
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
4100 G.Ndabashi/AP AP                 AP                 3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         3878 Y.SHI        
AP                 AP                 Xray CHECKOUT/3878 3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         3878 Y.SHI        
AP                 AP                 3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         3878 Y.SHI        
BEAM   LINE 7-3  
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
LOWA/AP            AP                 AP                 3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3593 T.STEMMLER   
AP                 AP                 SMB CHECKOUT/3900  3900 B.HEDMAN      3900 B.HEDMAN      CHANGE/3593 T.STEM 3593 T.STEMMLER   
AP                 AP                 3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3593 T.STEMMLER    3593 T.STEMMLER   
BEAM   LINE 9-3  
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
4134 C.Chantler/AP AP                 AP                 9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
AP                 AP                 Xray CHECKOUT/9704 9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
AP                 AP                 9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
BEAM   LINE 11-2 
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
4064 S.FENDORF/AP  AP                 AP                 3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
AP                 AP                 SMB CHECKOUT/3924  3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
AP                 AP                 3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
BEAM   LINE 11-3 
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
3977 A.WISE/AP     AP                 AP                 3984 K.BOYE        3984 K.BOYE        3867 L.Lim         3867 L.Lim        
AP                 AP                 Xray CHECKOUT/3984 3984 K.BOYE        Xray CHECKOUT/3867 3867 L.Lim         3867 L.Lim        
AP                 AP                 3984 K.BOYE        3984 K.BOYE        3867 L.Lim         3867 L.Lim         3867 L.Lim        
BEAM   LINE 14-3 
Jun. 16, 2014      Jun. 17, 2014      Jun. 18, 2014      Jun. 19, 2014      Jun. 20, 2014      Jun. 21, 2014      Jun. 22, 2014     
LOWA/AP            AP                 AP                 91V9 M.ZHU         91V9 M.ZHU         4079 M.ZHU         4079 M.ZHU        
AP                 AP                 SMB>XAS/91V9       91V9 M.ZHU         CHANGE/4079 M.ZHU  4079 M.ZHU         4079 M.ZHU        
AP                 AP                 91V9 M.ZHU         91V9 M.ZHU         4079 M.ZHU         4079 M.ZHU         4079 M.ZHU        

Back to Table of Contents

WEEK OF Jun. 23, 2014
                                         
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
BEAM   LINE 1-5  
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
8051 M.TONEY       8072 J.HAYTER      8072 J.HAYTER      4106 M.Haverty     4106 M.Haverty     4106 M.Haverty     4106 M.Haverty    
Xray CHECKOUT/8072 8072 J.HAYTER      Xray CHECKOUT/4106 4106 M.Haverty     4106 M.Haverty     4106 M.Haverty     4106 M.Haverty    
8072 J.HAYTER      8072 J.HAYTER      4106 M.Haverty     4106 M.Haverty     4106 M.Haverty     4106 M.Haverty     4106 M.Haverty    
BEAM   LINE 2-1  
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
3953 M.KANAN       3818 M.DOEFF       3818 M.DOEFF       3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3877 M.Ahmad       3877 M.Ahmad      
Xray CHECKOUT/3818 3818 M.DOEFF       Xray CHECKOUT/3922 3922 S.HIMMELBERGE Xray CHECKOUT/3877 3877 M.Ahmad       3877 M.Ahmad      
3818 M.DOEFF       3818 M.DOEFF       3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3877 M.Ahmad       3877 M.Ahmad       3877 M.Ahmad      
BEAM   LINE 2-2  
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
4099 I.Cianchetta  4099 I.Cianchetta  3658 W.Fischer     3984 K.BOYE        3984 K.BOYE        3726 A.SEYFFERTH   3726 A.SEYFFERTH  
4099 I.Cianchetta  CHANGE/3658 W.Fisc CHANGE/3984 K.BOYE 3984 K.BOYE        CHANGE/3726 A.SEYF 3726 A.SEYFFERTH   3726 A.SEYFFERTH  
4099 I.Cianchetta  3658 W.Fischer     3984 K.BOYE        3984 K.BOYE        3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
BEAM   LINE 4-1  
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
4030 J.Catalano    4025 B.GATES       4025 B.GATES       4025 B.GATES       4096 F.ESPINOSA FA 4096 F.ESPINOSA FA 4096 F.ESPINOSA FA
SMB CHECKOUT/4025  4025 B.GATES       4025 B.GATES       SMB CHECKOUT/4096  4096 F.ESPINOSA FA 4096 F.ESPINOSA FA 4096 F.ESPINOSA FA
4025 B.GATES       4025 B.GATES       4025 B.GATES       4096 F.ESPINOSA FA 4096 F.ESPINOSA FA 4096 F.ESPINOSA FA 4096 F.ESPINOSA FA
BEAM   LINE 4-2  
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
8077 T.MATSUI      3974 M.BRADY       8877 T.MATSUI      4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA    
CHANGE/3974 M.BRAD CHANGE/8877 T.MATS CHANGE/4021 C.SAFI 4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA    
3974 M.BRADY       8877 T.MATSUI      4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA    
BEAM   LINE 4-3  
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
4015 M.ZHU         3870 S.Daly        3870 S.Daly        8060 J.BARGAR      8060 J.BARGAR      4089 C.Richardson  4089 C.Richardson 
SMB CHECKOUT/3870  3870 S.Daly        SMB CHECKOUT/8060  8060 J.BARGAR      SMB CHECKOUT/4089  4089 C.Richardson  4089 C.Richardson 
3870 S.Daly        3870 S.Daly        8060 J.BARGAR      8060 J.BARGAR      4089 C.Richardson  4089 C.Richardson  4089 C.Richardson 
BEAM   LINE 6-2  
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
8072 J.HAYTER      91Y3 X.Huang       4110 H.Changela    4099 I.Cianchetta  91Y5 L.LaGuardia   4129 V.Pool        4092 B.Shyam      
CHANGE/91Y3 X.Huan CHANGE/4110 H.Chan CHANGE/4099 I.Cian CHANGE/91Y5 L.LaGu CHANGE/4129 V.Pool CHANGE/4092 B.Shya 4092 B.Shyam      
91Y3 X.Huang       4110 H.Changela    4099 I.Cianchetta  91Y5 L.LaGuardia   4129 V.Pool        4092 B.Shyam       4092 B.Shyam      
BEAM   LINE 7-2  
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
3878 Y.SHI         91X8 X.Cen         91X8 X.Cen         8851 M.TONEY       8851 M.TONEY       8851 M.TONEY       8851 M.TONEY      
Xray CHECKOUT/91X8 91X8 X.Cen         Xray CHECKOUT/8851 8851 M.TONEY       8851 M.TONEY       8851 M.TONEY       8851 M.TONEY      
91X8 X.Cen         91X8 X.Cen         8851 M.TONEY       8851 M.TONEY       8851 M.TONEY       8851 M.TONEY       8851 M.TONEY      
BEAM   LINE 7-3  
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
3593 T.STEMMLER    3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger   3637 F.JALILEHVAND 3637 F.JALILEHVAND
SMB CHECKOUT/3966  3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger   SMB CHECKOUT/3637  3637 F.JALILEHVAND 3637 F.JALILEHVAND
3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger   3966 J.Bollinger   3637 F.JALILEHVAND 3637 F.JALILEHVAND 3637 F.JALILEHVAND
BEAM   LINE 9-3  
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee         9704 Y.Lee        
BEAM   LINE 11-2 
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
3924 S.KOZIMOR     1G02 S.Walker      1G01 N.Birkner     3851 T.BORCH       3851 T.BORCH       91Z3 S.Bachas-Daun 91Z3 S.Bachas-Daun
SMB CHECKOUT/1G02  SMB CHECKOUT/1G01  SMB CHECKOUT/3851  3851 T.BORCH       SMB CHECKOUT/91Z3  91Z3 S.Bachas-Daun SMB CHECKOUT/8060 
1G02 S.Walker      1G01 N.Birkner     3851 T.BORCH       3851 T.BORCH       91Z3 S.Bachas-Daun 91Z3 S.Bachas-Daun 8060 J.BARGAR     
BEAM   LINE 11-3 
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
3867 L.Lim         3818 M.DOEFF       3818 M.DOEFF       8015 A.MEHTA       8015 A.MEHTA       4029 S.BENT        4029 S.BENT       
Xray CHECKOUT/3818 3818 M.DOEFF       Xray CHECKOUT/8015 8015 A.MEHTA       Xray CHECKOUT/4029 4029 S.BENT        4029 S.BENT       
3818 M.DOEFF       3818 M.DOEFF       8015 A.MEHTA       8015 A.MEHTA       4029 S.BENT        4029 S.BENT        4029 S.BENT       
BEAM   LINE 14-3 
Jun. 23, 2014      Jun. 24, 2014      Jun. 25, 2014      Jun. 26, 2014      Jun. 27, 2014      Jun. 28, 2014      Jun. 29, 2014     
4079 M.ZHU         3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR    
CHANGE/3810 S.KOZI 3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR    
3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR    

Back to Table of Contents

WEEK OF Jun. 30, 2014
AP       AP                   HOLIDAY                  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
BEAM   LINE 1-5  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
4106 M.Haverty/AP  AP                 AP                 4032 M.KRAMER      4032 M.KRAMER      4032 M.KRAMER      4032 M.KRAMER     
AP                 AP                 Xray CHECKOUT/4032 4032 M.KRAMER      4032 M.KRAMER      4032 M.KRAMER      4032 M.KRAMER     
AP                 AP                 4032 M.KRAMER      4032 M.KRAMER      4032 M.KRAMER      4032 M.KRAMER      4032 M.KRAMER     
BEAM   LINE 2-1  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
3877 M.Ahmad/AP    AP                 AP                 4129 V.Pool        4129 V.Pool        4101 V.Pool        4101 V.Pool       
AP                 AP                 Xray CHECKOUT/4129 4129 V.Pool        CHANGE/4101 V.Pool 4101 V.Pool        4101 V.Pool       
AP                 AP                 4129 V.Pool        4129 V.Pool        4101 V.Pool        4101 V.Pool        4101 V.Pool       
BEAM   LINE 2-2  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
3726 A.SEYFFERT/AP AP                 AP                 3875 S.CONRADSON   3875 S.CONRADSON   3945 S.CONRADSON   3945 S.CONRADSON  
AP                 AP                 CHANGE/3875 S.CONR 3875 S.CONRADSON   CHANGE/3945 S.CONR 3945 S.CONRADSON   3945 S.CONRADSON  
AP                 AP                 3875 S.CONRADSON   3875 S.CONRADSON   3945 S.CONRADSON   3945 S.CONRADSON   3945 S.CONRADSON  
BEAM   LINE 4-1  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
4096 F.ESPINOSA/AP AP                 AP                 3842 W.Chueh       3842 W.Chueh       3842 W.Chueh       3842 W.Chueh      
AP                 AP                 SMB CHECKOUT/3842  3842 W.Chueh       3842 W.Chueh       3842 W.Chueh       3842 W.Chueh      
AP                 AP                 3842 W.Chueh       3842 W.Chueh       3842 W.Chueh       3842 W.Chueh       3842 W.Chueh      
BEAM   LINE 4-2  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
4021 C.SAFINYA/AP  AP                 AP                 8877 T.MATSUI      3814 P.Grochulski  3814 P.Grochulski  3814 P.Grochulski 
AP                 AP                 CHANGE/8877 T.MATS CHANGE/3814 P.Groc 3814 P.Grochulski  3814 P.Grochulski  CHANGE/8077 T.MATS
AP                 AP                 8877 T.MATSUI      3814 P.Grochulski  3814 P.Grochulski  3814 P.Grochulski  8077 T.MATSUI     
BEAM   LINE 4-3  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
4089 C.Richards/AP AP                 AP                 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN
AP                 AP                 SMB CHECKOUT/4104  4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN
AP                 AP                 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN
BEAM   LINE 6-2  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
4092 B.Shyam/AP    AP                 AP                 8079 T.WENG        8079 T.WENG        8079 T.WENG        3971 F.Lin        
AP                 AP                 CHECKOUT/8079      8079 T.WENG        8079 T.WENG        CHANGE/3971 F.Lin  3971 F.Lin        
AP                 AP                 8079 T.WENG        8079 T.WENG        8079 T.WENG        3971 F.Lin         3971 F.Lin        
BEAM   LINE 7-2  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
8851 M.TONEY/AP    AP                 AP                 3942 M.Samant      3942 M.Samant      3942 M.Samant      3942 M.Samant     
AP                 AP                 Xray CHECKOUT/3942 3942 M.Samant      3942 M.Samant      3942 M.Samant      3942 M.Samant     
AP                 AP                 3942 M.Samant      3942 M.Samant      3942 M.Samant      3942 M.Samant      3942 M.Samant     
BEAM   LINE 7-3  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
3637 F.JALILEHV/AP AP                 AP                 3582 L.QUE         3582 L.QUE         3582 L.QUE         3582 L.QUE        
AP                 AP                 SMB CHECKOUT/3582  3582 L.QUE         3582 L.QUE         3582 L.QUE         3582 L.QUE        
AP                 AP                 3582 L.QUE         3582 L.QUE         3582 L.QUE         3582 L.QUE         3582 L.QUE        
BEAM   LINE 9-3  
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
9704 Y.Lee/AP      AP                 AP                 8867 S.WEBB        3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
AP                 AP                 Xray>Imaging/8867  CHANGE/3726 A.SEYF 3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
AP                 AP                 8867 S.WEBB        3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
BEAM   LINE 11-2 
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
8060 J.BARGAR/AP   AP                 AP                 4039 F.BRIDGES     4039 F.BRIDGES     4039 F.BRIDGES     4039 F.BRIDGES    
AP                 AP                 SMB CHECKOUT/4039  4039 F.BRIDGES     4039 F.BRIDGES     4039 F.BRIDGES     4039 F.BRIDGES    
AP                 AP                 4039 F.BRIDGES     4039 F.BRIDGES     4039 F.BRIDGES     4039 F.BRIDGES     4039 F.BRIDGES    
BEAM   LINE 11-3 
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
4029 S.BENT/AP     AP                 AP                 4130 E.Quiroga-Gon 4130 E.Quiroga-Gon 4130 E.Quiroga-Gon 4130 E.Quiroga-Gon
AP                 AP                 Xray CHECKOUT/4130 4130 E.Quiroga-Gon 4130 E.Quiroga-Gon 4130 E.Quiroga-Gon 4130 E.Quiroga-Gon
AP                 AP                 4130 E.Quiroga-Gon 4130 E.Quiroga-Gon 4130 E.Quiroga-Gon 4130 E.Quiroga-Gon 4130 E.Quiroga-Gon
BEAM   LINE 14-3 
Jun. 30, 2014      Jul. 01, 2014      Jul. 02, 2014      Jul. 03, 2014      Jul. 04, 2014      Jul. 05, 2014      Jul. 06, 2014     
3810 S.KOZIMOR/AP  AP                 AP                 8867 S.WEBB        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 SMB>Imaging/8867   Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 8867 S.WEBB        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jul. 07, 2014
                        ImagingSchool      ImagingSchool      ImagingSchool     
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
BEAM   LINE 1-5  
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
4032 M.KRAMER      3986 X.Chen        3986 X.Chen        3986 X.Chen        3906 C.Fox         3906 C.Fox         3906 C.Fox        
Xray CHECKOUT/3986 3986 X.Chen        3986 X.Chen        Xray>SAXS/3906     3906 C.Fox         3906 C.Fox         3906 C.Fox        
3986 X.Chen        3986 X.Chen        3986 X.Chen        3906 C.Fox         3906 C.Fox         3906 C.Fox         3906 C.Fox        
BEAM   LINE 2-1  
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
4101 V.Pool        91W3 B.Shyam       91W3 B.Shyam       3907 O.Trejo       3907 O.Trejo       3823 Y.SHI         3823 Y.SHI        
Xray CHECKOUT/91W3 91W3 B.Shyam       Xray CHECKOUT/3907 3907 O.Trejo       Xray CHECKOUT/3823 3823 Y.SHI         3823 Y.SHI        
91W3 B.Shyam       91W3 B.Shyam       3907 O.Trejo       3907 O.Trejo       3823 Y.SHI         3823 Y.SHI         3823 Y.SHI        
BEAM   LINE 2-2  
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
3945 S.CONRADSON   3940 H.BOUKHALFA   3940 H.BOUKHALFA   3940 H.BOUKHALFA   Unscheduled        8212 S.WEBB        8212 S.WEBB       
CHANGE/3940 H.BOUK 3940 H.BOUKHALFA   3940 H.BOUKHALFA   Unscheduled        CHANGE/8212 S.WEBB 8212 S.WEBB        8212 S.WEBB       
3940 H.BOUKHALFA   3940 H.BOUKHALFA   3940 H.BOUKHALFA   Unscheduled        8212 S.WEBB        8212 S.WEBB        8212 S.WEBB       
BEAM   LINE 4-1  
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
3842 W.Chueh       3927 A.FOSTER      3927 A.FOSTER      8060 J.BARGAR      8060 J.BARGAR      3867 L.Lim         3867 L.Lim        
SMB CHECKOUT/3927  3927 A.FOSTER      SMB CHECKOUT/8060  8060 J.BARGAR      SMB CHECKOUT/3867  3867 L.Lim         3867 L.Lim        
3927 A.FOSTER      3927 A.FOSTER      8060 J.BARGAR      8060 J.BARGAR      3867 L.Lim         3867 L.Lim         3867 L.Lim        
BEAM   LINE 4-2  
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
8077 T.MATSUI      10O4 C.Davidovich  8085 L.CARTER      3963 D.Herschlag   4109 S.KIM         3792 E.Snell       3792 E.Snell      
CHANGE/10O4 C.Davi CHANGE/8085 L.CART CHANGE/3963 D.Hers CHANGE/4109 S.KIM  CHANGE/3792 E.Snel 3792 E.Snell       3792 E.Snell      
10O4 C.Davidovich  8085 L.CARTER      3963 D.Herschlag   4109 S.KIM         3792 E.Snell       3792 E.Snell       3792 E.Snell      
BEAM   LINE 4-3  
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 3532 B.HEDMAN      3532 B.HEDMAN      9705 J.JCAP        9705 J.JCAP       
4104 S.CHRISTENSEN 4104 S.CHRISTENSEN SMB CHECKOUT/3532  3532 B.HEDMAN      SMB CHECKOUT/9705  9705 J.JCAP        9705 J.JCAP       
4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 3532 B.HEDMAN      3532 B.HEDMAN      9705 J.JCAP        9705 J.JCAP        9705 J.JCAP       
BEAM   LINE 6-2  
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
3971 F.Lin         3971 F.Lin         8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras     4091 H.Liang       4091 H.Liang      
3971 F.Lin         CHANGE/8092 D.Soka 8092 D.Sokaras     8092 D.Sokaras     CHANGE/4091 H.Lian 4091 H.Liang       4091 H.Liang      
3971 F.Lin         8092 D.Sokaras     8092 D.Sokaras     8092 D.Sokaras     4091 H.Liang       4091 H.Liang       4091 H.Liang      
BEAM   LINE 7-2  
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
3942 M.Samant      4013 T.Petach      4013 T.Petach      3842 W.Chueh       3921 W.Chueh       3921 W.Chueh       3921 W.Chueh      
Xray CHECKOUT/4013 4013 T.Petach      Xray CHECKOUT/3842 Xray CHECKOUT/3921 3921 W.Chueh       3921 W.Chueh       3921 W.Chueh      
4013 T.Petach      4013 T.Petach      3842 W.Chueh       3921 W.Chueh       3921 W.Chueh       3921 W.Chueh       3921 W.Chueh      
BEAM   LINE 7-3  
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
3582 L.QUE         3582 L.QUE         4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       4065 M.GREEN      
3582 L.QUE         SMB CHECKOUT/4065  4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       4065 M.GREEN      
3582 L.QUE         4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       4065 M.GREEN       4065 M.GREEN      
BEAM   LINE 9-3  
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
3726 A.SEYFFERTH   8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8212 S.WEBB        8212 S.WEBB       
CHANGE/8015 A.MEHT 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       CHANGE/8212 S.WEBB 8212 S.WEBB        8212 S.WEBB       
8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8212 S.WEBB        8212 S.WEBB        8212 S.WEBB       
BEAM   LINE 11-2 
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
4039 F.BRIDGES     STUP               STUP               STUP               8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
SMB>GIXAS/STUP     STUP               STUP               SMB CHECKOUT/8015  8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
STUP               STUP               STUP               8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 11-3 
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
4130 E.Quiroga-Gon 3625 S.SWEETNAM    3625 S.SWEETNAM    4133 Y.HUANG       3651 A.Sharenko    3973 M.BRADY       3973 M.BRADY      
Xray CHECKOUT/3625 3625 S.SWEETNAM    Xray CHECKOUT/4133 Xray CHECKOUT/3651 Xray CHECKOUT/3973 3973 M.BRADY       3973 M.BRADY      
3625 S.SWEETNAM    3625 S.SWEETNAM    4133 Y.HUANG       3651 A.Sharenko    3973 M.BRADY       3973 M.BRADY       3973 M.BRADY      
BEAM   LINE 14-3 
Jul. 07, 2014      Jul. 08, 2014      Jul. 09, 2014      Jul. 10, 2014      Jul. 11, 2014      Jul. 12, 2014      Jul. 13, 2014     
Unscheduled        4012 J.BARGAR      Unscheduled        3658 W.Fischer     3658 W.Fischer     8212 S.WEBB        8212 S.WEBB       
CHANGE/4012 J.BARG Unscheduled        CHANGE/3658 W.Fisc 3658 W.Fischer     CHANGE/8212 S.WEBB 8212 S.WEBB        8212 S.WEBB       
4012 J.BARGAR      Unscheduled        3658 W.Fischer     3658 W.Fischer     8212 S.WEBB        8212 S.WEBB        8212 S.WEBB       

Back to Table of Contents

WEEK OF Jul. 14, 2014
AP       AP                                    
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
BEAM   LINE 1-5  
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
3906 C.Fox/AP      AP                 AP                 3917 A.WISE        3917 A.WISE        4122 S.Andrews     4122 S.Andrews    
AP                 AP                 Xray CHECKOUT/3917 3917 A.WISE        Xray CHECKOUT/4122 4122 S.Andrews     4122 S.Andrews    
AP                 AP                 3917 A.WISE        3917 A.WISE        4122 S.Andrews     4122 S.Andrews     4122 S.Andrews    
BEAM   LINE 2-1  
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
3823 Y.SHI/AP      AP                 AP                 3989 K.Stone       3989 K.Stone       3989 K.Stone       3989 K.Stone      
AP                 AP                 Xray CHECKOUT/3989 3989 K.Stone       3989 K.Stone       3989 K.Stone       3989 K.Stone      
AP                 AP                 3989 K.Stone       3989 K.Stone       3989 K.Stone       3989 K.Stone       3989 K.Stone      
BEAM   LINE 2-2  
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
DOWN/AP            AP                 AP                 4043 S.Barberie    4043 S.Barberie    4043 S.Barberie    4043 S.Barberie   
AP                 AP                 Xray CHECKOUT/4043 4043 S.Barberie    4043 S.Barberie    4043 S.Barberie    4043 S.Barberie   
AP                 AP                 4043 S.Barberie    4043 S.Barberie    4043 S.Barberie    4043 S.Barberie    4043 S.Barberie   
BEAM   LINE 2-3  
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
8212 S.WEBB/AP     AP                 AP                 Unscheduled        Unscheduled        3884 J.Fischel     3884 J.Fischel    
AP                 AP                 Unscheduled        Unscheduled        CHANGE/3884 J.Fisc 3884 J.Fischel     3884 J.Fischel    
AP                 AP                 Unscheduled        Unscheduled        3884 J.Fischel     3884 J.Fischel     3884 J.Fischel    
BEAM   LINE 4-1  
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
3867 L.Lim/AP      AP                 AP                 3658 W.Fischer     3658 W.Fischer     3796 A.DEONARINE   3796 A.DEONARINE  
AP                 AP                 SMB CHECKOUT/3658  3658 W.Fischer     SMB CHECKOUT/3796  3796 A.DEONARINE   3796 A.DEONARINE  
AP                 AP                 3658 W.Fischer     3658 W.Fischer     3796 A.DEONARINE   3796 A.DEONARINE   3796 A.DEONARINE  
BEAM   LINE 4-2  
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
3792 E.Snell/AP    AP                 AP                 4041 W.Mieher      4041 W.Mieher      4041 W.Mieher      3873 A.VAN BUUREN 
AP                 AP                 CHANGE/4041 W.Mieh 4041 W.Mieher      4041 W.Mieher      CHANGE/3873 A.VAN  3873 A.VAN BUUREN 
AP                 AP                 4041 W.Mieher      4041 W.Mieher      4041 W.Mieher      3873 A.VAN BUUREN  3873 A.VAN BUUREN 
BEAM   LINE 4-3  
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
9705 J.JCAP/AP     AP                 AP                 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN
AP                 AP                 SMB CHECKOUT/4104  4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN
AP                 AP                 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN 4104 S.CHRISTENSEN
BEAM   LINE 6-2  
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
4091 H.Liang/AP    AP                 AP                 4107 F.DE GROOT    4107 F.DE GROOT    4107 F.DE GROOT    9705 J.JCAP       
AP                 AP                 CHANGE/4107 F.DE G 4107 F.DE GROOT    4107 F.DE GROOT    CHANGE/9705 J.JCAP 9705 J.JCAP       
AP                 AP                 4107 F.DE GROOT    4107 F.DE GROOT    4107 F.DE GROOT    9705 J.JCAP        9705 J.JCAP       
BEAM   LINE 7-2  
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
3921 W.Chueh/AP    AP                 AP                 3625 S.SWEETNAM    3625 S.SWEETNAM    3660 S.TOLBERT     3660 S.TOLBERT    
AP                 AP                 Xray CHECKOUT/3625 3625 S.SWEETNAM    Xray CHECKOUT/3660 3660 S.TOLBERT     3660 S.TOLBERT    
AP                 AP                 3625 S.SWEETNAM    3625 S.SWEETNAM    3660 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT    
BEAM   LINE 7-3  
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
4065 M.GREEN/AP    AP                 AP                 3912 N.BLACKBURN   3912 N.BLACKBURN   3838 E.WASINGER    3838 E.WASINGER   
AP                 AP                 SMB CHECKOUT/3912  3912 N.BLACKBURN   SMB CHECKOUT/3838  3838 E.WASINGER    3838 E.WASINGER   
AP                 AP                 3912 N.BLACKBURN   3912 N.BLACKBURN   3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER   
BEAM   LINE 9-3  
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
8212 S.WEBB/AP     AP                 AP                 8060 J.BARGAR      8067 S.WEBB        3505 H.NICHOL      3505 H.NICHOL     
AP                 AP                 CHANGE/8060 J.BARG CHANGE/8067 S.WEBB CHANGE/3505 H.NICH 3505 H.NICHOL      3505 H.NICHOL     
AP                 AP                 8060 J.BARGAR      8067 S.WEBB        3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL     
BEAM   LINE 11-2 
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
8015 A.MEHTA/AP    AP                 AP                 91W9 V.Pool        91W9 V.Pool        4074 B.Shyam       4074 B.Shyam      
AP                 AP                 SMB CHECKOUT/91W9  91W9 V.Pool        CHANGE/4074 B.Shya 4074 B.Shyam       4074 B.Shyam      
AP                 AP                 91W9 V.Pool        91W9 V.Pool        4074 B.Shyam       4074 B.Shyam       4074 B.Shyam      
BEAM   LINE 11-3 
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
3973 M.BRADY/AP    AP                 AP                 4057 A.Singh       4057 A.Singh       3787 A.LLORDES     91X1 I.Robertson  
AP                 AP                 Xray CHECKOUT/4057 4057 A.Singh       Xray CHECKOUT/3787 CHANGE/91X1 I.Robe CHANGE/4029 S.BENT
AP                 AP                 4057 A.Singh       4057 A.Singh       3787 A.LLORDES     91X1 I.Robertson   4029 S.BENT       
BEAM   LINE 14-3 
Jul. 14, 2014      Jul. 15, 2014      Jul. 16, 2014      Jul. 17, 2014      Jul. 18, 2014      Jul. 19, 2014      Jul. 20, 2014     
8212 S.WEBB/AP     AP                 AP                 4113 G.GEORGE      4113 G.GEORGE      4113 G.GEORGE      4113 G.GEORGE     
AP                 AP                 CHANGE/4113 G.GEOR 4113 G.GEORGE      4113 G.GEORGE      4113 G.GEORGE      4113 G.GEORGE     
AP                 AP                 4113 G.GEORGE      4113 G.GEORGE      4113 G.GEORGE      4113 G.GEORGE      4113 G.GEORGE     

Back to Table of Contents

WEEK OF Jul. 21, 2014
                                         
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
BEAM   LINE 1-5  
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
4122 S.Andrews     3853 A.Briseno     3853 A.Briseno     4036 N.Deb         4036 N.Deb         4036 N.Deb         4036 N.Deb        
Xray CHECKOUT/3853 3853 A.Briseno     Xray CHECKOUT/4036 4036 N.Deb         4036 N.Deb         4036 N.Deb         4036 N.Deb        
3853 A.Briseno     3853 A.Briseno     4036 N.Deb         4036 N.Deb         4036 N.Deb         4036 N.Deb         4036 N.Deb        
BEAM   LINE 2-1  
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
3989 K.Stone       3952 B.Shyam       3952 B.Shyam       3952 B.Shyam       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
CHANGE/3952 B.Shya 3952 B.Shyam       3952 B.Shyam       Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
3952 B.Shyam       3952 B.Shyam       3952 B.Shyam       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 2-2  
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
4043 S.Barberie    DOWN               DOWN               4022 T.Cahill      4022 T.Cahill      4022 T.Cahill      4022 T.Cahill     
DOWN               DOWN               CHANGE/4022 T.Cahi 4022 T.Cahill      4022 T.Cahill      4022 T.Cahill      4022 T.Cahill     
DOWN               DOWN               4022 T.Cahill      4022 T.Cahill      4022 T.Cahill      4022 T.Cahill      4022 T.Cahill     
BEAM   LINE 2-3  
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
3884 J.Fischel     91Z0 C.McClain     91Z0 C.McClain     3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3505 H.NICHOL     
CHANGE/91Z0 C.McCl 91Z0 C.McClain     CHANGE/3683 M.PUSH 3683 M.PUSHIE      3683 M.PUSHIE      CHANGE/3505 H.NICH 3505 H.NICHOL     
91Z0 C.McClain     91Z0 C.McClain     3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3505 H.NICHOL      3505 H.NICHOL     
BEAM   LINE 4-1  
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
3796 A.DEONARINE   4089 C.Richardson  4089 C.Richardson  4004 M.GINDER-VOGE 4004 M.GINDER-VOGE 4090 J.Fischel     4090 J.Fischel    
SMB CHECKOUT/4089  4089 C.Richardson  SMB CHECKOUT/4004  4004 M.GINDER-VOGE SMB CHECKOUT/4090  4090 J.Fischel     4090 J.Fischel    
4089 C.Richardson  4089 C.Richardson  4004 M.GINDER-VOGE 4004 M.GINDER-VOGE 4090 J.Fischel     4090 J.Fischel     4090 J.Fischel    
BEAM   LINE 4-2  
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
3873 A.VAN BUUREN  3535 G.WONG        3535 G.WONG        3535 G.WONG        3535 G.WONG        4021 C.SAFINYA     4021 C.SAFINYA    
CHANGE/3535 G.WONG 3535 G.WONG        3535 G.WONG        3535 G.WONG        CHANGE/4021 C.SAFI 4021 C.SAFINYA     4021 C.SAFINYA    
3535 G.WONG        3535 G.WONG        3535 G.WONG        3535 G.WONG        4021 C.SAFINYA     4021 C.SAFINYA     4021 C.SAFINYA    
BEAM   LINE 4-3  
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
4104 S.CHRISTENSEN 3859 I.PICKERING   3859 I.PICKERING   3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
SMB CHECKOUT/3859  3859 I.PICKERING   SMB CHECKOUT/3614  3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
3859 I.PICKERING   3859 I.PICKERING   3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
BEAM   LINE 6-2  
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
9705 J.JCAP        9705 J.JCAP        3739 T.WENG        3739 T.WENG        3739 T.WENG        STUP               3696 Y.Shi        
9705 J.JCAP        CHANGE/3739 T.WENG 3739 T.WENG        3739 T.WENG        Xray>TXM/STUP      CHANGE/3696 Y.Shi  3696 Y.Shi        
9705 J.JCAP        3739 T.WENG        3739 T.WENG        3739 T.WENG        STUP               3696 Y.Shi         3696 Y.Shi        
BEAM   LINE 7-2  
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
3660 S.TOLBERT     3877 M.Ahmad       3877 M.Ahmad       3877 M.Ahmad       3877 M.Ahmad       4097 C.Stolle      4097 C.Stolle     
Xray CHECKOUT/3877 3877 M.Ahmad       3877 M.Ahmad       3877 M.Ahmad       Xray CHECKOUT/4097 4097 C.Stolle      4097 C.Stolle     
3877 M.Ahmad       3877 M.Ahmad       3877 M.Ahmad       3877 M.Ahmad       4097 C.Stolle      4097 C.Stolle      4097 C.Stolle     
BEAM   LINE 7-3  
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
3838 E.WASINGER    3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3857 G.GEORGE      3857 G.GEORGE     
SMB CHECKOUT/3683  3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      SMB CHECKOUT/3857  3857 G.GEORGE      3857 G.GEORGE     
3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
BEAM   LINE 9-3  
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
3505 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3859 I.PICKERING   3859 I.PICKERING   3859 I.PICKERING  
CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL      CHANGE/3859 I.PICK 3859 I.PICKERING   3859 I.PICKERING   3859 I.PICKERING  
3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3859 I.PICKERING   3859 I.PICKERING   3859 I.PICKERING   3859 I.PICKERING  
BEAM   LINE 11-2 
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
4074 B.Shyam       3903 B.Beaulieu    3903 B.Beaulieu    3746 W.LUKENS      3746 W.LUKENS      3995 T.Bank        3995 T.Bank       
SMB CHECKOUT/3903  3903 B.Beaulieu    SMB CHECKOUT/3746  3746 W.LUKENS      SMB CHECKOUT/3995  3995 T.Bank        3995 T.Bank       
3903 B.Beaulieu    3903 B.Beaulieu    3746 W.LUKENS      3746 W.LUKENS      3995 T.Bank        3995 T.Bank        3995 T.Bank       
BEAM   LINE 11-3 
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
4029 S.BENT        4054 E.Davidson    4054 E.Davidson    3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3706 S.TOLBERT     3660 S.TOLBERT    
Xray CHECKOUT/4054 4054 E.Davidson    Xray CHECKOUT/3922 3922 S.HIMMELBERGE Xray CHECKOUT/3706 CHANGE/3660 S.TOLB 3660 S.TOLBERT    
4054 E.Davidson    4054 E.Davidson    3922 S.HIMMELBERGE 3922 S.HIMMELBERGE 3706 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT    
BEAM   LINE 14-3 
Jul. 21, 2014      Jul. 22, 2014      Jul. 23, 2014      Jul. 24, 2014      Jul. 25, 2014      Jul. 26, 2014      Jul. 27, 2014     
4113 G.GEORGE      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     

Back to Table of Contents

WEEK OF Jul. 28, 2014
                                         
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
BEAM   LINE 1-5  
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
4036 N.Deb         3660 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT     4055 C.Li          4035 S.Fleischman  4035 S.Fleischman 
Xray CHECKOUT/3660 3660 S.TOLBERT     3660 S.TOLBERT     Xray CHECKOUT/4055 Xray CHECKOUT/4035 4035 S.Fleischman  4035 S.Fleischman 
3660 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT     4055 C.Li          4035 S.Fleischman  4035 S.Fleischman  4035 S.Fleischman 
BEAM   LINE 2-1  
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
8051 M.TONEY       4135 A.WISE        4135 A.WISE        4066 K.Stone       4066 K.Stone       4066 K.Stone       4066 K.Stone      
Xray CHECKOUT/4135 4135 A.WISE        Xray CHECKOUT/4066 4066 K.Stone       4066 K.Stone       4066 K.Stone       4066 K.Stone      
4135 A.WISE        4135 A.WISE        4066 K.Stone       4066 K.Stone       4066 K.Stone       4066 K.Stone       4066 K.Stone      
BEAM   LINE 2-2  
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
4022 T.Cahill      8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN 
CHANGE/8875 D.VAN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN 
8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN 
BEAM   LINE 2-3  
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
3505 H.NICHOL      3505 H.NICHOL      3995 T.Bank        3995 T.Bank        3995 T.Bank        4059 C.HANSEL      4059 C.HANSEL     
3505 H.NICHOL      CHANGE/3995 T.Bank 3995 T.Bank        3995 T.Bank        CHANGE/4059 C.HANS 4059 C.HANSEL      4059 C.HANSEL     
3505 H.NICHOL      3995 T.Bank        3995 T.Bank        3995 T.Bank        4059 C.HANSEL      4059 C.HANSEL      4059 C.HANSEL     
BEAM   LINE 4-1  
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
4090 J.Fischel     3938 J.Nelson Weke 3938 J.Nelson Weke 3962 R.Bernier-Lat 3962 R.Bernier-Lat 3977 A.WISE        3977 A.WISE       
SMB CHECKOUT/3938  3938 J.Nelson Weke SMB CHECKOUT/3962  3962 R.Bernier-Lat SMB CHECKOUT/3977  3977 A.WISE        3977 A.WISE       
3938 J.Nelson Weke 3938 J.Nelson Weke 3962 R.Bernier-Lat 3962 R.Bernier-Lat 3977 A.WISE        3977 A.WISE        3977 A.WISE       
BEAM   LINE 4-2  
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
4021 C.SAFINYA     4021 C.SAFINYA     3933 K.LEE         3933 K.LEE         8077 T.MATSUI      8047 T.WEISS       8877 T.MATSUI     
4021 C.SAFINYA     CHANGE/3933 K.LEE  3933 K.LEE         CHANGE/8077 T.MATS CHANGE/8047 T.WEIS CHANGE/8877 T.MATS 8877 T.MATSUI     
4021 C.SAFINYA     3933 K.LEE         3933 K.LEE         8077 T.MATSUI      8047 T.WEISS       8877 T.MATSUI      8877 T.MATSUI     
BEAM   LINE 4-3  
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
3614 H.NICHOL      3962 R.Bernier-Lat 3962 R.Bernier-Lat 4101 V.Pool        4059 C.HANSEL      4059 C.HANSEL      4059 C.HANSEL     
SMB CHECKOUT/3962  3962 R.Bernier-Lat SMB CHECKOUT/4101  SMB CHECKOUT/4059  4059 C.HANSEL      4059 C.HANSEL      4059 C.HANSEL     
3962 R.Bernier-Lat 3962 R.Bernier-Lat 4101 V.Pool        4059 C.HANSEL      4059 C.HANSEL      4059 C.HANSEL      4059 C.HANSEL     
BEAM   LINE 6-2  
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
3696 Y.Shi         3696 Y.Shi         CHANGE/91V7 S.Peng 4127 N.Hess        3821 Y.Yu          3821 Y.Yu          8090 J.Nelson Weke
3696 Y.Shi         CHANGE/8081 Y.LIU  CHANGE/4127 N.Hess CHANGE/3821 Y.Yu   3821 Y.Yu          CHANGE/8090 J.Nels 8090 J.Nelson Weke
3696 Y.Shi         8081 Y.LIU         4127 N.Hess        3821 Y.Yu          3821 Y.Yu          8090 J.Nelson Weke 8090 J.Nelson Weke
BEAM   LINE 7-2  
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
4097 C.Stolle      4101 V.Pool        4101 V.Pool        4036 N.Deb         4036 N.Deb         3979 G.SU          3979 G.SU         
Xray CHECKOUT/4101 4101 V.Pool        Xray CHECKOUT/4036 4036 N.Deb         Xray CHECKOUT/3979 3979 G.SU          3979 G.SU         
4101 V.Pool        4101 V.Pool        4036 N.Deb         4036 N.Deb         3979 G.SU          3979 G.SU          3979 G.SU         
BEAM   LINE 7-3  
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
3857 G.GEORGE      3857 G.GEORGE      4085 S.GEORGE      4085 S.GEORGE      4085 S.GEORGE      9705 J.JCAP        9705 J.JCAP       
3857 G.GEORGE      SMB CHECKOUT/4085  4085 S.GEORGE      4085 S.GEORGE      SMB CHECKOUT/9705  9705 J.JCAP        9705 J.JCAP       
3857 G.GEORGE      4085 S.GEORGE      4085 S.GEORGE      4085 S.GEORGE      9705 J.JCAP        9705 J.JCAP        9705 J.JCAP       
BEAM   LINE 9-3  
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
3859 I.PICKERING   3995 T.Bank        3995 T.Bank        4064 S.FENDORF     4064 S.FENDORF     91X9 E.Clifford    91X9 E.Clifford   
CHANGE/3995 T.Bank 3995 T.Bank        CHANGE/4064 S.FEND 4064 S.FENDORF     CHANGE/91X9 E.Clif 91X9 E.Clifford    91X9 E.Clifford   
3995 T.Bank        3995 T.Bank        4064 S.FENDORF     4064 S.FENDORF     91X9 E.Clifford    91X9 E.Clifford    91X9 E.Clifford   
BEAM   LINE 11-2 
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
3995 T.Bank        4069 C.BOOTH       3521 C.BOOTH       8060 J.BARGAR      3945 S.CONRADSON   3875 S.CONRADSON   3875 S.CONRADSON  
SMB CHECKOUT/4069  CHANGE/3521 C.BOOT SMB CHECKOUT/8060  SMB CHECKOUT/3945  CHANGE/3875 S.CONR 3875 S.CONRADSON   3875 S.CONRADSON  
4069 C.BOOTH       3521 C.BOOTH       8060 J.BARGAR      3945 S.CONRADSON   3875 S.CONRADSON   3875 S.CONRADSON   3875 S.CONRADSON  
BEAM   LINE 11-3 
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
3660 S.TOLBERT     3853 A.Briseno     3853 A.Briseno     3853 A.Briseno     3918 A.LINDENBERG  4036 N.Deb         4036 N.Deb        
Xray CHECKOUT/3853 3853 A.Briseno     3853 A.Briseno     Xray CHECKOUT/3918 Xray CHECKOUT/4036 4036 N.Deb         4036 N.Deb        
3853 A.Briseno     3853 A.Briseno     3853 A.Briseno     3918 A.LINDENBERG  4036 N.Deb         4036 N.Deb         4036 N.Deb        
BEAM   LINE 14-3 
Jul. 28, 2014      Jul. 29, 2014      Jul. 30, 2014      Jul. 31, 2014      Aug. 01, 2014      Aug. 02, 2014      Aug. 03, 2014     
3614 H.NICHOL      4127 N.Hess        4127 N.Hess        4114 M.MASSEY      4114 M.MASSEY      4114 M.MASSEY      4114 M.MASSEY     
CHANGE/4127 N.Hess 4127 N.Hess        CHANGE/4114 M.MASS 4114 M.MASSEY      4114 M.MASSEY      4114 M.MASSEY      4114 M.MASSEY     
4127 N.Hess        4127 N.Hess        4114 M.MASSEY      4114 M.MASSEY      4114 M.MASSEY      4114 M.MASSEY      4114 M.MASSEY     

Back to Table of Contents

WEEK OF Aug. 04, 2014
Run Ends 6am                                          
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
BEAM   LINE 1-5  
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
4035 S.Fleischm/AP AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 2-1  
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
4066 K.Stone/AP    AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 2-2  
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
8875 D.VAN CAMP/AP AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 2-3  
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
4059 C.HANSEL/AP   AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 4-1  
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
3977 A.WISE/AP     AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 4-2  
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
8877 T.MATSUI/AP   AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 4-3  
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
4059 C.HANSEL/AP   AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 6-2  
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
8090 J.Nelson W/AP AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 7-2  
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
3979 G.SU/AP       AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 7-3  
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
9705 J.JCAP/AP     AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 9-3  
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
DOWN/AP            AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 10-2 
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
91X9 E.Clifford/AP AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 11-2 
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
3875 S.CONRADSO/AP AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 11-3 
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
4036 N.Deb/AP      AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              
BEAM   LINE 14-3 
Aug. 04, 2014      Aug. 05, 2014      Aug. 06, 2014      Aug. 07, 2014      Aug. 08, 2014      Aug. 09, 2014      Aug. 10, 2014     
4114 M.MASSEY/AP   AP/CLSD            CLSD               CLSD               CLSD               CLSD               CLSD              
AP                 CLSD               CLSD               CLSD               CLSD               CLSD               CLSD              