SSRL Beam Port Schedule


X-ray beam lines are scheduled in three 8-hour shifts each day (11pm-7am; 7am-3pm; 3-11pm). Checkouts/changeovers are scheduled during the 7am-3pm shift. Most X-ray beam lines officially turn over to the next user much earlier than 3pm depending on the equipment requirements and staff availability. At least 1 week prior to arrival, users need to contact the designated beam line engineer/scientist (see SSRL Beam Lines by Number for contact information) to discuss beam line configuration needs and start times. Unless instructed otherwise, experiments end at 7am (6am when Maintenance (MA) or Accelerator Physics (AP) are scheduled).


Weeks of the Schedule
 Oct. 29, 2012   Nov. 05, 2012   Nov. 12, 2012   Nov. 19, 2012 
 Nov. 26, 2012   Dec. 03, 2012   Dec. 10, 2012   Dec. 17, 2012 
 Dec. 24, 2012   Dec. 31, 2012   Jan. 07, 2013   Jan. 14, 2013 
 Jan. 21, 2013   Jan. 28, 2013   Feb. 04, 2013   Feb. 11, 2013 
 Feb. 18, 2013   Feb. 25, 2013   Mar. 04, 2013   Mar. 11, 2013 
 Mar. 18, 2013   Mar. 25, 2013   Apr. 01, 2013   Apr. 08, 2013 
 Apr. 15, 2013   Apr. 22, 2013   Apr. 29, 2013   May 06, 2013 
 May 13, 2013   May 20, 2013   May 27, 2013   Jun. 03, 2013 
 Jun. 10, 2013   Jun. 17, 2013   Jun. 24, 2013   Jul. 01, 2013 
 Jul. 08, 2013   Jul. 15, 2013   Jul. 22, 2013   Jul. 29, 2013 
 Aug. 05, 2013 

Back to Table of Contents

WEEK OF Oct. 29, 2012
                                         
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
BEAM   LINE 1-4  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Oct. 29, 2012      Oct. 30, 2012      Oct. 31, 2012      Nov. 01, 2012      Nov. 02, 2012      Nov. 03, 2012      Nov. 04, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Nov. 05, 2012
            SPEAR starts                              
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
BEAM   LINE 1-4  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 1-5  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               8856 C.TROXEL      8856 C.TROXEL      1F85 G.GIRI        1F85 G.GIRI       
DOWN               DOWN               8856 C.TROXEL      8856 C.TROXEL      Xray CHECKOUT/1F85 1F85 G.GIRI        1F85 G.GIRI       
DOWN               DOWN               8856 C.TROXEL      8856 C.TROXEL      1F85 G.GIRI        1F85 G.GIRI        1F85 G.GIRI       
BEAM   LINE 2-2  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               Unscheduled        91R4 S.GHIMIRE     91R4 S.GHIMIRE     91R4 S.GHIMIRE    
DOWN               DOWN               Unscheduled        Xray CHECKOUT/91R4 91R4 S.GHIMIRE     91R4 S.GHIMIRE     91R4 S.GHIMIRE    
DOWN               DOWN               Unscheduled        91R4 S.GHIMIRE     91R4 S.GHIMIRE     91R4 S.GHIMIRE     91R4 S.GHIMIRE    
BEAM   LINE 2-3  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
DOWN               DOWN               CHANGE/8867 S.WEBB 8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
DOWN               DOWN               8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
BEAM   LINE 4-1  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               8828 C.TROXEL      8828 C.TROXEL      3762 M.MASSEY      3762 M.MASSEY     
DOWN               DOWN               CHANGE/8828 C.TROX 8828 C.TROXEL      Xray CHECKOUT/3762 3762 M.MASSEY      3762 M.MASSEY     
DOWN               DOWN               8828 C.TROXEL      8828 C.TROXEL      3762 M.MASSEY      3762 M.MASSEY      3762 M.MASSEY     
BEAM   LINE 4-2  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI     
DOWN               DOWN               CHANGE/8877 T.MATS 8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI     
DOWN               DOWN               8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI      8877 T.MATSUI     
BEAM   LINE 4-3  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN     
DOWN               DOWN               SMB CHECKOUT/3532  3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN     
DOWN               DOWN               3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN     
BEAM   LINE 6-2  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               FACI               FACI               FACI               FACI              
DOWN               DOWN               FACI               FACI               FACI               FACI               FACI              
DOWN               DOWN               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-2  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               3625 S.SWEETNAM    3625 S.SWEETNAM    3709 J.CHANG       3709 J.CHANG      
DOWN               DOWN               Xray CHECKOUT/3625 3625 S.SWEETNAM    Xray CHECKOUT/3709 3709 J.CHANG       3709 J.CHANG      
DOWN               DOWN               3625 S.SWEETNAM    3625 S.SWEETNAM    3709 J.CHANG       3709 J.CHANG       3709 J.CHANG      
BEAM   LINE 7-3  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               Unscheduled        3681 S.GEORGE      3681 S.GEORGE      3681 S.GEORGE     
DOWN               DOWN               Unscheduled        SMB CHECKOUT/3681  3681 S.GEORGE      3681 S.GEORGE      3681 S.GEORGE     
DOWN               DOWN               Unscheduled        3681 S.GEORGE      3681 S.GEORGE      3681 S.GEORGE      3681 S.GEORGE     
BEAM   LINE 9-3  
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               FACI               8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD  
DOWN               DOWN               FACI               Xray CHECKOUT/8078 8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD  
DOWN               DOWN               FACI               8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD  
BEAM   LINE 11-2 
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR     
DOWN               DOWN               MES CHECKOUT/8860  8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR     
DOWN               DOWN               8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR     
BEAM   LINE 11-3 
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  3578 J.Nelson Weke 3578 J.Nelson Weke
DOWN               DOWN               CHANGE/8875 D.VAN  8875 D.VAN CAMPEN  Xray CHECKOUT/3578 3578 J.Nelson Weke 3578 J.Nelson Weke
DOWN               DOWN               8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  3578 J.Nelson Weke 3578 J.Nelson Weke 3578 J.Nelson Weke
BEAM   LINE 14-3 
Nov. 05, 2012      Nov. 06, 2012      Nov. 07, 2012      Nov. 08, 2012      Nov. 09, 2012      Nov. 10, 2012      Nov. 11, 2012     
DOWN               DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Nov. 12, 2012
                                         
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
BEAM   LINE 1-4  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
Unscheduled        3800 E.COLETTA     3800 E.COLETTA     3800 E.COLETTA     3856 C.Ryan        3856 C.Ryan        3856 C.Ryan       
CHANGE/3800 E.COLE 3800 E.COLETTA     3800 E.COLETTA     CHANGE/3856 C.Ryan 3856 C.Ryan        3856 C.Ryan        3856 C.Ryan       
3800 E.COLETTA     3800 E.COLETTA     3800 E.COLETTA     3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan       
BEAM   LINE 1-5  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
Unscheduled        8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   Unscheduled        Unscheduled        Unscheduled       
CHANGE/8078 S.MANN 8078 S.MANNSFELD   8078 S.MANNSFELD   Unscheduled        Unscheduled        Unscheduled        Unscheduled       
8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
1F85 G.GIRI        1F85 G.GIRI        3651 A.Sharenko    3651 A.Sharenko    3651 A.Sharenko    3855 M.Scarpulla   3855 M.Scarpulla  
1F85 G.GIRI        c/3651             3651 A.Sharenko    3651 A.Sharenko    Xray CHECKOUT/3855 3855 M.Scarpulla   3855 M.Scarpulla  
1F85 G.GIRI        3651 A.Sharenko    3651 A.Sharenko    3651 A.Sharenko    3855 M.Scarpulla   3855 M.Scarpulla   3855 M.Scarpulla  
BEAM   LINE 2-2  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
91R4 S.GHIMIRE     91R4 S.GHIMIRE     91R4 S.GHIMIRE     Unscheduled        Unscheduled        Unscheduled        Unscheduled       
91R4 S.GHIMIRE     91R4 S.GHIMIRE     Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
91R4 S.GHIMIRE     91R4 S.GHIMIRE     Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
8867 S.WEBB        3555 J.Wilcox      3555 J.Wilcox      3574 S.FENDORF     3574 S.FENDORF     3726 A.SEYFFERTH   3726 A.SEYFFERTH  
CHANGE/3555 J.Wilc 3555 J.Wilcox      CHANGE/3574 S.FEND 3574 S.FENDORF     CHANGE/3726 A.SEYF 3726 A.SEYFFERTH   3726 A.SEYFFERTH  
3555 J.Wilcox      3555 J.Wilcox      3574 S.FENDORF     3574 S.FENDORF     3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
BEAM   LINE 4-1  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
3762 M.MASSEY      3762 M.MASSEY      3712 J.PENA        3712 J.PENA        3712 J.PENA        3510 C.Van Genucht 3510 C.Van Genucht
3762 M.MASSEY      MES CHECKOUT/3712  3712 J.PENA        3712 J.PENA        MES CHECKOUT/3510  3510 C.Van Genucht 3510 C.Van Genucht
3762 M.MASSEY      3712 J.PENA        3712 J.PENA        3712 J.PENA        3510 C.Van Genucht 3510 C.Van Genucht 3510 C.Van Genucht
BEAM   LINE 4-2  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
8877 T.MATSUI      3358 D.Herschlag   10K4 L.Chen        3806 A.Edwards     8877 T.MATSUI      3704 L.HIRST       3704 L.HIRST      
CHANGE/3358 D.Hers CHANGE/10K4 L.Chen CHANGE/3806 A.Edwa CHANGE/8877 T.MATS CHANGE/3704 L.HIRS 3704 L.HIRST       3704 L.HIRST      
3358 D.Herschlag   10K4 L.Chen        3806 A.Edwards     8877 T.MATSUI      3704 L.HIRST       3704 L.HIRST       3704 L.HIRST      
BEAM   LINE 4-3  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
3532 B.HEDMAN      3380 J.BARGAR      3380 J.BARGAR      3823 Y.SHI         3823 Y.SHI         8879 T.WENG        8879 T.WENG       
SMB CHECKOUT/3380  3380 J.BARGAR      SMB CHECKOUT/3823  3823 Y.SHI         SMB CHECKOUT/8879  8879 T.WENG        8879 T.WENG       
3380 J.BARGAR      3380 J.BARGAR      3823 Y.SHI         3823 Y.SHI         8879 T.WENG        8879 T.WENG        8879 T.WENG       
BEAM   LINE 6-2  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-2  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
3709 J.CHANG       3289 M.CHABINYC    3289 M.CHABINYC    3289 M.CHABINYC    3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE
Xray CHECKOUT/3289 3289 M.CHABINYC    3289 M.CHABINYC    Xray CHECKOUT/3294 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE
3289 M.CHABINYC    3289 M.CHABINYC    3289 M.CHABINYC    3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE
BEAM   LINE 7-3  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
3681 S.GEORGE      8079 T.WENG        8079 T.WENG        8079 T.WENG        8079 T.WENG        3637 F.JALILEHVAND 3637 F.JALILEHVAND
SMB CHECKOUT/8079  8079 T.WENG        8079 T.WENG        8079 T.WENG        SMB CHECKOUT/3637  3637 F.JALILEHVAND 3637 F.JALILEHVAND
8079 T.WENG        8079 T.WENG        8079 T.WENG        8079 T.WENG        3637 F.JALILEHVAND 3637 F.JALILEHVAND 3637 F.JALILEHVAND
BEAM   LINE 9-3  
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
8078 S.MANNSFELD   3799 Y.LIU         3799 Y.LIU         8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8015 A.MEHTA      
Xray CHECKOUT/3799 3799 Y.LIU         Xray CHECKOUT/8818 8818 A.MEHTA       8818 A.MEHTA       CHANGE/8015 A.MEHT 8015 A.MEHTA      
3799 Y.LIU         3799 Y.LIU         8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 11-2 
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR      3574 S.FENDORF     3574 S.FENDORF    
8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR      MES CHECKOUT/3574  3574 S.FENDORF     3574 S.FENDORF    
8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR      8860 J.BARGAR      3574 S.FENDORF     3574 S.FENDORF     3574 S.FENDORF    
BEAM   LINE 11-3 
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
3578 J.Nelson Weke 3819 R.Wang        3819 R.Wang        91S1 M.TONEY       91S1 M.TONEY       3625 S.SWEETNAM    3625 S.SWEETNAM   
CHANGE/3819 R.Wang 3819 R.Wang        Xray CHECKOUT/91S1 91S1 M.TONEY       Xray CHECKOUT/3625 3625 S.SWEETNAM    3625 S.SWEETNAM   
3819 R.Wang        3819 R.Wang        91S1 M.TONEY       91S1 M.TONEY       3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM   
BEAM   LINE 14-3 
Nov. 12, 2012      Nov. 13, 2012      Nov. 14, 2012      Nov. 15, 2012      Nov. 16, 2012      Nov. 17, 2012      Nov. 18, 2012     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Nov. 19, 2012
            Down ~4-9 pm       HOLIDAY-Down       Resume ~noon       100mALowAlpha      100mA LowAlph     
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
BEAM   LINE 1-4  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
3856 C.Ryan        3779 E.Davidson    3779 E.Davids/DOWN DOWN               DOWN               Unscheduled        Unscheduled       
CHANGE/3779 E.Davi 3779 E.Davidson    DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
3779 E.Davidson    3779 E.Davidson    DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 1-5  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
Unscheduled        N002 A.VAILIONIS   DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
CHANGE/N002 A.VAIL N002 A.VAILIONIS   DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
N002 A.VAILIONIS   Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
3855 M.Scarpulla   3855 M.Scarpulla   3855 M.Scarpu/DOWN DOWN               DOWN               3855 M.Scarpulla   3855 M.Scarpulla  
3855 M.Scarpulla   3855 M.Scarpulla   DOWN               DOWN               DOWN               3855 M.Scarpulla   3855 M.Scarpulla  
3855 M.Scarpulla   3855 M.Scarpulla   DOWN               DOWN               3855 M.Scarpulla   3855 M.Scarpulla   3855 M.Scarpulla  
BEAM   LINE 2-2  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
Unscheduled        Unscheduled        DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
3726 A.SEYFFERTH   3635 J.Addison     8883 B.KOCAR/DOWN  DOWN               DOWN               8883 B.KOCAR       8883 B.KOCAR      
CHANGE/3635 J.Addi CHANGE/8883 B.KOCA DOWN               DOWN               DOWN               8883 B.KOCAR       8883 B.KOCAR      
3635 J.Addison     8883 B.KOCAR       DOWN               DOWN               8883 B.KOCAR       8883 B.KOCAR       8883 B.KOCAR      
BEAM   LINE 4-1  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
3510 C.Van Genucht 3823 Y.SHI         3823 Y.SHI/DOWN    DOWN               DOWN               3508 S.HAYES       3508 S.HAYES      
Xray CHECKOUT/3823 3823 Y.SHI         DOWN               DOWN               DOWN               3508 S.HAYES       3508 S.HAYES      
3823 Y.SHI         3823 Y.SHI         DOWN               DOWN               3508 S.HAYES       3508 S.HAYES       3508 S.HAYES      
BEAM   LINE 4-2  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
3704 L.HIRST       3704 L.HIRST       10K5 A.FYFE/DOWN   DOWN               DOWN               FACI               FACI              
3704 L.HIRST       CHANGE/10K5 A.FYFE DOWN               DOWN               DOWN               FACI               FACI              
3704 L.HIRST       10K5 A.FYFE        DOWN               DOWN               FACI               FACI               FACI              
BEAM   LINE 4-3  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
8879 T.WENG        3637 F.JALILEHVAND 3761 R.SZILAG/DOWN DOWN               DOWN               3761 R.SZILAGYI    3761 R.SZILAGYI   
SMB CHECKOUT/3637  SMB CHECKOUT/3761  DOWN               DOWN               DOWN               3761 R.SZILAGYI    3761 R.SZILAGYI   
3637 F.JALILEHVAND 3761 R.SZILAGYI    DOWN               DOWN               3761 R.SZILAGYI    3761 R.SZILAGYI    3761 R.SZILAGYI   
BEAM   LINE 6-2  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
FACI               FACI               FACI/DOWN          DOWN               DOWN               FACI               FACI              
FACI               FACI               DOWN               DOWN               DOWN               FACI               FACI              
FACI               FACI               DOWN               DOWN               FACI               FACI               FACI              
BEAM   LINE 7-2  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
3294 S.HIMMELBERGE 3762 M.MASSEY      3762 M.MASSEY/DOWN DOWN               DOWN               3762 M.MASSEY      3762 M.MASSEY     
Xray CHECKOUT/3762 3762 M.MASSEY      DOWN               DOWN               DOWN               3762 M.MASSEY      3762 M.MASSEY     
3762 M.MASSEY      3762 M.MASSEY      DOWN               DOWN               3762 M.MASSEY      3762 M.MASSEY      3762 M.MASSEY     
BEAM   LINE 7-3  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
3637 F.JALILEHVAND 3667 S.TIAN        3667 S.TIAN/DOWN   DOWN               DOWN               3761 R.SZILAGYI    3761 R.SZILAGYI   
SMB CHECKOUT/3667  3667 S.TIAN        DOWN               DOWN               DOWN               3761 R.SZILAGYI    3761 R.SZILAGYI   
3667 S.TIAN        3667 S.TIAN        DOWN               DOWN               3761 R.SZILAGYI    3761 R.SZILAGYI    3761 R.SZILAGYI   
BEAM   LINE 9-3  
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
8015 A.MEHTA       3820 J.Groves      3820 J.Groves/DOWN DOWN               DOWN               3820 J.Groves      3820 J.Groves     
CHANGE/3820 J.Grov 3820 J.Groves      DOWN               DOWN               DOWN               3820 J.Groves      3820 J.Groves     
3820 J.Groves      3820 J.Groves      DOWN               DOWN               3820 J.Groves      3820 J.Groves      3820 J.Groves     
BEAM   LINE 11-2 
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
3574 S.FENDORF     3650 Y.Gorlin      3412 G.BROWN/DOWN  DOWN               DOWN               3412 G.BROWN       3412 G.BROWN      
MES CHECKOUT/3650  MES CHECKOUT/3412  DOWN               DOWN               DOWN               3412 G.BROWN       3412 G.BROWN      
3650 Y.Gorlin      3412 G.BROWN       DOWN               DOWN               3412 G.BROWN       3412 G.BROWN       3412 G.BROWN      
BEAM   LINE 11-3 
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
3625 S.SWEETNAM    3731 A.AYZNER      3731 A.AYZNER/DOWN DOWN               DOWN               1F76 Y.Diao        1F76 Y.Diao       
Xray CHECKOUT/3731 3731 A.AYZNER      DOWN               DOWN               DOWN               1F76 Y.Diao        1F76 Y.Diao       
3731 A.AYZNER      3731 A.AYZNER      DOWN               DOWN               1F76 Y.Diao        1F76 Y.Diao        1F76 Y.Diao       
BEAM   LINE 14-3 
Nov. 19, 2012      Nov. 20, 2012      Nov. 21, 2012      Nov. 22, 2012      Nov. 23, 2012      Nov. 24, 2012      Nov. 25, 2012     
Unscheduled        Unscheduled        DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
Unscheduled        Unscheduled        DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Nov. 26, 2012
MA       AP                                    
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
BEAM   LINE 1-4  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
MA                 AP                 AP                 3416 E.Davidson    3416 E.Davidson    3416 E.Davidson    3416 E.Davidson   
MA                 AP                 CHANGE/3416 E.Davi 3416 E.Davidson    3416 E.Davidson    3416 E.Davidson    3416 E.Davidson   
MA/AP              AP                 3416 E.Davidson    3416 E.Davidson    3416 E.Davidson    3416 E.Davidson    3416 E.Davidson   
BEAM   LINE 1-5  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
3855 M.Scarpull/MA AP                 AP                 3289 M.CHABINYC    3289 M.CHABINYC    3625 S.SWEETNAM    3625 S.SWEETNAM   
MA                 AP                 Xray CHECKOUT/3289 3289 M.CHABINYC    Xray CHECKOUT/3625 3625 S.SWEETNAM    3625 S.SWEETNAM   
MA/AP              AP                 3289 M.CHABINYC    3289 M.CHABINYC    3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM   
BEAM   LINE 2-2  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
8883 B.KOCAR/MA    AP                 AP                 3783 C.FULLER      3783 C.FULLER      3771 Y.Slowey      3771 Y.Slowey     
MA                 AP                 CHANGE/3783 C.FULL 3783 C.FULLER      CHANGE/3771 Y.Slow 3771 Y.Slowey      3771 Y.Slowey     
MA/AP              AP                 3783 C.FULLER      3783 C.FULLER      3771 Y.Slowey      3771 Y.Slowey      3771 Y.Slowey     
BEAM   LINE 4-1  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
3508 S.HAYES/MA    AP                 AP                 3627 F.BRIDGES     3627 F.BRIDGES     3627 F.BRIDGES     3600 F.BRIDGES    
MA                 AP                 Xray CHECKOUT/3627 3627 F.BRIDGES     3627 F.BRIDGES     CHANGE/3600 F.BRID 3600 F.BRIDGES    
MA/AP              AP                 3627 F.BRIDGES     3627 F.BRIDGES     3627 F.BRIDGES     3600 F.BRIDGES     3600 F.BRIDGES    
BEAM   LINE 4-2  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
FACI/MA            AP                 AP                 3575 L.CARTER      3752 S.WILBANKS    3295 K.LEE         3765 T.Bryan      
MA                 AP                 CHANGE/3575 L.CART CHANGE/3752 S.WILB CHANGE/3295 K.LEE  CHANGE/3765 T.Brya 3765 T.Bryan      
MA/AP              AP                 3575 L.CARTER      3752 S.WILBANKS    3295 K.LEE         3765 T.Bryan       3765 T.Bryan      
BEAM   LINE 4-3  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
3761 R.SZILAGYI/MA AP                 AP                 3429 O.DUCKWORTH   3429 O.DUCKWORTH   3603 J.CHOROVER    3603 J.CHOROVER   
MA                 AP                 SMB CHECKOUT/3429  3429 O.DUCKWORTH   SMB CHECKOUT/3603  3603 J.CHOROVER    3603 J.CHOROVER   
MA/AP              AP                 3429 O.DUCKWORTH   3429 O.DUCKWORTH   3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
BEAM   LINE 6-2  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
FACI/MA            AP                 AP                 8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG       
MA                 AP                 Xray CHECKOUT/8879 8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG       
MA/AP              AP                 8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG       
BEAM   LINE 7-2  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
3762 M.MASSEY/MA   AP                 AP                 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
MA                 AP                 Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
MA/AP              AP                 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 7-3  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
3761 R.SZILAGYI/MA AP                 AP                 3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN  
MA                 AP                 SMB CHECKOUT/3282  3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN  
MA/AP              AP                 3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN  
BEAM   LINE 9-3  
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
DOWN/MA            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
MA/AP              AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
3820 J.Groves/MA   AP                 AP                 3657 M.Biegalski   3657 M.Biegalski   3657 M.Biegalski   3657 M.Biegalski  
MA                 AP                 Xray CHECKOUT/3657 3657 M.Biegalski   3657 M.Biegalski   3657 M.Biegalski   3657 M.Biegalski  
MA/AP              AP                 3657 M.Biegalski   3657 M.Biegalski   3657 M.Biegalski   3657 M.Biegalski   3657 M.Biegalski  
BEAM   LINE 11-2 
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
3412 G.BROWN/MA    AP                 AP                 3429 O.DUCKWORTH   3429 O.DUCKWORTH   3740 C.SANTELLI    3740 C.SANTELLI   
MA                 AP                 MES CHECKOUT/3429  3429 O.DUCKWORTH   MES CHECKOUT/3740  3740 C.SANTELLI    3740 C.SANTELLI   
MA/AP              AP                 3429 O.DUCKWORTH   3429 O.DUCKWORTH   3740 C.SANTELLI    3740 C.SANTELLI    3740 C.SANTELLI   
BEAM   LINE 11-3 
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
1F76 Y.Diao/MA     AP                 AP                 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3834 H.Duncan      3834 H.Duncan     
MA                 AP                 Xray CHECKOUT/3294 3294 S.HIMMELBERGE Xray CHECKOUT/3834 3834 H.Duncan      3834 H.Duncan     
MA/AP              AP                 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3834 H.Duncan      3834 H.Duncan      3834 H.Duncan     
BEAM   LINE 14-3 
Nov. 26, 2012      Nov. 27, 2012      Nov. 28, 2012      Nov. 29, 2012      Nov. 30, 2012      Dec. 01, 2012      Dec. 02, 2012     
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Dec. 03, 2012
                                         
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
BEAM   LINE 1-4  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
3416 E.Davidson    3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3607 N.BALSARA     3607 N.BALSARA    
CHANGE/3791 C.TASS 3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     CHANGE/3607 N.BALS 3607 N.BALSARA     3607 N.BALSARA    
3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA    
BEAM   LINE 1-5  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
3625 S.SWEETNAM    Unscheduled        Unscheduled        3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang       
Unscheduled        Unscheduled        Xray CHECKOUT/3819 3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang       
Unscheduled        Unscheduled        3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang       
BEAM   LINE 2-2  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
3771 Y.Slowey      3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3689 J.BARGAR      8067 S.WEBB        8067 S.WEBB       
CHANGE/3603 J.CHOR 3603 J.CHOROVER    3603 J.CHOROVER    CHANGE/3689 J.BARG CHANGE/8067 S.WEBB 8067 S.WEBB        8067 S.WEBB       
3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3689 J.BARGAR      8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
BEAM   LINE 4-1  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
3600 F.BRIDGES     3557 F.BRIDGES     3557 F.BRIDGES     3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT      
CHANGE/3557 F.BRID 3557 F.BRIDGES     Xray CHECKOUT/3329 3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT      
3557 F.BRIDGES     3557 F.BRIDGES     3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT      
BEAM   LINE 4-2  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
3765 T.Bryan       3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
CHANGE/3577 C.SAFI 3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
BEAM   LINE 4-3  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
3603 J.CHOROVER    8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT      
SMB CHECKOUT/8818  8818 A.MEHTA       8818 A.MEHTA       SMB CHECKOUT/3329  3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT      
8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT      
BEAM   LINE 6-2  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        3722 S.CHRISTENSEN 3722 S.CHRISTENSEN 3722 S.CHRISTENSEN
8879 T.WENG        8879 T.WENG        8879 T.WENG        Xray CHECKOUT/3722 3722 S.CHRISTENSEN 3722 S.CHRISTENSEN 3722 S.CHRISTENSEN
8879 T.WENG        8879 T.WENG        8879 T.WENG        3722 S.CHRISTENSEN 3722 S.CHRISTENSEN 3722 S.CHRISTENSEN 3722 S.CHRISTENSEN
BEAM   LINE 7-2  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
8051 M.TONEY       3807 T.GAO         3807 T.GAO         3807 T.GAO         91P9 Y.Lee         91P9 Y.Lee         91P9 Y.Lee        
Xray CHECKOUT/3807 3807 T.GAO         3807 T.GAO         Xray CHECKOUT/91P9 91P9 Y.Lee         91P9 Y.Lee         91P9 Y.Lee        
3807 T.GAO         3807 T.GAO         3807 T.GAO         91P9 Y.Lee         91P9 Y.Lee         91P9 Y.Lee         91P9 Y.Lee        
BEAM   LINE 7-3  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
3282 N.BLACKBURN   3697 G.Meloni      3697 G.Meloni      3697 G.Meloni      3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER   
SMB CHECKOUT/3697  3697 G.Meloni      3697 G.Meloni      SMB CHECKOUT/3593  3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER   
3697 G.Meloni      3697 G.Meloni      3697 G.Meloni      3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER   
BEAM   LINE 9-3  
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
3657 M.Biegalski   8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
Xray CHECKOUT/8818 8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
BEAM   LINE 11-2 
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
3740 C.SANTELLI    3757 R.Bassiri     3757 R.Bassiri     3757 R.Bassiri     3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
MES CHECKOUT/3757  3757 R.Bassiri     3757 R.Bassiri     MES CHECKOUT/3603  3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
3757 R.Bassiri     3757 R.Bassiri     3757 R.Bassiri     3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
BEAM   LINE 11-3 
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
3834 H.Duncan      3834 H.Duncan      1F86 C.Cismasu     1F86 C.Cismasu     1F86 C.Cismasu     3679 S.FENDORF     3679 S.FENDORF    
3834 H.Duncan      Xray CHECKOUT/1F86 1F86 C.Cismasu     1F86 C.Cismasu     Xray CHECKOUT/3679 3679 S.FENDORF     3679 S.FENDORF    
3834 H.Duncan      1F86 C.Cismasu     1F86 C.Cismasu     1F86 C.Cismasu     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    
BEAM   LINE 14-3 
Dec. 03, 2012      Dec. 04, 2012      Dec. 05, 2012      Dec. 06, 2012      Dec. 07, 2012      Dec. 08, 2012      Dec. 09, 2012     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Dec. 10, 2012
AP       AP                                    
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
BEAM   LINE 1-4  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
3607 N.BALSARA/AP  AP                 AP                 3745 B.Boudouris   3745 B.Boudouris   3745 B.Boudouris   3745 B.Boudouris  
AP                 AP                 CHANGE/3745 B.Boud 3745 B.Boudouris   3745 B.Boudouris   3745 B.Boudouris   3745 B.Boudouris  
AP                 AP                 3745 B.Boudouris   3745 B.Boudouris   3745 B.Boudouris   3745 B.Boudouris   3745 B.Boudouris  
BEAM   LINE 1-5  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
AP                 AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled       
AP                 AP                 CHANGE/N002 A.VAIL N002 A.VAILIONIS   CHANGE/N002 A.VAIL N002 A.VAILIONIS   Unscheduled       
AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
3819 R.Wang/AP     AP                 AP                 91S4 M.KANAN       91S4 M.KANAN       91S4 M.KANAN       91S4 M.KANAN      
AP                 AP                 Xray CHECKOUT/91S4 91S4 M.KANAN       91S4 M.KANAN       91S4 M.KANAN       91S4 M.KANAN      
AP                 AP                 91S4 M.KANAN       91S4 M.KANAN       91S4 M.KANAN       91S4 M.KANAN       91S4 M.KANAN      
BEAM   LINE 2-2  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
8067 S.WEBB/AP     AP                 AP                 3672 S.CONRADSON   3672 S.CONRADSON   3666 S.CONRADSON   3666 S.CONRADSON  
AP                 AP                 CHANGE/3672 S.CONR 3672 S.CONRADSON   CHANGE/3666 S.CONR 3666 S.CONRADSON   3666 S.CONRADSON  
AP                 AP                 3672 S.CONRADSON   3672 S.CONRADSON   3666 S.CONRADSON   3666 S.CONRADSON   3666 S.CONRADSON  
BEAM   LINE 4-1  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
3329 S.SCOTT/AP    AP                 AP                 3849 S.LEE         3849 S.LEE         3567 S.LEE         3567 S.LEE        
AP                 AP                 Xray CHECKOUT/3849 3849 S.LEE         CHANGE/3567 S.LEE  3567 S.LEE         3567 S.LEE        
AP                 AP                 3849 S.LEE         3849 S.LEE         3567 S.LEE         3567 S.LEE         3567 S.LEE        
BEAM   LINE 4-2  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
3577 C.SAFINYA/AP  AP                 AP                 8877 T.MATSUI      8847 T.WEISS       3752 S.WILBANKS    3434 A.Sali       
AP                 AP                 CHANGE/8877 T.MATS CHANGE/8847 T.WEIS CHANGE/3752 S.WILB CHANGE/3434 A.Sali 3434 A.Sali       
AP                 AP                 8877 T.MATSUI      8847 T.WEISS       3752 S.WILBANKS    3434 A.Sali        3434 A.Sali       
BEAM   LINE 4-3  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
3329 S.SCOTT/AP    AP                 AP                 3818 M.DOEFF       3851 T.BORCH       3851 T.BORCH       3851 T.BORCH      
AP                 AP                 SMB CHECKOUT/3818  SMB CHECKOUT/3851  3851 T.BORCH       3851 T.BORCH       3851 T.BORCH      
AP                 AP                 3818 M.DOEFF       3851 T.BORCH       3851 T.BORCH       3851 T.BORCH       3851 T.BORCH      
BEAM   LINE 6-2  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
3722 S.CHRISTEN/AP AP                 AP                 8859 B.JOHNSON     8072 J.HAYTER      8072 J.HAYTER      8072 J.HAYTER     
AP                 AP                 Xray CHECKOUT/8859 CHANGE/8072 J.HAYT 8072 J.HAYTER      8072 J.HAYTER      CHANGE/8041 J.HAYT
AP                 AP                 8859 B.JOHNSON     8072 J.HAYTER      8072 J.HAYTER      8072 J.HAYTER      8041 J.HAYTER     
BEAM   LINE 7-2  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
91P9 Y.Lee/AP      AP                 AP                 3543 T.FORREST     3543 T.FORREST     3543 T.FORREST     3543 T.FORREST    
AP                 AP                 Xray CHECKOUT/3543 3543 T.FORREST     3543 T.FORREST     3543 T.FORREST     3543 T.FORREST    
AP                 AP                 3543 T.FORREST     3543 T.FORREST     3543 T.FORREST     3543 T.FORREST     3543 T.FORREST    
BEAM   LINE 7-3  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
3593 T.STEMMLER/AP AP                 AP                 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS
AP                 AP                 SMB CHECKOUT/3324  3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS
AP                 AP                 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS
BEAM   LINE 9-3  
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
8818 A.MEHTA/AP    AP                 AP                 8867 S.WEBB        8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 Xray CHECKOUT/8867 CHANGE/8015 A.MEHT 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 8867 S.WEBB        8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 11-2 
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
3603 J.CHOROVER/AP AP                 AP                 3746 W.LUKENS      3746 W.LUKENS      3467 C.BOOTH       3467 C.BOOTH      
AP                 AP                 MES CHECKOUT/3746  3746 W.LUKENS      MES CHECKOUT/3467  3467 C.BOOTH       3467 C.BOOTH      
AP                 AP                 3746 W.LUKENS      3746 W.LUKENS      3467 C.BOOTH       3467 C.BOOTH       3467 C.BOOTH      
BEAM   LINE 11-3 
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
3679 S.FENDORF/AP  AP                 AP                 3854 C.Richardson  3854 C.Richardson  3818 M.DOEFF       3818 M.DOEFF      
AP                 AP                 Xray CHECKOUT/3854 3854 C.Richardson  Xray CHECKOUT/3818 3818 M.DOEFF       3818 M.DOEFF      
AP                 AP                 3854 C.Richardson  3854 C.Richardson  3818 M.DOEFF       3818 M.DOEFF       3818 M.DOEFF      
BEAM   LINE 14-3 
Dec. 10, 2012      Dec. 11, 2012      Dec. 12, 2012      Dec. 13, 2012      Dec. 14, 2012      Dec. 15, 2012      Dec. 16, 2012     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Dec. 17, 2012
                        Down 6 AM                  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
BEAM   LINE 1-4  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
3745 B.Boudouris   3822 O.Trejo       3822 O.Trejo       3822 O.Trejo       3822 O.Trejo/DOWN  DOWN               DOWN              
CHANGE/3822 O.Trej 3822 O.Trejo       3822 O.Trejo       3822 O.Trejo       DOWN               DOWN               DOWN              
3822 O.Trejo       3822 O.Trejo       3822 O.Trejo       3822 O.Trejo       DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
Unscheduled        8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA/DOWN  DOWN               DOWN              
CHANGE/8818 A.MEHT 8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       DOWN               DOWN               DOWN              
8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
91S4 M.KANAN       91S4 M.KANAN       3815 D.Xie         3815 D.Xie         3815 D.Xie/DOWN    DOWN               DOWN              
91S4 M.KANAN       Xray CHECKOUT/3815 3815 D.Xie         3815 D.Xie         DOWN               DOWN               DOWN              
91S4 M.KANAN       3815 D.Xie         3815 D.Xie         3815 D.Xie         DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
3666 S.CONRADSON   3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHO/DOWN DOWN               DOWN              
CHANGE/3763 T.PUNS 3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     DOWN               DOWN               DOWN              
3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
3567 S.LEE         3501 P.O'DAY       3501 P.O'DAY       3501 P.O'DAY       3501 P.O'DAY/DOWN  DOWN               DOWN              
Xray CHECKOUT/3501 3501 P.O'DAY       3501 P.O'DAY       3501 P.O'DAY       DOWN               DOWN               DOWN              
3501 P.O'DAY       3501 P.O'DAY       3501 P.O'DAY       3501 P.O'DAY       DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
3434 A.Sali        Unscheduled        3744 A.SCHOEFFLER  3351 V.CHEREZOV    8047 T.WEISS/DOWN  DOWN               DOWN              
Unscheduled        CHANGE/3744 A.SCHO CHANGE/3351 V.CHER CHANGE/8047 T.WEIS DOWN               DOWN               DOWN              
Unscheduled        3744 A.SCHOEFFLER  3351 V.CHEREZOV    8047 T.WEISS       DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
3851 T.BORCH       3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS/DOWN  DOWN               DOWN              
SMB CHECKOUT/3589  3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS       DOWN               DOWN               DOWN              
3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS       DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
8041 J.HAYTER      CHANGE/3502 F.DE G 3549 S.HO          3549 S.HO          3549 S.HO/DOWN     DOWN               DOWN              
8041 J.HAYTER      CHANGE/3549 S.HO   3549 S.HO          3549 S.HO          DOWN               DOWN               DOWN              
8041 J.HAYTER      3549 S.HO          3549 S.HO          3549 S.HO          DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
3543 T.FORREST     91R8 W.LEE         91R8 W.LEE         91R8 W.LEE         91R8 W.LEE/DOWN    DOWN               DOWN              
Xray CHECKOUT/91R8 91R8 W.LEE         91R8 W.LEE         91R8 W.LEE         DOWN               DOWN               DOWN              
91R8 W.LEE         91R8 W.LEE         91R8 W.LEE         91R8 W.LEE         DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
3324 P.RIGGS-GELAS 3582 L.QUE         3582 L.QUE         3582 L.QUE         3582 L.QUE/DOWN    DOWN               DOWN              
SMB CHECKOUT/3582  3582 L.QUE         3582 L.QUE         3582 L.QUE         DOWN               DOWN               DOWN              
3582 L.QUE         3582 L.QUE         3582 L.QUE         3582 L.QUE         DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
8015 A.MEHTA       8015 A.MEHTA       3658 W.Fischer     3658 W.Fischer     3658 W.Fische/DOWN DOWN               DOWN              
8015 A.MEHTA       CHANGE/3658 W.Fisc 3658 W.Fischer     3658 W.Fischer     DOWN               DOWN               DOWN              
8015 A.MEHTA       3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
3467 C.BOOTH       3521 C.BOOTH       3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS/DOWN  DOWN               DOWN              
MES CHECKOUT/3521  MES CHECKOUT/3589  3589 J.DAVIS       3589 J.DAVIS       DOWN               DOWN               DOWN              
3521 C.BOOTH       3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS       DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
3818 M.DOEFF       3531 G.LOWRY       3531 G.LOWRY       3651 A.Sharenko    3651 A.Sharen/DOWN DOWN               DOWN              
Xray CHECKOUT/3531 3531 G.LOWRY       Xray CHECKOUT/3651 3651 A.Sharenko    DOWN               DOWN               DOWN              
3531 G.LOWRY       3531 G.LOWRY       3651 A.Sharenko    3651 A.Sharenko    DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 17, 2012      Dec. 18, 2012      Dec. 19, 2012      Dec. 20, 2012      Dec. 21, 2012      Dec. 22, 2012      Dec. 23, 2012     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              
Unscheduled        Unscheduled        Unscheduled        Unscheduled        DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 24, 2012
                                         
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
BEAM   LINE 1-4  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 24, 2012      Dec. 25, 2012      Dec. 26, 2012      Dec. 27, 2012      Dec. 28, 2012      Dec. 29, 2012      Dec. 30, 2012     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Dec. 31, 2012
                                         
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
BEAM   LINE 1-4  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-1  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-3  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 6-2  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-2  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 7-3  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-3  
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 14-3 
Dec. 31, 2012      Jan. 01, 2013      Jan. 02, 2013      Jan. 03, 2013      Jan. 04, 2013      Jan. 05, 2013      Jan. 06, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Jan. 07, 2013
AP       Ops Resume                                    
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
BEAM   LINE 1-4  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       3586 S.HALL        3586 S.HALL       
DOWN               CHANGE/8051 M.TONE 8051 M.TONEY       8051 M.TONEY       CHANGE/3586 S.HALL 3586 S.HALL        3586 S.HALL       
DOWN               8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       3586 S.HALL        3586 S.HALL        3586 S.HALL       
BEAM   LINE 1-5  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               Unscheduled        N002 A.VAILIONIS   3845 M.KOZINA      Unscheduled        Unscheduled       
DOWN               Unscheduled        CHANGE/N002 A.VAIL CHANGE/3845 M.KOZI Unscheduled        Unscheduled        Unscheduled       
DOWN               Unscheduled        N002 A.VAILIONIS   3845 M.KOZINA      Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               3408 K.HAYES       3408 K.HAYES       3826 J.Komadina    3826 J.Komadina    3826 J.Komadina   
DOWN               Xray CHECKOUT/3408 3408 K.HAYES       Xray CHECKOUT/3826 3826 J.Komadina    3826 J.Komadina    3826 J.Komadina   
DOWN               3408 K.HAYES       3408 K.HAYES       3826 J.Komadina    3826 J.Komadina    3826 J.Komadina    3826 J.Komadina   
BEAM   LINE 2-2  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3614 H.NICHOL      3614 H.NICHOL     
DOWN               CHANGE/3658 W.Fisc 3658 W.Fischer     3658 W.Fischer     CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL     
DOWN               3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
BEAM   LINE 4-1  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               91S2 S.Venkatachal 3408 K.HAYES       3408 K.HAYES       3671 E.Benson      3671 E.Benson     
DOWN               Xray CHECKOUT/91S2 Xray CHECKOUT/3408 3408 K.HAYES       Xray CHECKOUT/3671 3671 E.Benson      3671 E.Benson     
DOWN               91S2 S.Venkatachal 3408 K.HAYES       3408 K.HAYES       3671 E.Benson      3671 E.Benson      3671 E.Benson     
BEAM   LINE 4-2  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               8047 T.WEISS       3586 S.HALL        3586 S.HALL        3804 A.KENDALL     3804 A.KENDALL    
DOWN               CHANGE/8047 T.WEIS CHANGE/3586 S.HALL 3586 S.HALL        CHANGE/3804 A.KEND 3804 A.KENDALL     3804 A.KENDALL    
DOWN               8047 T.WEISS       3586 S.HALL        3586 S.HALL        3804 A.KENDALL     3804 A.KENDALL     3804 A.KENDALL    
BEAM   LINE 4-3  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               3838 E.WASINGER    3838 E.WASINGER    3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
DOWN               SMB CHECKOUT/3838  3838 E.WASINGER    SMB CHECKOUT/3614  3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
DOWN               3838 E.WASINGER    3838 E.WASINGER    3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
BEAM   LINE 6-2  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               3842 W.Chueh       3842 W.Chueh       3821 Y.Yu          3821 Y.Yu          3581 J.Nelson Weke
DOWN               CHANGE/3842 W.Chue 3842 W.Chueh       CHANGE/3821 Y.Yu   3821 Y.Yu          CHANGE/3581 J.Nels 3581 J.Nelson Weke
DOWN               3842 W.Chueh       3842 W.Chueh       3821 Y.Yu          3821 Y.Yu          3581 J.Nelson Weke 3581 J.Nelson Weke
BEAM   LINE 7-2  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               3595 C.MURRAY      3595 C.MURRAY      3595 C.MURRAY      3595 C.MURRAY      3595 C.MURRAY     
DOWN               Xray CHECKOUT/3595 3595 C.MURRAY      3595 C.MURRAY      3595 C.MURRAY      3595 C.MURRAY      3595 C.MURRAY     
DOWN               3595 C.MURRAY      3595 C.MURRAY      3595 C.MURRAY      3595 C.MURRAY      3595 C.MURRAY      3595 C.MURRAY     
BEAM   LINE 7-3  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER    3859 I.PICKERING   3859 I.PICKERING  
DOWN               SMB CHECKOUT/3838  3838 E.WASINGER    3838 E.WASINGER    SMB CHECKOUT/3859  3859 I.PICKERING   3859 I.PICKERING  
DOWN               3838 E.WASINGER    3838 E.WASINGER    3838 E.WASINGER    3859 I.PICKERING   3859 I.PICKERING   3859 I.PICKERING  
BEAM   LINE 9-3  
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL     
DOWN               CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL      CHANGE/3505 H.NICH 3505 H.NICHOL      3505 H.NICHOL     
DOWN               3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL     
BEAM   LINE 11-2 
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               3601 J.SEITER      3601 J.SEITER      3601 J.SEITER      3628 L.RAO         3628 L.RAO        
DOWN               c/3601             3601 J.SEITER      3601 J.SEITER      MES CHECKOUT/3628  3628 L.RAO         3628 L.RAO        
DOWN               3601 J.SEITER      3601 J.SEITER      3601 J.SEITER      3628 L.RAO         3628 L.RAO         3628 L.RAO        
BEAM   LINE 11-3 
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               3407 T.SCHIROS     3407 T.SCHIROS     3673 A.Briseno     3673 A.Briseno     3673 A.Briseno    
DOWN               Xray CHECKOUT/3407 3407 T.SCHIROS     Xray CHECKOUT/3673 3673 A.Briseno     3673 A.Briseno     3673 A.Briseno    
DOWN               3407 T.SCHIROS     3407 T.SCHIROS     3673 A.Briseno     3673 A.Briseno     3673 A.Briseno     3673 A.Briseno    
BEAM   LINE 14-3 
Jan. 07, 2013      Jan. 08, 2013      Jan. 09, 2013      Jan. 10, 2013      Jan. 11, 2013      Jan. 12, 2013      Jan. 13, 2013     
DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
DOWN               Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jan. 14, 2013
MA       AP                                    
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
BEAM   LINE 1-4  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3586 S.HALL/MA     AP                 AP                 3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA    
MA                 AP                 CHANGE/3607 N.BALS 3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA    
MA/AP              AP                 3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA    
BEAM   LINE 1-5  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
MA                 AP                 AP                 Unscheduled        Unscheduled        8818 A.MEHTA       8818 A.MEHTA      
MA                 AP                 Unscheduled        Unscheduled        CHANGE/8818 A.MEHT 8818 A.MEHTA       8818 A.MEHTA      
MA/AP              AP                 Unscheduled        Unscheduled        8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
BEAM   LINE 2-1  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3826 J.Komadina/MA AP                 AP                 3820 J.Groves      3820 J.Groves      3820 J.Groves      3820 J.Groves     
MA                 AP                 Xray CHECKOUT/3820 3820 J.Groves      3820 J.Groves      3820 J.Groves      3820 J.Groves     
MA/AP              AP                 3820 J.Groves      3820 J.Groves      3820 J.Groves      3820 J.Groves      3820 J.Groves     
BEAM   LINE 2-2  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3614 H.NICHOL/MA   AP                 AP                 3505 H.NICHOL      3505 H.NICHOL      3754 B.POPESCU     3754 B.POPESCU    
MA                 AP                 CHANGE/3505 H.NICH 3505 H.NICHOL      CHANGE/3754 B.POPE 3754 B.POPESCU     3754 B.POPESCU    
MA/AP              AP                 3505 H.NICHOL      3505 H.NICHOL      3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
BEAM   LINE 4-1  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3671 E.Benson/MA   AP                 AP                 8818 A.MEHTA       8818 A.MEHTA       3612 F.MEIRER      3612 F.MEIRER     
MA                 AP                 Xray CHECKOUT/8818 8818 A.MEHTA       CHANGE/3612 F.MEIR 3612 F.MEIRER      3612 F.MEIRER     
MA/AP              AP                 8818 A.MEHTA       8818 A.MEHTA       3612 F.MEIRER      3612 F.MEIRER      3612 F.MEIRER     
BEAM   LINE 4-2  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3804 A.KENDALL/MA  AP                 AP                 3765 T.Bryan       10K1 D.Halling     Unscheduled        3625 S.SWEETNAM   
MA                 AP                 CHANGE/3765 T.Brya CHANGE/10K1 D.Hall CHANGE/10K2 X.Zhou CHANGE/3625 S.SWEE CHANGE/3791 C.TASS
MA/AP              AP                 3765 T.Bryan       10K1 D.Halling     Unscheduled        3625 S.SWEETNAM    3791 C.TASSONE    
BEAM   LINE 4-3  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3614 H.NICHOL/MA   AP                 AP                 3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR
MA                 AP                 SMB CHECKOUT/3835  3835 G.WAYCHUNAS   SMB CHECKOUT/3552  3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR
MA/AP              AP                 3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR
BEAM   LINE 6-2  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3581 J.Nelson W/MA AP                 AP                 3580 B.Vega-Martin 3580 B.Vega-Martin 3696 Y.Shi         3696 Y.Shi        
MA                 AP                 CHANGE/3580 B.Vega 3580 B.Vega-Martin CHANGE/3696 Y.Shi  3696 Y.Shi         3696 Y.Shi        
MA/AP              AP                 3580 B.Vega-Martin 3580 B.Vega-Martin 3696 Y.Shi         3696 Y.Shi         3696 Y.Shi        
BEAM   LINE 7-2  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3595 C.MURRAY/MA   AP                 AP                 3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD  
MA                 AP                 Xray CHECKOUT/3685 3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD  
MA/AP              AP                 3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD  
BEAM   LINE 7-3  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3859 I.PICKERIN/MA AP                 AP                 3859 I.PICKERING   3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
MA                 AP                 3859 I.PICKERING   SMB CHECKOUT/3857  3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
MA/AP              AP                 3859 I.PICKERING   3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
BEAM   LINE 9-3  
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
DOWN/MA            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
MA/AP              AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3505 H.NICHOL/MA   AP                 AP                 3754 B.POPESCU     3754 B.POPESCU     3683 M.PUSHIE      3683 M.PUSHIE     
MA                 AP                 CHANGE/3754 B.POPE 3754 B.POPESCU     CHANGE/3683 M.PUSH 3683 M.PUSHIE      3683 M.PUSHIE     
MA/AP              AP                 3754 B.POPESCU     3754 B.POPESCU     3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE     
BEAM   LINE 11-2 
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3628 L.RAO/MA      AP                 AP                 3567 S.LEE         3567 S.LEE         3689 J.BARGAR      3689 J.BARGAR     
MA                 AP                 MES CHECKOUT/3567  3567 S.LEE         MES CHECKOUT/3689  3689 J.BARGAR      3689 J.BARGAR     
MA/AP              AP                 3567 S.LEE         3567 S.LEE         3689 J.BARGAR      3689 J.BARGAR      3689 J.BARGAR     
BEAM   LINE 11-3 
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
3673 A.Briseno/MA  AP                 AP                 3676 R.KLINE       3676 R.KLINE       3676 R.KLINE       3676 R.KLINE      
MA                 AP                 Xray CHECKOUT/3676 3676 R.KLINE       3676 R.KLINE       3676 R.KLINE       3676 R.KLINE      
MA/AP              AP                 3676 R.KLINE       3676 R.KLINE       3676 R.KLINE       3676 R.KLINE       3676 R.KLINE      
BEAM   LINE 14-3 
Jan. 14, 2013      Jan. 15, 2013      Jan. 16, 2013      Jan. 17, 2013      Jan. 18, 2013      Jan. 19, 2013      Jan. 20, 2013     
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jan. 21, 2013
HOLIDAY                                          
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
BEAM   LINE 1-4  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3607 N.BALSARA     3607 N.BALSARA     3721 N.Lynd        3721 N.Lynd        3721 N.Lynd        3721 N.Lynd        3721 N.Lynd       
3607 N.BALSARA     CHANGE/3721 N.Lynd 3721 N.Lynd        3721 N.Lynd        3721 N.Lynd        3721 N.Lynd        3721 N.Lynd       
3607 N.BALSARA     3721 N.Lynd        3721 N.Lynd        3721 N.Lynd        3721 N.Lynd        3721 N.Lynd        3721 N.Lynd       
BEAM   LINE 1-5  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       N002 A.VAILIONIS   Unscheduled        Unscheduled       
8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       CHANGE/N002 A.VAIL Unscheduled        Unscheduled        Unscheduled       
8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       N002 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3820 J.Groves      3820 J.Groves      8051 M.TONEY       8051 M.TONEY       3731 A.AYZNER      3731 A.AYZNER      3731 A.AYZNER     
3820 J.Groves      Xray CHECKOUT/8051 8051 M.TONEY       Xray CHECKOUT/3731 3731 A.AYZNER      3731 A.AYZNER      3731 A.AYZNER     
3820 J.Groves      8051 M.TONEY       8051 M.TONEY       3731 A.AYZNER      3731 A.AYZNER      3731 A.AYZNER      3731 A.AYZNER     
BEAM   LINE 2-2  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3754 B.POPESCU     3754 B.POPESCU     3549 S.HO          3549 S.HO          3549 S.HO          3679 S.FENDORF     3679 S.FENDORF    
3754 B.POPESCU     CHANGE/3549 S.HO   3549 S.HO          3549 S.HO          CHANGE/3679 S.FEND 3679 S.FENDORF     3679 S.FENDORF    
3754 B.POPESCU     3549 S.HO          3549 S.HO          3549 S.HO          3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    
BEAM   LINE 4-1  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3612 F.MEIRER      3612 F.MEIRER      3612 F.MEIRER      3833 J.CABANA-JIME 3833 J.CABANA-JIME 3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR
3612 F.MEIRER      3612 F.MEIRER      MES CHECKOUT/3833  3833 J.CABANA-JIME Xray CHECKOUT/3552 3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR
3612 F.MEIRER      3612 F.MEIRER      3833 J.CABANA-JIME 3833 J.CABANA-JIME 3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR
BEAM   LINE 4-2  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3791 C.TASSONE     3660 S.TOLBERT     3351 V.CHEREZOV    8077 T.MATSUI      3742 H.LIANG       3742 H.LIANG       3295 K.LEE        
CHANGE/3660 S.TOLB CHANGE/3351 V.CHER CHANGE/8077 T.MATS CHANGE/3742 H.LIAN 3742 H.LIANG       CHANGE/3295 K.LEE  3295 K.LEE        
3660 S.TOLBERT     3351 V.CHEREZOV    8077 T.MATSUI      3742 H.LIANG       3742 H.LIANG       3295 K.LEE         3295 K.LEE        
BEAM   LINE 4-3  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR 3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR     
3552 R.KRETZSCHMAR SMB CHECKOUT/3380  3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR     
3552 R.KRETZSCHMAR 3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR     
BEAM   LINE 6-2  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3696 Y.Shi         8041 J.HAYTER      8051 M.TONEY       3848 J.HAYTER      3848 J.HAYTER      3848 J.HAYTER      3848 J.HAYTER     
CHANGE/8041 J.HAYT CHANGE/8051 M.TONE CHANGE/3848 J.HAYT 3848 J.HAYTER      3848 J.HAYTER      3848 J.HAYTER      3848 J.HAYTER     
8041 J.HAYTER      8051 M.TONEY       3848 J.HAYTER      3848 J.HAYTER      3848 J.HAYTER      3848 J.HAYTER      3848 J.HAYTER     
BEAM   LINE 7-2  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3685 S.MANNSFELD   3685 S.MANNSFELD   3823 Y.SHI         3823 Y.SHI         3823 Y.SHI         3706 S.TOLBERT     3706 S.TOLBERT    
3685 S.MANNSFELD   Xray CHECKOUT/3823 3823 Y.SHI         3823 Y.SHI         Xray CHECKOUT/3706 3706 S.TOLBERT     3706 S.TOLBERT    
3685 S.MANNSFELD   3823 Y.SHI         3823 Y.SHI         3823 Y.SHI         3706 S.TOLBERT     3706 S.TOLBERT     3706 S.TOLBERT    
BEAM   LINE 7-3  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3857 G.GEORGE      3857 G.GEORGE      3850 J.YANO        3850 J.YANO        3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
3857 G.GEORGE      SMB CHECKOUT/3850  3850 J.YANO        SMB CHECKOUT/3729  3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
3857 G.GEORGE      3850 J.YANO        3850 J.YANO        3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
BEAM   LINE 9-3  
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3683 M.PUSHIE      3683 M.PUSHIE      3592 B.KIMBALL     3592 B.KIMBALL     3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS      
3683 M.PUSHIE      CHANGE/3592 B.KIMB 3592 B.KIMBALL     CHANGE/3589 J.DAVI 3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS      
3683 M.PUSHIE      3592 B.KIMBALL     3592 B.KIMBALL     3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS      
BEAM   LINE 11-2 
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3689 J.BARGAR      3689 J.BARGAR      3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR 3803 H.Hsu-Kim     3803 H.Hsu-Kim    
3689 J.BARGAR      MES CHECKOUT/3552  3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR MES CHECKOUT/3803  3803 H.Hsu-Kim     3803 H.Hsu-Kim    
3689 J.BARGAR      3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR 3552 R.KRETZSCHMAR 3803 H.Hsu-Kim     3803 H.Hsu-Kim     3803 H.Hsu-Kim    
BEAM   LINE 11-3 
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
3676 R.KLINE       3676 R.KLINE       3660 S.TOLBERT     3660 S.TOLBERT     3706 S.TOLBERT     3648 V.HO          3648 V.HO         
3676 R.KLINE       CHECKOUT/3660      3660 S.TOLBERT     CHANGE/3706 S.TOLB Xray CHECKOUT/3648 3648 V.HO          3648 V.HO         
3676 R.KLINE       3660 S.TOLBERT     3660 S.TOLBERT     3706 S.TOLBERT     3648 V.HO          3648 V.HO          3648 V.HO         
BEAM   LINE 14-3 
Jan. 21, 2013      Jan. 22, 2013      Jan. 23, 2013      Jan. 24, 2013      Jan. 25, 2013      Jan. 26, 2013      Jan. 27, 2013     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jan. 28, 2013
AP       AP                                    
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
BEAM   LINE 1-4  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3721 N.Lynd/AP     AP                 AP                 3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan       
AP                 AP                 CHANGE/3856 C.Ryan 3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan       
AP                 AP                 3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan       
BEAM   LINE 1-5  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
AP                 AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 CHANGE/8015 A.MEHT 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 2-1  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3731 A.AYZNER/AP   AP                 AP                 3714 P.VALDIVIA    3714 P.VALDIVIA    3714 P.VALDIVIA    3714 P.VALDIVIA   
AP                 AP                 Xray CHECKOUT/3714 3714 P.VALDIVIA    3714 P.VALDIVIA    3714 P.VALDIVIA    3714 P.VALDIVIA   
AP                 AP                 3714 P.VALDIVIA    3714 P.VALDIVIA    3714 P.VALDIVIA    3714 P.VALDIVIA    3714 P.VALDIVIA   
BEAM   LINE 2-2  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
AP                 AP                 AP                 3777 G.Carini      3777 G.Carini      3777 G.Carini      3777 G.Carini     
AP                 AP                 CHANGE/3777 G.Cari 3777 G.Carini      3777 G.Carini      3777 G.Carini      3777 G.Carini     
AP                 AP                 3777 G.Carini      3777 G.Carini      3777 G.Carini      3777 G.Carini      3777 G.Carini     
BEAM   LINE 2-3  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3679 S.FENDORF/AP  AP                 AP                 3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS      
AP                 AP                 CHANGE/3589 J.DAVI 3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS      
AP                 AP                 3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS       3589 J.DAVIS      
BEAM   LINE 4-1  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3552 R.KRETZSCH/AP AP                 AP                 3592 B.KIMBALL     3592 B.KIMBALL     3456 I.PERSSON     3456 I.PERSSON    
AP                 AP                 Xray CHECKOUT/3592 3592 B.KIMBALL     Xray CHECKOUT/3456 3456 I.PERSSON     3456 I.PERSSON    
AP                 AP                 3592 B.KIMBALL     3592 B.KIMBALL     3456 I.PERSSON     3456 I.PERSSON     3456 I.PERSSON    
BEAM   LINE 4-2  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3295 K.LEE/AP      AP                 AP                 8877 T.MATSUI      3358 D.Herschlag   3792 E.Snell       3792 E.Snell      
AP                 AP                 CHANGE/8877 T.MATS CHANGE/3358 D.Hers CHANGE/3792 E.Snel 3792 E.Snell       3792 E.Snell      
AP                 AP                 8877 T.MATSUI      3358 D.Herschlag   3792 E.Snell       3792 E.Snell       3792 E.Snell      
BEAM   LINE 4-3  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3380 J.BARGAR/AP   AP                 AP                 3574 S.FENDORF     3574 S.FENDORF     3585 Y.ARAI        3585 Y.ARAI       
AP                 AP                 SMB CHECKOUT/3574  3574 S.FENDORF     SMB CHECKOUT/3585  3585 Y.ARAI        3585 Y.ARAI       
AP                 AP                 3574 S.FENDORF     3574 S.FENDORF     3585 Y.ARAI        3585 Y.ARAI        3585 Y.ARAI       
BEAM   LINE 6-2  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3848 J.HAYTER/AP   AP                 AP                 3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH       3810 S.KOZIMOR    
AP                 AP                 Xray>XES/3521      3521 C.BOOTH       3521 C.BOOTH       CHANGE/3810 S.KOZI 3810 S.KOZIMOR    
AP                 AP                 3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH       3810 S.KOZIMOR     3810 S.KOZIMOR    
BEAM   LINE 7-2  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3706 S.TOLBERT/AP  AP                 AP                 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
AP                 AP                 Xray CHECKOUT/3647 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
AP                 AP                 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
BEAM   LINE 7-3  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3729 V.YACHANDR/AP AP                 AP                 3729 V.YACHANDRA   3729 V.YACHANDRA   8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 3729 V.YACHANDRA   3729 V.YACHANDRA   SMB CHECKOUT/8071  8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 3729 V.YACHANDRA   3729 V.YACHANDRA   8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
BEAM   LINE 9-3  
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3589 J.DAVIS/AP    AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       3303 A.LINDENBERG  3303 A.LINDENBERG 
AP                 AP                 CHANGE/8015 A.MEHT 8015 A.MEHTA       Xray CHECKOUT/3303 3303 A.LINDENBERG  3303 A.LINDENBERG 
AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG 
BEAM   LINE 11-2 
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3803 H.Hsu-Kim/AP  AP                 AP                 3702 Y.ARAI        3702 Y.ARAI        3666 S.CONRADSON   3666 S.CONRADSON  
AP                 AP                 MES CHECKOUT/3702  3702 Y.ARAI        MES CHECKOUT/3666  3666 S.CONRADSON   3666 S.CONRADSON  
AP                 AP                 3702 Y.ARAI        3702 Y.ARAI        3666 S.CONRADSON   3666 S.CONRADSON   3666 S.CONRADSON  
BEAM   LINE 11-3 
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
3648 V.HO/AP       AP                 AP                 3289 M.CHABINYC    3289 M.CHABINYC    3947 B.Shyam       3947 B.Shyam      
AP                 AP                 Xray CHECKOUT/3289 3289 M.CHABINYC    Xray CHECKOUT/3947 3947 B.Shyam       3947 B.Shyam      
AP                 AP                 3289 M.CHABINYC    3289 M.CHABINYC    3947 B.Shyam       3947 B.Shyam       3947 B.Shyam      
BEAM   LINE 14-3 
Jan. 28, 2013      Jan. 29, 2013      Jan. 30, 2013      Jan. 31, 2013      Feb. 01, 2013      Feb. 02, 2013      Feb. 03, 2013     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Feb. 04, 2013
                        100mALowAlpha      100mALowAlpha      100mALowAlpha     
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
BEAM   LINE 1-4  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3856 C.Ryan        3660 S.TOLBERT     3660 S.TOLBERT     8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE      
CHANGE/3660 S.TOLB 3660 S.TOLBERT     3660 S.TOLBERT     8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE      
3660 S.TOLBERT     3660 S.TOLBERT     CHANGE/8840 J.POPL 8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE      
BEAM   LINE 1-5  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
8015 A.MEHTA       8015 A.MEHTA       3807 T.GAO         3807 T.GAO         3807 T.GAO         Unscheduled        Unscheduled       
8015 A.MEHTA       CHANGE/3807 T.GAO  3807 T.GAO         3807 T.GAO         Unscheduled        Unscheduled        Unscheduled       
8015 A.MEHTA       3807 T.GAO         3807 T.GAO         3807 T.GAO         Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3714 P.VALDIVIA    91S0 A.VAILIONIS   91S0 A.VAILIONIS   91S0 A.VAILIONIS   91S0 A.VAILIONIS   3620 M.Louie       3620 M.Louie      
Xray CHECKOUT/91S0 91S0 A.VAILIONIS   91S0 A.VAILIONIS   91S0 A.VAILIONIS   Xray CHECKOUT/3620 3620 M.Louie       3620 M.Louie      
91S0 A.VAILIONIS   91S0 A.VAILIONIS   91S0 A.VAILIONIS   91S0 A.VAILIONIS   3620 M.Louie       3620 M.Louie       3620 M.Louie      
BEAM   LINE 2-2  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3777 G.Carini      3777 G.Carini      FACI               FACI               FACI               Unscheduled        Unscheduled       
3777 G.Carini      FACI               FACI               FACI               FACI               Unscheduled        Unscheduled       
3777 G.Carini      FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3589 J.DAVIS       3702 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI        3567 S.LEE         3567 S.LEE         3849 S.LEE        
CHANGE/3702 Y.ARAI 3702 Y.ARAI        3702 Y.ARAI        CHANGE/3567 S.LEE  3567 S.LEE         CHANGE/3849 S.LEE  3849 S.LEE        
3702 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI        3567 S.LEE         3567 S.LEE         3849 S.LEE         3849 S.LEE        
BEAM   LINE 4-1  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3456 I.PERSSON     3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
Xray CHECKOUT/3658 3658 W.Fischer     3658 W.Fischer     Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 4-2  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3792 E.Snell       8077 T.MATSUI      10K6 D.DAS         8079 T.WENG        8079 T.WENG        FACI               FACI              
CHANGE/8077 T.MATS CHANGE/10K6 D.DAS  CHANGE/8079 T.WENG 8079 T.WENG        FACI               FACI               FACI              
8077 T.MATSUI      10K6 D.DAS         8079 T.WENG        8079 T.WENG        FACI               FACI               FACI              
BEAM   LINE 4-3  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3585 Y.ARAI        3831 S.CHRISTENSEN 3831 S.CHRISTENSEN 3831 S.CHRISTENSEN 3831 S.CHRISTENSEN 3532 B.HEDMAN      3532 B.HEDMAN     
SMB CHECKOUT/3831  3831 S.CHRISTENSEN 3831 S.CHRISTENSEN 3831 S.CHRISTENSEN CHANGE/3532 B.HEDM 3532 B.HEDMAN      3532 B.HEDMAN     
3831 S.CHRISTENSEN 3831 S.CHRISTENSEN 3831 S.CHRISTENSEN 3831 S.CHRISTENSEN 3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN     
BEAM   LINE 6-2  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3810 S.KOZIMOR     3810 S.KOZIMOR     3810 S.KOZIMOR     3620 M.Louie       3620 M.Louie       Unscheduled        Unscheduled       
3810 S.KOZIMOR     3810 S.KOZIMOR     CHANGE/3620 M.Loui 3620 M.Louie       Unscheduled        Unscheduled        Unscheduled       
3810 S.KOZIMOR     3810 S.KOZIMOR     3620 M.Louie       3620 M.Louie       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-2  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3647 S.BENT        91R0 T.Petach      91R0 T.Petach      91R0 T.Petach      91R0 T.Petach      Unscheduled        Unscheduled       
Xray CHECKOUT/91R0 91R0 T.Petach      91R0 T.Petach      91R0 T.Petach      Unscheduled        Unscheduled        Unscheduled       
91R0 T.Petach      91R0 T.Petach      91R0 T.Petach      91R0 T.Petach      Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 7-3  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
8071 R.SARANGI     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
SMB CHECKOUT/3339  3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
BEAM   LINE 9-3  
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA     
3303 A.LINDENBERG  3303 A.LINDENBERG  Xray CHECKOUT/3845 3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA     
3303 A.LINDENBERG  3303 A.LINDENBERG  3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA     
BEAM   LINE 11-2 
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3666 S.CONRADSON   3672 S.CONRADSON   3672 S.CONRADSON   3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR    
CHANGE/3672 S.CONR 3672 S.CONRADSON   MES CHECKOUT/3670  3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR    
3672 S.CONRADSON   3672 S.CONRADSON   3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR    
BEAM   LINE 11-3 
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
3947 B.Shyam       8067 S.WEBB        8067 S.WEBB        3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE    
Xray CHECKOUT/8067 8067 S.WEBB        Xray CHECKOUT/3735 3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE    
8067 S.WEBB        8067 S.WEBB        3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE    
BEAM   LINE 14-3 
Feb. 04, 2013      Feb. 05, 2013      Feb. 06, 2013      Feb. 07, 2013      Feb. 08, 2013      Feb. 09, 2013      Feb. 10, 2013     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Feb. 11, 2013
MA       AP                                    
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
BEAM   LINE 1-4  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
8840 J.POPLE/MA    AP                 AP                 3813 M.Riede       Unscheduled        3822 O.Trejo       3822 O.Trejo      
MA                 AP                 Xray CHECKOUT/3813 3813 M.Riede       Xray CHECKOUT/3822 3822 O.Trejo       3822 O.Trejo      
MA/AP              AP                 3813 M.Riede       Unscheduled        3822 O.Trejo       3822 O.Trejo       3822 O.Trejo      
BEAM   LINE 1-5  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
MA                 AP                 AP                 8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD  
MA                 AP                 CHANGE/8078 S.MANN 8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD  
MA/AP              AP                 8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD   8078 S.MANNSFELD  
BEAM   LINE 2-1  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
3620 M.Louie/MA    AP                 AP                 3820 J.Groves      3820 J.Groves      91R0 T.Petach      91R0 T.Petach     
MA                 AP                 Xray CHECKOUT/3820 3820 J.Groves      Xray CHECKOUT/91R0 91R0 T.Petach      91R0 T.Petach     
MA/AP              AP                 3820 J.Groves      3820 J.Groves      91R0 T.Petach      91R0 T.Petach      91R0 T.Petach     
BEAM   LINE 2-2  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
MA                 AP                 AP                 Unscheduled        3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL     
MA                 AP                 Unscheduled        Xray CHECKOUT/3626 3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL     
MA/AP              AP                 Unscheduled        3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL     
BEAM   LINE 2-3  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
3849 S.LEE/MA      AP                 AP                 3841 C.Kim         3841 C.Kim         3841 C.Kim         3841 C.Kim        
MA                 AP                 CHANGE/3841 C.Kim  3841 C.Kim         3841 C.Kim         3841 C.Kim         3841 C.Kim        
MA/AP              AP                 3841 C.Kim         3841 C.Kim         3841 C.Kim         3841 C.Kim         3841 C.Kim        
BEAM   LINE 4-1  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
8051 M.TONEY/MA    AP                 AP                 3581 J.Nelson Weke 3581 J.Nelson Weke 3661 C.CHEN        3661 C.CHEN       
MA                 AP                 Xray CHECKOUT/3581 3581 J.Nelson Weke Xray CHECKOUT/3661 3661 C.CHEN        3661 C.CHEN       
MA/AP              AP                 3581 J.Nelson Weke 3581 J.Nelson Weke 3661 C.CHEN        3661 C.CHEN        3661 C.CHEN       
BEAM   LINE 4-2  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
FACI/MA            AP                 AP                 8877 T.MATSUI      3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
MA                 AP                 CHANGE/8877 T.MATS CHANGE/3577 C.SAFI 3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
MA/AP              AP                 8877 T.MATSUI      3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
BEAM   LINE 4-3  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
3532 B.HEDMAN/MA   AP                 AP                 3654 C.HANSEL      3654 C.HANSEL      3652 C.HANSEL      3652 C.HANSEL     
MA                 AP                 SMB CHECKOUT/3654  3654 C.HANSEL      SMB CHECKOUT/3652  3652 C.HANSEL      3652 C.HANSEL     
MA/AP              AP                 3654 C.HANSEL      3654 C.HANSEL      3652 C.HANSEL      3652 C.HANSEL      3652 C.HANSEL     
BEAM   LINE 6-2  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
MA                 AP                 AP                 3793 R.Raptis      3793 R.Raptis      3793 R.Raptis      8079 T.WENG       
MA                 AP                 Xray CHECKOUT/3793 3793 R.Raptis      3793 R.Raptis      CHANGE/8079 T.WENG 8079 T.WENG       
MA/AP              AP                 3793 R.Raptis      3793 R.Raptis      3793 R.Raptis      8079 T.WENG        8079 T.WENG       
BEAM   LINE 7-2  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
MA                 AP                 AP                 3762 M.MASSEY      3762 M.MASSEY      8051 M.TONEY       8051 M.TONEY      
MA                 AP                 Xray CHECKOUT/3762 3762 M.MASSEY      Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY      
MA/AP              AP                 3762 M.MASSEY      3762 M.MASSEY      8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 7-3  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
3339 K.HODGSON/MA  AP                 AP                 3572 M.GREEN       3572 M.GREEN       3730 M.GREEN       3730 M.GREEN      
MA                 AP                 SMB CHECKOUT/3572  3572 M.GREEN       CHANGE/3730 M.GREE 3730 M.GREEN       3730 M.GREEN      
MA/AP              AP                 3572 M.GREEN       3572 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN      
BEAM   LINE 9-3  
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
DOWN/MA            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
MA/AP              AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
3845 M.KOZINA/MA   AP                 AP                 8067 S.WEBB        8067 S.WEBB        3667 S.TIAN        3667 S.TIAN       
MA                 AP                 Xray CHECKOUT/8067 8067 S.WEBB        CHANGE/3667 S.TIAN 3667 S.TIAN        3667 S.TIAN       
MA/AP              AP                 8067 S.WEBB        8067 S.WEBB        3667 S.TIAN        3667 S.TIAN        3667 S.TIAN       
BEAM   LINE 11-2 
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
3670 S.KOZIMOR/MA  AP                 AP                 3412 G.BROWN       3412 G.BROWN       3412 G.BROWN       3412 G.BROWN      
MA                 AP                 MES CHECKOUT/3412  3412 G.BROWN       3412 G.BROWN       3412 G.BROWN       3412 G.BROWN      
MA/AP              AP                 3412 G.BROWN       3412 G.BROWN       3412 G.BROWN       3412 G.BROWN       3412 G.BROWN      
BEAM   LINE 11-3 
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
3735 C.TASSONE/MA  AP                 AP                 3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE    
MA                 AP                 3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE    
MA/AP              AP                 3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE    
BEAM   LINE 14-3 
Feb. 11, 2013      Feb. 12, 2013      Feb. 13, 2013      Feb. 14, 2013      Feb. 15, 2013      Feb. 16, 2013      Feb. 17, 2013     
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Feb. 18, 2013
HOLIDAY                                          
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
BEAM   LINE 1-4  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
3822 O.Trejo       3822 O.Trejo       3899 B.Frisken     3899 B.Frisken     3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA    
3822 O.Trejo       CHANGE/3899 B.Fris 3899 B.Frisken     CHANGE/3607 N.BALS 3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA    
3822 O.Trejo       3899 B.Frisken     3899 B.Frisken     3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA    
BEAM   LINE 1-5  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
8078 S.MANNSFELD   8078 S.MANNSFELD   Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
8078 S.MANNSFELD   Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
8078 S.MANNSFELD   Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
91R0 T.Petach      91R0 T.Petach      3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
91R0 T.Petach      Xray CHECKOUT/3844 3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
91R0 T.Petach      3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
BEAM   LINE 2-2  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL     
3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL     
3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL     
BEAM   LINE 2-3  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
3841 C.Kim         3841 C.Kim         3762 M.MASSEY      3762 M.MASSEY      3667 S.TIAN        3667 S.TIAN        3667 S.TIAN       
3841 C.Kim         CHANGE/3762 M.MASS 3762 M.MASSEY      CHANGE/3667 S.TIAN 3667 S.TIAN        3667 S.TIAN        3667 S.TIAN       
3841 C.Kim         3762 M.MASSEY      3762 M.MASSEY      3667 S.TIAN        3667 S.TIAN        3667 S.TIAN        3667 S.TIAN       
BEAM   LINE 4-1  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
3661 C.CHEN        3661 C.CHEN        3352 B.GATES       3352 B.GATES       3352 B.GATES       3380 J.BARGAR      3380 J.BARGAR     
3661 C.CHEN        Xray CHECKOUT/3352 3352 B.GATES       3352 B.GATES       Xray CHECKOUT/3380 3380 J.BARGAR      3380 J.BARGAR     
3661 C.CHEN        3352 B.GATES       3352 B.GATES       3352 B.GATES       3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR     
BEAM   LINE 4-2  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     10K3 G.WONG        10K3 G.WONG        10K3 G.WONG        10K3 G.WONG       
3577 C.SAFINYA     3577 C.SAFINYA     CHANGE/10K3 G.WONG 10K3 G.WONG        10K3 G.WONG        10K3 G.WONG        10K3 G.WONG       
3577 C.SAFINYA     3577 C.SAFINYA     10K3 G.WONG        10K3 G.WONG        10K3 G.WONG        10K3 G.WONG        10K3 G.WONG       
BEAM   LINE 4-3  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
3652 C.HANSEL      3652 C.HANSEL      91R1 S.BARE        91R1 S.BARE        3757 R.Bassiri     3757 R.Bassiri     3757 R.Bassiri    
3652 C.HANSEL      SMB CHECKOUT/91R1  91R1 S.BARE        SMB CHECKOUT/3757  3757 R.Bassiri     3757 R.Bassiri     3757 R.Bassiri    
3652 C.HANSEL      91R1 S.BARE        91R1 S.BARE        3757 R.Bassiri     3757 R.Bassiri     3757 R.Bassiri     3757 R.Bassiri    
BEAM   LINE 6-2  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
8079 T.WENG        8079 T.WENG        3830 T.Lu          3830 T.Lu          3830 T.Lu          3809 N.BLACKBURN   3809 N.BLACKBURN  
8079 T.WENG        Xray CHECKOUT/3830 3830 T.Lu          3830 T.Lu          Xray CHECKOUT/3809 3809 N.BLACKBURN   3809 N.BLACKBURN  
8079 T.WENG        3830 T.Lu          3830 T.Lu          3830 T.Lu          3809 N.BLACKBURN   3809 N.BLACKBURN   3809 N.BLACKBURN  
BEAM   LINE 7-2  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       3762 M.MASSEY      3647 S.BENT        3647 S.BENT       
8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       Xray CHECKOUT/3762 Xray CHECKOUT/3647 3647 S.BENT        3647 S.BENT       
8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       3762 M.MASSEY      3647 S.BENT        3647 S.BENT        3647 S.BENT       
BEAM   LINE 7-3  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
3730 M.GREEN       3730 M.GREEN       8071 R.SARANGI     8071 R.SARANGI     3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY    
3730 M.GREEN       SMB CHECKOUT/8071  8071 R.SARANGI     SMB CHECKOUT/3743  3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY    
3730 M.GREEN       8071 R.SARANGI     8071 R.SARANGI     3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY    
BEAM   LINE 9-3  
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
3667 S.TIAN        3667 S.TIAN        3534 A.LAM         3534 A.LAM         3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR     
3667 S.TIAN        CHANGE/3534 A.LAM  3534 A.LAM         CHANGE/3380 J.BARG 3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR     
3667 S.TIAN        3534 A.LAM         3534 A.LAM         3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR     
BEAM   LINE 11-2 
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
3412 G.BROWN       3412 G.BROWN       3531 G.LOWRY       3531 G.LOWRY       3832 G.LOWRY       3749 R.DAEHN       3749 R.DAEHN      
3412 G.BROWN       MES CHECKOUT/3531  3531 G.LOWRY       MES CHECKOUT/3832  MES CHECKOUT/3749  3749 R.DAEHN       3749 R.DAEHN      
3412 G.BROWN       3531 G.LOWRY       3531 G.LOWRY       3832 G.LOWRY       3749 R.DAEHN       3749 R.DAEHN       3749 R.DAEHN      
BEAM   LINE 11-3 
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
3735 C.TASSONE     3735 C.TASSONE     3847 H.Duncan      3847 H.Duncan      3847 H.Duncan      3847 H.Duncan      3847 H.Duncan     
3735 C.TASSONE     Xray CHECKOUT/3847 3847 H.Duncan      3847 H.Duncan      3847 H.Duncan      3847 H.Duncan      3847 H.Duncan     
3735 C.TASSONE     3847 H.Duncan      3847 H.Duncan      3847 H.Duncan      3847 H.Duncan      3847 H.Duncan      3847 H.Duncan     
BEAM   LINE 14-3 
Feb. 18, 2013      Feb. 19, 2013      Feb. 20, 2013      Feb. 21, 2013      Feb. 22, 2013      Feb. 23, 2013      Feb. 24, 2013     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Feb. 25, 2013
AP       AP                                    
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
BEAM   LINE 1-4  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3607 N.BALSARA/AP  AP                 AP                 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
AP                 AP                 CHANGE/3647 S.BENT 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
AP                 AP                 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
BEAM   LINE 1-5  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
AP                 AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS  
AP                 AP                 CHANGE/N002 A.VAIL N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS  
AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS  
BEAM   LINE 2-1  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3844 Y.TAKAMURA/AP AP                 AP                 3815 D.Xie         3815 D.Xie         3815 D.Xie         3815 D.Xie        
AP                 AP                 Xray CHECKOUT/3815 3815 D.Xie         3815 D.Xie         3815 D.Xie         3815 D.Xie        
AP                 AP                 3815 D.Xie         3815 D.Xie         3815 D.Xie         3815 D.Xie         3815 D.Xie        
BEAM   LINE 2-2  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3626 T.CAHILL/AP   AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3667 S.TIAN/AP     AP                 AP                 1F87 M.PUSHIE      3817 P.Kraal       3817 P.Kraal       3817 P.Kraal      
AP                 AP                 CHANGE/1F87 M.PUSH CHANGE/3817 P.Kraa 3817 P.Kraal       3817 P.Kraal       3817 P.Kraal      
AP                 AP                 1F87 M.PUSHIE      3817 P.Kraal       3817 P.Kraal       3817 P.Kraal       3817 P.Kraal      
BEAM   LINE 4-1  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3380 J.BARGAR/AP   AP                 AP                 3867 L.Lim         3867 L.Lim         8051 M.TONEY       8051 M.TONEY      
AP                 AP                 Xray CHECKOUT/3867 3867 L.Lim         Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY      
AP                 AP                 3867 L.Lim         3867 L.Lim         8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 4-2  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
10K3 G.WONG/AP     AP                 AP                 3791 C.TASSONE     8847 T.WEISS       3575 L.CARTER      10K8 M.Strycharska
AP                 AP                 CHANGE/3791 C.TASS CHANGE/8847 T.WEIS CHANGE/3575 L.CART CHANGE/10K8 M.Stry 10K8 M.Strycharska
AP                 AP                 3791 C.TASSONE     8847 T.WEISS       3575 L.CARTER      10K8 M.Strycharska 10K8 M.Strycharska
BEAM   LINE 4-3  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3757 R.Bassiri/AP  AP                 AP                 3738 M.Keiluweit   3738 M.Keiluweit   3781 K.Wujcik      3781 K.Wujcik     
AP                 AP                 SMB CHECKOUT/3738  3738 M.Keiluweit   SMB CHECKOUT/3781  3781 K.Wujcik      3781 K.Wujcik     
AP                 AP                 3738 M.Keiluweit   3738 M.Keiluweit   3781 K.Wujcik      3781 K.Wujcik      3781 K.Wujcik     
BEAM   LINE 6-2  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3809 N.BLACKBUR/AP AP                 AP                 8859 B.JOHNSON     3624 A.Goode       3624 A.Goode       3624 A.Goode      
AP                 AP                 Xray>TXM/8859      CHANGE/3624 A.Good 3624 A.Goode       3624 A.Goode       3624 A.Goode      
AP                 AP                 8859 B.JOHNSON     3624 A.Goode       3624 A.Goode       3624 A.Goode       3624 A.Goode      
BEAM   LINE 7-2  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3647 S.BENT/AP     AP                 AP                 8818 A.MEHTA       8818 A.MEHTA       1F67 A.VAILIONIS   1F67 A.VAILIONIS  
AP                 AP                 Xray CHECKOUT/8818 8818 A.MEHTA       Xray CHECKOUT/1F67 1F67 A.VAILIONIS   1F67 A.VAILIONIS  
AP                 AP                 8818 A.MEHTA       8818 A.MEHTA       1F67 A.VAILIONIS   1F67 A.VAILIONIS   1F67 A.VAILIONIS  
BEAM   LINE 7-3  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3743 M.MARONEY/AP  AP                 AP                 3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
AP                 AP                 SMB CHECKOUT/3339  3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
AP                 AP                 3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
BEAM   LINE 9-3  
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3380 J.BARGAR/AP   AP                 AP                 3679 S.FENDORF     3679 S.FENDORF     3635 J.Addison     3635 J.Addison    
AP                 AP                 CHANGE/3679 S.FEND 3679 S.FENDORF     CHANGE/3635 J.Addi 3635 J.Addison     3635 J.Addison    
AP                 AP                 3679 S.FENDORF     3679 S.FENDORF     3635 J.Addison     3635 J.Addison     3635 J.Addison    
BEAM   LINE 11-2 
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3749 R.DAEHN/AP    AP                 AP                 FACI               3620 M.Louie       3620 M.Louie       3620 M.Louie      
AP                 AP                 GIXAS/FACI         MES CHECKOUT/3620  3620 M.Louie       3620 M.Louie       CHANGE/3613 D.FRIE
AP                 AP                 FACI               3620 M.Louie       3620 M.Louie       3620 M.Louie       3613 D.FRIEBEL    
BEAM   LINE 11-3 
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
3847 H.Duncan/AP   AP                 AP                 3289 M.CHABINYC    3289 M.CHABINYC    3731 A.AYZNER      3731 A.AYZNER     
AP                 AP                 Xray CHECKOUT/3289 3289 M.CHABINYC    Xray CHECKOUT/3731 3731 A.AYZNER      3731 A.AYZNER     
AP                 AP                 3289 M.CHABINYC    3289 M.CHABINYC    3731 A.AYZNER      3731 A.AYZNER      3731 A.AYZNER     
BEAM   LINE 14-3 
Feb. 25, 2013      Feb. 26, 2013      Feb. 27, 2013      Feb. 28, 2013      Mar. 01, 2013      Mar. 02, 2013      Mar. 03, 2013     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Mar. 04, 2013
                                         
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
BEAM   LINE 1-4  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
3647 S.BENT        3647 S.BENT        3647 S.BENT        8802 T.HOSTETLER   8802 T.HOSTETLER   8802 T.HOSTETLER   Unscheduled       
3647 S.BENT        3647 S.BENT        CHANGE/8802 T.HOST 8802 T.HOSTETLER   8802 T.HOSTETLER   Unscheduled        Unscheduled       
3647 S.BENT        3647 S.BENT        8802 T.HOSTETLER   8802 T.HOSTETLER   8802 T.HOSTETLER   Unscheduled        Unscheduled       
BEAM   LINE 1-5  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
N002 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
N002 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
3815 D.Xie         91S2 S.Venkatachal 91S2 S.Venkatachal 8051 M.TONEY       8051 M.TONEY       91S4 M.KANAN       91S4 M.KANAN      
Xray CHECKOUT/91S2 91S2 S.Venkatachal Xray CHECKOUT/8051 8051 M.TONEY       Xray CHECKOUT/91S4 91S4 M.KANAN       91S4 M.KANAN      
91S2 S.Venkatachal 91S2 S.Venkatachal 8051 M.TONEY       8051 M.TONEY       91S4 M.KANAN       91S4 M.KANAN       91S4 M.KANAN      
BEAM   LINE 2-2  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
Unscheduled        FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-3  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
3817 P.Kraal       91P8 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3750 M.WALTON      3750 M.WALTON      3750 M.WALTON     
CHANGE/91P8 S.FEND 91P8 S.FENDORF     3679 S.FENDORF     CHANGE/3750 M.WALT 3750 M.WALTON      3750 M.WALTON      3750 M.WALTON     
91P8 S.FENDORF     CHANGE/3679 S.FEND 3679 S.FENDORF     3750 M.WALTON      3750 M.WALTON      3750 M.WALTON      3750 M.WALTON     
BEAM   LINE 4-1  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
8051 M.TONEY       3630 C.Ban         3630 C.Ban         3682 R.Bernier-Lat 3682 R.Bernier-Lat 3628 L.RAO         3628 L.RAO        
Xray CHECKOUT/3630 3630 C.Ban         Xray CHECKOUT/3682 3682 R.Bernier-Lat Xray CHECKOUT/3628 3628 L.RAO         3628 L.RAO        
3630 C.Ban         3630 C.Ban         3682 R.Bernier-Lat 3682 R.Bernier-Lat 3628 L.RAO         3628 L.RAO         3628 L.RAO        
BEAM   LINE 4-2  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
10K8 M.Strycharska 3744 A.SCHOEFFLER  3814 P.Grochulski  3814 P.Grochulski  8877 T.MATSUI      3897 C.Putnam      3434 A.Sali       
CHANGE/3744 A.SCHO CHANGE/3814 P.Groc 3814 P.Grochulski  CHANGE/8877 T.MATS CHANGE/3897 C.Putn CHANGE/3434 A.Sali 3434 A.Sali       
3744 A.SCHOEFFLER  3814 P.Grochulski  3814 P.Grochulski  8877 T.MATSUI      3897 C.Putnam      3434 A.Sali        3434 A.Sali       
BEAM   LINE 4-3  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
3781 K.Wujcik      3781 K.Wujcik      Unscheduled        3818 M.DOEFF       3818 M.DOEFF       3508 S.HAYES       3508 S.HAYES      
3781 K.Wujcik      Unscheduled        SMB CHECKOUT/3818  3818 M.DOEFF       Xray CHECKOUT/3508 3508 S.HAYES       3508 S.HAYES      
3781 K.Wujcik      Unscheduled        3818 M.DOEFF       3818 M.DOEFF       3508 S.HAYES       3508 S.HAYES       3508 S.HAYES      
BEAM   LINE 6-2  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
3624 A.Goode       3728 R.DAVIS       3728 R.DAVIS       3829 E.Boulard     3829 E.Boulard     3829 E.Boulard     3819 R.Wang       
CHANGE/3728 R.DAVI 3728 R.DAVIS       CHANGE/3829 E.Boul 3829 E.Boulard     3829 E.Boulard     CHANGE/3819 R.Wang 3819 R.Wang       
3728 R.DAVIS       3728 R.DAVIS       3829 E.Boulard     3829 E.Boulard     3829 E.Boulard     3819 R.Wang        3819 R.Wang       
BEAM   LINE 7-2  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
1F67 A.VAILIONIS   8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY       Xray CHECKOUT/8818 8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
BEAM   LINE 7-3  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
3339 K.HODGSON     3830 T.Lu          3830 T.Lu          3830 T.Lu          3775 A.Scott       3775 A.Scott       3775 A.Scott      
SMB CHECKOUT/3830  3830 T.Lu          3830 T.Lu          SMB CHECKOUT/3775  3775 A.Scott       3775 A.Scott       3775 A.Scott      
3830 T.Lu          3830 T.Lu          3830 T.Lu          3775 A.Scott       3775 A.Scott       3775 A.Scott       3775 A.Scott      
BEAM   LINE 9-3  
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
3635 J.Addison     3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3508 S.HAYES       3508 S.HAYES       3508 S.HAYES      
CHANGE/3603 J.CHOR 3603 J.CHOROVER    3603 J.CHOROVER    CHANGE/3508 S.HAYE 3508 S.HAYES       3508 S.HAYES       3508 S.HAYES      
3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3508 S.HAYES       3508 S.HAYES       3508 S.HAYES       3508 S.HAYES      
BEAM   LINE 11-2 
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
3613 D.FRIEBEL     3613 D.FRIEBEL     3613 D.FRIEBEL     3709 J.CHANG       3709 J.CHANG       8060 J.BARGAR      8060 J.BARGAR     
3613 D.FRIEBEL     3613 D.FRIEBEL     MES CHECKOUT/3709  3709 J.CHANG       MES CHECKOUT/8060  8060 J.BARGAR      8060 J.BARGAR     
3613 D.FRIEBEL     3613 D.FRIEBEL     3709 J.CHANG       3709 J.CHANG       8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR     
BEAM   LINE 11-3 
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
3731 A.AYZNER      3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3818 M.DOEFF       3818 M.DOEFF       3818 M.DOEFF      
Xray CHECKOUT/3603 3603 J.CHOROVER    3603 J.CHOROVER    Xray CHECKOUT/3818 3818 M.DOEFF       3818 M.DOEFF       3818 M.DOEFF      
3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    3818 M.DOEFF       3818 M.DOEFF       3818 M.DOEFF       3818 M.DOEFF      
BEAM   LINE 14-3 
Mar. 04, 2013      Mar. 05, 2013      Mar. 06, 2013      Mar. 07, 2013      Mar. 08, 2013      Mar. 09, 2013      Mar. 10, 2013     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR     
Unscheduled        Unscheduled        Unscheduled        CHANGE/3380 J.BARG 3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR     
Unscheduled        Unscheduled        Unscheduled        3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR      3380 J.BARGAR     

Back to Table of Contents

WEEK OF Mar. 11, 2013
MA       AP                                    
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
BEAM   LINE 1-4  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
MA                 AP                 AP                 3906 C.Fox         3906 C.Fox         3906 C.Fox         3906 C.Fox        
MA                 AP                 CHANGE/3906 C.Fox  3906 C.Fox         3906 C.Fox         3906 C.Fox         3906 C.Fox        
MA/AP              AP                 3906 C.Fox         3906 C.Fox         3906 C.Fox         3906 C.Fox         3906 C.Fox        
BEAM   LINE 1-5  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
91S4 M.KANAN/MA    AP                 AP                 3774 R.Gandhiraman 3774 R.Gandhiraman 3774 R.Gandhiraman 3774 R.Gandhiraman
MA                 AP                 Xray CHECKOUT/3774 3774 R.Gandhiraman 3774 R.Gandhiraman 3774 R.Gandhiraman 3774 R.Gandhiraman
MA/AP              AP                 3774 R.Gandhiraman 3774 R.Gandhiraman 3774 R.Gandhiraman 3774 R.Gandhiraman 3774 R.Gandhiraman
BEAM   LINE 2-2  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
FACI/MA            AP                 AP                 FACI               FACI               91T1 M.KOZINA      91T1 M.KOZINA     
MA                 AP                 FACI               FACI               Xray CHECKOUT/91T1 91T1 M.KOZINA      91T1 M.KOZINA     
MA/AP              AP                 FACI               FACI               91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA     
BEAM   LINE 2-3  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
3750 M.WALTON/MA   AP                 AP                 3635 J.Addison     3635 J.Addison     3668 A.Barker      3668 A.Barker     
MA                 AP                 CHANGE/3635 J.Addi 3635 J.Addison     CHANGE/3668 A.Bark 3668 A.Barker      3668 A.Barker     
MA/AP              AP                 3635 J.Addison     3635 J.Addison     3668 A.Barker      3668 A.Barker      3668 A.Barker     
BEAM   LINE 4-1  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
3628 L.RAO/MA      AP                 AP                 3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3819 R.Wang        3819 R.Wang       
MA                 AP                 Xray CHECKOUT/3835 3835 G.WAYCHUNAS   Xray CHECKOUT/3819 3819 R.Wang        3819 R.Wang       
MA/AP              AP                 3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3819 R.Wang        3819 R.Wang        3819 R.Wang       
BEAM   LINE 4-2  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
3434 A.Sali/MA     AP                 AP                 8877 T.MATSUI      3358 D.Herschlag   3295 K.LEE         3295 K.LEE        
MA                 AP                 CHANGE/8877 T.MATS CHANGE/3358 D.Hers CHANGE/3295 K.LEE  3295 K.LEE         3295 K.LEE        
MA/AP              AP                 8877 T.MATSUI      3358 D.Herschlag   3295 K.LEE         3295 K.LEE         3295 K.LEE        
BEAM   LINE 4-3  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
3508 S.HAYES/MA    AP                 AP                 3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN     
MA                 AP                 SMB CHECKOUT/3532  3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN     
MA/AP              AP                 3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN     
BEAM   LINE 6-2  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
3819 R.Wang/MA     AP                 AP                 3331 P.MANNING     3331 P.MANNING     3331 P.MANNING     3331 P.MANNING    
MA                 AP                 Xray CHECKOUT/3331 3331 P.MANNING     3331 P.MANNING     3331 P.MANNING     3331 P.MANNING    
MA/AP              AP                 3331 P.MANNING     3331 P.MANNING     3331 P.MANNING     3331 P.MANNING     3331 P.MANNING    
BEAM   LINE 7-2  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
8818 A.MEHTA/MA    AP                 AP                 3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD  
MA                 AP                 Xray CHECKOUT/3685 3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD  
MA/AP              AP                 3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD   3685 S.MANNSFELD  
BEAM   LINE 7-3  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
3775 A.Scott/MA    AP                 AP                 3836 Y.Lu          3836 Y.Lu          3681 S.GEORGE      3681 S.GEORGE     
MA                 AP                 SMB CHECKOUT/3836  3836 Y.Lu          SMB CHECKOUT/3681  3681 S.GEORGE      3681 S.GEORGE     
MA/AP              AP                 3836 Y.Lu          3836 Y.Lu          3681 S.GEORGE      3681 S.GEORGE      3681 S.GEORGE     
BEAM   LINE 9-3  
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
DOWN/MA            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
MA/AP              AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
3508 S.HAYES/MA    AP                 AP                 3668 A.Barker      3668 A.Barker      3514 C.LOPANO      3514 C.LOPANO     
MA                 AP                 CHANGE/3668 A.Bark 3668 A.Barker      CHANGE/3514 C.LOPA 3514 C.LOPANO      3514 C.LOPANO     
MA/AP              AP                 3668 A.Barker      3668 A.Barker      3514 C.LOPANO      3514 C.LOPANO      3514 C.LOPANO     
BEAM   LINE 11-2 
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
8060 J.BARGAR/MA   AP                 AP                 3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    
MA                 AP                 MES CHECKOUT/3679  3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    
MA/AP              AP                 3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    
BEAM   LINE 11-3 
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
3818 M.DOEFF/MA    AP                 AP                 3819 R.Wang        3625 S.SWEETNAM    3834 H.Duncan      3834 H.Duncan     
MA                 AP                 Xray CHECKOUT/3819 Xray CHECKOUT/3625 Xray CHECKOUT/3834 3834 H.Duncan      3834 H.Duncan     
MA/AP              AP                 3819 R.Wang        3625 S.SWEETNAM    3834 H.Duncan      3834 H.Duncan      3834 H.Duncan     
BEAM   LINE 14-3 
Mar. 11, 2013      Mar. 12, 2013      Mar. 13, 2013      Mar. 14, 2013      Mar. 15, 2013      Mar. 16, 2013      Mar. 17, 2013     
3380 J.BARGAR/MA   AP                 AP                 3668 A.Barker      3668 A.Barker      Unscheduled        Unscheduled       
MA                 AP                 CHANGE/3668 A.Bark 3668 A.Barker      3668 A.Barker      Unscheduled        Unscheduled       
MA/AP              AP                 3668 A.Barker      3668 A.Barker      3668 A.Barker      Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Mar. 18, 2013
                                         
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
BEAM   LINE 1-4  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3906 C.Fox         3906 C.Fox         3906 C.Fox         3886 S.MARTIN      3886 S.MARTIN      3886 S.MARTIN      3886 S.MARTIN     
3906 C.Fox         3906 C.Fox         CHANGE/3886 S.MART 3886 S.MARTIN      3886 S.MARTIN      3886 S.MARTIN      3886 S.MARTIN     
3906 C.Fox         3906 C.Fox         3886 S.MARTIN      3886 S.MARTIN      3886 S.MARTIN      3886 S.MARTIN      3886 S.MARTIN     
BEAM   LINE 1-5  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        3685 S.MANNSFELD   Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        CHANGE/3685 S.MANN Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        3685 S.MANNSFELD   Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3774 R.Gandhiraman 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3820 J.Groves      3820 J.Groves      3820 J.Groves     
Xray CHECKOUT/3294 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE Xray CHECKOUT/3820 3820 J.Groves      3820 J.Groves      3820 J.Groves     
3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3820 J.Groves      3820 J.Groves      3820 J.Groves      3820 J.Groves     
BEAM   LINE 2-2  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA     
91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA     
91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA      91T1 M.KOZINA     
BEAM   LINE 2-3  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3668 A.Barker      3837 M.McNamara    3837 M.McNamara    8051 M.TONEY       1F89 P.Kennepohl   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
CHANGE/3837 M.McNa 3837 M.McNamara    CHANGE/8051 M.TONE CHANGE/1F89 P.Kenn CHANGE/3726 A.SEYF 3726 A.SEYFFERTH   3726 A.SEYFFERTH  
3837 M.McNamara    3837 M.McNamara    8051 M.TONEY       1F89 P.Kennepohl   3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
BEAM   LINE 4-1  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3819 R.Wang        3592 B.KIMBALL     3592 B.KIMBALL     3726 A.SEYFFERTH   3726 A.SEYFFERTH   3678 S.MYNENI      3678 S.MYNENI     
Xray CHECKOUT/3592 3592 B.KIMBALL     Xray CHECKOUT/3726 3726 A.SEYFFERTH   Xray CHECKOUT/3678 3678 S.MYNENI      3678 S.MYNENI     
3592 B.KIMBALL     3592 B.KIMBALL     3726 A.SEYFFERTH   3726 A.SEYFFERTH   3678 S.MYNENI      3678 S.MYNENI      3678 S.MYNENI     
BEAM   LINE 4-2  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3295 K.LEE         RA                 8206 T.WEISS       8206 T.WEISS       3873 A.VAN BUUREN  3873 A.VAN BUUREN  3806 A.Edwards    
RA                 CHANGE/8206 T.WEIS 8206 T.WEISS       CHANGE/3873 A.VAN  3873 A.VAN BUUREN  CHANGE/3806 A.Edwa 3806 A.Edwards    
RA                 8206 T.WEISS       8206 T.WEISS       3873 A.VAN BUUREN  3873 A.VAN BUUREN  3806 A.Edwards     3806 A.Edwards    
BEAM   LINE 4-3  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3532 B.HEDMAN      3532 B.HEDMAN      3781 K.Wujcik      3781 K.Wujcik      3781 K.Wujcik      3678 S.MYNENI      3678 S.MYNENI     
3532 B.HEDMAN      SMB CHECKOUT/3781  3781 K.Wujcik      3781 K.Wujcik      SMB CHECKOUT/3678  3678 S.MYNENI      3678 S.MYNENI     
3532 B.HEDMAN      3781 K.Wujcik      3781 K.Wujcik      3781 K.Wujcik      3678 S.MYNENI      3678 S.MYNENI      3678 S.MYNENI     
BEAM   LINE 6-2  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3331 P.MANNING     3331 P.MANNING     8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG       
3331 P.MANNING     Xray>XES/8879      8879 T.WENG        8879 T.WENG        CHANGE/8879 T.WENG 8879 T.WENG        8879 T.WENG       
3331 P.MANNING     8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG        8879 T.WENG       
BEAM   LINE 7-2  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3685 S.MANNSFELD   3868 Y.Ohkura      3868 Y.Ohkura      3799 Y.LIU         3799 Y.LIU         3819 R.Wang        3819 R.Wang       
Xray CHECKOUT/3868 3868 Y.Ohkura      Xray CHECKOUT/3799 3799 Y.LIU         Xray CHECKOUT/3819 3819 R.Wang        3819 R.Wang       
3868 Y.Ohkura      3868 Y.Ohkura      3799 Y.LIU         3799 Y.LIU         3819 R.Wang        3819 R.Wang        3819 R.Wang       
BEAM   LINE 7-3  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3681 S.GEORGE      3681 S.GEORGE      3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
3681 S.GEORGE      SMB CHECKOUT/3339  3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
3681 S.GEORGE      3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
BEAM   LINE 9-3  
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3514 C.LOPANO      3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     8867 S.WEBB        3726 A.SEYFFERTH   3726 A.SEYFFERTH  
CHANGE/3658 W.Fisc 3658 W.Fischer     3658 W.Fischer     CHANGE/8867 S.WEBB CHANGE/3726 A.SEYF 3726 A.SEYFFERTH   3726 A.SEYFFERTH  
3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     8867 S.WEBB        3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
BEAM   LINE 11-2 
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3679 S.FENDORF     8067 S.WEBB        3747 J.Catalano    3747 J.Catalano    3747 J.Catalano    3689 J.BARGAR      3689 J.BARGAR     
MES CHECKOUT/8067  MES CHECKOUT/3747  3747 J.Catalano    3747 J.Catalano    MES CHECKOUT/3689  3689 J.BARGAR      3689 J.BARGAR     
8067 S.WEBB        3747 J.Catalano    3747 J.Catalano    3747 J.Catalano    3689 J.BARGAR      3689 J.BARGAR      3689 J.BARGAR     
BEAM   LINE 11-3 
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
3834 H.Duncan      3834 H.Duncan      3679 S.FENDORF     3679 S.FENDORF     8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
3834 H.Duncan      Xray CHECKOUT/3679 3679 S.FENDORF     Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
3834 H.Duncan      3679 S.FENDORF     3679 S.FENDORF     8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 14-3 
Mar. 18, 2013      Mar. 19, 2013      Mar. 20, 2013      Mar. 21, 2013      Mar. 22, 2013      Mar. 23, 2013      Mar. 24, 2013     
Unscheduled        3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3514 C.LOPANO      Unscheduled        Unscheduled       
CHANGE/3658 W.Fisc 3658 W.Fischer     3658 W.Fischer     CHANGE/3514 C.LOPA Unscheduled        Unscheduled        Unscheduled       
3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3514 C.LOPANO      Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Mar. 25, 2013
AP       AP                                    
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
BEAM   LINE 1-4  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
3886 S.MARTIN/AP   AP                 AP                 3800 E.COLETTA     3800 E.COLETTA     3607 N.BALSARA     3607 N.BALSARA    
AP                 AP                 CHANGE/3800 E.COLE 3800 E.COLETTA     CHANGE/3607 N.BALS 3607 N.BALSARA     3607 N.BALSARA    
AP                 AP                 3800 E.COLETTA     3800 E.COLETTA     3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA    
BEAM   LINE 1-5  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
AP                 AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS  
AP                 AP                 CHANGE/N002 A.VAIL N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS  
AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS  
BEAM   LINE 2-1  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
3820 J.Groves/AP   AP                 AP                 3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang       
AP                 AP                 Xray CHECKOUT/3819 3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang       
AP                 AP                 3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang       
BEAM   LINE 2-2  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
91T1 M.KOZINA/AP   AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
3726 A.SEYFFERT/AP AP                 AP                 3514 C.LOPANO      3514 C.LOPANO      3417 A.TEMPLETON   3417 A.TEMPLETON  
AP                 AP                 CHANGE/3514 C.LOPA 3514 C.LOPANO      CHANGE/3417 A.TEMP 3417 A.TEMPLETON   3417 A.TEMPLETON  
AP                 AP                 3514 C.LOPANO      3514 C.LOPANO      3417 A.TEMPLETON   3417 A.TEMPLETON   3417 A.TEMPLETON  
BEAM   LINE 4-1  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
3678 S.MYNENI/AP   AP                 AP                 3712 J.PENA        3712 J.PENA        3771 Y.Slowey      3771 Y.Slowey     
AP                 AP                 Xray CHECKOUT/3712 3712 J.PENA        Xray CHECKOUT/3771 3771 Y.Slowey      3771 Y.Slowey     
AP                 AP                 3712 J.PENA        3712 J.PENA        3771 Y.Slowey      3771 Y.Slowey      3771 Y.Slowey     
BEAM   LINE 4-2  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
3806 A.Edwards/AP  AP                 AP                 8047 T.WEISS       3883 V.Saranathan  3883 V.Saranathan  10K7 A.FYFE       
AP                 AP                 CHANGE/8047 T.WEIS CHANGE/3883 V.Sara 3883 V.Saranathan  CHANGE/10K7 A.FYFE CHANGE/3660 S.TOLB
AP                 AP                 8047 T.WEISS       3883 V.Saranathan  3883 V.Saranathan  10K7 A.FYFE        3660 S.TOLBERT    
BEAM   LINE 4-3  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
3678 S.MYNENI/AP   AP                 AP                 3851 T.BORCH       3851 T.BORCH       3457 S.DEBEER      3457 S.DEBEER     
AP                 AP                 SMB CHECKOUT/3851  3851 T.BORCH       SMB CHECKOUT/3457  3457 S.DEBEER      3457 S.DEBEER     
AP                 AP                 3851 T.BORCH       3851 T.BORCH       3457 S.DEBEER      3457 S.DEBEER      3457 S.DEBEER     
BEAM   LINE 6-2  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
8879 T.WENG/AP     AP                 AP                 3717 E.SOLOMON     3717 E.SOLOMON     3717 E.SOLOMON     3717 E.SOLOMON    
AP                 AP                 CHANGE/3717 E.SOLO 3717 E.SOLOMON     3717 E.SOLOMON     3717 E.SOLOMON     CHANGE/3701 S.DEBE
AP                 AP                 3717 E.SOLOMON     3717 E.SOLOMON     3717 E.SOLOMON     3717 E.SOLOMON     3701 S.DEBEER     
BEAM   LINE 7-2  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
3819 R.Wang/AP     AP                 AP                 91P9 Y.Lee         91P9 Y.Lee         8818 A.MEHTA       8818 A.MEHTA      
AP                 AP                 Xray CHECKOUT/91P9 91P9 Y.Lee         Xray CHECKOUT/8818 8818 A.MEHTA       8818 A.MEHTA      
AP                 AP                 91P9 Y.Lee         91P9 Y.Lee         8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA      
BEAM   LINE 7-3  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
3339 K.HODGSON/AP  AP                 AP                 3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN  
AP                 AP                 SMB CHECKOUT/3282  3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN  
AP                 AP                 3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN  
BEAM   LINE 9-3  
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
3726 A.SEYFFERT/AP AP                 AP                 8067 S.WEBB        8067 S.WEBB        3635 J.Addison     3635 J.Addison    
AP                 AP                 CHANGE/8067 S.WEBB 8067 S.WEBB        CHANGE/3635 J.Addi 3635 J.Addison     3635 J.Addison    
AP                 AP                 8067 S.WEBB        8067 S.WEBB        3635 J.Addison     3635 J.Addison     3635 J.Addison    
BEAM   LINE 11-2 
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
3689 J.BARGAR/AP   AP                 AP                 3882 T.Bank        3650 Y.Gorlin      3712 J.PENA        3712 J.PENA       
AP                 AP                 MES CHECKOUT/3882  MES CHECKOUT/3650  MES CHECKOUT/3712  3712 J.PENA        3712 J.PENA       
AP                 AP                 3882 T.Bank        3650 Y.Gorlin      3712 J.PENA        3712 J.PENA        3712 J.PENA       
BEAM   LINE 11-3 
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
8051 M.TONEY/AP    AP                 AP                 3731 A.AYZNER      3731 A.AYZNER      3855 M.Scarpulla   3855 M.Scarpulla  
AP                 AP                 Xray CHECKOUT/3731 3731 A.AYZNER      Xray CHECKOUT/3855 3855 M.Scarpulla   3855 M.Scarpulla  
AP                 AP                 3731 A.AYZNER      3731 A.AYZNER      3855 M.Scarpulla   3855 M.Scarpulla   3855 M.Scarpulla  
BEAM   LINE 14-3 
Mar. 25, 2013      Mar. 26, 2013      Mar. 27, 2013      Mar. 28, 2013      Mar. 29, 2013      Mar. 30, 2013      Mar. 31, 2013     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Apr. 01, 2013
                                         
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
BEAM   LINE 1-4  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
3607 N.BALSARA     3416 E.Davidson    3416 E.Davidson    3416 E.Davidson    91S7 J.POPLE       91S7 J.POPLE       91S7 J.POPLE      
Xray CHECKOUT/3416 3416 E.Davidson    3416 E.Davidson    CHANGE/91S7 J.POPL 91S7 J.POPLE       91S7 J.POPLE       91S7 J.POPLE      
3416 E.Davidson    3416 E.Davidson    3416 E.Davidson    91S7 J.POPLE       91S7 J.POPLE       91S7 J.POPLE       91S7 J.POPLE      
BEAM   LINE 1-5  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS  
N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled       
N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled       
BEAM   LINE 2-1  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
3819 R.Wang        3289 M.CHABINYC    3289 M.CHABINYC    3289 M.CHABINYC    3640 J.ACRIVOS     3640 J.ACRIVOS     3640 J.ACRIVOS    
Xray CHECKOUT/3289 3289 M.CHABINYC    3289 M.CHABINYC    Xray CHECKOUT/3640 3640 J.ACRIVOS     3640 J.ACRIVOS     3640 J.ACRIVOS    
3289 M.CHABINYC    3289 M.CHABINYC    3289 M.CHABINYC    3640 J.ACRIVOS     3640 J.ACRIVOS     3640 J.ACRIVOS     3640 J.ACRIVOS    
BEAM   LINE 2-2  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
Unscheduled        Unscheduled        3777 G.Carini      Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        CHANGE/3777 G.Cari Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        3777 G.Carini      Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
3417 A.TEMPLETON   8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       3736 C.KIM         3736 C.KIM        
CHANGE/8015 A.MEHT 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       CHANGE/3736 C.KIM  3736 C.KIM         3736 C.KIM        
8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       3736 C.KIM         3736 C.KIM         3736 C.KIM        
BEAM   LINE 4-1  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
3771 Y.Slowey      3352 B.GATES       3352 B.GATES       3352 B.GATES       3352 B.GATES       3736 C.KIM         3736 C.KIM        
Xray CHECKOUT/3352 3352 B.GATES       3352 B.GATES       3352 B.GATES       Xray CHECKOUT/3736 3736 C.KIM         3736 C.KIM        
3352 B.GATES       3352 B.GATES       3352 B.GATES       3352 B.GATES       3736 C.KIM         3736 C.KIM         3736 C.KIM        
BEAM   LINE 4-2  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
3660 S.TOLBERT     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
CHANGE/3577 C.SAFI 3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
BEAM   LINE 4-3  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
3457 S.DEBEER      3457 S.DEBEER      3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3564 C.KIM         3564 C.KIM        
3457 S.DEBEER      CHANGE/3329 S.SCOT 3329 S.SCOTT       3329 S.SCOTT       SMB CHECKOUT/3564  3564 C.KIM         3564 C.KIM        
3457 S.DEBEER      3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3564 C.KIM         3564 C.KIM         3564 C.KIM        
BEAM   LINE 6-2  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
3701 S.DEBEER      3701 S.DEBEER      3701 S.DEBEER      3701 S.DEBEER      3739 T.WENG        3739 T.WENG        3739 T.WENG       
3701 S.DEBEER      3701 S.DEBEER      3701 S.DEBEER      CHANGE/3739 T.WENG 3739 T.WENG        3739 T.WENG        3739 T.WENG       
3701 S.DEBEER      3701 S.DEBEER      3701 S.DEBEER      3739 T.WENG        3739 T.WENG        3739 T.WENG        3739 T.WENG       
BEAM   LINE 7-2  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
8818 A.MEHTA       3826 J.Komadina    3826 J.Komadina    3826 J.Komadina    91R0 T.Petach      91R0 T.Petach      91R0 T.Petach     
Xray CHECKOUT/3826 3826 J.Komadina    3826 J.Komadina    Xray CHECKOUT/91R0 91R0 T.Petach      91R0 T.Petach      91R0 T.Petach     
3826 J.Komadina    3826 J.Komadina    3826 J.Komadina    91R0 T.Petach      91R0 T.Petach      91R0 T.Petach      91R0 T.Petach     
BEAM   LINE 7-3  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
3282 N.BLACKBURN   3457 S.DEBEER      3457 S.DEBEER      3457 S.DEBEER      3667 S.TIAN        3667 S.TIAN        3667 S.TIAN       
SMB CHECKOUT/3457  3457 S.DEBEER      3457 S.DEBEER      SMB CHECKOUT/3667  3667 S.TIAN        3667 S.TIAN        3667 S.TIAN       
3457 S.DEBEER      3457 S.DEBEER      3457 S.DEBEER      3667 S.TIAN        3667 S.TIAN        3667 S.TIAN        3667 S.TIAN       
BEAM   LINE 9-3  
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
3635 J.Addison     3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
CHANGE/3683 M.PUSH 3683 M.PUSHIE      3683 M.PUSHIE      CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
BEAM   LINE 11-2 
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
3712 J.PENA        3628 L.RAO         3628 L.RAO         3803 H.Hsu-Kim     3803 H.Hsu-Kim     3740 C.SANTELLI    3740 C.SANTELLI   
SMB CHECKOUT/3628  3628 L.RAO         MES CHECKOUT/3803  3803 H.Hsu-Kim     MES CHECKOUT/3740  3740 C.SANTELLI    3740 C.SANTELLI   
3628 L.RAO         3628 L.RAO         3803 H.Hsu-Kim     3803 H.Hsu-Kim     3740 C.SANTELLI    3740 C.SANTELLI    3740 C.SANTELLI   
BEAM   LINE 11-3 
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
3855 M.Scarpulla   3706 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT     3673 A.Briseno     3673 A.Briseno    
Xray CHECKOUT/3706 Xray CHECKOUT/3660 3660 S.TOLBERT     3660 S.TOLBERT     Xray CHECKOUT/3673 3673 A.Briseno     3673 A.Briseno    
3706 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT     3673 A.Briseno     3673 A.Briseno     3673 A.Briseno    
BEAM   LINE 14-3 
Apr. 01, 2013      Apr. 02, 2013      Apr. 03, 2013      Apr. 04, 2013      Apr. 05, 2013      Apr. 06, 2013      Apr. 07, 2013     
Unscheduled        3711 A.TEMPLETON   3711 A.TEMPLETON   3711 A.TEMPLETON   3711 A.TEMPLETON   3711 A.TEMPLETON   Unscheduled       
CHANGE/3711 A.TEMP 3711 A.TEMPLETON   3711 A.TEMPLETON   3711 A.TEMPLETON   3711 A.TEMPLETON   Unscheduled        Unscheduled       
3711 A.TEMPLETON   3711 A.TEMPLETON   3711 A.TEMPLETON   3711 A.TEMPLETON   3711 A.TEMPLETON   Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Apr. 08, 2013
MA       AP                                    
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
BEAM   LINE 1-4  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
91S7 J.POPLE/MA    AP                 AP                 91S6 J.RIVNAY      91S6 J.RIVNAY      91S6 J.RIVNAY      91S6 J.RIVNAY     
MA                 AP                 CHANGE/91S6 J.RIVN 91S6 J.RIVNAY      91S6 J.RIVNAY      91S6 J.RIVNAY      91S6 J.RIVNAY     
MA/AP              AP                 91S6 J.RIVNAY      91S6 J.RIVNAY      91S6 J.RIVNAY      91S6 J.RIVNAY      91S6 J.RIVNAY     
BEAM   LINE 1-5  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
MA                 AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled       
MA                 AP                 CHANGE/N002 A.VAIL N002 A.VAILIONIS   CHANGE/N002 A.VAIL Unscheduled        Unscheduled       
MA/AP              AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
3640 J.ACRIVOS/MA  AP                 AP                 3731 A.AYZNER      3731 A.AYZNER      3625 S.SWEETNAM    3625 S.SWEETNAM   
MA                 AP                 Xray CHECKOUT/3731 3731 A.AYZNER      Xray CHECKOUT/3625 3625 S.SWEETNAM    3625 S.SWEETNAM   
MA/AP              AP                 3731 A.AYZNER      3731 A.AYZNER      3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM   
BEAM   LINE 2-2  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
3736 C.KIM/MA      AP                 AP                 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
MA                 AP                 CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      CHANGE/3754 B.POPE
MA/AP              AP                 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3754 B.POPESCU    
BEAM   LINE 4-1  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
3736 C.KIM/MA      AP                 AP                 3770 A.SLOWEY      3796 A.DEONARINE   3796 A.DEONARINE   3796 A.DEONARINE  
MA                 AP                 Xray CHECKOUT/3770 Xray CHECKOUT/3796 3796 A.DEONARINE   3796 A.DEONARINE   3796 A.DEONARINE  
MA/AP              AP                 3770 A.SLOWEY      3796 A.DEONARINE   3796 A.DEONARINE   3796 A.DEONARINE   3796 A.DEONARINE  
BEAM   LINE 4-2  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
3577 C.SAFINYA/MA  AP                 AP                 8877 T.MATSUI      3791 C.TASSONE     3791 C.TASSONE     3575 L.CARTER     
MA                 AP                 CHANGE/8877 T.MATS CHANGE/3791 C.TASS 3791 C.TASSONE     CHANGE/3575 L.CART 3575 L.CARTER     
MA/AP              AP                 8877 T.MATSUI      3791 C.TASSONE     3791 C.TASSONE     3575 L.CARTER      3575 L.CARTER     
BEAM   LINE 4-3  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
3564 C.KIM/MA      AP                 AP                 3729 V.YACHANDRA   3729 V.YACHANDRA   8051 M.TONEY       8051 M.TONEY      
MA                 AP                 SMB CHECKOUT/3729  3729 V.YACHANDRA   SMB CHECKOUT/8051  8051 M.TONEY       8051 M.TONEY      
MA/AP              AP                 3729 V.YACHANDRA   3729 V.YACHANDRA   8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 6-2  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
3739 T.WENG/MA     AP                 AP                 8881 Y.LIU         8881 Y.LIU         3819 R.Wang        3819 R.Wang       
MA                 AP                 Xray>TXM/8881      8881 Y.LIU         CHANGE/3819 R.Wang 3819 R.Wang        3819 R.Wang       
MA/AP              AP                 8881 Y.LIU         8881 Y.LIU         3819 R.Wang        3819 R.Wang        3819 R.Wang       
BEAM   LINE 7-2  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
91R0 T.Petach/MA   AP                 AP                 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
MA                 AP                 Xray CHECKOUT/3647 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
MA/AP              AP                 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
BEAM   LINE 7-3  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
3667 S.TIAN/MA     AP                 AP                 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS
MA                 AP                 SMB CHECKOUT/3324  3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS
MA/AP              AP                 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS 3324 P.RIGGS-GELAS
BEAM   LINE 9-3  
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
DOWN/MA            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
MA/AP              AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
3614 H.NICHOL/MA   AP                 AP                 3505 H.NICHOL      3505 H.NICHOL      3754 B.POPESCU     3754 B.POPESCU    
MA                 AP                 CHANGE/3505 H.NICH 3505 H.NICHOL      CHANGE/3754 B.POPE 3754 B.POPESCU     3754 B.POPESCU    
MA/AP              AP                 3505 H.NICHOL      3505 H.NICHOL      3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU    
BEAM   LINE 11-2 
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
3740 C.SANTELLI/MA AP                 AP                 8860 J.BARGAR      8860 J.BARGAR      3709 J.CHANG       3709 J.CHANG      
MA                 AP                 MEIS>GIXAS/8860    8860 J.BARGAR      MES CHECKOUT/3709  3709 J.CHANG       3709 J.CHANG      
MA/AP              AP                 8860 J.BARGAR      8860 J.BARGAR      3709 J.CHANG       3709 J.CHANG       3709 J.CHANG      
BEAM   LINE 11-3 
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
3673 A.Briseno/MA  AP                 AP                 3759 A.Yiu         3759 A.Yiu         3294 S.HIMMELBERGE 3294 S.HIMMELBERGE
MA                 AP                 Xray CHECKOUT/3759 3759 A.Yiu         Xray CHECKOUT/3294 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE
MA/AP              AP                 3759 A.Yiu         3759 A.Yiu         3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE
BEAM   LINE 14-3 
Apr. 08, 2013      Apr. 09, 2013      Apr. 10, 2013      Apr. 11, 2013      Apr. 12, 2013      Apr. 13, 2013      Apr. 14, 2013     
MA                 AP                 AP                 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
MA                 AP                 CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
MA/AP              AP                 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     

Back to Table of Contents

WEEK OF Apr. 15, 2013
                        100mALowAlpha      100mALowAlpha      100mALowAlpha     
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
BEAM   LINE 1-4  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
91S6 J.RIVNAY      3779 E.Davidson    3779 E.Davidson    3779 E.Davidson    Unscheduled        Unscheduled        Unscheduled       
Xray CHECKOUT/3779 3779 E.Davidson    3779 E.Davidson    Unscheduled        Unscheduled        Unscheduled        Unscheduled       
3779 E.Davidson    3779 E.Davidson    3779 E.Davidson    Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 1-5  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        N002 A.VAILIONIS   Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        CHANGE/N002 A.VAIL Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        N002 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
3625 S.SWEETNAM    8082 A.VAILIONIS   8082 A.VAILIONIS   3826 J.Komadina    3826 J.Komadina    3953 M.KANAN       3953 M.KANAN      
Xray CHECKOUT/8082 8082 A.VAILIONIS   Xray CHECKOUT/3826 3826 J.Komadina    Xray CHECKOUT/3953 3953 M.KANAN       Unscheduled       
8082 A.VAILIONIS   8082 A.VAILIONIS   3826 J.Komadina    3826 J.Komadina    3953 M.KANAN       3953 M.KANAN       Unscheduled       
BEAM   LINE 2-2  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
Unscheduled        FACI               FACI               FACI               FACI               FACI               FACI              
Xray CHECKOUT/FACI FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-3  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3689 J.BARGAR      3689 J.BARGAR      3689 J.BARGAR     
3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     CHANGE/3689 J.BARG 3689 J.BARGAR      3689 J.BARGAR      3689 J.BARGAR     
3754 B.POPESCU     3754 B.POPESCU     3754 B.POPESCU     3689 J.BARGAR      3689 J.BARGAR      3689 J.BARGAR      3689 J.BARGAR     
BEAM   LINE 4-1  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
3796 A.DEONARINE   3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3889 S.Lounis      3889 S.Lounis      3889 S.Lounis     
Xray CHECKOUT/3658 3658 W.Fischer     3658 W.Fischer     Xray CHECKOUT/3889 3889 S.Lounis      3889 S.Lounis      3889 S.Lounis     
3658 W.Fischer     3658 W.Fischer     3658 W.Fischer     3889 S.Lounis      3889 S.Lounis      3889 S.Lounis      3889 S.Lounis     
BEAM   LINE 4-2  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
3575 L.CARTER      3910 E.Merritt     3909 S.Turley      8077 T.MATSUI      8077 T.MATSUI      3806 A.Edwards     3806 A.Edwards    
CHANGE/3910 E.Merr CHANGE/3909 S.Turl CHANGE/8077 T.MATS 8077 T.MATSUI      CHANGE/3806 A.Edwa 3806 A.Edwards     3806 A.Edwards    
3910 E.Merritt     3909 S.Turley      8077 T.MATSUI      8077 T.MATSUI      3806 A.Edwards     3806 A.Edwards     3806 A.Edwards    
BEAM   LINE 4-3  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
8051 M.TONEY       3681 S.GEORGE      8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
SMB CHECKOUT/3681  SMB CHECKOUT/8015  8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
3681 S.GEORGE      8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 6-2  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
3819 R.Wang        3824 Z.Ristanovic  3824 Z.Ristanovic  3824 Z.Ristanovic  8072 J.HAYTER      8072 J.HAYTER      8072 J.HAYTER     
CHANGE/3824 Z.Rist 3824 Z.Ristanovic  3824 Z.Ristanovic  CHANGE/8072 J.HAYT 8072 J.HAYTER      8072 J.HAYTER      8072 J.HAYTER     
3824 Z.Ristanovic  3824 Z.Ristanovic  3824 Z.Ristanovic  8072 J.HAYTER      8072 J.HAYTER      8072 J.HAYTER      8072 J.HAYTER     
BEAM   LINE 7-2  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
3647 S.BENT        3625 S.SWEETNAM    3625 S.SWEETNAM    3289 M.CHABINYC    3289 M.CHABINYC    3823 Y.SHI         3823 Y.SHI        
Xray CHECKOUT/3625 3625 S.SWEETNAM    Xray CHECKOUT/3289 3289 M.CHABINYC    Xray CHECKOUT/3823 3823 Y.SHI         3823 Y.SHI        
3625 S.SWEETNAM    3625 S.SWEETNAM    3289 M.CHABINYC    3289 M.CHABINYC    3823 Y.SHI         3823 Y.SHI         3823 Y.SHI        
BEAM   LINE 7-3  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
3324 P.RIGGS-GELAS 3593 T.STEMMLER    3593 T.STEMMLER    8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
SMB CHECKOUT/3593  3593 T.STEMMLER    SMB CHECKOUT/8071  8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
3593 T.STEMMLER    3593 T.STEMMLER    8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
BEAM   LINE 9-3  
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
3754 B.POPESCU     3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG 
Xray>Laser/3303    3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG 
3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG 
BEAM   LINE 11-2 
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
3709 J.CHANG       3620 M.Louie       3620 M.Louie       3620 M.Louie       3613 D.FRIEBEL     3613 D.FRIEBEL     3613 D.FRIEBEL    
MES CHECKOUT/3620  3620 M.Louie       3620 M.Louie       MES CHECKOUT/3613  3613 D.FRIEBEL     3613 D.FRIEBEL     3613 D.FRIEBEL    
3620 M.Louie       3620 M.Louie       3620 M.Louie       3613 D.FRIEBEL     3613 D.FRIEBEL     3613 D.FRIEBEL     3613 D.FRIEBEL    
BEAM   LINE 11-3 
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
3294 S.HIMMELBERGE 8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        3947 B.Shyam       3867 L.Lim         3867 L.Lim        
Xray CHECKOUT/8067 8067 S.WEBB        8067 S.WEBB        Xray CHECKOUT/3947 CHANGE/8875 D.VAN  3867 L.Lim         3867 L.Lim        
8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        3947 B.Shyam       CHANGE/3867 L.Lim  3867 L.Lim         3867 L.Lim        
BEAM   LINE 14-3 
Apr. 15, 2013      Apr. 16, 2013      Apr. 17, 2013      Apr. 18, 2013      Apr. 19, 2013      Apr. 20, 2013      Apr. 21, 2013     
3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      Unscheduled        Unscheduled       
3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      Unscheduled        Unscheduled        Unscheduled       
3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Apr. 22, 2013
AP       AP                                    
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
BEAM   LINE 1-4  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
AP                 AP                 AP                 3856 C.Ryan        3856 C.Ryan        Unscheduled        Unscheduled       
AP                 AP                 Xray CHECKOUT/3856 3856 C.Ryan        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 3856 C.Ryan        3856 C.Ryan        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 1-5  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
AP                 AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled       
AP                 AP                 CHANGE/N002 A.VAIL N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled       
AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
AP                 AP                 AP                 8856 C.TROXEL      8856 C.TROXEL      8856 C.TROXEL      8856 C.TROXEL     
AP                 AP                 Xray CHECKOUT/8856 8856 C.TROXEL      8856 C.TROXEL      8856 C.TROXEL      8856 C.TROXEL     
AP                 AP                 8856 C.TROXEL      8856 C.TROXEL      8856 C.TROXEL      8856 C.TROXEL      8856 C.TROXEL     
BEAM   LINE 2-2  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
FACI/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-3  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
3689 J.BARGAR/AP   AP                 AP                 3796 A.DEONARINE   3796 A.DEONARINE   3750 M.WALTON      3750 M.WALTON     
AP                 AP                 CHANGE/3796 A.DEON 3796 A.DEONARINE   CHANGE/3750 M.WALT 3750 M.WALTON      3750 M.WALTON     
AP                 AP                 3796 A.DEONARINE   3796 A.DEONARINE   3750 M.WALTON      3750 M.WALTON      3750 M.WALTON     
BEAM   LINE 4-1  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
3889 S.Lounis/AP   AP                 AP                 3855 M.Scarpulla   3855 M.Scarpulla   3329 S.SCOTT       3329 S.SCOTT      
AP                 AP                 Xray CHECKOUT/3855 3855 M.Scarpulla   Xray CHECKOUT/3329 3329 S.SCOTT       3329 S.SCOTT      
AP                 AP                 3855 M.Scarpulla   3855 M.Scarpulla   3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT      
BEAM   LINE 4-2  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
3806 A.Edwards/AP  AP                 AP                 3434 A.Sali        3358 D.Herschlag   3704 L.HIRST       3704 L.HIRST      
AP                 AP                 CHANGE/3434 A.Sali CHANGE/3358 D.Hers CHANGE/3704 L.HIRS 3704 L.HIRST       3704 L.HIRST      
AP                 AP                 3434 A.Sali        3358 D.Herschlag   3704 L.HIRST       3704 L.HIRST       3704 L.HIRST      
BEAM   LINE 4-3  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
8015 A.MEHTA/AP    AP                 AP                 3429 O.DUCKWORTH   3429 O.DUCKWORTH   3532 B.HEDMAN      3532 B.HEDMAN     
AP                 AP                 SMB CHECKOUT/3429  3429 O.DUCKWORTH   SMB CHECKOUT/3532  3532 B.HEDMAN      3532 B.HEDMAN     
AP                 AP                 3429 O.DUCKWORTH   3429 O.DUCKWORTH   3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN     
BEAM   LINE 6-2  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
8072 J.HAYTER/AP   AP                 AP                 8072 J.HAYTER      3821 Y.Yu          3821 Y.Yu          3581 J.Nelson Weke
AP                 AP                 CHANGE/91Q5 M.Scar CHANGE/3821 Y.Yu   3821 Y.Yu          CHANGE/3581 J.Nels 3581 J.Nelson Weke
AP                 AP                 8072 J.HAYTER      3821 Y.Yu          3821 Y.Yu          3581 J.Nelson Weke 3581 J.Nelson Weke
BEAM   LINE 7-2  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
3823 Y.SHI/AP      AP                 AP                 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3823 Y.SHI         3823 Y.SHI        
AP                 AP                 Xray CHECKOUT/3294 3294 S.HIMMELBERGE Xray CHECKOUT/3823 3823 Y.SHI         3823 Y.SHI        
AP                 AP                 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3823 Y.SHI         3823 Y.SHI         3823 Y.SHI        
BEAM   LINE 7-3  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
8071 R.SARANGI/AP  AP                 AP                 3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN      
AP                 AP                 SMB CHECKOUT/3730  3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN      
AP                 AP                 3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN      
BEAM   LINE 9-3  
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 10-2 
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
3303 A.LINDENBE/AP AP                 AP                 3667 S.TIAN        3667 S.TIAN        3534 A.LAM         3534 A.LAM        
AP                 AP                 Xray>Imaging/3667  3667 S.TIAN        CHANGE/3534 A.LAM  3534 A.LAM         3534 A.LAM        
AP                 AP                 3667 S.TIAN        3667 S.TIAN        3534 A.LAM         3534 A.LAM         3534 A.LAM        
BEAM   LINE 11-2 
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
3613 D.FRIEBEL/AP  AP                 AP                 3749 R.DAEHN       3749 R.DAEHN       3429 O.DUCKWORTH   3429 O.DUCKWORTH  
AP                 AP                 MES CHECKOUT/3749  3749 R.DAEHN       MES CHECKOUT/3429  3429 O.DUCKWORTH   3429 O.DUCKWORTH  
AP                 AP                 3749 R.DAEHN       3749 R.DAEHN       3429 O.DUCKWORTH   3429 O.DUCKWORTH   3429 O.DUCKWORTH  
BEAM   LINE 11-3 
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
3867 L.Lim/AP      AP                 AP                 3925 J.REINSPACH   3925 J.REINSPACH   3625 S.SWEETNAM    3625 S.SWEETNAM   
AP                 AP                 Xray CHECKOUT/3925 3925 J.REINSPACH   Xray CHECKOUT/3625 3625 S.SWEETNAM    3625 S.SWEETNAM   
AP                 AP                 3925 J.REINSPACH   3925 J.REINSPACH   3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM   
BEAM   LINE 14-3 
Apr. 22, 2013      Apr. 23, 2013      Apr. 24, 2013      Apr. 25, 2013      Apr. 26, 2013      Apr. 27, 2013      Apr. 28, 2013     
AP                 AP                 AP                 3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    
AP                 AP                 CHANGE/3679 S.FEND 3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    
AP                 AP                 3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    

Back to Table of Contents

WEEK OF Apr. 29, 2013
                                         
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
BEAM   LINE 1-4  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
Unscheduled        3856 C.Ryan        3856 C.Ryan        3800 E.COLETTA     3800 E.COLETTA     3607 N.BALSARA     3607 N.BALSARA    
Xray CHECKOUT/3856 3856 C.Ryan        CHANGE/3800 E.COLE 3800 E.COLETTA     CHANGE/3607 N.BALS 3607 N.BALSARA     3607 N.BALSARA    
3856 C.Ryan        3856 C.Ryan        3800 E.COLETTA     3800 E.COLETTA     3607 N.BALSARA     3607 N.BALSARA     3607 N.BALSARA    
BEAM   LINE 1-5  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
8856 C.TROXEL      3787 A.LLORDES     3787 A.LLORDES     3787 A.LLORDES     3787 A.LLORDES     8856 C.TROXEL      8856 C.TROXEL     
Xray CHECKOUT/3787 3787 A.LLORDES     3787 A.LLORDES     3787 A.LLORDES     Xray CHECKOUT/8856 8856 C.TROXEL      8856 C.TROXEL     
3787 A.LLORDES     3787 A.LLORDES     3787 A.LLORDES     3787 A.LLORDES     8856 C.TROXEL      8856 C.TROXEL      8856 C.TROXEL     
BEAM   LINE 2-2  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
FACI               FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled       
FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
FACI               FACI               FACI               Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
3750 M.WALTON      3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3550 M.HINDT       3550 M.HINDT      
CHANGE/3763 T.PUNS 3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     CHANGE/3550 M.HIND 3550 M.HINDT       3550 M.HINDT      
3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3763 T.PUNSHON     3550 M.HINDT       3550 M.HINDT       3550 M.HINDT      
BEAM   LINE 4-1  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
3329 S.SCOTT       3784 D.LEE         3784 D.LEE         3531 G.LOWRY       3531 G.LOWRY       3661 C.CHEN        3661 C.CHEN       
Xray CHECKOUT/3784 3784 D.LEE         Xray CHECKOUT/3531 3531 G.LOWRY       Xray CHECKOUT/3661 3661 C.CHEN        3661 C.CHEN       
3784 D.LEE         3784 D.LEE         3531 G.LOWRY       3531 G.LOWRY       3661 C.CHEN        3661 C.CHEN        3661 C.CHEN       
BEAM   LINE 4-2  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
3704 L.HIRST       3351 V.CHEREZOV    3752 S.WILBANKS    3434 A.Sali        3744 A.SCHOEFFLER  3792 E.Snell       3792 E.Snell      
CHANGE/3351 V.CHER CHANGE/3752 S.WILB CHANGE/3434 A.Sali CHANGE/3744 A.SCHO CHANGE/3792 E.Snel 3792 E.Snell       3792 E.Snell      
3351 V.CHEREZOV    3752 S.WILBANKS    3434 A.Sali        3744 A.SCHOEFFLER  3792 E.Snell       3792 E.Snell       3792 E.Snell      
BEAM   LINE 4-3  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
3532 B.HEDMAN      3531 G.LOWRY       3531 G.LOWRY       3670 S.KOZIMOR     3670 S.KOZIMOR     3363 S.KOZIMOR     3363 S.KOZIMOR    
SMB CHECKOUT/3531  3531 G.LOWRY       SMB CHECKOUT/3670  3670 S.KOZIMOR     SMB CHECKOUT/3363  3363 S.KOZIMOR     3363 S.KOZIMOR    
3531 G.LOWRY       3531 G.LOWRY       3670 S.KOZIMOR     3670 S.KOZIMOR     3363 S.KOZIMOR     3363 S.KOZIMOR     3363 S.KOZIMOR    
BEAM   LINE 6-2  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
3581 J.Nelson Weke 8051 M.TONEY       3829 E.Boulard     3829 E.Boulard     3829 E.Boulard     3842 W.Chueh       3842 W.Chueh      
CHANGE/8051 M.TONE CHANGE/3829 E.Boul 3829 E.Boulard     3829 E.Boulard     CHANGE/3842 W.Chue 3842 W.Chueh       3842 W.Chueh      
8051 M.TONEY       3829 E.Boulard     3829 E.Boulard     3829 E.Boulard     3842 W.Chueh       3842 W.Chueh       3842 W.Chueh      
BEAM   LINE 7-2  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
3823 Y.SHI         3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         3709 J.CHANG       3709 J.CHANG      
Xray CHECKOUT/3878 3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         Xray CHECKOUT/3709 3709 J.CHANG       3709 J.CHANG      
3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         3709 J.CHANG       3709 J.CHANG       3709 J.CHANG      
BEAM   LINE 7-3  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
3730 M.GREEN       3730 M.GREEN       3838 E.WASINGER    3838 E.WASINGER    3637 F.JALILEHVAND 3637 F.JALILEHVAND 3637 F.JALILEHVAND
3730 M.GREEN       SMB CHECKOUT/3838  3838 E.WASINGER    SMB CHECKOUT/3637  3637 F.JALILEHVAND 3637 F.JALILEHVAND 3637 F.JALILEHVAND
3730 M.GREEN       3838 E.WASINGER    3838 E.WASINGER    3637 F.JALILEHVAND 3637 F.JALILEHVAND 3637 F.JALILEHVAND 3637 F.JALILEHVAND
BEAM   LINE 9-3  
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
DOWN               DOWN               DOWN               DOWN               DOWN               3900 B.HEDMAN      3900 B.HEDMAN     
DOWN               DOWN               DOWN               DOWN               SMB CHECKOUT/3900  3900 B.HEDMAN      3900 B.HEDMAN     
DOWN               DOWN               DOWN               DOWN               3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
BEAM   LINE 10-2 
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
3534 A.LAM         3708 J.PERALTA-VID 3708 J.PERALTA-VID 3884 J.Fischel     3884 J.Fischel     3762 M.MASSEY      3762 M.MASSEY     
CHANGE/3708 J.PERA 3708 J.PERALTA-VID CHANGE/3884 J.Fisc 3884 J.Fischel     CHANGE/3762 M.MASS 3762 M.MASSEY      3762 M.MASSEY     
3708 J.PERALTA-VID 3708 J.PERALTA-VID 3884 J.Fischel     3884 J.Fischel     3762 M.MASSEY      3762 M.MASSEY      3762 M.MASSEY     
BEAM   LINE 11-2 
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
3429 O.DUCKWORTH   3884 J.Fischel     3884 J.Fischel     3893 D.WANG        3467 C.BOOTH       3467 C.BOOTH       3467 C.BOOTH      
MES CHECKOUT/3884  3884 J.Fischel     MES CHECKOUT/3893  MES CHECKOUT/3467  3467 C.BOOTH       3467 C.BOOTH       CHANGE/3521 C.BOOT
3884 J.Fischel     3884 J.Fischel     3893 D.WANG        3467 C.BOOTH       3467 C.BOOTH       3467 C.BOOTH       3521 C.BOOTH      
BEAM   LINE 11-3 
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
3625 S.SWEETNAM    3930 A.Singh       3289 M.CHABINYC    3289 M.CHABINYC    3896 D.Kang        3896 D.Kang        3896 D.Kang       
Xray CHECKOUT/3930 Xray CHECKOUT/3289 3289 M.CHABINYC    Xray CHECKOUT/3896 3896 D.Kang        3896 D.Kang        3896 D.Kang       
3930 A.Singh       3289 M.CHABINYC    3289 M.CHABINYC    3896 D.Kang        3896 D.Kang        3896 D.Kang        3896 D.Kang       
BEAM   LINE 14-3 
Apr. 29, 2013      Apr. 30, 2013      May 01, 2013       May 02, 2013       May 03, 2013       May 04, 2013       May 05, 2013      
3679 S.FENDORF     3764 T.PUNSHON     3764 T.PUNSHON     3764 T.PUNSHON     3764 T.PUNSHON     3764 T.PUNSHON     Unscheduled       
CHANGE/3764 T.PUNS 3764 T.PUNSHON     3764 T.PUNSHON     3764 T.PUNSHON     3764 T.PUNSHON     Unscheduled        Unscheduled       
3764 T.PUNSHON     3764 T.PUNSHON     3764 T.PUNSHON     3764 T.PUNSHON     3764 T.PUNSHON     Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF May 06, 2013 
MA       AP                                    
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
BEAM   LINE 1-4  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3607 N.BALSARA/MA  AP                 AP                 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
MA                 AP                 Xray CHECKOUT/3647 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
MA/AP              AP                 3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT        3647 S.BENT       
BEAM   LINE 1-5  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
8856 C.TROXEL/MA   AP                 AP                 3953 M.KANAN       3953 M.KANAN       3953 M.KANAN       3953 M.KANAN      
MA                 AP                 Xray CHECKOUT/3953 3953 M.KANAN       3953 M.KANAN       3953 M.KANAN       3953 M.KANAN      
MA/AP              AP                 3953 M.KANAN       3953 M.KANAN       3953 M.KANAN       3953 M.KANAN       3953 M.KANAN      
BEAM   LINE 2-2  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
MA                 AP                 AP                 91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler      
MA                 AP                 Xray CHECKOUT/91T8 91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler      
MA/AP              AP                 91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler      
BEAM   LINE 2-3  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3550 M.HINDT/MA    AP                 AP                 3658 W.Fischer     3658 W.Fischer     3708 J.PERALTA-VID 3708 J.PERALTA-VID
MA                 AP                 CHANGE/3658 W.Fisc 3658 W.Fischer     CHANGE/3708 J.PERA 3708 J.PERALTA-VID 3708 J.PERALTA-VID
MA/AP              AP                 3658 W.Fischer     3658 W.Fischer     3708 J.PERALTA-VID 3708 J.PERALTA-VID 3708 J.PERALTA-VID
BEAM   LINE 4-1  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3661 C.CHEN/MA     AP                 AP                 3869 E.Swanner     3846 O.ALEXEEV     3846 O.ALEXEEV     3846 O.ALEXEEV    
MA                 AP                 Xray CHECKOUT/3869 Xray CHECKOUT/3846 3846 O.ALEXEEV     3846 O.ALEXEEV     3846 O.ALEXEEV    
MA/AP              AP                 3869 E.Swanner     3846 O.ALEXEEV     3846 O.ALEXEEV     3846 O.ALEXEEV     3846 O.ALEXEEV    
BEAM   LINE 4-2  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3792 E.Snell/MA    AP                 AP                 8877 T.MATSUI      8047 T.WEISS       10K3 G.WONG        10K3 G.WONG       
MA                 AP                 CHANGE/8877 T.MATS CHANGE/8047 T.WEIS CHANGE/10K3 G.WONG 10K3 G.WONG        10K3 G.WONG       
MA/AP              AP                 8877 T.MATSUI      8047 T.WEISS       10K3 G.WONG        10K3 G.WONG        10K3 G.WONG       
BEAM   LINE 4-3  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3363 S.KOZIMOR/MA  AP                 AP                 3870 S.Daly        3870 S.Daly        3870 S.Daly        3870 S.Daly       
MA                 AP                 SMB CHECKOUT/3870  3870 S.Daly        3870 S.Daly        3870 S.Daly        3870 S.Daly       
MA/AP              AP                 3870 S.Daly        3870 S.Daly        3870 S.Daly        3870 S.Daly        3870 S.Daly       
BEAM   LINE 6-2  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3842 W.Chueh/MA    AP                 AP                 3650 Y.Gorlin      3650 Y.Gorlin      3650 Y.Gorlin      3881 Z.Jones      
MA                 AP                 CHANGE/3650 Y.Gorl 3650 Y.Gorlin      3650 Y.Gorlin      CHANGE/3881 Z.Jone 3881 Z.Jones      
MA/AP              AP                 3650 Y.Gorlin      3650 Y.Gorlin      3650 Y.Gorlin      3881 Z.Jones       3881 Z.Jones      
BEAM   LINE 7-2  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3709 J.CHANG/MA    AP                 AP                 1F81 A.VAILIONIS   1F81 A.VAILIONIS   1F81 A.VAILIONIS   1F81 A.VAILIONIS  
MA                 AP                 Xray CHECKOUT/1F81 1F81 A.VAILIONIS   1F81 A.VAILIONIS   1F81 A.VAILIONIS   1F81 A.VAILIONIS  
MA/AP              AP                 1F81 A.VAILIONIS   1F81 A.VAILIONIS   1F81 A.VAILIONIS   1F81 A.VAILIONIS   1F81 A.VAILIONIS  
BEAM   LINE 7-3  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3637 F.JALILEHV/MA AP                 AP                 1F83 K.LANCASTER   3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE  
MA                 AP                 SMB CHECKOUT/1F83  SMB CHECKOUT/3874  3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE  
MA/AP              AP                 1F83 K.LANCASTER   3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE  
BEAM   LINE 9-3  
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3900 B.HEDMAN/MA   AP                 AP                 3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
MA                 AP                 3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
MA/AP              AP                 3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
BEAM   LINE 10-2 
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3762 M.MASSEY/MA   AP                 AP                 8867 S.WEBB        8867 S.WEBB        3658 W.Fischer     3658 W.Fischer    
MA                 AP                 CHANGE/8867 S.WEBB 8867 S.WEBB        CHANGE/3658 W.Fisc 3658 W.Fischer     3658 W.Fischer    
MA/AP              AP                 8867 S.WEBB        8867 S.WEBB        3658 W.Fischer     3658 W.Fischer     3658 W.Fischer    
BEAM   LINE 11-2 
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3521 C.BOOTH/MA    AP                 AP                 3746 W.LUKENS      3746 W.LUKENS      3679 S.FENDORF     3679 S.FENDORF    
MA                 AP                 MES CHECKOUT/3746  3746 W.LUKENS      MES CHECKOUT/3679  3679 S.FENDORF     3679 S.FENDORF    
MA/AP              AP                 3746 W.LUKENS      3746 W.LUKENS      3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    
BEAM   LINE 11-3 
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
3896 D.Kang/MA     AP                 AP                 3641 M.CHABINYC    3641 M.CHABINYC    3820 J.Groves      3820 J.Groves     
MA                 AP                 Xray CHECKOUT/3641 3641 M.CHABINYC    Xray CHECKOUT/3820 3820 J.Groves      3820 J.Groves     
MA/AP              AP                 3641 M.CHABINYC    3641 M.CHABINYC    3820 J.Groves      3820 J.Groves      3820 J.Groves     
BEAM   LINE 14-3 
May 06, 2013       May 07, 2013       May 08, 2013       May 09, 2013       May 10, 2013       May 11, 2013       May 12, 2013      
MA                 AP                 AP                 3750 M.WALTON      3750 M.WALTON      Unscheduled        Unscheduled       
MA                 AP                 CHANGE/3750 M.WALT 3750 M.WALTON      3750 M.WALTON      Unscheduled        Unscheduled       
MA/AP              AP                 3750 M.WALTON      3750 M.WALTON      3750 M.WALTON      Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF May 13, 2013 
                                         
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
BEAM   LINE 1-4  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
3647 S.BENT        3647 S.BENT        Unscheduled        Unscheduled        Unscheduled        3416 E.Davidson    3416 E.Davidson   
3647 S.BENT        Unscheduled        Unscheduled        Unscheduled        Xray CHECKOUT/3416 3416 E.Davidson    3416 E.Davidson   
3647 S.BENT        Unscheduled        Unscheduled        Unscheduled        3416 E.Davidson    3416 E.Davidson    3416 E.Davidson   
BEAM   LINE 1-5  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
3953 M.KANAN       8082 A.VAILIONIS   8082 A.VAILIONIS   3820 J.Groves      3820 J.Groves      3820 J.Groves      3820 J.Groves     
Xray CHECKOUT/8082 8082 A.VAILIONIS   Xray CHECKOUT/3820 3820 J.Groves      3820 J.Groves      3820 J.Groves      3820 J.Groves     
8082 A.VAILIONIS   8082 A.VAILIONIS   3820 J.Groves      3820 J.Groves      3820 J.Groves      3820 J.Groves      3820 J.Groves     
BEAM   LINE 2-2  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler      
91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler      
91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler       91T8 D.Adler      
BEAM   LINE 2-3  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
3708 J.PERALTA-VID 3869 E.Swanner     3869 E.Swanner     3686 S.SINGH       3686 S.SINGH       3574 S.FENDORF     3574 S.FENDORF    
CHANGE/3869 E.Swan 3869 E.Swanner     CHANGE/3686 S.SING 3686 S.SINGH       CHANGE/3574 S.FEND 3574 S.FENDORF     3574 S.FENDORF    
3869 E.Swanner     3869 E.Swanner     3686 S.SINGH       3686 S.SINGH       3574 S.FENDORF     3574 S.FENDORF     3574 S.FENDORF    
BEAM   LINE 4-1  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
3846 O.ALEXEEV     3871 M.ACOSTA      3871 M.ACOSTA      8051 M.TONEY       8051 M.TONEY       3762 M.MASSEY      3762 M.MASSEY     
Xray CHECKOUT/3871 3871 M.ACOSTA      Xray CHECKOUT/8051 8051 M.TONEY       Xray CHECKOUT/3762 3762 M.MASSEY      3762 M.MASSEY     
3871 M.ACOSTA      3871 M.ACOSTA      8051 M.TONEY       8051 M.TONEY       3762 M.MASSEY      3762 M.MASSEY      3762 M.MASSEY     
BEAM   LINE 4-2  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
10K3 G.WONG        10K3 G.WONG        3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
10K3 G.WONG        CHANGE/3577 C.SAFI 3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
10K3 G.WONG        3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
BEAM   LINE 4-3  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
3870 S.Daly        3585 Y.ARAI        3585 Y.ARAI        3585 Y.ARAI        3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
SMB CHECKOUT/3585  3585 Y.ARAI        3585 Y.ARAI        SMB CHECKOUT/3614  3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
3585 Y.ARAI        3585 Y.ARAI        3585 Y.ARAI        3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
BEAM   LINE 6-2  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
3881 Z.Jones       3881 Z.Jones       3891 K.Kubicek     3891 K.Kubicek     3891 K.Kubicek     3687 C.Engtrakul   3687 C.Engtrakul  
3881 Z.Jones       CHANGE/3891 K.Kubi 3891 K.Kubicek     3891 K.Kubicek     CHANGE/3687 C.Engt 3687 C.Engtrakul   3687 C.Engtrakul  
3881 Z.Jones       3891 K.Kubicek     3891 K.Kubicek     3891 K.Kubicek     3687 C.Engtrakul   3687 C.Engtrakul   3687 C.Engtrakul  
BEAM   LINE 7-2  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
1F81 A.VAILIONIS   3706 S.TOLBERT     3706 S.TOLBERT     3706 S.TOLBERT     3942 M.Samant      3942 M.Samant      3942 M.Samant     
Xray CHECKOUT/3706 3706 S.TOLBERT     3706 S.TOLBERT     Xray CHECKOUT/3942 3942 M.Samant      3942 M.Samant      3942 M.Samant     
3706 S.TOLBERT     3706 S.TOLBERT     3706 S.TOLBERT     3942 M.Samant      3942 M.Samant      3942 M.Samant      3942 M.Samant     
BEAM   LINE 7-3  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
3874 N.PINGITORE   3859 I.PICKERING   3859 I.PICKERING   3859 I.PICKERING   3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
SMB CHECKOUT/3859  3859 I.PICKERING   3859 I.PICKERING   SMB CHECKOUT/3857  3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
3859 I.PICKERING   3859 I.PICKERING   3859 I.PICKERING   3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
BEAM   LINE 9-3  
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
3900 B.HEDMAN      3900 B.HEDMAN      Unscheduled        Unscheduled        3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
3900 B.HEDMAN      Unscheduled        Unscheduled        SMB CHECKOUT/3857  3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
3900 B.HEDMAN      Unscheduled        Unscheduled        3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE     
BEAM   LINE 10-2 
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
3658 W.Fischer     8072 J.HAYTER      8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       3820 J.Groves      3820 J.Groves     
CHANGE/8072 J.HAYT Xray CHECKOUT/8818 8818 A.MEHTA       8818 A.MEHTA       CHANGE/3820 J.Grov 3820 J.Groves      3820 J.Groves     
8072 J.HAYTER      8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       3820 J.Groves      3820 J.Groves      3820 J.Groves     
BEAM   LINE 11-2 
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
3679 S.FENDORF     3702 Y.ARAI        3702 Y.ARAI        FACI               1F91 M.Barney      1F91 M.Barney      1F91 M.Barney     
MES CHECKOUT/3702  3702 Y.ARAI        FACI               MES CHECKOUT/1F91  1F91 M.Barney      1F91 M.Barney      1F91 M.Barney     
3702 Y.ARAI        3702 Y.ARAI        FACI               1F91 M.Barney      1F91 M.Barney      1F91 M.Barney      1F91 M.Barney     
BEAM   LINE 11-3 
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
3820 J.Groves      3820 J.Groves      3651 A.Sharenko    3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE    
3820 J.Groves      Xray CHECKOUT/3651 Xray CHECKOUT/3791 3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE    
3820 J.Groves      3651 A.Sharenko    3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE    
BEAM   LINE 14-3 
May 13, 2013       May 14, 2013       May 15, 2013       May 16, 2013       May 17, 2013       May 18, 2013       May 19, 2013      
Unscheduled        3869 E.Swanner     3869 E.Swanner     3869 E.Swanner     3869 E.Swanner     3869 E.Swanner     Unscheduled       
CHANGE/3869 E.Swan 3869 E.Swanner     3869 E.Swanner     3869 E.Swanner     3869 E.Swanner     Unscheduled        Unscheduled       
3869 E.Swanner     3869 E.Swanner     3869 E.Swanner     3869 E.Swanner     3869 E.Swanner     Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF May 20, 2013 
AP       PA                                    
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
BEAM   LINE 1-4  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3416 E.Davidson/AP AP                 AP                 91Q9 R.Holmes      91Q9 R.Holmes      3925 J.REINSPACH   3925 J.REINSPACH  
AP                 AP                 Xray CHECKOUT/91Q9 91Q9 R.Holmes      Xray CHECKOUT/3925 3925 J.REINSPACH   3925 J.REINSPACH  
AP                 AP                 91Q9 R.Holmes      91Q9 R.Holmes      3925 J.REINSPACH   3925 J.REINSPACH   3925 J.REINSPACH  
BEAM   LINE 1-5  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
AP                 AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled       
AP                 AP                 CHANGE/N002 A.VAIL N002 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3820 J.Groves/AP   AP                 AP                 3640 J.ACRIVOS     3640 J.ACRIVOS     3640 J.ACRIVOS     3640 J.ACRIVOS    
AP                 AP                 Xray CHECKOUT/3640 3640 J.ACRIVOS     3640 J.ACRIVOS     3640 J.ACRIVOS     3640 J.ACRIVOS    
AP                 AP                 3640 J.ACRIVOS     3640 J.ACRIVOS     3640 J.ACRIVOS     3640 J.ACRIVOS     3640 J.ACRIVOS    
BEAM   LINE 2-2  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
91T8 D.Adler/AP    AP                 AP                 3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL     
AP                 AP                 Xray CHECKOUT/3626 3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL     
AP                 AP                 3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL     
BEAM   LINE 2-3  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3574 S.FENDORF/AP  AP                 AP                 3821 Y.Yu          3821 Y.Yu          3505 H.NICHOL      3505 H.NICHOL     
AP                 AP                 CHANGE/3821 Y.Yu   3821 Y.Yu          CHANGE/3505 H.NICH 3505 H.NICHOL      3505 H.NICHOL     
AP                 AP                 3821 Y.Yu          3821 Y.Yu          3505 H.NICHOL      3505 H.NICHOL      3505 H.NICHOL     
BEAM   LINE 4-1  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3762 M.MASSEY/AP   AP                 AP                 8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8015 A.MEHTA      
AP                 AP                 Xray>GIXAS/8818    8818 A.MEHTA       8818 A.MEHTA       CHANGE/8015 A.MEHT 8015 A.MEHTA      
AP                 AP                 8818 A.MEHTA       8818 A.MEHTA       8818 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 4-2  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3577 C.SAFINYA/AP  AP                 AP                 3617 B.Mooers      3617 B.Mooers      8077 T.MATSUI      3791 C.TASSONE    
AP                 AP                 CHANGE/3617 B.Mooe 3617 B.Mooers      CHANGE/8077 T.MATS CHANGE/3791 C.TASS 3791 C.TASSONE    
AP                 AP                 3617 B.Mooers      3617 B.Mooers      8077 T.MATSUI      3791 C.TASSONE     3791 C.TASSONE    
BEAM   LINE 4-3  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3614 H.NICHOL/AP   AP                 AP                 3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3835 G.WAYCHUNAS  
AP                 AP                 SMB CHECKOUT/3835  3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3835 G.WAYCHUNAS  
AP                 AP                 3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3835 G.WAYCHUNAS  
BEAM   LINE 6-2  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3687 C.Engtraku/AP AP                 AP                 3687 C.Engtrakul   8055 H.OGASAWARA   8055 H.OGASAWARA   8055 H.OGASAWARA  
AP                 AP                 3687 C.Engtrakul   CHANGE/8055 H.OGAS 8055 H.OGASAWARA   8055 H.OGASAWARA   8055 H.OGASAWARA  
AP                 AP                 3687 C.Engtrakul   8055 H.OGASAWARA   8055 H.OGASAWARA   8055 H.OGASAWARA   8055 H.OGASAWARA  
BEAM   LINE 7-2  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3942 M.Samant/AP   AP                 AP                 3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE    
AP                 AP                 Xray CHECKOUT/3735 3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE    
AP                 AP                 3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE     3735 C.TASSONE    
BEAM   LINE 7-3  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3857 G.GEORGE/AP   AP                 AP                 1F88 T.GUO         3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
AP                 AP                 SMB CHECKOUT/1F88  SMB CHECKOUT/3900  3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
AP                 AP                 1F88 T.GUO         3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN     
BEAM   LINE 9-3  
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3857 G.GEORGE/AP   AP                 AP                 8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 SMB CHECKOUT/8071  8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
BEAM   LINE 10-2 
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3820 J.Groves/AP   AP                 AP                 3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3657 M.Biegalski  
AP                 AP                 CHANGE/3844 Y.TAKA 3844 Y.TAKAMURA    3844 Y.TAKAMURA    CHANGE/3657 M.Bieg 3657 M.Biegalski  
AP                 AP                 3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3657 M.Biegalski   3657 M.Biegalski  
BEAM   LINE 11-2 
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
1F91 M.Barney/AP   AP                 AP                 8060 J.BARGAR      8060 J.BARGAR      3559 B.BOSTICK     3559 B.BOSTICK    
AP                 AP                 MES CHECKOUT/8060  8060 J.BARGAR      MES CHECKOUT/3559  3559 B.BOSTICK     3559 B.BOSTICK    
AP                 AP                 8060 J.BARGAR      8060 J.BARGAR      3559 B.BOSTICK     3559 B.BOSTICK     3559 B.BOSTICK    
BEAM   LINE 11-3 
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
3791 C.TASSONE/AP  AP                 AP                 1F76 Y.Diao        1F76 Y.Diao        3853 A.Briseno     3853 A.Briseno    
AP                 AP                 Xray CHECKOUT/1F76 1F76 Y.Diao        Xray CHECKOUT/3853 3853 A.Briseno     3853 A.Briseno    
AP                 AP                 1F76 Y.Diao        1F76 Y.Diao        3853 A.Briseno     3853 A.Briseno     3853 A.Briseno    
BEAM   LINE 14-3 
May 20, 2013       May 21, 2013       May 22, 2013       May 23, 2013       May 24, 2013       May 25, 2013       May 26, 2013      
AP                 AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       Unscheduled       
AP                 AP                 CHANGE/8015 A.MEHT 8015 A.MEHTA       8015 A.MEHTA       Unscheduled        Unscheduled       
AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF May 27, 2013 
HOLIDAY                                          
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
BEAM   LINE 1-4  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
3925 J.REINSPACH   3925 J.REINSPACH   3800 E.COLETTA     3800 E.COLETTA     3779 E.Davidson    3779 E.Davidson    3779 E.Davidson   
3925 J.REINSPACH   Xray CHECKOUT/3800 3800 E.COLETTA     Xray CHECKOUT/3779 3779 E.Davidson    3779 E.Davidson    3779 E.Davidson   
3925 J.REINSPACH   3800 E.COLETTA     3800 E.COLETTA     3779 E.Davidson    3779 E.Davidson    3779 E.Davidson    3779 E.Davidson   
BEAM   LINE 1-5  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
Unscheduled        Unscheduled        Unscheduled        N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled       
Unscheduled        Unscheduled        CHANGE/N002 A.VAIL N002 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
3640 J.ACRIVOS     3640 J.ACRIVOS     3289 M.CHABINYC    3289 M.CHABINYC    3289 M.CHABINYC    91T5 V.HASSAN      91T5 V.HASSAN     
3640 J.ACRIVOS     Xray CHECKOUT/3289 3289 M.CHABINYC    3289 M.CHABINYC    Xray CHECKOUT/91T5 91T5 V.HASSAN      91T5 V.HASSAN     
3640 J.ACRIVOS     3289 M.CHABINYC    3289 M.CHABINYC    3289 M.CHABINYC    91T5 V.HASSAN      91T5 V.HASSAN      91T5 V.HASSAN     
BEAM   LINE 2-2  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
3626 T.CAHILL      3626 T.CAHILL      3626 T.CAHILL      Unscheduled        8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN 
3626 T.CAHILL      3626 T.CAHILL      Unscheduled        Xray CHECKOUT/8875 8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN 
3626 T.CAHILL      3626 T.CAHILL      Unscheduled        8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  8875 D.VAN CAMPEN 
BEAM   LINE 2-3  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
3505 H.NICHOL      3505 H.NICHOL      8883 B.KOCAR       8883 B.KOCAR       3635 J.Addison     3534 A.LAM         3534 A.LAM        
3505 H.NICHOL      CHANGE/8883 B.KOCA 8883 B.KOCAR       CHANGE/3635 J.Addi CHANGE/3534 A.LAM  3534 A.LAM         3534 A.LAM        
3505 H.NICHOL      8883 B.KOCAR       8883 B.KOCAR       3635 J.Addison     3534 A.LAM         3534 A.LAM         3534 A.LAM        
BEAM   LINE 4-1  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
8015 A.MEHTA       8015 A.MEHTA       3833 J.CABANA-JIME 3833 J.CABANA-JIME 3833 J.CABANA-JIME 3657 M.Biegalski   3657 M.Biegalski  
8015 A.MEHTA       Xray CHECKOUT/3833 3833 J.CABANA-JIME 3833 J.CABANA-JIME Xray CHECKOUT/3657 3657 M.Biegalski   3657 M.Biegalski  
8015 A.MEHTA       3833 J.CABANA-JIME 3833 J.CABANA-JIME 3833 J.CABANA-JIME 3657 M.Biegalski   3657 M.Biegalski   3657 M.Biegalski  
BEAM   LINE 4-2  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
3791 C.TASSONE     3625 S.SWEETNAM    8847 T.WEISS       8077 T.MATSUI      DOWN               DOWN               3742 H.LIANG      
CHANGE/3625 S.SWEE CHANGE/8847 T.WEIS CHANGE/8077 T.MATS CHANGE/3358 D.Hers DOWN               CHANGE/3742 H.LIAN 3742 H.LIANG      
3625 S.SWEETNAM    8847 T.WEISS       8077 T.MATSUI      3358 D.Hersch/DOWN DOWN               3742 H.LIANG       3742 H.LIANG      
BEAM   LINE 4-3  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
3835 G.WAYCHUNAS   3835 G.WAYCHUNAS   3408 K.HAYES       3501 P.O'DAY       3501 P.O'DAY       3603 J.CHOROVER    3603 J.CHOROVER   
3835 G.WAYCHUNAS   SMB CHECKOUT/3408  SMB CHECKOUT/3501  3501 P.O'DAY       SMB CHECKOUT/3603  3603 J.CHOROVER    3603 J.CHOROVER   
3835 G.WAYCHUNAS   3408 K.HAYES       3501 P.O'DAY       3501 P.O'DAY       3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
BEAM   LINE 6-2  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
8055 H.OGASAWARA   3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH       3620 M.Louie       3620 M.Louie      
CHANGE/3521 C.BOOT 3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH       CHANGE/3620 M.Loui 3620 M.Louie       3620 M.Louie      
3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH       3620 M.Louie       3620 M.Louie       3620 M.Louie      
BEAM   LINE 7-2  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
3735 C.TASSONE     3735 C.TASSONE     3925 J.REINSPACH   3925 J.REINSPACH   3925 J.REINSPACH   3819 R.Wang        3819 R.Wang       
3735 C.TASSONE     Xray CHECKOUT/3925 3925 J.REINSPACH   3925 J.REINSPACH   Xray CHECKOUT/3819 3819 R.Wang        3819 R.Wang       
3735 C.TASSONE     3925 J.REINSPACH   3925 J.REINSPACH   3925 J.REINSPACH   3819 R.Wang        3819 R.Wang        3819 R.Wang       
BEAM   LINE 7-3  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
3900 B.HEDMAN      3900 B.HEDMAN      3697 G.Meloni      3697 G.Meloni      3697 G.Meloni      3593 T.STEMMLER    3593 T.STEMMLER   
3900 B.HEDMAN      SMB CHECKOUT/3697  3697 G.Meloni      3697 G.Meloni      SMB CHECKOUT/3593  3593 T.STEMMLER    3593 T.STEMMLER   
3900 B.HEDMAN      3697 G.Meloni      3697 G.Meloni      3697 G.Meloni      3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER   
BEAM   LINE 9-3  
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
8071 R.SARANGI     8071 R.SARANGI     3697 G.Meloni      3697 G.Meloni      3697 G.Meloni      3593 T.STEMMLER    3593 T.STEMMLER   
8071 R.SARANGI     SMB CHECKOUT/3697  3697 G.Meloni      3697 G.Meloni      SMB CHECKOUT/3593  3593 T.STEMMLER    3593 T.STEMMLER   
8071 R.SARANGI     3697 G.Meloni      3697 G.Meloni      3697 G.Meloni      3593 T.STEMMLER    3593 T.STEMMLER    3593 T.STEMMLER   
BEAM   LINE 10-2 
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
3657 M.Biegalski   3657 M.Biegalski   3657 M.Biegalski   3807 T.GAO         3807 T.GAO         91T2 F.BRIDGES     91T2 F.BRIDGES    
3657 M.Biegalski   3657 M.Biegalski   CHANGE/3807 T.GAO  3807 T.GAO         Xray CHECKOUT/91T2 91T2 F.BRIDGES     91T2 F.BRIDGES    
3657 M.Biegalski   3657 M.Biegalski   3807 T.GAO         3807 T.GAO         91T2 F.BRIDGES     91T2 F.BRIDGES     91T2 F.BRIDGES    
BEAM   LINE 11-2 
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
3559 B.BOSTICK     3559 B.BOSTICK     3944 N.Prouty      3408 K.HAYES       3408 K.HAYES       3501 P.O'DAY       3501 P.O'DAY      
3559 B.BOSTICK     SMB CHECKOUT/3944  SMB CHECKOUT/3408  3408 K.HAYES       SMB CHECKOUT/3501  3501 P.O'DAY       3501 P.O'DAY      
3559 B.BOSTICK     3944 N.Prouty      3408 K.HAYES       3408 K.HAYES       3501 P.O'DAY       3501 P.O'DAY       3501 P.O'DAY      
BEAM   LINE 11-3 
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
3853 A.Briseno     3853 A.Briseno     3892 S.Fan         3892 S.Fan         3892 S.Fan         3294 S.HIMMELBERGE 3294 S.HIMMELBERGE
3853 A.Briseno     Xray CHECKOUT/3892 3892 S.Fan         3892 S.Fan         Xray CHECKOUT/3294 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE
3853 A.Briseno     3892 S.Fan         3892 S.Fan         3892 S.Fan         3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE
BEAM   LINE 14-3 
May 27, 2013       May 28, 2013       May 29, 2013       May 30, 2013       May 31, 2013       Jun. 01, 2013      Jun. 02, 2013     
Unscheduled        Unscheduled        3783 C.FULLER      3783 C.FULLER      3635 J.Addison     3635 J.Addison     3635 J.Addison    
Unscheduled        CHANGE/3783 C.FULL 3783 C.FULLER      CHANGE/3635 J.Addi 3635 J.Addison     3635 J.Addison     3635 J.Addison    
Unscheduled        3783 C.FULLER      3783 C.FULLER      3635 J.Addison     3635 J.Addison     3635 J.Addison     3635 J.Addison    

Back to Table of Contents

WEEK OF Jun. 03, 2013
MA       AP                                    
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
BEAM   LINE 1-4  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3779 E.Davidson/MA AP                 AP                 3800 E.COLETTA     3800 E.COLETTA     Unscheduled        Unscheduled       
MA                 AP                 Xray CHECKOUT/3800 3800 E.COLETTA     Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 3800 E.COLETTA     3800 E.COLETTA     Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 1-5  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
MA                 AP                 AP                 Unscheduled        N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled       
MA                 AP                 Unscheduled        CHANGE/N002 A.VAIL N002 A.VAILIONIS   Unscheduled        Unscheduled       
MA/AP              AP                 Unscheduled        N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
91T5 V.HASSAN/MA   AP                 AP                 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3833 J.CABANA-JIME 3833 J.CABANA-JIME
MA                 AP                 Xray CHECKOUT/3294 3294 S.HIMMELBERGE Xray CHECKOUT/3833 3833 J.CABANA-JIME 3833 J.CABANA-JIME
MA/AP              AP                 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3833 J.CABANA-JIME 3833 J.CABANA-JIME 3833 J.CABANA-JIME
BEAM   LINE 2-2  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
8875 D.VAN CAMP/MA AP                 AP                 8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  Unscheduled        Unscheduled       
MA                 AP                 8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  Unscheduled        Unscheduled        Unscheduled       
MA/AP              AP                 8875 D.VAN CAMPEN  8875 D.VAN CAMPEN  Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3534 A.LAM/MA      AP                 AP                 8067 S.WEBB        8067 S.WEBB        8072 J.HAYTER      8072 J.HAYTER     
MA                 AP                 CHANGE/8067 S.WEBB 8067 S.WEBB        CHANGE/8072 J.HAYT 8072 J.HAYTER      8072 J.HAYTER     
MA/AP              AP                 8067 S.WEBB        8067 S.WEBB        8072 J.HAYTER      8072 J.HAYTER      8072 J.HAYTER     
BEAM   LINE 4-1  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3657 M.Biegalsk/MA AP                 AP                 3630 C.Ban         3630 C.Ban         3559 B.BOSTICK     3559 B.BOSTICK    
MA                 AP                 Xray CHECKOUT/3630 3630 C.Ban         Xray CHECKOUT/3559 3559 B.BOSTICK     3559 B.BOSTICK    
MA/AP              AP                 3630 C.Ban         3630 C.Ban         3559 B.BOSTICK     3559 B.BOSTICK     3559 B.BOSTICK    
BEAM   LINE 4-2  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3742 H.LIANG/MA    AP                 AP                 8877 T.MATSUI      8047 T.WEISS       3351 V.CHEREZOV    3873 A.VAN BUUREN 
MA                 AP                 CHANGE/8877 T.MATS CHANGE/8047 T.WEIS CHANGE/3351 V.CHER CHANGE/3873 A.VAN  CHANGE/8077 T.MATS
MA/AP              AP                 8877 T.MATSUI      8047 T.WEISS       3351 V.CHEREZOV    3873 A.VAN BUUREN  8077 T.MATSUI     
BEAM   LINE 4-3  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3603 J.CHOROVER/MA AP                 AP                 3867 L.Lim         8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
MA                 AP                 SMB CHECKOUT/3867  SMB CHECKOUT/8015  8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
MA/AP              AP                 3867 L.Lim         8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 6-2  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3620 M.Louie/MA    AP                 AP                 3401 E.SOLOMON     3401 E.SOLOMON     3717 E.SOLOMON     3717 E.SOLOMON    
MA                 AP                 Xray CHECKOUT/3401 3401 E.SOLOMON     3401 E.SOLOMON     3717 E.SOLOMON     3717 E.SOLOMON    
MA/AP              AP                 3401 E.SOLOMON     3401 E.SOLOMON     CHANGE/3717 E.SOLO 3717 E.SOLOMON     3717 E.SOLOMON    
BEAM   LINE 7-2  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3819 R.Wang/MA     AP                 AP                 3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM   
MA                 AP                 Xray CHECKOUT/3625 3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM   
MA/AP              AP                 3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM    3625 S.SWEETNAM   
BEAM   LINE 7-3  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3593 T.STEMMLER/MA AP                 AP                 8071 R.SARANGI     3681 S.GEORGE      3681 S.GEORGE      3681 S.GEORGE     
MA                 AP                 SMB CHECKOUT/8071  SMB CHECKOUT/3681  3681 S.GEORGE      3681 S.GEORGE      3681 S.GEORGE     
MA/AP              AP                 8071 R.SARANGI     3681 S.GEORGE      3681 S.GEORGE      3681 S.GEORGE      3681 S.GEORGE     
BEAM   LINE 9-3  
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3593 T.STEMMLER/MA AP                 AP                 3593 T.STEMMLER    3593 T.STEMMLER    3836 Y.Lu          3836 Y.Lu         
MA                 AP                 3593 T.STEMMLER    3593 T.STEMMLER    SMB CHECKOUT/3836  3836 Y.Lu          3836 Y.Lu         
MA/AP              AP                 3593 T.STEMMLER    3593 T.STEMMLER    3836 Y.Lu          3836 Y.Lu          3836 Y.Lu         
BEAM   LINE 10-2 
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
91T2 F.BRIDGES/MA  AP                 AP                 8867 S.WEBB        8867 S.WEBB        3845 M.KOZINA      3845 M.KOZINA     
MA                 AP                 CHANGE/8867 S.WEBB 8867 S.WEBB        Xray/3845          3845 M.KOZINA      3845 M.KOZINA     
MA/AP              AP                 8867 S.WEBB        8867 S.WEBB        3845 M.KOZINA      3845 M.KOZINA      3845 M.KOZINA     
BEAM   LINE 11-2 
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3501 P.O'DAY/MA    AP                 AP                 3429 O.DUCKWORTH   3429 O.DUCKWORTH   3747 J.Catalano    3747 J.Catalano   
MA                 AP                 SMB CHECKOUT/3429  3429 O.DUCKWORTH   SMB CHECKOUT/3747  3747 J.Catalano    3747 J.Catalano   
MA/AP              AP                 3429 O.DUCKWORTH   3429 O.DUCKWORTH   3747 J.Catalano    3747 J.Catalano    3747 J.Catalano   
BEAM   LINE 11-3 
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3294 S.HIMMELBE/MA AP                 AP                 Unscheduled        3676 R.KLINE       3676 R.KLINE       3676 R.KLINE      
MA                 AP                 Unscheduled        Xray CHECKOUT/3676 3676 R.KLINE       3676 R.KLINE       3676 R.KLINE      
MA/AP              AP                 Unscheduled        3676 R.KLINE       3676 R.KLINE       3676 R.KLINE       3676 R.KLINE      
BEAM   LINE 14-3 
Jun. 03, 2013      Jun. 04, 2013      Jun. 05, 2013      Jun. 06, 2013      Jun. 07, 2013      Jun. 08, 2013      Jun. 09, 2013     
3635 J.Addison/MA  AP                 AP                 8067 S.WEBB        8067 S.WEBB        3514 C.LOPANO      3514 C.LOPANO     
MA                 AP                 CHANGE/8067 S.WEBB 8067 S.WEBB        CHANGE/3514 C.LOPA 3514 C.LOPANO      3514 C.LOPANO     
MA/AP              AP                 8067 S.WEBB        8067 S.WEBB        3514 C.LOPANO      3514 C.LOPANO      3514 C.LOPANO     

Back to Table of Contents

WEEK OF Jun. 10, 2013
XAS School       XAS School       XAS School       XAS       100mALowAlpha      100mALowAlpha      100mALowAlpha     
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
BEAM   LINE 1-4  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
Unscheduled        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan       
Xray CHECKOUT/3856 3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan       
3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan        3856 C.Ryan       
BEAM   LINE 1-5  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
Unscheduled        N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        N002 A.VAILIONIS   Unscheduled        Unscheduled       
CHANGE/N002 A.VAIL N002 A.VAILIONIS   Unscheduled        CHANGE/N002 A.VAIL Unscheduled        Unscheduled        Unscheduled       
N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        N002 A.VAILIONIS   Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
3833 J.CABANA-JIME 3815 D.Xie         3815 D.Xie         3815 D.Xie         3948 B.Shyam       3948 B.Shyam       3948 B.Shyam      
Xray CHECKOUT/3815 3815 D.Xie         3815 D.Xie         Xray CHECKOUT/3948 3948 B.Shyam       3948 B.Shyam       3948 B.Shyam      
3815 D.Xie         3815 D.Xie         3815 D.Xie         3948 B.Shyam       3948 B.Shyam       3948 B.Shyam       3948 B.Shyam      
BEAM   LINE 2-2  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
8072 J.HAYTER      3821 Y.Yu          3821 Y.Yu          3939 M.Fuentes-Mon 3939 M.Fuentes-Mon 3945 S.CONRADSON   3945 S.CONRADSON  
CHANGE/3821 Y.Yu   3821 Y.Yu          CHANGE/3939 M.Fuen 3939 M.Fuentes-Mon CHANGE/3945 S.CONR 3945 S.CONRADSON   3945 S.CONRADSON  
3821 Y.Yu          3821 Y.Yu          3939 M.Fuentes-Mon 3939 M.Fuentes-Mon 3945 S.CONRADSON   3945 S.CONRADSON   3945 S.CONRADSON  
BEAM   LINE 4-1  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
3559 B.BOSTICK     8884 R.DAVIS       8208 R.SARANGI     3871 M.ACOSTA      3871 M.ACOSTA      3871 M.ACOSTA      3871 M.ACOSTA     
Xray CHECKOUT/8884 SMB CHECKOUT/8208  Xray CHECKOUT/3871 3871 M.ACOSTA      3871 M.ACOSTA      3871 M.ACOSTA      3871 M.ACOSTA     
8884 R.DAVIS       8208 R.SARANGI     3871 M.ACOSTA      3871 M.ACOSTA      3871 M.ACOSTA      3871 M.ACOSTA      3871 M.ACOSTA     
BEAM   LINE 4-2  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
8077 T.MATSUI      8077 T.MATSUI      3358 D.Herschlag   3791 C.TASSONE     3617 B.Mooers      3617 B.Mooers      3617 B.Mooers     
8077 T.MATSUI      CHANGE/8877 T.MATS CHANGE/3791 C.TASS CHANGE/3617 B.Mooe 3617 B.Mooers      3617 B.Mooers      3617 B.Mooers     
8077 T.MATSUI      CHANGE/3358 D.Hers 3791 C.TASSONE     3617 B.Mooers      3617 B.Mooers      3617 B.Mooers      3617 B.Mooers     
BEAM   LINE 4-3  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
8015 A.MEHTA       3574 S.FENDORF     3574 S.FENDORF     3574 S.FENDORF     3778 P.Kennepohl   3778 P.Kennepohl   3778 P.Kennepohl  
SMB CHECKOUT/3574  3574 S.FENDORF     3574 S.FENDORF     SMB CHECKOUT/3778  3778 P.Kennepohl   3778 P.Kennepohl   3778 P.Kennepohl  
3574 S.FENDORF     3574 S.FENDORF     3574 S.FENDORF     3778 P.Kennepohl   3778 P.Kennepohl   3778 P.Kennepohl   3778 P.Kennepohl  
BEAM   LINE 6-2  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
3717 E.SOLOMON     3717 E.SOLOMON     3809 N.BLACKBURN   3809 N.BLACKBURN   3809 N.BLACKBURN   8879 T.WENG        8879 T.WENG       
3717 E.SOLOMON     CHANGE/3809 N.BLAC 3809 N.BLACKBURN   3809 N.BLACKBURN   Xray CHECKOUT/8879 8879 T.WENG        8879 T.WENG       
3717 E.SOLOMON     3809 N.BLACKBURN   3809 N.BLACKBURN   3809 N.BLACKBURN   8879 T.WENG        8879 T.WENG        8879 T.WENG       
BEAM   LINE 7-2  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
3625 S.SWEETNAM    3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3921 W.Chueh       3921 W.Chueh       3921 W.Chueh      
Xray CHECKOUT/3294 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE Xray CHECKOUT/3921 3921 W.Chueh       3921 W.Chueh       3921 W.Chueh      
3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3294 S.HIMMELBERGE 3921 W.Chueh       3921 W.Chueh       3921 W.Chueh       3921 W.Chueh      
BEAM   LINE 7-3  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
3681 S.GEORGE      3681 S.GEORGE      8208 R.SARANGI     3755 P.Kennepohl   3755 P.Kennepohl   3778 P.Kennepohl   3778 P.Kennepohl  
3681 S.GEORGE      SMB CHECKOUT/8208  SMB CHECKOUT/3755  3755 P.Kennepohl   SMB CHECKOUT/3778  3778 P.Kennepohl   3778 P.Kennepohl  
3681 S.GEORGE      8208 R.SARANGI     3755 P.Kennepohl   3755 P.Kennepohl   3778 P.Kennepohl   3778 P.Kennepohl   3778 P.Kennepohl  
BEAM   LINE 9-3  
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
3836 Y.Lu          3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE  
SMB CHECKOUT/3900  3900 B.HEDMAN      3900 B.HEDMAN      SMB CHECKOUT/3874  3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE  
3900 B.HEDMAN      3900 B.HEDMAN      3900 B.HEDMAN      3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE   3874 N.PINGITORE  
BEAM   LINE 10-2 
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
3845 M.KOZINA      3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG 
Xray CHECKOUT/3303 3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG 
3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG  3303 A.LINDENBERG 
BEAM   LINE 11-2 
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
3747 J.Catalano    FACI               8208 R.SARANGI     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    
SMB CHECKOUT/FACI  SMB CHECKOUT/8208  SMB CHECKOUT/3679  3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    
FACI               8208 R.SARANGI     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF     3679 S.FENDORF    
BEAM   LINE 11-3 
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
3676 R.KLINE       3939 M.Fuentes-Mon 3939 M.Fuentes-Mon 3641 M.CHABINYC    3641 M.CHABINYC    3923 Y.Diao        3923 Y.Diao       
Xray CHECKOUT/3939 3939 M.Fuentes-Mon Xray CHECKOUT/3641 3641 M.CHABINYC    Xray CHECKOUT/3923 3923 Y.Diao        3923 Y.Diao       
3939 M.Fuentes-Mon 3939 M.Fuentes-Mon 3641 M.CHABINYC    3641 M.CHABINYC    3923 Y.Diao        3923 Y.Diao        3923 Y.Diao       
BEAM   LINE 14-3 
Jun. 10, 2013      Jun. 11, 2013      Jun. 12, 2013      Jun. 13, 2013      Jun. 14, 2013      Jun. 15, 2013      Jun. 16, 2013     
3514 C.LOPANO      3667 S.TIAN        3667 S.TIAN        3667 S.TIAN        3667 S.TIAN        Unscheduled        Unscheduled       
CHANGE/3667 S.TIAN 3667 S.TIAN        3667 S.TIAN        3667 S.TIAN        Unscheduled        Unscheduled        Unscheduled       
3667 S.TIAN        3667 S.TIAN        3667 S.TIAN        3667 S.TIAN        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jun. 17, 2013
AP       AP                                    
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
BEAM   LINE 1-4  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3856 C.Ryan/AP     AP                 AP                 3950 H.Liang       3950 H.Liang       3950 H.Liang       3950 H.Liang      
AP                 AP                 Xray CHECKOUT/3950 3950 H.Liang       3950 H.Liang       3950 H.Liang       3950 H.Liang      
AP                 AP                 3950 H.Liang       3950 H.Liang       3950 H.Liang       3950 H.Liang       3950 H.Liang      
BEAM   LINE 1-5  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
AP                 AP                 AP                 91U3 D.Sokaras     91U3 D.Sokaras     91U3 D.Sokaras     91U3 D.Sokaras    
AP                 AP                 Xray CHECKOUT/91U3 91U3 D.Sokaras     91U3 D.Sokaras     91U3 D.Sokaras     91U3 D.Sokaras    
AP                 AP                 91U3 D.Sokaras     91U3 D.Sokaras     91U3 D.Sokaras     91U3 D.Sokaras     91U3 D.Sokaras    
BEAM   LINE 2-1  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3948 B.Shyam/AP    AP                 AP                 3917 A.WISE        3917 A.WISE        3917 A.WISE        3917 A.WISE       
AP                 AP                 Xray CHECKOUT/3917 3917 A.WISE        3917 A.WISE        3917 A.WISE        3917 A.WISE       
AP                 AP                 3917 A.WISE        3917 A.WISE        3917 A.WISE        3917 A.WISE        3917 A.WISE       
BEAM   LINE 2-2  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3945 S.CONRADSO/AP AP                 AP                 3940 H.BOUKHALFA   3940 H.BOUKHALFA   3702 Y.ARAI        3702 Y.ARAI       
AP                 AP                 CHANGE/3940 H.BOUK 3940 H.BOUKHALFA   CHANGE/3702 Y.ARAI 3702 Y.ARAI        Unscheduled       
AP                 AP                 3940 H.BOUKHALFA   3940 H.BOUKHALFA   3702 Y.ARAI        3702 Y.ARAI        Unscheduled       
BEAM   LINE 4-1  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3871 M.ACOSTA/AP   AP                 AP                 3920 N.Abdul-Jabba 3920 N.Abdul-Jabba 3725 M.TAILLEFERT  3725 M.TAILLEFERT 
AP                 AP                 Xray CHECKOUT/3920 3920 N.Abdul-Jabba Xray CHECKOUT/3725 3725 M.TAILLEFERT  3725 M.TAILLEFERT 
AP                 AP                 3920 N.Abdul-Jabba 3920 N.Abdul-Jabba 3725 M.TAILLEFERT  3725 M.TAILLEFERT  3725 M.TAILLEFERT 
BEAM   LINE 4-2  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3617 B.Mooers/AP   AP                 AP                 10N0 C.Kadoch      3909 S.Turley      3434 A.Sali        3933 K.LEE        
AP                 AP                 CHANGE/10N0 C.Kado CHANGE/3909 S.Turl CHANGE/3434 A.Sali CHANGE/3933 K.LEE  3933 K.LEE        
AP                 AP                 10N0 C.Kadoch      3909 S.Turley      3434 A.Sali        3933 K.LEE         3933 K.LEE        
BEAM   LINE 4-3  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3778 P.Kennepoh/AP AP                 AP                 3585 Y.ARAI        3585 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI       
AP                 AP                 SMB CHECKOUT/3585  3585 Y.ARAI        SMB CHECKOUT/3702  3702 Y.ARAI        3702 Y.ARAI       
AP                 AP                 3585 Y.ARAI        3585 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI        3702 Y.ARAI       
BEAM   LINE 6-2  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
8879 T.WENG/AP     AP                 AP                 8841 J.HAYTER      3691 K.CATS        3691 K.CATS        3691 K.CATS       
AP                 AP                 CHANGE/3955 J.HAYT CHANGE/3691 K.CATS 3691 K.CATS        3691 K.CATS        3691 K.CATS       
AP                 AP                 CHANGE/8841 J.HAYT 3691 K.CATS        3691 K.CATS        3691 K.CATS        3691 K.CATS       
BEAM   LINE 7-2  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3921 W.Chueh/AP    AP                 AP                 3952 B.Shyam       3952 B.Shyam       3709 J.CHANG       3709 J.CHANG      
AP                 AP                 Xray CHECKOUT/3952 3952 B.Shyam       Xray CHECKOUT/3709 3709 J.CHANG       3709 J.CHANG      
AP                 AP                 3952 B.Shyam       3952 B.Shyam       3709 J.CHANG       3709 J.CHANG       3709 J.CHANG      
BEAM   LINE 7-3  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3778 P.Kennepoh/AP AP                 AP                 3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
AP                 AP                 SMB CHECKOUT/3339  3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
AP                 AP                 3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON     3339 K.HODGSON    
BEAM   LINE 9-3  
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3874 N.PINGITOR/AP AP                 AP                 3775 A.Scott       3775 A.Scott       Unscheduled        Unscheduled       
AP                 AP                 SMB CHECKOUT/3775  3775 A.Scott       Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 3775 A.Scott       3775 A.Scott       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 10-2 
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3303 A.LINDENBE/AP AP                 AP                 3694 J.Vinther     3694 J.Vinther     8067 S.WEBB        8067 S.WEBB       
AP                 AP                 CHANGE/3694 J.Vint 3694 J.Vinther     CHANGE/8067 S.WEBB 8067 S.WEBB        8067 S.WEBB       
AP                 AP                 3694 J.Vinther     3694 J.Vinther     8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
BEAM   LINE 11-2 
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3679 S.FENDORF/AP  AP                 AP                 3875 S.CONRADSON   3875 S.CONRADSON   3672 S.CONRADSON   3672 S.CONRADSON  
AP                 AP                 MES CHECKOUT/3875  3875 S.CONRADSON   CHANGE/3672 S.CONR 3672 S.CONRADSON   3672 S.CONRADSON  
AP                 AP                 3875 S.CONRADSON   3875 S.CONRADSON   3672 S.CONRADSON   3672 S.CONRADSON   3672 S.CONRADSON  
BEAM   LINE 11-3 
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
3923 Y.Diao/AP     AP                 AP                 8060 J.BARGAR      3673 A.Briseno     3673 A.Briseno     3673 A.Briseno    
AP                 AP                 Xray CHECKOUT/8060 Xray CHECKOUT/3673 3673 A.Briseno     3673 A.Briseno     3673 A.Briseno    
AP                 AP                 8060 J.BARGAR      3673 A.Briseno     3673 A.Briseno     3673 A.Briseno     3673 A.Briseno    
BEAM   LINE 14-3 
Jun. 17, 2013      Jun. 18, 2013      Jun. 19, 2013      Jun. 20, 2013      Jun. 21, 2013      Jun. 22, 2013      Jun. 23, 2013     
AP                 AP                 AP                 3725 M.TAILLEFERT  3725 M.TAILLEFERT  3725 M.TAILLEFERT  3725 M.TAILLEFERT 
AP                 AP                 CHANGE/3725 M.TAIL 3725 M.TAILLEFERT  3725 M.TAILLEFERT  3725 M.TAILLEFERT  3725 M.TAILLEFERT 
AP                 AP                 3725 M.TAILLEFERT  3725 M.TAILLEFERT  3725 M.TAILLEFERT  3725 M.TAILLEFERT  3725 M.TAILLEFERT 

Back to Table of Contents

WEEK OF Jun. 24, 2013
                                         
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
BEAM   LINE 1-4  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
3950 H.Liang       3779 E.Davidson    3779 E.Davidson    3949 D.Barbero     3949 D.Barbero     3906 C.Fox         3906 C.Fox        
Xray CHECKOUT/3779 3779 E.Davidson    Xray CHECKOUT/3949 3949 D.Barbero     Xray CHECKOUT/3906 3906 C.Fox         3906 C.Fox        
3779 E.Davidson    3779 E.Davidson    3949 D.Barbero     3949 D.Barbero     3906 C.Fox         3906 C.Fox         3906 C.Fox        
BEAM   LINE 1-5  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
91U3 D.Sokaras     N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled       
CHANGE/N002 A.VAIL N002 A.VAILIONIS   CHANGE/N002 A.VAIL N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled       
N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
3917 A.WISE        3725 M.TAILLEFERT  3725 M.TAILLEFERT  3725 M.TAILLEFERT  3898 P.VALDIVIA    3898 P.VALDIVIA    3898 P.VALDIVIA   
Xray CHECKOUT/3725 3725 M.TAILLEFERT  3725 M.TAILLEFERT  Xray CHECKOUT/3898 3898 P.VALDIVIA    3898 P.VALDIVIA    3898 P.VALDIVIA   
3725 M.TAILLEFERT  3725 M.TAILLEFERT  3725 M.TAILLEFERT  3898 P.VALDIVIA    3898 P.VALDIVIA    3898 P.VALDIVIA    3898 P.VALDIVIA   
BEAM   LINE 2-2  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
Unscheduled        1F96 D.Sokaras     8867 S.WEBB        3903 B.Beaulieu    3903 B.Beaulieu    8867 S.WEBB        8867 S.WEBB       
CHANGE/1F96 D.Soka CHANGE/8867 S.WEBB CHANGE/3903 B.Beau 3903 B.Beaulieu    CHANGE/8867 S.WEBB 8867 S.WEBB        8867 S.WEBB       
1F96 D.Sokaras     8867 S.WEBB        3903 B.Beaulieu    3903 B.Beaulieu    8867 S.WEBB        8867 S.WEBB        8867 S.WEBB       
BEAM   LINE 4-1  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
3725 M.TAILLEFERT  8884 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       3889 S.Lounis      3889 S.Lounis     
Xray CHECKOUT/8884 Xray CHECKOUT/3728 3728 R.DAVIS       3728 R.DAVIS       Xray CHECKOUT/3889 3889 S.Lounis      3889 S.Lounis     
8884 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       3728 R.DAVIS       3889 S.Lounis      3889 S.Lounis      3889 S.Lounis     
BEAM   LINE 4-2  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
3933 K.LEE         3933 K.LEE         3806 A.Edwards     3752 S.WILBANKS    8847 T.WEISS       3586 S.HALL        8877 T.MATSUI     
3933 K.LEE         CHANGE/3806 A.Edwa CHANGE/3752 S.WILB CHANGE/8847 T.WEIS CHANGE/3586 S.HALL CHANGE/8877 T.MATS 8877 T.MATSUI     
3933 K.LEE         3806 A.Edwards     3752 S.WILBANKS    8847 T.WEISS       3586 S.HALL        8877 T.MATSUI      8877 T.MATSUI     
BEAM   LINE 4-3  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
3702 Y.ARAI        3532 B.HEDMAN      3532 B.HEDMAN      3762 M.MASSEY      3762 M.MASSEY      3329 S.SCOTT       3329 S.SCOTT      
SMB CHECKOUT/3532  3532 B.HEDMAN      SMB CHECKOUT/3762  3762 M.MASSEY      SMB CHECKOUT/3329  3329 S.SCOTT       3329 S.SCOTT      
3532 B.HEDMAN      3532 B.HEDMAN      3762 M.MASSEY      3762 M.MASSEY      3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT      
BEAM   LINE 6-2  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
3691 K.CATS        8041 J.HAYTER      Unscheduled        CHANGE/91U8 S.CHEA 8081 Y.LIU         8081 Y.LIU         8081 Y.LIU        
CHANGE/8041 J.HAYT CHANGE/1F97 S.Flei CHANGE/91U4 G.NELS CHANGE/8081 Y.LIU  8081 Y.LIU         8081 Y.LIU         8081 Y.LIU        
8041 J.HAYTER      CHANGE/91U9 F.Gao  CHANGE/91V0 E.Quir 8081 Y.LIU         8081 Y.LIU         8081 Y.LIU         8081 Y.LIU        
BEAM   LINE 7-2  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
3709 J.CHANG       8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS   3647 S.BENT        3647 S.BENT       
Xray CHECKOUT/8082 8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS   Xray CHECKOUT/3647 3647 S.BENT        3647 S.BENT       
8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS   8082 A.VAILIONIS   3647 S.BENT        3647 S.BENT        3647 S.BENT       
BEAM   LINE 7-3  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
3339 K.HODGSON     1F97 S.Fleischman  1F97 S.Fleischman  3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN      
SMB CHECKOUT/1F97  1F97 S.Fleischman  SMB CHECKOUT/3730  3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN      
1F97 S.Fleischman  1F97 S.Fleischman  3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3730 M.GREEN      
BEAM   LINE 9-3  
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
Unscheduled        3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY     3582 L.QUE         3582 L.QUE        
SMB CHECKOUT/3743  3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY     SMB CHECKOUT/3582  3582 L.QUE         3582 L.QUE        
3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY     3743 M.MARONEY     3582 L.QUE         3582 L.QUE         3582 L.QUE        
BEAM   LINE 10-2 
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
8067 S.WEBB        8067 S.WEBB        3915 D.Kopriva     3915 D.Kopriva     3592 B.KIMBALL     3797 L.LU          3797 L.LU         
8067 S.WEBB        CHANGE/3915 D.Kopr 3915 D.Kopriva     CHANGE/3592 B.KIMB CHANGE/3797 L.LU   3797 L.LU          3797 L.LU         
8067 S.WEBB        3915 D.Kopriva     3915 D.Kopriva     3592 B.KIMBALL     3797 L.LU          3797 L.LU          3797 L.LU         
BEAM   LINE 11-2 
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
3672 S.CONRADSON   3592 B.KIMBALL     3592 B.KIMBALL     3726 A.SEYFFERTH   3726 A.SEYFFERTH   3803 H.Hsu-Kim     3803 H.Hsu-Kim    
SMB CHECKOUT/3592  3592 B.KIMBALL     SMB CHECKOUT/3726  3726 A.SEYFFERTH   SMB CHECKOUT/3803  3803 H.Hsu-Kim     3803 H.Hsu-Kim    
3592 B.KIMBALL     3592 B.KIMBALL     3726 A.SEYFFERTH   3726 A.SEYFFERTH   3803 H.Hsu-Kim     3803 H.Hsu-Kim     3803 H.Hsu-Kim    
BEAM   LINE 11-3 
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
3673 A.Briseno     3949 D.Barbero     3949 D.Barbero     3787 A.LLORDES     3787 A.LLORDES     3648 V.HO          3648 V.HO         
Xray CHECKOUT/3949 3949 D.Barbero     Xray CHECKOUT/3787 3787 A.LLORDES     Xray CHECKOUT/3648 3648 V.HO          3648 V.HO         
3949 D.Barbero     3949 D.Barbero     3787 A.LLORDES     3787 A.LLORDES     3648 V.HO          3648 V.HO          3648 V.HO         
BEAM   LINE 14-3 
Jun. 24, 2013      Jun. 25, 2013      Jun. 26, 2013      Jun. 27, 2013      Jun. 28, 2013      Jun. 29, 2013      Jun. 30, 2013     
3725 M.TAILLEFERT  8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
CHANGE/8067 S.WEBB 8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       

Back to Table of Contents

WEEK OF Jul. 01, 2013
                  HOLIDAY                        
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
BEAM   LINE 1-4  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
3906 C.Fox         Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 1-5  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
Unscheduled        3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan        
CHANGE/N002 A.VAIL 3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan        
Xray CHECKOUT/3892 3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan         3892 S.Fan        
BEAM   LINE 2-1  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
3898 P.VALDIVIA    3898 P.VALDIVIA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
3898 P.VALDIVIA    Xray CHECKOUT/3844 3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
3898 P.VALDIVIA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA   
BEAM   LINE 2-2  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-3  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
8867 S.WEBB        3635 J.Addison     1F95 E.Burton      3914 F.Michel      3914 F.Michel      3726 A.SEYFFERTH   3726 A.SEYFFERTH  
CHANGE/3635 J.Addi CHANGE/1F95 E.Burt CHANGE/3914 F.Mich 3914 F.Michel      CHANGE/3726 A.SEYF 3726 A.SEYFFERTH   3726 A.SEYFFERTH  
3635 J.Addison     1F95 E.Burton      3914 F.Michel      3914 F.Michel      3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH  
BEAM   LINE 4-1  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
3889 S.Lounis      3867 L.Lim         3867 L.Lim         3272 J.HEIN        3272 J.HEIN        3833 J.CABANA-JIME 3833 J.CABANA-JIME
Xray CHECKOUT/3867 3867 L.Lim         Xray CHECKOUT/3272 3272 J.HEIN        Xray CHECKOUT/3833 3833 J.CABANA-JIME 3833 J.CABANA-JIME
3867 L.Lim         3867 L.Lim         3272 J.HEIN        3272 J.HEIN        3833 J.CABANA-JIME 3833 J.CABANA-JIME 3833 J.CABANA-JIME
BEAM   LINE 4-2  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
8877 T.MATSUI      8877 T.MATSUI      3660 S.TOLBERT     3765 T.Bryan       3765 T.Bryan       8047 T.WEISS       3792 E.Snell      
8877 T.MATSUI      CHANGE/3660 S.TOLB CHANGE/3765 T.Brya 3765 T.Bryan       CHANGE/8047 T.WEIS CHANGE/3792 E.Snel 3792 E.Snell      
8877 T.MATSUI      3660 S.TOLBERT     3765 T.Bryan       3765 T.Bryan       8047 T.WEISS       3792 E.Snell       3792 E.Snell      
BEAM   LINE 4-3  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3532 B.HEDMAN      3532 B.HEDMAN     
3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       SMB CHECKOUT/3532  3532 B.HEDMAN      3532 B.HEDMAN     
3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3329 S.SCOTT       3532 B.HEDMAN      3532 B.HEDMAN      3532 B.HEDMAN     
BEAM   LINE 6-2  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
8081 Y.LIU         3929 L.Li          3929 L.Li          8015 A.MEHTA       8015 A.MEHTA       3842 W.Chueh       3842 W.Chueh      
CHANGE/3929 L.Li   3929 L.Li          CHANGE/8015 A.MEHT 8015 A.MEHTA       CHANGE/3842 W.Chue 3842 W.Chueh       3842 W.Chueh      
3929 L.Li          3929 L.Li          8015 A.MEHTA       8015 A.MEHTA       3842 W.Chueh       3842 W.Chueh       3842 W.Chueh      
BEAM   LINE 7-2  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
3647 S.BENT        3647 S.BENT        8875 D.VAN CAMPEN  3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE    
3647 S.BENT        Xray CHECKOUT/8875 Xray CHECKOUT/3791 3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE    
3647 S.BENT        8875 D.VAN CAMPEN  3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE     3791 C.TASSONE    
BEAM   LINE 7-3  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
3730 M.GREEN       3730 M.GREEN       3730 M.GREEN       3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
3730 M.GREEN       3730 M.GREEN       SMB CHECKOUT/3729  3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
3730 M.GREEN       3730 M.GREEN       3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
BEAM   LINE 9-3  
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
3582 L.QUE         3582 L.QUE         3911 K.LANCASTER   3911 K.LANCASTER   3911 K.LANCASTER   3432 V.YACHANDRA   3432 V.YACHANDRA  
3582 L.QUE         SMB CHECKOUT/3911  3911 K.LANCASTER   3911 K.LANCASTER   SMB CHECKOUT/3432  3432 V.YACHANDRA   3432 V.YACHANDRA  
3582 L.QUE         3911 K.LANCASTER   3911 K.LANCASTER   3911 K.LANCASTER   3432 V.YACHANDRA   3432 V.YACHANDRA   3432 V.YACHANDRA  
BEAM   LINE 10-2 
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
3797 L.LU          3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH   3683 M.PUSHIE      3683 M.PUSHIE     
CHANGE/3726 A.SEYF 3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH   CHANGE/3683 M.PUSH 3683 M.PUSHIE      3683 M.PUSHIE     
3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH   3726 A.SEYFFERTH   3683 M.PUSHIE      3683 M.PUSHIE      3683 M.PUSHIE     
BEAM   LINE 11-2 
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
3803 H.Hsu-Kim     8860 J.BARGAR      8860 J.BARGAR      8015 A.MEHTA       8015 A.MEHTA       3833 J.CABANA-JIME 3833 J.CABANA-JIME
GIXAS/8860         8860 J.BARGAR      GIXAS/8015         8015 A.MEHTA       GIXAS/3833         3833 J.CABANA-JIME 3833 J.CABANA-JIME
8860 J.BARGAR      8860 J.BARGAR      8015 A.MEHTA       8015 A.MEHTA       3833 J.CABANA-JIME 3833 J.CABANA-JIME 3833 J.CABANA-JIME
BEAM   LINE 11-3 
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
3648 V.HO          3648 V.HO          1F92 N.Kopidakis   3706 S.TOLBERT     3706 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT    
3648 V.HO          Xray CHECKOUT/1F92 Xray CHECKOUT/3706 3706 S.TOLBERT     Xray CHECKOUT/3660 3660 S.TOLBERT     3660 S.TOLBERT    
3648 V.HO          1F92 N.Kopidakis   3706 S.TOLBERT     3706 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT     3660 S.TOLBERT    
BEAM   LINE 14-3 
Jul. 01, 2013      Jul. 02, 2013      Jul. 03, 2013      Jul. 04, 2013      Jul. 05, 2013      Jul. 06, 2013      Jul. 07, 2013     
8067 S.WEBB        3914 F.Michel      3914 F.Michel      3914 F.Michel      Unscheduled        Unscheduled        Unscheduled       
CHANGE/3914 F.Mich 3914 F.Michel      3914 F.Michel      Unscheduled        Unscheduled        Unscheduled        Unscheduled       
3914 F.Michel      3914 F.Michel      3914 F.Michel      Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Jul. 08, 2013
MA       AP                                    
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
BEAM   LINE 1-4  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
MA                 AP                 AP                 3800 E.COLETTA     3800 E.COLETTA     3925 J.REINSPACH   3925 J.REINSPACH  
MA                 AP                 Xray CHECKOUT/3800 3800 E.COLETTA     Xray CHECKOUT/3925 3925 J.REINSPACH   3925 J.REINSPACH  
MA/AP              AP                 3800 E.COLETTA     3800 E.COLETTA     3925 J.REINSPACH   3925 J.REINSPACH   3925 J.REINSPACH  
BEAM   LINE 1-5  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3892 S.Fan/MA      AP                 AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled       
MA                 AP                 CHANGE/N002 A.VAIL N002 A.VAILIONIS   CHANGE/N002 A.VAIL Unscheduled        Unscheduled       
MA/AP              AP                 N002 A.VAILIONIS   N002 A.VAILIONIS   N002 A.VAILIONIS   Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3844 Y.TAKAMURA/MA AP                 AP                 3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang       
MA                 AP                 Xray CHECKOUT/3819 3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang       
MA/AP              AP                 3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang        3819 R.Wang       
BEAM   LINE 2-2  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
MA                 AP                 AP                 Unscheduled        Unscheduled        91U2 L.Xiang       91U2 L.Xiang      
MA                 AP                 Unscheduled        Unscheduled        Xray CHECKOUT/91U2 91U2 L.Xiang       91U2 L.Xiang      
MA/AP              AP                 Unscheduled        Unscheduled        91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang      
BEAM   LINE 2-3  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3726 A.SEYFFERT/MA AP                 AP                 3505 H.NICHOL      3505 H.NICHOL      3614 H.NICHOL      3754 B.POPESCU    
MA                 AP                 CHANGE/3505 H.NICH 3505 H.NICHOL      CHANGE/3614 H.NICH CHANGE/3754 B.POPE 3754 B.POPESCU    
MA/AP              AP                 3505 H.NICHOL      3505 H.NICHOL      3614 H.NICHOL      3754 B.POPESCU     3754 B.POPESCU    
BEAM   LINE 4-1  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3833 J.CABANA-J/MA AP                 AP                 3600 F.BRIDGES     3600 F.BRIDGES     3627 F.BRIDGES     3627 F.BRIDGES    
MA                 AP                 Xray CHECKOUT/3600 3600 F.BRIDGES     Xray CHECKOUT/3627 3627 F.BRIDGES     3627 F.BRIDGES    
MA/AP              AP                 3600 F.BRIDGES     3600 F.BRIDGES     3627 F.BRIDGES     3627 F.BRIDGES     3627 F.BRIDGES    
BEAM   LINE 4-2  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3792 E.Snell/MA    AP                 AP                 8877 T.MATSUI      3535 G.WONG        3535 G.WONG        3535 G.WONG       
MA                 AP                 CHANGE/8877 T.MATS CHANGE/3535 G.WONG 3535 G.WONG        3535 G.WONG        3535 G.WONG       
MA/AP              AP                 8877 T.MATSUI      3535 G.WONG        3535 G.WONG        3535 G.WONG        3535 G.WONG       
BEAM   LINE 4-3  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3532 B.HEDMAN/MA   AP                 AP                 8051 M.TONEY       8051 M.TONEY       3614 H.NICHOL      3614 H.NICHOL     
MA                 AP                 SMB CHECKOUT/8051  8051 M.TONEY       SMB CHECKOUT/3614  3614 H.NICHOL      3614 H.NICHOL     
MA/AP              AP                 8051 M.TONEY       8051 M.TONEY       3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
BEAM   LINE 6-2  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3842 W.Chueh/MA    AP                 AP                 3811 W.Chiu        3811 W.Chiu        3581 J.Nelson Weke 3581 J.Nelson Weke
MA                 AP                 CHANGE/3811 W.Chiu 3811 W.Chiu        CHANGE/3581 J.Nels 3581 J.Nelson Weke 3581 J.Nelson Weke
MA/AP              AP                 3811 W.Chiu        3811 W.Chiu        3581 J.Nelson Weke 3581 J.Nelson Weke 3581 J.Nelson Weke
BEAM   LINE 7-2  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3791 C.TASSONE/MA  AP                 AP                 3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         3878 Y.SHI        
MA                 AP                 Xray CHECKOUT/3878 3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         CHANGE/8051 M.TONE
MA/AP              AP                 3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         3878 Y.SHI         8051 M.TONEY      
BEAM   LINE 7-3  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3729 V.YACHANDR/MA AP                 AP                 3919 M.KIRK        3919 M.KIRK        3919 M.KIRK        3919 M.KIRK       
MA                 AP                 SMB CHECKOUT/3919  3919 M.KIRK        3919 M.KIRK        3919 M.KIRK        3919 M.KIRK       
MA/AP              AP                 3919 M.KIRK        3919 M.KIRK        3919 M.KIRK        3919 M.KIRK        3919 M.KIRK       
BEAM   LINE 9-3  
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3432 V.YACHANDR/MA AP                 AP                 3432 V.YACHANDRA   3432 V.YACHANDRA   3432 V.YACHANDRA   3432 V.YACHANDRA  
MA                 AP                 3432 V.YACHANDRA   3432 V.YACHANDRA   3432 V.YACHANDRA   3432 V.YACHANDRA   3432 V.YACHANDRA  
MA/AP              AP                 3432 V.YACHANDRA   3432 V.YACHANDRA   3432 V.YACHANDRA   3432 V.YACHANDRA   3432 V.YACHANDRA  
BEAM   LINE 10-2 
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3683 M.PUSHIE/MA   AP                 AP                 8818 A.MEHTA       8818 A.MEHTA       3657 M.Biegalski   3657 M.Biegalski  
MA                 AP                 Xray>BkHutch/8818  8818 A.MEHTA       CHANGE/3657 M.Bieg 3657 M.Biegalski   3657 M.Biegalski  
MA/AP              AP                 8818 A.MEHTA       8818 A.MEHTA       3657 M.Biegalski   3657 M.Biegalski   3657 M.Biegalski  
BEAM   LINE 11-2 
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3833 J.CABANA-J/MA AP                 AP                 3657 M.Biegalski   3657 M.Biegalski   3937 I.Chorkendorf 3937 I.Chorkendorf
MA                 AP                 GIXAS/3657         3657 M.Biegalski   GIXAS/3937         3937 I.Chorkendorf 3937 I.Chorkendorf
MA/AP              AP                 3657 M.Biegalski   3657 M.Biegalski   3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
BEAM   LINE 11-3 
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
3660 S.TOLBERT/MA  AP                 AP                 3759 A.Yiu         3759 A.Yiu         3834 H.Duncan      3834 H.Duncan     
MA                 AP                 Xray CHECKOUT/3759 3759 A.Yiu         Xray CHECKOUT/3834 3834 H.Duncan      3834 H.Duncan     
MA/AP              AP                 3759 A.Yiu         3759 A.Yiu         3834 H.Duncan      3834 H.Duncan      3834 H.Duncan     
BEAM   LINE 14-3 
Jul. 08, 2013      Jul. 09, 2013      Jul. 10, 2013      Jul. 11, 2013      Jul. 12, 2013      Jul. 13, 2013      Jul. 14, 2013     
MA                 AP                 AP                 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
MA                 AP                 CHANGE/3614 H.NICH 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     
MA/AP              AP                 3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL     

Back to Table of Contents

WEEK OF Jul. 15, 2013
                                         
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
BEAM   LINE 1-4  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3925 J.REINSPACH   Unscheduled        3791 C.TASSONE     3791 C.TASSONE     3703 K.Neyerlin    3703 K.Neyerlin    3703 K.Neyerlin   
Unscheduled        Xray CHECKOUT/3791 3791 C.TASSONE     Xray CHECKOUT/3703 3703 K.Neyerlin    3703 K.Neyerlin    3703 K.Neyerlin   
Unscheduled        3791 C.TASSONE     3791 C.TASSONE     3703 K.Neyerlin    3703 K.Neyerlin    3703 K.Neyerlin    3703 K.Neyerlin   
BEAM   LINE 1-5  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
Unscheduled        Unscheduled        N002 A.VAILIONIS   N002 A.VAILIONIS   91V1 D.Nelson      91V1 D.Nelson      91V1 D.Nelson     
Unscheduled        CHANGE/N002 A.VAIL N002 A.VAILIONIS   CHANGE/91V1 D.Nels 91V1 D.Nelson      91V1 D.Nelson      91V1 D.Nelson     
Unscheduled        N002 A.VAILIONIS   N002 A.VAILIONIS   91V1 D.Nelson      91V1 D.Nelson      91V1 D.Nelson      91V1 D.Nelson     
BEAM   LINE 2-1  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3819 R.Wang        3703 K.Neyerlin    3703 K.Neyerlin    3703 K.Neyerlin    8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
Xray CHECKOUT/3703 3703 K.Neyerlin    3703 K.Neyerlin    Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
3703 K.Neyerlin    3703 K.Neyerlin    3703 K.Neyerlin    8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 2-2  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang      
91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang      
91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang      
BEAM   LINE 2-3  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3754 B.POPESCU     3754 B.POPESCU     3549 S.HO          3549 S.HO          3549 S.HO          3658 W.Fischer     3658 W.Fischer    
3754 B.POPESCU     CHANGE/3549 S.HO   3549 S.HO          3549 S.HO          CHANGE/3658 W.Fisc 3658 W.Fischer     3658 W.Fischer    
3754 B.POPESCU     3549 S.HO          3549 S.HO          3549 S.HO          3658 W.Fischer     3658 W.Fischer     3658 W.Fischer    
BEAM   LINE 4-1  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3627 F.BRIDGES     3927 A.FOSTER      3927 A.FOSTER      3658 W.Fischer     3658 W.Fischer     3846 O.ALEXEEV     3846 O.ALEXEEV    
Xray CHECKOUT/3927 3927 A.FOSTER      Xray CHECKOUT/3658 3658 W.Fischer     Xray CHECKOUT/3846 3846 O.ALEXEEV     3846 O.ALEXEEV    
3927 A.FOSTER      3927 A.FOSTER      3658 W.Fischer     3658 W.Fischer     3846 O.ALEXEEV     3846 O.ALEXEEV     3846 O.ALEXEEV    
BEAM   LINE 4-2  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3535 G.WONG        3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
CHANGE/3577 C.SAFI 3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA     3577 C.SAFINYA    
BEAM   LINE 4-3  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3614 H.NICHOL      3614 H.NICHOL      91U0 S.Siah        91U0 S.Siah        91U0 S.Siah        3781 K.Wujcik      3781 K.Wujcik     
3614 H.NICHOL      SMB CHECKOUT/91U0  91U0 S.Siah        91U0 S.Siah        SMB CHECKOUT/3781  3781 K.Wujcik      3781 K.Wujcik     
3614 H.NICHOL      91U0 S.Siah        91U0 S.Siah        91U0 S.Siah        3781 K.Wujcik      3781 K.Wujcik      3781 K.Wujcik     
BEAM   LINE 6-2  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3581 J.Nelson Weke 3369 M.VAN DER MEU 3369 M.VAN DER MEU 3369 M.VAN DER MEU 3885 J.Nelson Weke 3821 Y.Yu          3821 Y.Yu         
CHANGE/3369 M.VAN  3369 M.VAN DER MEU 3369 M.VAN DER MEU CHANGE/3885 J.Nels CHANGE/3821 Y.Yu   3821 Y.Yu          3821 Y.Yu         
3369 M.VAN DER MEU 3369 M.VAN DER MEU 3369 M.VAN DER MEU 3885 J.Nelson Weke 3821 Y.Yu          3821 Y.Yu          3821 Y.Yu         
BEAM   LINE 7-2  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       3930 A.Singh       3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
8051 M.TONEY       8051 M.TONEY       Xray CHECKOUT/3930 Xray CHECKOUT/3937 3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
8051 M.TONEY       8051 M.TONEY       3930 A.Singh       3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf 3937 I.Chorkendorf
BEAM   LINE 7-3  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3919 M.KIRK        3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      3859 I.PICKERING   3859 I.PICKERING  
SMB CHECKOUT/3857  3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      SMB CHECKOUT/3859  3859 I.PICKERING   3859 I.PICKERING  
3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      3857 G.GEORGE      3859 I.PICKERING   3859 I.PICKERING   3859 I.PICKERING  
BEAM   LINE 9-3  
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3432 V.YACHANDRA   Unscheduled        8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     3442 D.ZAMBLE      3442 D.ZAMBLE     
Unscheduled        SMB CHECKOUT/8071  8071 R.SARANGI     8071 R.SARANGI     SMB CHECKOUT/3442  3442 D.ZAMBLE      3442 D.ZAMBLE     
Unscheduled        8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI     3442 D.ZAMBLE      3442 D.ZAMBLE      3442 D.ZAMBLE     
BEAM   LINE 10-2 
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3657 M.Biegalski   3657 M.Biegalski   3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    91R8 W.LEE         91R8 W.LEE        
3657 M.Biegalski   CHANGE/3844 Y.TAKA 3844 Y.TAKAMURA    3844 Y.TAKAMURA    Xray CHECKOUT/91R8 91R8 W.LEE         91R8 W.LEE        
3657 M.Biegalski   3844 Y.TAKAMURA    3844 Y.TAKAMURA    3844 Y.TAKAMURA    91R8 W.LEE         91R8 W.LEE         91R8 W.LEE        
BEAM   LINE 11-2 
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3937 I.Chorkendorf 3467 C.BOOTH       3467 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH       3652 C.HANSEL      3652 C.HANSEL     
SMB CHECKOUT/3467  3467 C.BOOTH       SMB CHECKOUT/3521  3521 C.BOOTH       SMB CHECKOUT/3652  3652 C.HANSEL      3652 C.HANSEL     
3467 C.BOOTH       3467 C.BOOTH       3521 C.BOOTH       3521 C.BOOTH       3652 C.HANSEL      3652 C.HANSEL      3652 C.HANSEL     
BEAM   LINE 11-3 
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3834 H.Duncan      3834 H.Duncan      91U6 C.Dahlman     1F98 C.Cismasu     8067 S.WEBB        3925 J.REINSPACH   3925 J.REINSPACH  
3834 H.Duncan      Xray CHECKOUT/91U6 Xray CHECKOUT/1F98 Xray CHECKOUT/8067 Xray CHECKOUT/3925 3925 J.REINSPACH   3925 J.REINSPACH  
3834 H.Duncan      91U6 C.Dahlman     1F98 C.Cismasu     8067 S.WEBB        3925 J.REINSPACH   3925 J.REINSPACH   3925 J.REINSPACH  
BEAM   LINE 14-3 
Jul. 15, 2013      Jul. 16, 2013      Jul. 17, 2013      Jul. 18, 2013      Jul. 19, 2013      Jul. 20, 2013      Jul. 21, 2013     
3614 H.NICHOL      3614 H.NICHOL      3614 H.NICHOL      3659 C.HANSEL      3659 C.HANSEL      3659 C.HANSEL      3659 C.HANSEL     
3614 H.NICHOL      3614 H.NICHOL      CHANGE/3659 C.HANS 3659 C.HANSEL      3659 C.HANSEL      3659 C.HANSEL      3659 C.HANSEL     
3614 H.NICHOL      3614 H.NICHOL      3659 C.HANSEL      3659 C.HANSEL      3659 C.HANSEL      3659 C.HANSEL      3659 C.HANSEL     

Back to Table of Contents

WEEK OF Jul. 22, 2013
AP       AP                                    
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
BEAM   LINE 1-4  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3703 K.Neyerlin/AP AP                 AP                 3660 S.TOLBERT     3660 S.TOLBERT     Unscheduled        Unscheduled       
AP                 AP                 Xray CHECKOUT/3660 3660 S.TOLBERT     Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 3660 S.TOLBERT     3660 S.TOLBERT     Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 1-5  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
91V1 D.Nelson/AP   AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 Xray CHECKOUT/8015 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 2-1  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
8051 M.TONEY/AP    AP                 AP                 8051 M.TONEY       8051 M.TONEY       3651 A.Sharenko    3651 A.Sharenko   
AP                 AP                 8051 M.TONEY       8051 M.TONEY       Xray CHECKOUT/3651 3651 A.Sharenko    3651 A.Sharenko   
AP                 AP                 8051 M.TONEY       8051 M.TONEY       3651 A.Sharenko    3651 A.Sharenko    3651 A.Sharenko   
BEAM   LINE 2-2  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
91U2 L.Xiang/AP    AP                 AP                 91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang      
AP                 AP                 91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang      
AP                 AP                 91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang      
BEAM   LINE 2-3  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3658 W.Fischer/AP  AP                 AP                 8067 S.WEBB        8067 S.WEBB        3837 M.McNamara    3837 M.McNamara   
AP                 AP                 CHANGE/8067 S.WEBB 8067 S.WEBB        CHANGE/3837 M.McNa 3837 M.McNamara    3837 M.McNamara   
AP                 AP                 8067 S.WEBB        8067 S.WEBB        3837 M.McNamara    3837 M.McNamara    3837 M.McNamara   
BEAM   LINE 4-1  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3846 O.ALEXEEV/AP  AP                 AP                 3851 T.BORCH       3851 T.BORCH       3682 R.Bernier-Lat 3682 R.Bernier-Lat
AP                 AP                 Xray CHECKOUT/3851 3851 T.BORCH       Xray CHECKOUT/3682 3682 R.Bernier-Lat 3682 R.Bernier-Lat
AP                 AP                 3851 T.BORCH       3851 T.BORCH       3682 R.Bernier-Lat 3682 R.Bernier-Lat 3682 R.Bernier-Lat
BEAM   LINE 4-2  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3577 C.SAFINYA/AP  AP                 AP                 8077 T.MATSUI      8077 T.MATSUI      3703 K.Neyerlin    8047 T.WEISS      
AP                 AP                 CHANGE/8077 T.MATS 8077 T.MATSUI      CHANGE/3703 K.Neye CHANGE/8047 T.WEIS CHANGE/3358 D.Hers
AP                 AP                 8077 T.MATSUI      8077 T.MATSUI      3703 K.Neyerlin    8047 T.WEISS       3358 D.Herschlag  
BEAM   LINE 4-3  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3781 K.Wujcik/AP   AP                 AP                 3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
AP                 AP                 SMB CHECKOUT/3729  3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
AP                 AP                 3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA   3729 V.YACHANDRA  
BEAM   LINE 6-2  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3821 Y.Yu/AP       AP                 AP                 3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA  
AP                 AP                 XRAY>XES/3529      3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA  
AP                 AP                 3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA  
BEAM   LINE 7-2  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3937 I.Chorkend/AP AP                 AP                 3289 M.CHABINYC    3289 M.CHABINYC    91P9 Y.Lee         91P9 Y.Lee        
AP                 AP                 Xray CHECKOUT/3289 3289 M.CHABINYC    Xray CHECKOUT/91P9 91P9 Y.Lee         91P9 Y.Lee        
AP                 AP                 3289 M.CHABINYC    3289 M.CHABINYC    91P9 Y.Lee         91P9 Y.Lee         91P9 Y.Lee        
BEAM   LINE 7-3  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3859 I.PICKERIN/AP AP                 AP                 3859 I.PICKERING   3859 I.PICKERING   8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 3859 I.PICKERING   3859 I.PICKERING   SMB CHECKOUT/8071  8071 R.SARANGI     8071 R.SARANGI    
AP                 AP                 3859 I.PICKERING   3859 I.PICKERING   8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
BEAM   LINE 9-3  
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3442 D.ZAMBLE/AP   AP                 AP                 3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN  
AP                 AP                 SMB CHECKOUT/3282  3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN  
AP                 AP                 3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN  
BEAM   LINE 10-2 
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
91R8 W.LEE/AP      AP                 AP                 8015 A.MEHTA       91P9 Y.Lee         3826 J.Komadina    3826 J.Komadina   
AP                 AP                 Xray CHECKOUT/8015 Xray CHECKOUT/91P9 Xray CHECKOUT/3826 3826 J.Komadina    3826 J.Komadina   
AP                 AP                 8015 A.MEHTA       91P9 Y.Lee         3826 J.Komadina    3826 J.Komadina    3826 J.Komadina   
BEAM   LINE 11-2 
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3652 C.HANSEL/AP   AP                 AP                 3746 W.LUKENS      3746 W.LUKENS      8060 J.BARGAR      8060 J.BARGAR     
AP                 AP                 SMB CHECKOUT/3746  3746 W.LUKENS      SMB CHECKOUT/8060  8060 J.BARGAR      8060 J.BARGAR     
AP                 AP                 3746 W.LUKENS      3746 W.LUKENS      8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR     
BEAM   LINE 11-3 
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3925 J.REINSPAC/AP AP                 AP                 1F93 G.GIRI        3651 A.Sharenko    3603 J.CHOROVER    3603 J.CHOROVER   
AP                 AP                 Xray CHECKOUT/1F93 Xray CHECKOUT/3651 Xray CHECKOUT/3603 3603 J.CHOROVER    3603 J.CHOROVER   
AP                 AP                 1F93 G.GIRI        3651 A.Sharenko    3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
BEAM   LINE 14-3 
Jul. 22, 2013      Jul. 23, 2013      Jul. 24, 2013      Jul. 25, 2013      Jul. 26, 2013      Jul. 27, 2013      Jul. 28, 2013     
3659 C.HANSEL/AP   AP                 AP                 8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
AP                 AP                 CHANGE/8067 S.WEBB 8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       
AP                 AP                 8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB        8067 S.WEBB       

Back to Table of Contents

WEEK OF Jul. 29, 2013
                                         
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
BEAM   LINE 1-4  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
Unscheduled        91V1 D.Nelson      91V1 D.Nelson      91V1 D.Nelson      Unscheduled        Unscheduled        Unscheduled       
Xray CHECKOUT/91V1 91V1 D.Nelson      91V1 D.Nelson      Unscheduled        Unscheduled        Unscheduled        Unscheduled       
91V1 D.Nelson      91V1 D.Nelson      91V1 D.Nelson      Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 1-5  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       3700 T.GAO         3700 T.GAO         3700 T.GAO        
8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       c/3700             3700 T.GAO         3700 T.GAO         3700 T.GAO        
8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       3700 T.GAO         3700 T.GAO         3700 T.GAO         3700 T.GAO        
BEAM   LINE 2-1  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
3651 A.Sharenko    3833 J.CABANA-JIME 3833 J.CABANA-JIME 3917 A.WISE        3917 A.WISE        3952 B.Shyam       3952 B.Shyam      
Xray CHECKOUT/3833 3833 J.CABANA-JIME Xray CHECKOUT/3917 3917 A.WISE        Xray CHECKOUT/3952 3952 B.Shyam       3952 B.Shyam      
3833 J.CABANA-JIME 3833 J.CABANA-JIME 3917 A.WISE        3917 A.WISE        3952 B.Shyam       3952 B.Shyam       3952 B.Shyam      
BEAM   LINE 2-2  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang      
91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang      
91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang       91U2 L.Xiang      
BEAM   LINE 2-3  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
3837 M.McNamara    3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
CHANGE/3603 J.CHOR 3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER    CHANGE/8051 M.TONE 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
BEAM   LINE 4-1  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
3682 R.Bernier-Lat 3682 R.Bernier-Lat 3917 A.WISE        3687 C.Engtrakul   3687 C.Engtrakul   3637 F.JALILEHVAND 3637 F.JALILEHVAND
3682 R.Bernier-Lat SMB CHECKOUT/3917  SMB CHECKOUT/3687  3687 C.Engtrakul   Xray CHECKOUT/3637 3637 F.JALILEHVAND 3637 F.JALILEHVAND
3682 R.Bernier-Lat 3917 A.WISE        3687 C.Engtrakul   3687 C.Engtrakul   3637 F.JALILEHVAND 3637 F.JALILEHVAND 3637 F.JALILEHVAND
BEAM   LINE 4-2  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
3358 D.Herschlag   3744 A.SCHOEFFLER  8877 T.MATSUI      8047 T.WEISS       3704 L.HIRST       3704 L.HIRST       3804 A.KENDALL    
CHANGE/3744 A.SCHO CHANGE/8877 T.MATS CHANGE/8047 T.WEIS CHANGE/3704 L.HIRS 3704 L.HIRST       CHANGE/3804 A.KEND 3804 A.KENDALL    
3744 A.SCHOEFFLER  8877 T.MATSUI      8047 T.WEISS       3704 L.HIRST       3704 L.HIRST       3804 A.KENDALL     3804 A.KENDALL    
BEAM   LINE 4-3  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
3729 V.YACHANDRA   3870 S.Daly        3870 S.Daly        3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
SMB CHECKOUT/3870  3870 S.Daly        SMB CHECKOUT/3924  3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
3870 S.Daly        3870 S.Daly        3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR     3924 S.KOZIMOR    
BEAM   LINE 6-2  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   3669 D.Sokaras     3669 D.Sokaras     3669 D.Sokaras    
3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   CHANGE/3669 D.Soka 3669 D.Sokaras     3669 D.Sokaras     3669 D.Sokaras    
3529 V.YACHANDRA   3529 V.YACHANDRA   3529 V.YACHANDRA   3669 D.Sokaras     3669 D.Sokaras     3669 D.Sokaras     3669 D.Sokaras    
BEAM   LINE 7-2  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
91P9 Y.Lee         3706 S.TOLBERT     3706 S.TOLBERT     3706 S.TOLBERT     91T7 R.TILLEY      91T7 R.TILLEY      91T7 R.TILLEY     
Xray CHECKOUT/3706 3706 S.TOLBERT     3706 S.TOLBERT     Xray CHECKOUT/91T7 91T7 R.TILLEY      91T7 R.TILLEY      91T7 R.TILLEY     
3706 S.TOLBERT     3706 S.TOLBERT     3706 S.TOLBERT     91T7 R.TILLEY      91T7 R.TILLEY      91T7 R.TILLEY      91T7 R.TILLEY     
BEAM   LINE 7-3  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
8071 R.SARANGI     3761 R.SZILAGYI    3761 R.SZILAGYI    3761 R.SZILAGYI    3761 R.SZILAGYI    8071 R.SARANGI     8071 R.SARANGI    
SMB CHECKOUT/3761  3761 R.SZILAGYI    3761 R.SZILAGYI    3761 R.SZILAGYI    SMB CHECKOUT/8071  8071 R.SARANGI     8071 R.SARANGI    
3761 R.SZILAGYI    3761 R.SZILAGYI    3761 R.SZILAGYI    3761 R.SZILAGYI    8071 R.SARANGI     8071 R.SARANGI     8071 R.SARANGI    
BEAM   LINE 9-3  
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
3282 N.BLACKBURN   3282 N.BLACKBURN   3282 N.BLACKBURN   Unscheduled        Unscheduled        3581 J.Nelson Weke 3581 J.Nelson Weke
3282 N.BLACKBURN   3282 N.BLACKBURN   Unscheduled        Unscheduled        SMB CHECKOUT/3581  3581 J.Nelson Weke 3581 J.Nelson Weke
3282 N.BLACKBURN   3282 N.BLACKBURN   Unscheduled        Unscheduled        3581 J.Nelson Weke 3581 J.Nelson Weke 3581 J.Nelson Weke
BEAM   LINE 10-2 
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
3826 J.Komadina    3875 S.CONRADSON   3875 S.CONRADSON   3875 S.CONRADSON   3666 S.CONRADSON   3666 S.CONRADSON   3666 S.CONRADSON  
Xray>BkHtch/3875   3875 S.CONRADSON   3875 S.CONRADSON   CHANGE/3666 S.CONR 3666 S.CONRADSON   3666 S.CONRADSON   3666 S.CONRADSON  
3875 S.CONRADSON   3875 S.CONRADSON   3875 S.CONRADSON   3666 S.CONRADSON   3666 S.CONRADSON   3666 S.CONRADSON   3666 S.CONRADSON  
BEAM   LINE 11-2 
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
8060 J.BARGAR      3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR     3603 J.CHOROVER    3603 J.CHOROVER   
SMB CHECKOUT/3670  3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR     SMB CHECKOUT/3603  3603 J.CHOROVER    3603 J.CHOROVER   
3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR     3670 S.KOZIMOR     3603 J.CHOROVER    3603 J.CHOROVER    3603 J.CHOROVER   
BEAM   LINE 11-3 
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
3603 J.CHOROVER    3818 M.DOEFF       3818 M.DOEFF       3734 C.TASSONE     3734 C.TASSONE     3734 C.TASSONE     3734 C.TASSONE    
Xray CHECKOUT/3818 3818 M.DOEFF       Xray CHECKOUT/3734 3734 C.TASSONE     3734 C.TASSONE     3734 C.TASSONE     3734 C.TASSONE    
3818 M.DOEFF       3818 M.DOEFF       3734 C.TASSONE     3734 C.TASSONE     3734 C.TASSONE     3734 C.TASSONE     3734 C.TASSONE    
BEAM   LINE 14-3 
Jul. 29, 2013      Jul. 30, 2013      Jul. 31, 2013      Aug. 01, 2013      Aug. 02, 2013      Aug. 03, 2013      Aug. 04, 2013     
8067 S.WEBB        Unscheduled        Unscheduled        Unscheduled        Unscheduled        3761 R.SZILAGYI    3761 R.SZILAGYI   
Unscheduled        Unscheduled        Unscheduled        Unscheduled        SMB CHECKOUT/3761  3761 R.SZILAGYI    3761 R.SZILAGYI   
Unscheduled        Unscheduled        Unscheduled        Unscheduled        3761 R.SZILAGYI    3761 R.SZILAGYI    3761 R.SZILAGYI   

Back to Table of Contents

WEEK OF Aug. 05, 2013
AP/DOWN       DOWN-Nov2013                                    
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
BEAM   LINE 1-4  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
AP                 AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 1-5  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
3700 T.GAO/AP      AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-1  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
3952 B.Shyam/AP    AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-2  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
91U2 L.Xiang/AP    AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 2-3  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
8051 M.TONEY/AP    AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-1  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
3637 F.JALILEHV/AP AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-2  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
3804 A.KENDALL/AP  AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 4-3  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
3924 S.KOZIMOR/AP  AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 6-2  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
3669 D.Sokaras/AP  AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-2  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
91T7 R.TILLEY/AP   AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 7-3  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
8071 R.SARANGI/AP  AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 9-3  
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
3581 J.Nelson W/AP AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 10-2 
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
3666 S.CONRADSO/AP AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-2 
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
3603 J.CHOROVER/AP AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-3 
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
3734 C.TASSONE/AP  AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 14-3 
Aug. 05, 2013      Aug. 06, 2013      Aug. 07, 2013      Aug. 08, 2013      Aug. 09, 2013      Aug. 10, 2013      Aug. 11, 2013     
3761 R.SZILAGYI/AP AP/FACI            FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI              
AP                 FACI               FACI               FACI               FACI               FACI               FACI