X-ray beam lines are scheduled in three 8-hour shifts each day (11pm-7am; 7am-3pm; 3-11pm). Checkouts/changeovers are scheduled during the 7am-3pm shift. Most X-ray beam lines officially turn over to the next user much earlier than 3pm depending on the equipment requirements and staff availability. At least 1 week prior to arrival, users need to contact the designated beam line engineer/scientist (see SSRL Beam Lines by Number for contact information) to discuss beam line configuration needs and start times. Unless instructed otherwise, experiments end at 7am (6am when Maintenance (MA) or Accelerator Physics (AP) are scheduled). |
WEEK OF Nov. 14, 2011 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
BEAM LINE 1-4 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
Unscheduled | Unscheduled | Unscheduled | 3497 K.ENGBERG | 3497 K.ENGBERG | 3497 K.ENGBERG | 3497 K.ENGBERG |
Unscheduled | Unscheduled | Xray CHECKOUT/3497 | 3497 K.ENGBERG | 3497 K.ENGBERG | 3497 K.ENGBERG | 3497 K.ENGBERG |
Unscheduled | Unscheduled | 3497 K.ENGBERG | 3497 K.ENGBERG | 3497 K.ENGBERG | 3497 K.ENGBERG | 3497 K.ENGBERG |
BEAM LINE 2-1 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
Unscheduled | 8856 C.TROXEL | 8856 C.TROXEL | 8856 C.TROXEL | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA |
CHANGE/8856 C.TROX | 8856 C.TROXEL | 8856 C.TROXEL | Xray CHECKOUT/8015 | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA |
8856 C.TROXEL | 8856 C.TROXEL | 8856 C.TROXEL | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA |
BEAM LINE 2-3 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
Unscheduled | 8867 S.WEBB | 8867 S.WEBB | 8867 S.WEBB | 8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB |
CHANGE/8867 S.WEBB | 8867 S.WEBB | 8867 S.WEBB | CHANGE/8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB |
8867 S.WEBB | 8867 S.WEBB | 8867 S.WEBB | 8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB |
BEAM LINE 4-1 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
8828 C.TROXEL | 8833 J.Rogers | 3412 G.BROWN | 3412 G.BROWN | 3412 G.BROWN | 3228 M.AMIRIDIS | 3228 M.AMIRIDIS |
MES CHECKOUT/8833 | MES CHECKOUT/3412 | 3412 G.BROWN | 3412 G.BROWN | CHECKOUT/3228 | 3228 M.AMIRIDIS | 3228 M.AMIRIDIS |
8833 J.Rogers | 3412 G.BROWN | 3412 G.BROWN | 3412 G.BROWN | 3228 M.AMIRIDIS | 3228 M.AMIRIDIS | 3228 M.AMIRIDIS |
BEAM LINE 4-2 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
8877 T.MATSUI | 8877 T.MATSUI | 3492 G.STUBBS | 3492 G.STUBBS | 3492 G.STUBBS | 3351 V.CHEREZOV | 3351 V.CHEREZOV |
8877 T.MATSUI | CHANGE/3492 G.STUB | 3492 G.STUBBS | 3492 G.STUBBS | CHANGE/3351 V.CHER | 3351 V.CHEREZOV | CHANGE/3295 K.LEE |
8877 T.MATSUI | 3492 G.STUBBS | 3492 G.STUBBS | 3492 G.STUBBS | 3351 V.CHEREZOV | 3351 V.CHEREZOV | 3295 K.LEE |
BEAM LINE 4-3 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
3427 J.Lezama Pach | 3581 J.Nelson | 3581 J.Nelson | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN |
SMB CHECKOUT/3581 | 3581 J.Nelson | SMB CHECKOUT/3572 | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN |
3581 J.Nelson | 3581 J.Nelson | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN |
BEAM LINE 6-2 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
8879 T.WENG | 8879 T.WENG | 8879 T.WENG | 3526 C.BOOTH | 3526 C.BOOTH | 3670 S.KOZIMOR | 3670 S.KOZIMOR |
8879 T.WENG | 8879 T.WENG | CHANGE/3526 C.BOOT | 3526 C.BOOTH | CHANGE/3670 S.KOZI | 3670 S.KOZIMOR | CHANGE/3502 F.DE G |
8879 T.WENG | 8879 T.WENG | 3526 C.BOOTH | 3526 C.BOOTH | 3670 S.KOZIMOR | 3670 S.KOZIMOR | 3502 F.DE GROOT |
BEAM LINE 7-2 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 7-3 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
Unscheduled | 8831 M.LATIMER | 8831 M.LATIMER | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON |
CHANGE/8831 M.LATI | 8831 M.LATIMER | SMB CHECKOUT/3236 | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON |
8831 M.LATIMER | 8831 M.LATIMER | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON |
BEAM LINE 9-3 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
Unscheduled | 8848 V.Borzenets | 8848 V.Borzenets | 8848 V.Borzenets | 8848 V.Borzenets | 8848 V.Borzenets | 8848 V.Borzenets |
CHANGE/8848 V.Borz | 8848 V.Borzenets | 8848 V.Borzenets | 8848 V.Borzenets | 8848 V.Borzenets | 8848 V.Borzenets | CHANGE/8867 S.WEBB |
8848 V.Borzenets | 8848 V.Borzenets | 8848 V.Borzenets | 8848 V.Borzenets | 8848 V.Borzenets | 8848 V.Borzenets | 8867 S.WEBB |
BEAM LINE 11-2 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
8833 J.Rogers | 8833 J.Rogers | 8833 J.Rogers | 8833 J.Rogers | 8833 J.Rogers | 8015 A.MEHTA | 8015 A.MEHTA |
8833 J.Rogers | 8833 J.Rogers | 8833 J.Rogers | 8833 J.Rogers | 8833 J.Rogers | 8015 A.MEHTA | 8015 A.MEHTA |
8833 J.Rogers | 8833 J.Rogers | 8833 J.Rogers | 8833 J.Rogers | CHANGE/8015 A.MEHT | 8015 A.MEHTA | 8015 A.MEHTA |
BEAM LINE 11-3 | ||||||
Nov. 14, 2011 | Nov. 15, 2011 | Nov. 16, 2011 | Nov. 17, 2011 | Nov. 18, 2011 | Nov. 19, 2011 | Nov. 20, 2011 |
8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | Xray CHECKOUT/8051 | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
WEEK OF Nov. 21, 2011 | ||||||
Down ~9 pm | Thanksgiving | Reumes ~noon | ||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
BEAM LINE 1-4 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
3497 K.ENGBERG | 3607 N.BALSARA | 3607 N.BALSARA | DOWN | DOWN | 3607 N.BALSARA | 3607 N.BALSARA |
Xray CHECKOUT/3607 | 3607 N.BALSARA | 3607 N.BALSARA | DOWN | DOWN | 3607 N.BALSARA | 3607 N.BALSARA |
3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSAR/DOWN | DOWN | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA |
BEAM LINE 2-1 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
8015 A.MEHTA | 8015 A.MEHTA | 3533 M.BIBEE | DOWN | DOWN | 3533 M.BIBEE | 3533 M.BIBEE |
8015 A.MEHTA | Xray CHECKOUT/3533 | 3533 M.BIBEE | DOWN | DOWN | 3533 M.BIBEE | 3533 M.BIBEE |
8015 A.MEHTA | 3533 M.BIBEE | 3533 M.BIBEE/DOWN | DOWN | 3533 M.BIBEE | 3533 M.BIBEE | 3533 M.BIBEE |
BEAM LINE 2-3 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
8067 S.WEBB | 3679 S.FENDORF | 3679 S.FENDORF | DOWN | DOWN | 3508 S.HAYES | 3508 S.HAYES |
CHANGE/3679 S.FEND | 3679 S.FENDORF | CHANGE/3508 S.HAYE | DOWN | DOWN | 3508 S.HAYES | 3508 S.HAYES |
3679 S.FENDORF | 3679 S.FENDORF | 3508 S.HAYES/DOWN | DOWN | 3508 S.HAYES | 3508 S.HAYES | 3508 S.HAYES |
BEAM LINE 4-1 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
3228 M.AMIRIDIS | 3658 W.Fischer | 3658 W.Fischer | DOWN | DOWN | 3627 F.BRIDGES | 3600 F.BRIDGES |
MES CHECKOUT/3658 | 3658 W.Fischer | MES CHECKOUT/3627 | DOWN | DOWN | MES CHECKOUT/3600 | 3600 F.BRIDGES |
3658 W.Fischer | 3658 W.Fischer | 3627 F.BRIDGE/DOWN | DOWN | 3627 F.BRIDGES | 3600 F.BRIDGES | CHANGE/3557 F.BRID |
BEAM LINE 4-2 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
3295 K.LEE | 8077 T.MATSUI | 3358 D.HERSCHLAG | DOWN | DOWN | 8077 T.MATSUI | 8077 T.MATSUI |
CHANGE/8077 T.MATS | CHANGE/3358 D.HERS | Unscheduled | DOWN | DOWN | 8077 T.MATSUI | 8077 T.MATSUI |
8077 T.MATSUI | 3358 D.HERSCHLAG | DOWN | DOWN | 8077 T.MATSUI | 8077 T.MATSUI | 8077 T.MATSUI |
BEAM LINE 4-3 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
3572 M.GREEN | 3572 M.GREEN | 3380 J.BARGAR | DOWN | DOWN | 3380 J.BARGAR | 3567 S.LEE |
3572 M.GREEN | SMB CHECKOUT/3380 | 3380 J.BARGAR | DOWN | DOWN | CHANGE/3567 S.LEE | 3567 S.LEE |
3572 M.GREEN | 3380 J.BARGAR | 3380 J.BARGAR/DOWN | DOWN | 3380 J.BARGAR | 3567 S.LEE | 3567 S.LEE |
BEAM LINE 6-2 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
3502 F.DE GROOT | 3502 F.DE GROOT | 3502 F.DE GROOT | DOWN | DOWN | 3620 M.Louie | 3620 M.Louie |
3502 F.DE GROOT | 3502 F.DE GROOT | 3502 F.DE GROOT | DOWN | DOWN | 3620 M.Louie | 3620 M.Louie |
3502 F.DE GROOT | 3502 F.DE GROOT | 3502 F.DE GRO/DOWN | DOWN | 3620 M.Louie | 3620 M.Louie | 3620 M.Louie |
BEAM LINE 7-2 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
FACI | FACI | FACI | DOWN | DOWN | FACI | FACI |
FACI | FACI | FACI | DOWN | DOWN | FACI | FACI |
FACI | FACI | FACI/DOWN | DOWN | FACI | FACI | FACI |
BEAM LINE 7-3 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
3236 K.HODGSON | 8072 J.HAYTER | 3420 M.MARONEY | DOWN | DOWN | 3445 M.MARONEY | 3445 M.MARONEY |
SMB CHECKOUT/8072 | SMB CHECKOUT/3420 | 3420 M.MARONEY | DOWN | DOWN | 3445 M.MARONEY | 3445 M.MARONEY |
8072 J.HAYTER | 3420 M.MARONEY | 3420 M.MARONE/DOWN | DOWN | 3445 M.MARONEY | 3445 M.MARONEY | 3445 M.MARONEY |
BEAM LINE 9-3 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
8867 S.WEBB | 8867 S.WEBB | 8867 S.WEBB | DOWN | DOWN | 8067 S.WEBB | 8067 S.WEBB |
8867 S.WEBB | 8867 S.WEBB | CHANGE/8067 S.WEBB | DOWN | DOWN | 8067 S.WEBB | 8067 S.WEBB |
8867 S.WEBB | 8867 S.WEBB | 8067 S.WEBB/DOWN | DOWN | 8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB |
BEAM LINE 11-2 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
8015 A.MEHTA | 8015 A.MEHTA | 3259 G.BROWN | DOWN | DOWN | 3259 G.BROWN | 3259 G.BROWN |
8015 A.MEHTA | MES CHECKOUT/3259 | 3259 G.BROWN | DOWN | DOWN | 3259 G.BROWN | 3259 G.BROWN |
8015 A.MEHTA | 3259 G.BROWN | 3259 G.BROWN/DOWN | DOWN | 3259 G.BROWN | 3259 G.BROWN | 3259 G.BROWN |
BEAM LINE 11-3 | ||||||
Nov. 21, 2011 | Nov. 22, 2011 | Nov. 23, 2011 | Nov. 24, 2011 | Nov. 25, 2011 | Nov. 26, 2011 | Nov. 27, 2011 |
8051 M.TONEY | 3625 S.SWEETNAM | 3625 S.SWEETNAM | DOWN | DOWN | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
Xray CHECKOUT/3625 | 3625 S.SWEETNAM | Xray CHECKOUT/3294 | DOWN | DOWN | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
3625 S.SWEETNAM | 3625 S.SWEETNAM | 3294 S.HIMMEL/DOWN | DOWN | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
WEEK OF Nov. 28, 2011 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
BEAM LINE 1-4 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
3607 N.BALSARA | 3518 E.COLETTA | 3518 E.COLETTA | 3518 E.COLETTA | 3518 E.COLETTA | 8051 M.TONEY | 8051 M.TONEY |
Xray CHECKOUT/3518 | 3518 E.COLETTA | 3518 E.COLETTA | 3518 E.COLETTA | CHANGE/8051 M.TONE | 8051 M.TONEY | 8051 M.TONEY |
3518 E.COLETTA | 3518 E.COLETTA | 3518 E.COLETTA | 3518 E.COLETTA | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
BEAM LINE 2-1 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
3533 M.BIBEE | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 8856 C.TROXEL | 3642 M.CHABINYC | 3642 M.CHABINYC |
Xray CHECKOUT/3471 | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | Xray CHECKOUT/8856 | Xray CHECKOUT/3642 | 3642 M.CHABINYC | 3642 M.CHABINYC |
3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 8856 C.TROXEL | 3642 M.CHABINYC | 3642 M.CHABINYC | 3642 M.CHABINYC |
BEAM LINE 2-3 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
3508 S.HAYES | 1F65 C.Mogren | 1F65 C.Mogren | 8072 J.HAYTER | 8072 J.HAYTER | 3423 J.SEITER | 3423 J.SEITER |
CHANGE/1F65 C.Mogr | 1F65 C.Mogren | CHANGE/8072 J.HAYT | 8072 J.HAYTER | CHANGE/3423 J.SEIT | 3423 J.SEITER | 3423 J.SEITER |
1F65 C.Mogren | 1F65 C.Mogren | 8072 J.HAYTER | 8072 J.HAYTER | 3423 J.SEITER | 3423 J.SEITER | 3423 J.SEITER |
BEAM LINE 4-1 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
3557 F.BRIDGES | 3352 B.GATES | 3352 B.GATES | 3352 B.GATES | 3347 F.HUGGINS | 3347 F.HUGGINS | 3347 F.HUGGINS |
Xray CHECKOUT/3352 | 3352 B.GATES | 3352 B.GATES | Xray CHECKOUT/3347 | 3347 F.HUGGINS | 3347 F.HUGGINS | 3347 F.HUGGINS |
3352 B.GATES | 3352 B.GATES | 3352 B.GATES | 3347 F.HUGGINS | 3347 F.HUGGINS | 3347 F.HUGGINS | 3347 F.HUGGINS |
BEAM LINE 4-2 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
8077 T.MATSUI | 3434 A.Sali | 3434 A.Sali | 8877 T.MATSUI | 3202 E.SNELL | 3202 E.SNELL | 3202 E.SNELL |
CHANGE/3434 A.Sali | 3434 A.Sali | CHANGE/8877 T.MATS | CHANGE/3202 E.SNEL | 3202 E.SNELL | 3202 E.SNELL | CHANGE/3481 E.SNEL |
3434 A.Sali | 3434 A.Sali | 8877 T.MATSUI | 3202 E.SNELL | 3202 E.SNELL | 3202 E.SNELL | 3481 E.SNELL |
BEAM LINE 4-3 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
3567 S.LEE | 3347 F.HUGGINS | 3347 F.HUGGINS | 3347 F.HUGGINS | 3347 F.HUGGINS | 3678 S.MYNENI | 3678 S.MYNENI |
SMB CHECKOUT/3347 | 3347 F.HUGGINS | 3347 F.HUGGINS | 3347 F.HUGGINS | SMB CHECKOUT/3678 | 3678 S.MYNENI | 3678 S.MYNENI |
3347 F.HUGGINS | 3347 F.HUGGINS | 3347 F.HUGGINS | 3347 F.HUGGINS | 3678 S.MYNENI | 3678 S.MYNENI | 3678 S.MYNENI |
BEAM LINE 6-2 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
3620 M.Louie | 3620 M.Louie | 8053 D.NORDLUND | 8053 D.NORDLUND | 3401 E.SOLOMON | 3401 E.SOLOMON | 3401 E.SOLOMON |
3620 M.Louie | CHANGE/8053 D.NORD | 8053 D.NORDLUND | CHANGE/3401 E.SOLO | 3401 E.SOLOMON | 3401 E.SOLOMON | 3401 E.SOLOMON |
3620 M.Louie | 8053 D.NORDLUND | 8053 D.NORDLUND | 3401 E.SOLOMON | 3401 E.SOLOMON | 3401 E.SOLOMON | 3401 E.SOLOMON |
BEAM LINE 7-2 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
FACI | FACI | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 7-3 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
3445 M.MARONEY | 3667 S.TIAN | 3667 S.TIAN | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER |
SMB CHECKOUT/3667 | 3667 S.TIAN | SMB CHECKOUT/3457 | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER |
3667 S.TIAN | 3667 S.TIAN | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER |
BEAM LINE 9-3 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
8067 S.WEBB | 3524 C.FULLER | 8072 J.HAYTER | 3508 S.HAYES | 3508 S.HAYES | 3635 J.Addison | 3635 J.Addison |
CHANGE/3524 C.FULL | CHANGE/8072 J.HAYT | CHANGE/3508 S.HAYE | 3508 S.HAYES | CHANGE/3635 J.Addi | 3635 J.Addison | 3635 J.Addison |
3524 C.FULLER | 8072 J.HAYTER | 3508 S.HAYES | 3508 S.HAYES | 3635 J.Addison | 3635 J.Addison | 3635 J.Addison |
BEAM LINE 11-2 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
3259 G.BROWN | 8831 M.LATIMER | 3427 J.Lezama Pach | 3689 J.BARGAR | 3689 J.BARGAR | 3589 J.DAVIS | 3589 J.DAVIS |
CHANGE/8831 M.LATI | MES CHECKOUT/3427 | MES CHECKOUT/3689 | 3689 J.BARGAR | 3689 J.BARGAR | 3589 J.DAVIS | 3589 J.DAVIS |
8831 M.LATIMER | 3427 J.Lezama Pach | 3689 J.BARGAR | 3689 J.BARGAR | CHANGE/3589 J.DAVI | 3589 J.DAVIS | 3589 J.DAVIS |
BEAM LINE 11-3 | ||||||
Nov. 28, 2011 | Nov. 29, 2011 | Nov. 30, 2011 | Dec. 01, 2011 | Dec. 02, 2011 | Dec. 03, 2011 | Dec. 04, 2011 |
3294 S.HIMMELBERGE | 3679 S.FENDORF | 3679 S.FENDORF | 3196 A.Yiu | 3196 A.Yiu | 3440 A.AYZNER | 3440 A.AYZNER |
Xray CHECKOUT/3679 | 3679 S.FENDORF | Xray CHECKOUT/3196 | 3196 A.Yiu | Xray CHECKOUT/3440 | 3440 A.AYZNER | 3440 A.AYZNER |
3679 S.FENDORF | 3679 S.FENDORF | 3196 A.Yiu | 3196 A.Yiu | 3440 A.AYZNER | 3440 A.AYZNER | 3440 A.AYZNER |
WEEK OF Dec. 05, 2011 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
BEAM LINE 1-4 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
8051 M.TONEY/MA | MA/AP | AP | 8051 M.TONEY | 8051 M.TONEY | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
MA | AP | 8051 M.TONEY | 8051 M.TONEY | CHANGE/3416 R.SEGA | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
MA | AP | 8051 M.TONEY | 8051 M.TONEY | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
BEAM LINE 2-1 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
3642 M.CHABINYC/MA | MA/AP | AP | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
MA | AP | Xray CHECKOUT/3473 | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
MA | AP | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
BEAM LINE 2-3 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
3423 J.SEITER/MA | MA/AP | AP | 3550 M.HINDT | 3550 M.HINDT | 3478 T.PUNSHON | 3478 T.PUNSHON |
MA | AP | CHANGE/3550 M.HIND | 3550 M.HINDT | CHANGE/3478 T.PUNS | 3478 T.PUNSHON | 3478 T.PUNSHON |
MA | AP | 3550 M.HINDT | 3550 M.HINDT | 3478 T.PUNSHON | 3478 T.PUNSHON | 3478 T.PUNSHON |
BEAM LINE 4-1 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
3347 F.HUGGINS/MA | MA/AP | AP | 3675 P.NICO | 3675 P.NICO | 3628 G.TIAN | 3628 G.TIAN |
MA | AP | Xray CHECKOUT/3675 | 3675 P.NICO | Xray CHECKOUT/3628 | 3628 G.TIAN | 3628 G.TIAN |
MA | AP | 3675 P.NICO | 3675 P.NICO | 3628 G.TIAN | 3628 G.TIAN | 3628 G.TIAN |
BEAM LINE 4-2 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
3481 E.SNELL/MA | MA/AP | AP | 3469 L.SCHULTZ | 3469 L.SCHULTZ | 3212 D.BARONDEAU | 3212 D.BARONDEAU |
MA | AP | CHANGE/3469 L.SCHU | 3469 L.SCHULTZ | CHANGE/3212 D.BARO | 3212 D.BARONDEAU | 3212 D.BARONDEAU |
MA | AP | 3469 L.SCHULTZ | 3469 L.SCHULTZ | 3212 D.BARONDEAU | 3212 D.BARONDEAU | 3212 D.BARONDEAU |
BEAM LINE 4-3 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
3678 S.MYNENI/MA | MA/AP | AP | 3185 S.DEBEER | 3185 S.DEBEER | 3185 S.DEBEER | 3185 S.DEBEER |
MA | AP | SMB CHECKOUT/3185 | 3185 S.DEBEER | 3185 S.DEBEER | 3185 S.DEBEER | 3185 S.DEBEER |
MA | AP | 3185 S.DEBEER | 3185 S.DEBEER | 3185 S.DEBEER | 3185 S.DEBEER | 3185 S.DEBEER |
BEAM LINE 6-2 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
3401 E.SOLOMON/MA | MA/AP | AP | 8859 B.JOHNSON | 8072 J.HAYTER | 8072 J.HAYTER | 3390 J.CABANA-JIME |
MA | AP | Xray CHECKOUT/8859 | 8859 B.JOHNSON | 8072 J.HAYTER | CHANGE/3390 J.CABA | 3390 J.CABANA-JIME |
MA | AP | 8859 B.JOHNSON | CHANGE/8072 J.HAYT | 8072 J.HAYTER | 3390 J.CABANA-JIME | 3390 J.CABANA-JIME |
BEAM LINE 7-2 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
FACI/MA | MA/AP | AP | FACI | FACI | FACI | FACI |
MA | AP | FACI | FACI | FACI | FACI | FACI |
MA | AP | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 7-3 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
3457 S.DEBEER/MA | MA/AP | AP | 3483 R.SZILAGYI | 3483 R.SZILAGYI | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS |
MA | AP | SMB CHECKOUT/3483 | 3483 R.SZILAGYI | SMB CHECKOUT/3324 | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS |
MA | AP | 3483 R.SZILAGYI | 3483 R.SZILAGYI | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS |
BEAM LINE 9-3 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
DOWN/MA | MA/AP | AP | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
3635 J.Addison/MA | MA/AP | AP | 3658 W.Fischer | 3658 W.Fischer | 3267 I.PICKERING | 3267 I.PICKERING |
MA | AP | CHANGE/3658 W.Fisc | 3658 W.Fischer | CHANGE/3267 I.PICK | 3267 I.PICKERING | 3267 I.PICKERING |
MA | AP | 3658 W.Fischer | 3658 W.Fischer | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING |
BEAM LINE 11-2 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
3589 J.DAVIS/MA | MA/AP | AP | 3538 S.FENDORF | 3538 S.FENDORF | 3472 A.SLOWEY | 3472 A.SLOWEY |
MA | AP | MES CHECKOUT/3538 | 3538 S.FENDORF | MES CHECKOUT/3472 | 3472 A.SLOWEY | 3472 A.SLOWEY |
MA | AP | 3538 S.FENDORF | 3538 S.FENDORF | 3472 A.SLOWEY | 3472 A.SLOWEY | 3472 A.SLOWEY |
BEAM LINE 11-3 | ||||||
Dec. 05, 2011 | Dec. 06, 2011 | Dec. 07, 2011 | Dec. 08, 2011 | Dec. 09, 2011 | Dec. 10, 2011 | Dec. 11, 2011 |
3440 A.AYZNER/MA | MA/AP | AP | 3651 L.PEREZ | 3651 L.PEREZ | 3289 M.CHABINYC | 3289 M.CHABINYC |
MA | AP | Xray CHECKOUT/3651 | 3651 L.PEREZ | Xray CHECKOUT/3289 | 3289 M.CHABINYC | 3289 M.CHABINYC |
MA | AP | 3651 L.PEREZ | 3651 L.PEREZ | 3289 M.CHABINYC | 3289 M.CHABINYC | 3289 M.CHABINYC |
WEEK OF Dec. 12, 2011 | ||||||
DOWN 6 am | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
BEAM LINE 1-4 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
3416 R.SEGALMAN | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA/AP | AP/DOWN | DOWN |
Xray CHECKOUT/3607 | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | AP | DOWN | DOWN |
3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | AP | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
3473 Y.SHI | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN | 3441 E.VERPLOEG/AP | AP/DOWN | DOWN |
Xray CHECKOUT/3441 | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN | AP | DOWN | DOWN |
3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN | AP | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
3478 T.PUNSHON | 3686 S.SINGH | 3686 S.SINGH | 3658 W.Fischer | 3658 W.Fischer/AP | AP/DOWN | DOWN |
CHANGE/3686 S.SING | 3686 S.SINGH | CHANGE/3658 W.Fisc | 3658 W.Fischer | AP | DOWN | DOWN |
3686 S.SINGH | 3686 S.SINGH | 3658 W.Fischer | 3658 W.Fischer | AP | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
3628 G.TIAN | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT/AP | AP/DOWN | DOWN |
Xray CHECKOUT/3329 | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | AP | DOWN | DOWN |
3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | AP | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
3212 D.BARONDEAU | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL/AP | AP/DOWN | DOWN |
CHANGE/3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL | AP | DOWN | DOWN |
3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL | AP | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
3185 S.DEBEER | 3392 R.SZILAGYI | 3392 R.SZILAGYI | 3429 O.DUCKWORTH | 3429 O.DUCKWORT/AP | AP/DOWN | DOWN |
SMB CHECKOUT/3392 | 3392 R.SZILAGYI | SMB CHECKOUT/3429 | 3429 O.DUCKWORTH | AP | DOWN | DOWN |
3392 R.SZILAGYI | 3392 R.SZILAGYI | 3429 O.DUCKWORTH | 3429 O.DUCKWORTH | AP | DOWN | DOWN |
BEAM LINE 6-2 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
3390 J.CABANA-JIME | 3390 J.CABANA-JIME | 8051 M.TONEY | 3581 J.Nelson | 3581 J.Nelson/AP | AP/DOWN | DOWN |
3390 J.CABANA-JIME | CHANGE/8051 M.TONE | CHANGE/3581 J.Nels | 3581 J.Nelson | AP | DOWN | DOWN |
3390 J.CABANA-JIME | 8051 M.TONEY | 3581 J.Nelson | 3581 J.Nelson | AP | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
FACI | FACI | FACI | FACI | FACI/AP | AP/DOWN | DOWN |
FACI | FACI | FACI | FACI | AP | DOWN | DOWN |
FACI | FACI | FACI | FACI | AP | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | 3593 T.STEMMLER | 3593 T.STEMMLER | 3593 T.STEMMLER/AP | AP/DOWN | DOWN |
3324 P.RIGGS-GELAS | SMB CHECKOUT/3593 | 3593 T.STEMMLER | 3593 T.STEMMLER | AP | DOWN | DOWN |
3324 P.RIGGS-GELAS | 3593 T.STEMMLER | 3593 T.STEMMLER | 3593 T.STEMMLER | AP | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN/AP | AP/DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | AP | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | AP | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
3267 I.PICKERING | 3267 I.PICKERING | 3668 A.Barker | 3668 A.Barker | 3534 A.LAM/AP | AP/DOWN | DOWN |
3267 I.PICKERING | CHANGE/3668 A.Bark | 3668 A.Barker | CHANGE/3534 A.LAM | AP | DOWN | DOWN |
3267 I.PICKERING | 3668 A.Barker | 3668 A.Barker | 3534 A.LAM | AP | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
3472 A.SLOWEY | 3429 O.DUCKWORTH | 3429 O.DUCKWORTH | 3508 S.HAYES | 3508 S.HAYES/AP | AP/DOWN | DOWN |
MES CHECKOUT/3429 | 3429 O.DUCKWORTH | MES CHECKOUT/3508 | 3508 S.HAYES | AP | DOWN | DOWN |
3429 O.DUCKWORTH | 3429 O.DUCKWORTH | 3508 S.HAYES | 3508 S.HAYES | AP | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Dec. 12, 2011 | Dec. 13, 2011 | Dec. 14, 2011 | Dec. 15, 2011 | Dec. 16, 2011 | Dec. 17, 2011 | Dec. 18, 2011 |
3289 M.CHABINYC | 3647 S.BENT | 1F70 A.AYZNER | 3368 E.KRAMER | 3368 E.KRAMER/AP | AP/DOWN | DOWN |
Xray CHECKOUT/3647 | Xray CHECKOUT/1F70 | Xray CHECKOUT/3368 | 3368 E.KRAMER | AP | DOWN | DOWN |
3647 S.BENT | 1F70 A.AYZNER | 3368 E.KRAMER | 3368 E.KRAMER | AP | DOWN | DOWN |
WEEK OF Dec. 19, 2011 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
BEAM LINE 1-4 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Dec. 19, 2011 | Dec. 20, 2011 | Dec. 21, 2011 | Dec. 22, 2011 | Dec. 23, 2011 | Dec. 24, 2011 | Dec. 25, 2011 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Dec. 26, 2011 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
BEAM LINE 1-4 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Dec. 26, 2011 | Dec. 27, 2011 | Dec. 28, 2011 | Dec. 29, 2011 | Dec. 30, 2011 | Dec. 31, 2011 | Jan. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
WEEK OF Jan. 02, 2012 | ||||||
HOLIDAY | AP | Run Resumes | ||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
BEAM LINE 1-4 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | 3425 S.MARTIN | 3425 S.MARTIN | 3425 S.MARTIN | 3425 S.MARTIN |
DOWN | AP | Xray CHECKOUT/3425 | 3425 S.MARTIN | 3425 S.MARTIN | 3425 S.MARTIN | 3425 S.MARTIN |
DOWN | AP | 3425 S.MARTIN | 3425 S.MARTIN | 3425 S.MARTIN | 3425 S.MARTIN | 3425 S.MARTIN |
BEAM LINE 2-1 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | 3446 A.Moule | 3446 A.Moule | 8051 M.TONEY | 8051 M.TONEY |
DOWN | AP | Xray CHECKOUT/3446 | 3446 A.Moule | Xray CHECKOUT/8051 | 8051 M.TONEY | 8051 M.TONEY |
DOWN | AP | 3446 A.Moule | 3446 A.Moule | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
BEAM LINE 2-3 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | 8067 S.WEBB | 8067 S.WEBB | 3668 A.Barker | 3668 A.Barker |
DOWN | AP | CHANGE/8067 S.WEBB | 8067 S.WEBB | CHANGE/3668 A.Bark | 3668 A.Barker | 3668 A.Barker |
DOWN | AP | 8067 S.WEBB | 8067 S.WEBB | 3668 A.Barker | 3668 A.Barker | 3668 A.Barker |
BEAM LINE 4-1 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | 3603 J.CHOROVER | 3603 J.CHOROVER | 3501 P.O'DAY | 3501 P.O'DAY |
DOWN | AP | Xray CHECKOUT/3603 | 3603 J.CHOROVER | Xray CHECKOUT/3501 | 3501 P.O'DAY | CHANGE/3279 P.O'DA |
DOWN | AP | 3603 J.CHOROVER | 3603 J.CHOROVER | 3501 P.O'DAY | 3501 P.O'DAY | 3279 P.O'DAY |
BEAM LINE 4-2 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | 8877 T.MATSUI | 8051 M.TONEY | 3660 S.TOLBERT | 10I4 C.HUANG |
DOWN | AP | CHANGE/8877 T.MATS | CHANGE/8051 M.TONE | CHANGE/3660 S.TOLB | CHANGE/10I4 C.HUAN | 10I4 C.HUANG |
DOWN | AP | 8877 T.MATSUI | 8051 M.TONEY | 3660 S.TOLBERT | 10I4 C.HUANG | 10I4 C.HUANG |
BEAM LINE 4-3 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN |
DOWN | AP | SMB CHECKOUT/3532 | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN |
DOWN | AP | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN |
BEAM LINE 6-2 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | 8015 A.MEHTA | 8015 A.MEHTA | 3254 W.MAO | 3254 W.MAO |
DOWN | AP | CHANGE/8015 A.MEHT | 8015 A.MEHTA | CHANGE/3254 W.MAO | 3254 W.MAO | 3254 W.MAO |
DOWN | AP | 8015 A.MEHTA | 8015 A.MEHTA | 3254 W.MAO | 3254 W.MAO | 3254 W.MAO |
BEAM LINE 7-2 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | FACI | FACI | FACI | FACI |
DOWN | AP | FACI | FACI | FACI | FACI | FACI |
DOWN | AP | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 7-3 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN |
DOWN | AP | SMB CHECKOUT/3282 | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN |
DOWN | AP | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN |
BEAM LINE 9-3 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | DOWN | DOWN | DOWN | DOWN |
DOWN | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | 3603 J.CHOROVER | 3603 J.CHOROVER | 3689 J.BARGAR | 3689 J.BARGAR |
DOWN | AP | CHANGE/3603 J.CHOR | 3603 J.CHOROVER | CHANGE/3689 J.BARG | 3689 J.BARGAR | 3689 J.BARGAR |
DOWN | AP | 3603 J.CHOROVER | 3603 J.CHOROVER | 3689 J.BARGAR | 3689 J.BARGAR | 3689 J.BARGAR |
BEAM LINE 11-2 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim |
DOWN | AP | MES CHECKOUT/3634 | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim |
DOWN | AP | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim |
BEAM LINE 11-3 | ||||||
Jan. 02, 2012 | Jan. 03, 2012 | Jan. 04, 2012 | Jan. 05, 2012 | Jan. 06, 2012 | Jan. 07, 2012 | Jan. 08, 2012 |
DOWN | DOWN/AP | AP | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE |
DOWN | AP | Xray CHECKOUT/3676 | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE |
DOWN | AP | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE |
WEEK OF Jan. 09, 2012 | ||||||
MA | AP | |||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
BEAM LINE 1-4 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
3425 S.MARTIN/MA | MA/AP | AP | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL |
MA | AP | CHANGE/3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL |
MA | AP | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL |
BEAM LINE 2-1 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
8051 M.TONEY/MA | MA/AP | AP | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
MA | AP | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
MA | AP | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
BEAM LINE 2-3 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
3668 A.Barker/MA | MA/AP | AP | 3524 C.FULLER | 3524 C.FULLER | 3667 S.TIAN | 3667 S.TIAN |
MA | AP | CHANGE/3524 C.FULL | 3524 C.FULLER | CHANGE/3667 S.TIAN | 3667 S.TIAN | CHANGE/3482 S.TIAN |
MA | AP | 3524 C.FULLER | 3524 C.FULLER | 3667 S.TIAN | 3667 S.TIAN | 3482 S.TIAN |
BEAM LINE 4-1 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
3279 P.O'DAY/MA | MA/AP | AP | 3279 P.O'DAY | 3427 J.Lezama Pach | 3427 J.Lezama Pach | 3380 J.BARGAR |
MA | AP | 3279 P.O'DAY | Xray CHECKOUT/3427 | 3427 J.Lezama Pach | CHANGE/3380 J.BARG | 3380 J.BARGAR |
MA | AP | 3279 P.O'DAY | 3427 J.Lezama Pach | 3427 J.Lezama Pach | 3380 J.BARGAR | 3380 J.BARGAR |
BEAM LINE 4-2 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
10I4 C.HUANG/MA | MA/AP | AP | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG |
MA | AP | CHANGE/3535 G.WONG | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG | CHANGE/3575 L.CART |
MA | AP | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG | 3575 L.CARTER |
BEAM LINE 4-3 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
3532 B.HEDMAN/MA | MA/AP | AP | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA |
MA | AP | SMB CHECKOUT/3250 | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA |
MA | AP | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA |
BEAM LINE 6-2 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
3254 W.MAO/MA | MA/AP | AP | 3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING |
MA | AP | Xray CHECKOUT/3331 | 3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING |
MA | AP | 3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING |
BEAM LINE 7-2 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
FACI/MA | MA/AP | AP | FACI | 3685 S.MANNSFELD | 3685 S.MANNSFELD | 3685 S.MANNSFELD |
MA | AP | FACI | Xray CHECKOUT/3685 | 3685 S.MANNSFELD | 3685 S.MANNSFELD | 3685 S.MANNSFELD |
MA | AP | FACI | 3685 S.MANNSFELD | 3685 S.MANNSFELD | 3685 S.MANNSFELD | 3685 S.MANNSFELD |
BEAM LINE 7-3 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
3282 N.BLACKBUR/MA | MA/AP | AP | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA |
MA | AP | SMB CHECKOUT/3250 | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA |
MA | AP | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA |
BEAM LINE 9-3 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
DOWN/MA | MA/AP | AP | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
3689 J.BARGAR/MA | MA/AP | AP | 3427 J.Lezama Pach | 3614 H.NICHOL | 3614 H.NICHOL | 3505 H.NICHOL |
MA | AP | CHANGE/3427 J.Leza | CHANGE/3614 H.NICH | 3614 H.NICHOL | CHANGE/3505 H.NICH | 3505 H.NICHOL |
MA | AP | 3427 J.Lezama Pach | 3614 H.NICHOL | 3614 H.NICHOL | 3505 H.NICHOL | 3505 H.NICHOL |
BEAM LINE 11-2 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
3634 T.Kim/MA | MA/AP | AP | 8860 J.BARGAR | Unscheduled | 3654 C.HANSEL | 3652 C.HANSEL |
MA | AP | MES CHECKOUT/8860 | 8860 J.BARGAR | MES CHECKOUT/3654 | Xray CHECKOUT/3652 | 3652 C.HANSEL |
MA | AP | 8860 J.BARGAR | 8860 J.BARGAR | 3654 C.HANSEL | 3652 C.HANSEL | 3652 C.HANSEL |
BEAM LINE 11-3 | ||||||
Jan. 09, 2012 | Jan. 10, 2012 | Jan. 11, 2012 | Jan. 12, 2012 | Jan. 13, 2012 | Jan. 14, 2012 | Jan. 15, 2012 |
3676 R.KLINE/MA | MA/AP | AP | 3368 E.KRAMER | 3368 E.KRAMER | 3519 S.MANNSFELD | 3519 S.MANNSFELD |
MA | AP | Xray CHECKOUT/3368 | 3368 E.KRAMER | Xray CHECKOUT/3519 | 3519 S.MANNSFELD | 3519 S.MANNSFELD |
MA | AP | 3368 E.KRAMER | 3368 E.KRAMER | 3519 S.MANNSFELD | 3519 S.MANNSFELD | 3519 S.MANNSFELD |
WEEK OF Jan. 16, 2012 | ||||||
HOLIDAY | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
BEAM LINE 1-4 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
3586 S.HALL | 3586 S.HALL | 3497 K.ENGBERG | 3497 K.ENGBERG | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
3586 S.HALL | CHANGE/3497 K.ENGB | 3497 K.ENGBERG | CHANGE/3416 R.SEGA | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
3586 S.HALL | 3497 K.ENGBERG | 3497 K.ENGBERG | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
BEAM LINE 2-1 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
8051 M.TONEY | 8051 M.TONEY | 3625 S.SWEETNAM | 3625 S.SWEETNAM | 91O8 H.Deng | 91O8 H.Deng | 91O8 H.Deng |
8051 M.TONEY | Xray CHECKOUT/3625 | 3625 S.SWEETNAM | Xray CHECKOUT/91O8 | 91O8 H.Deng | 91O8 H.Deng | 91O8 H.Deng |
8051 M.TONEY | 3625 S.SWEETNAM | 3625 S.SWEETNAM | 91O8 H.Deng | 91O8 H.Deng | 91O8 H.Deng | 91O8 H.Deng |
BEAM LINE 2-3 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
3482 S.TIAN | 3482 S.TIAN | 3659 C.HANSEL | 3514 C.LOPANO | 3514 C.LOPANO | 3505 H.NICHOL | 3505 H.NICHOL |
3482 S.TIAN | CHANGE/3659 C.HANS | CHANGE/3514 C.LOPA | 3514 C.LOPANO | CHANGE/3505 H.NICH | 3505 H.NICHOL | 3505 H.NICHOL |
3482 S.TIAN | 3659 C.HANSEL | 3514 C.LOPANO | 3514 C.LOPANO | 3505 H.NICHOL | 3505 H.NICHOL | 3505 H.NICHOL |
BEAM LINE 4-1 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
3380 J.BARGAR | 3380 J.BARGAR | 3682 R.Bernier-Lat | 3682 R.Bernier-Lat | 3682 R.Bernier-Lat | 3671 E.Benson | 3671 E.Benson |
3380 J.BARGAR | CHANGE/3682 R.Bern | 3682 R.Bernier-Lat | 3682 R.Bernier-Lat | CHANGE/3671 E.Bens | 3671 E.Benson | 3671 E.Benson |
3380 J.BARGAR | 3682 R.Bernier-Lat | 3682 R.Bernier-Lat | 3682 R.Bernier-Lat | 3671 E.Benson | 3671 E.Benson | 3671 E.Benson |
BEAM LINE 4-2 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
3575 L.CARTER | 3575 L.CARTER | 8047 T.WEISS | 10I5 R.Olcese | 3443 A.SCHOEFFLER | 3348 E.FICKO-BLEAN | 3348 E.FICKO-BLEAN |
3575 L.CARTER | CHANGE/8047 T.WEIS | CHANGE/10I5 R.Olce | CHANGE/3443 A.SCHO | CHANGE/3348 E.FICK | 3348 E.FICKO-BLEAN | CHANGE/8077 T.MATS |
3575 L.CARTER | 8047 T.WEISS | 10I5 R.Olcese | 3443 A.SCHOEFFLER | 3348 E.FICKO-BLEAN | 3348 E.FICKO-BLEAN | 8077 T.MATSUI |
BEAM LINE 4-3 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
3250 V.YACHANDRA | 3250 V.YACHANDRA | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3603 J.CHOROVER | 3603 J.CHOROVER |
3250 V.YACHANDRA | SMB CHECKOUT/3614 | 3614 H.NICHOL | 3614 H.NICHOL | SMB CHECKOUT/3603 | 3603 J.CHOROVER | 3603 J.CHOROVER |
3250 V.YACHANDRA | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER |
BEAM LINE 6-2 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING | 8055 H.OGASAWARA | 8055 H.OGASAWARA | 8055 H.OGASAWARA | 3573 Z.LIU |
3331 P.MANNING | 3331 P.MANNING | Xray CHECKOUT/8055 | 8055 H.OGASAWARA | 8055 H.OGASAWARA | CHANGE/3573 Z.LIU | 3573 Z.LIU |
3331 P.MANNING | 3331 P.MANNING | 8055 H.OGASAWARA | 8055 H.OGASAWARA | 8055 H.OGASAWARA | 3573 Z.LIU | 3573 Z.LIU |
BEAM LINE 7-2 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
3685 S.MANNSFELD | 3625 S.SWEETNAM | 3625 S.SWEETNAM | 8051 M.TONEY | 8051 M.TONEY | 3618 A.BRAUN | 3618 A.BRAUN |
3685 S.MANNSFELD | 3625 S.SWEETNAM | Xray CHECKOUT/8051 | 8051 M.TONEY | Xray CHECKOUT/3618 | 3618 A.BRAUN | 3618 A.BRAUN |
CHANGE/3625 S.SWEE | 3625 S.SWEETNAM | 8051 M.TONEY | 8051 M.TONEY | 3618 A.BRAUN | 3618 A.BRAUN | 3618 A.BRAUN |
BEAM LINE 7-3 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
3250 V.YACHANDRA | 3250 V.YACHANDRA | 3637 F.JALILEHVAND | 3637 F.JALILEHVAND | 3637 F.JALILEHVAND | 3681 S.GEORGE | 3681 S.GEORGE |
3250 V.YACHANDRA | SMB CHECKOUT/3637 | 3637 F.JALILEHVAND | 3637 F.JALILEHVAND | SMB CHECKOUT/3681 | 3681 S.GEORGE | 3681 S.GEORGE |
3250 V.YACHANDRA | 3637 F.JALILEHVAND | 3637 F.JALILEHVAND | 3637 F.JALILEHVAND | 3681 S.GEORGE | 3681 S.GEORGE | 3681 S.GEORGE |
BEAM LINE 9-3 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
3505 H.NICHOL | 3505 H.NICHOL | 3514 C.LOPANO | 3514 C.LOPANO | 3589 J.DAVIS | 3538 S.FENDORF | 3538 S.FENDORF |
3505 H.NICHOL | CHANGE/3514 C.LOPA | 3514 C.LOPANO | CHANGE/3589 J.DAVI | CHANGE/3538 S.FEND | 3538 S.FENDORF | 3538 S.FENDORF |
3505 H.NICHOL | 3514 C.LOPANO | 3514 C.LOPANO | 3589 J.DAVIS | 3538 S.FENDORF | 3538 S.FENDORF | 3538 S.FENDORF |
BEAM LINE 11-2 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
3652 C.HANSEL | 3652 C.HANSEL | 3467 C.BOOTH | 3467 C.BOOTH | 3527 D.WANG | 3527 D.WANG | 3521 C.BOOTH |
3652 C.HANSEL | MES CHECKOUT/3467 | 3467 C.BOOTH | CHANGE/3527 D.WANG | 3527 D.WANG | CHANGE/3467 C.BOOT | 3521 C.BOOTH |
3652 C.HANSEL | 3467 C.BOOTH | 3467 C.BOOTH | 3527 D.WANG | 3527 D.WANG | CHANGE/3521 C.BOOT | 3521 C.BOOTH |
BEAM LINE 11-3 | ||||||
Jan. 16, 2012 | Jan. 17, 2012 | Jan. 18, 2012 | Jan. 19, 2012 | Jan. 20, 2012 | Jan. 21, 2012 | Jan. 22, 2012 |
3519 S.MANNSFELD | 3519 S.MANNSFELD | 3407 T.SCHIROS | 3407 T.SCHIROS | 3578 J.Nelson | 3603 J.CHOROVER | 3603 J.CHOROVER |
3519 S.MANNSFELD | Xray CHECKOUT/3407 | 3407 T.SCHIROS | Xray CHECKOUT/3578 | Xray CHECKOUT/3603 | 3603 J.CHOROVER | 3603 J.CHOROVER |
3519 S.MANNSFELD | 3407 T.SCHIROS | 3407 T.SCHIROS | 3578 J.Nelson | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER |
WEEK OF Jan. 23, 2012 | ||||||
AP | AP | |||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
BEAM LINE 1-4 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
3416 R.SEGALMAN/AP | AP | AP | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA |
AP | AP | Xray CHECKOUT/3607 | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA |
AP | AP | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA |
BEAM LINE 2-1 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
91O8 H.Deng/AP | AP | AP | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA |
AP | AP | Xray CHECKOUT/3714 | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA |
AP | AP | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA |
BEAM LINE 2-3 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
3505 H.NICHOL/AP | AP | AP | 3603 J.CHOROVER | 3603 J.CHOROVER | 3417 A.TEMPLETON | 3417 A.TEMPLETON |
AP | AP | CHANGE/3603 J.CHOR | 3603 J.CHOROVER | CHANGE/3417 A.TEMP | 3417 A.TEMPLETON | 3417 A.TEMPLETON |
AP | AP | 3603 J.CHOROVER | 3603 J.CHOROVER | 3417 A.TEMPLETON | 3417 A.TEMPLETON | 3417 A.TEMPLETON |
BEAM LINE 4-1 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
3671 E.Benson/AP | AP | AP | 3417 A.TEMPLETON | 3417 A.TEMPLETON | 8051 M.TONEY | 8051 M.TONEY |
AP | AP | Xray CHECKOUT/3417 | 3417 A.TEMPLETON | MES CHECKOUT/8051 | 8051 M.TONEY | 8051 M.TONEY |
AP | AP | 3417 A.TEMPLETON | 3417 A.TEMPLETON | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
BEAM LINE 4-2 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
8077 T.MATSUI/AP | AP | AP | 8877 T.MATSUI | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA |
AP | AP | CHANGE/8877 T.MATS | CHANGE/3577 C.SAFI | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA |
AP | AP | 8877 T.MATSUI | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA |
BEAM LINE 4-3 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
3603 J.CHOROVER/AP | AP | AP | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT |
AP | AP | SMB CHECKOUT/3329 | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT |
AP | AP | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT |
BEAM LINE 6-2 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
3573 Z.LIU/AP | AP | AP | 8079 T.WENG | 8079 T.WENG | 3613 D.FRIEBEL | 3613 D.FRIEBEL |
AP | AP | CHANGE/8079 T.WENG | 8079 T.WENG | CHANGE/3613 D.FRIE | 3613 D.FRIEBEL | 3613 D.FRIEBEL |
AP | AP | 8079 T.WENG | 8079 T.WENG | 3613 D.FRIEBEL | 3613 D.FRIEBEL | 3613 D.FRIEBEL |
BEAM LINE 7-2 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
3618 A.BRAUN/AP | AP | AP | 3642 M.CHABINYC | 3642 M.CHABINYC | 3543 T.FORREST | 3543 T.FORREST |
AP | AP | Xray CHECKOUT/3642 | 3642 M.CHABINYC | Xray CHECKOUT/3543 | 3543 T.FORREST | 3543 T.FORREST |
AP | AP | 3642 M.CHABINYC | 3642 M.CHABINYC | 3543 T.FORREST | 3543 T.FORREST | 3543 T.FORREST |
BEAM LINE 7-3 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
3681 S.GEORGE/AP | AP | AP | 3681 S.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE |
AP | AP | 3681 S.GEORGE | SMB CHECKOUT/3266 | 3266 G.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE |
AP | AP | 3681 S.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE |
BEAM LINE 9-3 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
3538 S.FENDORF/AP | AP | AP | 8818 A.MEHTA | 8818 A.MEHTA | 8818 A.MEHTA | 8818 A.MEHTA |
AP | AP | Xray>BkHutch/8818 | 8818 A.MEHTA | 8818 A.MEHTA | 8818 A.MEHTA | 8818 A.MEHTA |
AP | AP | 8818 A.MEHTA | 8818 A.MEHTA | 8818 A.MEHTA | 8818 A.MEHTA | 8818 A.MEHTA |
BEAM LINE 11-2 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
3521 C.BOOTH/AP | AP | AP | 8860 J.BARGAR | 8860 J.BARGAR | 3265 R.WOGELIUS | 3265 R.WOGELIUS |
AP | AP | MES CHECKOUT/8860 | 8860 J.BARGAR | CHANGE/3265 R.WOGE | 3265 R.WOGELIUS | 3265 R.WOGELIUS |
AP | AP | 8860 J.BARGAR | 8860 J.BARGAR | 3265 R.WOGELIUS | 3265 R.WOGELIUS | 3265 R.WOGELIUS |
BEAM LINE 11-3 | ||||||
Jan. 23, 2012 | Jan. 24, 2012 | Jan. 25, 2012 | Jan. 26, 2012 | Jan. 27, 2012 | Jan. 28, 2012 | Jan. 29, 2012 |
3603 J.CHOROVER/AP | AP | AP | 3508 S.HAYES | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME |
AP | AP | Xray CHECKOUT/3508 | Xray CHECKOUT/3378 | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME |
AP | AP | 3508 S.HAYES | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME |
WEEK OF Jan. 30, 2012 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
BEAM LINE 1-4 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
3607 N.BALSARA | 3607 N.BALSARA | 91O5 J.Strachan | 91O5 J.Strachan | 91O6 P.Russo | 91O6 P.Russo | 91O6 P.Russo |
3607 N.BALSARA | CHANGE/91O5 J.Stra | 91O5 J.Strachan | CHANGE/91O6 P.Russ | 91O6 P.Russo | 91O6 P.Russo | 91O6 P.Russo |
3607 N.BALSARA | 91O5 J.Strachan | 91O5 J.Strachan | 91O6 P.Russo | 91O6 P.Russo | 91O6 P.Russo | 91O6 P.Russo |
BEAM LINE 2-1 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
3714 P.VALDIVIA | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
Xray CHECKOUT/3294 | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
BEAM LINE 2-3 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
3417 A.TEMPLETON | 1F75 S.WEBB | 3534 A.LAM | 3534 A.LAM | 3534 A.LAM | 3689 J.BARGAR | 3689 J.BARGAR |
CHANGE/1F75 S.WEBB | CHANGE/3534 A.LAM | 3534 A.LAM | 3534 A.LAM | CHANGE/3689 J.BARG | 3689 J.BARGAR | 3689 J.BARGAR |
1F75 S.WEBB | 3534 A.LAM | 3534 A.LAM | 3534 A.LAM | 3689 J.BARGAR | 3689 J.BARGAR | 3689 J.BARGAR |
BEAM LINE 4-1 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
8051 M.TONEY | 3408 K.HAYES | 3408 K.HAYES | 3531 G.LOWRY | 3531 G.LOWRY | 3201 J.MOREAU | 3201 J.MOREAU |
Xray CHECKOUT/3408 | 3408 K.HAYES | Xray CHECKOUT/3531 | 3531 G.LOWRY | MES CHECKOUT/3201 | 3201 J.MOREAU | 3201 J.MOREAU |
3408 K.HAYES | 3408 K.HAYES | 3531 G.LOWRY | 3531 G.LOWRY | 3201 J.MOREAU | 3201 J.MOREAU | 3201 J.MOREAU |
BEAM LINE 4-2 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA |
3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA |
3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA |
BEAM LINE 4-3 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
3329 S.SCOTT | 3585 Y.ARAI | 3585 Y.ARAI | 3408 K.HAYES | 3408 K.HAYES | 3531 G.LOWRY | 3531 G.LOWRY |
SMB CHECKOUT/3585 | 3585 Y.ARAI | SMB CHECKOUT/3408 | 3408 K.HAYES | SMB CHECKOUT/3531 | 3531 G.LOWRY | 3531 G.LOWRY |
3585 Y.ARAI | 3585 Y.ARAI | 3408 K.HAYES | 3408 K.HAYES | 3531 G.LOWRY | 3531 G.LOWRY | 3531 G.LOWRY |
BEAM LINE 6-2 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
3613 D.FRIEBEL | 3619 F.MBUGA | 3619 F.MBUGA | 3619 F.MBUGA | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER |
CHANGE/3619 F.MBUG | 3619 F.MBUGA | 3619 F.MBUGA | CHANGE/3457 S.DEBE | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER |
3619 F.MBUGA | 3619 F.MBUGA | 3619 F.MBUGA | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER |
BEAM LINE 7-2 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
3543 T.FORREST | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY |
Xray CHECKOUT/3595 | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY |
3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY | 3595 C.MURRAY |
BEAM LINE 7-3 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
3266 G.GEORGE | 3683 M.PUSHIE | 3683 M.PUSHIE | 3683 M.PUSHIE | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN |
SMB CHECKOUT/3683 | 3683 M.PUSHIE | 3683 M.PUSHIE | SMB CHECKOUT/3572 | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN |
3683 M.PUSHIE | 3683 M.PUSHIE | 3683 M.PUSHIE | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN |
BEAM LINE 9-3 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
8818 A.MEHTA | 8818 A.MEHTA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski |
8818 A.MEHTA | Xray CHECKOUT/3471 | 3471 Y.TAKAMURA | Xray CHECKOUT/3657 | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski |
8818 A.MEHTA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski |
BEAM LINE 11-2 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
3265 R.WOGELIUS | 3548 D.SINGER | 3548 D.SINGER | 3548 D.SINGER | 3619 F.MBUGA | 3619 F.MBUGA | 3619 F.MBUGA |
MES CHECKOUT/3548 | 3548 D.SINGER | 3548 D.SINGER | MES CHECKOUT/3619 | 3619 F.MBUGA | 3619 F.MBUGA | CHANGE/3613 D.FRIE |
3548 D.SINGER | 3548 D.SINGER | 3548 D.SINGER | 3619 F.MBUGA | 3619 F.MBUGA | 3619 F.MBUGA | 3613 D.FRIEBEL |
BEAM LINE 11-3 | ||||||
Jan. 30, 2012 | Jan. 31, 2012 | Feb. 01, 2012 | Feb. 02, 2012 | Feb. 03, 2012 | Feb. 04, 2012 | Feb. 05, 2012 |
3378 J.CABANA-JIME | 3578 J.Nelson | 3531 G.LOWRY | 3539 A.Amassian | 3539 A.Amassian | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN |
CHANGE/3578 J.Nels | Xray CHECKOUT/3531 | Xray CHECKOUT/3539 | 3539 A.Amassian | Xray CHECKOUT/3441 | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN |
3578 J.Nelson | 3531 G.LOWRY | 3539 A.Amassian | 3539 A.Amassian | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN |
WEEK OF Feb. 06, 2012 | ||||||
MA | AP | |||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
BEAM LINE 1-4 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
91O6 P.Russo/MA | MA/AP | AP | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA |
MA | AP | Xray CHECKOUT/3607 | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA |
MA | AP | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA |
BEAM LINE 2-1 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
3294 S.HIMMELBE/MA | MA/AP | AP | 3511 L.FUENTES-COB | 3511 L.FUENTES-COB | 3511 L.FUENTES-COB | 3511 L.FUENTES-COB |
MA | AP | Xray CHECKOUT/3511 | 3511 L.FUENTES-COB | 3511 L.FUENTES-COB | 3511 L.FUENTES-COB | 3511 L.FUENTES-COB |
MA | AP | 3511 L.FUENTES-COB | 3511 L.FUENTES-COB | 3511 L.FUENTES-COB | 3511 L.FUENTES-COB | 3511 L.FUENTES-COB |
BEAM LINE 2-3 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
3689 J.BARGAR/MA | MA/AP | AP | 3431 S.GEORGE | 3431 S.GEORGE | 3549 S.HO | 3549 S.HO |
MA | AP | CHANGE/3431 S.GEOR | 3431 S.GEORGE | CHANGE/3549 S.HO | 3549 S.HO | 3549 S.HO |
MA | AP | 3431 S.GEORGE | 3431 S.GEORGE | 3549 S.HO | 3549 S.HO | 3549 S.HO |
BEAM LINE 4-1 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
3201 J.MOREAU/MA | MA/AP | AP | 3567 S.LEE | 3567 S.LEE | 3663 D.WELLMAN | 3663 D.WELLMAN |
MA | AP | Xray CHECKOUT/3567 | 3567 S.LEE | MES CHECKOUT/3663 | 3663 D.WELLMAN | 3663 D.WELLMAN |
MA | AP | 3567 S.LEE | 3567 S.LEE | 3663 D.WELLMAN | 3663 D.WELLMAN | 3663 D.WELLMAN |
BEAM LINE 4-2 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
3577 C.SAFINYA/MA | MA/AP | AP | 3434 A.Sali | 3434 A.Sali | 3295 K.LEE | 3295 K.LEE |
MA | AP | CHANGE/3434 A.Sali | 3434 A.Sali | CHANGE/3295 K.LEE | 3295 K.LEE | 3295 K.LEE |
MA | AP | 3434 A.Sali | 3434 A.Sali | 3295 K.LEE | 3295 K.LEE | 3295 K.LEE |
BEAM LINE 4-3 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
3531 G.LOWRY/MA | MA/AP | AP | 3546 M.ZHU | 3546 M.ZHU | 3272 J.HEIN | 3272 J.HEIN |
MA | AP | SMB CHECKOUT/3546 | 3546 M.ZHU | SMB CHECKOUT/3272 | 3272 J.HEIN | 3272 J.HEIN |
MA | AP | 3546 M.ZHU | 3546 M.ZHU | 3272 J.HEIN | 3272 J.HEIN | 3272 J.HEIN |
BEAM LINE 6-2 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
3457 S.DEBEER/MA | MA/AP | AP | 8879 T.WENG | 8879 T.WENG | 3303 A.LINDENBERG | 3303 A.LINDENBERG |
MA | AP | CHANGE/8879 T.WENG | 8879 T.WENG | CHANGE/3303 A.LIND | 3303 A.LINDENBERG | 3303 A.LINDENBERG |
MA | AP | 8879 T.WENG | 8879 T.WENG | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 3303 A.LINDENBERG |
BEAM LINE 7-2 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
3595 C.MURRAY/MA | MA/AP | AP | 1F67 A.VAILIONIS | 1F67 A.VAILIONIS | 3651 L.PEREZ | 3651 L.PEREZ |
MA | AP | Xray CHECKOUT/1F67 | 1F67 A.VAILIONIS | Xray CHECKOUT/3651 | 3651 L.PEREZ | 3651 L.PEREZ |
MA | AP | 1F67 A.VAILIONIS | 1F67 A.VAILIONIS | 3651 L.PEREZ | 3651 L.PEREZ | 3651 L.PEREZ |
BEAM LINE 7-3 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
3572 M.GREEN/MA | MA/AP | AP | 3455 N.PINGITORE | 3455 N.PINGITORE | 3582 L.QUE | 3582 L.QUE |
MA | AP | SMB CHECKOUT/3455 | 3455 N.PINGITORE | SMB CHECKOUT/3582 | 3582 L.QUE | 3582 L.QUE |
MA | AP | 3455 N.PINGITORE | 3455 N.PINGITORE | 3582 L.QUE | 3582 L.QUE | 3582 L.QUE |
BEAM LINE 9-3 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
DOWN/MA | MA/AP | AP | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
3657 M.Biegalsk/MA | MA/AP | AP | 3657 M.Biegalski | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA |
MA | AP | 3657 M.Biegalski | CHANGE/8015 A.MEHT | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA |
MA | AP | 3657 M.Biegalski | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA |
BEAM LINE 11-2 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
3613 D.FRIEBEL/MA | MA/AP | AP | 3613 D.FRIEBEL | 3613 D.FRIEBEL | 3362 R.KRETZSCHMAR | 3362 R.KRETZSCHMAR |
MA | AP | 3613 D.FRIEBEL | 3613 D.FRIEBEL | MES CHECKOUT/3362 | 3362 R.KRETZSCHMAR | 3362 R.KRETZSCHMAR |
MA | AP | 3613 D.FRIEBEL | 3613 D.FRIEBEL | 3362 R.KRETZSCHMAR | 3362 R.KRETZSCHMAR | 3362 R.KRETZSCHMAR |
BEAM LINE 11-3 | ||||||
Feb. 06, 2012 | Feb. 07, 2012 | Feb. 08, 2012 | Feb. 09, 2012 | Feb. 10, 2012 | Feb. 11, 2012 | Feb. 12, 2012 |
3441 E.VERPLOEG/MA | MA/AP | AP | Unscheduled | 3648 V.HO | 3648 V.HO | 3648 V.HO |
MA | AP | Unscheduled | Xray CHECKOUT/3648 | 3648 V.HO | 3648 V.HO | 3648 V.HO |
MA | AP | Unscheduled | 3648 V.HO | 3648 V.HO | 3648 V.HO | 3648 V.HO |
WEEK OF Feb. 13, 2012 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
BEAM LINE 1-4 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
3607 N.BALSARA | 3660 S.TOLBERT | 3660 S.TOLBER/DOWN | 3660 S.TOLBERT | 3504 P.STRASSER | 3504 P.STRASSER | 3504 P.STRASSER |
CHANGE/3660 S.TOLB | 3660 S.TOLBERT | DOWN | CHANGE/3504 P.STRA | 3504 P.STRASSER | 3504 P.STRASSER | 3504 P.STRASSER |
3660 S.TOLBERT | 3660 S.TOLBERT | DOWN | 3504 P.STRASSER | 3504 P.STRASSER | 3504 P.STRASSER | 3504 P.STRASSER |
BEAM LINE 2-1 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
3511 L.FUENTES-COB | 3552 R.KRETZSCHMAR | 3552 R.KRETZS/DOWN | 3552 R.KRETZSCHMAR | 3552 R.KRETZSCHMAR | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA |
Xray CHECKOUT/3552 | 3552 R.KRETZSCHMAR | DOWN | 3552 R.KRETZSCHMAR | Xray CHECKOUT/3471 | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA |
3552 R.KRETZSCHMAR | 3552 R.KRETZSCHMAR | DOWN | 3552 R.KRETZSCHMAR | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA |
BEAM LINE 2-3 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
3549 S.HO | 3662 E.MYSAK | 3662 E.MYSAK/DOWN | 3662 E.MYSAK | 3662 E.MYSAK | 3536 O.BATUK | 3536 O.BATUK |
CHANGE/3662 E.MYSA | 3662 E.MYSAK | DOWN | 3662 E.MYSAK | CHANGE/3536 O.BATU | 3536 O.BATUK | CHANGE/3666 S.CONR |
3662 E.MYSAK | 3662 E.MYSAK | DOWN | 3662 E.MYSAK | 3536 O.BATUK | 3536 O.BATUK | 3666 S.CONRADSON |
BEAM LINE 4-1 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
3663 D.WELLMAN | 3337 S.BONE | 3337 S.BONE/DOWN | 3510 C.Van Genucht | 3510 C.Van Genucht | 3552 R.KRETZSCHMAR | 3552 R.KRETZSCHMAR |
MES CHECKOUT/3337 | 3337 S.BONE | DOWN | 3510 C.Van Genucht | MES CHECKOUT/3552 | 3552 R.KRETZSCHMAR | 3552 R.KRETZSCHMAR |
3337 S.BONE | 3337 S.BONE | DOWN | 3510 C.Van Genucht | 3552 R.KRETZSCHMAR | 3552 R.KRETZSCHMAR | 3552 R.KRETZSCHMAR |
BEAM LINE 4-2 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
3295 K.LEE | 8077 T.MATSUI | 3625 S.SWEETN/DOWN | 8877 T.MATSUI | 8053 D.NORDLUND | 3610 T.MCQUEEN | 3610 T.MCQUEEN |
CHANGE/8077 T.MATS | CHANGE/3625 S.SWEE | DOWN | CHANGE/8053 D.NORD | CHANGE/3610 T.MCQU | 3610 T.MCQUEEN | CHANGE/8047 T.WEIS |
8077 T.MATSUI | 3625 S.SWEETNAM | DOWN | 8053 D.NORDLUND | 3610 T.MCQUEEN | 3610 T.MCQUEEN | 8047 T.WEISS |
BEAM LINE 4-3 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
3272 J.HEIN | 91M6 I.LEVIN | 91M6 I.LEVIN/DOWN | 3511 L.FUENTES-COB | 3203 E.WASINGER | 3244 P.PERSSON | 3244 P.PERSSON |
SMB CHECKOUT/91M6 | 91M6 I.LEVIN | DOWN | SMB CHECKOUT/3203 | SMB CHECKOUT/3244 | 3244 P.PERSSON | 3244 P.PERSSON |
91M6 I.LEVIN | 91M6 I.LEVIN | DOWN | 3203 E.WASINGER | 3244 P.PERSSON | 3244 P.PERSSON | 3244 P.PERSSON |
BEAM LINE 6-2 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
3303 A.LINDENBERG | 8859 B.JOHNSON | 8060 J.BARGAR/DOWN | 91N5 T.Cornelius | 91N5 T.Cornelius | 3369 M.VAN DER MEU | 3369 M.VAN DER MEU |
Xray CHECKOUT/8859 | CHANGE/8060 J.BARG | DOWN | 91N5 T.Cornelius | CHANGE/3369 M.VAN | 3369 M.VAN DER MEU | 3369 M.VAN DER MEU |
8859 B.JOHNSON | 8060 J.BARGAR | DOWN | 91N5 T.Cornelius | 3369 M.VAN DER MEU | 3369 M.VAN DER MEU | 3369 M.VAN DER MEU |
BEAM LINE 7-2 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
3651 L.PEREZ | 8051 M.TONEY | 8051 M.TONEY/DOWN | 8051 M.TONEY | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
Xray CHECKOUT/8051 | 8051 M.TONEY | DOWN | Xray CHECKOUT/3473 | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
8051 M.TONEY | 8051 M.TONEY | DOWN | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
BEAM LINE 7-3 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
3582 L.QUE | 3646 C.WILMOT | 3646 C.WILMOT/DOWN | 3646 C.WILMOT | 3646 C.WILMOT | 3203 E.WASINGER | 3203 E.WASINGER |
SMB CHECKOUT/3646 | 3646 C.WILMOT | DOWN | 3646 C.WILMOT | SMB CHECKOUT/3203 | 3203 E.WASINGER | 3203 E.WASINGER |
3646 C.WILMOT | 3646 C.WILMOT | DOWN | 3646 C.WILMOT | 3203 E.WASINGER | 3203 E.WASINGER | 3203 E.WASINGER |
BEAM LINE 9-3 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
8015 A.MEHTA | 8015 A.MEHTA | 8848 V.Borzen/DOWN | 3419 S.SHWARTZ | 3419 S.SHWARTZ | 3419 S.SHWARTZ | 3419 S.SHWARTZ |
8015 A.MEHTA | Xray CHECKOUT/8848 | DOWN | 3419 S.SHWARTZ | 3419 S.SHWARTZ | 3419 S.SHWARTZ | 3419 S.SHWARTZ |
8015 A.MEHTA | 8848 V.Borzenets | DOWN | 3419 S.SHWARTZ | 3419 S.SHWARTZ | 3419 S.SHWARTZ | 3419 S.SHWARTZ |
BEAM LINE 11-2 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
3362 R.KRETZSCHMAR | 3362 R.KRETZSCHMAR | 3337 S.BONE/DOWN | 3337 S.BONE | 3536 O.BATUK | 3480 S.CONRADSON | 3480 S.CONRADSON |
3362 R.KRETZSCHMAR | MES CHECKOUT/3337 | DOWN | MES CHECKOUT/3536 | CHANGE/3480 S.CONR | 3480 S.CONRADSON | CHANGE/3672 S.CONR |
3362 R.KRETZSCHMAR | 3337 S.BONE | DOWN | 3536 O.BATUK | 3480 S.CONRADSON | 3480 S.CONRADSON | 3672 S.CONRADSON |
BEAM LINE 11-3 | ||||||
Feb. 13, 2012 | Feb. 14, 2012 | Feb. 15, 2012 | Feb. 16, 2012 | Feb. 17, 2012 | Feb. 18, 2012 | Feb. 19, 2012 |
3648 V.HO | 3511 L.FUENTES-COB | 3511 L.FUENTE/DOWN | 3660 S.TOLBERT | 3660 S.TOLBERT | 3515 B.BOYCE | 3515 B.BOYCE |
Xray CHECKOUT/3511 | 3511 L.FUENTES-COB | DOWN | 3660 S.TOLBERT | CHANGE/3515 B.BOYC | 3515 B.BOYCE | 3515 B.BOYCE |
3511 L.FUENTES-COB | 3511 L.FUENTES-COB | DOWN | 3660 S.TOLBERT | 3515 B.BOYCE | 3515 B.BOYCE | 3515 B.BOYCE |
WEEK OF Feb. 20, 2012 | ||||||
HOLIDAY | AP | |||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
BEAM LINE 1-4 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
3504 P.STRASSER | 3504 P.STRASSER/AP | AP | 3504 P.STRASSER | 3416 R.SEGALMAN | 3607 N.BALSARA | 3607 N.BALSARA |
3504 P.STRASSER | AP | 3504 P.STRASSER | CHANGE/3416 R.SEGA | CHANGE/3607 N.BALS | 3607 N.BALSARA | CHANGE/3504 P.STRA |
3504 P.STRASSER | AP | 3504 P.STRASSER | 3416 R.SEGALMAN | 3607 N.BALSARA | 3607 N.BALSARA | 3504 P.STRASSER |
BEAM LINE 2-1 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
3471 Y.TAKAMURA | 3471 Y.TAKAMURA/AP | AP | 3471 Y.TAKAMURA | 3640 J.ACRIVOS | 3640 J.ACRIVOS | 3640 J.ACRIVOS |
3471 Y.TAKAMURA | AP | 3471 Y.TAKAMURA | Xray CHECKOUT/3640 | 3640 J.ACRIVOS | 3640 J.ACRIVOS | 3640 J.ACRIVOS |
3471 Y.TAKAMURA | AP | 3471 Y.TAKAMURA | 3640 J.ACRIVOS | 3640 J.ACRIVOS | 3640 J.ACRIVOS | 3640 J.ACRIVOS |
BEAM LINE 2-3 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
3666 S.CONRADSON | 3666 S.CONRADSO/AP | AP | 3635 J.Addison | 3635 J.Addison | 3589 J.DAVIS | 3589 J.DAVIS |
3666 S.CONRADSON | AP | CHANGE/3635 J.Addi | 3635 J.Addison | CHANGE/3589 J.DAVI | 3589 J.DAVIS | 3589 J.DAVIS |
3666 S.CONRADSON | AP | 3635 J.Addison | 3635 J.Addison | 3589 J.DAVIS | 3589 J.DAVIS | 3589 J.DAVIS |
BEAM LINE 4-1 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
3552 R.KRETZSCHMAR | 3552 R.KRETZSCH/AP | AP | 3639 A.Morris | 3639 A.Morris | 3661 C.CHEN | 3661 C.CHEN |
3552 R.KRETZSCHMAR | AP | Xray CHECKOUT/3639 | 3639 A.Morris | Xray CHECKOUT/3661 | 3661 C.CHEN | 3661 C.CHEN |
3552 R.KRETZSCHMAR | AP | 3639 A.Morris | 3639 A.Morris | 3661 C.CHEN | 3661 C.CHEN | 3661 C.CHEN |
BEAM LINE 4-2 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
8047 T.WEISS | 10I7 W.WEIS/AP | AP | 8877 T.MATSUI | 3358 D.HERSCHLAG | 3504 P.STRASSER | 3504 P.STRASSER |
CHANGE/10I7 W.WEIS | AP | CHANGE/8877 T.MATS | CHANGE/3358 D.HERS | CHANGE/3504 P.STRA | 3504 P.STRASSER | 3504 P.STRASSER |
10I7 W.WEIS | AP | 8877 T.MATSUI | 3358 D.HERSCHLAG | 3504 P.STRASSER | 3504 P.STRASSER | 3504 P.STRASSER |
BEAM LINE 4-3 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
3244 P.PERSSON | 3244 P.PERSSON/AP | AP | 8871 R.SARANGI | 3581 J.Nelson | 3639 A.Morris | 3639 A.Morris |
3244 P.PERSSON | AP | SMB CHECKOUT/8871 | SMB CHECKOUT/3581 | SMB CHECKOUT/3639 | 3639 A.Morris | 3639 A.Morris |
3244 P.PERSSON | AP | 8871 R.SARANGI | 3581 J.Nelson | 3639 A.Morris | 3639 A.Morris | 3639 A.Morris |
BEAM LINE 6-2 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
3369 M.VAN DER MEU | 3369 M.VAN DER /AP | AP | 91M2 F.DE GROOT | 91M2 F.DE GROOT | 91M2 F.DE GROOT | 3431 S.GEORGE |
3369 M.VAN DER MEU | AP | CHANGE/91M2 F.DE G | 91M2 F.DE GROOT | 91M2 F.DE GROOT | CHANGE/3431 S.GEOR | 3431 S.GEORGE |
3369 M.VAN DER MEU | AP | 91M2 F.DE GROOT | 91M2 F.DE GROOT | 91M2 F.DE GROOT | 3431 S.GEORGE | 3431 S.GEORGE |
BEAM LINE 7-2 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
3473 Y.SHI | 3473 Y.SHI/AP | AP | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT |
3473 Y.SHI | AP | Xray CHECKOUT/3660 | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT |
3473 Y.SHI | AP | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT |
BEAM LINE 7-3 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
3203 E.WASINGER | 3203 E.WASINGER/AP | AP | 3667 S.TIAN | 3667 S.TIAN | 3681 S.GEORGE | 3681 S.GEORGE |
3203 E.WASINGER | AP | SMB CHECKOUT/3667 | 3667 S.TIAN | SMB CHECKOUT/3681 | 3681 S.GEORGE | 3681 S.GEORGE |
3203 E.WASINGER | AP | 3667 S.TIAN | 3667 S.TIAN | 3681 S.GEORGE | 3681 S.GEORGE | 3681 S.GEORGE |
BEAM LINE 9-3 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
DOWN | DOWN/AP | AP | DOWN | DOWN | DOWN | DOWN |
DOWN | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
3419 S.SHWARTZ | 3419 S.SHWARTZ/AP | AP | 8818 A.MEHTA | 8818 A.MEHTA | 3520 M.TRIGO | 3520 M.TRIGO |
3419 S.SHWARTZ | AP | Xray CHECKOUT/8818 | 8818 A.MEHTA | Xray CHECKOUT/3520 | 3520 M.TRIGO | 3520 M.TRIGO |
3419 S.SHWARTZ | AP | 8818 A.MEHTA | 8818 A.MEHTA | 3520 M.TRIGO | 3520 M.TRIGO | 3520 M.TRIGO |
BEAM LINE 11-2 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
3672 S.CONRADSON | 3672 S.CONRADSO/AP | AP | 8860 J.BARGAR | 8860 J.BARGAR | 3689 J.BARGAR | 3689 J.BARGAR |
3672 S.CONRADSON | AP | SMB CHECKOUT/8860 | 8860 J.BARGAR | MES CHECKOUT/3689 | 3689 J.BARGAR | 3689 J.BARGAR |
3672 S.CONRADSON | AP | 8860 J.BARGAR | 8860 J.BARGAR | 3689 J.BARGAR | 3689 J.BARGAR | 3689 J.BARGAR |
BEAM LINE 11-3 | ||||||
Feb. 20, 2012 | Feb. 21, 2012 | Feb. 22, 2012 | Feb. 23, 2012 | Feb. 24, 2012 | Feb. 25, 2012 | Feb. 26, 2012 |
3515 B.BOYCE | 3515 B.BOYCE/AP | AP | 3578 J.Nelson | 3673 A.Briseno | 3673 A.Briseno | 3673 A.Briseno |
3515 B.BOYCE | AP | Xray CHECKOUT/3578 | Xray CHECKOUT/3673 | 3673 A.Briseno | 3673 A.Briseno | 3673 A.Briseno |
3515 B.BOYCE | AP | 3578 J.Nelson | 3673 A.Briseno | 3673 A.Briseno | 3673 A.Briseno | 3673 A.Briseno |
WEEK OF Feb. 27, 2012 | ||||||
TimingStudies | TimingStudies | |||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
BEAM LINE 1-4 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3504 P.STRASSER | 3504 P.STRASSER | 3518 E.COLETTA | 3518 E.COLETTA | 3518 E.COLETTA | Low Alpha Exp/FACI | FACI |
3504 P.STRASSER | CHANGE/3518 E.COLE | 3518 E.COLETTA | 3518 E.COLETTA | CHANGE/3452 G.FULL | FACI | FACI |
3504 P.STRASSER | 3518 E.COLETTA | 3518 E.COLETTA | 3518 E.COLETTA | 3452 G.FULLER | FACI | FACI |
BEAM LINE 2-1 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3640 J.ACRIVOS | 3640 J.ACRIVOS | 3642 M.CHABINYC | 3642 M.CHABINYC | 3642 M.CHABINYC | Low Alpha Exp/FACI | FACI |
3640 J.ACRIVOS | Xray CHECKOUT/3642 | 3642 M.CHABINYC | 3642 M.CHABINYC | 3642 M.CHABINYC | FACI | FACI |
3640 J.ACRIVOS | 3642 M.CHABINYC | 3642 M.CHABINYC | 3642 M.CHABINYC | 3642 M.CHABINYC | FACI | FACI |
BEAM LINE 2-3 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3589 J.DAVIS | 3589 J.DAVIS | 1F74 C.OZE | 8067 S.WEBB | 8067 S.WEBB | Low Alpha Exp/FACI | FACI |
3589 J.DAVIS | CHANGE/1F74 C.OZE | CHANGE/8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB | FACI | FACI |
3589 J.DAVIS | 1F74 C.OZE | 8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB | FACI | FACI |
BEAM LINE 4-1 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3661 C.CHEN | 3412 G.BROWN | 3412 G.BROWN | 3412 G.BROWN | 3412 G.BROWN | Low Alpha Exp/FACI | FACI |
Xray CHECKOUT/3412 | 3412 G.BROWN | 3412 G.BROWN | 3412 G.BROWN | 3412 G.BROWN | FACI | FACI |
3412 G.BROWN | 3412 G.BROWN | 3412 G.BROWN | 3412 G.BROWN | 3412 G.BROWN | FACI | FACI |
BEAM LINE 4-2 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3504 P.STRASSER | 3551 Y.Wang | 10I8 R.Galimidi | 10I8 R.Galimidi | 8047 T.WEISS | Low Alpha Exp/FACI | FACI |
CHANGE/3551 Y.Wang | CHANGE/10I8 R.Gali | 10I8 R.Galimidi | CHANGE/8047 T.WEIS | CHANGE/3295 K.LEE | FACI | FACI |
3551 Y.Wang | 10I8 R.Galimidi | 10I8 R.Galimidi | 8047 T.WEISS | 3295 K.LEE | FACI | FACI |
BEAM LINE 4-3 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3639 A.Morris | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | Low Alpha Exp/FACI | FACI |
SMB CHECKOUT/3329 | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | FACI | FACI |
3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | FACI | FACI |
BEAM LINE 6-2 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3431 S.GEORGE | 3624 A.CRUICKSHANK | 3624 A.CRUICKSHANK | 8041 J.HAYTER | 8879 T.WENG | Low Alpha Exp/FACI | FACI |
CHANGE/3624 A.CRUI | 3624 A.CRUICKSHANK | CHANGE/8041 J.HAYT | Xray>XES/8879 | 8879 T.WENG | FACI | FACI |
3624 A.CRUICKSHANK | 3624 A.CRUICKSHANK | 8041 J.HAYTER | 8879 T.WENG | 8879 T.WENG | FACI | FACI |
BEAM LINE 7-2 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3660 S.TOLBERT | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | Low Alpha Exp/FACI | FACI |
Xray CHECKOUT/3294 | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | FACI | FACI |
3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | FACI | FACI |
BEAM LINE 7-3 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3681 S.GEORGE | 3681 S.GEORGE | 3681 S.GEORGE | 3183 S.SPROULES | 3236 K.HODGSON | Low Alpha Exp/FACI | FACI |
3681 S.GEORGE | 3681 S.GEORGE | SMB CHECKOUT/3183 | SMB CHECKOUT/3236 | 3236 K.HODGSON | FACI | FACI |
3681 S.GEORGE | 3681 S.GEORGE | 3183 S.SPROULES | 3236 K.HODGSON | 3236 K.HODGSON | FACI | FACI |
BEAM LINE 9-3 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | Low Alpha Exp/FACI | FACI |
DOWN | DOWN | DOWN | DOWN | DOWN | FACI | FACI |
DOWN | DOWN | DOWN | DOWN | DOWN | FACI | FACI |
BEAM LINE 10-2 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3520 M.TRIGO | 3520 M.TRIGO | 3520 M.TRIGO | 8015 A.MEHTA | 8015 A.MEHTA | Low Alpha Exp/FACI | FACI |
3520 M.TRIGO | 3520 M.TRIGO | Xray CHECKOUT/8015 | 8015 A.MEHTA | 8015 A.MEHTA | FACI | FACI |
3520 M.TRIGO | 3520 M.TRIGO | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | FACI | FACI |
BEAM LINE 11-2 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3689 J.BARGAR | 3337 S.BONE | 3337 S.BONE | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH | Low Alpha Exp/FACI | FACI |
MES CHECKOUT/3337 | 3337 S.BONE | MES CHECKOUT/3726 | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH | FACI | FACI |
3337 S.BONE | 3337 S.BONE | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH | FACI | FACI |
BEAM LINE 11-3 | ||||||
Feb. 27, 2012 | Feb. 28, 2012 | Feb. 29, 2012 | Mar. 01, 2012 | Mar. 02, 2012 | Mar. 03, 2012 | Mar. 04, 2012 |
3673 A.Briseno | 3625 S.SWEETNAM | 3625 S.SWEETNAM | 8875 D.VAN CAMPEN | 3520 M.TRIGO | Low Alpha Exp/FACI | FACI |
Xray CHECKOUT/3625 | 3625 S.SWEETNAM | Xray CHECKOUT/8875 | CHANGE/3520 M.TRIG | 3520 M.TRIGO | FACI | FACI |
3625 S.SWEETNAM | 3625 S.SWEETNAM | 8875 D.VAN CAMPEN | 3520 M.TRIGO | 3520 M.TRIGO | FACI | FACI |
WEEK OF Mar. 05, 2012 | ||||||
AP | AP | |||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
BEAM LINE 1-4 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | 3452 G.FULLER | 3452 G.FULLER | 3452 G.FULLER | 3452 G.FULLER |
MA | AP | 3452 G.FULLER | 3452 G.FULLER | 3452 G.FULLER | 3452 G.FULLER | 3452 G.FULLER |
MA | AP | 3452 G.FULLER | 3452 G.FULLER | 3452 G.FULLER | 3452 G.FULLER | 3452 G.FULLER |
BEAM LINE 2-1 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | Unscheduled | 3473 Y.SHI | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
MA | AP | Unscheduled | Xray CHECKOUT/3473 | Xray CHECKOUT/3294 | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
MA | AP | Unscheduled | 3473 Y.SHI | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
BEAM LINE 2-3 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | 8067 S.WEBB | 8067 S.WEBB | 3417 A.TEMPLETON | 3417 A.TEMPLETON |
MA | AP | CHANGE/8067 S.WEBB | 8067 S.WEBB | CHANGE/3417 A.TEMP | 3417 A.TEMPLETON | 3417 A.TEMPLETON |
MA | AP | 8067 S.WEBB | 8067 S.WEBB | 3417 A.TEMPLETON | 3417 A.TEMPLETON | 3417 A.TEMPLETON |
BEAM LINE 4-1 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | 8818 A.MEHTA | 8818 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA |
MA | AP | Xray CHECKOUT/8818 | 8818 A.MEHTA | CHANGE/8015 A.MEHT | 8015 A.MEHTA | 8015 A.MEHTA |
MA | AP | 8818 A.MEHTA | 8818 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA |
BEAM LINE 4-2 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | 8877 T.MATSUI | 8077 T.MATSUI | 3443 A.SCHOEFFLER | 3575 L.CARTER |
MA | AP | CHANGE/8877 T.MATS | CHANGE/8077 T.MATS | CHANGE/3443 A.SCHO | CHANGE/3575 L.CART | 3575 L.CARTER |
MA | AP | 8877 T.MATSUI | 8077 T.MATSUI | 3443 A.SCHOEFFLER | 3575 L.CARTER | 3575 L.CARTER |
BEAM LINE 4-3 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | 3337 S.BONE | 3337 S.BONE | 3711 A.TEMPLETON | 3711 A.TEMPLETON |
MA | AP | SMB CHECKOUT/3337 | 3337 S.BONE | SMB CHECKOUT/3711 | 3711 A.TEMPLETON | 3711 A.TEMPLETON |
MA | AP | 3337 S.BONE | 3337 S.BONE | 3711 A.TEMPLETON | 3711 A.TEMPLETON | 3711 A.TEMPLETON |
BEAM LINE 6-2 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | 3529 V.YACHANDRA | 3529 V.YACHANDRA | 3529 V.YACHANDRA | 3529 V.YACHANDRA |
MA | AP | Xray CHECKOUT/3529 | 3529 V.YACHANDRA | 3529 V.YACHANDRA | 3529 V.YACHANDRA | Xray CHECKOUT/3729 |
MA | AP | 3529 V.YACHANDRA | 3529 V.YACHANDRA | 3529 V.YACHANDRA | 3529 V.YACHANDRA | 3729 V.YACHANDRA |
BEAM LINE 7-2 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | 1F67 A.VAILIONIS | 1F67 A.VAILIONIS | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN |
MA | AP | Xray CHECKOUT/1F67 | 1F67 A.VAILIONIS | Xray CHECKOUT/3441 | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN |
MA | AP | 1F67 A.VAILIONIS | 1F67 A.VAILIONIS | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN |
BEAM LINE 7-3 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN |
MA | AP | SMB CHECKOUT/3282 | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN |
MA | AP | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN |
BEAM LINE 9-3 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | 8867 S.WEBB | 8867 S.WEBB | 8867 S.WEBB | 8067 S.WEBB |
MA | AP | Xray CHECKOUT/8867 | 8867 S.WEBB | 8867 S.WEBB | CHANGE/8067 S.WEBB | 8067 S.WEBB |
MA | AP | 8867 S.WEBB | 8867 S.WEBB | 8867 S.WEBB | 8067 S.WEBB | 8067 S.WEBB |
BEAM LINE 11-2 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | FACI | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER |
MA | AP | SingXtal/FACI | MES CHECKOUT/3603 | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER |
MA | AP | FACI | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER |
BEAM LINE 11-3 | ||||||
Mar. 05, 2012 | Mar. 06, 2012 | Mar. 07, 2012 | Mar. 08, 2012 | Mar. 09, 2012 | Mar. 10, 2012 | Mar. 11, 2012 |
FACI/MA | MA/AP | AP | 3196 A.Yiu | 3196 A.Yiu | 3578 J.Nelson | 3578 J.Nelson |
MA | AP | Xray CHECKOUT/3196 | 3196 A.Yiu | Xray CHECKOUT/3578 | 3578 J.Nelson | 3578 J.Nelson |
MA | AP | 3196 A.Yiu | 3196 A.Yiu | 3578 J.Nelson | 3578 J.Nelson | 3578 J.Nelson |
WEEK OF Mar. 12, 2012 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
BEAM LINE 1-4 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
3452 G.FULLER | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3721 N.Lynd | 3721 N.Lynd | 3721 N.Lynd |
CHANGE/3607 N.BALS | 3607 N.BALSARA | 3607 N.BALSARA | CHANGE/3721 N.Lynd | 3721 N.Lynd | 3721 N.Lynd | 3721 N.Lynd |
3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3721 N.Lynd | 3721 N.Lynd | 3721 N.Lynd | 3721 N.Lynd |
BEAM LINE 2-1 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
3294 S.HIMMELBERGE | 91O8 H.Deng | 91O8 H.Deng | 91O8 H.Deng | 91O8 H.Deng | 3563 N.WIDJONARKO | 3563 N.WIDJONARKO |
Xray CHECKOUT/91O8 | 91O8 H.Deng | 91O8 H.Deng | 91O8 H.Deng | Xray CHECKOUT/3563 | 3563 N.WIDJONARKO | 3563 N.WIDJONARKO |
91O8 H.Deng | 91O8 H.Deng | 91O8 H.Deng | 91O8 H.Deng | 3563 N.WIDJONARKO | 3563 N.WIDJONARKO | 3563 N.WIDJONARKO |
BEAM LINE 2-3 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
3417 A.TEMPLETON | 8072 J.HAYTER | 91P8 S.FENDORF | 3584 B.Goodfellow | 3584 B.Goodfellow | 3658 W.Fischer | 3658 W.Fischer |
CHANGE/8072 J.HAYT | CHANGE/91P8 S.FEND | CHANGE/3584 B.Good | 3584 B.Goodfellow | CHANGE/3658 W.Fisc | 3658 W.Fischer | 3658 W.Fischer |
8072 J.HAYTER | 91P8 S.FENDORF | 3584 B.Goodfellow | 3584 B.Goodfellow | 3658 W.Fischer | 3658 W.Fischer | 3658 W.Fischer |
BEAM LINE 4-1 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 3612 F.MEIRER | 3612 F.MEIRER | 3612 F.MEIRER |
8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | CHANGE/3612 F.MEIR | 3612 F.MEIRER | 3612 F.MEIRER | 3612 F.MEIRER |
8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 3612 F.MEIRER | 3612 F.MEIRER | 3612 F.MEIRER | 3612 F.MEIRER |
BEAM LINE 4-2 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
3575 L.CARTER | 8053 D.NORDLUND | 8053 D.NORDLUND | 3704 L.HIRST | 3704 L.HIRST | 3351 V.CHEREZOV | 3351 V.CHEREZOV |
CHANGE/8053 D.NORD | 8053 D.NORDLUND | CHANGE/3704 L.HIRS | 3704 L.HIRST | CHANGE/3351 V.CHER | 3351 V.CHEREZOV | 3351 V.CHEREZOV |
8053 D.NORDLUND | 8053 D.NORDLUND | 3704 L.HIRST | 3704 L.HIRST | 3351 V.CHEREZOV | 3351 V.CHEREZOV | 3351 V.CHEREZOV |
BEAM LINE 4-3 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
3711 A.TEMPLETON | 3729 V.YACHANDRA | 3729 V.YACHANDRA | 3729 V.YACHANDRA | 3729 V.YACHANDRA | 3447 S.CHEAH | 3447 S.CHEAH |
SMB CHECKOUT/3729 | 3729 V.YACHANDRA | 3729 V.YACHANDRA | 3729 V.YACHANDRA | Xray CHECKOUT/3447 | 3447 S.CHEAH | 3447 S.CHEAH |
3729 V.YACHANDRA | 3729 V.YACHANDRA | 3729 V.YACHANDRA | 3729 V.YACHANDRA | 3447 S.CHEAH | 3447 S.CHEAH | 3447 S.CHEAH |
BEAM LINE 6-2 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
3729 V.YACHANDRA | 3729 V.YACHANDRA | 3729 V.YACHANDRA | 3717 M.QAYYUM | 3717 M.QAYYUM | 3717 M.QAYYUM | 8079 T.WENG |
3729 V.YACHANDRA | 3729 V.YACHANDRA | Xray CHECKOUT/3717 | 3717 M.QAYYUM | 3717 M.QAYYUM | CHANGE/8079 T.WENG | 8079 T.WENG |
3729 V.YACHANDRA | 3729 V.YACHANDRA | 3717 M.QAYYUM | 3717 M.QAYYUM | 3717 M.QAYYUM | 8079 T.WENG | 8079 T.WENG |
BEAM LINE 7-2 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
3441 E.VERPLOEGEN | 3440 A.AYZNER | 3440 A.AYZNER | 3440 A.AYZNER | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
Xray CHECKOUT/3440 | 3440 A.AYZNER | 3440 A.AYZNER | Xray CHECKOUT/3473 | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
3440 A.AYZNER | 3440 A.AYZNER | 3440 A.AYZNER | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
BEAM LINE 7-3 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
3282 N.BLACKBURN | 3179 G.DE LA ROSA | 3179 G.DE LA ROSA | 3179 G.DE LA ROSA | 3723 J.Huang | 3723 J.Huang | 3723 J.Huang |
SMB CHECKOUT/3179 | 3179 G.DE LA ROSA | 3179 G.DE LA ROSA | SMB CHECKOUT/3723 | 3723 J.Huang | 3723 J.Huang | 3723 J.Huang |
3179 G.DE LA ROSA | 3179 G.DE LA ROSA | 3179 G.DE LA ROSA | 3723 J.Huang | 3723 J.Huang | 3723 J.Huang | 3723 J.Huang |
BEAM LINE 9-3 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
8067 S.WEBB | 91P8 S.FENDORF | 8072 J.HAYTER | 3667 S.TIAN | 3667 S.TIAN | 8067 S.WEBB | 8067 S.WEBB |
CHANGE/91P8 S.FEND | CHANGE/8072 J.HAYT | CHANGE/3667 S.TIAN | 3667 S.TIAN | CHANGE/8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB |
91P8 S.FENDORF | 8072 J.HAYTER | 3667 S.TIAN | 3667 S.TIAN | 8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB |
BEAM LINE 11-2 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
3603 J.CHOROVER | 3467 C.BOOTH | 3467 C.BOOTH | 3467 C.BOOTH | 3467 C.BOOTH | 3472 A.SLOWEY | 3472 A.SLOWEY |
MES CHECKOUT/3467 | 3467 C.BOOTH | CHANGE/3467 C.BOOT | 3467 C.BOOTH | MES CHECKOUT/3472 | 3472 A.SLOWEY | 3472 A.SLOWEY |
3467 C.BOOTH | 3467 C.BOOTH | 3467 C.BOOTH | 3467 C.BOOTH | 3472 A.SLOWEY | 3472 A.SLOWEY | 3472 A.SLOWEY |
BEAM LINE 11-3 | ||||||
Mar. 12, 2012 | Mar. 13, 2012 | Mar. 14, 2012 | Mar. 15, 2012 | Mar. 16, 2012 | Mar. 17, 2012 | Mar. 18, 2012 |
3578 J.Nelson | 3563 N.WIDJONARKO | 3563 N.WIDJONARKO | 3679 S.FENDORF | 3679 S.FENDORF | 3603 J.CHOROVER | 3603 J.CHOROVER |
Xray CHECKOUT/3563 | 3563 N.WIDJONARKO | Xray CHECKOUT/3679 | 3679 S.FENDORF | Xray CHECKOUT/3603 | 3603 J.CHOROVER | 3603 J.CHOROVER |
3563 N.WIDJONARKO | 3563 N.WIDJONARKO | 3679 S.FENDORF | 3679 S.FENDORF | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER |
WEEK OF Mar. 19, 2012 | ||||||
MA | AP | |||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
BEAM LINE 1-4 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
3721 N.Lynd/AP | AP | AP | Unscheduled | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
AP | AP | Unscheduled | CHANGE/3416 R.SEGA | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
AP | AP | Unscheduled | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
BEAM LINE 2-1 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
3563 N.WIDJONAR/AP | AP | AP | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA |
AP | AP | Xray CHECKOUT/3714 | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA |
AP | AP | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA |
BEAM LINE 2-3 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
3658 W.Fischer/AP | AP | AP | 3667 S.TIAN | 3667 S.TIAN | 3689 J.BARGAR | 3689 J.BARGAR |
AP | AP | CHANGE/3667 S.TIAN | 3667 S.TIAN | CHANGE/3689 J.BARG | 3689 J.BARGAR | 3689 J.BARGAR |
AP | AP | 3667 S.TIAN | 3667 S.TIAN | 3689 J.BARGAR | 3689 J.BARGAR | 3689 J.BARGAR |
BEAM LINE 4-1 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
3612 F.MEIRER/AP | AP | AP | 3674 T.BORCH | 3674 T.BORCH | 3728 R.DAVIS | 3728 R.DAVIS |
AP | AP | Xray CHECKOUT/3674 | 3674 T.BORCH | Xray CHECKOUT/3728 | 3728 R.DAVIS | 3728 R.DAVIS |
AP | AP | 3674 T.BORCH | 3674 T.BORCH | 3728 R.DAVIS | 3728 R.DAVIS | 3728 R.DAVIS |
BEAM LINE 4-2 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
3351 V.CHEREZOV/AP | AP | AP | 8877 T.MATSUI | 10J0 C.SMITH | 3434 A.Sali | 3434 A.Sali |
AP | AP | CHANGE/8877 T.MATS | CHANGE/10J0 C.SMIT | CHANGE/3434 A.Sali | 3434 A.Sali | CHANGE/3358 D.HERS |
AP | AP | 8877 T.MATSUI | 10J0 C.SMITH | 3434 A.Sali | 3434 A.Sali | 3358 D.HERSCHLAG |
BEAM LINE 4-3 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
3447 S.CHEAH/AP | AP | AP | 3654 C.HANSEL | 3654 C.HANSEL | 3652 C.HANSEL | 3652 C.HANSEL |
AP | AP | SMB CHECKOUT/3654 | 3654 C.HANSEL | CHANGE/3652 C.HANS | 3652 C.HANSEL | 3652 C.HANSEL |
AP | AP | 3654 C.HANSEL | 3654 C.HANSEL | 3652 C.HANSEL | 3652 C.HANSEL | 3652 C.HANSEL |
BEAM LINE 6-2 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
8079 T.WENG/AP | AP | AP | 8859 B.JOHNSON | 8041 J.HAYTER | 3581 J.Nelson | 3581 J.Nelson |
AP | AP | Xray CHECKOUT/8859 | CHANGE/8041 J.HAYT | CHANGE/3581 J.Nels | 3581 J.Nelson | 3581 J.Nelson |
AP | AP | 8859 B.JOHNSON | 8041 J.HAYTER | 3581 J.Nelson | 3581 J.Nelson | 3581 J.Nelson |
BEAM LINE 7-2 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
3473 Y.SHI/AP | AP | AP | 3709 J.CHANG | 3709 J.CHANG | 3709 J.CHANG | 3709 J.CHANG |
AP | AP | Xray CHECKOUT/3709 | 3709 J.CHANG | 3709 J.CHANG | 3709 J.CHANG | 3709 J.CHANG |
AP | AP | 3709 J.CHANG | 3709 J.CHANG | 3709 J.CHANG | 3709 J.CHANG | 3709 J.CHANG |
BEAM LINE 7-3 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
3723 J.Huang/AP | AP | AP | 3593 T.STEMMLER | 3593 T.STEMMLER | 3593 T.STEMMLER | 3593 T.STEMMLER |
AP | AP | SMB CHECKOUT/3593 | 3593 T.STEMMLER | 3593 T.STEMMLER | 3593 T.STEMMLER | 3593 T.STEMMLER |
AP | AP | 3593 T.STEMMLER | 3593 T.STEMMLER | 3593 T.STEMMLER | 3593 T.STEMMLER | 3593 T.STEMMLER |
BEAM LINE 9-3 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
8067 S.WEBB/AP | AP | AP | 3380 J.BARGAR | 3380 J.BARGAR | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH |
AP | AP | CHANGE/3380 J.BARG | 3380 J.BARGAR | CHANGE/3726 A.SEYF | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH |
AP | AP | 3380 J.BARGAR | 3380 J.BARGAR | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH |
BEAM LINE 11-2 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
3472 A.SLOWEY/AP | AP | AP | 3467 C.BOOTH | 3546 M.ZHU | 3201 J.MOREAU | 3201 J.MOREAU |
AP | AP | MES CHECKOUT/3467 | MES CHECKOUT/3546 | MES CHECKOUT/3201 | 3201 J.MOREAU | 3201 J.MOREAU |
AP | AP | 3467 C.BOOTH | 3546 M.ZHU | 3201 J.MOREAU | 3201 J.MOREAU | 3201 J.MOREAU |
BEAM LINE 11-3 | ||||||
Mar. 19, 2012 | Mar. 20, 2012 | Mar. 21, 2012 | Mar. 22, 2012 | Mar. 23, 2012 | Mar. 24, 2012 | Mar. 25, 2012 |
3603 J.CHOROVER/AP | AP | AP | 3531 G.LOWRY | 3531 G.LOWRY | 3519 S.MANNSFELD | 3519 S.MANNSFELD |
AP | AP | Xray CHECKOUT/3531 | 3531 G.LOWRY | Xray CHECKOUT/3519 | 3519 S.MANNSFELD | 3519 S.MANNSFELD |
AP | AP | 3531 G.LOWRY | 3531 G.LOWRY | 3519 S.MANNSFELD | 3519 S.MANNSFELD | 3519 S.MANNSFELD |
WEEK OF Mar. 26, 2012 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
BEAM LINE 1-4 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3564 C.KIM | 3564 C.KIM | 3564 C.KIM |
3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN | CHANGE/3564 C.KIM | 3564 C.KIM | 3564 C.KIM | 3564 C.KIM |
3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3564 C.KIM | 3564 C.KIM | 3564 C.KIM | 3564 C.KIM |
BEAM LINE 2-1 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | Xray CHECKOUT/3294 | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
BEAM LINE 2-3 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3689 J.BARGAR | 3689 J.BARGAR | 8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB | 3736 C.KIM | 3736 C.KIM |
3689 J.BARGAR | CHANGE/8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB | CHANGE/3736 C.KIM | 3736 C.KIM | 3736 C.KIM |
3689 J.BARGAR | 8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB | 3736 C.KIM | 3736 C.KIM | 3736 C.KIM |
BEAM LINE 4-1 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3728 R.DAVIS | 3728 R.DAVIS | 3728 R.DAVIS | 3531 G.LOWRY | 3531 G.LOWRY | 3736 C.KIM | 3736 C.KIM |
3728 R.DAVIS | 3728 R.DAVIS | Xray CHECKOUT/3531 | 3531 G.LOWRY | Xray CHECKOUT/3736 | 3736 C.KIM | 3736 C.KIM |
3728 R.DAVIS | 3728 R.DAVIS | 3531 G.LOWRY | 3531 G.LOWRY | 3736 C.KIM | 3736 C.KIM | 3736 C.KIM |
BEAM LINE 4-2 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3358 D.HERSCHLAG | 8047 T.WEISS | 3575 L.CARTER | 3575 L.CARTER | 8077 T.MATSUI | 3541 D.SALTZBERG | 3434 A.Sali |
CHANGE/8047 T.WEIS | CHANGE/3575 L.CART | 3575 L.CARTER | CHANGE/8077 T.MATS | CHANGE/3541 D.SALT | 3541 D.SALTZBERG | 3434 A.Sali |
8047 T.WEISS | 3575 L.CARTER | 3575 L.CARTER | 8077 T.MATSUI | 3541 D.SALTZBERG | CHANGE/3434 A.Sali | 3434 A.Sali |
BEAM LINE 4-3 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3652 C.HANSEL | 3659 C.HANSEL | 3408 K.HAYES | 3531 G.LOWRY | 3531 G.LOWRY | 3564 C.KIM | 3564 C.KIM |
CHANGE/3659 C.HANS | SMB CHECKOUT/3408 | SMB CHECKOUT/3531 | 3531 G.LOWRY | SMB CHECKOUT/3564 | 3564 C.KIM | 3564 C.KIM |
3659 C.HANSEL | 3408 K.HAYES | 3531 G.LOWRY | 3531 G.LOWRY | 3564 C.KIM | 3564 C.KIM | 3564 C.KIM |
BEAM LINE 6-2 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3581 J.Nelson | 8041 J.HAYTER | 8041 J.HAYTER | 8041 J.HAYTER | 8041 J.HAYTER | 3696 Y.Shi | 3710 Y.LIN |
CHANGE/8041 J.HAYT | 8041 J.HAYTER | 8041 J.HAYTER | 8041 J.HAYTER | CHANGE/3696 Y.Shi | CHANGE/3710 Y.LIN | 3710 Y.LIN |
8041 J.HAYTER | 8041 J.HAYTER | 8041 J.HAYTER | 8041 J.HAYTER | 3696 Y.Shi | 3710 Y.LIN | 3710 Y.LIN |
BEAM LINE 7-2 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3709 J.CHANG | 3625 S.SWEETNAM | 3625 S.SWEETNAM | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee |
Xray CHECKOUT/3625 | 3625 S.SWEETNAM | Xray CHECKOUT/91P9 | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee |
3625 S.SWEETNAM | 3625 S.SWEETNAM | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee |
BEAM LINE 7-3 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3593 T.STEMMLER | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON |
SMB CHECKOUT/3324 | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | SMB CHECKOUT/3236 | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON |
3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON |
BEAM LINE 9-3 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3726 A.SEYFFERTH | 3589 J.DAVIS | 3589 J.DAVIS | 3589 J.DAVIS | 3524 C.FULLER | 8015 A.MEHTA | 8015 A.MEHTA |
CHANGE/3589 J.DAVI | 3589 J.DAVIS | 3589 J.DAVIS | CHANGE/3524 C.FULL | CHANGE/8015 A.MEHT | 8015 A.MEHTA | 8015 A.MEHTA |
3589 J.DAVIS | 3589 J.DAVIS | 3589 J.DAVIS | 3524 C.FULLER | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA |
BEAM LINE 11-2 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3201 J.MOREAU | 3408 K.HAYES | 3408 K.HAYES | 3732 D.Fan | 3732 D.Fan | 3552 R.KRETZSCHMAR | 3552 R.KRETZSCHMAR |
MES CHECKOUT/3408 | 3408 K.HAYES | MES CHECKOUT/3732 | 3732 D.Fan | MES CHECKOUT/3552 | 3552 R.KRETZSCHMAR | 3552 R.KRETZSCHMAR |
3408 K.HAYES | 3408 K.HAYES | 3732 D.Fan | 3732 D.Fan | 3552 R.KRETZSCHMAR | 3552 R.KRETZSCHMAR | 3552 R.KRETZSCHMAR |
BEAM LINE 11-3 | ||||||
Mar. 26, 2012 | Mar. 27, 2012 | Mar. 28, 2012 | Mar. 29, 2012 | Mar. 30, 2012 | Mar. 31, 2012 | Apr. 01, 2012 |
3519 S.MANNSFELD | 3519 S.MANNSFELD | 3630 C.Ban | 3630 C.Ban | 3630 C.Ban | 3641 M.CHABINYC | 3641 M.CHABINYC |
3519 S.MANNSFELD | Xray CHECKOUT/3630 | 3630 C.Ban | 3630 C.Ban | Xray CHECKOUT/3641 | 3641 M.CHABINYC | 3641 M.CHABINYC |
3519 S.MANNSFELD | 3630 C.Ban | 3630 C.Ban | 3630 C.Ban | 3641 M.CHABINYC | 3641 M.CHABINYC | 3641 M.CHABINYC |
WEEK OF Apr. 02, 2012 | ||||||
MA | AP | |||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
BEAM LINE 1-4 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
3564 C.KIM/MA | MA/AP | AP | Unscheduled | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT |
MA | AP | Unscheduled | Unscheduled | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT |
MA | AP | Unscheduled | CHANGE/3660 S.TOLB | 3660 S.TOLBERT | 3660 S.TOLBERT | Unscheduled |
BEAM LINE 2-1 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
3294 S.HIMMELBE/MA | MA/AP | AP | 3294 S.HIMMELBERGE | Unscheduled | FACI | FACI |
MA | AP | 3294 S.HIMMELBERGE | Unscheduled | FACI | FACI | FACI |
MA | AP | 3294 S.HIMMELBERGE | Unscheduled | FACI | FACI | FACI |
BEAM LINE 2-3 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
3736 C.KIM/MA | MA/AP | AP | 3362 R.KRETZSCHMAR | 3362 R.KRETZSCHMAR | 3478 T.PUNSHON | 3478 T.PUNSHON |
MA | AP | CHANGE/3362 R.KRET | 3362 R.KRETZSCHMAR | CHANGE/3478 T.PUNS | 3478 T.PUNSHON | 3478 T.PUNSHON |
MA | AP | 3362 R.KRETZSCHMAR | 3362 R.KRETZSCHMAR | 3478 T.PUNSHON | 3478 T.PUNSHON | 3478 T.PUNSHON |
BEAM LINE 4-1 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
3736 C.KIM/MA | MA/AP | AP | 3567 S.LEE | 3567 S.LEE | 3732 D.Fan | 3732 D.Fan |
MA | AP | Xray CHECKOUT/3567 | 3567 S.LEE | c\/3732 | 3732 D.Fan | 3732 D.Fan |
MA | AP | 3567 S.LEE | 3567 S.LEE | 3732 D.Fan | 3732 D.Fan | 3732 D.Fan |
BEAM LINE 4-2 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
3434 A.Sali/MA | MA/AP | AP | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG |
MA | AP | CHANGE/3535 G.WONG | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG | CHANGE/3577 C.SAFI |
MA | AP | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG | 3577 C.SAFINYA |
BEAM LINE 4-3 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
3564 C.KIM/MA | MA/AP | AP | 3738 M.Keiluweit | 3738 M.Keiluweit | 3380 J.BARGAR | 3380 J.BARGAR |
MA | AP | SMB CHECKOUT/3738 | 3738 M.Keiluweit | SMB CHECKOUT/3380 | 3380 J.BARGAR | 3380 J.BARGAR |
MA | AP | 3738 M.Keiluweit | 3738 M.Keiluweit | 3380 J.BARGAR | 3380 J.BARGAR | 3380 J.BARGAR |
BEAM LINE 6-2 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
3710 Y.LIN/MA | MA/AP | AP | 8879 T.WENG | 8879 T.WENG | 8879 T.WENG | 8879 T.WENG |
MA | AP | Xray>ES2 XES/8879 | 8879 T.WENG | 8879 T.WENG | 8879 T.WENG | 8879 T.WENG |
MA | AP | 8879 T.WENG | 8879 T.WENG | 8879 T.WENG | 8879 T.WENG | 8879 T.WENG |
BEAM LINE 7-2 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
91P9 Y.Lee/MA | MA/AP | AP | 3700 T.GAO | 3700 T.GAO | 3700 T.GAO | 3700 T.GAO |
MA | AP | Xray>BkHutch/3700 | 3700 T.GAO | 3700 T.GAO | 3700 T.GAO | 3700 T.GAO |
MA | AP | 3700 T.GAO | 3700 T.GAO | 3700 T.GAO | 3700 T.GAO | 3700 T.GAO |
BEAM LINE 7-3 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
3236 K.HODGSON/MA | MA/AP | AP | 3236 K.HODGSON | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA |
MA | AP | 3236 K.HODGSON | SMB CHECKOUT/3250 | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA |
MA | AP | 3236 K.HODGSON | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA | 3250 V.YACHANDRA |
BEAM LINE 9-3 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
DOWN/MA | MA/AP | AP | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
8015 A.MEHTA/MA | MA/AP | AP | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND |
MA | AP | Xray>Bk Hutch/8053 | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND |
MA | AP | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND |
BEAM LINE 11-2 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
3552 R.KRETZSCH/MA | MA/AP | AP | 8860 J.BARGAR | 8860 J.BARGAR | 8871 R.SARANGI | 8871 R.SARANGI |
MA | AP | MES CHECKOUT/8860 | 8860 J.BARGAR | MES CHECKOUT/8871 | 8871 R.SARANGI | 8871 R.SARANGI |
MA | AP | 8860 J.BARGAR | 8860 J.BARGAR | 8871 R.SARANGI | 8871 R.SARANGI | 8871 R.SARANGI |
BEAM LINE 11-3 | ||||||
Apr. 02, 2012 | Apr. 03, 2012 | Apr. 04, 2012 | Apr. 05, 2012 | Apr. 06, 2012 | Apr. 07, 2012 | Apr. 08, 2012 |
3641 M.CHABINYC/MA | MA/AP | AP | Unscheduled | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME |
MA | AP | Unscheduled | Xray CHECKOUT/3378 | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME |
MA | AP | Unscheduled | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME |
WEEK OF Apr. 09, 2012 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
BEAM LINE 1-4 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
Unscheduled | 8120 J.POPLE | 8120 J.POPLE | 8120 J.POPLE | DOWN | DOWN | DOWN |
CHANGE/8120 J.POPL | 8120 J.POPLE | 8120 J.POPLE | 8120 J.POPLE | DOWN | DOWN | DOWN |
8120 J.POPLE | 8120 J.POPLE | 8120 J.POPLE | 8120 J.POPLE | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
FACI | 3533 M.BIBEE | 3533 M.BIBEE | 3533 M.BIBEE | DOWN | DOWN | DOWN |
Xray CHECKOUT/3533 | 3533 M.BIBEE | 3533 M.BIBEE | 3533 M.BIBEE | DOWN | DOWN | DOWN |
3533 M.BIBEE | 3533 M.BIBEE | 3533 M.BIBEE | 3533 M.BIBEE | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
3478 T.PUNSHON | 3478 T.PUNSHON | 1F77 C.Kim | 1F77 C.Kim | DOWN | DOWN | DOWN |
3478 T.PUNSHON | CHANGE/1F77 C.Kim | 1F77 C.Kim | CHANGE/3589 J.DAVI | DOWN | DOWN | DOWN |
3478 T.PUNSHON | 1F77 C.Kim | 1F77 C.Kim | 3589 J.DAVIS | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
3732 D.Fan | 3337 S.BONE | 3337 S.BONE | 3712 J.PENA | DOWN | DOWN | DOWN |
Xray CHECKOUT/3337 | 3337 S.BONE | Xray CHECKOUT/3712 | 3712 J.PENA | DOWN | DOWN | DOWN |
3337 S.BONE | 3337 S.BONE | 3712 J.PENA | 3712 J.PENA | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | DOWN | DOWN | DOWN |
3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | DOWN | DOWN | DOWN |
3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
3380 J.BARGAR | 3363 S.KOZIMOR | 3363 S.KOZIMOR | 3487 S.KOZIMOR | DOWN | DOWN | DOWN |
SMB CHECKOUT/3363 | 3363 S.KOZIMOR | CHANGE/3487 S.KOZI | 3487 S.KOZIMOR | DOWN | DOWN | DOWN |
3363 S.KOZIMOR | 3363 S.KOZIMOR | 3487 S.KOZIMOR | 3487 S.KOZIMOR | DOWN | DOWN | DOWN |
BEAM LINE 6-2 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
8879 T.WENG | 8879 T.WENG | 3565 J.Bradley | 3565 J.Bradley | DOWN | DOWN | DOWN |
8879 T.WENG | CHANGE/3565 J.Brad | 3565 J.Bradley | 3565 J.Bradley | DOWN | DOWN | DOWN |
8879 T.WENG | 3565 J.Bradley | 3565 J.Bradley | 3565 J.Bradley | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
3700 T.GAO | 3700 T.GAO | 91N2 Y.TAKAMURA | 91N2 Y.TAKAMURA | DOWN | DOWN | DOWN |
3700 T.GAO | CHANGE/91N2 Y.TAKA | 91N2 Y.TAKAMURA | 91N2 Y.TAKAMURA | DOWN | DOWN | DOWN |
3700 T.GAO | 91N2 Y.TAKAMURA | 91N2 Y.TAKAMURA | 91N2 Y.TAKAMURA | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
3250 V.YACHANDRA | 3250 V.YACHANDRA | 3692 F.JIAO | 3692 F.JIAO | DOWN | DOWN | DOWN |
3250 V.YACHANDRA | SMB CHECKOUT/3692 | 3692 F.JIAO | SMB CHECKOUT/3582 | DOWN | DOWN | DOWN |
3250 V.YACHANDRA | 3692 F.JIAO | 3692 F.JIAO | 3582 L.QUE | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
8053 D.NORDLUND | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | DOWN | DOWN | DOWN |
Xray CHECKOUT/8015 | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | DOWN | DOWN | DOWN |
8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
8871 R.SARANGI | 8871 R.SARANGI | 8871 R.SARANGI | 8871 R.SARANGI | DOWN | DOWN | DOWN |
8871 R.SARANGI | 8871 R.SARANGI | 8871 R.SARANGI | MES CHECKOUT/3709 | DOWN | DOWN | DOWN |
8871 R.SARANGI | 8871 R.SARANGI | 8871 R.SARANGI | 3709 J.CHANG | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Apr. 09, 2012 | Apr. 10, 2012 | Apr. 11, 2012 | Apr. 12, 2012 | Apr. 13, 2012 | Apr. 14, 2012 | Apr. 15, 2012 |
3378 J.CABANA-JIME | 3520 M.TRIGO | 3520 M.TRIGO | 3520 M.TRIGO | DOWN | DOWN | DOWN |
Xray CHECKOUT/3520 | 3520 M.TRIGO | 3520 M.TRIGO | Xray CHECKOUT/91Q6 | DOWN | DOWN | DOWN |
3520 M.TRIGO | 3520 M.TRIGO | 3520 M.TRIGO | 91Q6 J.Groves | DOWN | DOWN | DOWN |
WEEK OF Apr. 16, 2012 | ||||||
MA | AP | |||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
BEAM LINE 1-4 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | 8120 J.POPLE | 91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan |
DOWN | 8120 J.POPLE | CHANGE/91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan |
DOWN/AP | 8120 J.POPLE | 91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan |
BEAM LINE 2-1 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | 3533 M.BIBEE | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
DOWN | 3533 M.BIBEE | Xray CHECKOUT/3473 | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
DOWN/AP | 3533 M.BIBEE | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI |
BEAM LINE 2-3 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | 3589 J.DAVIS | 3592 B.KIMBALL | 3592 B.KIMBALL | 3304 A.FOSTER | 3304 A.FOSTER |
DOWN | 3589 J.DAVIS | CHANGE/3592 B.KIMB | 3592 B.KIMBALL | CHANGE/3304 A.FOST | 3304 A.FOSTER | 3304 A.FOSTER |
DOWN/AP | 3589 J.DAVIS | 3592 B.KIMBALL | 3592 B.KIMBALL | 3304 A.FOSTER | 3304 A.FOSTER | 3304 A.FOSTER |
BEAM LINE 4-1 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | 3501 P.O'DAY | 3501 P.O'DAY | 3501 P.O'DAY | 91N8 F.BRIDGES | 91N8 F.BRIDGES |
DOWN | Xray CHECKOUT/3501 | 3501 P.O'DAY | 3501 P.O'DAY | Xray CHECKOUT/91N8 | 91N8 F.BRIDGES | CHANGE/3627 F.BRID |
DOWN/AP | 3501 P.O'DAY | 3501 P.O'DAY | 3501 P.O'DAY | 91N8 F.BRIDGES | 91N8 F.BRIDGES | 3627 F.BRIDGES |
BEAM LINE 4-2 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | 8847 T.WEISS | 8847 T.WEISS | 8077 T.MATSUI | 3295 K.LEE | 3295 K.LEE |
DOWN | CHANGE/8847 T.WEIS | 8847 T.WEISS | CHANGE/8077 T.MATS | CHANGE/3295 K.LEE | 3295 K.LEE | 3295 K.LEE |
DOWN/AP | 8847 T.WEISS | 8847 T.WEISS | 8077 T.MATSUI | 3295 K.LEE | 3295 K.LEE | 3295 K.LEE |
BEAM LINE 4-3 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | 3670 S.KOZIMOR | 3603 J.CHOROVER | 3603 J.CHOROVER | 3678 S.MYNENI | 3678 S.MYNENI |
DOWN | 3670 S.KOZIMOR | SMB CHECKOUT/3603 | 3603 J.CHOROVER | SMB CHECKOUT/3678 | 3678 S.MYNENI | 3678 S.MYNENI |
DOWN/AP | 3670 S.KOZIMOR | 3603 J.CHOROVER | 3603 J.CHOROVER | 3678 S.MYNENI | 3678 S.MYNENI | 3678 S.MYNENI |
BEAM LINE 6-2 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | Unscheduled | 3521 C.BOOTH | 3521 C.BOOTH | 3521 C.BOOTH | 3499 J.CABANA-JIME |
DOWN | Unscheduled | Xray CHECKOUT/3521 | 3521 C.BOOTH | 3521 C.BOOTH | Xray CHECKOUT/3499 | 3499 J.CABANA-JIME |
DOWN/AP | Unscheduled | 3521 C.BOOTH | 3521 C.BOOTH | 3521 C.BOOTH | 3499 J.CABANA-JIME | 3499 J.CABANA-JIME |
BEAM LINE 7-2 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | 91N2 Y.TAKAMURA | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski |
DOWN | 91N2 Y.TAKAMURA | CHANGE/3657 M.Bieg | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski |
DOWN/AP | 91N2 Y.TAKAMURA | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski |
BEAM LINE 7-3 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | Unscheduled | 3730 M.GREEN | 3730 M.GREEN | 3730 M.GREEN | 3730 M.GREEN |
DOWN | Unscheduled | SMB CHECKOUT/3730 | 3730 M.GREEN | 3730 M.GREEN | 3730 M.GREEN | 3730 M.GREEN |
DOWN/AP | Unscheduled | 3730 M.GREEN | 3730 M.GREEN | 3730 M.GREEN | 3730 M.GREEN | 3730 M.GREEN |
BEAM LINE 9-3 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN/AP | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | 3657 M.Biegalski | 3657 M.Biegalski | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 3303 A.LINDENBERG |
DOWN | 3657 M.Biegalski | 3657 M.Biegalski | Xray CHECKOUT/3303 | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 3303 A.LINDENBERG |
DOWN/AP | 3657 M.Biegalski | 3657 M.Biegalski | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 3303 A.LINDENBERG |
BEAM LINE 11-2 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | Unscheduled | 3619 F.MBUGA | 3619 F.MBUGA | 3548 D.SINGER | 3548 D.SINGER |
DOWN | Unscheduled | CHANGE/3619 F.MBUG | 3619 F.MBUGA | MES CHECKOUT/3548 | 3548 D.SINGER | 3548 D.SINGER |
DOWN/AP | Unscheduled | 3619 F.MBUGA | 3619 F.MBUGA | 3548 D.SINGER | 3548 D.SINGER | 3548 D.SINGER |
BEAM LINE 11-3 | ||||||
Apr. 16, 2012 | Apr. 17, 2012 | Apr. 18, 2012 | Apr. 19, 2012 | Apr. 20, 2012 | Apr. 21, 2012 | Apr. 22, 2012 |
DOWN | AP | 3294 S.HIMMELBERGE | 3735 C.TASSONE | 3735 C.TASSONE | 3735 C.TASSONE | 3735 C.TASSONE |
DOWN | Xray CHECKOUT/3294 | Xray CHECKOUT/3735 | 3735 C.TASSONE | 3735 C.TASSONE | 3735 C.TASSONE | 3735 C.TASSONE |
DOWN/AP | 3294 S.HIMMELBERGE | 3735 C.TASSONE | 3735 C.TASSONE | 3735 C.TASSONE | 3735 C.TASSONE | 3735 C.TASSONE |
WEEK OF Apr. 23, 2012 | ||||||
TimingStudies | TimingStudies | |||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
BEAM LINE 1-4 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
91P0 C.Ryan | 8840 J.POPLE | 8840 J.POPLE | 8840 J.POPLE | 8840 J.POPLE | Low Alpha/FACI | FACI |
CHANGE/8840 J.POPL | 8840 J.POPLE | 8840 J.POPLE | 8840 J.POPLE | 8840 J.POPLE | FACI | FACI |
8840 J.POPLE | 8840 J.POPLE | 8840 J.POPLE | 8840 J.POPLE | 8840 J.POPLE | FACI | FACI |
BEAM LINE 2-1 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | Low Alpha/FACI | FACI |
3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | Unscheduled | FACI | FACI |
3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | 3473 Y.SHI | Unscheduled | FACI | FACI |
BEAM LINE 2-3 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
3304 A.FOSTER | 3501 P.O'DAY | 3501 P.O'DAY | 1F78 M.Keiluweit | 3514 C.LOPANO | Low Alpha/FACI | FACI |
CHANGE/3501 P.O'DA | 3501 P.O'DAY | CHANGE/1F78 M.Keil | CHANGE/3514 C.LOPA | 3514 C.LOPANO | FACI | FACI |
3501 P.O'DAY | 3501 P.O'DAY | 1F78 M.Keiluweit | 3514 C.LOPANO | 3514 C.LOPANO | FACI | FACI |
BEAM LINE 4-1 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
3627 F.BRIDGES | 3627 F.BRIDGES | 3557 F.BRIDGES | 3557 F.BRIDGES | 3600 F.BRIDGES | Low Alpha/FACI | FACI |
3627 F.BRIDGES | Xray CHECKOUT/3557 | 3557 F.BRIDGES | Xray CHECKOUT/3600 | 3600 F.BRIDGES | FACI | FACI |
3627 F.BRIDGES | 3557 F.BRIDGES | 3557 F.BRIDGES | 3600 F.BRIDGES | 3600 F.BRIDGES | FACI | FACI |
BEAM LINE 4-2 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
3295 K.LEE | 10J3 W.WEIS | 3202 E.SNELL | 3202 E.SNELL | 3481 E.SNELL | Low Alpha/FACI | FACI |
CHANGE/10J3 W.WEIS | CHANGE/3202 E.SNEL | 3202 E.SNELL | CHANGE/3481 E.SNEL | 3481 E.SNELL | FACI | FACI |
10J3 W.WEIS | 3202 E.SNELL | 3202 E.SNELL | 3481 E.SNELL | 3481 E.SNELL | FACI | FACI |
BEAM LINE 4-3 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
3678 S.MYNENI | 3678 S.MYNENI | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | Low Alpha/FACI | FACI |
3678 S.MYNENI | SMB CHECKOUT/3614 | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | FACI | FACI |
3678 S.MYNENI | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | FACI | FACI |
BEAM LINE 6-2 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
3499 J.CABANA-JIME | 3499 J.CABANA-JIME | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 3303 A.LINDENBERG | Low Alpha/FACI | FACI |
3499 J.CABANA-JIME | Xray CHECKOUT/3303 | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 3303 A.LINDENBERG | FACI | FACI |
3499 J.CABANA-JIME | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 3303 A.LINDENBERG | FACI | FACI |
BEAM LINE 7-2 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
3657 M.Biegalski | 91Q6 J.Groves | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT | Low Alpha/FACI | FACI |
Xray CHECKOUT/91Q6 | Xray CHECKOUT/3647 | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT | FACI | FACI |
91Q6 J.Groves | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT | FACI | FACI |
BEAM LINE 7-3 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
3730 M.GREEN | 3730 M.GREEN | 3266 G.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE | Low Alpha/FACI | FACI |
3730 M.GREEN | SMB CHECKOUT/3266 | 3266 G.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE | FACI | FACI |
3730 M.GREEN | 3266 G.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE | FACI | FACI |
BEAM LINE 9-3 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | Low Alpha/FACI | FACI |
DOWN | DOWN | DOWN | DOWN | DOWN | FACI | FACI |
DOWN | DOWN | DOWN | DOWN | DOWN | FACI | FACI |
BEAM LINE 10-2 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
3303 A.LINDENBERG | 3480 S.CONRADSON | 3480 S.CONRADSON | 3480 S.CONRADSON | 3480 S.CONRADSON | Low Alpha/FACI | FACI |
Xray CHECKOUT/3480 | 3480 S.CONRADSON | 3480 S.CONRADSON | 3480 S.CONRADSON | 3480 S.CONRADSON | FACI | FACI |
3480 S.CONRADSON | 3480 S.CONRADSON | 3480 S.CONRADSON | 3480 S.CONRADSON | 3480 S.CONRADSON | FACI | FACI |
BEAM LINE 11-2 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
3548 D.SINGER | 3548 D.SINGER | 3548 D.SINGER | 3589 J.DAVIS | 3589 J.DAVIS | Low Alpha/FACI | FACI |
3548 D.SINGER | 3548 D.SINGER | MES CHECKOUT/3589 | 3589 J.DAVIS | 3589 J.DAVIS | FACI | FACI |
3548 D.SINGER | 3548 D.SINGER | 3589 J.DAVIS | 3589 J.DAVIS | 3589 J.DAVIS | FACI | FACI |
BEAM LINE 11-3 | ||||||
Apr. 23, 2012 | Apr. 24, 2012 | Apr. 25, 2012 | Apr. 26, 2012 | Apr. 27, 2012 | Apr. 28, 2012 | Apr. 29, 2012 |
3735 C.TASSONE | 3440 A.AYZNER | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 3674 T.BORCH | Low Alpha/FACI | FACI |
Xray CHECKOUT/3440 | Xray CHECKOUT/8875 | 8875 D.VAN CAMPEN | Xray CHECKOUT/3674 | 3674 T.BORCH | FACI | FACI |
3440 A.AYZNER | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 3674 T.BORCH | Unscheduled | FACI | FACI |
WEEK OF Apr. 30, 2012 | ||||||
AP | AP | |||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
BEAM LINE 1-4 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin |
MA | AP | CHANGE/3703 K.Neye | 3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin |
MA | AP | 3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin |
BEAM LINE 2-1 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 91N7 J.Komadina | 91N7 J.Komadina | 91N7 J.Komadina | 91N7 J.Komadina |
MA | AP | Xray CHECKOUT/91N7 | 91N7 J.Komadina | 91N7 J.Komadina | 91N7 J.Komadina | 91N7 J.Komadina |
MA | AP | 91N7 J.Komadina | 91N7 J.Komadina | 91N7 J.Komadina | 91N7 J.Komadina | 91N7 J.Komadina |
BEAM LINE 2-3 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 3524 C.FULLER | 3524 C.FULLER | 3549 S.HO | 3549 S.HO |
MA | AP | CHANGE/3524 C.FULL | 3524 C.FULLER | CHANGE/3549 S.HO | 3549 S.HO | 3549 S.HO |
MA | AP | 3524 C.FULLER | 3524 C.FULLER | 3549 S.HO | 3549 S.HO | 3549 S.HO |
BEAM LINE 4-1 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT |
MA | AP | Xray CHECKOUT/3329 | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT |
MA | AP | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT |
BEAM LINE 4-2 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 8877 T.MATSUI | 3660 S.TOLBERT | 3625 S.SWEETNAM | 3625 S.SWEETNAM |
MA | AP | CHANGE/8877 T.MATS | CHANGE/3660 S.TOLB | CHANGE/3625 S.SWEE | 3625 S.SWEETNAM | CHANGE/10J2 R.SCHO |
MA | AP | 8877 T.MATSUI | 3660 S.TOLBERT | 3625 S.SWEETNAM | 3625 S.SWEETNAM | 10J2 R.SCHOFIELD |
BEAM LINE 4-3 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 3241 D.TILLEY | 3241 D.TILLEY | 3238 T.KOHZUMA | 3238 T.KOHZUMA |
MA | AP | SMB CHECKOUT/3241 | 3241 D.TILLEY | SMB CHECKOUT/3238 | 3238 T.KOHZUMA | 3238 T.KOHZUMA |
MA | AP | 3241 D.TILLEY | 3241 D.TILLEY | 3238 T.KOHZUMA | 3238 T.KOHZUMA | 3238 T.KOHZUMA |
BEAM LINE 6-2 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 8859 B.JOHNSON | 8072 J.HAYTER | 8072 J.HAYTER | 8072 J.HAYTER |
MA | AP | Xray CHECKOUT/8859 | CHANGE/8072 J.HAYT | 8072 J.HAYTER | 8072 J.HAYTER | 8072 J.HAYTER |
MA | AP | 8859 B.JOHNSON | 8072 J.HAYTER | 8072 J.HAYTER | 8072 J.HAYTER | 8072 J.HAYTER |
BEAM LINE 7-2 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 8078 S.MANNSFELD | 8078 S.MANNSFELD | 8078 S.MANNSFELD | 8078 S.MANNSFELD |
MA | AP | Xray CHECKOUT/8078 | 8078 S.MANNSFELD | 8078 S.MANNSFELD | 8078 S.MANNSFELD | 8078 S.MANNSFELD |
MA | AP | 8078 S.MANNSFELD | 8078 S.MANNSFELD | 8078 S.MANNSFELD | 8078 S.MANNSFELD | 8078 S.MANNSFELD |
BEAM LINE 7-3 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 3238 T.KOHZUMA | 3238 T.KOHZUMA | 3238 T.KOHZUMA | 3238 T.KOHZUMA |
MA | AP | SMB CHECKOUT/3238 | 3238 T.KOHZUMA | 3238 T.KOHZUMA | 3238 T.KOHZUMA | 3238 T.KOHZUMA |
MA | AP | 3238 T.KOHZUMA | 3238 T.KOHZUMA | 3238 T.KOHZUMA | 3238 T.KOHZUMA | 3238 T.KOHZUMA |
BEAM LINE 9-3 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 8067 S.WEBB | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL |
MA | AP | Xray>Imaging/8067 | CHANGE/3614 H.NICH | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL |
MA | AP | 8067 S.WEBB | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL |
BEAM LINE 11-2 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 3672 S.CONRADSON | 3672 S.CONRADSON | 3672 S.CONRADSON | 3666 S.CONRADSON |
MA | AP | MES CHECKOUT/3672 | 3672 S.CONRADSON | 3672 S.CONRADSON | CHANGE/3666 S.CONR | 3666 S.CONRADSON |
MA | AP | 3672 S.CONRADSON | 3672 S.CONRADSON | 3672 S.CONRADSON | 3666 S.CONRADSON | 3666 S.CONRADSON |
BEAM LINE 11-3 | ||||||
Apr. 30, 2012 | May 01, 2012 | May 02, 2012 | May 03, 2012 | May 04, 2012 | May 05, 2012 | May 06, 2012 |
FACI/MA | MA/AP | AP | 3679 S.FENDORF | 3679 S.FENDORF | 3660 S.TOLBERT | 3660 S.TOLBERT |
MA | AP | Xray CHECKOUT/3679 | 3679 S.FENDORF | Xray CHECKOUT/3660 | 3660 S.TOLBERT | 3660 S.TOLBERT |
MA | AP | 3679 S.FENDORF | 3679 S.FENDORF | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT |
WEEK OF May 07, 2012 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
BEAM LINE 1-4 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
3703 K.Neyerlin | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 8120 J.POPLE | 8120 J.POPLE |
CHANGE/3607 N.BALS | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | CHANGE/8120 J.POPL | 8120 J.POPLE | 8120 J.POPLE |
3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 8120 J.POPLE | 8120 J.POPLE | 8120 J.POPLE |
BEAM LINE 2-1 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
91N7 J.Komadina | Unscheduled | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3714 P.VALDIVIA | 3714 P.VALDIVIA |
Unscheduled | Xray CHECKOUT/3294 | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | Xray CHECKOUT/3714 | 3714 P.VALDIVIA | 3714 P.VALDIVIA |
Unscheduled | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3714 P.VALDIVIA | 3714 P.VALDIVIA | 3714 P.VALDIVIA |
BEAM LINE 2-3 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
3549 S.HO | 3534 A.LAM | 1F80 N.Prouty | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3505 H.NICHOL |
CHANGE/3534 A.LAM | CHANGE/1F80 N.Prou | CHANGE/3614 H.NICH | 3614 H.NICHOL | 3614 H.NICHOL | CHANGE/3505 H.NICH | 3505 H.NICHOL |
3534 A.LAM | 1F80 N.Prouty | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3505 H.NICHOL | 3505 H.NICHOL |
BEAM LINE 4-1 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
3329 S.SCOTT | 3352 B.GATES | 3352 B.GATES | 3352 B.GATES | 3244 P.PERSSON | 3244 P.PERSSON | 3244 P.PERSSON |
Xray CHECKOUT/3352 | 3352 B.GATES | 3352 B.GATES | Xray CHECKOUT/3244 | 3244 P.PERSSON | 3244 P.PERSSON | 3244 P.PERSSON |
3352 B.GATES | 3352 B.GATES | 3352 B.GATES | 3244 P.PERSSON | 3244 P.PERSSON | 3244 P.PERSSON | 3244 P.PERSSON |
BEAM LINE 4-2 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
10J2 R.SCHOFIELD | 8047 T.WEISS | 10J4 A.Edwards | 10J4 A.Edwards | 10J1 T.Bryan | 10J1 T.Bryan | 3434 A.Sali |
CHANGE/8047 T.WEIS | CHANGE/10J4 A.Edwa | 10J4 A.Edwards | CHANGE/10J1 T.Brya | 10J1 T.Bryan | CHANGE/3434 A.Sali | 3434 A.Sali |
8047 T.WEISS | 10J4 A.Edwards | 10J4 A.Edwards | 10J1 T.Bryan | 10J1 T.Bryan | 3434 A.Sali | 3434 A.Sali |
BEAM LINE 4-3 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
3238 T.KOHZUMA | 3238 T.KOHZUMA | 3238 T.KOHZUMA | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN |
3238 T.KOHZUMA | 3238 T.KOHZUMA | SMB CHECKOUT/3532 | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN |
3238 T.KOHZUMA | 3238 T.KOHZUMA | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN |
BEAM LINE 6-2 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
8072 J.HAYTER | 3580 B.Vega-Martin | 3580 B.Vega-Martin | 3580 B.Vega-Martin | 3630 C.Ban | 3390 J.CABANA-JIME | 3390 J.CABANA-JIME |
CHANGE/3580 B.Vega | 3580 B.Vega-Martin | 3580 B.Vega-Martin | CHANGE/3630 C.Ban | CHANGE/3390 J.CABA | 3390 J.CABANA-JIME | 3390 J.CABANA-JIME |
3580 B.Vega-Martin | 3580 B.Vega-Martin | 3580 B.Vega-Martin | 3630 C.Ban | 3390 J.CABANA-JIME | 3390 J.CABANA-JIME | 3390 J.CABANA-JIME |
BEAM LINE 7-2 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
8078 S.MANNSFELD | 3427 J.Lezama Pach | 3427 J.Lezama Pach | 3427 J.Lezama Pach | 3693 N.Abdul-Jabba | 3693 N.Abdul-Jabba | 3693 N.Abdul-Jabba |
Xray CHECKOUT/3427 | 3427 J.Lezama Pach | 3427 J.Lezama Pach | Xray CHECKOUT/3693 | 3693 N.Abdul-Jabba | 3693 N.Abdul-Jabba | 3693 N.Abdul-Jabba |
3427 J.Lezama Pach | 3427 J.Lezama Pach | 3427 J.Lezama Pach | 3693 N.Abdul-Jabba | 3693 N.Abdul-Jabba | 3693 N.Abdul-Jabba | 3693 N.Abdul-Jabba |
BEAM LINE 7-3 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
3238 T.KOHZUMA | 3241 D.TILLEY | 3241 D.TILLEY | 3614 H.NICHOL | 3614 H.NICHOL | 3455 N.PINGITORE | 3455 N.PINGITORE |
SMB CHECKOUT/3241 | 3241 D.TILLEY | SMB CHECKOUT/3614 | 3614 H.NICHOL | SMB CHECKOUT/3455 | 3455 N.PINGITORE | 3455 N.PINGITORE |
3241 D.TILLEY | 3241 D.TILLEY | 3614 H.NICHOL | 3614 H.NICHOL | 3455 N.PINGITORE | 3455 N.PINGITORE | 3455 N.PINGITORE |
BEAM LINE 9-3 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
3614 H.NICHOL | 3534 A.LAM | 3534 A.LAM | 3534 A.LAM | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING |
CHANGE/3534 A.LAM | 3534 A.LAM | 3534 A.LAM | CHANGE/3267 I.PICK | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING |
3534 A.LAM | 3534 A.LAM | 3534 A.LAM | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING |
BEAM LINE 11-2 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
3666 S.CONRADSON | 3666 S.CONRADSON | 3702 Y.ARAI | 3702 Y.ARAI | 3702 Y.ARAI | 3679 S.FENDORF | 3679 S.FENDORF |
3666 S.CONRADSON | MES CHECKOUT/3702 | 3702 Y.ARAI | 3702 Y.ARAI | MES CHECKOUT/3679 | 3679 S.FENDORF | 3679 S.FENDORF |
3666 S.CONRADSON | 3702 Y.ARAI | 3702 Y.ARAI | 3702 Y.ARAI | 3679 S.FENDORF | 3679 S.FENDORF | 3679 S.FENDORF |
BEAM LINE 11-3 | ||||||
May 07, 2012 | May 08, 2012 | May 09, 2012 | May 10, 2012 | May 11, 2012 | May 12, 2012 | May 13, 2012 |
3660 S.TOLBERT | 3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin | 1F76 Y.Diao | 1F76 Y.Diao |
Xray CHECKOUT/3703 | 3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin | Xray CHECKOUT/1F76 | 1F76 Y.Diao | 1F76 Y.Diao |
3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin | 3703 K.Neyerlin | 1F76 Y.Diao | 1F76 Y.Diao | 1F76 Y.Diao |
WEEK OF May 14, 2012 | ||||||
MA | AP | |||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
BEAM LINE 1-4 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
8120 J.POPLE/AP | AP | AP | 8120 J.POPLE | 8120 J.POPLE | 3586 S.HALL | 3586 S.HALL |
AP | AP | 8120 J.POPLE | 8120 J.POPLE | CHANGE/3586 S.HALL | 3586 S.HALL | 3586 S.HALL |
AP | AP | 8120 J.POPLE | 8120 J.POPLE | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL |
BEAM LINE 2-1 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
3714 P.VALDIVIA/AP | AP | AP | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee |
AP | AP | Xray CHECKOUT/91P9 | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee |
AP | AP | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee |
BEAM LINE 2-3 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
3505 H.NICHOL/AP | AP | AP | 3431 S.GEORGE | 3431 S.GEORGE | 3603 J.CHOROVER | 3603 J.CHOROVER |
AP | AP | CHANGE/3431 S.GEOR | 3431 S.GEORGE | CHANGE/3603 J.CHOR | 3603 J.CHOROVER | 3603 J.CHOROVER |
AP | AP | 3431 S.GEORGE | 3431 S.GEORGE | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER |
BEAM LINE 4-1 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
3244 P.PERSSON/AP | AP | AP | 3380 J.BARGAR | 3380 J.BARGAR | 3380 J.BARGAR | 3380 J.BARGAR |
AP | AP | Xray CHECKOUT/3380 | 3380 J.BARGAR | 3380 J.BARGAR | 3380 J.BARGAR | CHANGE/3682 R.Bern |
AP | AP | 3380 J.BARGAR | 3380 J.BARGAR | 3380 J.BARGAR | 3380 J.BARGAR | 3682 R.Bernier-Lat |
BEAM LINE 4-2 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
3434 A.Sali/AP | AP | AP | 8047 T.WEISS | 3586 S.HALL | 3704 L.HIRST | 3704 L.HIRST |
AP | AP | CHANGE/8047 T.WEIS | CHANGE/3586 S.HALL | CHANGE/3704 L.HIRS | 3704 L.HIRST | 3704 L.HIRST |
AP | AP | 8047 T.WEISS | 3586 S.HALL | 3704 L.HIRST | 3704 L.HIRST | 3704 L.HIRST |
BEAM LINE 4-3 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
3532 B.HEDMAN/AP | AP | AP | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN |
AP | AP | SMB CHECKOUT/3572 | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN |
AP | AP | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN | 3572 M.GREEN |
BEAM LINE 6-2 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
3390 J.CABANA-J/AP | AP | AP | 3669 D.Sokaras | 3669 D.Sokaras | 3669 D.Sokaras | 3529 V.YACHANDRA |
AP | AP | Xray>ES2/3669 | 3669 D.Sokaras | 3669 D.Sokaras | CHANGE/3529 V.YACH | 3529 V.YACHANDRA |
AP | AP | 3669 D.Sokaras | 3669 D.Sokaras | 3669 D.Sokaras | 3529 V.YACHANDRA | 3529 V.YACHANDRA |
BEAM LINE 7-2 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
3693 N.Abdul-Ja/AP | AP | AP | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
AP | AP | Xray CHECKOUT/3294 | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
AP | AP | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
BEAM LINE 7-3 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
3455 N.PINGITOR/AP | AP | AP | 1F69 E.WASINGER | 1F69 E.WASINGER | 3491 L.BAKER | 3491 L.BAKER |
AP | AP | SMB CHECKOUT/1F69 | 1F69 E.WASINGER | SMB CHECKOUT/3491 | 3491 L.BAKER | 3491 L.BAKER |
AP | AP | 1F69 E.WASINGER | 1F69 E.WASINGER | 3491 L.BAKER | 3491 L.BAKER | 3491 L.BAKER |
BEAM LINE 9-3 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
3267 I.PICKERIN/AP | AP | AP | 3603 J.CHOROVER | 3603 J.CHOROVER | 8015 A.MEHTA | 8015 A.MEHTA |
AP | AP | CHANGE/3603 J.CHOR | 3603 J.CHOROVER | CHANGE/8015 A.MEHT | 8015 A.MEHTA | 8015 A.MEHTA |
AP | AP | 3603 J.CHOROVER | 3603 J.CHOROVER | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA |
BEAM LINE 11-2 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
3679 S.FENDORF/AP | AP | AP | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim |
AP | AP | MES CHECKOUT/3634 | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim |
AP | AP | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim | 3634 T.Kim |
BEAM LINE 11-3 | ||||||
May 14, 2012 | May 15, 2012 | May 16, 2012 | May 17, 2012 | May 18, 2012 | May 19, 2012 | May 20, 2012 |
1F76 Y.Diao/AP | AP | AP | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME |
AP | AP | Xray CHECKOUT/3378 | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME |
AP | AP | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME | 3378 J.CABANA-JIME |
WEEK OF May 21, 2012 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
BEAM LINE 1-4 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3518 E.COLETTA | 3518 E.COLETTA | Unscheduled |
3586 S.HALL | 3586 S.HALL | 3586 S.HALL | CHANGE/3518 E.COLE | 3518 E.COLETTA | Unscheduled | Unscheduled |
3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3518 E.COLETTA | 3518 E.COLETTA | Unscheduled | Unscheduled |
BEAM LINE 2-1 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA |
91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | Xray CHECKOUT/3471 | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA |
91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA |
BEAM LINE 2-3 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
3603 J.CHOROVER | 3666 S.CONRADSON | 3666 S.CONRADSON | 3666 S.CONRADSON | 8067 S.WEBB | 8015 A.MEHTA | 8015 A.MEHTA |
CHANGE/3666 S.CONR | 3666 S.CONRADSON | 3666 S.CONRADSON | CHANGE/8067 S.WEBB | CHANGE/8015 A.MEHT | 8015 A.MEHTA | 8015 A.MEHTA |
3666 S.CONRADSON | 3666 S.CONRADSON | 3666 S.CONRADSON | 8067 S.WEBB | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA |
BEAM LINE 4-1 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
3682 R.Bernier-Lat | 3682 R.Bernier-Lat | 3682 R.Bernier-Lat | 3429 O.DUCKWORTH | 3429 O.DUCKWORTH | 3508 S.HAYES | 3508 S.HAYES |
3682 R.Bernier-Lat | 3682 R.Bernier-Lat | Xray CHECKOUT/3429 | 3429 O.DUCKWORTH | Xray CHECKOUT/3508 | 3508 S.HAYES | 3508 S.HAYES |
3682 R.Bernier-Lat | 3682 R.Bernier-Lat | 3429 O.DUCKWORTH | 3429 O.DUCKWORTH | 3508 S.HAYES | 3508 S.HAYES | 3508 S.HAYES |
BEAM LINE 4-2 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
3704 L.HIRST | Unscheduled | 8077 T.MATSUI | 8077 T.MATSUI | 8053 D.NORDLUND | 8053 D.NORDLUND | 3610 T.MCQUEEN |
Unscheduled | CHANGE/8077 T.MATS | 8077 T.MATSUI | CHANGE/8053 D.NORD | 8053 D.NORDLUND | CHANGE/3610 T.MCQU | 3610 T.MCQUEEN |
Unscheduled | 8077 T.MATSUI | 8077 T.MATSUI | 8053 D.NORDLUND | 8053 D.NORDLUND | 3610 T.MCQUEEN | 3610 T.MCQUEEN |
BEAM LINE 4-3 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
3572 M.GREEN | 3429 O.DUCKWORTH | 3429 O.DUCKWORTH | 8079 T.WENG | 8079 T.WENG | 3329 S.SCOTT | 3329 S.SCOTT |
SMB CHECKOUT/3429 | 3429 O.DUCKWORTH | SMB CHECKOUT/8079 | 8079 T.WENG | SMB CHECKOUT/3329 | 3329 S.SCOTT | 3329 S.SCOTT |
3429 O.DUCKWORTH | 3429 O.DUCKWORTH | 8079 T.WENG | 8079 T.WENG | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT |
BEAM LINE 6-2 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
3529 V.YACHANDRA | 3529 V.YACHANDRA | 3793 R.Raptis | 3793 R.Raptis | 3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING |
3529 V.YACHANDRA | CHANGE/3793 R.Rapt | 3793 R.Raptis | Xray CHECKOUT/3331 | 3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING |
3529 V.YACHANDRA | 3793 R.Raptis | 3793 R.Raptis | 3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING | 3331 P.MANNING |
BEAM LINE 7-2 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
3294 S.HIMMELBERGE | 3706 S.TOLBERT | 3706 S.TOLBERT | 3706 S.TOLBERT | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
Xray CHECKOUT/3706 | 3706 S.TOLBERT | 3706 S.TOLBERT | Xray CHECKOUT/8051 | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
3706 S.TOLBERT | 3706 S.TOLBERT | 3706 S.TOLBERT | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
BEAM LINE 7-3 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
3491 L.BAKER | 3491 L.BAKER | 3482 S.TIAN | 3482 S.TIAN | 3482 S.TIAN | 3282 N.BLACKBURN | 3282 N.BLACKBURN |
3491 L.BAKER | SMB CHECKOUT/3482 | 3482 S.TIAN | 3482 S.TIAN | SMB CHECKOUT/3282 | 3282 N.BLACKBURN | 3282 N.BLACKBURN |
3491 L.BAKER | 3482 S.TIAN | 3482 S.TIAN | 3482 S.TIAN | 3282 N.BLACKBURN | 3282 N.BLACKBURN | 3282 N.BLACKBURN |
BEAM LINE 9-3 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
8015 A.MEHTA | 8067 S.WEBB | 8067 S.WEBB | 3694 J.Vinther | 3694 J.Vinther | 3679 S.FENDORF | 3679 S.FENDORF |
CHANGE/8067 S.WEBB | 8067 S.WEBB | CHANGE/3694 J.Vint | 3694 J.Vinther | CHANGE/3679 S.FEND | 3679 S.FENDORF | 3679 S.FENDORF |
8067 S.WEBB | 8067 S.WEBB | 3694 J.Vinther | 3694 J.Vinther | 3679 S.FENDORF | 3679 S.FENDORF | 3679 S.FENDORF |
BEAM LINE 11-2 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
3634 T.Kim | 3712 J.PENA | 3712 J.PENA | 3589 J.DAVIS | 3589 J.DAVIS | 3412 G.BROWN | 3412 G.BROWN |
MES CHECKOUT/3712 | 3712 J.PENA | MES CHECKOUT/3589 | 3589 J.DAVIS | MES CHECKOUT/3412 | 3412 G.BROWN | 3412 G.BROWN |
3712 J.PENA | 3712 J.PENA | 3589 J.DAVIS | 3589 J.DAVIS | 3412 G.BROWN | 3412 G.BROWN | 3412 G.BROWN |
BEAM LINE 11-3 | ||||||
May 21, 2012 | May 22, 2012 | May 23, 2012 | May 24, 2012 | May 25, 2012 | May 26, 2012 | May 27, 2012 |
3378 J.CABANA-JIME | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 91Q6 J.Groves | 91Q6 J.Groves | 91Q6 J.Groves |
Xray CHECKOUT/3303 | 3303 A.LINDENBERG | 3303 A.LINDENBERG | Xray CHECKOUT/91Q6 | 91Q6 J.Groves | 91Q6 J.Groves | CHECKOUT/1F76 |
3303 A.LINDENBERG | 3303 A.LINDENBERG | 3303 A.LINDENBERG | 91Q6 J.Groves | 91Q6 J.Groves | 91Q6 J.Groves | 1F76 Y.Diao |
WEEK OF May 28, 2012 | ||||||
HOLIDAY | AP | XRS School | XRS School | |||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
BEAM LINE 1-4 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
Unscheduled | AP | AP | 8203 M.TONEY | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | AP | CHANGE/8203 M.TONE | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Unscheduled | AP | 8203 M.TONEY | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 2-1 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
3471 Y.TAKAMURA | 3471 Y.TAKAMURA/AP | AP | 8203 M.TONEY | Unscheduled | Unscheduled | Unscheduled |
3471 Y.TAKAMURA | AP | CHANGE/8203 M.TONE | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
3471 Y.TAKAMURA | AP | 8203 M.TONEY | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 2-3 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
8015 A.MEHTA | 8015 A.MEHTA/AP | AP | 3635 J.Addison | 3635 J.Addison | 3736 C.KIM | 3736 C.KIM |
8015 A.MEHTA | AP | CHANGE/3635 J.Addi | 3635 J.Addison | CHANGE/3736 C.KIM | 3736 C.KIM | 3736 C.KIM |
8015 A.MEHTA | AP | 3635 J.Addison | 3635 J.Addison | 3736 C.KIM | 3736 C.KIM | 3736 C.KIM |
BEAM LINE 4-1 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
3508 S.HAYES | 3508 S.HAYES/AP | AP | 3378 J.CABANA-JIME | 3728 R.DAVIS | 3728 R.DAVIS | 3728 R.DAVIS |
3508 S.HAYES | AP | Xray CHECKOUT/3378 | Xray CHECKOUT/3728 | 3728 R.DAVIS | 3728 R.DAVIS | 3728 R.DAVIS |
3508 S.HAYES | AP | 3378 J.CABANA-JIME | 3728 R.DAVIS | 3728 R.DAVIS | 3728 R.DAVIS | 3728 R.DAVIS |
BEAM LINE 4-2 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
3610 T.MCQUEEN | 3610 T.MCQUEEN/AP | AP | 8877 T.MATSUI | 8077 T.MATSUI | 10J7 D.Halling | 10J6 M.REESE |
3610 T.MCQUEEN | AP | CHANGE/8877 T.MATS | CHANGE/8077 T.MATS | CHANGE/10J7 D.Hall | CHANGE/10J6 M.REES | CHANGE/3358 D.HERS |
3610 T.MCQUEEN | AP | 8877 T.MATSUI | 8077 T.MATSUI | 10J7 D.Halling | 10J6 M.REESE | 3358 D.HERSCHLAG |
BEAM LINE 4-3 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
3329 S.SCOTT | 3329 S.SCOTT/AP | AP | 3738 M.Keiluweit | 3738 M.Keiluweit | 3652 C.HANSEL | 3652 C.HANSEL |
3329 S.SCOTT | AP | SMB CHECKOUT/3738 | 3738 M.Keiluweit | SMB CHECKOUT/3652 | 3652 C.HANSEL | 3652 C.HANSEL |
3329 S.SCOTT | AP | 3738 M.Keiluweit | 3738 M.Keiluweit | 3652 C.HANSEL | 3652 C.HANSEL | 3652 C.HANSEL |
BEAM LINE 6-2 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
3331 P.MANNING | 3331 P.MANNING/AP | AP | 8859 B.JOHNSON | 8072 J.HAYTER | 91P9 Y.Lee | 91P9 Y.Lee |
3331 P.MANNING | AP | Xray CHECKOUT/8859 | CHANGE/8072 J.HAYT | CHANGE/91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee |
3331 P.MANNING | AP | 8859 B.JOHNSON | 8072 J.HAYTER | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee |
BEAM LINE 7-2 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
8051 M.TONEY | 8051 M.TONEY/AP | AP | 8203 M.TONEY | Unscheduled | 3440 A.AYZNER | 3440 A.AYZNER |
8051 M.TONEY | AP | CHANGE/8203 M.TONE | Unscheduled | Xray CHECKOUT/3440 | 3440 A.AYZNER | 3440 A.AYZNER |
8051 M.TONEY | AP | 8203 M.TONEY | Unscheduled | 3440 A.AYZNER | 3440 A.AYZNER | 3440 A.AYZNER |
BEAM LINE 7-3 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
3282 N.BLACKBURN | 3282 N.BLACKBUR/AP | AP | 3697 G.Meloni | 3697 G.Meloni | 3681 S.GEORGE | 3681 S.GEORGE |
3282 N.BLACKBURN | AP | SMB CHECKOUT/3697 | 3697 G.Meloni | SMB CHECKOUT/3681 | 3681 S.GEORGE | 3681 S.GEORGE |
3282 N.BLACKBURN | AP | 3697 G.Meloni | 3697 G.Meloni | 3681 S.GEORGE | 3681 S.GEORGE | 3681 S.GEORGE |
BEAM LINE 9-3 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
DOWN | DOWN/AP | AP | DOWN | DOWN | DOWN | DOWN |
DOWN | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
3679 S.FENDORF | 3679 S.FENDORF/AP | AP | 3635 J.Addison | 3635 J.Addison | 3603 J.CHOROVER | 3603 J.CHOROVER |
3679 S.FENDORF | AP | CHANGE/3635 J.Addi | 3635 J.Addison | CHANGE/3603 J.CHOR | 3603 J.CHOROVER | 3603 J.CHOROVER |
3679 S.FENDORF | AP | 3635 J.Addison | 3635 J.Addison | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER |
BEAM LINE 11-2 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
3412 G.BROWN | 3412 G.BROWN/AP | AP | 8860 J.BARGAR | 8860 J.BARGAR | 3613 D.FRIEBEL | 3613 D.FRIEBEL |
3412 G.BROWN | AP | MEIS>GIXAS/8860 | 8860 J.BARGAR | MES CHECKOUT/3613 | 3613 D.FRIEBEL | 3613 D.FRIEBEL |
3412 G.BROWN | AP | 8860 J.BARGAR | 8860 J.BARGAR | 3613 D.FRIEBEL | 3613 D.FRIEBEL | 3613 D.FRIEBEL |
BEAM LINE 11-3 | ||||||
May 28, 2012 | May 29, 2012 | May 30, 2012 | May 31, 2012 | Jun. 01, 2012 | Jun. 02, 2012 | Jun. 03, 2012 |
1F76 Y.Diao | 1F76 Y.Diao/AP | AP | 8203 M.TONEY | 3578 J.Nelson | 3787 A.LLORDES | 3787 A.LLORDES |
1F76 Y.Diao | AP | CHANGE/8203 M.TONE | Unscheduled | Xray CHECKOUT/3787 | 3787 A.LLORDES | 3787 A.LLORDES |
1F76 Y.Diao | AP | 8203 M.TONEY | CHANGE/3578 J.Nels | 3787 A.LLORDES | 3787 A.LLORDES | 3787 A.LLORDES |
WEEK OF Jun. 04, 2012 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
BEAM LINE 1-4 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
Unscheduled | Unscheduled | 3518 E.COLETTA | 3518 E.COLETTA | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT |
Unscheduled | CHANGE/3518 E.COLE | 3518 E.COLETTA | CHANGE/3647 S.BENT | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT |
Unscheduled | 3518 E.COLETTA | 3518 E.COLETTA | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT |
BEAM LINE 2-1 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled | 3625 S.SWEETNAM | 3625 S.SWEETNAM |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | Xray CHECKOUT/3625 | 3625 S.SWEETNAM | 3625 S.SWEETNAM |
Unscheduled | Unscheduled | Unscheduled | Unscheduled | 3625 S.SWEETNAM | 3625 S.SWEETNAM | 3625 S.SWEETNAM |
BEAM LINE 2-3 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
3736 C.KIM | 8867 S.WEBB | 3478 T.PUNSHON | 3478 T.PUNSHON | 3478 T.PUNSHON | 3550 M.HINDT | 3550 M.HINDT |
CHANGE/8867 S.WEBB | CHANGE/3478 T.PUNS | 3478 T.PUNSHON | 3478 T.PUNSHON | CHANGE/3550 M.HIND | 3550 M.HINDT | 3550 M.HINDT |
8867 S.WEBB | 3478 T.PUNSHON | 3478 T.PUNSHON | 3478 T.PUNSHON | 3550 M.HINDT | 3550 M.HINDT | 3550 M.HINDT |
BEAM LINE 4-1 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
3728 R.DAVIS | 3661 C.CHEN | 3661 C.CHEN | 3771 Y.Slowey | 3771 Y.Slowey | 3228 M.AMIRIDIS | 3228 M.AMIRIDIS |
Xray CHECKOUT/3661 | 3661 C.CHEN | Xray CHECKOUT/3771 | 3771 Y.Slowey | Xray CHECKOUT/3228 | 3228 M.AMIRIDIS | 3228 M.AMIRIDIS |
3661 C.CHEN | 3661 C.CHEN | 3771 Y.Slowey | 3771 Y.Slowey | 3228 M.AMIRIDIS | 3228 M.AMIRIDIS | 3228 M.AMIRIDIS |
BEAM LINE 4-2 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
3358 D.HERSCHLAG | 3443 A.SCHOEFFLER | 3617 B.MOOERS | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 10J8 J.Julien | Unscheduled |
CHANGE/3443 A.SCHO | CHANGE/3617 B.MOOE | CHANGE/3791 K.SCHM | 3791 K.SCHMIDT | CHANGE/10J8 J.Juli | Unscheduled | Unscheduled |
3443 A.SCHOEFFLER | 3617 B.MOOERS | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 10J8 J.Julien | Unscheduled | Unscheduled |
BEAM LINE 4-3 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
3652 C.HANSEL | 3654 C.HANSEL | 3654 C.HANSEL | 3531 G.LOWRY | 3531 G.LOWRY | 3757 R.Bassiri | 3757 R.Bassiri |
SMB CHECKOUT/3654 | 3654 C.HANSEL | SMB CHECKOUT/3531 | 3531 G.LOWRY | SMB CHECKOUT/3757 | 3757 R.Bassiri | 3757 R.Bassiri |
3654 C.HANSEL | 3654 C.HANSEL | 3531 G.LOWRY | 3531 G.LOWRY | 3757 R.Bassiri | 3757 R.Bassiri | 3757 R.Bassiri |
BEAM LINE 6-2 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
91P9 Y.Lee | 3728 R.DAVIS | 3728 R.DAVIS | 91P6 Z.Huang | 91P6 Z.Huang | 3581 J.Nelson | 3581 J.Nelson |
CHANGE/3728 R.DAVI | 3728 R.DAVIS | CHANGE/91P6 Z.Huan | 91P6 Z.Huang | CHANGE/3581 J.Nels | 3581 J.Nelson | 3581 J.Nelson |
3728 R.DAVIS | 3728 R.DAVIS | 91P6 Z.Huang | 91P6 Z.Huang | 3581 J.Nelson | 3581 J.Nelson | 3581 J.Nelson |
BEAM LINE 7-2 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
3440 A.AYZNER | 3625 S.SWEETNAM | 3625 S.SWEETNAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
Xray CHECKOUT/3625 | 3625 S.SWEETNAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
3625 S.SWEETNAM | 3625 S.SWEETNAM | Unscheduled | Unscheduled | Unscheduled | Unscheduled | Unscheduled |
BEAM LINE 7-3 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
3681 S.GEORGE | 3681 S.GEORGE | 3445 M.MARONEY | 3445 M.MARONEY | 3445 M.MARONEY | 3236 K.HODGSON | 3236 K.HODGSON |
3681 S.GEORGE | SMB CHECKOUT/3445 | 3445 M.MARONEY | 3445 M.MARONEY | SMB CHECKOUT/3236 | 3236 K.HODGSON | 3236 K.HODGSON |
3681 S.GEORGE | 3445 M.MARONEY | 3445 M.MARONEY | 3445 M.MARONEY | 3236 K.HODGSON | 3236 K.HODGSON | 3236 K.HODGSON |
BEAM LINE 9-3 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
3603 J.CHOROVER | 8067 S.WEBB | 8067 S.WEBB | 3679 S.FENDORF | 3679 S.FENDORF | 3550 M.HINDT | 3550 M.HINDT |
CHANGE/8067 S.WEBB | 8067 S.WEBB | CHANGE/3679 S.FEND | 3679 S.FENDORF | CHANGE/3550 M.HIND | 3550 M.HINDT | 3550 M.HINDT |
8067 S.WEBB | 8067 S.WEBB | 3679 S.FENDORF | 3679 S.FENDORF | 3550 M.HINDT | 3550 M.HINDT | 3550 M.HINDT |
BEAM LINE 11-2 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
3613 D.FRIEBEL | 3265 R.WOGELIUS | 3265 R.WOGELIUS | DOWN | DOWN | DOWN | DOWN |
MES CHECKOUT/3265 | 3265 R.WOGELIUS | 3265 R.WOGELIUS | DOWN | DOWN | DOWN | DOWN |
3265 R.WOGELIUS | 3265 R.WOGELIUS | 3265 R.WOGELI/DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Jun. 04, 2012 | Jun. 05, 2012 | Jun. 06, 2012 | Jun. 07, 2012 | Jun. 08, 2012 | Jun. 09, 2012 | Jun. 10, 2012 |
3787 A.LLORDES | 3531 G.LOWRY | 3603 J.CHOROVER | 3603 J.CHOROVER | DOWN | DOWN | DOWN |
Xray CHECKOUT/3531 | Xray CHECKOUT/3603 | 3603 J.CHOROVER | 3603 J.CHOROVER | DOWN | DOWN | DOWN |
3531 G.LOWRY | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROV/DOWN | DOWN | DOWN | DOWN |
WEEK OF Jun. 11, 2012 | ||||||
AP | AP | |||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
BEAM LINE 1-4 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
3647 S.BENT/MA | MA/AP | AP | 3779 M.MODESTINO | 3779 M.MODESTINO | 3497 K.ENGBERG | 3497 K.ENGBERG |
MA | AP | CHANGE/3779 M.MODE | 3779 M.MODESTINO | CHANGE/3497 K.ENGB | 3497 K.ENGBERG | 3497 K.ENGBERG |
MA | AP | 3779 M.MODESTINO | 3779 M.MODESTINO | 3497 K.ENGBERG | 3497 K.ENGBERG | 3497 K.ENGBERG |
BEAM LINE 2-1 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
3625 S.SWEETNAM/MA | MA/AP | AP | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN | 3651 L.PEREZ | 3651 L.PEREZ |
MA | AP | Xray CHECKOUT/3441 | 3441 E.VERPLOEGEN | Xray CHECKOUT/3651 | 3651 L.PEREZ | 3651 L.PEREZ |
MA | AP | 3441 E.VERPLOEGEN | 3441 E.VERPLOEGEN | 3651 L.PEREZ | 3651 L.PEREZ | 3651 L.PEREZ |
BEAM LINE 2-3 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
3550 M.HINDT/MA | MA/AP | AP | 91P7 J.Nelson | 1F75 S.WEBB | 1F75 S.WEBB | 3726 A.SEYFFERTH |
MA | AP | CHANGE/91P7 J.Nels | CHANGE/1F75 S.WEBB | 1F75 S.WEBB | CHANGE/3726 A.SEYF | 3726 A.SEYFFERTH |
MA | AP | 91P7 J.Nelson | 1F75 S.WEBB | 1F75 S.WEBB | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH |
BEAM LINE 4-1 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
3228 M.AMIRIDIS/MA | MA/AP | AP | 3567 S.LEE | 3567 S.LEE | 3628 G.TIAN | 3628 G.TIAN |
MA | AP | Xray CHECKOUT/3567 | 3567 S.LEE | Xray CHECKOUT/3628 | 3628 G.TIAN | 3628 G.TIAN |
MA | AP | 3567 S.LEE | 3567 S.LEE | 3628 G.TIAN | 3628 G.TIAN | 3628 G.TIAN |
BEAM LINE 4-2 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
MA | MA/AP | AP | 8877 T.MATSUI | 8047 T.WEISS | 3351 V.CHEREZOV | 3351 V.CHEREZOV |
MA | AP | CHANGE/8877 T.MATS | CHANGE/8047 T.WEIS | CHANGE/3351 V.CHER | 3351 V.CHEREZOV | 3351 V.CHEREZOV |
MA | AP | 8877 T.MATSUI | 8047 T.WEISS | 3351 V.CHEREZOV | 3351 V.CHEREZOV | 3351 V.CHEREZOV |
BEAM LINE 4-3 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
3757 R.Bassiri/MA | MA/AP | AP | 3781 K.Wujcik | 3781 K.Wujcik | 3724 J.SEITER | 3724 J.SEITER |
MA | AP | SMB CHECKOUT/3781 | 3781 K.Wujcik | SMB CHECKOUT/3724 | 3724 J.SEITER | 3724 J.SEITER |
MA | AP | 3781 K.Wujcik | 3781 K.Wujcik | 3724 J.SEITER | 3724 J.SEITER | 3724 J.SEITER |
BEAM LINE 6-2 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
3581 J.Nelson/MA | MA/AP | AP | 3401 E.SOLOMON | 3401 E.SOLOMON | 3401 E.SOLOMON | 3610 T.MCQUEEN |
MA | AP | Xray CHECKOUT/3401 | 3401 E.SOLOMON | 3401 E.SOLOMON | CHANGE/3610 T.MCQU | 3610 T.MCQUEEN |
MA | AP | 3401 E.SOLOMON | 3401 E.SOLOMON | 3401 E.SOLOMON | 3610 T.MCQUEEN | 3610 T.MCQUEEN |
BEAM LINE 7-2 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
MA | MA/AP | AP | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT |
MA | AP | Xray CHECKOUT/3791 | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT |
MA | AP | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT |
BEAM LINE 7-3 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
3236 K.HODGSON/MA | MA/AP | AP | 3236 K.HODGSON | 3503 J.PENNER-HAHN | 3503 J.PENNER-HAHN | 3503 J.PENNER-HAHN |
MA | AP | 3236 K.HODGSON | SMB CHECKOUT/3503 | 3503 J.PENNER-HAHN | 3503 J.PENNER-HAHN | 3503 J.PENNER-HAHN |
MA | AP | 3236 K.HODGSON | 3503 J.PENNER-HAHN | 3503 J.PENNER-HAHN | 3503 J.PENNER-HAHN | 3503 J.PENNER-HAHN |
BEAM LINE 9-3 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
DOWN/MA | MA/AP | AP | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
3550 M.HINDT/MA | MA/AP | AP | DOWN | 8867 S.WEBB | 3589 J.DAVIS | 3589 J.DAVIS |
MA | AP | DOWN | CHANGE/8867 S.WEBB | CHANGE/3589 J.DAVI | 3589 J.DAVIS | 3589 J.DAVIS |
MA | AP | DOWN | 8867 S.WEBB | 3589 J.DAVIS | 3589 J.DAVIS | 3589 J.DAVIS |
BEAM LINE 11-2 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
DOWN/MA | MA/AP | AP | 3733 G.WAYCHUNAS | 3733 G.WAYCHUNAS | 3467 C.BOOTH | 3527 D.WANG |
MA | AP | MES CHECKOUT/3733 | 3733 G.WAYCHUNAS | MES CHECKOUT/3467 | CHANGE/3527 D.WANG | CHANGE/3746 W.LUKE |
MA | AP | 3733 G.WAYCHUNAS | 3733 G.WAYCHUNAS | 3467 C.BOOTH | 3527 D.WANG | 3746 W.LUKENS |
BEAM LINE 11-3 | ||||||
Jun. 11, 2012 | Jun. 12, 2012 | Jun. 13, 2012 | Jun. 14, 2012 | Jun. 15, 2012 | Jun. 16, 2012 | Jun. 17, 2012 |
DOWN/MA | MA/AP | AP | 3651 L.PEREZ | 3651 L.PEREZ | 3641 M.CHABINYC | 3641 M.CHABINYC |
MA | AP | Xray CHECKOUT/3651 | 3651 L.PEREZ | Xray CHECKOUT/3641 | 3641 M.CHABINYC | 3641 M.CHABINYC |
MA | AP | 3651 L.PEREZ | 3651 L.PEREZ | 3641 M.CHABINYC | 3641 M.CHABINYC | 3641 M.CHABINYC |
WEEK OF Jun. 18, 2012 | ||||||
TimingStudies | TimingStudies | |||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
BEAM LINE 1-4 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3497 K.ENGBERG | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
CHANGE/3607 N.BALS | 3607 N.BALSARA | 3607 N.BALSARA | CHANGE/3416 R.SEGA | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN |
BEAM LINE 2-1 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3651 L.PEREZ | 3731 A.AYZNER | 3731 A.AYZNER | 3731 A.AYZNER | 8051 M.TONEY | 8051 M.TONEY | Unscheduled |
Xray CHECKOUT/3731 | 3731 A.AYZNER | 3731 A.AYZNER | Xray CHECKOUT/8051 | 8051 M.TONEY | Unscheduled | Unscheduled |
3731 A.AYZNER | 3731 A.AYZNER | 3731 A.AYZNER | 8051 M.TONEY | 8051 M.TONEY | Unscheduled | Unscheduled |
BEAM LINE 2-3 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3726 A.SEYFFERTH | 3726 A.SEYFFERTH | 3603 J.CHOROVER | 3603 J.CHOROVER | 3423 J.SEITER | 3423 J.SEITER | 3423 J.SEITER |
3726 A.SEYFFERTH | CHANGE/3603 J.CHOR | 3603 J.CHOROVER | CHANGE/3423 J.SEIT | 3423 J.SEITER | 3423 J.SEITER | 3423 J.SEITER |
3726 A.SEYFFERTH | 3603 J.CHOROVER | 3603 J.CHOROVER | 3423 J.SEITER | 3423 J.SEITER | 3423 J.SEITER | 3423 J.SEITER |
BEAM LINE 4-1 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3628 G.TIAN | 3601 J.SEITER | 3408 K.HAYES | 3591 L.KLOO | 3591 L.KLOO | 3591 L.KLOO | Unscheduled |
Xray CHECKOUT/3601 | SMB CHECKOUT/3408 | Xray CHECKOUT/3591 | 3591 L.KLOO | 3591 L.KLOO | Unscheduled | Unscheduled |
3601 J.SEITER | 3408 K.HAYES | 3591 L.KLOO | 3591 L.KLOO | 3591 L.KLOO | Unscheduled | Unscheduled |
BEAM LINE 4-2 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3351 V.CHEREZOV | 3742 H.LIANG | 3742 H.LIANG | 3765 T.Bryan | 3765 T.Bryan | CHANGE/8847 T.WEIS | 8847 T.WEISS |
CHANGE/3742 H.LIAN | 3742 H.LIANG | CHANGE/3765 T.Brya | 3765 T.Bryan | CHANGE/3758 J.Lath | 8847 T.WEISS | 8847 T.WEISS |
3742 H.LIANG | 3742 H.LIANG | 3765 T.Bryan | 3765 T.Bryan | 3758 J.Latham | 8847 T.WEISS | 8847 T.WEISS |
BEAM LINE 4-3 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3724 J.SEITER | 3408 K.HAYES | 3547 R.Couture | 3547 R.Couture | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER |
SMB CHECKOUT/3408 | SMB CHECKOUT/3547 | 3547 R.Couture | SMB CHECKOUT/3603 | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER |
3408 K.HAYES | 3547 R.Couture | 3547 R.Couture | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER | 3603 J.CHOROVER |
BEAM LINE 6-2 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3610 T.MCQUEEN | 3610 T.MCQUEEN | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND |
3610 T.MCQUEEN | CHANGE/8053 D.NORD | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND |
3610 T.MCQUEEN | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND | 8053 D.NORDLUND |
BEAM LINE 7-2 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3791 K.SCHMIDT | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN |
Xray CHECKOUT/8875 | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN |
8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN | 8875 D.VAN CAMPEN |
BEAM LINE 7-3 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3503 J.PENNER-HAHN | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | 3593 T.STEMMLER | 3593 T.STEMMLER | 3339 K.HODGSON |
SMB CHECKOUT/3324 | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | SMB CHECKOUT/3593 | 3593 T.STEMMLER | CHANGE/3339 K.HODG | 3339 K.HODGSON |
3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | 3324 P.RIGGS-GELAS | 3593 T.STEMMLER | 3593 T.STEMMLER | 3339 K.HODGSON | 3339 K.HODGSON |
BEAM LINE 9-3 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3589 J.DAVIS | 3667 S.TIAN | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING |
CHANGE/3667 S.TIAN | CHANGE/3267 I.PICK | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING |
3667 S.TIAN | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING | 3267 I.PICKERING |
BEAM LINE 11-2 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3746 W.LUKENS | 3746 W.LUKENS | 3746 W.LUKENS | 3480 S.CONRADSON | 3480 S.CONRADSON | 3666 S.CONRADSON | 3666 S.CONRADSON |
3746 W.LUKENS | 3746 W.LUKENS | MES CHECKOUT/3480 | 3480 S.CONRADSON | CHANGE/3666 S.CONR | 3666 S.CONRADSON | 3666 S.CONRADSON |
3746 W.LUKENS | 3746 W.LUKENS | 3480 S.CONRADSON | 3480 S.CONRADSON | 3666 S.CONRADSON | 3666 S.CONRADSON | 3666 S.CONRADSON |
BEAM LINE 11-3 | ||||||
Jun. 18, 2012 | Jun. 19, 2012 | Jun. 20, 2012 | Jun. 21, 2012 | Jun. 22, 2012 | Jun. 23, 2012 | Jun. 24, 2012 |
3641 M.CHABINYC | 3625 S.SWEETNAM | 3625 S.SWEETNAM | 3519 S.MANNSFELD | 3519 S.MANNSFELD | 3647 S.BENT | Unscheduled |
Xray CHECKOUT/3625 | 3625 S.SWEETNAM | CHANGE/3519 S.MANN | 3519 S.MANNSFELD | Xray CHECKOUT/3647 | Unscheduled | Unscheduled |
3625 S.SWEETNAM | 3625 S.SWEETNAM | 3519 S.MANNSFELD | 3519 S.MANNSFELD | 3647 S.BENT | Unscheduled | Unscheduled |
WEEK OF Jun. 25, 2012 | ||||||
AP | AP | |||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
BEAM LINE 1-4 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
3416 R.SEGALMAN/AP | AP | AP | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT | Unscheduled |
AP | AP | CHANGE/3660 S.TOLB | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT | Unscheduled |
AP | AP | 3660 S.TOLBERT | 3660 S.TOLBERT | 3660 S.TOLBERT | Unscheduled | Unscheduled |
BEAM LINE 2-1 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
AP | AP | AP | 1F82 G.GIRI | 3774 R.Gandhiraman | 3774 R.Gandhiraman | 3774 R.Gandhiraman |
AP | AP | Xray CHECKOUT/1F82 | Xray CHECKOUT/3774 | 3774 R.Gandhiraman | 3774 R.Gandhiraman | 3774 R.Gandhiraman |
AP | AP | 1F82 G.GIRI | 3774 R.Gandhiraman | 3774 R.Gandhiraman | 3774 R.Gandhiraman | 3774 R.Gandhiraman |
BEAM LINE 2-3 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
3423 J.SEITER/AP | AP | AP | 1F65 C.Mogren | 1F65 C.Mogren | 3750 M.WALTON | 3750 M.WALTON |
AP | AP | CHANGE/1F65 C.Mogr | 1F65 C.Mogren | CHANGE/3750 M.WALT | 3750 M.WALTON | 3750 M.WALTON |
AP | AP | 1F65 C.Mogren | 1F65 C.Mogren | 3750 M.WALTON | 3750 M.WALTON | 3750 M.WALTON |
BEAM LINE 4-1 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
AP | AP | AP | 3671 E.Benson | 3671 E.Benson | 3732 D.Fan | 3732 D.Fan |
AP | AP | Xray CHECKOUT/3671 | 3671 E.Benson | Xray CHECKOUT/3732 | 3732 D.Fan | 3732 D.Fan |
AP | AP | 3671 E.Benson | 3671 E.Benson | 3732 D.Fan | 3732 D.Fan | 3732 D.Fan |
BEAM LINE 4-2 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
8847 T.WEISS/AP | AP | AP | 10J9 W.WEIS | 3492 G.STUBBS | 3492 G.STUBBS | 3492 G.STUBBS |
AP | AP | CHANGE/10J9 W.WEIS | CHANGE/3492 G.STUB | 3492 G.STUBBS | 3492 G.STUBBS | CHANGE/3577 C.SAFI |
AP | AP | 10J9 W.WEIS | 3492 G.STUBBS | 3492 G.STUBBS | 3492 G.STUBBS | 3577 C.SAFINYA |
BEAM LINE 4-3 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
3603 J.CHOROVER/AP | AP | AP | 3774 R.Gandhiraman | 3774 R.Gandhiraman | 3729 V.YACHANDRA | 3729 V.YACHANDRA |
AP | AP | SMB CHECKOUT/3774 | 3774 R.Gandhiraman | SMB CHECKOUT/3729 | 3729 V.YACHANDRA | 3729 V.YACHANDRA |
AP | AP | 3774 R.Gandhiraman | 3774 R.Gandhiraman | 3729 V.YACHANDRA | 3729 V.YACHANDRA | 3729 V.YACHANDRA |
BEAM LINE 6-2 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
8053 D.NORDLUND/AP | AP | AP | 8859 B.JOHNSON | 91P7 J.Nelson | 3507 W.Chiu | 3507 W.Chiu |
AP | AP | Xray>TXM/8859 | CHANGE/91P7 J.Nels | CHANGE/3507 W.Chiu | 3507 W.Chiu | 3507 W.Chiu |
AP | AP | 8859 B.JOHNSON | 91P7 J.Nelson | 3507 W.Chiu | 3507 W.Chiu | 3507 W.Chiu |
BEAM LINE 7-2 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
8875 D.VAN CAMP/AP | AP | AP | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT |
AP | AP | Xray CHECKOUT/3647 | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT |
AP | AP | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT | 3647 S.BENT |
BEAM LINE 7-3 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
3339 K.HODGSON/AP | AP | AP | 3775 A.Scott | 3775 A.Scott | 3729 V.YACHANDRA | 3729 V.YACHANDRA |
AP | AP | SMB CHECKOUT/3775 | 3775 A.Scott | SMB CHECKOUT/3729 | 3729 V.YACHANDRA | 3729 V.YACHANDRA |
AP | AP | 3775 A.Scott | 3775 A.Scott | 3729 V.YACHANDRA | 3729 V.YACHANDRA | 3729 V.YACHANDRA |
BEAM LINE 9-3 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
3267 I.PICKERIN/AP | AP | AP | 8878 S.MANNSFELD | 8878 S.MANNSFELD | 8078 S.MANNSFELD | 8078 S.MANNSFELD |
AP | AP | Xray>XRD/8878 | 8878 S.MANNSFELD | CHANGE/8078 S.MANN | 8078 S.MANNSFELD | 8078 S.MANNSFELD |
AP | AP | 8878 S.MANNSFELD | 8878 S.MANNSFELD | 8078 S.MANNSFELD | 8078 S.MANNSFELD | 8078 S.MANNSFELD |
BEAM LINE 11-2 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
3666 S.CONRADSO/AP | AP | AP | 3702 Y.ARAI | 3702 Y.ARAI | 3679 S.FENDORF | 3679 S.FENDORF |
AP | AP | MES CHECKOUT/3702 | 3702 Y.ARAI | MES CHECKOUT/3679 | 3679 S.FENDORF | 3679 S.FENDORF |
AP | AP | 3702 Y.ARAI | 3702 Y.ARAI | 3679 S.FENDORF | 3679 S.FENDORF | 3679 S.FENDORF |
BEAM LINE 11-3 | ||||||
Jun. 25, 2012 | Jun. 26, 2012 | Jun. 27, 2012 | Jun. 28, 2012 | Jun. 29, 2012 | Jun. 30, 2012 | Jul. 01, 2012 |
AP | AP | AP | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3578 J.Nelson |
AP | AP | Xray CHECKOUT/3294 | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | CHANGE/3578 J.Nels | 3578 J.Nelson |
AP | AP | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3578 J.Nelson | 3578 J.Nelson |
WEEK OF Jul. 02, 2012 | ||||||
HOLIDAY | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
BEAM LINE 1-4 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
Unscheduled | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan |
CHANGE/3416 R.SEGA | 3416 R.SEGALMAN | 3416 R.SEGALMAN | CHANGE/91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan |
3416 R.SEGALMAN | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan | 91P0 C.Ryan |
BEAM LINE 2-1 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
3774 R.Gandhiraman | 3774 R.Gandhiraman | 3774 R.Gandhiraman | 3774 R.Gandhiraman | 3780 C.ROCHESTER | 3780 C.ROCHESTER | 3780 C.ROCHESTER |
3774 R.Gandhiraman | 3774 R.Gandhiraman | 3774 R.Gandhiraman | Xray CHECKOUT/3780 | 3780 C.ROCHESTER | 3780 C.ROCHESTER | 3780 C.ROCHESTER |
3774 R.Gandhiraman | 3774 R.Gandhiraman | 3774 R.Gandhiraman | 3780 C.ROCHESTER | 3780 C.ROCHESTER | 3780 C.ROCHESTER | 3780 C.ROCHESTER |
BEAM LINE 2-3 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
3750 M.WALTON | 3534 A.LAM | 3672 S.CONRADSON | 3672 S.CONRADSON | 3666 S.CONRADSON | 3666 S.CONRADSON | 3536 O.BATUK |
CHANGE/3534 A.LAM | CHANGE/3672 S.CONR | 3672 S.CONRADSON | CHANGE/3666 S.CONR | 3666 S.CONRADSON | CHANGE/3536 O.BATU | 3536 O.BATUK |
3534 A.LAM | 3672 S.CONRADSON | 3672 S.CONRADSON | 3666 S.CONRADSON | 3666 S.CONRADSON | 3536 O.BATUK | 3536 O.BATUK |
BEAM LINE 4-1 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
3732 D.Fan | 3352 B.GATES | 3352 B.GATES | 3352 B.GATES | 91N8 F.BRIDGES | CHANGE/3600 F.BRID | CHANGE/3627 F.BRID |
Xray CHECKOUT/3352 | 3352 B.GATES | 3352 B.GATES | Xray CHECKOUT/91N8 | Xray CHECKOUT/3557 | 3600 F.BRIDGES | 3627 F.BRIDGES |
3352 B.GATES | 3352 B.GATES | 3352 B.GATES | 91N8 F.BRIDGES | 3557 F.BRIDGES | 3600 F.BRIDGES | 3627 F.BRIDGES |
BEAM LINE 4-2 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
3577 C.SAFINYA | 3577 C.SAFINYA | 8015 A.MEHTA | 8015 A.MEHTA | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 8077 T.MATSUI |
3577 C.SAFINYA | CHANGE/8015 A.MEHT | 8015 A.MEHTA | CHANGE/3791 K.SCHM | 3791 K.SCHMIDT | CHANGE/8077 T.MATS | CHANGE/10J4 A.Edwa |
3577 C.SAFINYA | 8015 A.MEHTA | 8015 A.MEHTA | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 8077 T.MATSUI | 10J4 A.Edwards |
BEAM LINE 4-3 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
3729 V.YACHANDRA | 3729 V.YACHANDRA | 3781 K.Wujcik | 3781 K.Wujcik | 3672 S.CONRADSON | 3480 S.CONRADSON | 3480 S.CONRADSON |
3729 V.YACHANDRA | SMB CHECKOUT/3781 | 3781 K.Wujcik | SMB CHECKOUT/3672 | CHANGE/3480 S.CONR | 3480 S.CONRADSON | 3480 S.CONRADSON |
3729 V.YACHANDRA | 3781 K.Wujcik | 3781 K.Wujcik | 3672 S.CONRADSON | 3480 S.CONRADSON | 3480 S.CONRADSON | 3480 S.CONRADSON |
BEAM LINE 6-2 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
3507 W.Chiu | 3490 P.SHEARING | 3490 P.SHEARING | 3490 P.SHEARING | 3630 C.Ban | 3630 C.Ban | 3624 A.CRUICKSHANK |
CHANGE/3490 P.SHEA | 3490 P.SHEARING | 3490 P.SHEARING | CHANGE/3630 C.Ban | 3630 C.Ban | CHANGE/3624 A.CRUI | 3624 A.CRUICKSHANK |
3490 P.SHEARING | 3490 P.SHEARING | 3490 P.SHEARING | 3630 C.Ban | 3630 C.Ban | 3624 A.CRUICKSHANK | 3624 A.CRUICKSHANK |
BEAM LINE 7-2 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
3647 S.BENT | 3735 C.TASSONE | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
Xray CHECKOUT/3735 | Xray CHECKOUT/3676 | 3676 R.KLINE | 3676 R.KLINE | Xray CHECKOUT/3294 | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
3735 C.TASSONE | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE | 3294 S.HIMMELBERGE |
BEAM LINE 7-3 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
3729 V.YACHANDRA | 3729 V.YACHANDRA | 3686 S.SINGH | 3686 S.SINGH | 3582 L.QUE | 3582 L.QUE | 3582 L.QUE |
3729 V.YACHANDRA | SMB CHECKOUT/3686 | 3686 S.SINGH | SMB CHECKOUT/3582 | 3582 L.QUE | 3582 L.QUE | 3582 L.QUE |
3729 V.YACHANDRA | 3686 S.SINGH | 3686 S.SINGH | 3582 L.QUE | 3582 L.QUE | 3582 L.QUE | 3582 L.QUE |
BEAM LINE 9-3 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
8078 S.MANNSFELD | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA |
Xray CHECKOUT/8015 | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | CHANGE/3471 Y.TAKA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA |
8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA | 3471 Y.TAKAMURA |
BEAM LINE 11-2 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
3679 S.FENDORF | 3679 S.FENDORF | 3732 D.Fan | 3732 D.Fan | 3732 D.Fan | 3740 C.SANTELLI | 3740 C.SANTELLI |
3679 S.FENDORF | MES CHECKOUT/3732 | 3732 D.Fan | 3732 D.Fan | MES CHECKOUT/3740 | 3740 C.SANTELLI | 3740 C.SANTELLI |
3679 S.FENDORF | 3732 D.Fan | 3732 D.Fan | 3732 D.Fan | 3740 C.SANTELLI | 3740 C.SANTELLI | 3740 C.SANTELLI |
BEAM LINE 11-3 | ||||||
Jul. 02, 2012 | Jul. 03, 2012 | Jul. 04, 2012 | Jul. 05, 2012 | Jul. 06, 2012 | Jul. 07, 2012 | Jul. 08, 2012 |
3578 J.Nelson | 3578 J.Nelson | 3740 C.SANTELLI | 3740 C.SANTELLI | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE |
3578 J.Nelson | Xray CHECKOUT/3740 | 3740 C.SANTELLI | Xray CHECKOUT/3676 | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE |
3578 J.Nelson | 3740 C.SANTELLI | 3740 C.SANTELLI | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE | 3676 R.KLINE |
WEEK OF Jul. 09, 2012 | ||||||
MA | AP | |||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
BEAM LINE 1-4 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
91P0 C.Ryan/MA | MA/AP | AP | 3745 B.Boudouris | 3745 B.Boudouris | 3745 B.Boudouris | 3745 B.Boudouris |
MA | AP | CHANGE/3745 B.Boud | 3745 B.Boudouris | 3745 B.Boudouris | 3745 B.Boudouris | 3745 B.Boudouris |
MA | AP | 3745 B.Boudouris | 3745 B.Boudouris | 3745 B.Boudouris | 3745 B.Boudouris | 3745 B.Boudouris |
BEAM LINE 2-1 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
3780 C.ROCHESTE/MA | MA/AP | AP | 1F82 G.GIRI | 1F82 G.GIRI | 3725 M.TAILLEFERT | 3725 M.TAILLEFERT |
MA | AP | Xray CHECKOUT/1F82 | 1F82 G.GIRI | CHANGE/3725 M.TAIL | 3725 M.TAILLEFERT | 3725 M.TAILLEFERT |
MA | AP | 1F82 G.GIRI | 1F82 G.GIRI | 3725 M.TAILLEFERT | 3725 M.TAILLEFERT | 3725 M.TAILLEFERT |
BEAM LINE 2-3 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
3536 O.BATUK/MA | MA/AP | AP | 3702 Y.ARAI | 3702 Y.ARAI | 3658 W.Fischer | 3658 W.Fischer |
MA | AP | CHANGE/3702 Y.ARAI | 3702 Y.ARAI | CHANGE/3658 W.Fisc | 3658 W.Fischer | 3658 W.Fischer |
MA | AP | 3702 Y.ARAI | 3702 Y.ARAI | 3658 W.Fischer | 3658 W.Fischer | 3658 W.Fischer |
BEAM LINE 4-1 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
3627 F.BRIDGES/MA | MA/AP | AP | 3725 M.TAILLEFERT | 3725 M.TAILLEFERT | 3501 P.O'DAY | 3501 P.O'DAY |
MA | AP | Xray CHECKOUT/3725 | 3725 M.TAILLEFERT | Xray CHECKOUT/3501 | 3501 P.O'DAY | 3501 P.O'DAY |
MA | AP | 3725 M.TAILLEFERT | 3725 M.TAILLEFERT | 3501 P.O'DAY | 3501 P.O'DAY | 3501 P.O'DAY |
BEAM LINE 4-2 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
10J4 A.Edwards/MA | MA/AP | AP | 8877 T.MATSUI | 8047 T.WEISS | 3752 S.WILBANKS | 3358 D.HERSCHLAG |
MA | AP | CHANGE/8877 T.MATS | CHANGE/8047 T.WEIS | CHANGE/3752 S.WILB | CHANGE/3358 D.HERS | CHANGE/3295 K.LEE |
MA | AP | 8877 T.MATSUI | 8047 T.WEISS | 3752 S.WILBANKS | 3358 D.HERSCHLAG | 3295 K.LEE |
BEAM LINE 4-3 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
3480 S.CONRADSO/MA | MA/AP | AP | 3363 S.KOZIMOR | 3363 S.KOZIMOR | 3670 S.KOZIMOR | 3670 S.KOZIMOR |
MA | AP | SMB CHECKOUT/3363 | 3363 S.KOZIMOR | SMB CHECKOUT/3670 | 3670 S.KOZIMOR | 3670 S.KOZIMOR |
MA | AP | 3363 S.KOZIMOR | 3363 S.KOZIMOR | 3670 S.KOZIMOR | 3670 S.KOZIMOR | 3670 S.KOZIMOR |
BEAM LINE 6-2 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
3624 A.CRUICKSH/MA | MA/AP | AP | 8879 T.WENG | 8879 T.WENG | 8071 R.SARANGI | 8071 R.SARANGI |
MA | AP | Xray>ES2/8879 | 8879 T.WENG | CHANGE/8071 R.SARA | 8071 R.SARANGI | 8071 R.SARANGI |
MA | AP | 8879 T.WENG | 8879 T.WENG | 8071 R.SARANGI | 8071 R.SARANGI | 8071 R.SARANGI |
BEAM LINE 7-2 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
3294 S.HIMMELBE/MA | MA/AP | AP | 8053 D.NORDLUND | 8053 D.NORDLUND | 3543 T.FORREST | 3543 T.FORREST |
MA | AP | Xray>XtalAnalyzer/ | 8053 D.NORDLUND | Xray CHECKOUT/3543 | 3543 T.FORREST | 3543 T.FORREST |
MA | AP | 8053 D.NORDLUND | 8053 D.NORDLUND | 3543 T.FORREST | 3543 T.FORREST | 3543 T.FORREST |
BEAM LINE 7-3 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
3582 L.QUE/MA | MA/AP | AP | 3667 S.TIAN | 3667 S.TIAN | 3457 S.DEBEER | 3457 S.DEBEER |
MA | AP | SMB CHECKOUT/3667 | 3667 S.TIAN | SMB CHECKOUT/3457 | 3457 S.DEBEER | 3457 S.DEBEER |
MA | AP | 3667 S.TIAN | 3667 S.TIAN | 3457 S.DEBEER | 3457 S.DEBEER | 3457 S.DEBEER |
BEAM LINE 9-3 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
DOWN/MA | MA/AP | AP | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
MA | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
3471 Y.TAKAMURA/MA | MA/AP | AP | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski |
MA | AP | CHANGE/3657 M.Bieg | 3657 M.Biegalski | CHANGE/3657 M.Bieg | 3657 M.Biegalski | 3657 M.Biegalski |
MA | AP | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski | 3657 M.Biegalski |
BEAM LINE 11-2 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
3740 C.SANTELLI/MA | MA/AP | AP | 3467 C.BOOTH | 3467 C.BOOTH | 3747 J.Catalano | 3747 J.Catalano |
MA | AP | MES CHECKOUT/3467 | 3467 C.BOOTH | MES CHECKOUT/3747 | 3747 J.Catalano | 3747 J.Catalano |
MA | AP | 3467 C.BOOTH | 3467 C.BOOTH | 3747 J.Catalano | 3747 J.Catalano | 3747 J.Catalano |
BEAM LINE 11-3 | ||||||
Jul. 09, 2012 | Jul. 10, 2012 | Jul. 11, 2012 | Jul. 12, 2012 | Jul. 13, 2012 | Jul. 14, 2012 | Jul. 15, 2012 |
3676 R.KLINE/MA | MA/AP | AP | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT |
MA | AP | Xray CHECKOUT/3791 | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT |
MA | AP | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT |
WEEK OF Jul. 16, 2012 | ||||||
XAS School | XAS School | |||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
BEAM LINE 1-4 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
3745 B.Boudouris | 3497 K.ENGBERG | 3497 K.ENGBERG | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3607 N.BALSARA | 3607 N.BALSARA |
CHANGE/3497 K.ENGB | 3497 K.ENGBERG | CHANGE/3416 R.SEGA | 3416 R.SEGALMAN | CHANGE/3607 N.BALS | 3607 N.BALSARA | 3607 N.BALSARA |
3497 K.ENGBERG | 3497 K.ENGBERG | 3416 R.SEGALMAN | 3416 R.SEGALMAN | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA |
BEAM LINE 2-1 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
3725 M.TAILLEFERT | 3725 M.TAILLEFERT | 91Q6 J.Groves | 91Q6 J.Groves | 91Q6 J.Groves | 3642 M.CHABINYC | 3642 M.CHABINYC |
3725 M.TAILLEFERT | CHECKOUT/91Q6 | 91Q6 J.Groves | 91Q6 J.Groves | Xray CHECKOUT/3642 | 3642 M.CHABINYC | 3642 M.CHABINYC |
3725 M.TAILLEFERT | 91Q6 J.Groves | 91Q6 J.Groves | 91Q6 J.Groves | 3642 M.CHABINYC | 3642 M.CHABINYC | 3642 M.CHABINYC |
BEAM LINE 2-3 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
3658 W.Fischer | 3667 S.TIAN | 3667 S.TIAN | 8204 R.SARANGI | 8204 R.SARANGI | 3589 J.DAVIS | 3589 J.DAVIS |
CHANGE/3667 S.TIAN | 3667 S.TIAN | CHANGE/8204 R.SARA | 8204 R.SARANGI | CHANGE/3589 J.DAVI | 3589 J.DAVIS | 3589 J.DAVIS |
3667 S.TIAN | 3667 S.TIAN | 8204 R.SARANGI | 8204 R.SARANGI | 3589 J.DAVIS | 3589 J.DAVIS | 3589 J.DAVIS |
BEAM LINE 4-1 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
3501 P.O'DAY | 3658 W.Fischer | 3658 W.Fischer | 3783 C.FULLER | 3783 C.FULLER | 3347 F.HUGGINS | 3347 F.HUGGINS |
Xray CHECKOUT/3658 | 3658 W.Fischer | Xray CHECKOUT/3783 | 3783 C.FULLER | Xray CHECKOUT/3347 | 3347 F.HUGGINS | 3347 F.HUGGINS |
3658 W.Fischer | 3658 W.Fischer | 3783 C.FULLER | 3783 C.FULLER | 3347 F.HUGGINS | 3347 F.HUGGINS | 3347 F.HUGGINS |
BEAM LINE 4-2 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
3295 K.LEE | 3295 K.LEE | 3295 K.LEE | 8204 R.SARANGI | 8204 R.SARANGI | 3434 A.Sali | 3541 D.SALTZBERG |
3295 K.LEE | 3295 K.LEE | CHANGE/8204 R.SARA | 8204 R.SARANGI | CHANGE/3434 A.Sali | CHANGE/3541 D.SALT | 3541 D.SALTZBERG |
3295 K.LEE | 3295 K.LEE | 8204 R.SARANGI | 8204 R.SARANGI | 3434 A.Sali | 3541 D.SALTZBERG | 3541 D.SALTZBERG |
BEAM LINE 4-3 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
3670 S.KOZIMOR | 3487 S.KOZIMOR | 3487 S.KOZIMOR | 8116 B.HEDMAN | 3347 F.HUGGINS | 3185 S.DEBEER | 3185 S.DEBEER |
SMB CHECKOUT/3487 | 3487 S.KOZIMOR | SMB CHECKOUT/8116 | SMB CHECKOUT/3347 | SMB CHECKOUT/3185 | 3185 S.DEBEER | 3185 S.DEBEER |
3487 S.KOZIMOR | 3487 S.KOZIMOR | 8116 B.HEDMAN | 3347 F.HUGGINS | 3185 S.DEBEER | 3185 S.DEBEER | 3185 S.DEBEER |
BEAM LINE 6-2 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
8071 R.SARANGI | 3701 S.DEBEER | 3701 S.DEBEER | 3701 S.DEBEER | 8859 B.JOHNSON | 3696 Y.Shi | 3696 Y.Shi |
CHANGE/3701 S.DEBE | 3701 S.DEBEER | 3701 S.DEBEER | Xray>TXM/8859 | CHANGE/3696 Y.Shi | 3696 Y.Shi | 3696 Y.Shi |
3701 S.DEBEER | 3701 S.DEBEER | 3701 S.DEBEER | 8859 B.JOHNSON | 3696 Y.Shi | 3696 Y.Shi | 3696 Y.Shi |
BEAM LINE 7-2 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
3543 T.FORREST | 3473 Y.SHI | 3473 Y.SHI | 3735 C.TASSONE | 3735 C.TASSONE | 3642 M.CHABINYC | 3642 M.CHABINYC |
Xray CHECKOUT/3473 | 3473 Y.SHI | Xray CHECKOUT/3735 | 3735 C.TASSONE | Xray CHECKOUT/3642 | 3642 M.CHABINYC | 3642 M.CHABINYC |
3473 Y.SHI | 3473 Y.SHI | 3735 C.TASSONE | 3735 C.TASSONE | 3642 M.CHABINYC | 3642 M.CHABINYC | 3642 M.CHABINYC |
BEAM LINE 7-3 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
3457 S.DEBEER | 3457 S.DEBEER | 1F83 K.LANCASTER | 8204 R.SARANGI | 8204 R.SARANGI | 3339 K.HODGSON | 3339 K.HODGSON |
3457 S.DEBEER | SMB CHECKOUT/1F83 | SMB CHECKOUT/8204 | 8204 R.SARANGI | SMB CHECKOUT/3339 | 3339 K.HODGSON | 3339 K.HODGSON |
3457 S.DEBEER | 1F83 K.LANCASTER | 8204 R.SARANGI | 8204 R.SARANGI | 3339 K.HODGSON | 3339 K.HODGSON | 3339 K.HODGSON |
BEAM LINE 9-3 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
3657 M.Biegalski | 3767 P.Evans | 3767 P.Evans | 8818 A.MEHTA | 8818 A.MEHTA | 3520 M.TRIGO | 3520 M.TRIGO |
Xray CHECKOUT/3767 | 3767 P.Evans | Xray CHECKOUT/8818 | 8818 A.MEHTA | Xray CHECKOUT/3520 | 3520 M.TRIGO | 3520 M.TRIGO |
3767 P.Evans | 3767 P.Evans | 8818 A.MEHTA | 8818 A.MEHTA | 3520 M.TRIGO | 3520 M.TRIGO | 3520 M.TRIGO |
BEAM LINE 11-2 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
3747 J.Catalano | 3749 R.DAEHN | 3749 R.DAEHN | 3749 R.DAEHN | 8104 P.PIANETTA | 8104 P.PIANETTA | 8104 P.PIANETTA |
MES CHECKOUT/3749 | 3749 R.DAEHN | 3749 R.DAEHN | MES CHECKOUT/8104 | 8104 P.PIANETTA | 8104 P.PIANETTA | 8104 P.PIANETTA |
3749 R.DAEHN | 3749 R.DAEHN | 3749 R.DAEHN | 8104 P.PIANETTA | 8104 P.PIANETTA | 8104 P.PIANETTA | 8104 P.PIANETTA |
BEAM LINE 11-3 | ||||||
Jul. 16, 2012 | Jul. 17, 2012 | Jul. 18, 2012 | Jul. 19, 2012 | Jul. 20, 2012 | Jul. 21, 2012 | Jul. 22, 2012 |
3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3648 V.HO | 3648 V.HO | 3648 V.HO |
3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | Xray CHECKOUT/3648 | 3648 V.HO | 3648 V.HO | 3648 V.HO |
3791 K.SCHMIDT | 3791 K.SCHMIDT | 3791 K.SCHMIDT | 3648 V.HO | 3648 V.HO | 3648 V.HO | 3648 V.HO |
WEEK OF Jul. 23, 2012 | ||||||
AP | AP | |||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
BEAM LINE 1-4 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
3607 N.BALSARA/AP | AP | AP | 3518 E.COLETTA | 3518 E.COLETTA | 3518 E.COLETTA | 8120 J.POPLE |
AP | AP | CHANGE/3518 E.COLE | 3518 E.COLETTA | 3518 E.COLETTA | CHANGE/8120 J.POPL | 8120 J.POPLE |
AP | AP | 3518 E.COLETTA | 3518 E.COLETTA | 3518 E.COLETTA | 8120 J.POPLE | 8120 J.POPLE |
BEAM LINE 2-1 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
3642 M.CHABINYC/AP | AP | AP | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
AP | AP | Xray CHECKOUT/8051 | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
AP | AP | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY | 8051 M.TONEY |
BEAM LINE 2-3 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
3589 J.DAVIS/AP | AP | AP | 3549 S.HO | 3549 S.HO | 8067 S.WEBB | 8067 S.WEBB |
AP | AP | CHANGE/3549 S.HO | 3549 S.HO | CHANGE/8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB |
AP | AP | 3549 S.HO | 3549 S.HO | 8067 S.WEBB | 8067 S.WEBB | 8067 S.WEBB |
BEAM LINE 4-1 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
3347 F.HUGGINS/AP | AP | AP | 8015 A.MEHTA | 8015 A.MEHTA | 3612 F.MEIRER | 3612 F.MEIRER |
AP | AP | Xray CHECKOUT/8015 | 8015 A.MEHTA | CHANGE/3612 F.MEIR | 3612 F.MEIRER | 3612 F.MEIRER |
AP | AP | 8015 A.MEHTA | 8015 A.MEHTA | 3612 F.MEIRER | 3612 F.MEIRER | 3612 F.MEIRER |
BEAM LINE 4-2 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
3541 D.SALTZBER/AP | AP | AP | 10K0 K.Corbett | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG |
AP | AP | CHANGE/10K0 K.Corb | CHANGE/3535 G.WONG | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG |
AP | AP | 10K0 K.Corbett | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG | 3535 G.WONG |
BEAM LINE 4-3 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
3185 S.DEBEER/AP | AP | AP | 3380 J.BARGAR | 3380 J.BARGAR | 3532 B.HEDMAN | 3532 B.HEDMAN |
AP | AP | SMB CHECKOUT/3380 | 3380 J.BARGAR | SMB CHECKOUT/3532 | 3532 B.HEDMAN | 3532 B.HEDMAN |
AP | AP | 3380 J.BARGAR | 3380 J.BARGAR | 3532 B.HEDMAN | 3532 B.HEDMAN | 3532 B.HEDMAN |
BEAM LINE 6-2 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
3696 Y.Shi/AP | AP | AP | 91P3 K.CATS | 91P3 K.CATS | 91P3 K.CATS | 91P3 K.CATS |
AP | AP | CHANGE/91P3 K.CATS | 91P3 K.CATS | 91P3 K.CATS | 91P3 K.CATS | CHANGE/8072 J.HAYT |
AP | AP | 91P3 K.CATS | 91P3 K.CATS | 91P3 K.CATS | 91P3 K.CATS | 8072 J.HAYTER |
BEAM LINE 7-2 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
3642 M.CHABINYC/AP | AP | AP | 3762 M.MASSEY | 3762 M.MASSEY | 3762 M.MASSEY | 3762 M.MASSEY |
AP | AP | Xray CHECKOUT/3762 | 3762 M.MASSEY | 3762 M.MASSEY | 3762 M.MASSEY | 3762 M.MASSEY |
AP | AP | 3762 M.MASSEY | 3762 M.MASSEY | 3762 M.MASSEY | 3762 M.MASSEY | 3762 M.MASSEY |
BEAM LINE 7-3 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
3339 K.HODGSON/AP | AP | AP | 3B49 S.RUBIN | 3723 J.Huang | 3723 J.Huang | 3723 J.Huang |
AP | AP | SMB CHECKOUT/3B49 | SMB CHECKOUT/3723 | 3723 J.Huang | 3723 J.Huang | 3723 J.Huang |
AP | AP | 3B49 S.RUBIN | 3723 J.Huang | 3723 J.Huang | 3723 J.Huang | 3723 J.Huang |
BEAM LINE 9-3 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
DOWN/AP | AP | AP | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
AP | AP | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
3520 M.TRIGO/AP | AP | AP | 3520 M.TRIGO | 3520 M.TRIGO | 3767 P.Evans | 3767 P.Evans |
AP | AP | 3520 M.TRIGO | 3520 M.TRIGO | Xray CHECKOUT/3767 | 3767 P.Evans | 3767 P.Evans |
AP | AP | 3520 M.TRIGO | 3520 M.TRIGO | 3767 P.Evans | 3767 P.Evans | 3767 P.Evans |
BEAM LINE 11-2 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
8104 P.PIANETTA/AP | AP | AP | FACI | FACI | FACI | FACI |
AP | AP | MES CHECKOUT/FACI | FACI | FACI | FACI | FACI |
AP | AP | FACI | FACI | FACI | FACI | FACI |
BEAM LINE 11-3 | ||||||
Jul. 23, 2012 | Jul. 24, 2012 | Jul. 25, 2012 | Jul. 26, 2012 | Jul. 27, 2012 | Jul. 28, 2012 | Jul. 29, 2012 |
3648 V.HO/AP | AP | AP | 3731 A.AYZNER | 3731 A.AYZNER | 3673 A.Briseno | 3673 A.Briseno |
AP | AP | Xray CHECKOUT/3731 | 3731 A.AYZNER | Xray CHECKOUT/3673 | 3673 A.Briseno | 3673 A.Briseno |
AP | AP | 3731 A.AYZNER | 3731 A.AYZNER | 3673 A.Briseno | 3673 A.Briseno | 3673 A.Briseno |
WEEK OF Jul. 30, 2012 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
BEAM LINE 1-4 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
8120 J.POPLE | 8120 J.POPLE | 8120 J.POPLE | 8120 J.POPLE | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL |
8120 J.POPLE | 8120 J.POPLE | 8120 J.POPLE | CHANGE/3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL |
8120 J.POPLE | 8120 J.POPLE | 8120 J.POPLE | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL | 3586 S.HALL |
BEAM LINE 2-1 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
8051 M.TONEY | 3774 R.Gandhiraman | 3774 R.Gandhiraman | 3563 N.WIDJONARKO | 3563 N.WIDJONARKO | 3563 N.WIDJONARKO | 1F85 G.GIRI |
Xray CHECKOUT/3774 | 3774 R.Gandhiraman | Xray CHECKOUT/3563 | 3563 N.WIDJONARKO | 3563 N.WIDJONARKO | CHANGE/1F85 G.GIRI | 1F85 G.GIRI |
3774 R.Gandhiraman | 3774 R.Gandhiraman | 3563 N.WIDJONARKO | 3563 N.WIDJONARKO | 3563 N.WIDJONARKO | 1F85 G.GIRI | 1F85 G.GIRI |
BEAM LINE 2-3 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
8067 S.WEBB | 3760 E.Hammer | 3760 E.Hammer | 3760 E.Hammer | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL |
CHANGE/3760 E.Hamm | 3760 E.Hammer | 3760 E.Hammer | CHANGE/3614 H.NICH | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL |
3760 E.Hammer | 3760 E.Hammer | 3760 E.Hammer | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL |
BEAM LINE 4-1 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
3612 F.MEIRER | 3612 F.MEIRER | 3523 T.BORCH | 8072 J.HAYTER | 3789 M.Verde | 3329 S.SCOTT | 3329 S.SCOTT |
3612 F.MEIRER | Xray CHECKOUT/3523 | Xray CHECKOUT/8072 | Xray CHECKOUT/3789 | Xray CHECKOUT/3329 | 3329 S.SCOTT | 3329 S.SCOTT |
3612 F.MEIRER | 3523 T.BORCH | 8072 J.HAYTER | 3789 M.Verde | 3329 S.SCOTT | 3329 S.SCOTT | 3329 S.SCOTT |
BEAM LINE 4-2 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
3535 G.WONG | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA |
CHANGE/3577 C.SAFI | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA |
3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA | 3577 C.SAFINYA |
BEAM LINE 4-3 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
3532 B.HEDMAN | 3532 B.HEDMAN | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL |
3532 B.HEDMAN | SMB CHECKOUT/3614 | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL |
3532 B.HEDMAN | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL | 3614 H.NICHOL |
BEAM LINE 6-2 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
8072 J.HAYTER | 8072 J.HAYTER | 3677 D.FRIEBEL | 3677 D.FRIEBEL | 3677 D.FRIEBEL | 3722 S.CHRISTENSEN | 3722 S.CHRISTENSEN |
8072 J.HAYTER | Xray>ES2/3677 | 3677 D.FRIEBEL | 3677 D.FRIEBEL | CHANGE/3722 S.CHRI | 3722 S.CHRISTENSEN | 3722 S.CHRISTENSEN |
8072 J.HAYTER | 3677 D.FRIEBEL | 3677 D.FRIEBEL | 3677 D.FRIEBEL | 3722 S.CHRISTENSEN | 3722 S.CHRISTENSEN | 3722 S.CHRISTENSEN |
BEAM LINE 7-2 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
3762 M.MASSEY | 3685 S.MANNSFELD | 3685 S.MANNSFELD | 3685 S.MANNSFELD | 3700 T.GAO | 3700 T.GAO | 3700 T.GAO |
Xray CHECKOUT/3685 | 3685 S.MANNSFELD | 3685 S.MANNSFELD | Xray CHECKOUT/3700 | 3700 T.GAO | 3700 T.GAO | 3700 T.GAO |
3685 S.MANNSFELD | 3685 S.MANNSFELD | 3685 S.MANNSFELD | 3700 T.GAO | 3700 T.GAO | 3700 T.GAO | 3700 T.GAO |
BEAM LINE 7-3 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
3723 J.Huang | 1F84 M.QAYYUM | 3266 G.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE | 3683 M.PUSHIE | 3683 M.PUSHIE |
SMB CHECKOUT/1F84 | SMB CHECKOUT/3266 | 3266 G.GEORGE | 3266 G.GEORGE | SMB CHECKOUT/3683 | 3683 M.PUSHIE | 3683 M.PUSHIE |
1F84 M.QAYYUM | 3266 G.GEORGE | 3266 G.GEORGE | 3266 G.GEORGE | 3683 M.PUSHIE | 3683 M.PUSHIE | 3683 M.PUSHIE |
BEAM LINE 9-3 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
3767 P.Evans | FACI | FACI | 3614 H.NICHOL | 3614 H.NICHOL | 3505 H.NICHOL | 3505 H.NICHOL |
Xray>Imaging/FACI | FACI | CHANGE/3614 H.NICH | 3614 H.NICHOL | CHANGE/3505 H.NICH | 3505 H.NICHOL | 3505 H.NICHOL |
FACI | FACI | 3614 H.NICHOL | 3614 H.NICHOL | 3505 H.NICHOL | 3505 H.NICHOL | 3505 H.NICHOL |
BEAM LINE 11-2 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
FACI | FACI | FACI | 3432 V.YACHANDRA | 3432 V.YACHANDRA | 8860 J.BARGAR | 8860 J.BARGAR |
FACI | FACI | MES CHECKOUT/3432 | 3432 V.YACHANDRA | MES CHECKOUT/8860 | 8860 J.BARGAR | 8860 J.BARGAR |
FACI | FACI | 3432 V.YACHANDRA | 3432 V.YACHANDRA | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR |
BEAM LINE 11-3 | ||||||
Jul. 30, 2012 | Jul. 31, 2012 | Aug. 01, 2012 | Aug. 02, 2012 | Aug. 03, 2012 | Aug. 04, 2012 | Aug. 05, 2012 |
3673 A.Briseno | 3563 N.WIDJONARKO | 3563 N.WIDJONARKO | 8015 A.MEHTA | 8015 A.MEHTA | 3734 C.TASSONE | 3734 C.TASSONE |
Xray CHECKOUT/3563 | 3563 N.WIDJONARKO | Xray CHECKOUT/8015 | 8015 A.MEHTA | CHANGE/8072 J.HAYT | 3734 C.TASSONE | 3734 C.TASSONE |
3563 N.WIDJONARKO | 3563 N.WIDJONARKO | 8015 A.MEHTA | 8015 A.MEHTA | CHANGE/3734 C.TASS | 3734 C.TASSONE | 3734 C.TASSONE |
WEEK OF Aug. 06, 2012 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
BEAM LINE 1-4 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
3586 S.HALL | 91O5 J.Strachan | 91O5 J.Strachan | 3779 M.MODESTINO | 3779 M.MODESTINO | 3607 N.BALSARA | 3607 N.BALSARA |
CHANGE/91O5 J.Stra | 91O5 J.Strachan | CHANGE/3779 M.MODE | 3779 M.MODESTINO | CHANGE/3607 N.BALS | 3607 N.BALSARA | 3607 N.BALSARA |
91O5 J.Strachan | 91O5 J.Strachan | 3779 M.MODESTINO | 3779 M.MODESTINO | 3607 N.BALSARA | 3607 N.BALSARA | 3607 N.BALSARA |
BEAM LINE 2-1 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
1F85 G.GIRI | Unscheduled | Unscheduled | 1F76 Y.Diao | 91Q6 J.Groves | 91Q6 J.Groves | 91Q6 J.Groves |
Unscheduled | Unscheduled | CHANGE/1F76 Y.Diao | Xray CHECKOUT/91Q6 | 91Q6 J.Groves | 91Q6 J.Groves | 91Q6 J.Groves |
Unscheduled | Unscheduled | 1F76 Y.Diao | 91Q6 J.Groves | 91Q6 J.Groves | 91Q6 J.Groves | 91Q6 J.Groves |
BEAM LINE 2-3 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
3614 H.NICHOL | 3530 L.YANG | 3530 L.YANG | 3530 L.YANG | 3530 L.YANG | 3505 H.NICHOL | 3505 H.NICHOL |
CHANGE/3530 L.YANG | 3530 L.YANG | 3530 L.YANG | 3530 L.YANG | CHANGE/3505 H.NICH | 3505 H.NICHOL | 3505 H.NICHOL |
3530 L.YANG | 3530 L.YANG | 3530 L.YANG | 3530 L.YANG | 3505 H.NICHOL | 3505 H.NICHOL | 3505 H.NICHOL |
BEAM LINE 4-1 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
3329 S.SCOTT | 3784 D.LEE | 3784 D.LEE | 3682 R.Bernier-Lat | 3682 R.Bernier-Lat | 3380 J.BARGAR | 3380 J.BARGAR |
Xray CHECKOUT/3784 | 3784 D.LEE | Xray CHECKOUT/3682 | 3682 R.Bernier-Lat | Xray CHECKOUT/3380 | 3380 J.BARGAR | 3380 J.BARGAR |
3784 D.LEE | 3784 D.LEE | 3682 R.Bernier-Lat | 3682 R.Bernier-Lat | 3380 J.BARGAR | 3380 J.BARGAR | 3380 J.BARGAR |
BEAM LINE 4-2 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
3577 C.SAFINYA | 3660 S.TOLBERT | 8047 T.WEISS | 8047 T.WEISS | 3575 L.CARTER | 10J5 Y.TAKAGI | 8077 T.MATSUI |
CHANGE/3660 S.TOLB | CHANGE/8047 T.WEIS | 8047 T.WEISS | CHANGE/3575 L.CART | CHANGE/10J5 Y.TAKA | CHANGE/8077 T.MATS | 8077 T.MATSUI |
3660 S.TOLBERT | 8047 T.WEISS | 8047 T.WEISS | 3575 L.CARTER | 10J5 Y.TAKAGI | 8077 T.MATSUI | 8077 T.MATSUI |
BEAM LINE 4-3 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
3614 H.NICHOL | 3203 E.WASINGER | 3203 E.WASINGER | 3473 Y.SHI | 3473 Y.SHI | 8116 B.HEDMAN | 8116 B.HEDMAN |
SMB CHECKOUT/3203 | 3203 E.WASINGER | SMB CHECKOUT/3473 | 3473 Y.SHI | SMB CHECKOUT/8116 | 8116 B.HEDMAN | 8116 B.HEDMAN |
3203 E.WASINGER | 3203 E.WASINGER | 3473 Y.SHI | 3473 Y.SHI | 8116 B.HEDMAN | 8116 B.HEDMAN | 8116 B.HEDMAN |
BEAM LINE 6-2 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
3722 S.CHRISTENSEN | 3670 S.KOZIMOR | 3670 S.KOZIMOR | 3670 S.KOZIMOR | 3670 S.KOZIMOR | 3670 S.KOZIMOR | 3329 S.SCOTT |
CHANGE/3670 S.KOZI | 3670 S.KOZIMOR | 3670 S.KOZIMOR | 3670 S.KOZIMOR | 3670 S.KOZIMOR | CHANGE/3329 S.SCOT | 3329 S.SCOTT |
3670 S.KOZIMOR | 3670 S.KOZIMOR | 3670 S.KOZIMOR | 3670 S.KOZIMOR | 3670 S.KOZIMOR | 3329 S.SCOTT | 3329 S.SCOTT |
BEAM LINE 7-2 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
3700 T.GAO | 8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee |
Xray CHECKOUT/8015 | 8015 A.MEHTA | 8015 A.MEHTA | Xray CHECKOUT/91P9 | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee |
8015 A.MEHTA | 8015 A.MEHTA | 8015 A.MEHTA | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee | 91P9 Y.Lee |
BEAM LINE 7-3 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
3683 M.PUSHIE | 3203 E.WASINGER | 3203 E.WASINGER | 3203 E.WASINGER | 8071 R.SARANGI | 8071 R.SARANGI | 8071 R.SARANGI |
SMB CHECKOUT/3203 | 3203 E.WASINGER | 3203 E.WASINGER | SMB CHECKOUT/8071 | 8071 R.SARANGI | 8071 R.SARANGI | 8071 R.SARANGI |
3203 E.WASINGER | 3203 E.WASINGER | 3203 E.WASINGER | 8071 R.SARANGI | 8071 R.SARANGI | 8071 R.SARANGI | 8071 R.SARANGI |
BEAM LINE 9-3 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
3505 H.NICHOL | 3754 B.POPESCU | 3754 B.POPESCU | 3754 B.POPESCU | 8867 S.WEBB | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH |
CHANGE/3754 B.POPE | 3754 B.POPESCU | 3754 B.POPESCU | CHANGE/8867 S.WEBB | CHANGE/3726 A.SEYF | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH |
3754 B.POPESCU | 3754 B.POPESCU | 3754 B.POPESCU | 8867 S.WEBB | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH | 3726 A.SEYFFERTH |
BEAM LINE 11-2 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR |
8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR |
8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR | 8860 J.BARGAR |
BEAM LINE 11-3 | ||||||
Aug. 06, 2012 | Aug. 07, 2012 | Aug. 08, 2012 | Aug. 09, 2012 | Aug. 10, 2012 | Aug. 11, 2012 | Aug. 12, 2012 |
3734 C.TASSONE | 3441 E.VERPLOEGEN | 3660 S.TOLBERT | 3660 S.TOLBERT | 3706 S.TOLBERT | 3519 S.MANNSFELD | 3519 S.MANNSFELD |
Xray CHECKOUT/3441 | Xray CHECKOUT/3660 | 3660 S.TOLBERT | Xray CHECKOUT/3706 | Xray CHECKOUT/3519 | 3519 S.MANNSFELD | 3519 S.MANNSFELD |
3441 E.VERPLOEGEN | 3660 S.TOLBERT | 3660 S.TOLBERT | 3706 S.TOLBERT | 3519 S.MANNSFELD | 3519 S.MANNSFELD | 3519 S.MANNSFELD |
WEEK OF Aug. 13, 2012 | ||||||
Run Ends 6am | AP/DOWN | |||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
BEAM LINE 1-4 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
3607 N.BALSAR/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-1 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
91Q6 J.Groves/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 2-3 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
3505 H.NICHOL/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-1 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
3380 J.BARGAR/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-2 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
8077 T.MATSUI/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 4-3 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
8116 B.HEDMAN/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 6-2 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
3329 S.SCOTT/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-2 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
91P9 Y.Lee/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 7-3 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
8071 R.SARANG/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 9-3 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 10-2 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
3726 A.SEYFFE/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-2 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
8860 J.BARGAR/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
BEAM LINE 11-3 | ||||||
Aug. 13, 2012 | Aug. 14, 2012 | Aug. 15, 2012 | Aug. 16, 2012 | Aug. 17, 2012 | Aug. 18, 2012 | Aug. 19, 2012 |
3519 S.MANNSF/DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |
DOWN | DOWN | DOWN | DOWN | DOWN | DOWN | DOWN |