SSRL Beam Port Schedule                

Weeks of the Schedule
 Mar. 15, 2004   Mar. 22, 2004   Mar. 29, 2004   Apr. 05, 2004 
 Apr. 12, 2004   Apr. 19, 2004   Apr. 26, 2004   May 03, 2004 
 May 10, 2004   May 17, 2004   May 24, 2004   May 31, 2004 
 Jun. 07, 2004   Jun. 14, 2004   Jun. 21, 2004   Jun. 28, 2004 
 Jul. 05, 2004   Jul. 12, 2004   Jul. 19, 2004   Jul. 26, 2004 

Back to Table of Contents

WEEK OF Mar. 15, 2004
      Down 1-5             BL6 Opens       BL10 Opens                  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
BEAM   LINE 1-4  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-1  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-1  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI/DOWN          FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 5-2  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI/DOWN          FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 6-2  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS   
DOWN               DOWN               DOWN               CHANGE/8801 W.TOMP 8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS   
DOWN               DOWN               DOWN               8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS   
BEAM   LINE 7-2  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-1  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-2  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-1  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
Unscheduled        CHANGE/8837 A.COHE 8837 A.COHEN       8837 A.COHEN       8837 A.COHEN       8837 A.COHEN       8837 A.COHEN      
Unscheduled        8837 A.COHEN/DOWN  8837 A.COHEN       8837 A.COHEN       8837 A.COHEN       8837 A.COHEN       8837 A.COHEN      
Unscheduled        8837 A.COHEN       8837 A.COHEN       8837 A.COHEN       8837 A.COHEN       8837 A.COHEN       8837 A.COHEN      
BEAM   LINE 9-2  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
FACI               FACI               FACI               FACI               CHANGE/8824 P.ELLI 8824 P.ELLIS       8824 P.ELLIS      
FACI               FACI/DOWN          FACI               FACI               8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS      
FACI               FACI               FACI               FACI               8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS      
BEAM   LINE 9-3  
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
8831 M.LATIMER     8065 S.DEBEER-GEOR 8065 S.DEBEER-GEOR 8065 S.DEBEER-GEOR 8116 B.HEDMAN      8116 B.HEDMAN      8116 B.HEDMAN     
Xray CHECKOUT/8065 8065 S.DEBEER/DOWN 8065 S.DEBEER-GEOR CHANGE/8116 B.HEDM 8116 B.HEDMAN      8116 B.HEDMAN      8116 B.HEDMAN     
8065 S.DEBEER-GEOR 8065 S.DEBEER-GEOR 8065 S.DEBEER-GEOR 8116 B.HEDMAN      8116 B.HEDMAN      8116 B.HEDMAN      8116 B.HEDMAN     
BEAM   LINE 10-1 
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               8821 D.BREHMER     8821 D.BREHMER    
DOWN               DOWN               DOWN               DOWN               CHANGE/8821 D.BREH 8821 D.BREHMER     8821 D.BREHMER    
DOWN               DOWN               DOWN               DOWN               8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
BEAM   LINE 10-2 
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               8801 W.TOMPKINS    8801 W.TOMPKINS   
DOWN               DOWN               DOWN               DOWN               CHANGE/8801 W.TOMP 8801 W.TOMPKINS    8801 W.TOMPKINS   
DOWN               DOWN               DOWN               DOWN               8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS   
BEAM   LINE 11-1 
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Mar. 15, 2004      Mar. 16, 2004      Mar. 17, 2004      Mar. 18, 2004      Mar. 19, 2004      Mar. 20, 2004      Mar. 21, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Mar. 22, 2004
MA       MA/AP       AP             BL5 Opens                  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
BEAM   LINE 1-4  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA/AP              AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-1  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-1  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
FACI/MA            MA                 AP                 AP                 FACI               FACI               FACI              
MA                 AP                 AP                 FACI               FACI/DOWN          FACI               FACI              
MA                 AP                 AP                 FACI               FACI               FACI               FACI              
BEAM   LINE 5-2  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
FACI/MA            MA                 AP                 AP                 8820 D.LU          8820 D.LU          8820 D.LU         
MA                 AP                 AP                 8820 D.LU          8820 D.LU/DOWN     8820 D.LU          8820 D.LU         
MA                 AP                 AP                 8820 D.LU          8820 D.LU          8820 D.LU          8820 D.LU         
BEAM   LINE 6-2  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
8801 W.TOMPKINS/MA MA                 AP                 AP                 8801 W.TOMPKINS    8841 K.LUNING      8841 K.LUNING     
MA                 AP                 AP                 8801 W.TOMPKINS    F>B microfocu/DOWN 8841 K.LUNING      8841 K.LUNING     
MA                 AP                 AP                 8801 W.TOMPKINS    8841 K.LUNING      8841 K.LUNING      8841 K.LUNING     
BEAM   LINE 7-2  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-1  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-2  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-1  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
8837 A.COHEN/MA    MA/AP              AP                 AP                 8837 A.COHEN       8837 A.COHEN       8837 A.COHEN      
MA                 AP                 AP                 8837 A.COHEN       8837 A.COHEN/DOWN  8837 A.COHEN       8837 A.COHEN      
MA                 AP                 AP                 8837 A.COHEN       8837 A.COHEN       8837 A.COHEN       8837 A.COHEN      
BEAM   LINE 9-2  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
8824 P.ELLIS/MA    MA/AP              AP                 AP                 8824 P.ELLIS       9B01 A.DEACON      9B01 A.DEACON     
MA                 AP                 AP                 8824 P.ELLIS       DOWN               9B01 A.DEACON      9B01 A.DEACON     
MA                 AP                 AP                 8824 P.ELLIS       CHANGE/9B01 A.DEAC 9B01 A.DEACON      CHANGE/7A29 W.WEIS
BEAM   LINE 9-3  
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
8116 B.HEDMAN/MA   MA                 AP                 AP                 2619 N.BLACKBURN   2619 N.BLACKBURN   2619 N.BLACKBURN  
MA                 AP                 AP                 SMB CHECKOUT/2619  2619 N.BLACKB/DOWN 2619 N.BLACKBURN   2619 N.BLACKBURN  
MA                 AP                 AP                 2619 N.BLACKBURN   2619 N.BLACKBURN   2619 N.BLACKBURN   2619 N.BLACKBURN  
BEAM   LINE 10-1 
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
8821 D.BREHMER/MA  MA                 AP                 AP                 8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
MA                 AP                 AP                 8821 D.BREHMER     8821 D.BREHME/DOWN 8821 D.BREHMER     8821 D.BREHMER    
MA                 AP                 AP                 8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
BEAM   LINE 10-2 
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
8801 W.TOMPKINS/MA MA                 AP                 AP                 8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS   
MA                 AP                 AP                 8801 W.TOMPKINS    8801 W.TOMPKI/DOWN 8801 W.TOMPKINS    8801 W.TOMPKINS   
MA                 AP                 AP                 8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS   
BEAM   LINE 11-1 
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA/AP              AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-2 
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Mar. 22, 2004      Mar. 23, 2004      Mar. 24, 2004      Mar. 25, 2004      Mar. 26, 2004      Mar. 27, 2004      Mar. 28, 2004     
DOWN/MA            MA/AP              AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Mar. 29, 2004
                                         
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
BEAM   LINE 1-4  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-1  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-1  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI/DOWN          FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 5-2  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
8820 D.LU          8820 D.LU          8820 D.LU          8820 D.LU          8820 D.LU          8820 D.LU          8820 D.LU         
8820 D.LU          8820 D.LU          8820 D.LU          8820 D.LU/DOWN     8820 D.LU          8820 D.LU          8820 D.LU         
8820 D.LU          8820 D.LU          8820 D.LU          8820 D.LU          8820 D.LU          8820 D.LU          8820 D.LU         
BEAM   LINE 6-2  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
8841 K.LUNING      2723 G.LONG        2723 G.LONG        2723 G.LONG        2821 J.DAVIS       2821 J.DAVIS       2821 J.DAVIS      
B>F/2723           2723 G.LONG        2723 G.LONG        Xray CHECKOUT/DOWN 2821 J.DAVIS       2821 J.DAVIS       2821 J.DAVIS      
2723 G.LONG        2723 G.LONG        2723 G.LONG        2821 J.DAVIS       2821 J.DAVIS       2821 J.DAVIS       2821 J.DAVIS      
BEAM   LINE 7-2  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-1  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-2  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-1  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
8837 A.COHEN       FACI               7A54 D.BUSHNELL    DOWN               7A70 M.BRACEY      7A69 S.RICHARD     7A69 S.RICHARD    
FACI               MC CHECKOUT/7A54   Unscheduled        DOWN               MC CHECKOUT/7A69   7A69 S.RICHARD     7A69 S.RICHARD    
FACI               7A54 D.BUSHNELL    Unscheduled        7A70 M.BRACEY      7A69 S.RICHARD     7A69 S.RICHARD     7A69 S.RICHARD    
BEAM   LINE 9-2  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
7A29 W.WEIS        7A46 C.GARCIA      9A85 D.BUSSIERE    7A46 C.GARCIA/DOWN 9A75 T.STOUT       7A63 C.STOUT       7A63 C.STOUT      
MC CHECKOUT/7A46   MC CHECKOUT/9A85   MC CHECKOUT/7A46   DOWN               MC CHECKOUT/7A63   7A63 C.STOUT       CHANGE/9B01 A.DEAC
7A46 C.GARCIA      9A85 D.BUSSIERE    7A46 C.GARCIA      9A75 T.STOUT       7A63 C.STOUT       7A63 C.STOUT       9B01 A.DEACON     
BEAM   LINE 9-3  
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
2619 N.BLACKBURN   8065 S.DEBEER-GEOR 8116 B.HEDMAN      8116 B.HEDMAN      2593 R.SCOTT       2593 R.SCOTT       2593 R.SCOTT      
Xray CHECKOUT/8065 8065 S.DEBEER-GEOR 8116 B.HEDMAN      SMB CHECKOUT//DOWN 2593 R.SCOTT       2593 R.SCOTT       2593 R.SCOTT      
8065 S.DEBEER-GEOR CHANGE/8116 B.HEDM 8116 B.HEDMAN      2593 R.SCOTT       2593 R.SCOTT       2593 R.SCOTT       2593 R.SCOTT      
BEAM   LINE 10-1 
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHME/DOWN 8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
BEAM   LINE 10-2 
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
8801 W.TOMPKINS    90T1 T.NORMAN      90T1 T.NORMAN      2683 F.BRIDGES     2683 F.BRIDGES     2683 F.BRIDGES     2683 F.BRIDGES    
Xray CHECKOUT/90T1 90T1 T.NORMAN      HarRejMir/2683     2683 F.BRIDGE/DOWN 2683 F.BRIDGES     2683 F.BRIDGES     2683 F.BRIDGES    
90T1 T.NORMAN      90T1 T.NORMAN      2683 F.BRIDGES     2683 F.BRIDGES     2683 F.BRIDGES     2683 F.BRIDGES     2683 F.BRIDGES    
BEAM   LINE 11-1 
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               FACI               FACI               FACI/DOWN          FACI               FACI               FACI              
FACI               FACI               FACI               DOWN               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 11-2 
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 11-3 
Mar. 29, 2004      Mar. 30, 2004      Mar. 31, 2004      Apr. 01, 2004      Apr. 02, 2004      Apr. 03, 2004      Apr. 04, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              

Back to Table of Contents

WEEK OF Apr. 05, 2004
AP/BL11 Opens      AP                                    
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
BEAM   LINE 1-4  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-1  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-1  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
FACI/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 5-2  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
8820 D.LU/AP       AP                 AP                 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
AP                 AP                 CHANGE/9702 Z.SHEN 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
AP                 AP                 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
BEAM   LINE 6-2  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
2821 J.DAVIS/AP    AP                 AP                 2821 J.DAVIS       2742 B.MODEN       2742 B.MODEN       2742 B.MODEN      
AP                 AP                 2821 J.DAVIS       Xray CHECKOUT/2742 2742 B.MODEN       2742 B.MODEN       2742 B.MODEN      
AP                 AP                 2821 J.DAVIS       2742 B.MODEN       2742 B.MODEN       2742 B.MODEN       2742 B.MODEN      
BEAM   LINE 7-2  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-1  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-2  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-1  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
7A69 S.RICHARD/AP  AP                 AP                 7A73 L.BRINEN      9B01 A.DEACON      6A03 R.LIDDINGTON  6A03 R.LIDDINGTON 
AP                 AP                 MC CHECKOUT/7A73   CHANGE/9B01 A.DEAC MC CHECKOUT/6A03   6A03 R.LIDDINGTON  6A03 R.LIDDINGTON 
AP                 AP                 7A73 L.BRINEN      9B01 A.DEACON      6A03 R.LIDDINGTON  6A03 R.LIDDINGTON  6A03 R.LIDDINGTON 
BEAM   LINE 9-2  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
9B01 A.DEACON/AP   AP                 AP                 7A20 I.WILSON      9A40 A.VILLASENOR  7A38 A.ROSENZWEIG  7A38 A.ROSENZWEIG 
AP                 AP                 MC CHECKOUT/7A20   MC CHECKOUT/9A40   MC CHECKOUT/7A38   7A38 A.ROSENZWEIG  7A38 A.ROSENZWEIG 
AP                 AP                 7A20 I.WILSON      9A40 A.VILLASENOR  7A38 A.ROSENZWEIG  7A38 A.ROSENZWEIG  7A38 A.ROSENZWEIG 
BEAM   LINE 9-3  
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
2593 R.SCOTT/AP    AP                 AP                 90T6 R.SCOTT       90T3 R.SCOTT       2593 R.SCOTT       2593 R.SCOTT      
AP                 AP                 CHANGE/90T6 R.SCOT CHANGE/90T3 R.SCOT 90T3 R.SCOTT       2593 R.SCOTT       2593 R.SCOTT      
AP                 AP                 90T6 R.SCOTT       90T3 R.SCOTT       CHANGE/2593 R.SCOT 2593 R.SCOTT       2593 R.SCOTT      
BEAM   LINE 10-1 
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
8821 D.BREHMER/AP  AP                 AP                 8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON    
AP                 AP                 VUV CHECKOUT       8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON    
AP                 AP                 8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON    
BEAM   LINE 10-2 
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
2683 F.BRIDGES/AP  AP                 AP                 8808 S.BRENNAN     8808 S.BRENNAN     8001 S.BRENNAN     8001 S.BRENNAN    
AP                 AP                 Xray CHECKOUT/8808 8808 S.BRENNAN     CHANGE/8001 S.BREN 8001 S.BRENNAN     8001 S.BRENNAN    
AP                 AP                 8808 S.BRENNAN     8808 S.BRENNAN     8001 S.BRENNAN     8001 S.BRENNAN     8001 S.BRENNAN    
BEAM   LINE 11-1 
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
FACI/AP            AP                 AP                 8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ   
AP                 AP                 8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ   
AP                 AP                 8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ   
BEAM   LINE 11-2 
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
DOWN/AP            AP                 AP                 8833 J.ROGERS      8833 J.ROGERS      8833 J.ROGERS      8060 J.BARGAR     
AP                 AP                 CHANGE/8833 J.ROGE 8833 J.ROGERS      CHANGE/8833 J.ROGE CHANGE/8060 J.BARG 8060 J.BARGAR     
AP                 AP                 8833 J.ROGERS      8833 J.ROGERS      8833 J.ROGERS      8060 J.BARGAR      8060 J.BARGAR     
BEAM   LINE 11-3 
Apr. 05, 2004      Apr. 06, 2004      Apr. 07, 2004      Apr. 08, 2004      Apr. 09, 2004      Apr. 10, 2004      Apr. 11, 2004     
CHANGE/8801 W.T/AP AP                 AP                 8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS    Unscheduled       
AP                 AP                 8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS    Unscheduled        Unscheduled       
AP                 AP                 8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS    Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Apr. 12, 2004
                                         
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
BEAM   LINE 1-4  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-1  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-1  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 5-2  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        2640 D.DESSAU      2640 D.DESSAU     
9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        CHANGE/2640 D.DESS 2640 D.DESSAU      2640 D.DESSAU     
9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        2640 D.DESSAU      2640 D.DESSAU      2640 D.DESSAU     
BEAM   LINE 6-2  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
2742 B.MODEN       2802 S.DEBEER-GEOR 2802 S.DEBEER-GEOR 2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON    
Xray-M1 in/2802    2802 S.DEBEER-GEOR CHANGE/2623 K.HODG 2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON    
2802 S.DEBEER-GEOR 2802 S.DEBEER-GEOR 2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON    
BEAM   LINE 7-2  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-1  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-2  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-1  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
6A03 R.LIDDINGTON  9A75 T.STOUT       9A65 K.ZHANG       7A77 G.FEHER       7A77 G.FEHER       1B02 D.BARONDEAU   1B02 D.BARONDEAU  
MC CHECKOUT/9A75   MC CHECKOUT/9A65   MC CHECKOUT/7A77   7A77 G.FEHER       MC CHECKOUT/1B02   1B02 D.BARONDEAU   1B02 D.BARONDEAU  
9A75 T.STOUT       9A65 K.ZHANG       7A77 G.FEHER       7A77 G.FEHER       1B02 D.BARONDEAU   1B02 D.BARONDEAU   1B02 D.BARONDEAU  
BEAM   LINE 9-2  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
7A38 A.ROSENZWEIG  7A45 A.FISHER      1R18 C.STOUT       1R18 C.STOUT       9B01 A.DEACON      6A98 C.RAMAN       6A98 C.RAMAN      
MC CHECKOUT/7A45   MC CHECKOUT/1R18   1R18 C.STOUT       MC CHECKOUT/7A30   MC CHECKOUT/6A98   6A98 C.RAMAN       6A98 C.RAMAN      
7A45 A.FISHER      1R18 C.STOUT       1R18 C.STOUT       CHANGE/9B01 A.DEAC 6A98 C.RAMAN       6A98 C.RAMAN       6A98 C.RAMAN      
BEAM   LINE 9-3  
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
2593 R.SCOTT       2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA  
CHANGE/2825 V.YACH 2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA  
2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA  
BEAM   LINE 10-1 
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON    
8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON    
8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON    
BEAM   LINE 10-2 
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
8001 S.BRENNAN     8001 S.BRENNAN     8001 S.BRENNAN     2721 T.HUFNAGEL    2721 T.HUFNAGEL    2721 T.HUFNAGEL    2721 T.HUFNAGEL   
8001 S.BRENNAN     8001 S.BRENNAN     CHANGE/2721 T.HUFN 2721 T.HUFNAGEL    2721 T.HUFNAGEL    2721 T.HUFNAGEL    2721 T.HUFNAGEL   
8001 S.BRENNAN     8001 S.BRENNAN     2721 T.HUFNAGEL    2721 T.HUFNAGEL    2721 T.HUFNAGEL    2721 T.HUFNAGEL    2721 T.HUFNAGEL   
BEAM   LINE 11-1 
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    9A05 E.GETZOFF    
8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    MC CHECKOUT/9A05   9A05 E.GETZOFF    
8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    8845 A.GONZALEZ    9A05 E.GETZOFF     9A05 E.GETZOFF    
BEAM   LINE 11-2 
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
8060 J.BARGAR      2656 G.BROWN       2656 G.BROWN       2656 G.BROWN       2708 G.WAYCHUNAS   2708 G.WAYCHUNAS   2709 G.WAYCHUNAS  
MES CHECKOUT/2656  2656 G.BROWN       2656 G.BROWN       GIXAS/2708         2708 G.WAYCHUNAS   CHANGE/2709 G.WAYC 2709 G.WAYCHUNAS  
2656 G.BROWN       2656 G.BROWN       2656 G.BROWN       2708 G.WAYCHUNAS   2708 G.WAYCHUNAS   2709 G.WAYCHUNAS   2709 G.WAYCHUNAS  
BEAM   LINE 11-3 
Apr. 12, 2004      Apr. 13, 2004      Apr. 14, 2004      Apr. 15, 2004      Apr. 16, 2004      Apr. 17, 2004      Apr. 18, 2004     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       

Back to Table of Contents

WEEK OF Apr. 19, 2004
MA       MA/AP       AP/BL7 Opens                              
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
BEAM   LINE 1-4  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-1  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-1  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
FACI/MA            MA                 MA                 MA                 8812 M.ROWEN       FACI               FACI              
MA                 MA                 MA                 8812 M.ROWEN       FACI               FACI               FACI              
MA                 MA                 MA                 8812 M.ROWEN       FACI               FACI               FACI              
BEAM   LINE 5-2  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
2640 D.DESSAU/MA   MA                 MA                 MA                 Unscheduled        9702 Z.SHEN        9702 Z.SHEN       
MA                 MA                 MA                 Unscheduled        CHANGE/9702 Z.SHEN 9702 Z.SHEN        9702 Z.SHEN       
MA                 MA                 MA                 Unscheduled        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
BEAM   LINE 6-2  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
2623 K.HODGSON/MA  MA                 MA                 MA                 2731 M.SANDSTROM   2731 M.SANDSTROM   2731 M.SANDSTROM  
MA                 MA                 MA                 Xray CHECKOUT/2731 2731 M.SANDSTROM   2731 M.SANDSTROM   2731 M.SANDSTROM  
MA                 MA                 MA                 2731 M.SANDSTROM   2731 M.SANDSTROM   2731 M.SANDSTROM   2731 M.SANDSTROM  
BEAM   LINE 7-2  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS   
MA                 MA                 MA                 Xray CHECKOUT/8801 8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS   
MA                 MA                 MA                 8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS   
BEAM   LINE 8-1  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-2  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-1  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
1B02 D.BARONDEA/MA MA                 MA                 MA                 8054 M.SOLTIS      7A35 J.LANYI       7A35 J.LANYI      
MA                 MA                 MA                 Unscheduled        MC CHECKOUT/7A35   7A35 J.LANYI       CHANGE/8044 I.MATH
MA                 MA                 MA                 CHANGE/8054 M.SOLT 7A35 J.LANYI       7A35 J.LANYI       8044 I.MATHEWS    
BEAM   LINE 9-2  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
6A98 C.RAMAN/MA    MA                 MA                 MA                 9A85 D.BUSSIERE    7A78 S.TSAI        7A78 S.TSAI       
MA                 MA                 MA                 MC CHECKOUT/9A85   MC CHECKOUT/8121   7A78 S.TSAI        7A78 S.TSAI       
MA                 MA                 MA                 9A85 D.BUSSIERE    MC CHECKOUT/7A78   7A78 S.TSAI        7A78 S.TSAI       
BEAM   LINE 9-3  
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
2825 V.YACHANDR/MA MA                 MA                 MA                 2739 N.BLACKBURN   2739 N.BLACKBURN   2739 N.BLACKBURN  
MA                 MA                 MA                 SMB CHECKOUT/2739  2739 N.BLACKBURN   2739 N.BLACKBURN   2739 N.BLACKBURN  
MA                 MA                 MA                 2739 N.BLACKBURN   2739 N.BLACKBURN   2739 N.BLACKBURN   2739 N.BLACKBURN  
BEAM   LINE 10-1 
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
8110 K.HODGSON/MA  MA                 MA                 MA                 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
MA                 MA                 MA                 VUV CHECKOUT       2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
MA                 MA                 MA                 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
BEAM   LINE 10-2 
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
2721 T.HUFNAGEL/MA MA                 MA                 MA                 8852 U.BERGMANN    8852 U.BERGMANN    8852 U.BERGMANN   
MA                 MA                 MA                 Xray-B>F/8852      8852 U.BERGMANN    8852 U.BERGMANN    CHANGE/8052 U.BERG
MA                 MA                 MA                 8852 U.BERGMANN    8852 U.BERGMANN    8852 U.BERGMANN    8052 U.BERGMANN   
BEAM   LINE 11-1 
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
9A05 E.GETZOFF/MA  MA                 MA                 MA                 7A74 M.ROMANOWSKI  9A02 G.CHANG       9A02 G.CHANG      
MA                 MA                 MA                 MC CHECKOUT/7A74   MC CHECKOUT/9A02   9A02 G.CHANG       CHANGE/9B01 A.DEAC
MA                 MA                 MA                 7A74 M.ROMANOWSKI  9A02 G.CHANG       9A02 G.CHANG       9B01 A.DEACON     
BEAM   LINE 11-2 
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
2709 G.WAYCHUNA/MA MA                 MA                 MA                 2783 G.BROWN       2783 G.BROWN       2783 G.BROWN      
MA                 MA                 MA                 CHANGE/8863 A.ARAN 2783 G.BROWN       2783 G.BROWN       2783 G.BROWN      
MA                 MA                 MA                 CHANGE/2783 G.BROW 2783 G.BROWN       2783 G.BROWN       2783 G.BROWN      
BEAM   LINE 11-3 
Apr. 19, 2004      Apr. 20, 2004      Apr. 21, 2004      Apr. 22, 2004      Apr. 23, 2004      Apr. 24, 2004      Apr. 25, 2004     
MA                 MA                 MA                 MA                 8051 M.TONEY       CHANGE/8015 A.MEHT 8015 A.MEHTA      
MA                 MA                 MA                 8051 M.TONEY       Unscheduled        8015 A.MEHTA       8015 A.MEHTA      
MA                 MA                 MA                 8051 M.TONEY       Unscheduled        8015 A.MEHTA       8015 A.MEHTA      

Back to Table of Contents

WEEK OF Apr. 26, 2004
            Down             BL2-3 Opens                  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
BEAM   LINE 1-4  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-2  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
DOWN               DOWN               DOWN               DOWN               CHANGE/8801 W.TOMP 2788 S.FENDORF     2788 S.FENDORF    
DOWN               DOWN               DOWN               DOWN               8801 W.TOMPKINS    2788 S.FENDORF     2788 S.FENDORF    
DOWN               DOWN               DOWN               DOWN               MES/2788           2788 S.FENDORF     2788 S.FENDORF    
BEAM   LINE 3-1  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-1  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
FACI               FACI               DOWN               FACI               FACI               FACI               FACI              
FACI               FACI/DOWN          DOWN               FACI               FACI               FACI               FACI              
FACI               DOWN               FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 5-2  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
9702 Z.SHEN        2743 A.FUJIMORI    DOWN               2743 A.FUJIMORI    2743 A.FUJIMORI    2743 A.FUJIMORI    2743 A.FUJIMORI   
CHANGE/2743 A.FUJI 2743 A.FUJIMO/DOWN DOWN               2743 A.FUJIMORI    2743 A.FUJIMORI    2743 A.FUJIMORI    2743 A.FUJIMORI   
2743 A.FUJIMORI    DOWN               2743 A.FUJIMORI    2743 A.FUJIMORI    2743 A.FUJIMORI    2743 A.FUJIMORI    2743 A.FUJIMORI   
BEAM   LINE 6-2  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
2731 M.SANDSTROM   2802 S.DEBEER-GEOR DOWN               2819 G.GEORGE      2819 G.GEORGE      2819 G.GEORGE      2819 G.GEORGE     
Xray CHECKOUT/2802 2802 S.DEBEER/DOWN DOWN               2819 G.GEORGE      2819 G.GEORGE      2819 G.GEORGE      2819 G.GEORGE     
2802 S.DEBEER-GEOR DOWN               2819 G.GEORGE      2819 G.GEORGE      2819 G.GEORGE      2819 G.GEORGE      2819 G.GEORGE     
BEAM   LINE 7-2  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
8801 W.TOMPKINS    8801 W.TOMPKINS    DOWN               8801 W.TOMPKINS    2831 S.BRENNAN     2831 S.BRENNAN     2831 S.BRENNAN    
8801 W.TOMPKINS    8801 W.TOMPKI/DOWN DOWN               8801 W.TOMPKINS    2831 S.BRENNAN     2831 S.BRENNAN     2831 S.BRENNAN    
8801 W.TOMPKINS    DOWN               8801 W.TOMPKINS    Xray CHECKOUT/2831 2831 S.BRENNAN     2831 S.BRENNAN     2831 S.BRENNAN    
BEAM   LINE 8-1  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-2  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-1  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
8044 I.MATHEWS     1B16 H.NOLLER      DOWN               7A75 P.BJORKMAN    9A75 T.STOUT       9A67 W.HOL         9A67 W.HOL        
MC CHECKOUT/1B16   MC CHECKOUT/7/DOWN DOWN               MC CHECKOUT/9A75   MC CHECKOUT/9A67   9A67 W.HOL         9A67 W.HOL        
1B16 H.NOLLER      DOWN               7A75 P.BJORKMAN    9A75 T.STOUT       9A67 W.HOL         9A67 W.HOL         9A67 W.HOL        
BEAM   LINE 9-2  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
7A78 S.TSAI        7A95 P.GHOSH       DOWN               9A90 D.REES        9A90 D.REES        7A81 G.CINGOLANI   7A81 G.CINGOLANI  
MC CHECKOUT/7A95   MC CHECKOUT/9/DOWN DOWN               9A90 D.REES        MC CHECKOUT/7A81   7A81 G.CINGOLANI   7A81 G.CINGOLANI  
7A95 P.GHOSH       DOWN               9A90 D.REES        9A90 D.REES        7A81 G.CINGOLANI   7A81 G.CINGOLANI   CHANGE/9B01 A.DEAC
BEAM   LINE 9-3  
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
2739 N.BLACKBURN   2622 K.HODGSON     DOWN               2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON    
SMB CHECKOUT/2622  2622 K.HODGSO/DOWN DOWN               2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON    
2622 K.HODGSON     DOWN               2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON    
BEAM   LINE 10-1 
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
2784 T.KENDELEWICZ 2784 T.KENDELEWICZ DOWN               2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
2784 T.KENDELEWICZ 2784 T.KENDEL/DOWN DOWN               2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
2784 T.KENDELEWICZ DOWN               2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
BEAM   LINE 10-2 
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
8052 U.BERGMANN    8052 U.BERGMANN    DOWN               FACI               2590 S.CONRADSON   2590 S.CONRADSON   2684 D.CLARK      
8052 U.BERGMANN    8052 U.BERGMA/DOWN DOWN               Frt>Bk/2590        2590 S.CONRADSON   CHANGE/2684 D.CLAR 2684 D.CLARK      
8052 U.BERGMANN    DOWN               FACI               2590 S.CONRADSON   2590 S.CONRADSON   2684 D.CLARK       2684 D.CLARK      
BEAM   LINE 11-1 
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
9B01 A.DEACON      9A67 W.HOL         DOWN               9A53 R.KORNBERG    9A52 A.BRUNGER     9A55 C.GARCIA      9A65 K.ZHANG      
MC CHECKOUT/9A67   9A67 W.HOL/DOWN    DOWN               MC CHECKOUT/9A52   MC CHECKOUT/9A55   9A55 C.GARCIA      CHANGE/9A50 W.WEIS
9A67 W.HOL         DOWN               9A53 R.KORNBERG    9A52 A.BRUNGER     9A55 C.GARCIA      CHANGE/9A65 K.ZHAN 9A50 W.WEIS       
BEAM   LINE 11-2 
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
2783 G.BROWN       8833 J.ROGERS      DOWN               2821 J.DAVIS       8833 J.ROGERS      2590 S.CONRADSON   2590 S.CONRADSON  
CHANGE/8833 J.ROGE MES CHECKOUT//DOWN DOWN               CHANGE/8833 J.ROGE MES CHECKOUT/2590  2590 S.CONRADSON   2590 S.CONRADSON  
8833 J.ROGERS      DOWN               2821 J.DAVIS       8833 J.ROGERS      2590 S.CONRADSON   2590 S.CONRADSON   2590 S.CONRADSON  
BEAM   LINE 11-3 
Apr. 26, 2004      Apr. 27, 2004      Apr. 28, 2004      Apr. 29, 2004      Apr. 30, 2004      May 01, 2004       May 02, 2004      
8015 A.MEHTA       8015 A.MEHTA       DOWN               CHANGE/8051 M.TONE 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
8015 A.MEHTA       8015 A.MEHTA/DOWN  DOWN               8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
8015 A.MEHTA       DOWN               8015 A.MEHTA       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      

Back to Table of Contents

WEEK OF May 03, 2004 
AP       AP                   BL2-1 Opens                  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
BEAM   LINE 1-4  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
DOWN/AP            AP                 AP                 DOWN               DOWN               8859 B.JOHNSON     8859 B.JOHNSON    
AP                 AP                 DOWN               DOWN               CHANGE/8859 B.JOHN 8859 B.JOHNSON     8859 B.JOHNSON    
AP                 AP                 DOWN               DOWN               8859 B.JOHNSON     8859 B.JOHNSON     8859 B.JOHNSON    
BEAM   LINE 2-2  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
2788 S.FENDORF/AP  AP                 AP                 2788 S.FENDORF     2750 G.BROWN       2750 G.BROWN       2750 G.BROWN      
AP                 AP                 2788 S.FENDORF     S2>S1#2/2750       2750 G.BROWN       2750 G.BROWN       2750 G.BROWN      
AP                 AP                 2788 S.FENDORF     2750 G.BROWN       2750 G.BROWN       2750 G.BROWN       2750 G.BROWN      
BEAM   LINE 3-1  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-1  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
FACI/AP            AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
BEAM   LINE 5-2  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
2743 A.FUJIMORI/AP AP                 AP                 2743 A.FUJIMORI    2743 A.FUJIMORI    2743 A.FUJIMORI    9702 Z.SHEN       
AP                 AP                 2743 A.FUJIMORI    2743 A.FUJIMORI    2743 A.FUJIMORI    CHANGE/9702 Z.SHEN 9702 Z.SHEN       
AP                 AP                 2743 A.FUJIMORI    2743 A.FUJIMORI    2743 A.FUJIMORI    9702 Z.SHEN        9702 Z.SHEN       
BEAM   LINE 6-2  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
2819 G.GEORGE/AP   AP                 AP                 2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
AP                 AP                 Xray CHECKOUT/2645 2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
AP                 AP                 2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
BEAM   LINE 7-2  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
2831 S.BRENNAN/AP  AP                 AP                 2831 S.BRENNAN     90U2 G.HUSSEN      90U2 G.HUSSEN      90U2 G.HUSSEN     
AP                 AP                 2831 S.BRENNAN     Xray CHECKOUT/90U2 90U2 G.HUSSEN      90U2 G.HUSSEN      90U2 G.HUSSEN     
AP                 AP                 2831 S.BRENNAN     90U2 G.HUSSEN      90U2 G.HUSSEN      90U2 G.HUSSEN      90U2 G.HUSSEN     
BEAM   LINE 8-1  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-2  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-1  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
9A67 W.HOL/AP      AP                 AP                 7A03 W.MONTFORT    CHANGE/9B01 A.DEAC 6A96 D.WILSON      6A96 D.WILSON     
AP                 AP                 MC CHECKOUT/7A03   7A03 W.MONTFORT    MC CHECKOUT/6A96   6A96 D.WILSON      6A96 D.WILSON     
AP                 AP                 7A03 W.MONTFORT    7A03 W.MONTFORT    6A96 D.WILSON      6A96 D.WILSON      6A96 D.WILSON     
BEAM   LINE 9-2  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
9B01 A.DEACON/AP   AP                 AP                 9L01 A.KE          9L02 J.CATE        6A76 J.PETERS      6A76 J.PETERS     
AP                 AP                 MC CHECKOUT/9L01   MC CHECKOUT/9L02   MC CHECKOUT/6A76   6A76 J.PETERS      6A76 J.PETERS     
AP                 AP                 9L01 A.KE          9L02 J.CATE        6A76 J.PETERS      6A76 J.PETERS      6A76 J.PETERS     
BEAM   LINE 9-3  
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
2622 K.HODGSON/AP  AP                 AP                 2818 G.GEORGE      2818 G.GEORGE      2818 G.GEORGE      2818 G.GEORGE     
AP                 AP                 SMB CHECKOUT/2818  2818 G.GEORGE      2818 G.GEORGE      2818 G.GEORGE      2818 G.GEORGE     
AP                 AP                 2818 G.GEORGE      2818 G.GEORGE      2818 G.GEORGE      2818 G.GEORGE      2818 G.GEORGE     
BEAM   LINE 10-1 
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
2784 T.KENDELEW/AP AP                 AP                 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
AP                 AP                 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
AP                 AP                 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
BEAM   LINE 10-2 
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
2684 D.CLARK/AP    AP                 AP                 2727 T.STEMMLER    2727 T.STEMMLER    2727 T.STEMMLER    2727 T.STEMMLER   
AP                 AP                 Bck>Frt/2727       2727 T.STEMMLER    2727 T.STEMMLER    2727 T.STEMMLER    2727 T.STEMMLER   
AP                 AP                 2727 T.STEMMLER    2727 T.STEMMLER    2727 T.STEMMLER    2727 T.STEMMLER    2727 T.STEMMLER   
BEAM   LINE 11-1 
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
9A50 W.WEIS/AP     AP                 AP                 7A28 R.STENKAMP    7A28 R.STENKAMP    9A01 I.WILSON      9A01 I.WILSON     
AP                 AP                 MC CHECKOUT/7A28   7A28 R.STENKAMP    MC CHECKOUT/9A01   9A01 I.WILSON      9A01 I.WILSON     
AP                 AP                 7A28 R.STENKAMP    7A28 R.STENKAMP    9A01 I.WILSON      9A01 I.WILSON      CHANGE/9A07 C.STOU
BEAM   LINE 11-2 
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
2590 S.CONRADSO/AP AP                 AP                 2684 D.CLARK       2684 D.CLARK       2684 D.CLARK       2711 N.HESS       
AP                 AP                 CHANGE/2684 D.CLAR 2684 D.CLARK       2684 D.CLARK       CHANGE/2711 N.HESS 2711 N.HESS       
AP                 AP                 2684 D.CLARK       2684 D.CLARK       2684 D.CLARK       2711 N.HESS        2711 N.HESS       
BEAM   LINE 11-3 
May 03, 2004       May 04, 2004       May 05, 2004       May 06, 2004       May 07, 2004       May 08, 2004       May 09, 2004      
8051 M.TONEY/FA/AP AP                 AP                 FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              
AP                 AP                 FACI               FACI               FACI               FACI               FACI              

Back to Table of Contents

WEEK OF May 10, 2004 
                                         
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
BEAM   LINE 1-4  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
8859 B.JOHNSON     8859 B.JOHNSON     2764 J.BARGAR      2764 J.BARGAR      2799 V.IMBENI      2799 V.IMBENI      2799 V.IMBENI     
8859 B.JOHNSON     S2>S1/2764         2764 J.BARGAR      Xray CHECKOUT/2799 2799 V.IMBENI      2799 V.IMBENI      2799 V.IMBENI     
8859 B.JOHNSON     2764 J.BARGAR      2764 J.BARGAR      2799 V.IMBENI      2799 V.IMBENI      2799 V.IMBENI      2799 V.IMBENI     
BEAM   LINE 2-2  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
2750 G.BROWN       2751 S.SCOTT       2751 S.SCOTT       2751 S.SCOTT       2860 S.SCOTT       2860 S.SCOTT       2860 S.SCOTT      
Xray-S2>S1/2751    2751 S.SCOTT       2751 S.SCOTT       CHANGE/2860 S.SCOT 2860 S.SCOTT       2860 S.SCOTT       2860 S.SCOTT      
2751 S.SCOTT       2751 S.SCOTT       2751 S.SCOTT       2860 S.SCOTT       2860 S.SCOTT       2860 S.SCOTT       2860 S.SCOTT      
BEAM   LINE 3-1  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-1  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
CHANGE/8812 M.ROWE 8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       Unscheduled        Unscheduled       
8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       Unscheduled        Unscheduled       
8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 5-2  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
9702 Z.SHEN        9702 Z.SHEN        Unscheduled        Unscheduled        Unscheduled        9702 Z.SHEN        9702 Z.SHEN       
9702 Z.SHEN        Unscheduled        Unscheduled        Unscheduled        Unscheduled        9702 Z.SHEN        9702 Z.SHEN       
9702 Z.SHEN        Unscheduled        Unscheduled        Unscheduled        CHANGE/9702 Z.SHEN 9702 Z.SHEN        9702 Z.SHEN       
BEAM   LINE 6-2  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2730 A.BELL        2730 A.BELL        2730 A.BELL        2730 A.BELL       
2645 S.MYNENI      2645 S.MYNENI      M1 out/2730        2730 A.BELL        2730 A.BELL        2730 A.BELL        2730 A.BELL       
2645 S.MYNENI      2645 S.MYNENI      2730 A.BELL        2730 A.BELL        2730 A.BELL        2730 A.BELL        2730 A.BELL       
BEAM   LINE 7-2  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
90U2 G.HUSSEN      8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE   
CHANGE/8051 M.TONE 8051 M.TONEY       8051 M.TONEY       Xray CHECKOUT/2767 2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE   
8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE   
BEAM   LINE 8-1  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 8-2  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 9-1  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
6A96 D.WILSON      1B00 W.SCOTT       9A67 W.HOL         9A67 W.HOL         9A85 D.BUSSIERE    7A37 S.LIPPARD     7A37 S.LIPPARD    
MC CHECKOUT/1B00   MC CHECKOUT/9A67   9A67 W.HOL         MC CHECKOUT/9A85   MC CHECKOUT/7A37   7A37 S.LIPPARD     7A37 S.LIPPARD    
1B00 W.SCOTT       9A67 W.HOL         9A67 W.HOL         9A85 D.BUSSIERE    7A37 S.LIPPARD     7A37 S.LIPPARD     7A37 S.LIPPARD    
BEAM   LINE 9-2  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
6A76 J.PETERS      9L03 S.JORDAN      9A65 K.ZHANG       6A04 R.LIDDINGTON  6A03 R.LIDDINGTON  6A55 M.REDINBO     9A67 W.HOL        
MC CHECKOUT/9L03   MC CHECKOUT/9A65   MC CHECKOUT/6A04   CHANGE/6A03 R.LIDD MC CHECKOUT/6A55   6A55 M.REDINBO     9A67 W.HOL        
9L03 S.JORDAN      9A65 K.ZHANG       6A04 R.LIDDINGTON  6A03 R.LIDDINGTON  6A55 M.REDINBO     CHANGE/9A67 W.HOL  CHANGE/7A30 D.MCKA
BEAM   LINE 9-3  
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
2818 G.GEORGE      2697 J.PENNER-HAHN 2697 J.PENNER-HAHN 2697 J.PENNER-HAHN 2697 J.PENNER-HAHN 2820 J.PENNER-HAHN 2820 J.PENNER-HAHN
SMB CHECKOUT/2697  2697 J.PENNER-HAHN 2697 J.PENNER-HAHN 2697 J.PENNER-HAHN CHANGE/2820 J.PENN 2820 J.PENNER-HAHN 2820 J.PENNER-HAHN
2697 J.PENNER-HAHN 2697 J.PENNER-HAHN 2697 J.PENNER-HAHN 2697 J.PENNER-HAHN 2820 J.PENNER-HAHN 2820 J.PENNER-HAHN 2820 J.PENNER-HAHN
BEAM   LINE 10-1 
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ 2784 T.KENDELEWICZ
BEAM   LINE 10-2 
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
2727 T.STEMMLER    2794 H.NICHOL      2794 H.NICHOL      2794 H.NICHOL      2855 B.HEDMAN      2855 B.HEDMAN      2855 B.HEDMAN     
Xray CHECKOUT/2794 2794 H.NICHOL      2794 H.NICHOL      CHANGE/2855 B.HEDM 2855 B.HEDMAN      2855 B.HEDMAN      2855 B.HEDMAN     
2794 H.NICHOL      2794 H.NICHOL      2794 H.NICHOL      2855 B.HEDMAN      2855 B.HEDMAN      2855 B.HEDMAN      2855 B.HEDMAN     
BEAM   LINE 11-1 
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
9A07 C.STOUT       9B01 A.DEACON      9A40 A.VILLASENOR  9A53 R.KORNBERG    9A50 W.WEIS        CHANGE/9A51 D.MCKA 9B01 A.DEACON     
CHANGE/9B01 A.DEAC MC CHECKOUT/9A40   MC CHECKOUT/9A53   MC CHECKOUT/9A50   MC CHECKOUT/6A37   CHANGE/9B01 A.DEAC 9B01 A.DEACON     
9B01 A.DEACON      9A40 A.VILLASENOR  9A53 R.KORNBERG    9A50 W.WEIS        6A37 K.BREJC       9B01 A.DEACON      CHANGE/9A55 C.GARC
BEAM   LINE 11-2 
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
2711 N.HESS        2763 F.FARGES      2763 F.FARGES      8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR     
MES CHECKOUT/2763  2763 F.FARGES      MES CHECKOUT/8060  8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR     
2763 F.FARGES      2763 F.FARGES      8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR     
BEAM   LINE 11-3 
May 10, 2004       May 11, 2004       May 12, 2004       May 13, 2004       May 14, 2004       May 15, 2004       May 16, 2004      
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              
FACI               FACI               FACI               FACI               FACI               FACI               FACI              

Back to Table of Contents

WEEK OF May 17, 2004 
MA       MA/AP       AP       BL4-2 Opens                        
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
BEAM   LINE 1-4  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
DOWN/MA            MA/AP              AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
2799 V.IMBENI/MA   MA                 AP                 AP                 2799 V.IMBENI      2864 B.BOYCE       2864 B.BOYCE      
MA                 AP                 AP                 2799 V.IMBENI      Xray CHECKOUT/2864 2864 B.BOYCE       2864 B.BOYCE      
MA                 AP                 AP                 2799 V.IMBENI      2864 B.BOYCE       2864 B.BOYCE       2864 B.BOYCE      
BEAM   LINE 2-2  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
2860 S.SCOTT/MA    MA                 AP                 AP                 2628 J.TORRESDEY   2628 J.TORRESDEY   2628 J.TORRESDEY  
MA                 AP                 AP                 Xray-S1>S2#4/2628  2628 J.TORRESDEY   2628 J.TORRESDEY   2628 J.TORRESDEY  
MA                 AP                 AP                 2628 J.TORRESDEY   2628 J.TORRESDEY   2628 J.TORRESDEY   2628 J.TORRESDEY  
BEAM   LINE 3-1  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
DOWN/MA            MA                 AP                 AP                 8801 W.TOMPKINS    8804 H.TSURUTA     8804 H.TSURUTA    
MA                 AP                 AP                 Xray CHECKOUT/8801 8801 W.TOMPKINS    8804 H.TSURUTA     8804 H.TSURUTA    
MA                 AP                 AP                 8801 W.TOMPKINS    CHANGE/8804 H.TSUR 8804 H.TSURUTA     8804 H.TSURUTA    
BEAM   LINE 5-1  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
MA                 MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 AP                 CHANGE/8812 M.ROWE Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 AP                 8812 M.ROWEN       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 5-2  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
9702 Z.SHEN/MA     MA                 AP                 AP                 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
MA                 AP                 AP                 CHANGE/9702 Z.SHEN 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
MA                 AP                 AP                 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
BEAM   LINE 6-2  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
2730 A.BELL/MA     MA                 AP                 AP                 2664 D.STRAWN      2664 D.STRAWN      2664 D.STRAWN     
MA                 AP                 AP                 Xray CHECKOUT/2664 2664 D.STRAWN      2664 D.STRAWN      2664 D.STRAWN     
MA                 AP                 AP                 2664 D.STRAWN      2664 D.STRAWN      2664 D.STRAWN      2664 D.STRAWN     
BEAM   LINE 7-2  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
2767 P.MCINTYRE/MA MA                 AP                 AP                 2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS      
MA                 AP                 AP                 Xray CHECKOUT/2791 2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS      
MA                 AP                 AP                 2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS      
BEAM   LINE 8-1  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
DOWN/MA            MA                 AP                 AP                 DOWN               8888 P.PIANETTA    8888 P.PIANETTA   
MA                 AP                 AP                 DOWN               VUV CHECKOUT       8888 P.PIANETTA    8888 P.PIANETTA   
MA                 AP                 AP                 DOWN               8888 P.PIANETTA    8888 P.PIANETTA    8888 P.PIANETTA   
BEAM   LINE 8-2  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
DOWN/MA            MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 9-1  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
7A37 S.LIPPARD/MA  MA/AP              AP                 AP                 9B01 A.DEACON      7A67 J.ROSS        7A67 J.ROSS       
MA                 AP                 AP                 8054 M.SOLTIS      MC CHECKOUT/7A67   7A67 J.ROSS        7A67 J.ROSS       
MA                 AP                 AP                 CHANGE/9B01 A.DEAC 7A67 J.ROSS        7A67 J.ROSS        7A67 J.ROSS       
BEAM   LINE 9-2  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
7A30 D.MCKAY/MA    MA/AP              AP                 AP                 7A20 I.WILSON      7A83 S.CHOE        7A83 S.CHOE       
MA                 AP                 AP                 MC CHECKOUT/7A20   MC CHECKOUT/7A83   7A83 S.CHOE        7A83 S.CHOE       
MA                 AP                 AP                 7A20 I.WILSON      7A83 S.CHOE        7A83 S.CHOE        7A83 S.CHOE       
BEAM   LINE 9-3  
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
2820 J.PENNER-H/MA MA                 AP                 AP                 2740 L.QUE, JR.    2740 L.QUE, JR.    2740 L.QUE, JR.   
MA                 AP                 AP                 Xray CHECKOUT/2740 2740 L.QUE, JR.    2740 L.QUE, JR.    2740 L.QUE, JR.   
MA                 AP                 AP                 2740 L.QUE, JR.    2740 L.QUE, JR.    2740 L.QUE, JR.    2740 L.QUE, JR.   
BEAM   LINE 10-1 
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
2784 T.KENDELEW/MA MA                 AP                 AP                 2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR
MA                 AP                 AP                 VUV                2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR
MA                 AP                 AP                 2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR
BEAM   LINE 10-2 
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
2855 B.HEDMAN/MA   MA                 AP                 AP                 2741 N.PINGITORE   2741 N.PINGITORE   2741 N.PINGITORE  
MA                 AP                 AP                 Xray CHECKOUT/2741 2741 N.PINGITORE   2741 N.PINGITORE   CHANGE/2744 N.PING
MA                 AP                 AP                 2741 N.PINGITORE   2741 N.PINGITORE   2741 N.PINGITORE   2744 N.PINGITORE  
BEAM   LINE 11-1 
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
9A55 C.GARCIA/MA   MA/AP              AP                 AP                 9A75 T.STOUT       7A10 E.SNELL       7A10 E.SNELL      
MA                 AP                 AP                 MC CHECKOUT/9A75   MC CHECKOUT/7A10   7A10 E.SNELL       7A10 E.SNELL      
MA                 AP                 AP                 9A75 T.STOUT       7A10 E.SNELL       7A10 E.SNELL       CHANGE/8044 I.MATH
BEAM   LINE 11-2 
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
8060 J.BARGAR/MA   MA                 AP                 AP                 2674 C.BOOTH       2674 C.BOOTH       2674 C.BOOTH      
MA                 AP                 AP                 MES CHECKOUT/2674  2674 C.BOOTH       2674 C.BOOTH       2674 C.BOOTH      
MA                 AP                 AP                 2674 C.BOOTH       2674 C.BOOTH       2674 C.BOOTH       2674 C.BOOTH      
BEAM   LINE 11-3 
May 17, 2004       May 18, 2004       May 19, 2004       May 20, 2004       May 21, 2004       May 22, 2004       May 23, 2004      
FACI/MA            MA/AP              AP                 AP                 FACI               FACI               FACI              
MA                 AP                 AP                 FACI               FACI               FACI               FACI              
MA                 AP                 AP                 FACI               FACI               FACI               FACI              

Back to Table of Contents

WEEK OF May 24, 2004 
BL8 Opens                                          
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
BEAM   LINE 1-4  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
2864 B.BOYCE       2854 B.CLEMENS     2854 B.CLEMENS     2854 B.CLEMENS     2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO    
Xray CHECKOUT/2854 2854 B.CLEMENS     2854 B.CLEMENS     Xray CHECKOUT/2592 2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO    
2854 B.CLEMENS     2854 B.CLEMENS     2854 B.CLEMENS     2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO    
BEAM   LINE 2-2  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
2628 J.TORRESDEY   2628 J.TORRESDEY   2628 J.TORRESDEY   2772 J.LICHTENBERG 2772 J.LICHTENBERG 2772 J.LICHTENBERG 2808 H.LACHEEN    
2628 J.TORRESDEY   2628 J.TORRESDEY   Xray CHECKOUT/2772 2772 J.LICHTENBERG 2772 J.LICHTENBERG CHANGE/2808 H.LACH 2808 H.LACHEEN    
2628 J.TORRESDEY   2628 J.TORRESDEY   2772 J.LICHTENBERG 2772 J.LICHTENBERG 2772 J.LICHTENBERG 2808 H.LACHEEN     2808 H.LACHEEN    
BEAM   LINE 3-1  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
8804 H.TSURUTA     8804 H.TSURUTA     8804 H.TSURUTA     8804 H.TSURUTA     8804 H.TSURUTA     2691 A.FINK        2691 A.FINK       
8804 H.TSURUTA     8804 H.TSURUTA     8804 H.TSURUTA     8804 H.TSURUTA     SMB/2691           2691 A.FINK        CHANGE/8059 H.TSUR
8804 H.TSURUTA     8804 H.TSURUTA     8804 H.TSURUTA     8804 H.TSURUTA     2691 A.FINK        2691 A.FINK        8059 H.TSURUTA    
BEAM   LINE 5-1  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
Unscheduled        Unscheduled        CHANGE/8812 M.ROWE CHANGE/8812 M.ROWE CHANGE/8812 M.ROWE Unscheduled        Unscheduled       
Unscheduled        Unscheduled        8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 5-2  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        2640 D.DESSAU      2640 D.DESSAU     
9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        Unscheduled        Unscheduled        2640 D.DESSAU      2640 D.DESSAU     
9702 Z.SHEN        9702 Z.SHEN        CHANGE/9702 Z.SHEN CHANGE/9702 Z.SHEN CHANGE/2640 D.DESS 2640 D.DESSAU      2640 D.DESSAU     
BEAM   LINE 6-2  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
2664 D.STRAWN      2730 A.BELL        2699 R.SHAFER      2699 R.SHAFER      2648 F.BRIDGES     2648 F.BRIDGES     2648 F.BRIDGES    
Xray CHECKOUT/2730 Xray CHECKOUT/2699 2699 R.SHAFER      Xray CHECKOUT/2648 2648 F.BRIDGES     2648 F.BRIDGES     2648 F.BRIDGES    
2730 A.BELL        2699 R.SHAFER      2699 R.SHAFER      2648 F.BRIDGES     2648 F.BRIDGES     2648 F.BRIDGES     2648 F.BRIDGES    
BEAM   LINE 7-2  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS      
2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS      
2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS      
BEAM   LINE 8-1  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
8888 P.PIANETTA    8888 P.PIANETTA    8888 P.PIANETTA    8888 P.PIANETTA    8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
8888 P.PIANETTA    8888 P.PIANETTA    8888 P.PIANETTA    CHANGE/8821 D.BREH 8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
8888 P.PIANETTA    8888 P.PIANETTA    8888 P.PIANETTA    8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
BEAM   LINE 8-2  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
Unscheduled        8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
CHANGE/8821 D.BREH 8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
BEAM   LINE 9-1  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
7A67 J.ROSS        MC CHECKOUT/7A54   1R30 U.SCHULZE-GAH 9B01 A.DEACON      7A42 C.PETERS-LIBE 6A95 T.WOOD        6A95 T.WOOD       
MC CHECKOUT/9A85   MC CHECKOUT/1R30   MC CHECKOUT/9B01   MC CHECKOUT/7A42   MC CHECKOUT/6A95   6A95 T.WOOD        CHANGE/1B02 D.BARO
9A85 D.BUSSIERE    1R30 U.SCHULZE-GAH 9B01 A.DEACON      7A42 C.PETERS-LIBE 6A95 T.WOOD        6A95 T.WOOD        1B02 D.BARONDEAU  
BEAM   LINE 9-2  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
7A83 S.CHOE        7A08 G.SNELL       7A08 G.SNELL       7A27 D.REES        7A27 D.REES        6A89 N.HORTON      6A89 N.HORTON     
MC CHECKOUT/7A08   7A08 G.SNELL       MC CHECKOUT/7A27   7A27 D.REES        MC CHECKOUT/6A89   6A89 N.HORTON      6A89 N.HORTON     
7A08 G.SNELL       7A08 G.SNELL       7A27 D.REES        7A27 D.REES        6A89 N.HORTON      6A89 N.HORTON      6A89 N.HORTON     
BEAM   LINE 9-3  
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
2740 L.QUE, JR.    2739 N.BLACKBURN   2739 N.BLACKBURN   2739 N.BLACKBURN   2739 N.BLACKBURN   8065 S.DEBEER-GEOR 8065 S.DEBEER-GEOR
SMB CHECKOUT/2739  2739 N.BLACKBURN   2739 N.BLACKBURN   2739 N.BLACKBURN   SMB CHECKOUT/8065  8065 S.DEBEER-GEOR 8065 S.DEBEER-GEOR
2739 N.BLACKBURN   2739 N.BLACKBURN   2739 N.BLACKBURN   2739 N.BLACKBURN   8065 S.DEBEER-GEOR 8065 S.DEBEER-GEOR 8065 S.DEBEER-GEOR
BEAM   LINE 10-1 
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR 2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON    
2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR CHANGE/2880 K.HODG 2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON    
2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR 2803 S.DEBEER-GEOR 2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON    
BEAM   LINE 10-2 
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
2744 N.PINGITORE   2744 N.PINGITORE   2744 N.PINGITORE   2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO    
2744 N.PINGITORE   2744 N.PINGITORE   Xray CHECKOUT/2592 2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO    
2744 N.PINGITORE   2744 N.PINGITORE   2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO    
BEAM   LINE 11-1 
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
8044 I.MATHEWS     9B01 A.DEACON      9A06 P.SCHIMMEL    7A82 G.CHANG       7A82 G.CHANG       9A01 I.WILSON      9A01 I.WILSON     
CHANGE/9B01 A.DEAC MC CHECKOUT/9A06   MC CHECKOUT/7A82   7A82 G.CHANG       MC CHECKOUT/9A01   9A01 I.WILSON      MC CHECKOUT/9A04  
9B01 A.DEACON      9A06 P.SCHIMMEL    7A82 G.CHANG       7A82 G.CHANG       9A01 I.WILSON      9A01 I.WILSON      9A04 J.JOHNSON    
BEAM   LINE 11-2 
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
2674 C.BOOTH       2674 C.BOOTH       2795 W.LUKENS      2795 W.LUKENS      2811 A.FOSTER      2811 A.FOSTER      2812 A.FOSTER     
2674 C.BOOTH       CHANGE/2795 W.LUKE 2795 W.LUKENS      MES CHECKOUT/2811  2811 A.FOSTER      CHANGE/2812 A.FOST 2812 A.FOSTER     
2674 C.BOOTH       2795 W.LUKENS      2795 W.LUKENS      2811 A.FOSTER      2811 A.FOSTER      2812 A.FOSTER      2812 A.FOSTER     
BEAM   LINE 11-3 
May 24, 2004       May 25, 2004       May 26, 2004       May 27, 2004       May 28, 2004       May 29, 2004       May 30, 2004      
FACI               FACI               FACI               FACI               CHANGE/8044 I.MATH 9A67 W.HOL         Unscheduled       
FACI               FACI               FACI               FACI               8044 I.MATHEWS     9A67 W.HOL         Unscheduled       
FACI               FACI               FACI               FACI               CHANGE/9A67 W.HOL  9A67 W.HOL         CHANGE/8861 I.MATH

Back to Table of Contents

WEEK OF May 31, 2004 
HOLIDAY       AP       AP                              
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
BEAM   LINE 1-4  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
DOWN               DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
DOWN               DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
2592 J.BILELLO     2592 J.BILELLO/AP  AP                 AP                 2806 K.HAYES       2806 K.HAYES       2806 K.HAYES      
2592 J.BILELLO     AP                 AP                 Xray CHECKOUT/2806 2806 K.HAYES       2806 K.HAYES       CHANGE/2726 K.HAYE
2592 J.BILELLO     AP                 AP                 2806 K.HAYES       2806 K.HAYES       2806 K.HAYES       2726 K.HAYES      
BEAM   LINE 2-2  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
DOWN               DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
2808 H.LACHEEN     2808 H.LACHEEN/AP  AP                 AP                 2808 H.LACHEEN     2666 B.GATES       2666 B.GATES      
2808 H.LACHEEN     AP                 AP                 2808 H.LACHEEN     Xray CHECKOUT/2666 2666 B.GATES       2666 B.GATES      
2808 H.LACHEEN     AP                 AP                 2808 H.LACHEEN     2666 B.GATES       2666 B.GATES       2666 B.GATES      
BEAM   LINE 3-1  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
DOWN               DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
DOWN               DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
8059 H.TSURUTA     8059 H.TSURUTA/AP  AP                 AP                 2838 H.KIM         2838 H.KIM         2838 H.KIM        
8059 H.TSURUTA     AP                 AP                 Xray/SAS/2838      2838 H.KIM         2838 H.KIM         2838 H.KIM        
8059 H.TSURUTA     AP                 AP                 2838 H.KIM         2838 H.KIM         2838 H.KIM         2838 H.KIM        
BEAM   LINE 5-1  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
Unscheduled        AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled       
Unscheduled        AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 5-2  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
DOWN               DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
DOWN               AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
2640 D.DESSAU      2640 D.DESSAU/AP   AP                 AP                 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
2640 D.DESSAU      AP                 AP                 CHANGE/9702 Z.SHEN 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
2640 D.DESSAU      AP                 AP                 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
BEAM   LINE 6-2  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
2648 F.BRIDGES     2648 F.BRIDGES/AP  AP                 AP                 8001 S.BRENNAN     8001 S.BRENNAN     8001 S.BRENNAN    
2648 F.BRIDGES     AP                 AP                 FtS1>BkMulti?/8001 8001 S.BRENNAN     8001 S.BRENNAN     8001 S.BRENNAN    
2648 F.BRIDGES     AP                 AP                 8001 S.BRENNAN     8001 S.BRENNAN     8001 S.BRENNAN     8001 S.BRENNAN    
BEAM   LINE 7-2  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
2791 C.LUCAS       2791 C.LUCAS/AP    AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
2791 C.LUCAS       AP                 AP                 CHANGE/8015 A.MEHT 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
2791 C.LUCAS       AP                 AP                 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 8-1  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
8821 D.BREHMER     8821 D.BREHMER/AP  AP                 AP                 8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
8821 D.BREHMER     AP                 AP                 8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
8821 D.BREHMER     AP                 AP                 8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
BEAM   LINE 8-2  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
8821 D.BREHMER     8821 D.BREHMER/AP  AP                 AP                 2865 D.LEE         2865 D.LEE         2865 D.LEE        
8821 D.BREHMER     AP                 AP                 VUV                2865 D.LEE         2865 D.LEE         2865 D.LEE        
8821 D.BREHMER     AP                 AP                 2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE        
BEAM   LINE 9-1  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
1B02 D.BARONDEAU   1B02 D.BARONDEA/AP AP                 AP                 7A94 E.BERRY       7A72 H.LI          7A72 H.LI         
1B02 D.BARONDEAU   AP                 AP                 MC CHECKOUT/7A94   MC CHECKOUT/7A72   7A72 H.LI          7A72 H.LI         
1B02 D.BARONDEAU   AP                 AP                 7A94 E.BERRY       7A72 H.LI          7A72 H.LI          7A72 H.LI         
BEAM   LINE 9-2  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
6A89 N.HORTON      8121 A.BRUNGER/AP  AP                 AP                 7A45 A.FISHER      9A90 D.REES        9A90 D.REES       
MC CHECKOUT/8121   AP                 AP                 MC CHECKOUT/7A45   MC CHECKOUT/9A90   9A90 D.REES        CHANGE/9A50 W.WEIS
8121 A.BRUNGER     AP                 AP                 7A45 A.FISHER      9A90 D.REES        9A90 D.REES        9A50 W.WEIS       
BEAM   LINE 9-3  
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
8065 S.DEBEER-GEOR 8065 S.DEBEER-G/AP AP                 AP                 8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON    
8065 S.DEBEER-GEOR AP                 AP                 CHANGE/8110 K.HODG 8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON    
8065 S.DEBEER-GEOR AP                 AP                 8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON    
BEAM   LINE 10-1 
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
2880 K.HODGSON     2880 K.HODGSON/AP  AP                 AP                 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ
2880 K.HODGSON     AP                 AP                 CHANGE/2644 T.KEND 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ
2880 K.HODGSON     AP                 AP                 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ
BEAM   LINE 10-2 
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
2592 J.BILELLO     2592 J.BILELLO/AP  AP                 AP                 2734 C.BOOTH       2734 C.BOOTH       2734 C.BOOTH      
2592 J.BILELLO     AP                 AP                 Xray CHECKOUT/2734 2734 C.BOOTH       2734 C.BOOTH       2734 C.BOOTH      
2592 J.BILELLO     AP                 AP                 2734 C.BOOTH       2734 C.BOOTH       2734 C.BOOTH       2734 C.BOOTH      
BEAM   LINE 11-1 
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
9A04 J.JOHNSON     9A04 J.JOHNSON/AP  AP                 AP                 9A40 A.VILLASENOR  9A53 R.KORNBERG    9A52 A.BRUNGER    
9A04 J.JOHNSON     AP                 AP                 MC CHECKOUT/9A40   MC CHECKOUT/9A53   CHANGE/9A52 A.BRUN 9A52 A.BRUNGER    
9A04 J.JOHNSON     AP                 AP                 9A40 A.VILLASENOR  9A53 R.KORNBERG    9A52 A.BRUNGER     9A52 A.BRUNGER    
BEAM   LINE 11-2 
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
2812 A.FOSTER      2812 A.FOSTER/AP   AP                 AP                 2806 K.HAYES       2806 K.HAYES       2806 K.HAYES      
2812 A.FOSTER      AP                 AP                 MES CHECKOUT/2806  2806 K.HAYES       2806 K.HAYES       2806 K.HAYES      
2812 A.FOSTER      AP                 AP                 2806 K.HAYES       2806 K.HAYES       2806 K.HAYES       2806 K.HAYES      
BEAM   LINE 11-3 
May 31, 2004       Jun. 01, 2004      Jun. 02, 2004      Jun. 03, 2004      Jun. 04, 2004      Jun. 05, 2004      Jun. 06, 2004     
8861 I.MATHEWS     8861 I.MATHEWS/AP  AP                 AP                 9A65 K.ZHANG       6A04 R.LIDDINGTON  6A04 R.LIDDINGTON 
8861 I.MATHEWS     AP                 AP                 MC CHECKOUT/9A65   MC CHECKOUT/6A04   6A04 R.LIDDINGTON  6A04 R.LIDDINGTON 
8861 I.MATHEWS     AP                 AP                 9A65 K.ZHANG       6A04 R.LIDDINGTON  6A04 R.LIDDINGTON  6A04 R.LIDDINGTON 

Back to Table of Contents

WEEK OF Jun. 07, 2004
                                         
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
BEAM   LINE 1-4  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 1-5  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
2726 K.HAYES       2726 K.HAYES       2726 K.HAYES       2732 S.FENDORF     2732 S.FENDORF     2732 S.FENDORF     2732 S.FENDORF    
2726 K.HAYES       2726 K.HAYES       Xray CHECKOUT/2732 2732 S.FENDORF     2732 S.FENDORF     2732 S.FENDORF     2732 S.FENDORF    
2726 K.HAYES       2726 K.HAYES       2732 S.FENDORF     2732 S.FENDORF     2732 S.FENDORF     2732 S.FENDORF     2732 S.FENDORF    
BEAM   LINE 2-2  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
2666 B.GATES       2701 S.FENDORF     2701 S.FENDORF     2701 S.FENDORF     2876 S.DEBEER-GEOR 2876 S.DEBEER-GEOR 2622 K.HODGSON    
X-S2#4>S2#1/2701   2701 S.FENDORF     2701 S.FENDORF     X-S2#1>S2#4/2876   2876 S.DEBEER-GEOR CHANGE/2622 K.HODG 2622 K.HODGSON    
2701 S.FENDORF     2701 S.FENDORF     2701 S.FENDORF     2876 S.DEBEER-GEOR 2876 S.DEBEER-GEOR 2622 K.HODGSON     2622 K.HODGSON    
BEAM   LINE 3-1  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
2838 H.KIM         2657 U.GENICK      2657 U.GENICK      2657 U.GENICK      2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA    
CHANGE/2657 U.GENI 2657 U.GENICK      2657 U.GENICK      Xray/2796          2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA    
2657 U.GENICK      2657 U.GENICK      2657 U.GENICK      2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA    
BEAM   LINE 5-1  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
Unscheduled        CHANGE/8812 M.ROWE 8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       Unscheduled        Unscheduled       
Unscheduled        8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       Unscheduled        Unscheduled       
Unscheduled        8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 5-2  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
9702 Z.SHEN        9702 Z.SHEN        Unscheduled        Unscheduled        Unscheduled        9702 Z.SHEN        9702 Z.SHEN       
9702 Z.SHEN        Unscheduled        Unscheduled        Unscheduled        Unscheduled        9702 Z.SHEN        9702 Z.SHEN       
9702 Z.SHEN        Unscheduled        Unscheduled        Unscheduled        CHANGE/9702 Z.SHEN 9702 Z.SHEN        9702 Z.SHEN       
BEAM   LINE 6-2  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
8001 S.BRENNAN     8001 S.BRENNAN     8001 S.BRENNAN     2742 B.MODEN       2742 B.MODEN       2846 J.XU          2846 J.XU         
8001 S.BRENNAN     8001 S.BRENNAN     Bk>FtS1/2742       2742 B.MODEN       CHANGE/2846 J.XU   2846 J.XU          2846 J.XU         
8001 S.BRENNAN     8001 S.BRENNAN     2742 B.MODEN       2742 B.MODEN       2846 J.XU          2846 J.XU          2846 J.XU         
BEAM   LINE 7-2  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
8015 A.MEHTA       2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN     
Xray CHECKOUT/2758 2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN     
2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN      2758 M.GREVEN     
BEAM   LINE 8-1  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
BEAM   LINE 8-2  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
2865 D.LEE         2865 D.LEE         2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON    
2865 D.LEE         VUV CHECKOUT       2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON    
2865 D.LEE         2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON    
BEAM   LINE 9-1  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
7A72 H.LI          1R21 K.JUDE        7A53 A.ROSENGARTH  1B09 C.KANG        1B09 C.KANG        7A71 J.VICKERY     7A71 J.VICKERY    
MC CHECKOUT/1R21   MC CHECKOUT/7A53   MC CHECKOUT/1B09   1B09 C.KANG        MC CHECKOUT/7A71   7A71 J.VICKERY     7A71 J.VICKERY    
1R21 K.JUDE        7A53 A.ROSENGARTH  1B09 C.KANG        1B09 C.KANG        7A71 J.VICKERY     7A71 J.VICKERY     7A71 J.VICKERY    
BEAM   LINE 9-2  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
9A50 W.WEIS        1R27 G.MILLER      1R27 G.MILLER      7A83 S.CHOE        9B01 A.DEACON      9A67 W.HOL         9A67 W.HOL        
MC CHECKOUT/1R27   1R27 G.MILLER      CHANGE/8054 M.SOLT CHANGE/9B01 A.DEAC MC CHECKOUT/9A67   9A67 W.HOL         CHANGE/8054 M.SOLT
1R27 G.MILLER      1R27 G.MILLER      CHANGE/7A83 S.CHOE 9B01 A.DEACON      9A67 W.HOL         9A67 W.HOL         8054 M.SOLTIS     
BEAM   LINE 9-3  
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     2697 J.PENNER-HAHN 2697 J.PENNER-HAHN 2858 J.PENNER-HAHN
8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     Xray CHECKOUT/2697 2697 J.PENNER-HAHN CHANGE/2858 J.PENN 2858 J.PENNER-HAHN
8110 K.HODGSON     8110 K.HODGSON     8110 K.HODGSON     2697 J.PENNER-HAHN 2697 J.PENNER-HAHN 2858 J.PENNER-HAHN 2858 J.PENNER-HAHN
BEAM   LINE 10-1 
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ
2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ
2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ
BEAM   LINE 10-2 
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
2734 C.BOOTH       2710 S.TOLBERT     2710 S.TOLBERT     2710 S.TOLBERT     2786 J.ANDREWS     2786 J.ANDREWS     2786 J.ANDREWS    
Xray CHECKOUT/2710 2710 S.TOLBERT     2710 S.TOLBERT     Xray CHECKOUT/2786 2786 J.ANDREWS     2786 J.ANDREWS     2786 J.ANDREWS    
2710 S.TOLBERT     2710 S.TOLBERT     2710 S.TOLBERT     2786 J.ANDREWS     2786 J.ANDREWS     2786 J.ANDREWS     2786 J.ANDREWS    
BEAM   LINE 11-1 
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
9A52 A.BRUNGER     1R26 R.MACKINNON   1R26 R.MACKINNON   7A30 D.MCKAY       9A08 K.VARUGHESE   9A05 E.GETZOFF     9A05 E.GETZOFF    
MC CHECKOUT/1R26   1R26 R.MACKINNON   MC CHECKOUT/7A30   CHANGE/9A08 K.VARU MC CHECKOUT/9A05   9A05 E.GETZOFF     9A05 E.GETZOFF    
1R26 R.MACKINNON   1R26 R.MACKINNON   7A30 D.MCKAY       9A08 K.VARUGHESE   9A05 E.GETZOFF     9A05 E.GETZOFF     9A05 E.GETZOFF    
BEAM   LINE 11-2 
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
2806 K.HAYES       2806 K.HAYES       2656 G.BROWN       2656 G.BROWN       2656 G.BROWN       2821 J.DAVIS       2821 J.DAVIS      
2806 K.HAYES       MES CHECKOUT/2656  2656 G.BROWN       2656 G.BROWN       MES CHECKOUT/2821  2821 J.DAVIS       2821 J.DAVIS      
2806 K.HAYES       2656 G.BROWN       2656 G.BROWN       2656 G.BROWN       2821 J.DAVIS       2821 J.DAVIS       2821 J.DAVIS      
BEAM   LINE 11-3 
Jun. 07, 2004      Jun. 08, 2004      Jun. 09, 2004      Jun. 10, 2004      Jun. 11, 2004      Jun. 12, 2004      Jun. 13, 2004     
6A04 R.LIDDINGTON  9A75 T.STOUT       9A85 D.BUSSIERE    9A67 W.HOL         9A67 W.HOL         6A87 E.BALDWIN     6A87 E.BALDWIN    
MC CHECKOUT/9A75   MC CHECKOUT/9A85   MC CHECKOUT/9A67   9A67 W.HOL         MC CHECKOUT/6A87   6A87 E.BALDWIN     6A87 E.BALDWIN    
9A75 T.STOUT       9A85 D.BUSSIERE    9A67 W.HOL         9A67 W.HOL         6A87 E.BALDWIN     6A87 E.BALDWIN     6A87 E.BALDWIN    

Back to Table of Contents

WEEK OF Jun. 14, 2004
MA       MA/AP       AP                              
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
BEAM   LINE 1-4  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
DOWN/MA            MA                 MA                 MA                 Unscheduled        Unscheduled        Unscheduled       
MA                 MA                 MA                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 MA                 MA                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 1-5  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-1  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
2732 S.FENDORF/MA  MA                 MA                 MA                 2832 K.SAVAGE      2832 K.SAVAGE      2832 K.SAVAGE     
MA                 MA                 MA                 Xray CHECKOUT/2832 2832 K.SAVAGE      2832 K.SAVAGE      2832 K.SAVAGE     
MA                 MA                 MA                 2832 K.SAVAGE      2832 K.SAVAGE      2832 K.SAVAGE      2832 K.SAVAGE     
BEAM   LINE 2-2  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
2622 K.HODGSON/MA  MA                 MA                 MA                 2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON    
MA                 MA                 MA                 2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON    
MA                 MA                 MA                 2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON     2622 K.HODGSON    
BEAM   LINE 3-1  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
2796 C.SAFINYA/MA  MA                 MA                 MA                 2796 C.SAFINYA     2796 C.SAFINYA     2672 G.WONG       
MA                 MA                 MA                 2796 C.SAFINYA     2796 C.SAFINYA     CHANGE/2672 G.WONG 2672 G.WONG       
MA                 MA                 MA                 2796 C.SAFINYA     2796 C.SAFINYA     2672 G.WONG        2672 G.WONG       
BEAM   LINE 5-1  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
MA                 MA                 MA                 MA                 Unscheduled        Unscheduled        Unscheduled       
MA                 MA                 MA                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 MA                 MA                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 5-2  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
DOWN/MA            MA                 MA                 MA                 DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
MA                 MA                 MA                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
9702 Z.SHEN/MA     MA                 MA                 MA                 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
MA                 MA                 MA                 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
MA                 MA                 MA                 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
BEAM   LINE 6-2  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
2846 J.XU/MA       MA                 MA                 MA                 2850 P.KENNEPOHL   2850 P.KENNEPOHL   2850 P.KENNEPOHL  
MA                 MA                 MA                 Xray CHECKOUT/2850 2850 P.KENNEPOHL   2850 P.KENNEPOHL   CHANGE/2849 P.KENN
MA                 MA                 MA                 2850 P.KENNEPOHL   2850 P.KENNEPOHL   2850 P.KENNEPOHL   2849 P.KENNEPOHL  
BEAM   LINE 7-2  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
2758 M.GREVEN/MA   MA                 MA                 MA                 2842 M.WARD        2842 M.WARD        2842 M.WARD       
MA                 MA                 MA                 Xray CHECKOUT/2842 2842 M.WARD        2842 M.WARD        2842 M.WARD       
MA                 MA                 MA                 2842 M.WARD        2842 M.WARD        2842 M.WARD        2842 M.WARD       
BEAM   LINE 8-1  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
8821 D.BREHMER/MA  MA                 MA                 MA                 8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
MA                 MA                 MA                 8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
MA                 MA                 MA                 8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER    
BEAM   LINE 8-2  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
2622 K.HODGSON/MA  MA                 MA                 MA                 2850 P.KENNEPOHL   2850 P.KENNEPOHL   2850 P.KENNEPOHL  
MA                 MA                 MA                 CHANGE/2850 P.KENN 2850 P.KENNEPOHL   2850 P.KENNEPOHL   2850 P.KENNEPOHL  
MA                 MA                 MA                 2850 P.KENNEPOHL   2850 P.KENNEPOHL   2850 P.KENNEPOHL   2850 P.KENNEPOHL  
BEAM   LINE 9-1  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
7A71 J.VICKERY/MA  MA                 MA                 MA                 9A40 A.VILLASENOR  7A82 G.CHANG       7A82 G.CHANG      
MA                 MA                 MA                 MC CHECKOUT/9A40   MC CHECKOUT/7A82   7A82 G.CHANG       7A82 G.CHANG      
MA                 MA                 MA                 9A40 A.VILLASENOR  7A82 G.CHANG       7A82 G.CHANG       7A82 G.CHANG      
BEAM   LINE 9-2  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
8054 M.SOLTIS/MA   MA                 MA                 MA                 7A96 M.CHAN        8044 I.MATHEWS     1B13 C.LAWRENCE   
MA                 MA                 MA                 MC CHECKOUT/7A96   MC CHECKOUT/8044   CHANGE/1B13 C.LAWR 1B13 C.LAWRENCE   
MA                 MA                 MA                 7A96 M.CHAN        8044 I.MATHEWS     1B13 C.LAWRENCE    1B13 C.LAWRENCE   
BEAM   LINE 9-3  
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
2858 J.PENNER-H/MA MA                 MA                 MA                 2858 J.PENNER-HAHN 2820 J.PENNER-HAHN 2820 J.PENNER-HAHN
MA                 MA                 MA                 2858 J.PENNER-HAHN CHANGE/2820 J.PENN 2820 J.PENNER-HAHN 2820 J.PENNER-HAHN
MA                 MA                 MA                 2858 J.PENNER-HAHN 2820 J.PENNER-HAHN 2820 J.PENNER-HAHN 2820 J.PENNER-HAHN
BEAM   LINE 10-1 
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
2644 T.KENDELEW/MA MA                 MA                 MA                 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ
MA                 MA                 MA                 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ
MA                 MA                 MA                 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ
BEAM   LINE 10-2 
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
2786 J.ANDREWS/MA  MA                 MA                 MA                 2786 J.ANDREWS     2741 N.PINGITORE   2741 N.PINGITORE  
MA                 MA                 MA                 2786 J.ANDREWS     Xray CHECKOUT/2741 2741 N.PINGITORE   CHANGE/2744 N.PING
MA                 MA                 MA                 2786 J.ANDREWS     2741 N.PINGITORE   2741 N.PINGITORE   2744 N.PINGITORE  
BEAM   LINE 11-1 
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
9A05 E.GETZOFF/MA  MA                 MA                 MA                 9B01 A.DEACON      9A02 G.CHANG       CHANGE/9A55 C.GARC
MA                 MA                 MA                 CHANGE/9B01 A.DEAC MC CHECKOUT/9A02   9A02 G.CHANG       9A55 C.GARCIA     
MA                 MA                 MA                 9B01 A.DEACON      9A02 G.CHANG       9A02 G.CHANG       9A55 C.GARCIA     
BEAM   LINE 11-2 
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
2821 J.DAVIS/MA    MA                 MA                 MA                 2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
MA                 MA                 MA                 MES CHECKOUT/2645  2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
MA                 MA                 MA                 2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
BEAM   LINE 11-3 
Jun. 14, 2004      Jun. 15, 2004      Jun. 16, 2004      Jun. 17, 2004      Jun. 18, 2004      Jun. 19, 2004      Jun. 20, 2004     
6A87 E.BALDWIN/MA  MA                 MA                 MA                 7A42 C.PETERS-LIBE 6A97 M.MURPHY      6A97 M.MURPHY     
MA                 MA                 MA                 MC CHECKOUT/7A42   MC CHECKOUT/6A97   6A97 M.MURPHY      6A97 M.MURPHY     
MA                 MA                 MA                 7A42 C.PETERS-LIBE 6A97 M.MURPHY      6A97 M.MURPHY      6A97 M.MURPHY     

Back to Table of Contents

WEEK OF Jun. 21, 2004
                                         
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
BEAM   LINE 1-4  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 1-5  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
DOWN               DOWN               DOWN               DOWN               Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 2-1  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
2832 K.SAVAGE      2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN  
Xray CHECKOUT/2722 2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN  
2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN   2722 Z.ALTOUNIAN  
BEAM   LINE 2-2  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
2622 K.HODGSON     2848 F.JALILEHVAND 2848 F.JALILEHVAND 2848 F.JALILEHVAND 2731 M.SANDSTROM   2731 M.SANDSTROM   2731 M.SANDSTROM  
Xray CHECKOUT/2848 2848 F.JALILEHVAND 2848 F.JALILEHVAND S2#4>S2#1/2731     2731 M.SANDSTROM   2731 M.SANDSTROM   2731 M.SANDSTROM  
2848 F.JALILEHVAND 2848 F.JALILEHVAND 2848 F.JALILEHVAND 2731 M.SANDSTROM   2731 M.SANDSTROM   2731 M.SANDSTROM   2731 M.SANDSTROM  
BEAM   LINE 3-1  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
2672 G.WONG        2672 G.WONG        2672 G.WONG        2672 G.WONG        2672 G.WONG        2873 R.STROUD      2873 R.STROUD     
2672 G.WONG        2672 G.WONG        2672 G.WONG        2672 G.WONG        CHANGE/2873 R.STRO 2873 R.STROUD      2873 R.STROUD     
2672 G.WONG        2672 G.WONG        2672 G.WONG        2672 G.WONG        2873 R.STROUD      2873 R.STROUD      2873 R.STROUD     
BEAM   LINE 5-1  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 5-2  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
BEAM   LINE 6-2  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
2849 P.KENNEPOHL   2849 P.KENNEPOHL   2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
2849 P.KENNEPOHL   Xray CHECKOUT/2645 2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
2849 P.KENNEPOHL   2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
BEAM   LINE 7-2  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
2842 M.WARD        2841 M.TONEY       2841 M.TONEY       2841 M.TONEY       2853 J.KLINE       2853 J.KLINE       2853 J.KLINE      
CHANGE/2841 M.TONE 2841 M.TONEY       2841 M.TONEY       CHANGE/2853 J.KLIN 2853 J.KLINE       2853 J.KLINE       2853 J.KLINE      
2841 M.TONEY       2841 M.TONEY       2841 M.TONEY       2853 J.KLINE       2853 J.KLINE       2853 J.KLINE       2853 J.KLINE      
BEAM   LINE 8-1  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
8821 D.BREHMER     8821 D.BREHMER     8821 D.BREHMER     2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE        
8821 D.BREHMER     8821 D.BREHMER     CHANGE/2865 D.LEE  2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE        
8821 D.BREHMER     8821 D.BREHMER     2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE        
BEAM   LINE 8-2  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
2850 P.KENNEPOHL   2850 P.KENNEPOHL   2850 P.KENNEPOHL   2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
2850 P.KENNEPOHL   2850 P.KENNEPOHL   VUV CHECKOUT       2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
2850 P.KENNEPOHL   2850 P.KENNEPOHL   2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
BEAM   LINE 9-1  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
7A82 G.CHANG       9A67 W.HOL         7A74 M.ROMANOWSKI  9A75 T.STOUT       7A75 P.BJORKMAN    1B12 A.YAMAGATA    1B12 A.YAMAGATA   
MC CHECKOUT/9A67   MC CHECKOUT/7A74   MC CHECKOUT/9A75   MC CHECKOUT/7A75   MC CHECKOUT/1B12   1B12 A.YAMAGATA    CHANGE/9B01 A.DEAC
9A67 W.HOL         7A74 M.ROMANOWSKI  9A75 T.STOUT       7A75 P.BJORKMAN    1B12 A.YAMAGATA    1B12 A.YAMAGATA    9B01 A.DEACON     
BEAM   LINE 9-2  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
1B13 C.LAWRENCE    8054 M.SOLTIS      8054 M.SOLTIS      7A27 D.REES        7A27 D.REES        7A59 E.BAKER       7A59 E.BAKER      
MC CHECKOUT/8054   8054 M.SOLTIS      MC CHECKOUT/7A27   7A27 D.REES        MC CHECKOUT/7A59   7A59 E.BAKER       7A59 E.BAKER      
8054 M.SOLTIS      8054 M.SOLTIS      7A27 D.REES        7A27 D.REES        7A59 E.BAKER       7A59 E.BAKER       7A59 E.BAKER      
BEAM   LINE 9-3  
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
2820 J.PENNER-HAHN 2593 R.SCOTT       2593 R.SCOTT       2593 R.SCOTT       2593 R.SCOTT       90T6 R.SCOTT       90T6 R.SCOTT      
SMB CHECKOUT/2593  2593 R.SCOTT       2593 R.SCOTT       2593 R.SCOTT       SMB CHECKOUT/90T6  90T6 R.SCOTT       90T6 R.SCOTT      
2593 R.SCOTT       2593 R.SCOTT       2593 R.SCOTT       2593 R.SCOTT       90T6 R.SCOTT       90T6 R.SCOTT       90T6 R.SCOTT      
BEAM   LINE 10-1 
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON    
2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ VUV CHECKOUT       2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON    
2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2644 T.KENDELEWICZ 2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON    
BEAM   LINE 10-2 
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
2744 N.PINGITORE   2744 N.PINGITORE   2744 N.PINGITORE   2852 F.BRIDGES     2852 F.BRIDGES     2852 F.BRIDGES     2852 F.BRIDGES    
2744 N.PINGITORE   2744 N.PINGITORE   Xray CHECKOUT/2852 2852 F.BRIDGES     2852 F.BRIDGES     2852 F.BRIDGES     2852 F.BRIDGES    
2744 N.PINGITORE   2744 N.PINGITORE   2852 F.BRIDGES     2852 F.BRIDGES     2852 F.BRIDGES     2852 F.BRIDGES     2852 F.BRIDGES    
BEAM   LINE 11-1 
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
9A55 C.GARCIA      9A52 A.BRUNGER     9A50 W.WEIS        9A53 R.KORNBERG    1B16 H.NOLLER      9A01 I.WILSON      9A01 I.WILSON     
MC CHECKOUT/9A52   MC CHECKOUT/9A50   MC CHECKOUT/9A53   MC CHECKOUT/1B16   MC CHECKOUT/9A01   9A01 I.WILSON      9A01 I.WILSON     
9A52 A.BRUNGER     9A50 W.WEIS        9A53 R.KORNBERG    1B16 H.NOLLER      9A01 I.WILSON      9A01 I.WILSON      9A01 I.WILSON     
BEAM   LINE 11-2 
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
2645 S.MYNENI      2771 F.FARGES      2771 F.FARGES      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
MES CHECKOUT/2771  2771 F.FARGES      MES CHECKOUT/2645  2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
2771 F.FARGES      2771 F.FARGES      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI      2645 S.MYNENI     
BEAM   LINE 11-3 
Jun. 21, 2004      Jun. 22, 2004      Jun. 23, 2004      Jun. 24, 2004      Jun. 25, 2004      Jun. 26, 2004      Jun. 27, 2004     
6A97 M.MURPHY      9A85 D.BUSSIERE    7A78 S.TSAI        6A37 K.BREJC       9A65 K.ZHANG       1B06 M.LUO         1B06 M.LUO        
MC CHECKOUT/9A85   MC CHECKOUT/7A78   MC CHECKOUT/6A37   MC CHECKOUT/9A65   MC CHECKOUT/1B06   1B06 M.LUO         1B06 M.LUO        
9A85 D.BUSSIERE    7A78 S.TSAI        6A37 K.BREJC       9A65 K.ZHANG       1B06 M.LUO         1B06 M.LUO         1B06 M.LUO        

Back to Table of Contents

WEEK OF Jun. 28, 2004
AP/Bl1 opens       AP                                    
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
BEAM   LINE 1-4  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
AP                 AP                 AP                 8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE      
AP                 AP                 8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE      
AP                 AP                 8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE      
BEAM   LINE 1-5  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
AP                 AP                 AP                 8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON 
AP                 AP                 8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON 
AP                 AP                 8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON 
BEAM   LINE 2-1  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
2722 Z.ALTOUNIA/AP AP                 AP                 8859 B.JOHNSON     2799 V.IMBENI      2799 V.IMBENI      2799 V.IMBENI     
AP                 AP                 CHANGE/8859 B.JOHN Xray CHECKOUT/2799 2799 V.IMBENI      2799 V.IMBENI      2799 V.IMBENI     
AP                 AP                 8859 B.JOHNSON     2799 V.IMBENI      2799 V.IMBENI      2799 V.IMBENI      2799 V.IMBENI     
BEAM   LINE 2-2  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
2731 M.SANDSTRO/AP AP                 AP                 2878 V.YACHANDRA   2878 V.YACHANDRA   2878 V.YACHANDRA   2878 V.YACHANDRA  
AP                 AP                 Xray CHECKOUT/2878 2878 V.YACHANDRA   2878 V.YACHANDRA   2878 V.YACHANDRA   2878 V.YACHANDRA  
AP                 AP                 2878 V.YACHANDRA   2878 V.YACHANDRA   2878 V.YACHANDRA   2878 V.YACHANDRA   2878 V.YACHANDRA  
BEAM   LINE 3-1  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
2873 R.STROUD/AP   AP                 AP                 2769 P.HARBURY     2769 P.HARBURY     2755 D.HERSCHLAG   2755 D.HERSCHLAG  
AP                 AP                 CHANGE/2769 P.HARB 2769 P.HARBURY     CHANGE/2755 D.HERS 2755 D.HERSCHLAG   2755 D.HERSCHLAG  
AP                 AP                 2769 P.HARBURY     2769 P.HARBURY     2755 D.HERSCHLAG   2755 D.HERSCHLAG   2755 D.HERSCHLAG  
BEAM   LINE 5-1  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
AP                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 5-2  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
DOWN/AP            AP                 AP                 DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
AP                 AP                 DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
9702 Z.SHEN/AP     AP                 AP                 9702 Z.SHEN        9702 Z.SHEN        2859 A.DAMASCELLI  2859 A.DAMASCELLI 
AP                 AP                 CHANGE/9702 Z.SHEN 9702 Z.SHEN        CHANGE/2859 A.DAMA 2859 A.DAMASCELLI  2859 A.DAMASCELLI 
AP                 AP                 9702 Z.SHEN        9702 Z.SHEN        2859 A.DAMASCELLI  2859 A.DAMASCELLI  2859 A.DAMASCELLI 
BEAM   LINE 6-2  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
2645 S.MYNENI/AP   AP                 AP                 2731 M.SANDSTROM   2731 M.SANDSTROM   2819 G.GEORGE      2819 G.GEORGE     
AP                 AP                 Xray CHECKOUT/2731 2731 M.SANDSTROM   Xray CHECKOUT/2819 2819 G.GEORGE      2819 G.GEORGE     
AP                 AP                 2731 M.SANDSTROM   2731 M.SANDSTROM   2819 G.GEORGE      2819 G.GEORGE      2819 G.GEORGE     
BEAM   LINE 7-2  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
2853 J.KLINE/AP    AP                 AP                 2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS      
AP                 AP                 Xray CHECKOUT/2791 2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS      
AP                 AP                 2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS       2791 C.LUCAS      
BEAM   LINE 8-1  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
2865 D.LEE/AP      AP                 AP                 2865 D.LEE         90R5 C.CHUI        90R5 C.CHUI        90R5 C.CHUI       
AP                 AP                 2865 D.LEE         CHANGE/90R5 C.CHUI 90R5 C.CHUI        90R5 C.CHUI        90R5 C.CHUI       
AP                 AP                 2865 D.LEE         90R5 C.CHUI        90R5 C.CHUI        90R5 C.CHUI        90R5 C.CHUI       
BEAM   LINE 8-2  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
2753 E.SOLOMON/AP  AP                 AP                 2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
AP                 AP                 2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
AP                 AP                 2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
BEAM   LINE 9-1  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
9B01 A.DEACON/AP   AP                 AP                 7A42 C.PETERS-LIBE 9A40 A.VILLASENOR  1B02 D.BARONDEAU   1B02 D.BARONDEAU  
AP                 AP                 MC CHECKOUT/7A42   MC CHECKOUT/9A40   MC CHECKOUT/1B02   1B02 D.BARONDEAU   1B02 D.BARONDEAU  
AP                 AP                 7A42 C.PETERS-LIBE 9A40 A.VILLASENOR  1B02 D.BARONDEAU   1B02 D.BARONDEAU   1B02 D.BARONDEAU  
BEAM   LINE 9-2  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
7A59 E.BAKER/AP    AP                 AP                 1R22 M.MAHER       1R22 M.MAHER       7A37 S.LIPPARD     7A37 S.LIPPARD    
AP                 AP                 MC CHECKOUT/1R22   1R22 M.MAHER       MC CHECKOUT/7A37   7A37 S.LIPPARD     7A37 S.LIPPARD    
AP                 AP                 1R22 M.MAHER       1R22 M.MAHER       7A37 S.LIPPARD     7A37 S.LIPPARD     7A37 S.LIPPARD    
BEAM   LINE 9-3  
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
90T6 R.SCOTT/AP    AP                 AP                 2890 S.GEORGE      2890 S.GEORGE      2883 G.GEORGE      2883 G.GEORGE     
AP                 AP                 SMB CHECKOUT/2890  2890 S.GEORGE      SMB CHECKOUT/2883  2883 G.GEORGE      2883 G.GEORGE     
AP                 AP                 2890 S.GEORGE      2890 S.GEORGE      2883 G.GEORGE      2883 G.GEORGE      2883 G.GEORGE     
BEAM   LINE 10-1 
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
2880 K.HODGSON/AP  AP                 AP                 2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON    
AP                 AP                 2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON    
AP                 AP                 2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON     2880 K.HODGSON    
BEAM   LINE 10-2 
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
2852 F.BRIDGES/AP  AP                 AP                 2889 C.YOO         2889 C.YOO         2889 C.YOO         2889 C.YOO        
AP                 AP                 X-S1>S1/2889       2889 C.YOO         2889 C.YOO         2889 C.YOO         2889 C.YOO        
AP                 AP                 2889 C.YOO         2889 C.YOO         2889 C.YOO         2889 C.YOO         2889 C.YOO        
BEAM   LINE 11-1 
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
9A01 I.WILSON/AP   AP                 AP                 9A85 D.BUSSIERE    9A07 C.STOUT       7A58 M.WILSON      7A58 M.WILSON     
AP                 AP                 MC CHECKOUT/9A85   MC CHECKOUT/9A07   MC CHECKOUT/7A58   7A58 M.WILSON      7A58 M.WILSON     
AP                 AP                 9A85 D.BUSSIERE    9A07 C.STOUT       7A58 M.WILSON      7A58 M.WILSON      7A58 M.WILSON     
BEAM   LINE 11-2 
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
2645 S.MYNENI/AP   AP                 AP                 8833 J.ROGERS      2745 T.GUO         2783 G.BROWN       2783 G.BROWN      
AP                 AP                 CHANGE/8833 J.ROGE GIXAS/2745         MES CHECKOUT/2783  2783 G.BROWN       2783 G.BROWN      
AP                 AP                 8833 J.ROGERS      2745 T.GUO         2783 G.BROWN       2783 G.BROWN       2783 G.BROWN      
BEAM   LINE 11-3 
Jun. 28, 2004      Jun. 29, 2004      Jun. 30, 2004      Jul. 01, 2004      Jul. 02, 2004      Jul. 03, 2004      Jul. 04, 2004     
1B06 M.LUO/AP      AP                 AP                 7A57 J.FEE         7A57 J.FEE         7A80 J.PERONA      7A80 J.PERONA     
AP                 AP                 MC CHECKOUT/7A57   7A57 J.FEE         MC CHECKOUT/7A80   7A80 J.PERONA      7A80 J.PERONA     
AP                 AP                 7A57 J.FEE         7A57 J.FEE         7A80 J.PERONA      7A80 J.PERONA      7A80 J.PERONA     

Back to Table of Contents

WEEK OF Jul. 05, 2004
HOLIDAY                                          
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
BEAM   LINE 1-4  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE      
8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE      
8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE       8840 J.POPLE      
BEAM   LINE 1-5  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON 
8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON 
8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON  8858 D.HARRINGTON 
BEAM   LINE 2-1  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
2799 V.IMBENI      2799 V.IMBENI      2764 J.BARGAR      2764 J.BARGAR      2764 J.BARGAR      2764 J.BARGAR      2764 J.BARGAR     
2799 V.IMBENI      Xray CHECKOUT/2764 2764 J.BARGAR      2764 J.BARGAR      2764 J.BARGAR      2764 J.BARGAR      2764 J.BARGAR     
2799 V.IMBENI      2764 J.BARGAR      2764 J.BARGAR      2764 J.BARGAR      2764 J.BARGAR      2764 J.BARGAR      2764 J.BARGAR     
BEAM   LINE 2-2  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
2878 V.YACHANDRA   2878 V.YACHANDRA   2788 S.FENDORF     2788 S.FENDORF     2750 G.BROWN       2750 G.BROWN       2750 G.BROWN      
2878 V.YACHANDRA   Xray CHECKOUT/2788 2788 S.FENDORF     X-S2#1>S2#4/2750   2750 G.BROWN       2750 G.BROWN       2750 G.BROWN      
2878 V.YACHANDRA   2788 S.FENDORF     2788 S.FENDORF     2750 G.BROWN       2750 G.BROWN       2750 G.BROWN       2750 G.BROWN      
BEAM   LINE 3-1  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
2755 D.HERSCHLAG   2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA    
CHANGE/2796 C.SAFI 2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA    
2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA     2796 C.SAFINYA    
BEAM   LINE 5-1  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
Unscheduled        CHANGE/8812 M.ROWE 8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN      
Unscheduled        8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN      
Unscheduled        8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN      
BEAM   LINE 5-2  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
2859 A.DAMASCELLI  2859 A.DAMASCELLI  Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
2859 A.DAMASCELLI  Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
2859 A.DAMASCELLI  Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
2819 G.GEORGE      2819 G.GEORGE      2819 G.GEORGE      2802 S.DEBEER-GEOR 2802 S.DEBEER-GEOR 2623 K.HODGSON     2623 K.HODGSON    
2819 G.GEORGE      2819 G.GEORGE      CHANGE/2802 S.DEBE 2802 S.DEBEER-GEOR CHANGE/2623 K.HODG 2623 K.HODGSON     2623 K.HODGSON    
2819 G.GEORGE      2819 G.GEORGE      2802 S.DEBEER-GEOR 2802 S.DEBEER-GEOR 2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON    
BEAM   LINE 7-2  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
2791 C.LUCAS       2791 C.LUCAS       2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE   
2791 C.LUCAS       Xray CHECKOUT/2767 2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE   
2791 C.LUCAS       2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE    2767 P.MCINTYRE   
BEAM   LINE 8-1  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
90R5 C.CHUI        90S1 J.CHANG       90S1 J.CHANG       90S1 J.CHANG       2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
CHANGE/90S1 J.CHAN 90S1 J.CHANG       90S1 J.CHANG       VUV CHECKOUT       2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
90S1 J.CHANG       90S1 J.CHANG       90S1 J.CHANG       2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
BEAM   LINE 8-2  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2869 E.NELSON      2869 E.NELSON      2869 E.NELSON      2869 E.NELSON     
2753 E.SOLOMON     2753 E.SOLOMON     VUV CHECKOUT       2869 E.NELSON      2869 E.NELSON      2869 E.NELSON      2869 E.NELSON     
2753 E.SOLOMON     2753 E.SOLOMON     2869 E.NELSON      2869 E.NELSON      2869 E.NELSON      2869 E.NELSON      2869 E.NELSON     
BEAM   LINE 9-1  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
1B02 D.BARONDEAU   CHANGE/7A29 W.WEIS 1B10 A.KRISHNAMOOR 1B10 A.KRISHNAMOOR 9B01 A.DEACON      7A88 K.NEWBERRY    7A88 K.NEWBERRY   
1B02 D.BARONDEAU   MC CHECKOUT/1B10   1B10 A.KRISHNAMOOR CHANGE/8050 C.SMIT CHANGE/7A88 K.NEWB 7A88 K.NEWBERRY    7A88 K.NEWBERRY   
1B02 D.BARONDEAU   1B10 A.KRISHNAMOOR 1B10 A.KRISHNAMOOR CHANGE/9B01 A.DEAC 7A88 K.NEWBERRY    7A88 K.NEWBERRY    7A88 K.NEWBERRY   
BEAM   LINE 9-2  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
7A37 S.LIPPARD     7A29 W.WEIS        7A90 E.BALDWIN     8054 M.SOLTIS      8045 A.GONZALEZ    6A98 C.RAMAN       6A98 C.RAMAN      
CHANGE/7A29 W.WEIS MC CHECKOUT/7A90   CHANGE/8054 M.SOLT CHANGE/8045 A.GONZ MC CHECKOUT/6A98   6A98 C.RAMAN       CHANGE/8054 M.SOLT
7A29 W.WEIS        7A90 E.BALDWIN     8054 M.SOLTIS      8045 A.GONZALEZ    6A98 C.RAMAN       6A98 C.RAMAN       8054 M.SOLTIS     
BEAM   LINE 9-3  
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
2883 G.GEORGE      2883 G.GEORGE      2883 G.GEORGE      FACI               2885 I.PICKERING   2885 I.PICKERING   2885 I.PICKERING  
2883 G.GEORGE      2883 G.GEORGE      SMB/FACI           Xray CHECKOUT/2885 2885 I.PICKERING   2885 I.PICKERING   2885 I.PICKERING  
2883 G.GEORGE      2883 G.GEORGE      FACI               2885 I.PICKERING   2885 I.PICKERING   2885 I.PICKERING   2885 I.PICKERING  
BEAM   LINE 10-1 
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
2880 K.HODGSON     2880 K.HODGSON     8025 J.LUNING      8025 J.LUNING      8025 J.LUNING      8025 J.LUNING      8025 J.LUNING     
2880 K.HODGSON     VUV CHECKOUT       8025 J.LUNING      8025 J.LUNING      8025 J.LUNING      8025 J.LUNING      8025 J.LUNING     
2880 K.HODGSON     8025 J.LUNING      8025 J.LUNING      8025 J.LUNING      8025 J.LUNING      8025 J.LUNING      8025 J.LUNING     
BEAM   LINE 10-2 
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
2889 C.YOO         2889 C.YOO         2781 G.BROWN       2781 G.BROWN       2781 G.BROWN       8060 J.BARGAR      8060 J.BARGAR     
2889 C.YOO         S1>S2/2781         2781 G.BROWN       2781 G.BROWN       CHANGE/8060 J.BARG 8060 J.BARGAR      8060 J.BARGAR     
2889 C.YOO         2781 G.BROWN       2781 G.BROWN       2781 G.BROWN       8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR     
BEAM   LINE 11-1 
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
7A58 M.WILSON      9B01 A.DEACON      9A67 W.HOL         9A75 T.STOUT       9A52 A.BRUNGER     CHANGE/9A54 C.KHOS 9A50 W.WEIS       
CHANGE/9B01 A.DEAC MC CHECKOUT/9A67   MC CHECKOUT/9A75   MC CHECKOUT/9A52   MC CHECKOUT/9A55   9A54 C.KHOSLA      9A50 W.WEIS       
9B01 A.DEACON      9A67 W.HOL         9A75 T.STOUT       9A52 A.BRUNGER     9A55 C.GARCIA      CHANGE/9A50 W.WEIS 9A50 W.WEIS       
BEAM   LINE 11-2 
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
2783 G.BROWN       2783 G.BROWN       2821 J.DAVIS       2821 J.DAVIS       2674 C.BOOTH       2674 C.BOOTH       2674 C.BOOTH      
2783 G.BROWN       MES CHECKOUT/2821  2821 J.DAVIS       MES CHECKOUT/2674  2674 C.BOOTH       2674 C.BOOTH       2674 C.BOOTH      
2783 G.BROWN       2821 J.DAVIS       2821 J.DAVIS       2674 C.BOOTH       2674 C.BOOTH       2674 C.BOOTH       2674 C.BOOTH      
BEAM   LINE 11-3 
Jul. 05, 2004      Jul. 06, 2004      Jul. 07, 2004      Jul. 08, 2004      Jul. 09, 2004      Jul. 10, 2004      Jul. 11, 2004     
7A80 J.PERONA      CHANGE/8801 W.TOMP 8801 W.TOMPKINS    8801 W.TOMPKINS    CHANGE/2841 M.TONE 2841 M.TONEY       2841 M.TONEY      
7A80 J.PERONA      8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS    2841 M.TONEY       2841 M.TONEY       2841 M.TONEY      
7A80 J.PERONA      8801 W.TOMPKINS    8801 W.TOMPKINS    8801 W.TOMPKINS    2841 M.TONEY       2841 M.TONEY       2841 M.TONEY      

Back to Table of Contents

WEEK OF Jul. 12, 2004
MA       MA/AP       AP                              
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
BEAM   LINE 1-4  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
8840 J.POPLE/MA    MA                 AP                 AP                 2805 N.BALSARA     2805 N.BALSARA     2805 N.BALSARA    
MA                 AP                 AP                 CHANGE/2805 N.BALS 2805 N.BALSARA     2805 N.BALSARA     2805 N.BALSARA    
MA                 AP                 AP                 2805 N.BALSARA     2805 N.BALSARA     2805 N.BALSARA     2805 N.BALSARA    
BEAM   LINE 1-5  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
8858 D.HARRINGT/MA MA/AP              AP                 AP                 8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS      
MA                 AP                 AP                 8858 D.HARRINGTON  8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS      
MA                 AP                 AP                 CHANGE/8824 P.ELLI 8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS      
BEAM   LINE 2-1  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
2764 J.BARGAR/MA   MA                 AP                 AP                 2665 P.MCINTYRE    2665 P.MCINTYRE    2665 P.MCINTYRE   
MA                 AP                 AP                 Xray CHECKOUT/2665 2665 P.MCINTYRE    2665 P.MCINTYRE    2665 P.MCINTYRE   
MA                 AP                 AP                 2665 P.MCINTYRE    2665 P.MCINTYRE    2665 P.MCINTYRE    2665 P.MCINTYRE   
BEAM   LINE 2-2  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
2750 G.BROWN/MA    MA                 AP                 AP                 2860 S.SCOTT       2860 S.SCOTT       2860 S.SCOTT      
MA                 AP                 AP                 X-S2>S1/2860       2860 S.SCOTT       2860 S.SCOTT       2860 S.SCOTT      
MA                 AP                 AP                 2860 S.SCOTT       2860 S.SCOTT       2860 S.SCOTT       2860 S.SCOTT      
BEAM   LINE 3-1  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
2796 C.SAFINYA/MA  MA                 AP                 AP                 2706 W.WEIS        8804 H.TSURUTA     8059 H.TSURUTA    
MA                 AP                 AP                 CHANGE/2706 W.WEIS CHANGE/8804 H.TSUR CHANGE/8059 H.TSUR 8059 H.TSURUTA    
MA                 AP                 AP                 2706 W.WEIS        8804 H.TSURUTA     8059 H.TSURUTA     8059 H.TSURUTA    
BEAM   LINE 5-1  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
8812 M.ROWEN/MA    MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
MA                 AP                 AP                 Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 5-2  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
DOWN/MA            MA                 AP                 AP                 DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
MA                 AP                 AP                 DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
MA                 MA                 AP                 AP                 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
MA                 AP                 AP                 CHANGE/9702 Z.SHEN 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
MA                 AP                 AP                 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN       
BEAM   LINE 6-2  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
2623 K.HODGSON/MA  MA                 AP                 AP                 2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON    
MA                 AP                 AP                 2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON    
MA                 AP                 AP                 2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON     2623 K.HODGSON    
BEAM   LINE 7-2  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
2767 P.MCINTYRE/MA MA                 AP                 AP                 2831 S.BRENNAN     2831 S.BRENNAN     2831 S.BRENNAN    
MA                 AP                 AP                 Xray CHECKOUT/2831 2831 S.BRENNAN     2831 S.BRENNAN     2831 S.BRENNAN    
MA                 AP                 AP                 2831 S.BRENNAN     2831 S.BRENNAN     2831 S.BRENNAN     2831 S.BRENNAN    
BEAM   LINE 8-1  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
2753 E.SOLOMON/MA  MA                 AP                 AP                 2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
MA                 AP                 AP                 2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
MA                 AP                 AP                 2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
BEAM   LINE 8-2  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
2869 E.NELSON/MA   MA                 AP                 AP                 2869 E.NELSON      2869 E.NELSON      2869 E.NELSON     
MA                 AP                 AP                 2869 E.NELSON      2869 E.NELSON      2869 E.NELSON      2869 E.NELSON     
MA                 AP                 AP                 2869 E.NELSON      2869 E.NELSON      2869 E.NELSON      2869 E.NELSON     
BEAM   LINE 9-1  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
7A88 K.NEWBERRY/MA MA/AP              AP                 AP                 7A42 C.PETERS-LIBE 7A69 S.RICHARD     7A69 S.RICHARD    
MA                 AP                 AP                 MC CHECKOUT/7A42   MC CHECKOUT/7A69   7A69 S.RICHARD     7A69 S.RICHARD    
MA                 AP                 AP                 7A42 C.PETERS-LIBE 7A69 S.RICHARD     7A69 S.RICHARD     7A69 S.RICHARD    
BEAM   LINE 9-2  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
8054 M.SOLTIS/MA   MA/AP              AP                 AP                 8121 A.BRUNGER     7A62 V.SUNDARESAN  7A62 V.SUNDARESAN 
MA                 AP                 AP                 Unscheduled        MC CHECKOUT/7A62   7A62 V.SUNDARESAN  CHANGE/9B01 A.DEAC
MA                 AP                 AP                 MC CHECKOUT/8121   7A62 V.SUNDARESAN  7A62 V.SUNDARESAN  9B01 A.DEACON     
BEAM   LINE 9-3  
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
2885 I.PICKERIN/MA MA                 AP                 AP                 8816 B.HEDMAN      8816 B.HEDMAN      8816 B.HEDMAN     
MA                 AP                 AP                 SMB CHECKOUT/8816  8816 B.HEDMAN      8816 B.HEDMAN      SMB CHECKOUT/8116 
MA                 AP                 AP                 8816 B.HEDMAN      8816 B.HEDMAN      8816 B.HEDMAN      8116 B.HEDMAN     
BEAM   LINE 10-1 
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
8025 J.LUNING/MA   MA                 AP                 AP                 8025 J.LUNING      8025 J.LUNING      8025 J.LUNING     
MA                 AP                 AP                 8025 J.LUNING      8025 J.LUNING      8025 J.LUNING      8025 J.LUNING     
MA                 AP                 AP                 8025 J.LUNING      8025 J.LUNING      8025 J.LUNING      8025 J.LUNING     
BEAM   LINE 10-2 
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
8060 J.BARGAR/MA   MA                 AP                 AP                 8852 U.BERGMANN    8852 U.BERGMANN    8052 U.BERGMANN   
MA                 AP                 AP                 Xray CHECKOUT/8852 8852 U.BERGMANN    CHANGE/8052 U.BERG 8052 U.BERGMANN   
MA                 AP                 AP                 8852 U.BERGMANN    8852 U.BERGMANN    8052 U.BERGMANN    8052 U.BERGMANN   
BEAM   LINE 11-1 
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
9A50 W.WEIS/MA     MA/AP              AP                 AP                 9A06 P.SCHIMMEL    9A07 C.STOUT       9A07 C.STOUT      
MA                 AP                 AP                 MC CHECKOUT/9A06   MC CHECKOUT/9A07   9A07 C.STOUT       CHANGE/9B01 A.DEAC
MA                 AP                 AP                 9A06 P.SCHIMMEL    9A07 C.STOUT       9A07 C.STOUT       9B01 A.DEACON     
BEAM   LINE 11-2 
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
2674 C.BOOTH/MA    MA                 AP                 AP                 2674 C.BOOTH       2674 C.BOOTH       2795 W.LUKENS     
MA                 AP                 AP                 2674 C.BOOTH       2674 C.BOOTH       CHANGE/2795 W.LUKE 2795 W.LUKENS     
MA                 AP                 AP                 2674 C.BOOTH       2674 C.BOOTH       2795 W.LUKENS      2795 W.LUKENS     
BEAM   LINE 11-3 
Jul. 12, 2004      Jul. 13, 2004      Jul. 14, 2004      Jul. 15, 2004      Jul. 16, 2004      Jul. 17, 2004      Jul. 18, 2004     
2841 M.TONEY/MA    MA/AP              AP                 AP                 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
MA                 AP                 AP                 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      
MA                 AP                 AP                 8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       8051 M.TONEY      

Back to Table of Contents

WEEK OF Jul. 19, 2004
                                         
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
BEAM   LINE 1-4  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
2805 N.BALSARA     2805 N.BALSARA     2805 N.BALSARA     2702 J.KINNEY      2702 J.KINNEY      2702 J.KINNEY      2702 J.KINNEY     
2805 N.BALSARA     2805 N.BALSARA     CHANGE/2702 J.KINN 2702 J.KINNEY      2702 J.KINNEY      2702 J.KINNEY      2702 J.KINNEY     
2805 N.BALSARA     2805 N.BALSARA     2702 J.KINNEY      2702 J.KINNEY      2702 J.KINNEY      2702 J.KINNEY      2702 J.KINNEY     
BEAM   LINE 1-5  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS      
8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS      
8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS      
BEAM   LINE 2-1  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
2665 P.MCINTYRE    2665 P.MCINTYRE    2665 P.MCINTYRE    2843 J.BILELLO     2843 J.BILELLO     2843 J.BILELLO     2732 S.FENDORF    
2665 P.MCINTYRE    2665 P.MCINTYRE    Xray CHECKOUT/2843 2843 J.BILELLO     2843 J.BILELLO     CHANGE/2732 S.FEND 2732 S.FENDORF    
2665 P.MCINTYRE    2665 P.MCINTYRE    2843 J.BILELLO     2843 J.BILELLO     2843 J.BILELLO     2732 S.FENDORF     2732 S.FENDORF    
BEAM   LINE 2-2  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 2-3  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
2860 S.SCOTT       1E80 M.BENFATTO    1E80 M.BENFATTO    1E80 M.BENFATTO    1E80 M.BENFATTO    90U1 G.HIRSCH      90U1 G.HIRSCH     
Xray CHECKOUT/1E80 1E80 M.BENFATTO    1E80 M.BENFATTO    1E80 M.BENFATTO    Xray CHECKOUT/90U1 90U1 G.HIRSCH      90U1 G.HIRSCH     
1E80 M.BENFATTO    1E80 M.BENFATTO    1E80 M.BENFATTO    1E80 M.BENFATTO    90U1 G.HIRSCH      90U1 G.HIRSCH      90U1 G.HIRSCH     
BEAM   LINE 3-1  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 3-3  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 4-2  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
8059 H.TSURUTA     90U3 M.BRZUSTOWICZ 2870 W.SHEN        2870 W.SHEN        2770 E.KANTROWITZ  2770 E.KANTROWITZ  2770 E.KANTROWITZ 
CHANGE/90U3 M.BRZU CHANGE/2870 W.SHEN 2870 W.SHEN        S1>Multi/2770      2770 E.KANTROWITZ  2770 E.KANTROWITZ  2770 E.KANTROWITZ 
90U3 M.BRZUSTOWICZ 2870 W.SHEN        2870 W.SHEN        2770 E.KANTROWITZ  2770 E.KANTROWITZ  2770 E.KANTROWITZ  2770 E.KANTROWITZ 
BEAM   LINE 5-1  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
CHANGE/8812 M.ROWE 8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN      
8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN      
8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN       8812 M.ROWEN      
BEAM   LINE 5-2  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               DOWN              
BEAM   LINE 5-4  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
9702 Z.SHEN        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled       
BEAM   LINE 6-2  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
2623 K.HODGSON     2845 R.SZILAGYI    2845 R.SZILAGYI    2845 R.SZILAGYI    8841 K.LUNING      8841 K.LUNING      8841 K.LUNING     
Xray CHECKOUT/2845 2845 R.SZILAGYI    2845 R.SZILAGYI    CHANGE/8841 K.LUNI 8841 K.LUNING      8841 K.LUNING      8841 K.LUNING     
2845 R.SZILAGYI    2845 R.SZILAGYI    2845 R.SZILAGYI    8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      8841 K.LUNING     
BEAM   LINE 7-2  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
2831 S.BRENNAN     8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO    
Xray CHECKOUT/8051 8051 M.TONEY       8051 M.TONEY       Xray CHECKOUT/2592 2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO    
8051 M.TONEY       8051 M.TONEY       8051 M.TONEY       2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO     2592 J.BILELLO    
BEAM   LINE 8-1  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON    
BEAM   LINE 8-2  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
2869 E.NELSON      2869 E.NELSON      2869 E.NELSON      2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN 
2869 E.NELSON      2869 E.NELSON      CHANGE/2835 A.VAN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN 
2869 E.NELSON      2869 E.NELSON      2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN 
BEAM   LINE 9-1  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
7A69 S.RICHARD     MC CHECKOUT/7A94   9A75 T.STOUT       CHANGE/7A81 G.CING 7A45 A.FISHER      7A93 B.MOOERS      7A93 B.MOOERS     
MC CHECKOUT/7A50   MC CHECKOUT/9A75   MC CHECKOUT/7A74   7A81 G.CINGOLANI   MC CHECKOUT/7A93   7A93 B.MOOERS      7A93 B.MOOERS     
7A50 C.EIGENBROT   9A75 T.STOUT       7A74 M.ROMANOWSKI  CHANGE/7A45 A.FISH 7A93 B.MOOERS      7A93 B.MOOERS      7A93 B.MOOERS     
BEAM   LINE 9-2  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
9B01 A.DEACON      7A94 E.BERRY       7A78 S.TSAI        7A81 G.CINGOLANI   6A96 D.WILSON      7A20 I.WILSON      7A20 I.WILSON     
MC CHECKOUT/7A94   MC CHECKOUT/7A78   MC CHECKOUT/7A81   MC CHECKOUT/6A96   MC CHECKOUT/7A20   7A20 I.WILSON      CHANGE/9B01 A.DEAC
7A94 E.BERRY       7A78 S.TSAI        7A81 G.CINGOLANI   6A96 D.WILSON      7A20 I.WILSON      7A20 I.WILSON      9B01 A.DEACON     
BEAM   LINE 9-3  
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
8116 B.HEDMAN      8116 B.HEDMAN      8116 B.HEDMAN      8116 B.HEDMAN      8116 B.HEDMAN      2713 V.YACHANDRA   2713 V.YACHANDRA  
8116 B.HEDMAN      8116 B.HEDMAN      8116 B.HEDMAN      8116 B.HEDMAN      SMB CHECKOUT/2713  2713 V.YACHANDRA   2713 V.YACHANDRA  
8116 B.HEDMAN      8116 B.HEDMAN      8116 B.HEDMAN      8116 B.HEDMAN      2713 V.YACHANDRA   2713 V.YACHANDRA   2713 V.YACHANDRA  
BEAM   LINE 10-1 
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
8025 J.LUNING      2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE        
VUV CHECKOUT       2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE        
2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE        
BEAM   LINE 10-2 
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
8052 U.BERGMANN    8052 U.BERGMANN    FACI               8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR      8015 A.MEHTA      
8052 U.BERGMANN    GraphAnal/FACI     Xray CHECKOUT/8060 8060 J.BARGAR      8060 J.BARGAR      CHANGE/8015 A.MEHT 8015 A.MEHTA      
8052 U.BERGMANN    FACI               8060 J.BARGAR      8060 J.BARGAR      8060 J.BARGAR      8015 A.MEHTA       8015 A.MEHTA      
BEAM   LINE 11-1 
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
9B01 A.DEACON      9A04 J.JOHNSON     9A02 G.CHANG       9A65 K.ZHANG       9A53 R.KORNBERG    9A50 W.WEIS        9A54 C.KHOSLA     
MC CHECKOUT/9A04   MC CHECKOUT/9A02   MC CHECKOUT/9A65   MC CHECKOUT/9A53   MC CHECKOUT/9A50   9A50 W.WEIS        CHANGE/9A55 C.GARC
9A04 J.JOHNSON     9A02 G.CHANG       9A65 K.ZHANG       9A53 R.KORNBERG    9A50 W.WEIS        CHANGE/9A54 C.KHOS CHANGE/9A52 A.BRUN
BEAM   LINE 11-2 
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
2795 W.LUKENS      2590 S.CONRADSON   2590 S.CONRADSON   2590 S.CONRADSON   2591 B.BEGG        2591 B.BEGG        2591 B.BEGG       
MES CHECKOUT/2590  2590 S.CONRADSON   2590 S.CONRADSON   CHANGE/2591 B.BEGG 2591 B.BEGG        2591 B.BEGG        CHANGE/2757 N.HESS
2590 S.CONRADSON   2590 S.CONRADSON   2590 S.CONRADSON   2591 B.BEGG        2591 B.BEGG        2591 B.BEGG        2757 N.HESS       
BEAM   LINE 11-3 
Jul. 19, 2004      Jul. 20, 2004      Jul. 21, 2004      Jul. 22, 2004      Jul. 23, 2004      Jul. 24, 2004      Jul. 25, 2004     
Xray CHECKOUT/2879 2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS  
2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS  
2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS   2879 A.VAILIONIS  

Back to Table of Contents

WEEK OF Jul. 26, 2004
                              Run ends 6pm            
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
BEAM   LINE 1-4  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
2702 J.KINNEY      2702 J.KINNEY      2769 P.HARBURY     2822 B.GILBERT     2822 B.GILBERT     2822 B.GILBERT     MA                
2702 J.KINNEY      CHANGE/2769 P.HARB 2769 P.HARBURY     2822 B.GILBERT     2822 B.GILBERT     2822 B.GILBERT     MA                
2702 J.KINNEY      2769 P.HARBURY     CHANGE/2822 B.GILB 2822 B.GILBERT     2822 B.GILBERT     2822 B.GILBERT/MA  MA                
BEAM   LINE 1-5  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       MA                
8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       MA                
8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS       8824 P.ELLIS/MA    MA                
BEAM   LINE 2-1  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
2732 S.FENDORF     90S4 L.FUENTES-COB 90S4 L.FUENTES-COB 90S4 L.FUENTES-COB 90S4 L.FUENTES-COB 90S4 L.FUENTES-COB MA                
S1>S2/90S4         90S4 L.FUENTES-COB 90S4 L.FUENTES-COB 90S4 L.FUENTES-COB 90S4 L.FUENTES-COB 90S4 L.FUENTES-COB MA                
90S4 L.FUENTES-COB 90S4 L.FUENTES-COB 90S4 L.FUENTES-COB 90S4 L.FUENTES-COB 90S4 L.FUENTES-COB 90S4 L.FUENTES-/MA MA                
BEAM   LINE 2-2  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               MA                
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               MA                
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN/MA            MA                
BEAM   LINE 2-3  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
90U1 G.HIRSCH      2851 B.BOSTICK     2851 B.BOSTICK     2851 B.BOSTICK     2851 B.BOSTICK     2851 B.BOSTICK     MA                
Xray CHECKOUT/2851 2851 B.BOSTICK     2851 B.BOSTICK     2851 B.BOSTICK     2851 B.BOSTICK     2851 B.BOSTICK     MA                
2851 B.BOSTICK     2851 B.BOSTICK     2851 B.BOSTICK     2851 B.BOSTICK     2851 B.BOSTICK     2851 B.BOSTICK/MA  MA                
BEAM   LINE 3-1  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               MA                
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               MA                
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN/MA            MA                
BEAM   LINE 3-3  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               MA                
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               MA                
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN/MA            MA                
BEAM   LINE 4-2  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
2770 E.KANTROWITZ  2770 E.KANTROWITZ  2863 J.JOHNSON     2863 J.JOHNSON     2863 J.JOHNSON     8804 H.TSURUTA     MA                
2770 E.KANTROWITZ  Multi>S1/2863      2863 J.JOHNSON     2863 J.JOHNSON     CHANGE/8804 H.TSUR 8804 H.TSURUTA     MA                
2770 E.KANTROWITZ  2863 J.JOHNSON     2863 J.JOHNSON     2863 J.JOHNSON     8804 H.TSURUTA     8804 H.TSURUTA/MA  MA                
BEAM   LINE 5-1  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
8812 M.ROWEN       8812 M.ROWEN       Unscheduled        Unscheduled        Unscheduled        Unscheduled        MA                
8812 M.ROWEN       Unscheduled        Unscheduled        Unscheduled        Unscheduled        Unscheduled        MA                
8812 M.ROWEN       Unscheduled        Unscheduled        Unscheduled        Unscheduled        MA                 MA                
BEAM   LINE 5-2  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               MA                
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN               MA                
DOWN               DOWN               DOWN               DOWN               DOWN               DOWN/MA            MA                
BEAM   LINE 5-4  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
Unscheduled        CHANGE/9702 Z.SHEN 9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        MA                
Unscheduled        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        MA                
Unscheduled        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        9702 Z.SHEN        MA                 MA                
BEAM   LINE 6-2  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      MA                
8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      MA                
8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      8841 K.LUNING      8841 K.LUNING/MA   MA                
BEAM   LINE 7-2  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
2592 J.BILELLO     8051 M.TONEY       8051 M.TONEY       2768 M.NAVACERRADA 2768 M.NAVACERRADA 2768 M.NAVACERRADA MA                
CHANGE/8051 M.TONE 8051 M.TONEY       Xray CHECKOUT/2768 2768 M.NAVACERRADA 2768 M.NAVACERRADA 2768 M.NAVACERRADA MA                
8051 M.TONEY       8051 M.TONEY       2768 M.NAVACERRADA 2768 M.NAVACERRADA 2768 M.NAVACERRADA 2768 M.NAVACERR/MA MA                
BEAM   LINE 8-1  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     MA                
2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     MA                
2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON     2753 E.SOLOMON/MA  MA                
BEAM   LINE 8-2  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  MA                
2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  MA                
2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUREN  2835 A.VAN BUUR/MA MA                
BEAM   LINE 9-1  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
7A93 B.MOOERS      9A65 K.ZHANG       9A85 D.BUSSIERE    1B08 N.HORTON      7A77 G.FEHER       8044 I.MATHEWS     MA                
MC CHECKOUT/9A65   MC CHECKOUT/9A85   MC CHECKOUT/1B08   MC CHECKOUT/7A77   CHANGE/8044 I.MATH 8044 I.MATHEWS     MA                
9A65 K.ZHANG       9A85 D.BUSSIERE    1B08 N.HORTON      7A77 G.FEHER       8044 I.MATHEWS     8044 I.MATHEWS/MA  MA                
BEAM   LINE 9-2  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
9B01 A.DEACON      7A08 G.SNELL       8054 M.SOLTIS      8054 M.SOLTIS      1B08 N.HORTON      9B01 A.DEACON      MA                
MC CHECKOUT/7A08   CHANGE/8054 M.SOLT 8054 M.SOLTIS      CHANGE/9B01 A.DEAC CHANGE/9B01 A.DEAC 9B01 A.DEACON      MA                
7A08 G.SNELL       8054 M.SOLTIS      8054 M.SOLTIS      CHANGE/1B08 N.HORT 9B01 A.DEACON      9B01 A.DEACON/MA   MA                
BEAM   LINE 9-3  
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
2713 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2878 V.YACHANDRA   2878 V.YACHANDRA   MA                
CHANGE/2825 V.YACH 2825 V.YACHANDRA   2825 V.YACHANDRA   CHANGE/2878 V.YACH 2878 V.YACHANDRA   2878 V.YACHANDRA   MA                
2825 V.YACHANDRA   2825 V.YACHANDRA   2825 V.YACHANDRA   2878 V.YACHANDRA   2878 V.YACHANDRA   2878 V.YACHANDR/MA MA                
BEAM   LINE 10-1 
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         MA                
2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         MA                
2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE         2865 D.LEE/MA      MA                
BEAM   LINE 10-2 
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
8015 A.MEHTA       8015 A.MEHTA       2872 M.GREEN       2872 M.GREEN       2872 M.GREEN       2872 M.GREEN       MA                
8015 A.MEHTA       Xray CHECKOUT/2872 2872 M.GREEN       2872 M.GREEN       2872 M.GREEN       2872 M.GREEN       MA                
8015 A.MEHTA       2872 M.GREEN       2872 M.GREEN       2872 M.GREEN       2872 M.GREEN       2872 M.GREEN/MA    MA                
BEAM   LINE 11-1 
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
9A52 A.BRUNGER     6A03 R.LIDDINGTON  7A28 R.STENKAMP    7A28 R.STENKAMP    9A40 A.VILLASENOR  9A03 R.STEVENS     MA                
MC CHECKOUT/6A03   MC CHECKOUT/7A28   7A28 R.STENKAMP    MC CHECKOUT/9A40   MC CHECKOUT/9A03   9A03 R.STEVENS     MA                
6A03 R.LIDDINGTON  7A28 R.STENKAMP    7A28 R.STENKAMP    9A40 A.VILLASENOR  9A03 R.STEVENS     9A03 R.STEVENS/MA  MA                
BEAM   LINE 11-2 
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
2757 N.HESS        2757 N.HESS        2745 T.GUO         2821 J.DAVIS       2821 J.DAVIS       8817 T.RABEDEAU    MA                
2757 N.HESS        CHANGE/8833 J.ROGE CHANGE/8833 J.ROGE CHANGE/8833 J.ROGE CHANGE/8833 J.ROGE 8817 T.RABEDEAU    MA                
2757 N.HESS        GIXAS/2745         GIXAS/2821         CHANGE/2821 J.DAVI CHANGE/8817 T.RABE 8817 T.RABEDEAU/MA MA                
BEAM   LINE 11-3 
Jul. 26, 2004      Jul. 27, 2004      Jul. 28, 2004      Jul. 29, 2004      Jul. 30, 2004      Jul. 31, 2004      Aug. 01, 2004     
2879 A.VAILIONIS   Xray CHECKOUT/8015 8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       MA                
2879 A.VAILIONIS   8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       MA                
2879 A.VAILIONIS   8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA       8015 A.MEHTA/MA    MA