LCLS

LCLS Undulator Meeting

Argonne National Laboratory
Advanced Photon Source (APS) Facility
Building 401, Conference Room B4100

Friday, July 23, 2004

A one-day meeting to review the first revision of PRD 1.4-001, ICDs, X-Ray Diagnostics Funding, FY05 Long-Lead Procurement and prepare for he upcoming Lehman review will be held at the Argonne National Laboratory.

Contacts:

Workshop Organizer: Mark Reichenadter, SLAC +1-650-926-8583
Administration: Frances Coose, ANL +1-630-252-4955

Items to be brought to the meeting:

Undulator System Layout   Dean Walters, ANL
Requirements Document Revision: PRD 1.4-001   Heinz-Dieter Nuhn, SLAC

Agenda:

Friday, June 23, 2004  
09:00 - 10:30 Undulator System PRD 1.4-001 Session 1 H.-D. Nuhn
10:30 - 10:45 Break  
10:45 - 12:00 Undulator System PRD 1.4-001 Session 2 H.-D. Nuhn
12:00 - 13:00 Lunch  
13:00 - 13:45 Any Outstanding Issues or Action Items for the PRD? H.-D. Nuhn
13:45 - 14:15 ICDs
(Mechanical and Conventional Facilities)
J. Welch
14:15 - 14:30 Break  
14:30 - 15:00 Streak Camera, Wire Scanners, Flags/Diagnostics
(Should be zero Streak Camera, Wire Scanners and Flags)
H.-D. Nuhn
15:00 - 15:15 X-Ray Diagnostics R&D
(Is the estimate correct?)
T. Mast
15:15 - 16:15 FY05 Long-Lead Procurement at ANL S.V. Milton
16:15 - 17:00 Prep for Lehman Review S.V. Milton

Presentation Equipment:

Provisions for presenting talks from a CD or a PC laptop are available as wells as using the old overhead projector.

Documents:

Icon  Name                      Last modified      Size  Description
[DIR] Parent Directory -
Last Updated: 20 Jul 2004
Content Owner: Mark Reichanadter, SLAC
Heinz-Dieter Nuhn, SLAC
Page Editor: Heinz-Dieter Nuhn, SLAC

Disclaimer