
| A one-day meeting to review the first revision of PRD 1.4-001, ICDs, X-Ray Diagnostics Funding, FY05 Long-Lead Procurement and prepare for he upcoming Lehman review will be held at the Argonne National Laboratory. |
| Workshop Organizer: | Mark Reichenadter, SLAC | +1-650-926-8583 |
| Administration: | Frances Coose, ANL | +1-630-252-4955 |
| Undulator System Layout | Dean Walters, ANL | |
| Requirements Document Revision: PRD 1.4-001 | Heinz-Dieter Nuhn, SLAC |
| Friday, June 23, 2004 | ||
| 09:00 - 10:30 | Undulator System PRD 1.4-001 Session 1 | H.-D. Nuhn |
| 10:30 - 10:45 | Break | |
| 10:45 - 12:00 | Undulator System PRD 1.4-001 Session 2 | H.-D. Nuhn |
| 12:00 - 13:00 | Lunch | |
| 13:00 - 13:45 | Any Outstanding Issues or Action Items for the PRD? | H.-D. Nuhn |
| 13:45 - 14:15 |
ICDs (Mechanical and Conventional Facilities) |
J. Welch |
| 14:15 - 14:30 | Break | |
| 14:30 - 15:00 |
Streak Camera, Wire Scanners, Flags/Diagnostics (Should be zero Streak Camera, Wire Scanners and Flags) |
H.-D. Nuhn |
| 15:00 - 15:15 |
X-Ray Diagnostics R&D (Is the estimate correct?) |
T. Mast |
| 15:15 - 16:15 | FY05 Long-Lead Procurement at ANL | S.V. Milton |
| 16:15 - 17:00 | Prep for Lehman Review | S.V. Milton |
| Provisions for presenting talks from a CD or a PC laptop are available as wells as using the old overhead projector. |
Name Last modified Size Description
Parent Directory -
| Last Updated: | 20 Jul 2004 |
| Content Owner: |
Mark Reichanadter,
SLAC Heinz-Dieter Nuhn, SLAC |
| Page Editor: | Heinz-Dieter Nuhn, SLAC |