LCLS

LCLS Undulator Physics and Engineering Meeting

Argonne National Laboratory
Advanced Photon Source (APS) Facility
Building 401, Conference Room B2100

Monday, June 28 - Tuesday, June 29, 2004

A two-day meeting about physcis and engineering issues of the LCLS Undulator System will be held at the Argonne National Laboratory.

Contacts:

Workshop Organizer: Stephen V. Milton, ANL +1-630-252-9101
Administration: Frances Coose, ANL +1-630-252-4955

Items to be brough to the meeting:

Tunnel Layout etc.   Jim Welch, SLAC
Undulator System Layout   Dean Walters, ANL
6.9 mm Gap Input   Heinz-Dieter Nuhn, SLAC
Installation Plan   Robert Ruland, SLAC
Gap Requirement for Remote Motion   Emil Trakhtenberg, ANL
Tolerances and Ranges (BBA)   Heinz-Dieter Nuhn, SLAC
MMF Phasing Control to Chosen Length   Isaac Vasserman, ANL
Interface Control Document   Jim Welch, SLAC
Requirements Document   Heinz-Dieter Nuhn, SLAC

Agenda:

Monday, June 28, 2004 Physics Requirements  
09:00 - 09:30 Welcome and Strategy for Resolving Issues Stephen V. Milton, ANL
09:30 - 09:50 Undulator Production Schedule Marion M. White, ANL
09:50 - 10:10 PRDs, ESDs and ICDs Heinz-Dieter Nuhn, SLAC
10:10 - 10:50 BBA Related Issues (Cradle, Movers, etc.) Heinz-Dieter Nuhn, SLAC
James Welch, SLAC
Steve Milton, ANL
10:50 - 11:10 Break  
11:10 - 12:00 Gap Orientation (Servicability, Tunnel Layout) Emil Trakhtenberg, ANL
Robert Ruland, SLAC
12:10 - 13:10 Lunch  
13:10 - 13:35 Phase Adjustments (Ends vs K) Heinz-Dieter Nuhn, ANL
13:35 - 14:00 Phase Adjustments (Ends vs K) Isaac Vasserman, ANL
14:00 - 14:30 Break  
14:30 - 15:10 Rollaway Prototype Description Emil Trakhtenberg, ANL
15:10 - 16:40 6.9 mm Gap Input Heinz-Dieter Nuhn, SLAC
16:40 - 17:30 Summary Discussion Steve Milton, ANL
     
Tuesday, June 29, 2004 Mechanical/Design  
09:00 - 10:30 Gap Decision Steve Milton, ANL
10:30 - 10:50 Break  
10:50 - 11:30 Alignment System (HLS, WPM, Integration) Robert Ruland, SLAC
James Welch, SLAC
11:30 - 12:10 Interfaces and Tunnel Layout (Fixed Support, etc.) James Welch, SLAC
12:10 - 13:00 Lunch  
13:00 - 15:05 EM vs. PM Quads (incl. Space Constraints) Heinz-Dieter Nuhn, SLAC
Dean Walters, ANL
15:05 - 15:20 Break  
15:20 - 16:00 Titanium Long Lead Procurement Wrap-Up Steve Milton, SLAC
16:00 - 16:10 CF Requirements (Quads, Water, Power etc.) James Welch, SLAC
16:10 - 16:25 Installation Plan Robert Ruland, SLAC
16:25 - 17:10 Summary Discussion
  What was covered?
  What was decided?
  Action items and schedule for implementing them.
 
Steve Milton, ANL

Presentation Equipment:

Provisions for presenting talks from a CD or a PC laptop are available as wells as using the old overhead projector.

Documents:

Icon  Name                                               Last modified      Size  Description
[DIR] Parent Directory - [   ] I_vassermanJune29.ppt 29-Jun-2004 07:13 557K [   ] Install-Align_6-28-04.MPP 29-Jun-2004 07:13 754K [   ] LCLSProdUndSchedule_28June2004.ppt 29-Jun-2004 07:13 194K [   ] MM_and_Alignment_6-28-04.PPT 29-Jun-2004 08:59 5.6M [   ] Nuhn_BBA_Related_Issues_28_Jun_2004r4.ppt 29-Jun-2004 07:13 803K [   ] Nuhn_EM_vs_PM_Quads_28_Jun_2004r2.ppt 29-Jun-2004 07:13 7.2M [   ] Nuhn_Gap_Increase_28_Jun_2004r3.ppt 29-Jun-2004 07:13 242K [   ] Nuhn_PRDs_28_Jun_2004r2.ppt 29-Jun-2004 07:13 514K [   ] Nuhn_Phase_Adjustments_Ends_vs_K_28_Jun_2004r2.ppt 29-Jun-2004 07:13 219K [   ] UndulatorFinalChance4Input.ppt 29-Jun-2004 07:13 77K
Last Updated: 28 Jun 2004
Content Owner: Heinz-Dieter Nuhn, SLAC
Marion M. White, ANL
Page Editor: Heinz-Dieter Nuhn, SLAC

Disclaimer