| A two-day meeting about physcis and engineering issues of the LCLS Undulator System will be held at the Argonne National Laboratory. |
| Workshop Organizer: | Stephen V. Milton, ANL | +1-630-252-9101 |
| Administration: | Frances Coose, ANL | +1-630-252-4955 |
| Tunnel Layout etc. | Jim Welch, SLAC | |
| Undulator System Layout | Dean Walters, ANL | |
| 6.9 mm Gap Input | Heinz-Dieter Nuhn, SLAC | |
| Installation Plan | Robert Ruland, SLAC | |
| Gap Requirement for Remote Motion | Emil Trakhtenberg, ANL | |
| Tolerances and Ranges (BBA) | Heinz-Dieter Nuhn, SLAC | |
| MMF Phasing Control to Chosen Length | Isaac Vasserman, ANL | |
| Interface Control Document | Jim Welch, SLAC | |
| Requirements Document | Heinz-Dieter Nuhn, SLAC |
| Monday, June 28, 2004 | Physics Requirements | |
| 09:00 - 09:30 | Welcome and Strategy for Resolving Issues | Stephen V. Milton, ANL |
| 09:30 - 09:50 | Undulator Production Schedule | Marion M. White, ANL |
| 09:50 - 10:10 | PRDs, ESDs and ICDs | Heinz-Dieter Nuhn, SLAC |
| 10:10 - 10:50 | BBA Related Issues (Cradle, Movers, etc.) |
Heinz-Dieter Nuhn, SLAC James Welch, SLAC Steve Milton, ANL |
| 10:50 - 11:10 | Break | |
| 11:10 - 12:00 | Gap Orientation (Servicability, Tunnel Layout) |
Emil Trakhtenberg, ANL Robert Ruland, SLAC |
| 12:10 - 13:10 | Lunch | |
| 13:10 - 13:35 | Phase Adjustments (Ends vs K) | Heinz-Dieter Nuhn, ANL |
| 13:35 - 14:00 | Phase Adjustments (Ends vs K) | Isaac Vasserman, ANL |
| 14:00 - 14:30 | Break | |
| 14:30 - 15:10 | Rollaway Prototype Description | Emil Trakhtenberg, ANL |
| 15:10 - 16:40 | 6.9 mm Gap Input | Heinz-Dieter Nuhn, SLAC |
| 16:40 - 17:30 | Summary Discussion | Steve Milton, ANL |
| Tuesday, June 29, 2004 | Mechanical/Design | |
| 09:00 - 10:30 | Gap Decision | Steve Milton, ANL |
| 10:30 - 10:50 | Break | |
| 10:50 - 11:30 | Alignment System (HLS, WPM, Integration) |
Robert Ruland, SLAC James Welch, SLAC |
| 11:30 - 12:10 | Interfaces and Tunnel Layout (Fixed Support, etc.) | James Welch, SLAC |
| 12:10 - 13:00 | Lunch | |
| 13:00 - 15:05 | EM vs. PM Quads (incl. Space Constraints) |
Heinz-Dieter Nuhn, SLAC Dean Walters, ANL |
| 15:05 - 15:20 | Break | |
| 15:20 - 16:00 | Titanium Long Lead Procurement Wrap-Up | Steve Milton, SLAC |
| 16:00 - 16:10 | CF Requirements (Quads, Water, Power etc.) | James Welch, SLAC |
| 16:10 - 16:25 | Installation Plan | Robert Ruland, SLAC |
| 16:25 - 17:10 |
Summary Discussion What was covered? What was decided? Action items and schedule for implementing them. |
Steve Milton, ANL |
| Provisions for presenting talks from a CD or a PC laptop are available as wells as using the old overhead projector. |
Name Last modified Size Description
Parent Directory -
I_vassermanJune29.ppt 29-Jun-2004 07:13 557K
Install-Align_6-28-04.MPP 29-Jun-2004 07:13 754K
LCLSProdUndSchedule_28June2004.ppt 29-Jun-2004 07:13 194K
MM_and_Alignment_6-28-04.PPT 29-Jun-2004 08:59 5.6M
Nuhn_BBA_Related_Issues_28_Jun_2004r4.ppt 29-Jun-2004 07:13 803K
Nuhn_EM_vs_PM_Quads_28_Jun_2004r2.ppt 29-Jun-2004 07:13 7.2M
Nuhn_Gap_Increase_28_Jun_2004r3.ppt 29-Jun-2004 07:13 242K
Nuhn_PRDs_28_Jun_2004r2.ppt 29-Jun-2004 07:13 514K
Nuhn_Phase_Adjustments_Ends_vs_K_28_Jun_2004r2.ppt 29-Jun-2004 07:13 219K
UndulatorFinalChance4Input.ppt 29-Jun-2004 07:13 77K
| Last Updated: | 28 Jun 2004 |
| Content Owner: |
Heinz-Dieter Nuhn,
SLAC Marion M. White, ANL |
| Page Editor: | Heinz-Dieter Nuhn, SLAC |