LUSI MIE
Supporting Documentation
June 3, 2009
| Procurement Docs | ||
| Bid Evaluation Guide for the Procurement of the CXI 1 micron KB System | Sebastien Boutet | |
| CXI 1 micron K-B Mirror System Proposal Evaluation Procedure | Paul Montanez | |
| Radiation Physics | ||
| Comparison of FLUKA and STAC8 for shielding calculations of the hard X-ray line of the LCLS | J. Vollaire,A. Prinz | |
| Shielding Requirements for the LCLS hard X-ray beam pipe | J. Vollaire,J. Liu,Alyssa Prinz | |
| Shielding Recommendations for the walls of the FEH Hutches | J. Vollaire,Alyssa Prinz | |
| Statement of Work | ||
| SOW for the CXI 1 micron KB system, Mirror Coating | Sebastien Boutet | |
| SOW for the CXI 1 micron KB System, Mirror Substrates | Sebastien Boutet | |
| SOW for the CXI 1 micron KB System, Mechanical System | Sebastien Boutet | |
| SOW for the CXI 1 micron KB System, Mirror Metrology | Sebastien Boutet | |
| SOW for the CXI 0.1 micron KB System, Mirror Coating | Sebastien Boutet | |
| SOW for the CXI 0.1 micron KB System, Mirror Substrates | Sebastien Boutet | |
| SOW for the CXI 0.1 micron KB System, Mechanical System | Sebastien Boutet | |
| SOW for the CXI 0.1 micron KB System, Mirror Metrology | Sebastien Boutet | |
| SOW for the Design of the CXI Detector Stage | Sebastien Boutet | |
| Startup Plan | ||
| CXI Instrument Start-up Plan | Sebastien Boutet | |