LCLS

LCLS Injector RF Systems Review

Stanford Linear Accelerator Center
Orange Room (Building 40, Conference Room)

Wednesday, November 3, 2004

 

Contacts:

Workshop Organizer: Cecile Limborg,  SLAC +1-650-926-8685
Administration: Helen O'Donnell, SLAC +1-650-926-3368

Review Committee:

Juwen Wang, Chair, Stanford Linear Accelerator Center

Valery Dolgashev, Stanford Linear Accelerator Center
Jake Haimson, Haimson Research Corp.

Roger Miller, Stanford Linear Accelerator Center

Chris Pearson, Stanford Linear Accelerator Center

Sami Tantawi, Stanford Linear Accelerator Center

Arnold Vlieks, Stanford Linear Accelerator Center

Agenda: (click for printable version)

Welcome & Overview  
 8:00 - 8:15 Coffee  
 8:15 - 8:30 Introduction, Charge to the Committee D. Dowell
 8:30 - 9:00 Committee Session - Closed  
   
 Part 1 - L01  
 9:00  Beam Dynamics Justification of S-Band Structure Coupler Design C. Limborg
 9:20 LCLS Injector S-Band Structure Coupler Design Z. Li
 9:50 RF & Mechanical Tolerance Requirements J. Schmerge
10:05 Design, Manufacturing and Testing R. F. Boyce
11:00 Break  
     
Part 2 - Gun RF Design & Thermal Issues  
11:15 Beam Dynamics Justification of RF Gun Modifications C. Limborg
11:30 Thermal Issues in the RF Gun J. Schmerge
12:00 RF Gun Design & Pulsed Heating Issues L. Xiao
12:30 Lunch  
   
Part 3 - Mode 0 in Gun  
1:30 Mode 0 in the GTF Gun, Pulse Shaping for the LCLS Gun J. Schmerge
2:10 Beam Dynamics in the Presence of Mode 0 C. Limborg
2:35 Revised RF Gun Geometry, Pulse Shaping Discussion Z. Li
3:05 break  
     
Part 4 - Manufacturing & Testing  
3:30 Manufacturing Plans, Schedule D. Dowell
4:00 Committee Discussion - Closed Session
5:30 Closeout - Plenary
   

Presentation Equipment:

Provisions for presenting talks from a CD or a PC laptop are available as wells as using the old overhead projector.

Documents:

Icon  Name                                                      Last modified      Size  Description
[DIR] Parent Directory - [   ] Agenda.pdf 01-Nov-2004 13:57 62K [   ] Boyce_L0-1design_and_fab6.ppt 01-Nov-2004 17:12 2.9M [   ] Cecile_L01_GR01.ppt 02-Nov-2004 17:02 511K [   ] Cecile_gun.ppt 03-Nov-2004 07:27 362K [   ] Cecile_mode0.ppt 03-Nov-2004 07:27 295K [   ] Charge.doc 29-Oct-2004 16:09 166K [   ] Dowell_RFreviewGunFabrication3.ppt 01-Nov-2004 17:12 466K [   ] Dowell_RFreviewIntroduction.ppt 01-Nov-2004 13:57 2.7M [   ] Xiao_rf-review-Nov3.ppt 01-Nov-2004 17:11 3.6M [   ] Zenghai_lcls-injector-sband-coupler-review-11-03-2004.pdf 02-Nov-2004 17:02 549K [   ] schmerge_0_mode.ppt 02-Nov-2004 17:02 550K [   ] schmerge_L0-1_tolerance.ppt 02-Nov-2004 17:02 216K [   ] schmerge_thermal.ppt 02-Nov-2004 17:02 1.2M [   ] zenghai_lcls-gun-review-nov-03-2004.pdf 03-Nov-2004 07:27 186K
Last Updated: 05 Nov 2004
Content Owner: LCLS Project Office
Page Editor: LCLS Web Master

Disclaimer