Project Office Breakout: Preparation for DOE Lehman Review
(Redwood A) |
Reichanadter |
|
Project Office (PO): Galayda,
Reichanadter, Sisson, RM Boyce, Scharfenstein, Mast, McGiven, QA
Mgr, ODonnell |
|
|
|
|
Time |
Topic |
Presenters |
9:00 |
LCLS Project Overview Galayda (Dry-run
DOE Presentation) |
PO, System Mgrs |
9:30 |
LCLS ISMS - Scharfenstein
(Dry-run DOE Presentation) |
PO, System Mgrs |
10:00 |
LCLS Project Management Reichanadter
(Dry-run DOE Presentation) |
PO, System Mgrs |
10:30 |
Break |
|
10:45 |
Injector / Linac Overview - Bong (Dry-run
DOE Presentation) |
Bong, CAMs, PO |
11:15 |
Undulator Overview Milton (Dry-Run DOE
Presentation) |
Milton, CAMs, PO |
11:45 |
XTOD Overview (Dry-run DOE Presentation) |
Bionta, CAMs, PO |
12:15 |
Lunch |
|
1:30 |
XES Overview Moeller (Dry-run DOE
Presentation) |
Moeller, CAMs, PO |
2:00 |
Conventional Facilities Overview Saenz
(Dry-run Presentation) |
Saenz, CAMs, PO |
2:30 |
Global Controls Overview Dalesio (Dry-run
Presentation) |
Dalesio, CAMs, PO |
3:00 |
PIXEL Status and Overview Arthur (Dry-run
Presentation) |
Arthur, Hastings, PO |
3:30 |
Wrap-Up Comments Galayda |
PO, System Managers |
|
Conventional
Facilities Breakout (Redwood B) |
Saenz |
Time |
Topic |
Presenters |
9:00 |
CF Overview (Dry-run DOE Presentation) |
Saenz |
9:30 |
Title II Status / Building Program Requirements |
Saenz |
10:30 |
Break |
|
10:45 |
CM/GC Overview |
Saenz |
11:15 |
MMF Status |
Sevilla |
12:00 |
Lunch |
|
1:00 |
Construction Safety |
Hislop |
2:00 |
Project Office Breakout Session (Redwood A) |
|
2:45 |
Sector 20 Status |
Folger |
3:15 |
Linac Status (3:15 to 3:45) |
Sevilla |
3:30 |
PO Breakout Session: Wrap-up Comments (System Mgrs only) |
|
3:45 |
MCC Status |
Folger |
|
Accelerator
Systems Breakout: Injector/Linac (Redwood C) |
Bong |
Time |
Topic |
Presenters |
9:00 |
Update on 3D Ellipsoidal
Distribution |
Limborg |
9:20 |
Impact of RF Modifications on Beam Dynamics |
Limborg |
9:30 |
RF Modifications for Linac Structures |
Li |
9:45 |
Design of the Modifications to the Linac Structures |
Chan |
10:00 |
Break |
|
10:15 |
Drive Laser R&D |
Loos |
10:30 |
Drive Laser Update |
Gilevich |
10:40 |
Project Office Breakout Session (Redwood A) |
|
11:30 |
Lunch |
|
1:30 |
LCLS Beam Tuning Simulations |
Emma |
2:00 |
Beam Collimation and Dark Current Simulations |
Wu |
2:30 |
RF Gun Design Status / Plan |
Schultz |
3:00 |
Break |
|
3:15 |
Future Guns (3:15 to 3:45) |
Dowell |
3:30 |
PO Breakout Session: Wrap-up Comments (System Mgrs only) |
|
3:45 |
BNL Bunch Length Measurement and FieldEyE/Trafic4 Simulations
Results |
Rosenzweig |
4:00 |
Beam Energy Spread and Longitudinal Emittance for RF Guns |
Huang |
|
Undulator
Breakout (Madrone, Room 224B) |
Milton |
Time |
Topic |
Presenters |
9:00 |
AC Conductivity Wrap-Up: Wakefield Summary |
Bane |
9:20 |
AC Conductivity Wrap-Up: Sample Preparation Summary |
Milton/Walters |
9:30 |
Chamber Dimensions: General Discussion |
Nuhn |
9:50 |
Chamber Transitions: Transition Wakefields at Short Bunches |
Bane |
10:00 |
Earth's Field Correction (Delta): Earth Field Correction
Plans |
Wolf |
10:10 |
Earth's Field Correction (Delta): Error Mitigation by
Variable Shimming |
Milton/Emma |
10:20 |
BPM Locations: Cradle Alignment Issues |
Nuhn |
10:30 |
BPM Locations: Undulator End Alignment with Wires |
Milton |
10:40 |
BPM Locations: Discussion |
|
11:00 |
Break/Lunch |
|
11:15 |
Project Management Breakout Session |
|
12:30 |
Wire Scanner Use (Type): Wire Scanner Use as Presently
Envisioned |
Milton |
12:40 |
Wire Scanner Use (Type): Discussion: Alignment Wires & Need
for Wire Scanners |
|
1:00 |
Commissioning: Draft Commissioning Plan |
Nuhn |
1:10 |
Commissioning: Discussion of Plan |
|
1:30 |
BPM (System Integration /Planning): Discussion |
Krejcik/Milton |
2:30 |
Alignment/Assembly (Process/Requirements): Alignment/Assembly
Issues |
Ruland |
2:45 |
Alignment/Assembly (Process/Requirements): Discussion |
|
3:30 |
PO Breakout Session: Wrap-up Comments (System Mgrs only) |
|
|
Photon Systems Breakout: XTOD/X-Ray
End Stations (Cedar, Room 101) |
Arthur |
Time |
Topic |
Presenters |
9:00 |
X-Ray Low-Pass Mirror System |
Arthur |
9:30 |
Revised XES Scope |
Moeller |
10:00 |
XTOD Layout and Diagnostics |
Bionta |
11:45 |
XTOD Project Office Breakout Session (Redwood A) |
|
1:30 |
XES: Project Office Breakout Session (Redwood A) |
|
3:00 |
PIXEL Project Office Breakout (Redwood A) |
|
3:30 |
PO Breakout Session: Wrap-up Comments (System Mgrs only) |
|
|
Controls Breakout (Redwood
D) |
Dalesio |
Time |
Topic |
Presenters |
9:00 |
Motion Control |
Stein |
10:00 |
Vacuum |
Lewis |
11:00 |
Image Control |
Krejcik |
11:45 |
Lunch |
|
1:30 |
PPS |
P. Bong |
2:30 |
Project Office Breakout Session |
|
3:15 |
SLC-aware IOC (3:15 to 3:45) |
Allison |
3:30 |
PO Breakout Session: Wrap-up Comments (System Mgrs only) |
|
3:45 |
Power Supplies |
Luchini |
4:00 |
BPMs |
Straumann |
4:15 |
CF Wiring, Racks, Power Status |
Ortega |
4:30 |
Naming |
Allison |
4:45 |
Group Discussion: Hardware Choices |
|
|
Wednesday, April 6th
Breakouts / Plenary
Location:
Redwood Rooms, Cedar, Madrone
|
|
|
Controls Breakout,
continued (Redwood D) |
Dalesio |
Time |
Sessions |
|
9:00 |
Group Discussion: Cavity BPMs |
|
10:30 |
Group Discussion: Bunch Length Monitors |
|
11:30 |
PLC Standardization: Hardware and Software |
|
12:30 |
Drive Laser Controls |
|
|
Undulator Breakout,
continued
(Redwood C) |
|
Time |
Sessions |
Presenters |
9:00 |
Attend Controls Group Discussion: Cavity BPMs (Redwood D) |
|
10:30 |
Break |
|
10:45 |
System Integration Test Plan (The Mockup): Plans |
White |
11:00 |
System Integration Test Plan (The Mockup): Discussion |
|
11:30 |
FY05 Planning |
Milton |
|
Plenary |
LCLS Week Closeout
(Redwood Rooms) |
Galayda |
Time |
Topic |
Presenters |
1:30 |
Status / Progress / Issues |
Galayda |
3:00 |
Break |
|
3:15 |
Management / Cost / Schedule /
Resources |
Reichanadter |
|
AOB |
Others |