LCLS

LCLS Week - Spring 2005

April 4-6, 2005

AGENDA

                                                                                       Printable Version: Full Agenda v Breakout Block Agenda                                                                        

Monday, April 4th – Plenary Session

Location: Redwood Rooms

Time

Topic

Presenters

  9:00 

Welcome

Dorfan

  9:15 

DOE Overview

Lee

  9:45

LCLS Project Overview/ Status / Budgets

Galayda

10:30

Break

 

10:45

LCLS Project Management     

Reichanadter

11:30

LCLS ES&H

Scharfenstein

12:00

Lunch

 

  1:30

Injector/Linac Systems Overview/Status

Bong

  2:00

Undulator System Overview/Status from ANL

Milton

  2:30

XTOD System Overview/Status from LLNL

Bionta

  3:00

X-Ray End Station Overview/Status              

Moeller

  3:30

Break

 

  4:00

Conventional Facilities Overview/Status

Saenz

  4:30

Controls Overview/Status

Dalesio

  7:00

Dinner (Buca di Beppo, 643 Emerson Street, Palo Alto)

 


 

Tuesday, April 5th – Breakout Sessions

Location: Redwood Rooms, Cedar, Madrone

 
   

Project Office Breakout: Preparation for DOE “Lehman” Review (Redwood A)

Reichanadter

 

Project Office (PO): Galayda, Reichanadter, Sisson, RM Boyce, Scharfenstein, Mast, McGiven, QA Mgr, O’Donnell

 

     

Time

Topic

Presenters

  9:00

LCLS Project Overview – Galayda (Dry-run DOE Presentation)

PO, System Mgrs

  9:30

LCLS ISMS  - Scharfenstein (Dry-run DOE Presentation)

PO, System Mgrs

10:00

LCLS Project Management – Reichanadter (Dry-run DOE Presentation)

PO, System Mgrs

10:30

Break

 

10:45

Injector / Linac Overview  - Bong (Dry-run DOE Presentation)

Bong, CAMs, PO

11:15

Undulator Overview – Milton (Dry-Run DOE Presentation)

Milton, CAMs, PO

11:45

XTOD Overview (Dry-run DOE Presentation)

Bionta, CAMs, PO

12:15

Lunch

 

  1:30

XES Overview – Moeller (Dry-run DOE Presentation)

Moeller, CAMs, PO

  2:00

Conventional Facilities Overview – Saenz (Dry-run Presentation)

Saenz, CAMs, PO

  2:30

Global Controls Overview – Dalesio (Dry-run Presentation)

Dalesio, CAMs, PO

  3:00

PIXEL Status and Overview – Arthur (Dry-run Presentation)

Arthur, Hastings, PO

  3:30

Wrap-Up Comments – Galayda

PO, System Managers


Conventional Facilities Breakout (Redwood B)

Saenz

Time

Topic

Presenters

  9:00 CF Overview (Dry-run DOE Presentation) Saenz
  9:30 Title II Status / Building Program Requirements Saenz
10:30 Break  

10:45

CM/GC Overview

Saenz

11:15

MMF Status

Sevilla

12:00

Lunch

 

  1:00 Construction Safety Hislop
  2:00 Project Office Breakout Session (Redwood A)  
  2:45 Sector 20 Status Folger
  3:15 Linac Status (3:15 to 3:45) Sevilla
  3:30 PO Breakout Session: Wrap-up Comments (System Mgrs only)  
  3:45 MCC Status Folger

Accelerator Systems Breakout: Injector/Linac  (Redwood C)

Bong

Time

Topic

Presenters

  9:00

Update on 3D Ellipsoidal Distribution

Limborg

  9:20

Impact of RF Modifications on Beam Dynamics

Limborg

  9:30

RF Modifications for Linac Structures

Li

  9:45 Design of the Modifications to the Linac Structures Chan
10:00 Break  
10:15 Drive Laser R&D Loos
10:30 Drive Laser Update Gilevich
10:40 Project Office Breakout Session (Redwood A)  
11:30 Lunch  
  1:30 LCLS Beam Tuning Simulations Emma
  2:00 Beam Collimation and Dark Current Simulations Wu
  2:30 RF Gun Design Status / Plan Schultz
  3:00 Break  
  3:15 Future Guns (3:15 to 3:45) Dowell
  3:30 PO Breakout Session: Wrap-up Comments (System Mgrs only)  
  3:45 BNL Bunch Length Measurement and FieldEyE/Trafic4 Simulations Results Rosenzweig
  4:00 Beam Energy Spread and Longitudinal Emittance for RF Guns Huang

Undulator Breakout (Madrone, Room 224B)

Milton

Time

Topic

Presenters

  9:00 AC Conductivity Wrap-Up: Wakefield Summary Bane
  9:20 AC Conductivity Wrap-Up: Sample Preparation Summary Milton/Walters
  9:30 Chamber Dimensions: General Discussion Nuhn
  9:50 Chamber Transitions: Transition Wakefields at Short Bunches Bane
10:00 Earth's Field Correction (Delta): Earth Field Correction Plans Wolf
10:10 Earth's Field Correction (Delta): Error Mitigation by Variable Shimming Milton/Emma
10:20 BPM Locations: Cradle Alignment Issues Nuhn
10:30 BPM Locations: Undulator End Alignment with Wires Milton
10:40 BPM Locations: Discussion  
11:00 Break/Lunch  
11:15 Project Management Breakout Session  
12:30 Wire Scanner Use (Type): Wire Scanner Use as Presently Envisioned Milton
12:40 Wire Scanner Use (Type): Discussion: Alignment Wires & Need for Wire Scanners  
  1:00 Commissioning: Draft Commissioning Plan Nuhn
  1:10 Commissioning: Discussion of Plan  
  1:30 BPM (System Integration /Planning): Discussion Krejcik/Milton
  2:30 Alignment/Assembly (Process/Requirements): Alignment/Assembly Issues Ruland
  2:45 Alignment/Assembly (Process/Requirements): Discussion  
  3:30 PO Breakout Session: Wrap-up Comments (System Mgrs only)  

Photon Systems Breakout:  XTOD/X-Ray End Stations (Cedar, Room 101)

Arthur

Time

Topic

Presenters

  9:00 X-Ray Low-Pass Mirror System Arthur
  9:30 Revised XES Scope Moeller
10:00 XTOD Layout and Diagnostics Bionta
11:45 XTOD Project Office Breakout Session (Redwood A)  
  1:30 XES: Project Office Breakout Session (Redwood A)  
  3:00 PIXEL Project Office Breakout (Redwood A)  
  3:30 PO Breakout Session: Wrap-up Comments (System Mgrs only)  

Controls Breakout (Redwood D)

Dalesio

Time

Topic

Presenters

  9:00

Motion Control

Stein

10:00 Vacuum Lewis
11:00 Image Control Krejcik
11:45 Lunch  
  1:30 PPS P. Bong
  2:30 Project Office Breakout Session  
  3:15 SLC-aware IOC (3:15 to 3:45) Allison
  3:30 PO Breakout Session: Wrap-up Comments (System Mgrs only)  
  3:45 Power Supplies Luchini
  4:00 BPMs Straumann
  4:15 CF – Wiring, Racks, Power Status Ortega
  4:30 Naming Allison
  4:45 Group Discussion: Hardware Choices  

Wednesday, April 6th – Breakouts / Plenary

Location: Redwood Rooms, Cedar, Madrone

   

Controls Breakout, continued (Redwood D)

Dalesio

Time Sessions  
  9:00 Group Discussion: Cavity BPMs  
10:30 Group Discussion: Bunch Length Monitors  
11:30 PLC Standardization: Hardware and Software  
12:30 Drive Laser Controls  

Undulator Breakout, continued (Redwood C)  
Time Sessions Presenters
  9:00 Attend Controls Group Discussion: Cavity BPMs (Redwood D)  
10:30 Break  
10:45 System Integration Test Plan (The Mockup): Plans White
11:00 System Integration Test Plan (The Mockup): Discussion  
11:30 FY05 Planning Milton

Plenary

LCLS Week Closeout (Redwood Rooms)

Galayda

Time

Topic

Presenters

  1:30

Status / Progress / Issues

Galayda

  3:00 Break  

  3:15

Management / Cost / Schedule / Resources

Reichanadter

 

AOB

Others